1 |
44269982 |
Const of Drainwith C.C Road From Lenga singh House to Gura singh House . |
172000 |
Const of Drainwith C.C Road From Lenga singh House to Gura singh House . 1 |
Completion of work |
-
latitude : 21.81810488,21.81811275
Longitude : 86.63807611,86.6380868
file name : Image_18072021100229810.png
|
2021-07-18 10:02:29.880259 |
2 |
44269982 |
Const of Drainwith C.C Road From Lenga singh House to Gura singh House . |
172000 |
Const of Drainwith C.C Road From Lenga singh House to Gura singh House . 1 |
Completion of work |
-
latitude : 21.81817066,21.81817383
Longitude : 86.63801509,86.638016
file name : Image_22072021111230339.png
|
2021-07-22 11:12:30.41469 |
3 |
44269982 |
Const of Drainwith C.C Road From Lenga singh House to Gura singh House . |
172000 |
Const of Drainwith C.C Road From Lenga singh House to Gura singh House . 1 |
Completion of work |
-
latitude : 21.81812372,21.81813064
Longitude : 86.63807869,86.63807829
file name : Image_11082021142145344.png
|
2021-08-11 14:21:45.432248 |
4 |
44269946 |
Completion of Barial Graund |
100000 |
Completion of Barial Graund 1 |
Completion of work |
-
latitude : 21.81907458,21.81907654
Longitude : 86.67983875,86.67982201
file name : Image_17062021154223031.png
|
2021-06-17 15:42:23.394171 |
5 |
44269946 |
Completion of Barial Graund |
100000 |
Completion of Barial Graund 1 |
Completion of work |
-
latitude : 21.84329778,21.84329778
Longitude : 86.70853056,86.70853056
file name : Image_13062021073059803.png
|
2021-06-13 07:30:59.89085 |
6 |
44269946 |
Completion of Barial Graund |
100000 |
Completion of Barial Graund 1 |
Completion of work |
-
latitude : 21.81901154,21.81898027
Longitude : 86.6798295,86.67981716
file name : Image_11062021114120454.png
|
2021-06-11 11:41:20.541272 |
7 |
47822409 |
Const of Toilet With Water Supply to Narankhunta Mission Shakti Building |
64488 |
Const of Toilet With Water Supply to Narankhunta Mission Shakti Building1 |
Completion of work |
-
latitude : 21.816117,21.81611715
Longitude : 86.68090458,86.68090463
file name : Image_22092021102510819.png
|
2021-09-22 10:25:10.896355 |
8 |
47822409 |
Const of Toilet With Water Supply to Narankhunta Mission Shakti Building |
64488 |
Const of Toilet With Water Supply to Narankhunta Mission Shakti Building1 |
Completion of work |
-
latitude : 21.81613044,21.81610021
Longitude : 86.68091899,86.68094426
file name : Image_22092021102516820.png
|
2021-09-22 10:25:16.921269 |
9 |
47822409 |
Const of Toilet With Water Supply to Narankhunta Mission Shakti Building |
64488 |
Const of Toilet With Water Supply to Narankhunta Mission Shakti Building1 |
Completion of work |
-
latitude : 21.81600825,21.81600816
Longitude : 86.68092308,86.680923
file name : Image_10122021110637287.png
|
2021-12-10 11:06:37.395666 |
10 |
47821964 |
Const of Toilet With Water Supply to Astajharan Mission Shakti Building at Banasahi. |
64487 |
Const of Toilet With Water Supply to Astajharan Mission Shakti Building at Banasahi.1 |
Completion of work |
-
latitude : 21.81364296,21.81367172
Longitude : 86.65208942,86.65209875
file name : Image_25092021105505571.png
|
2021-09-25 10:55:05.642432 |
11 |
47821964 |
Const of Toilet With Water Supply to Astajharan Mission Shakti Building at Banasahi. |
64487 |
Const of Toilet With Water Supply to Astajharan Mission Shakti Building at Banasahi.1 |
Completion of work |
-
latitude : 21.81365937,21.81366145
Longitude : 86.65207843,86.65210067
file name : Image_10122021105000020.png
|
2021-12-10 10:50:00.116902 |
12 |
44269953 |
Const of R C C Culvert with C C Road at Goudsole Susanta Behera House to Baula Chhaka |
200000 |
Const of R C C Culvert with C C Road at Goudsole Susanta Behera House to Baula Chhaka 1 |
Completion of work |
-
