1 |
44249597 |
Construction of CC Road from Upper sahi Sitala Sabha gruha to AWC |
100000 |
Construction of CC Road from Upper sahi Sitala Sabha gruha to AWC1 |
Completion of work |
-
latitude : 21.84627725,21.84627177
Longitude : 86.7065905,86.70661987
file name : Image_19072021121925925.png
|
2021-07-19 12:19:26.0027 |
2 |
44249597 |
Construction of CC Road from Upper sahi Sitala Sabha gruha to AWC |
100000 |
Construction of CC Road from Upper sahi Sitala Sabha gruha to AWC1 |
Completion of work |
-
latitude : 21.8462215,21.84623248
Longitude : 86.70662736,86.70659519
file name : Image_19072021121941195.png
|
2021-07-19 12:19:41.264706 |
3 |
44249709 |
Construction of Boundary Wall at Mathuri Sahi AWC |
162419 |
Construction of Boundary Wall at Mathuri Sahi AWC1 |
Completion of work |
-
latitude : 21.84727995
Longitude : 86.71581449
file name : Image_18072021095913902.png
|
2021-07-18 09:59:14.02048 |
4 |
44249709 |
Construction of Boundary Wall at Mathuri Sahi AWC |
162419 |
Construction of Boundary Wall at Mathuri Sahi AWC1 |
Completion of work |
-
latitude : 21.84733161
Longitude : 86.71547558
file name : Image_18072021095920193.png
|
2021-07-18 09:59:20.273763 |
5 |
44249549 |
Construction of stop dam at Budhi Bandha near Brundaban Behera Land |
100000 |
Construction of stop dam at Budhi Bandha near Brundaban Behera Land1 |
Completion of work |
-
latitude : 21.85031048,21.85043819
Longitude : 86.69671245,86.69680425
file name : Image_02082021175018057.png
|
2021-08-02 17:50:18.173263 |
6 |
44249549 |
Construction of stop dam at Budhi Bandha near Brundaban Behera Land |
100000 |
Construction of stop dam at Budhi Bandha near Brundaban Behera Land1 |
Completion of work |
-
latitude : 21.85030102,21.8503726
Longitude : 86.69669785,86.69668907
file name : Image_02082021175134481.png
|
2021-08-02 17:51:34.572642 |
7 |
44249549 |
Construction of stop dam at Budhi Bandha near Brundaban Behera Land |
100000 |
Construction of stop dam at Budhi Bandha near Brundaban Behera Land1 |
Completion of work |
-
latitude : 21.85123312,21.85124498
Longitude : 86.69568327,86.69567126
file name : Image_04082021092814490.png
|
2021-08-04 09:28:14.615349 |
8 |
44249549 |
Construction of stop dam at Budhi Bandha near Brundaban Behera Land |
100000 |
Construction of stop dam at Budhi Bandha near Brundaban Behera Land1 |
Completion of work |
-
latitude : 21.85057524,21.85057606,21.8505797,21.85057471,21.85057471
Longitude : 86.69679602,86.69679418,86.69679234,86.69677649,86.69677649
file name : Image_04082021092818072.png
|
2021-08-04 09:28:18.193115 |
9 |
44249549 |
Construction of stop dam at Budhi Bandha near Brundaban Behera Land |
100000 |
Construction of stop dam at Budhi Bandha near Brundaban Behera Land1 |
Completion of work |
-
latitude : 21.85038068,21.85035507
Longitude : 86.69670621,86.69668951
file name : Image_15092021152544192.png
|
2021-09-15 15:25:44.292172 |
10 |
44249570 |
Repair of CC Road from Rajkishore house to U.P.School |
100000 |
Repair of CC Road from Rajkishore house to U.P.School 1 |
Completion of work |
-
latitude : 21.84653097,21.84652491
