1 |
87698858 |
Water Supply to villages |
400000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 21.9564597,21.9564597
Longitude : 86.7518636,86.7518636
file name : Image_14102023162759462.png
|
2023-10-14 16:28:00.047941 |
2 |
54989387 |
REPAIRING OF TOILET WITH RUNNING WATER FACILITY AT GP OFFICE TANGASOLE |
120000 |
REPAIRING OF TOILET WITH RUNNING WATER FACILITY AT GP OFFICE TANGASOLE1 |
Completion of work |
-
latitude : 21.9560486
Longitude : 86.7506966
file name : Image_05022022112512303.png
|
2022-02-05 11:25:12.573385 |
3 |
47567833 |
COMP OF CC ROAD AT SANSORISHABILLA MOHANTA SAHI |
100000 |
COMP OF CC ROAD AT SANSORISHABILLA MOHANTA SAHI1 |
Completion of work |
-
latitude : 21.9560531,21.9560406
Longitude : 86.7506961,86.7506888
file name : Image_05022022112934017.png
|
2022-02-05 11:29:34.145609 |
4 |
44219074 |
Comp. of Boundary wall at tangasole AWC-2 |
120000 |
Comp. of Boundary wall at tangasole AWC-21 |
Completion of work |
-
latitude : 21.854358333333334
Longitude : 86.66144000000001
file name : Image_09022021162017491.png
|
2021-02-09 16:20:17.596408 |
5 |
86942893 |
WATER TANKER SUPPLY FOR SUMMER SEASON |
70990 |
WATER TANKER SUPPLY FOR SUMMER SEASON1 |
Completion of work |
-
latitude : 21.9563063,21.9563063
Longitude : 86.7519104,86.7519104
file name : Image_09082023223309560.png
|
2023-08-09 22:33:09.711514 |
6 |
44219132 |
Comp. C.C road AWC to Sudhir house at Baiganbadia |
250000 |
Comp. C.C road AWC to Sudhir house at Baiganbadia1 |
Completion of work |
-
latitude : 21.857475,21.857573333333335
Longitude : 86.67959666666665,86.679685
file name : Image_18052021135904318.png
|
2021-05-18 13:59:04.416609 |
7 |
44218944 |
Comp. of boundary wall with gate at Talanda AWC-3 |
60000 |
Comp. of boundary wall with gate at Talanda AWC-31 |
Completion of work |
-
latitude : 21.9560623
Longitude : 86.7506786
file name : Image_05022022112659743.png
|
2022-02-05 11:27:00.457609 |
8 |
44218986 |
G.P office repairing |
22419 |
G.P office repairing1 |
Completion of work |
-
latitude : 21.8547398
Longitude : 86.6629244
file name : Image_18052021133708348.png
|
2021-05-18 13:37:08.47492 |
9 |
54989356 |
REPAIRING AND DEVELOPMENT OF GP OFFICE |
300000 |
REPAIRING AND DEVELOPMENT OF GP OFFICE 1 |
Completion of work |
-
latitude : 21.9558369
Longitude : 86.7506344
file name : Image_28102021220621130.png
|
2021-10-28 22:06:21.21418 |
10 |
54989298 |
REPAIRING OF TALANDA UP SCHOOL |
75000 |
REPAIRING OF TALANDA UP SCHOOL1 |
Completion of work |
-
latitude : 21.9558369
Longitude : 86.7506344
file name : Image_28102021220501881.png
|
2021-10-28 22:05:01.968612 |
11 |
47568094 |
CONST OF CC ROAD AT APARTI HOUSE TO MAIN ROAD AT TANGASOLE |
300000 |
CONST OF CC ROAD AT APARTI HOUSE TO MAIN ROAD AT TANGASOLE1 |
Completion of work |
-
latitude : 21.852563333333332,21.852598333333336
Longitude : 86.66215500000001,86.66214833333333
file name : Image_06122021112611479.png
|
2021-12-06 11:26:11.57983 |
12 |
47568094 |
CONST OF CC ROAD AT APARTI HOUSE TO MAIN ROAD AT TANGASOLE |
300000 |
CONST OF CC ROAD AT APARTI HOUSE TO MAIN ROAD AT TANGASOLE1 |
Completion of work |
-
latitude : 21.852605,21.8526
Longitude : 86.66212333333333,86.662145
file name : Image_06122021112615725.png
|
2021-12-06 11:26:15.830209 |
13 |
47565919 |
CONST OF CC ROAD AT RD ROAD TO RAMESH MOHANTA HOUSE |
58198 |
CONST OF CC ROAD AT RD ROAD TO RAMESH MOHANTA HOUSE1 |
Plinth level |
-
latitude : 21.7221929,21.7221931
Longitude : 86.746066,86.7460681
file name : Image_06122021115320179.png
|
2021-12-06 11:53:20.302346 |
14 |
47565919 |
CONST OF CC ROAD AT RD ROAD TO RAMESH MOHANTA HOUSE |