latitude : 21.82676539,21.82676536
Longitude : 86.66394951,86.66396838
file name : Image_03122021144912278.png
|
2021-12-03 14:49:12.368681 |
13 |
44269953 |
Const of R C C Culvert with C C Road at Goudsole Susanta Behera House to Baula Chhaka |
200000 |
Const of R C C Culvert with C C Road at Goudsole Susanta Behera House to Baula Chhaka 1 |
Completion of work |
-
latitude : 21.82666157,21.82670435
Longitude : 86.66423791,86.66412723
file name : Image_16122021130420016.png
|
2021-12-16 13:04:20.069095 |
14 |
47821390 |
Const of Drainage System From Balaji Singh House to Suna Singh House at Astajharan. |
200000 |
Const of Drainage System From Balaji Singh House to Suna Singh House at Astajharan.1 |
Completion of work |
-
latitude : 21.8193477,21.81937125
Longitude : 86.63991369,86.63988484
file name : Image_03122021145050907.png
|
2021-12-03 14:50:50.98835 |
15 |
47821390 |
Const of Drainage System From Balaji Singh House to Suna Singh House at Astajharan. |
200000 |
Const of Drainage System From Balaji Singh House to Suna Singh House at Astajharan.1 |
Completion of work |
-
latitude : 21.81927487,21.81933131
Longitude : 86.63994854,86.63991549
file name : Image_23122021104859342.png
|
2021-12-23 10:48:59.425953 |
16 |
47821390 |
Const of Drainage System From Balaji Singh House to Suna Singh House at Astajharan. |
200000 |
Const of Drainage System From Balaji Singh House to Suna Singh House at Astajharan.1 |
Completion of work |
-
latitude : 21.81937717,21.81937694
Longitude : 86.63987933,86.63987941
file name : Image_09012022134612663.png
|
2022-01-09 13:46:12.737676 |
17 |
47816451 |
Const of Drainage system at Ganeswar Gachhayat Land to Dacharam Singh House. |
200000 |
Const of Drainage system at Ganeswar Gachhayat Land to Dacharam Singh House.1 |
Completion of work |
-
latitude : 21.81343579,21.8134475
Longitude : 86.65421777,86.65421768
file name : Image_01122021100317824.png
|
2021-12-01 10:03:17.879536 |
18 |
47816451 |
Const of Drainage system at Ganeswar Gachhayat Land to Dacharam Singh House. |
200000 |
Const of Drainage system at Ganeswar Gachhayat Land to Dacharam Singh House.1 |
Completion of work |
-
latitude : 21.81348343,21.81342297
Longitude : 86.65423856,86.65423053
file name : Image_06012022111341628.png
|
2022-01-06 11:13:41.692278 |
19 |
47816451 |
Const of Drainage system at Ganeswar Gachhayat Land to Dacharam Singh House. |
200000 |
Const of Drainage system at Ganeswar Gachhayat Land to Dacharam Singh House.1 |
Completion of work |
-
latitude : 21.8134892,21.81350041
Longitude : 86.65418586,86.65420068
file name : Image_09012022133819198.png
|
2022-01-09 13:38:19.273848 |
20 |
47819883 |
Completion of Additional Class Room at Astajharan Primary School. |
292419 |
Completion of Additional Class Room at Astajharan Primary School.1 |
Completion of work |
-
latitude : 21.81905947
Longitude : 86.64560237
file name : Image_23012022104613291.png
|
2022-01-23 10:46:13.384067 |
21 |
47819883 |
Completion of Additional Class Room at Astajharan Primary School. |
292419 |
Completion of Additional Class Room at Astajharan Primary School.1 |
Completion of work |
-
latitude : 21.81905828
Longitude : 86.64559877
file name : Image_09032022080903222.png
|
2022-03-09 08:09:03.300374 |
22 |
47819883 |
Completion of Additional Class Room at Astajharan Primary School. |
292419 |
Completion of Additional Class Room at Astajharan Primary School.1 |
Completion of work |
-
latitude : 21.81905912
Longitude : 86.6455972
file name : Image_09032022080720147.png
|
2022-03-09 08:07:20.230964 |
23 |
56357551 |
CONST OF CC ROAD FROM BAILA SINGH HOUSE TO MAHADEV SINGH HOUSE BANA SAHI |
400000 |
CONST OF CC ROAD FROM BAILA SINGH HOUSE TO MAHADEV SINGH HOUSE BANA SAHI1 |
Completion of work |
-