Longitude : 86.70603247,86.7060528
file name : Image_20092021123816255.png
|
2021-09-20 12:38:16.332719 |
11 |
44249570 |
Repair of CC Road from Rajkishore house to U.P.School |
100000 |
Repair of CC Road from Rajkishore house to U.P.School 1 |
Completion of work |
-
latitude : 21.84651811,21.8464986
Longitude : 86.70603397,86.70603537
file name : Image_25122021110940462.png
|
2021-12-25 11:09:40.538205 |
12 |
44249614 |
Construction of Kitchen room near Talasahi AWC |
150000 |
Construction of Kitchen room near Talasahi AWC1 |
Completion of work |
-
latitude : 21.84860603
Longitude : 86.70939118
file name : Image_20092021123041405.png
|
2021-09-20 12:30:41.494644 |
13 |
56097617 |
INSTALLATION OF WATER SUPPLY AT UTHANINUAGAON UPAR SAHI MISSION SHAKTI BUILDING NEAR SITALA MANDAP |
30000 |
INSTALLATION OF WATER SUPPLY AT UTHANINUAGAON UPAR SAHI MISSION SHAKTI BUILDING NEAR SITALA MANDAP1 |
Completion of work |
-
latitude : 21.84638395,21.8463778
Longitude : 86.70647246,86.70645561
file name : Image_28122021124820446.png
|
2021-12-28 12:48:20.553436 |
14 |
56097617 |
INSTALLATION OF WATER SUPPLY AT UTHANINUAGAON UPAR SAHI MISSION SHAKTI BUILDING NEAR SITALA MANDAP |
30000 |
INSTALLATION OF WATER SUPPLY AT UTHANINUAGAON UPAR SAHI MISSION SHAKTI BUILDING NEAR SITALA MANDAP1 |
Completion of work |
-
latitude : 21.84639164,21.84639131
Longitude : 86.70642547,86.70642772
file name : Image_28122021125017035.png
|
2021-12-28 12:50:17.173409 |
15 |
56097647 |
INSTALLATION OF WATER SUPPLY AT UTHANINUAGAON MISSION SHAKTI BUILDING NEAR SIBA MANDIRA |
35000 |
INSTALLATION OF WATER SUPPLY AT UTHANINUAGAON MISSION SHAKTI BUILDING NEAR SIBA MANDIRA1 |
Completion of work |
-
latitude : 21.84850634,21.8485143
Longitude : 86.70927641,86.70925463
file name : Image_28122021130921121.png
|
2021-12-28 13:09:21.206309 |
16 |
56097647 |
INSTALLATION OF WATER SUPPLY AT UTHANINUAGAON MISSION SHAKTI BUILDING NEAR SIBA MANDIRA |
35000 |
INSTALLATION OF WATER SUPPLY AT UTHANINUAGAON MISSION SHAKTI BUILDING NEAR SIBA MANDIRA1 |
Completion of work |
-
latitude : 21.8485107,21.84850924
Longitude : 86.7090947,86.70909908
file name : Image_28122021131118200.png
|
2021-12-28 13:11:18.310161 |
17 |
56097589 |
INSTALLATION OF WATER SUPPLY AT DHOBALANG MISSION SHAKTI BUILDING NEAR SINGH SAHI CHHAKA |
35000 |
INSTALLATION OF WATER SUPPLY AT DHOBALANG MISSION SHAKTI BUILDING NEAR SINGH SAHI CHHAKA1 |
Completion of work |
-
latitude : 21.83685033,21.83685027
Longitude : 86.70549682,86.70549677
file name : Image_28122021125649109.png
|
2021-12-28 12:56:49.342896 |
18 |
56097589 |
INSTALLATION OF WATER SUPPLY AT DHOBALANG MISSION SHAKTI BUILDING NEAR SINGH SAHI CHHAKA |
35000 |
INSTALLATION OF WATER SUPPLY AT DHOBALANG MISSION SHAKTI BUILDING NEAR SINGH SAHI CHHAKA1 |
Completion of work |
-
latitude : 21.83688701,21.83688697
Longitude : 86.70545648,86.70545661
file name : Image_28122021125830369.png
|
2021-12-28 12:58:30.494757 |
19 |
56097567 |
INSTALLATION OF WATER SUPPLY AT KHUKUNDA MISSION SHAKTI BUILDING NEAR GANESH PUJA MANDAP |
35000 |
INSTALLATION OF WATER SUPPLY AT KHUKUNDA MISSION SHAKTI BUILDING NEAR GANESH PUJA MANDAP1 |