58198 |
CONST OF CC ROAD AT RD ROAD TO RAMESH MOHANTA HOUSE1 |
Plinth level |
-
latitude : 21.7221933,21.7221933
Longitude : 86.7460644,86.7460644
file name : Image_06122021115324073.png
|
2021-12-06 11:53:24.769321 |
15 |
76450311 |
INSTALLATION OF PWS PIPE LINE AT TANGASOLE |
120000 |
INSTALLATION OF PWS PIPE LINE AT TANGASOLE1 |
Completion of work |
-
latitude : 21.9564924,21.9564924
Longitude : 86.7509763,86.7509763
file name : Image_22052023051341492.png
|
2023-05-22 05:13:41.585585 |
16 |
67453131 |
Creation of drainage channel for management of grey water |
149995 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 21.95625191
Longitude : 86.75158054
file name : Image_24032023054733331.png
|
2023-03-24 05:47:33.410092 |
17 |
47566295 |
CONST OF ADDITIONLA SCHOOL BUILDING AT TANGASOLE NODAL UP SCHOOL |
380000 |
CONST OF ADDITIONLA SCHOOL BUILDING AT TANGASOLE NODAL UP SCHOOL1 |
Completion of work |
-
latitude : 21.7221976
Longitude : 86.7460892
file name : Image_07032022111332435.png
|
2022-03-07 11:13:32.51183 |
18 |
62547078 |
Comp of CC road from Manu sahi to Mudga house, ward-4 |
200000 |
Comp of CC road from Manu sahi to Mudga house, ward-41 |
Completion of work |
-
latitude : 21.9556009,21.9556009
Longitude : 86.7509128,86.7509128
file name : Image_15012023044912296.png
|
2023-01-15 04:49:12.395721 |
19 |
62547065 |
Const of CC road from Surendra house to Bagharay field |
200000 |
Const of CC road from Surendra house to Bagharay field1 |
Completion of work |
-
latitude : 21.9562528,21.9562528
Longitude : 86.7510331,86.7510331
file name : Image_15012023044616723.png
|
2023-01-15 04:46:16.819223 |
20 |
62547058 |
Energy Bill for PWS |
170744 |
Energy Bill for PWS1 |
Completion of work |
-
latitude : 21.956499,21.9564245
Longitude : 86.7512861,86.7511051
file name : Image_21092022053437816.png
|
2022-09-21 05:34:37.913795 |
21 |
47565177 |
CONST OF BATHING GHAT AT TALANDA JAHIRA POKHARI |
130000 |
CONST OF BATHING GHAT AT TALANDA JAHIRA POKHARI1 |
Completion of work |
-
latitude : 21.956355
Longitude : 86.7509911
file name : Image_12052022061049694.png
|
2022-05-12 06:10:50.230892 |
22 |
47565667 |
DRINKING WATER SUPPLY AND SANITATION FACILITY |
400000 |
DRINKING WATER SUPPLY AND SANITATION FACILITY1 |
Completion of work |
-
latitude : 21.9560531
Longitude : 86.7506961
file name : Image_05022022112833945.png
|
2022-02-05 11:28:34.089104 |
23 |
47567181 |
REPARING OF BAIGANABADIA AWC-1 |
53900 |
REPARING OF BAIGANABADIA AWC-11 |
Completion of work |
-
latitude : 21.9560531
Longitude : 86.7506961
file name : Image_05022022112903764.png
|
2022-02-05 11:29:03.876755 |
24 |
62547070 |
Const of Bathing ghat and dress changing room at Talanda Majhisahi Tank, ward-8 |
100000 |
Const of Bathing ghat and dress changing room at Talanda Majhisahi Tank, ward-81 |
Completion of work |
-
latitude : 21.9558087
Longitude : 86.7506357
file name : Image_12072023063616564.png
|
2023-07-12 06:36:16.652016 |
25 |
62547060 |
Const of Boundary wall at AWC- Badasorishabilla |
150000 |
Const of Boundary wall at AWC- Badasorishabilla1 |
Completion of work |
-
latitude : 21.9564924
Longitude : 86.7509763
file name : Image_22052023051437171.png
|
2023-05-22 05:14:37.268787 |
26 |
62547042 |
Honorarium to SEM |
48000 |
Honorarium to SEM1 |
Completion of work |
-
latitude : 21.9561219,21.956499
Longitude : 86.7508004,86.7512861
file name : Image_21092022053601732.png
|
2022-09-21 05:36:01.820985 |
27 |
47564617 |
SEM SALARY |
48000 |
SEM SALARY1 |
Completion of work |
-
latitude : 21.9559216
Longitude : 86.7505644