latitude : 21.8112771,21.81086862
Longitude : 86.64822954,86.64830279
file name : Image_29012022170343293.png
|
2022-01-29 17:03:43.371417 |
24 |
56357551 |
CONST OF CC ROAD FROM BAILA SINGH HOUSE TO MAHADEV SINGH HOUSE BANA SAHI |
400000 |
CONST OF CC ROAD FROM BAILA SINGH HOUSE TO MAHADEV SINGH HOUSE BANA SAHI1 |
Completion of work |
-
latitude : 21.81087565,21.81087802
Longitude : 86.64829632,86.64829581
file name : Image_26012022091615779.png
|
2022-01-26 09:16:15.838979 |
25 |
56357551 |
CONST OF CC ROAD FROM BAILA SINGH HOUSE TO MAHADEV SINGH HOUSE BANA SAHI |
400000 |
CONST OF CC ROAD FROM BAILA SINGH HOUSE TO MAHADEV SINGH HOUSE BANA SAHI1 |
Completion of work |
-
latitude : 21.81125613,21.81101082
Longitude : 86.6482899,86.64825391
file name : Image_20012022123942063.png
|
2022-01-20 12:39:42.147818 |
26 |
44269966 |
Water Supply to Sub center at Narankhunta |
100000 |
Water Supply to Sub center at Narankhunta 1 |
Completion of work |
-
latitude : 21.7221685,21.7221685
Longitude : 86.7462597,86.7462597
file name : Image_11012022145600416.png
|
2022-01-11 14:56:00.536623 |
27 |
47825169 |
Const of Culvert at Bargadi Near Katia Singh House |
150000 |
Const of Culvert at Bargadi Near Katia Singh House 1 |
Completion of work |
-
latitude : 21.83006021,21.83006014
Longitude : 86.67557669,86.67557591
file name : Image_14022022102827937.png
|
2022-02-14 10:28:28.002372 |
28 |
47825169 |
Const of Culvert at Bargadi Near Katia Singh House |
150000 |
Const of Culvert at Bargadi Near Katia Singh House 1 |
Completion of work |
-
latitude : 21.83006898,21.83007688
Longitude : 86.67551384,86.67552338
file name : Image_08032022110401779.png
|
2022-03-08 11:04:01.878667 |
29 |
47825169 |
Const of Culvert at Bargadi Near Katia Singh House |
150000 |
Const of Culvert at Bargadi Near Katia Singh House 1 |
Completion of work |
-
latitude : 21.82997945,21.83004103
Longitude : 86.67562358,86.67552974
file name : Image_03022022104024352.png
|
2022-02-03 10:40:24.437155 |
30 |
47823172 |
Const of Urinal at Astajharan Hato |
150975 |
Const of Urinal at Astajharan Hato1 |
Completion of work |
-
latitude : 21.81977467
Longitude : 86.64473839
file name : Image_03022022110936612.png
|
2022-02-03 11:09:36.684712 |
31 |
47840727 |
Const of Garbage Pit at Astajharan Hato |
50000 |
Const of Garbage Pit at Astajharan Hato1 |
Completion of work |
-
latitude : 21.81976924
Longitude : 86.64476205
file name : Image_03022022110815269.png
|
2022-02-03 11:08:15.322388 |
32 |
62605145 |
Purchags of Tricycle |
48300 |
Purchags of Tricycle1 |
Completion of work |
-
latitude : 21.9564623
Longitude : 86.7518423
file name : Image_30012024220026607.png
|
2024-01-30 22:00:26.698405 |
33 |
62605150 |
Mass Cleaning in G.P Areamangent of sanitation SLWM |
50260 |
Mass Cleaning in G.P Areamangent of sanitation SLWM1 |
Completion of work |
-
latitude : 21.9564561
Longitude : 86.7518324
file name : Image_30012024220047555.png
|
2024-01-30 22:00:47.689149 |
34 |
62605154 |
West Segergation shed |
90000 |
West Segergation shed1 |
Completion of work |
-
latitude : 21.9558843
Longitude : 86.7504199
file name : Image_19102022062327672.png
|
2022-10-19 06:23:27.77305 |
35 |
62605159 |
Community Compost Pit |
5205 |
Community Compost Pit1 |
Completion of work |
-
latitude : 21.722219
Longitude : 86.7460681
file name : Image_31012023112820348.png
|
2023-01-31 11:28:20.455797 |
36 |
62605159 |
Community Compost Pit |
5205 |
Community Compost Pit1 |
Completion of work |
-
latitude : 21.9557462
Longitude : 86.7506939
file name : Image_04012023052227412.png
|
2023-01-04 05:22:27.498006 |
37 |
62605169 |
School & AWC Compost pit |
10000 |
School & AWC Compost pit 1 |
Completion of work |
-
latitude : 21.7222183
Longitude : 86.7460688