Completion of work |
-
latitude : 21.85432085,21.85437727
Longitude : 86.70166668,86.70158334
file name : Image_28122021123743484.png
|
2021-12-28 12:37:43.608594 |
20 |
56097567 |
INSTALLATION OF WATER SUPPLY AT KHUKUNDA MISSION SHAKTI BUILDING NEAR GANESH PUJA MANDAP |
35000 |
INSTALLATION OF WATER SUPPLY AT KHUKUNDA MISSION SHAKTI BUILDING NEAR GANESH PUJA MANDAP1 |
Completion of work |
-
latitude : 21.85435255,21.85435263
Longitude : 86.7016323,86.7016324
file name : Image_28122021124013101.png
|
2021-12-28 12:40:13.215029 |
21 |
56097545 |
INSTALLATION OF WATER SUPPLY AT TIKARPADA MISSION SHAKTI BUILDING NEAR HARI MANDAP |
35000 |
INSTALLATION OF WATER SUPPLY AT TIKARPADA MISSION SHAKTI BUILDING NEAR HARI MANDAP1 |
Completion of work |
-
latitude : 21.84052809,21.84052791
Longitude : 86.71056218,86.71056197
file name : Image_28122021130250290.png
|
2021-12-28 13:02:50.392097 |
22 |
56097545 |
INSTALLATION OF WATER SUPPLY AT TIKARPADA MISSION SHAKTI BUILDING NEAR HARI MANDAP |
35000 |
INSTALLATION OF WATER SUPPLY AT TIKARPADA MISSION SHAKTI BUILDING NEAR HARI MANDAP1 |
Completion of work |
-
latitude : 21.84053533,21.8405326
Longitude : 86.7104765,86.71050937
file name : Image_28122021130414268.png
|
2021-12-28 13:04:14.374572 |
23 |
56097669 |
INSTALLATION OF WATER SUPPLY AT TALASAHI MISSION SHAKTI BUILDING NEAR SITALA MANDAP |
30000 |
INSTALLATION OF WATER SUPPLY AT TALASAHI MISSION SHAKTI BUILDING NEAR SITALA MANDAP1 |
Completion of work |
-
latitude : 21.7222199,21.72220321
Longitude : 86.7461001,86.74598915
file name : Image_28122021163938922.png
|
2021-12-28 16:39:39.28115 |
24 |
56097669 |
INSTALLATION OF WATER SUPPLY AT TALASAHI MISSION SHAKTI BUILDING NEAR SITALA MANDAP |
30000 |
INSTALLATION OF WATER SUPPLY AT TALASAHI MISSION SHAKTI BUILDING NEAR SITALA MANDAP1 |
Completion of work |
-
latitude : 21.84882698,21.84884786
Longitude : 86.71197537,86.71204846
file name : Image_30122021133953352.png
|
2021-12-30 13:39:53.451891 |
25 |
56097669 |
INSTALLATION OF WATER SUPPLY AT TALASAHI MISSION SHAKTI BUILDING NEAR SITALA MANDAP |
30000 |
INSTALLATION OF WATER SUPPLY AT TALASAHI MISSION SHAKTI BUILDING NEAR SITALA MANDAP1 |
Completion of work |
-
latitude : 21.8488291,21.84882997
Longitude : 86.71196582,86.71197001
file name : Image_30122021134059862.png
|
2021-12-30 13:40:59.968332 |
26 |
65986379 |
Operation & maintenance of community soak pits |
121744 |
Operation & maintenance of community soak pits1 |
Completion of work |
-
latitude : 21.9563137
Longitude : 86.7516838
file name : Image_28122022205512869.png
|
2022-12-28 20:55:12.980584 |
27 |
56115560 |
TUBEWELL WASHING |
120000 |
TUBEWELL WASHING1 |
Completion of work |
-
latitude : 21.7221965,21.7221965
Longitude : 86.7461305,86.7461305
file name : Image_25012022182334572.png
|
2022-01-25 18:23:34.669735 |
28 |
47746726 |
Jalachhatra at GP Area |
65000 |
Jalachhatra at GP Area1 |
Plinth level |
-
latitude : 21.7221936
Longitude : 86.7460739
file name : Image_11102022120746646.png
|
2022-10-11 12:07:47.259647 |
29 |
47749500 |
Compl. Of C.c. road fromMurali house to Main road Khukunda. |