file name : Image_01102022085205867.png
|
2022-10-01 08:52:06.504172 |
28 |
66198158 |
Maintenance of GP Road & Footpath Murum at Baiganbadia UP School to Gajendra |
70000 |
Maintenance of GP Road & Footpath Murum at Baiganbadia UP School to Gajendra 1 |
Completion of work |
-
latitude : 21.9563524,21.9562528
Longitude : 86.7519058,86.7510331
file name : Image_15012023044654486.png
|
2023-01-15 04:46:54.579334 |
29 |
83011863 |
Construction of Building |
172000 |
Construction of Building1 |
Plinth level |
-
latitude : 21.9559075
Longitude : 86.7506891
file name : Image_29082024053117354.png
|
2024-08-29 05:31:17.845493 |
30 |
83011863 |
Construction of Building |
172000 |
Construction of Building1 |
Completion of work |
-
latitude : 21.9559013
Longitude : 86.7506847
file name : Image_29082024053017606.png
|
2024-08-29 05:30:18.082522 |
31 |
66198365 |
Const. of Boundary wall at Baiganbadia Sadak Sahi AWC at Baiganbadia Ward no - 11 |
100000 |
Const. of Boundary wall at Baiganbadia Sadak Sahi AWC at Baiganbadia Ward no - 111 |
Roof laid |
-
latitude : 21.7221962
Longitude : 86.7460689
file name : Image_22022023135634081.png
|
2023-02-22 13:56:34.179293 |
32 |
66198057 |
Water Supply to villages |
120000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 21.9563522
Longitude : 86.751989
file name : Image_29032023081004144.png
|
2023-03-29 08:10:04.249827 |
33 |
86295258 |
Water Supply to villages |
100000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 21.9558087
Longitude : 86.7506357
file name : Image_12072023064119806.png
|
2023-07-12 06:41:19.892764 |
34 |
86295273 |
Water Supply to villages |
100000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 21.9564296
Longitude : 86.7508702
file name : Image_18072023053753536.png
|
2023-07-18 05:37:53.626434 |
35 |
86295299 |
Materials required for composting |
100000 |
Materials required for composting1 |
Completion of work |
-
latitude : 21.9558087
Longitude : 86.7506357
file name : Image_12072023063952932.png
|
2023-07-12 06:39:53.012834 |
36 |
86295312 |
Materials required for composting |
50000 |
Materials required for composting1 |
Completion of work |
-
latitude : 21.7222165
Longitude : 86.7460715
file name : Image_04032024173759816.png
|
2024-03-04 17:37:59.906427 |
37 |
86295312 |
Materials required for composting |
50000 |
Materials required for composting1 |
Completion of work |
-
latitude : 21.7222186
Longitude : 86.7460698
file name : Image_04032024174013765.png
|
2024-03-04 17:40:13.918928 |
38 |
86295312 |
Materials required for composting |
50000 |
Materials required for composting1 |
Completion of work |
-
latitude : 21.9564568
Longitude : 86.7518595
file name : Image_14102023162849748.png
|
2023-10-14 16:28:50.344937 |
39 |
76450336 |
RENOVATION OF SANSORISABILLA DESHBANDA |
80000 |
RENOVATION OF SANSORISABILLA DESHBANDA1 |
Completion of work |
-
latitude : 21.9558087
Longitude : 86.7506357
file name : Image_12072023063808317.png
|
2023-07-12 06:38:08.399472 |
40 |
62547085 |
Const of raised tubewell platform at baiganbadia UP School |
20000 |
Const of raised tubewell platform at baiganbadia UP School1 |
Completion of work |
-
latitude : 21.9558087,21.9558087
Longitude : 86.7506357,86.7506357
file name : Image_12072023063646120.png
|
2023-07-12 06:36:46.204113 |
41 |
66198300 |
Const. of new additional Building at G.P Office |
200000 |
Const. of new additional Building at G.P Office1 |
Completion of work |
-
latitude : 21.722219
Longitude : 86.7460701
file name : Image_22062023112739791.png
|
2023-06-22 11:27:39.884367 |
42 |
66198018 |
Water Supply to villages |