file name : Image_31012023113800159.png
|
2023-01-31 11:38:00.264311 |
38 |
62605173 |
School & Leach Pit |
4378 |
School & Leach Pit1 |
Completion of work |
-
latitude : 21.7222158
Longitude : 86.7460655
file name : Image_31012023112738094.png
|
2023-01-31 11:27:38.192566 |
39 |
62605178 |
Con.of Dranage System from Naupal Hemandra Singh House to G.P Office |
208228 |
Con.of Dranage System from Naupal Hemandra Singh House to G.P Office1 |
Completion of work |
-
latitude : 21.9555937
Longitude : 86.7508908
file name : Image_04012023052916798.png
|
2023-01-04 05:29:16.872136 |
40 |
62605186 |
Paniya jala seva kendra with tanker |
35000 |
Paniya jala seva kendra with tanker1 |
Completion of work |
-
latitude : 21.7222293,21.7222293
Longitude : 86.7460591,86.7460591
file name : Image_11012023105538833.png
|
2023-01-11 10:55:38.934703 |
41 |
62605210 |
Con. Of cc road from Gopala Naik House to Jogeswar Naik house |
150000 |
Con. Of cc road from Gopala Naik House to Jogeswar Naik house1 |
Completion of work |
-
latitude : 21.9560543,21.9560543
Longitude : 86.7507079,86.7507079
file name : Image_17092022084540869.png
|
2022-09-17 08:45:40.978392 |
42 |
62605198 |
Reparing of Ring wall Platfporm with Dress changing room ner Gogeswer marndi house |
111744 |
Reparing of Ring wall Platfporm with Dress changing room ner Gogeswer marndi house1 |
Completion of work |
-
latitude : 21.95653814,21.9563397
Longitude : 86.75175147,86.7519561
file name : Image_10022023060953041.png
|
2023-02-10 06:09:53.130006 |
43 |
62605199 |
Com. Kitchen sheed at Choprapur U.P School |
130000 |
Com. Kitchen sheed at Choprapur U.P School1 |
Completion of work |
-
latitude : 21.95652808
Longitude : 86.75177773
file name : Image_04012023054024193.png
|
2023-01-04 05:40:24.290372 |
44 |
62605203 |
Imp. Of road from Jaktu Murmu House to Baragacha |
130000 |
Imp. Of road from Jaktu Murmu House to Baragacha 1 |
Completion of work |
-
latitude : 21.95653421,21.95653426
Longitude : 86.7517752,86.75177522
file name : Image_04012023060711587.png
|
2023-01-04 06:07:11.668375 |
45 |
62605217 |
Con. Drainage System from Gajendra Marndi house to Mansing murmu house |
198993 |
Con. Drainage System from Gajendra Marndi house to Mansing murmu house 1 |
Completion of work |
-
latitude : 21.955731
Longitude : 86.7507033
file name : Image_04012023053534238.png
|
2023-01-04 05:35:34.31421 |
46 |
62605235 |
Const. Dress changing room at. Mohanta sahi Tubewell near Bagha mohanta house |
60306 |
Const. Dress changing room at. Mohanta sahi Tubewell near Bagha mohanta house1 |
Completion of work |
-
latitude : 21.7222183
Longitude : 86.7460706
file name : Image_31032023185446516.png
|
2023-03-31 18:54:47.114074 |
47 |
62605240 |
Dress chingh room near Banasahi tank |
60000 |
Dress chingh room near Banasahi tank1 |
Completion of work |
-
latitude : 21.95643172
Longitude : 86.75169049
file name : Image_04012023094752249.png
|
2023-01-04 09:47:52.351153 |
48 |
62605249 |
Con. Drainage Systm at Narankhunta Mane Majhi House to Rupai Majhi house |
115000 |
Con. Drainage Systm at Narankhunta Mane Majhi House to Rupai Majhi house1 |
Completion of work |
-
latitude : 21.9558268
Longitude : 86.750546
file name : Image_01052023195639811.png
|
2023-05-01 19:56:39.937188 |
49 |
47820260 |
Completion of Additional Class Room at Narankhunta UGME School. |
200000 |
Completion of Additional Class Room at Narankhunta UGME School.1 |
Completion of work |
-
latitude : 21.9558614
Longitude : 86.7505044
file name : Image_17092022084355875.png
|
2022-09-17 08:43:55.983 |
50 |
47818393 |
Const of Shead and Hato Pindi at Astajharan Hato. |
138198 |
Const of Shead and Hato Pindi at Astajharan Hato.1 |
Completion of work |
-
latitude : 21.9559372
Longitude : 86.7505316