150000 |
Compl. Of C.c. road fromMurali house to Main road Khukunda.1 |
Plinth level |
-
latitude : 21.956004,21.956004
Longitude : 86.7505916,86.7505916
file name : Image_18102022064501674.png
|
2022-10-18 06:45:01.767417 |
30 |
56115503 |
ENERGY CHARGES |
100000 |
ENERGY CHARGES1 |
Completion of work |
-
latitude : 21.9559064,21.9558805
Longitude : 86.7505095,86.750489
file name : Image_23092022090028149.png
|
2022-09-23 09:00:28.257369 |
31 |
56115540 |
INSTALLATION OF WATER SUPPLY SYSTEM AT GP OFFICE |
106149 |
INSTALLATION OF WATER SUPPLY SYSTEM AT GP OFFICE 1 |
Completion of work |
-
latitude : 21.9564937,21.9564937
Longitude : 86.7511103,86.7511103
file name : Image_05022023052518255.png
|
2023-02-05 05:25:18.34165 |
32 |
56115580 |
CONST OF DRAIN FROM OLD AWC TO DURGA MANDAP AT UTHANINUAGAON TALA SAHI |
226149 |
CONST OF DRAIN FROM OLD AWC TO DURGA MANDAP AT UTHANINUAGAON TALA SAHI1 |
Completion of work |
-
latitude : 21.72220733
Longitude : 86.74610899
file name : Image_31052022134345727.png
|
2022-05-31 13:43:46.339189 |
33 |
56115821 |
CONST OF CC ROAD BAHAKANDA HARI MANDP TO RD ROAD |
100000 |
CONST OF CC ROAD BAHAKANDA HARI MANDP TO RD ROAD1 |
Completion of work |
-
latitude : 21.7221999
Longitude : 86.7460717
file name : Image_10052022103838295.png
|
2022-05-10 10:38:38.402375 |
34 |
56115804 |
COMP OF CC ROAD BIRANCHI GOCHHAIT HOUSE TO AWC BUILDING TALA SAHI |
100000 |
COMP OF CC ROAD BIRANCHI GOCHHAIT HOUSE TO AWC BUILDING TALA SAHI1 |
Completion of work |
-
latitude : 21.7222196,21.7222191
Longitude : 86.7460683,86.7460697
file name : Image_31052022134301810.png
|
2022-05-31 13:43:02.424455 |
35 |
47748967 |
Repairing of AWC Building at Tikarpada. |
100000 |
Repairing of AWC Building at Tikarpada.1 |
Completion of work |
-
latitude : 21.9565238
Longitude : 86.7518475
file name : Image_04052022210649727.png
|
2022-05-04 21:06:50.405773 |
36 |
56115604 |
COSNT OF CC ROAD FROM NET SOREN HOUSE TO RD ROAD WITH DRAIN AT TIKARPADA |
215000 |
COSNT OF CC ROAD FROM NET SOREN HOUSE TO RD ROAD WITH DRAIN AT TIKARPADA1 |
Completion of work |
-
latitude : 21.9589158,21.956524
Longitude : 86.7553078,86.751848
file name : Image_04052022210746486.png
|
2022-05-04 21:07:47.169153 |
37 |
56115518 |
HONORARIUM TO SEM AND LABOUR CHARGES |
115000 |
HONORARIUM TO SEM AND LABOUR CHARGES1 |
Completion of work |
-
latitude : 21.9565208,21.95647559
Longitude : 86.7518261,86.75173052
file name : Image_04052022211758126.png
|
2022-05-04 21:17:58.381127 |
38 |
56115518 |
HONORARIUM TO SEM AND LABOUR CHARGES |
115000 |
HONORARIUM TO SEM AND LABOUR CHARGES1 |
Completion of work |
-
latitude : 21.722218,21.72215513
Longitude : 86.7460699,86.74607122
file name : Image_31052022134426539.png
|
2022-05-31 13:44:27.150114 |
39 |
56092264 |
Construction of Additional Class Room at Tikarpada UP School |
250000 |
Construction of Additional Class Room at Tikarpada UP School1 |
Completion of work |
-
latitude : 21.7221931
Longitude : 86.7460664
file name : Image_10052022103942022.png
|
2022-05-10 10:39:42.142179 |
40 |
56115615 |
COMP OF CC ROAD FROM DURGA MANDAP TO SHIBA MANDIR |