80000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 21.7222159
Longitude : 86.7460674
file name : Image_30062023121638507.png
|
2023-06-30 12:16:38.485115 |
43 |
66197991 |
Water Supply to villages |
30000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 21.7222159
Longitude : 86.7460674
file name : Image_29062023182255829.png
|
2023-06-29 18:22:55.970701 |
44 |
83010751 |
Operation and Maintenance of drinking water supply system |
250000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 21.9559199
Longitude : 86.7506071
file name : Image_24032024073309651.png
|
2024-03-24 07:33:09.76351 |
45 |
83010751 |
Operation and Maintenance of drinking water supply system |
250000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.9558729
Longitude : 86.7506196
file name : Image_20102023153745929.png
|
2023-10-20 15:37:46.041424 |
46 |
83010751 |
Operation and Maintenance of drinking water supply system |
250000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.9559111
Longitude : 86.7505555
file name : Image_20102023152437245.png
|
2023-10-20 15:24:37.349925 |
47 |
87698833 |
Water Supply to villages |
400000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 21.9563054,21.956305,21.956305
Longitude : 86.7519826,86.7519844,86.7519844
file name : Image_20102023154256836.png
|
2023-10-20 15:42:59.971543 |
48 |
76450295 |
REPAIR AND RENOVATION OF RPWS SCHEME FROM VILLAGE TALANDA |
200000 |
REPAIR AND RENOVATION OF RPWS SCHEME FROM VILLAGE TALANDA1 |
Completion of work |
-
latitude : 21.7222181,21.7222181
Longitude : 86.7460599,86.7460599
file name : Image_05012024135208808.png
|
2024-01-05 13:52:08.899093 |
49 |
83011888 |
Installation Computer and Audio Visual aid |
30900 |
Installation Computer and Audio Visual aid1 |
|
-
latitude : 21.9561305
Longitude : 86.7516744
file name : Image_04012024051828373.png
|
2024-01-04 05:18:28.460253 |
50 |
83011037 |
Any other operation and maintenance needs related to solid waste management |
100000 |
Any other operation and maintenance needs related to solid waste management1 |
Roof laid |
-
latitude : 21.9563901
Longitude : 86.7508281
file name : Image_04012024051411373.png
|
2024-01-04 05:14:11.475861 |
51 |
83011037 |
Any other operation and maintenance needs related to solid waste management |
100000 |
Any other operation and maintenance needs related to solid waste management1 |
Plinth level |
-
latitude : 21.9559826
Longitude : 86.7506584
file name : Image_04012024051256893.png
|
2024-01-04 05:12:56.992637 |
52 |
83011037 |
Any other operation and maintenance needs related to solid waste management |
100000 |
Any other operation and maintenance needs related to solid waste management1 |
Completion of work |
-
latitude : 21.9560023
Longitude : 86.7505889
file name : Image_04012024051126884.png
|
2024-01-04 05:11:26.98298 |
53 |
83010783 |
Operation and Maintenance of drinking water supply system |
48000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 21.9564535
Longitude : 86.7518375
file name : Image_11012024074526644.png
|
2024-01-11 07:45:26.741413 |
54 |
83010783 |
Operation and Maintenance of drinking water supply system |
48000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.9564561
Longitude : 86.7518454
file name : Image_11012024073616653.png
|
2024-01-11 07:36:16.748859 |
55 |
83011672 |
Construction of Retaining Walls |
400000 |
Construction of Retaining Walls1 |
Roof laid |
-
latitude : 21.9556122
Longitude : 86.7508746
file name : Image_16012024041845474.png
|
2024-01-16 04:18:45.559734 |
56 |
83011672 |
Construction of Retaining Walls |
400000 |