file name : Image_02112022070239030.png
|
2022-11-02 07:02:39.113523 |
51 |
47818393 |
Const of Shead and Hato Pindi at Astajharan Hato. |
138198 |
Const of Shead and Hato Pindi at Astajharan Hato.1 |
Completion of work |
-
latitude : 21.9559372
Longitude : 86.750524
file name : Image_02112022070128416.png
|
2022-11-02 07:01:28.509716 |
52 |
47815571 |
Renovation of Tank at Astajharan Near Bharat Mohanta House. |
230023 |
Renovation of Tank at Astajharan Near Bharat Mohanta House.1 |
Completion of work |
-
latitude : 21.9563397
Longitude : 86.7519561
file name : Image_10022023060833633.png
|
2023-02-10 06:08:33.71996 |
53 |
47821003 |
Const of C.C.Road With Culvert From PWD to G.P Office. |
100000 |
Const of C.C.Road With Culvert From PWD to G.P Office.1 |
Roof laid |
-
latitude : 21.9556727,21.9563862
Longitude : 86.750777,86.7519077
file name : Image_04012023055236408.png
|
2023-01-04 05:52:36.498079 |
54 |
72744377 |
CONST OF CC ROAD FROM PMGSY ROAD TO KARTIK MAJHI HOUSE AT NARANKHUNTA |
250000 |
CONST OF CC ROAD FROM PMGSY ROAD TO KARTIK MAJHI HOUSE AT NARANKHUNTA1 |
Completion of work |
-
latitude : 21.9563411,21.9561938
Longitude : 86.7519346,86.7516589
file name : Image_01052023195444395.png
|
2023-05-01 19:54:44.506684 |
55 |
82966833 |
Operation and Maintenance of drinking water supply system |
150000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 21.9559053
Longitude : 86.7506295
file name : Image_22032024052021488.png
|
2024-03-22 05:20:21.579716 |
56 |
82966833 |
Operation and Maintenance of drinking water supply system |
150000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.7222187
Longitude : 86.7460705
file name : Image_25102023115425025.png
|
2023-10-25 11:54:25.186091 |
57 |
82900779 |
Operation and Maintenance of drinking water supply system |
72000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 21.9564571
Longitude : 86.7518456
file name : Image_12012024061134936.png
|
2024-01-12 06:11:35.01609 |
58 |
82900779 |
Operation and Maintenance of drinking water supply system |
72000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.7222185
Longitude : 86.7460701
file name : Image_25102023115357113.png
|
2023-10-25 11:53:57.257111 |
59 |
82901478 |
Water Supply to villages |
24000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 21.9564525
Longitude : 86.7518542
file name : Image_12012024054219965.png
|
2024-01-12 05:42:20.046584 |
60 |
82901478 |
Water Supply to villages |
24000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 21.9564525
Longitude : 86.7518542
file name : Image_12012024053657518.png
|
2024-01-12 05:36:57.618106 |
61 |
82901478 |
Water Supply to villages |
24000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 21.9564525
Longitude : 86.7518542
file name : Image_12012024052825141.png
|
2024-01-12 05:28:25.261658 |
62 |
82901538 |
Water Supply to villages |
24000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 21.9564571
Longitude : 86.7518456
file name : Image_12012024055601946.png
|
2024-01-12 05:56:02.018319 |
63 |
82901538 |
Water Supply to villages |
24000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 21.95649258
Longitude : 86.75191244
file name : Image_12012024055155042.png
|
2024-01-12 05:51:55.113426 |
64 |
82901538 |
Water Supply to villages |
24000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 21.9564525
Longitude : 86.7518542
file name : Image_12012024053112429.png
|
2024-01-12 05:31:12.536574 |
65 |
82901623 |
Water Supply to villages |
24000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 21.9564571
Longitude : 86.7518456
file name : Image_12012024055636165.png
|
2024-01-12 05:56:36.235407 |
66 |
82901623 |
Water Supply to villages |