200000 |
COMP OF CC ROAD FROM DURGA MANDAP TO SHIBA MANDIR1 |
Completion of work |
-
latitude : 21.7222163
Longitude : 86.7460676
file name : Image_31052022134220986.png
|
2022-05-31 13:42:21.607172 |
41 |
59925167 |
Cons. Of Maa Sitala Sobha Gruha at Uparsahi Uthaninuagaon |
208990 |
Cons. Of Maa Sitala Sobha Gruha at Uparsahi Uthaninuagaon 1 |
Completion of work |
-
latitude : 21.7222173
Longitude : 86.7460689
file name : Image_08082023120612438.png
|
2023-08-08 12:06:12.506255 |
42 |
59924797 |
Honorarium to SEMS Salary and Labour Charges |
84000 |
Honorarium to SEMS Salary and Labour Charges1 |
Completion of work |
-
latitude : 21.9563735,21.9562438
Longitude : 86.7510089,86.7509587
file name : Image_21092022062007872.png
|
2022-09-21 06:20:07.952075 |
43 |
65986694 |
REPAIR OF UP SCHOOL AT KUKUNDA |
50000 |
REPAIR OF UP SCHOOL AT KUKUNDA 1 |
Completion of work |
-
latitude : 21.85610282
Longitude : 86.70001676
file name : Image_13122022113640883.png
|
2022-12-13 11:36:40.970787 |
44 |
65986694 |
REPAIR OF UP SCHOOL AT KUKUNDA |
50000 |
REPAIR OF UP SCHOOL AT KUKUNDA 1 |
Completion of work |
-
latitude : 21.8559556
Longitude : 86.7001831
file name : Image_13122022112424694.png
|
2022-12-13 11:24:24.788407 |
45 |
65986542 |
Water Supply to villages |
156744 |
Water Supply to villages1 |
Completion of work |
-
latitude : 21.9563981
Longitude : 86.7520041
file name : Image_16052023052428893.png
|
2023-05-16 05:24:28.992847 |
46 |
65986498 |
Creation of Shed for segregation and processing of wet and dry waste |
90000 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 21.9564104
Longitude : 86.7519305
file name : Image_16052023052340965.png
|
2023-05-16 05:23:41.059546 |
47 |
59925489 |
Complition of CC Road from Fatakusum Surendra Singh House To Nuasahi |
100000 |
Complition of CC Road from Fatakusum Surendra Singh House To Nuasahi 1 |
Completion of work |
-
latitude : 21.9566389,21.9566389
Longitude : 86.7510576,86.7510576
file name : Image_16052023052240284.png
|
2023-05-16 05:22:40.384298 |
48 |
65986560 |
Water Supply to villages |
200000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 21.7222192,21.7222192
Longitude : 86.7460675,86.7460675
file name : Image_08082023122203205.png
|
2023-08-08 12:22:03.281685 |
49 |
87706663 |
CONST OF COMMUNITY SOBHA GRUHA NEAR DURGA MANDAP AT UTHANINUAGAON TALASAHI |
200000 |
CONST OF COMMUNITY SOBHA GRUHA NEAR DURGA MANDAP AT UTHANINUAGAON TALASAHI1 |
Completion of work |
-
latitude : 21.7222177
Longitude : 86.7460709
file name : Image_07102023120008229.png
|
2023-10-07 12:00:08.32036 |
50 |
87706665 |
REPAIRING OF DURGA MANDAP AT UTHANINUAGAON |
50000 |
REPAIRING OF DURGA MANDAP AT UTHANINUAGAON1 |
Completion of work |
-
latitude : 21.7222202
Longitude : 86.746068
file name : Image_07102023120144167.png
|
2023-10-07 12:01:44.258428 |
51 |
83011837 |
Drainage Construction |
50000 |
Drainage Construction1 |
Roof laid |
-
latitude : 21.7222194
Longitude : 86.7460706
file name : Image_04102023160946038.png
|
2023-10-04 16:09:46.190821 |
52 |
83011837 |
Drainage Construction |
50000 |
Drainage Construction1 |