Construction of Retaining Walls1 |
Plinth level |
-
latitude : 21.9556122
Longitude : 86.7508746
file name : Image_16012024041714836.png
|
2024-01-16 04:17:14.917768 |
57 |
83011672 |
Construction of Retaining Walls |
400000 |
Construction of Retaining Walls1 |
Completion of work |
-
latitude : 21.9556122
Longitude : 86.7508746
file name : Image_16012024041504184.png
|
2024-01-16 04:15:04.276795 |
58 |
87698799 |
Water Supply to villages |
100000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 21.7222196,21.7222196
Longitude : 86.7460646,86.7460646
file name : Image_15112023120444915.png
|
2023-11-15 12:04:45.068635 |
59 |
87698814 |
Water Supply to villages |
100000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 21.7222191,21.7222191
Longitude : 86.7460712,86.7460712
file name : Image_15112023120525314.png
|
2023-11-15 12:05:25.434332 |
60 |
88097820 |
DEVELOPMENT OF PLAY FIELD AT BAIGANBADIA SADAK SAHI |
30000 |
DEVELOPMENT OF PLAY FIELD AT BAIGANBADIA SADAK SAHI1 |
Completion of work |
-
latitude : 21.7222168,21.7222168
Longitude : 86.7460743,86.7460743
file name : Image_04032024170500861.png
|
2024-03-04 17:05:00.969369 |
61 |
86295247 |
Water Supply to villages |
100000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 21.7222188
Longitude : 86.7460742
file name : Image_04032024174248022.png
|
2024-03-04 17:42:48.113555 |
62 |
83011240 |
Water Supply to villages |
154000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 21.9566028
Longitude : 86.7518075
file name : Image_18032024054314456.png
|
2024-03-18 05:43:14.534079 |
63 |
83011240 |
Water Supply to villages |
154000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 21.9564863
Longitude : 86.7518121
file name : Image_18032024053750493.png
|
2024-03-18 05:37:50.57274 |
64 |
83011652 |
Drainage Construction |
201000 |
Drainage Construction1 |
Plinth level |
-
latitude : 21.7222178
Longitude : 86.7460886
file name : Image_16052024100743122.png
|
2024-05-16 10:07:43.218045 |
65 |
83011652 |
Drainage Construction |
201000 |
Drainage Construction1 |
Completion of work |
-
latitude : 21.7222178
Longitude : 86.7460886
file name : Image_16052024100623412.png
|
2024-05-16 10:06:23.511859 |
66 |
83011000 |
Construction of toilets in public institutions |
200000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 21.9564822
Longitude : 86.7518084
file name : Image_18032024054242690.png
|
2024-03-18 05:42:42.769538 |
67 |
83011000 |
Construction of toilets in public institutions |
200000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 21.9566028
Longitude : 86.7518075
file name : Image_18032024053829599.png
|
2024-03-18 05:38:29.679847 |
68 |
83011629 |
Construction of Building |
232080 |
Construction of Building1 |
Plinth level |
-
latitude : 21.9558863
Longitude : 86.7505744
file name : Image_06072024052249340.png
|
2024-07-06 05:22:49.413985 |
69 |
83011629 |
Construction of Building |
232080 |
Construction of Building1 |
Completion of work |
-
latitude : 21.9558863
Longitude : 86.7505744
file name : Image_06072024052143190.png
|
2024-07-06 05:21:43.265288 |
70 |
102680196 |
Construction of Retaining Walls/ Fencing Work |
201961 |
Construction of Retaining Walls/ Fencing Work1 |
Plinth level |
-
latitude : 21.9559549
Longitude : 86.7505766
file name : Image_02082024081253584.png
|
2024-08-02 08:12:53.697571 |
71 |
102680196 |
Construction of Retaining Walls/ Fencing Work |
201961 |
Construction of Retaining Walls/ Fencing Work1 |
Completion of work |
-
latitude : 21.9559549
Longitude : 86.7505766
file name : Image_02082024081142627.png
|
2024-08-02 08:11:42.73022 |