24000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 21.9564427
Longitude : 86.751841
file name : Image_12012024055117255.png
|
2024-01-12 05:51:17.328184 |
67 |
82901623 |
Water Supply to villages |
24000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 21.9564525
Longitude : 86.7518542
file name : Image_12012024053434160.png
|
2024-01-12 05:34:34.24746 |
68 |
82912621 |
Installation Computer and Audio Visual aid |
30000 |
Installation Computer and Audio Visual aid1 |
|
-
latitude : 21.9564571
Longitude : 86.7518456
file name : Image_12012024060005626.png
|
2024-01-12 06:00:05.704721 |
69 |
88702282 |
CONST OF CC ROAD AT ASTAJHARAN FROM HADANGSAHI SANATAN MURMU HOUSE TO CHAITAN MARNDI LAND |
208152 |
CONST OF CC ROAD AT ASTAJHARAN FROM HADANGSAHI SANATAN MURMU HOUSE TO CHAITAN MARNDI LAND1 |
Completion of work |
-
latitude : 21.95650594,21.95650594
Longitude : 86.75183456,86.75183456
file name : Image_19012024045017549.png
|
2024-01-19 04:50:17.616337 |
70 |
82901228 |
Water Supply to villages |
24000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 21.7222194
Longitude : 86.7460694
file name : Image_05122023112656426.png
|
2023-12-05 11:26:56.51692 |
71 |
82901228 |
Water Supply to villages |
24000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 21.7222181
Longitude : 86.7460721
file name : Image_05122023112010910.png
|
2023-12-05 11:20:11.005562 |
72 |
82901315 |
Water Supply to villages |
24000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 21.7222194
Longitude : 86.7460694
file name : Image_05122023112726404.png
|
2023-12-05 11:27:26.510805 |
73 |
82901315 |
Water Supply to villages |
24000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 21.7222181
Longitude : 86.7460721
file name : Image_05122023111931303.png
|
2023-12-05 11:19:31.398583 |
74 |
82901406 |
Water Supply to villages |
24000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 21.722218
Longitude : 86.7460711
file name : Image_05122023112755071.png
|
2023-12-05 11:27:55.172227 |
75 |
82901406 |
Water Supply to villages |
24000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 21.7222181
Longitude : 86.7460721
file name : Image_05122023111855130.png
|
2023-12-05 11:18:55.233522 |
76 |
82901120 |
Water Supply to villages |
24000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 21.722218
Longitude : 86.7460711
file name : Image_05122023112817572.png
|
2023-12-05 11:28:17.664948 |
77 |
82901120 |
Water Supply to villages |
24000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 21.7222181
Longitude : 86.7460721
file name : Image_05122023111820564.png
|
2023-12-05 11:18:20.661841 |
78 |
82912535 |
Construction of Retaining Walls |
205000 |
Construction of Retaining Walls1 |
Plinth level |
-
latitude : 21.9559763
Longitude : 86.7506656
file name : Image_14052024050008424.png
|
2024-05-14 05:00:08.506334 |
79 |
82912535 |
Construction of Retaining Walls |
205000 |
Construction of Retaining Walls1 |
Completion of work |
-
latitude : 21.9556631
Longitude : 86.7508681
file name : Image_14052024045907988.png
|
2024-05-14 04:59:08.071465 |
80 |
82903007 |
Purchase of Tricycles/other battery -operated vehicles for door to door collection of waste |
10000 |
Purchase of Tricycles/other battery -operated vehicles for door to door collection of waste1 |
Plinth level |
-
latitude : 21.9561845
Longitude : 86.7509902
file name : Image_14052024050237980.png
|
2024-05-14 05:02:38.096511 |
81 |
82903007 |
Purchase of Tricycles/other battery -operated vehicles for door to door collection of waste |
10000 |
Purchase of Tricycles/other battery -operated vehicles for door to door collection of waste1 |
Completion of work |
-
latitude : 21.95646499
Longitude : 86.75175834
file name : Image_14052024050140680.png
|
2024-05-14 05:01:40.786771 |