Plinth level |
-
latitude : 21.7222194
Longitude : 86.7460706
file name : Image_04102023160802992.png
|
2023-10-04 16:08:03.18419 |
53 |
83011837 |
Drainage Construction |
50000 |
Drainage Construction1 |
Completion of work |
-
latitude : 21.7222194
Longitude : 86.7460706
file name : Image_04102023160520582.png
|
2023-10-04 16:05:20.78894 |
54 |
83011886 |
Installation Computer and Audio Visual aid |
30000 |
Installation Computer and Audio Visual aid1 |
|
-
latitude : 21.95644
Longitude : 86.7518461
file name : Image_11012024082958967.png
|
2024-01-11 08:29:59.061491 |
55 |
83009950 |
Operation and Maintenance of drinking water supply system |
72000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 21.95644
Longitude : 86.7518461
file name : Image_11012024082845211.png
|
2024-01-11 08:28:45.307243 |
56 |
83009950 |
Operation and Maintenance of drinking water supply system |
72000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.95644
Longitude : 86.7518461
file name : Image_11012024082715161.png
|
2024-01-11 08:27:15.251858 |
57 |
83011516 |
Water Supply to villages |
50000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 21.9556109
Longitude : 86.7508717
file name : Image_16012024040051562.png
|
2024-01-16 04:00:51.657964 |
58 |
83011516 |
Water Supply to villages |
50000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 21.95641378
Longitude : 86.75177532
file name : Image_16012024035947115.png
|
2024-01-16 03:59:47.182959 |
59 |
83011516 |
Water Supply to villages |
50000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 21.95613951
Longitude : 86.75168713
file name : Image_16012024035750587.png
|
2024-01-16 03:57:50.675989 |
60 |
83010132 |
Construction of toilets in public institutions |
200000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 21.95649709
Longitude : 86.74159836
file name : Image_18112023082009267.png
|
2023-11-18 08:20:09.35934 |
61 |
83010132 |
Construction of toilets in public institutions |
200000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 21.9558507
Longitude : 86.7506973
file name : Image_18112023081554202.png
|
2023-11-18 08:15:54.291376 |
62 |
83010132 |
Construction of toilets in public institutions |
200000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 21.7222185
Longitude : 86.7460699
file name : Image_17112023124640875.png
|
2023-11-17 12:46:40.964975 |
63 |
83011459 |
Drainage Construction |
200000 |
Drainage Construction1 |
Roof laid |
-
latitude : 21.9564185
Longitude : 86.7518584
file name : Image_18112023082035645.png
|
2023-11-18 08:20:35.731152 |
64 |
83011459 |
Drainage Construction |
200000 |
Drainage Construction1 |
Plinth level |
-
latitude : 21.9564936
Longitude : 86.7518309
file name : Image_18112023081451028.png
|
2023-11-18 08:14:51.107938 |
65 |
83011459 |
Drainage Construction |
200000 |
Drainage Construction1 |
Completion of work |
-
latitude : 21.7222199
Longitude : 86.7460651
file name : Image_17112023124944333.png
|
2023-11-17 12:49:44.423722 |
66 |
83011459 |
Drainage Construction |
200000 |
Drainage Construction1 |
Completion of work |
-
latitude : 21.7222162
