1 |
44157689 |
IMPROVEMENT OF ROAD FROM CHITTARANJAN DAS HOUSE TO BAYA DALEI HOUSE TALAKADADA |
277220 |
IMPROVEMENT OF ROAD FROM CHITTARANJAN DAS HOUSE TO BAYA DALEI HOUSE TALAKADADA1 |
Completion of work |
-
latitude : 21.61544742,21.6154374
Longitude : 86.74344235,86.74347464
file name : Image_14122020130321575.png
|
2020-12-14 13:03:21.656966 |
2 |
44157583 |
IMPROVEMENT OF ROAD WITH U SHAPE DRAIN FROM MANGALA MANDIR TO TRILOCHAN HOUSE ,SIKIDIA |
318440 |
IMPROVEMENT OF ROAD WITH U SHAPE DRAIN FROM MANGALA MANDIR TO TRILOCHAN HOUSE ,SIKIDIA1 |
Completion of work |
-
latitude : 21.6423866,21.64238688
Longitude : 86.72843361,86.72843395
file name : Image_10052021115847326.png
|
2021-05-10 11:58:47.454566 |
3 |
44157583 |
IMPROVEMENT OF ROAD WITH U SHAPE DRAIN FROM MANGALA MANDIR TO TRILOCHAN HOUSE ,SIKIDIA |
318440 |
IMPROVEMENT OF ROAD WITH U SHAPE DRAIN FROM MANGALA MANDIR TO TRILOCHAN HOUSE ,SIKIDIA1 |
Completion of work |
-
latitude : 21.64242816,21.64242708
Longitude : 86.72847651,86.72846757
file name : Image_02012021163527888.png
|
2021-01-02 16:35:28.017567 |
4 |
44157443 |
IMPROVEMENT OF ROAD FROM KARA NANA HOUSE TO UP SCHOOL,PATUA |
119171 |
IMPROVEMENT OF ROAD FROM KARA NANA HOUSE TO UP SCHOOL,PATUA1 |
Completion of work |
-
latitude : 21.64089651,21.64089814
Longitude : 86.72071192,86.72071008
file name : Image_24122020121849518.png
|
2020-12-24 12:18:49.657906 |
5 |
44156931 |
MAINTENANCE OF PWS & SOLAR DUAL PUMP |
353043 |
MAINTENANCE OF PWS & SOLAR DUAL PUMP1 |
Completion of work |
-
latitude : 21.6285314,21.62853149
Longitude : 86.73319102,86.73319098
file name : Image_11102021171434084.png
|
2021-10-11 17:14:34.210214 |
6 |
44156931 |
MAINTENANCE OF PWS & SOLAR DUAL PUMP |
353043 |
MAINTENANCE OF PWS & SOLAR DUAL PUMP1 |
Completion of work |
-
latitude : 21.6285314,21.62853149
Longitude : 86.73319102,86.73319098
file name : Image_11102021171502528.png
|
2021-10-11 17:15:02.713097 |
7 |
44156931 |
MAINTENANCE OF PWS & SOLAR DUAL PUMP |
353043 |
MAINTENANCE OF PWS & SOLAR DUAL PUMP1 |
Completion of work |
-
latitude : 21.62852779,21.62852781
Longitude : 86.73319041,86.73319047
file name : Image_11102021171551071.png
|
2021-10-11 17:15:51.193467 |
8 |
38362955 |
MAINTENANCE OF EXISTING PIPE PUMP HOUSE @ KUAMARA SIKIDIA |
450000 |
MAINTENANCE OF EXISTING PIPE PUMP HOUSE @ KUAMARA SIKIDIA1 |
Commenced |
-
latitude : 21.62200847
Longitude : 86.72942834
file name : Image_24122020123840004.png
|
2020-12-24 12:38:40.139612 |
9 |
44157170 |
IMPROVEMENT OF ROAD FROM KUSHA CHANDRA BISWAL HOUSE TO HARIJANA SAHI AT KUSUMIAN |
150000 |
IMPROVEMENT OF ROAD FROM KUSHA CHANDRA BISWAL HOUSE TO HARIJANA SAHI AT KUSUMIAN1 |
Completion of work |
-
latitude : 21.65116554,21.6511652,21.65116509
Longitude : 86.7413912,86.74138922,86.74138935
file name : Image_07032021102047412.png
|
2021-03-07 10:20:47.545284 |
10 |
44157266 |
COMPLETION OF POLLY SABHA /GRAMA SABHA HOUSE AT-CHILIMA |
332872 |
COMPLETION OF POLLY SABHA /GRAMA SABHA HOUSE AT-CHILIMA1 |
Completion of work |
-
latitude : 21.62579886
Longitude : 86.72635351
file name : Image_24062021123020973.png
|
2021-06-24 12:30:21.109889 |
11 |
44157266 |
COMPLETION OF POLLY SABHA /GRAMA SABHA HOUSE AT-CHILIMA |
332872 |
COMPLETION OF POLLY SABHA /GRAMA SABHA HOUSE AT-CHILIMA1 |
Completion of work |
-
latitude : 21.62579112
Longitude : 86.72634515
file name : Image_24062021123024923.png
|
2021-06-24 12:30:25.048243 |
12 |
44157744 |
CONSTRUCTION OF TOILET AT KUSUMIA ANGANWADI CENTRE |