82 |
82901699 |
Water Supply to villages |
47060 |
Water Supply to villages1 |
Plinth level |
-
latitude : 21.9559672
Longitude : 86.7506296
file name : Image_14052024050553646.png
|
2024-05-14 05:05:53.75583 |
83 |
82901699 |
Water Supply to villages |
47060 |
Water Supply to villages1 |
Completion of work |
-
latitude : 21.9562704
Longitude : 86.7518156
file name : Image_14052024050437179.png
|
2024-05-14 05:04:37.292557 |
84 |
82911072 |
Construction of community washing & bathing complex |
150000 |
Construction of community washing & bathing complex1 |
Plinth level |
-
latitude : 21.9558944
Longitude : 86.7505802
file name : Image_14052024051002029.png
|
2024-05-14 05:10:02.105782 |
85 |
82911072 |
Construction of community washing & bathing complex |
150000 |
Construction of community washing & bathing complex1 |
Completion of work |
-
latitude : 21.9559025
Longitude : 86.7506059
file name : Image_14052024050853819.png
|
2024-05-14 05:08:53.913244 |
86 |
82911636 |
Drainage Construction |
200975 |
Drainage Construction1 |
Plinth level |
-
latitude : 21.9563532
Longitude : 86.7517937
file name : Image_29032024075751576.png
|
2024-03-29 07:57:51.669163 |
87 |
82911636 |
Drainage Construction |
200975 |
Drainage Construction1 |
Completion of work |
-
latitude : 21.9558919
Longitude : 86.7505658
file name : Image_29032024075349017.png
|
2024-03-29 07:53:49.119704 |
88 |
82911551 |
Drainage line for grey water |
150000 |
Drainage line for grey water1 |
Plinth level |
-
latitude : 21.955879,21.955879
Longitude : 86.7506349,86.7506349
file name : Image_29032024075726109.png
|
2024-03-29 07:57:26.208088 |
89 |
82911551 |
Drainage line for grey water |
150000 |
Drainage line for grey water1 |
Completion of work |
-
latitude : 21.9562717,21.9562717
Longitude : 86.7516874,86.7516874
file name : Image_29032024075418813.png
|
2024-03-29 07:54:18.906571 |
90 |
82912254 |
Drainage line for grey water |
135000 |
Drainage line for grey water1 |
Plinth level |
-
latitude : 21.7219671,21.7219671
Longitude : 86.7462236,86.7462236
file name : Image_27062024161320739.png
|
2024-06-27 16:13:20.852463 |
91 |
82912254 |
Drainage line for grey water |
135000 |
Drainage line for grey water1 |
Completion of work |
-
latitude : 21.7219663,21.7219663
Longitude : 86.7462163,86.7462163
file name : Image_27062024161157474.png
|
2024-06-27 16:11:57.576019 |
92 |
82910781 |
Drainage Construction |
154314 |
Drainage Construction1 |
Plinth level |
-
latitude : 21.722194
Longitude : 86.7461024
file name : Image_27062024162208794.png
|
2024-06-27 16:22:08.886706 |
93 |
82910781 |
Drainage Construction |
154314 |
Drainage Construction1 |
Completion of work |
-
latitude : 21.7221934
Longitude : 86.7461041
file name : Image_27062024162008123.png
|
2024-06-27 16:20:08.220686 |
94 |
102569687 |
Construction of Retaining Walls/ Fencing Work |
180000 |
Construction of Retaining Walls/ Fencing Work1 |
Plinth level |
-
latitude : 21.72225394
Longitude : 86.74593662
file name : Image_05072024142243916.png
|
2024-07-05 14:22:43.99983 |
95 |
102569687 |
Construction of Retaining Walls/ Fencing Work |
180000 |
Construction of Retaining Walls/ Fencing Work1 |
Completion of work |
-
latitude : 21.72223014
Longitude : 86.74606795
file name : Image_05072024142040977.png
|
2024-07-05 14:20:41.064498 |
96 |
102573248 |
Construction of roads |
230000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.7222133,21.7222135
Longitude : 86.7461101,86.74611
file name : Image_31072024152939876.png
|
2024-07-31 15:29:40.000243 |
97 |
102573248 |
Construction of roads |
230000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.7221992,21.7221992
Longitude : 86.7460723,86.7460723
file name : Image_31072024152609018.png
|