Longitude : 86.7460666
file name : Image_17112023124940853.png
|
2023-11-17 12:49:40.940928 |
67 |
83011788 |
Construction of Sheds |
228900 |
Construction of Sheds1 |
Roof laid |
-
latitude : 21.9564974
Longitude : 86.7518315
file name : Image_18112023081843720.png
|
2023-11-18 08:18:43.810022 |
68 |
83011788 |
Construction of Sheds |
228900 |
Construction of Sheds1 |
Plinth level |
-
latitude : 21.9565
Longitude : 86.7518246
file name : Image_18112023081701260.png
|
2023-11-18 08:17:01.362204 |
69 |
83011788 |
Construction of Sheds |
228900 |
Construction of Sheds1 |
Completion of work |
-
latitude : 21.7222163
Longitude : 86.7460658
file name : Image_17112023125034841.png
|
2023-11-17 12:50:34.930701 |
70 |
83010110 |
Operation and Maintenance of drinking water supply system |
72060 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.9565283
Longitude : 86.7517987
file name : Image_03122023131914635.png
|
2023-12-03 13:19:14.716131 |
71 |
83009940 |
Operation and Maintenance of drinking water supply system |
150000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 21.9558638
Longitude : 86.7506156
file name : Image_24032024072034786.png
|
2024-03-24 07:20:34.87875 |
72 |
83009940 |
Operation and Maintenance of drinking water supply system |
150000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.9558309
Longitude : 86.7506523
file name : Image_24032024071920753.png
|
2024-03-24 07:19:20.852393 |
73 |
83011445 |
Drainage Construction |
154314 |
Drainage Construction1 |
Plinth level |
-
latitude : 21.9559702
Longitude : 86.751061
file name : Image_06072024044658356.png
|
2024-07-06 04:46:58.425416 |
74 |
83011445 |
Drainage Construction |
154314 |
Drainage Construction1 |
Completion of work |
-
latitude : 21.9559702
Longitude : 86.751061
file name : Image_06072024044552433.png
|
2024-07-06 04:45:52.507656 |
75 |
83011805 |
Drainage Construction |
130000 |
Drainage Construction1 |
Plinth level |
-
latitude : 21.9563448
Longitude : 86.7518995
file name : Image_06072024044931413.png
|
2024-07-06 04:49:31.485389 |
76 |
83011805 |
Drainage Construction |
130000 |
Drainage Construction1 |
Completion of work |
-
latitude : 21.9559702
Longitude : 86.751061
file name : Image_06072024044829523.png
|
2024-07-06 04:48:29.597337 |
77 |
83011768 |
Drainage Construction |
201000 |
Drainage Construction1 |
Plinth level |
-
latitude : 21.9559775
Longitude : 86.7510815
file name : Image_06072024045352017.png
|
2024-07-06 04:53:52.093681 |
78 |
83011768 |
Drainage Construction |
201000 |
Drainage Construction1 |
Completion of work |
-
latitude : 21.9559211
Longitude : 86.7507271
file name : Image_06072024045228118.png
|
2024-07-06 04:52:28.189892 |
79 |
83011820 |
Drainage Construction |
150000 |
Drainage Construction1 |
Plinth level |
-
latitude : 21.9558619
Longitude : 86.7506792
file name : Image_14082024062335507.png
|
2024-08-14 06:23:35.584371 |
80 |
83011820 |
Drainage Construction |
150000 |
Drainage Construction1 |
Completion of work |
-
latitude : 21.9558788
Longitude : 86.7506631
file name : Image_14082024061959765.png
|
2024-08-14 06:19:59.843716 |