100000 |
CONSTRUCTION OF TOILET AT KUSUMIA ANGANWADI CENTRE1 |
Completion of work |
-
latitude : 21.65223651
Longitude : 86.73818844
file name : Image_21122021110848054.png
|
2021-12-21 11:08:48.193732 |
13 |
44157744 |
CONSTRUCTION OF TOILET AT KUSUMIA ANGANWADI CENTRE |
100000 |
CONSTRUCTION OF TOILET AT KUSUMIA ANGANWADI CENTRE1 |
Completion of work |
-
latitude : 21.65225435
Longitude : 86.73821113
file name : Image_21122021110855239.png
|
2021-12-21 11:08:55.376356 |
14 |
44157744 |
CONSTRUCTION OF TOILET AT KUSUMIA ANGANWADI CENTRE |
100000 |
CONSTRUCTION OF TOILET AT KUSUMIA ANGANWADI CENTRE1 |
Completion of work |
-
latitude : 21.65221936
Longitude : 86.73828235
file name : Image_10052021112133928.png
|
2021-05-10 11:21:34.056136 |
15 |
38363131 |
INSTALATION OF LED LIGHT AT KUAMARA HATA |
140000 |
INSTALATION OF LED LIGHT AT KUAMARA HATA1 |
Commenced |
-
latitude : 21.62621172
Longitude : 86.73232226
file name : Image_30122020130130188.png
|
2020-12-30 13:01:30.313021 |
16 |
38362905 |
CONST OF NEW TUBE WELL PLATFORM INCLUDING RECHAGE PIN (NEAR) |
230000 |
CONST OF NEW TUBE WELL PLATFORM INCLUDING RECHAGE PIN (NEAR) 2 |
Commenced |
-
latitude : 21.62368128
Longitude : 86.72776686
file name : Image_24122020122140617.png
|
2020-12-24 12:21:40.748024 |
17 |
38362905 |
CONST OF NEW TUBE WELL PLATFORM INCLUDING RECHAGE PIN (NEAR) |
230000 |
CONST OF NEW TUBE WELL PLATFORM INCLUDING RECHAGE PIN (NEAR) 3 |
Commenced |
-
latitude : 21.62209904
Longitude : 86.72920626
file name : Image_24122020122405511.png
|
2020-12-24 12:24:05.636543 |
18 |
38362905 |
CONST OF NEW TUBE WELL PLATFORM INCLUDING RECHAGE PIN (NEAR) |
230000 |
CONST OF NEW TUBE WELL PLATFORM INCLUDING RECHAGE PIN (NEAR) 4 |
Commenced |
-
latitude : 21.62051948
Longitude : 86.72876382
file name : Image_24122020122551667.png
|
2020-12-24 12:25:51.792011 |
19 |
38362905 |
CONST OF NEW TUBE WELL PLATFORM INCLUDING RECHAGE PIN (NEAR) |
230000 |
CONST OF NEW TUBE WELL PLATFORM INCLUDING RECHAGE PIN (NEAR) 5 |
Commenced |
-
latitude : 21.6289802
Longitude : 86.73242912
file name : Image_24122020124234174.png
|
2020-12-24 12:42:34.298845 |
20 |
44157300 |
COMPLETION OF KALYAN MANDAP BUILDING AT KUAMARA |
100000 |
COMPLETION OF KALYAN MANDAP BUILDING AT KUAMARA1 |
Completion of work |
-
latitude : 21.624019
Longitude : 86.72773002
file name : Image_30042021094125570.png
|
2021-04-30 09:41:25.720566 |
21 |
44157300 |
COMPLETION OF KALYAN MANDAP BUILDING AT KUAMARA |
100000 |
COMPLETION OF KALYAN MANDAP BUILDING AT KUAMARA1 |
Completion of work |
-
latitude : 21.62402668
Longitude : 86.72773035
file name : Image_30042021094305368.png
|
2021-04-30 09:43:05.511397 |
22 |
44157216 |
IMPROVEMENT OF ROAD FROM DINABANDHU HOUSE TO KUNDI POKHARI,CHILIMA |
200000 |
IMPROVEMENT OF ROAD FROM DINABANDHU HOUSE TO KUNDI POKHARI,CHILIMA1 |
Completion of work |
-
latitude : 21.62413875,21.62413831
Longitude : 86.72337377,86.72337326
file name : Image_10042021173009685.png
|
2021-04-10 17:30:09.82194 |
23 |
44157398 |
IMPROVEMENT OF ROAD FROM NARASINGHA JENA HOUSE TO KUNDI POKHARI,KUAMARA |
200000 |
IMPROVEMENT OF ROAD FROM NARASINGHA JENA HOUSE TO KUNDI POKHARI,KUAMARA1 |
Completion of work |
-
latitude : 21.6256121,21.6256121
Longitude : 86.726391,86.726391
file name : Image_30042021095849162.png
|
2021-04-30 09:58:49.300072 |
24 |
44157398 |
IMPROVEMENT OF ROAD FROM NARASINGHA JENA HOUSE TO KUNDI POKHARI,KUAMARA |
200000 |
IMPROVEMENT OF ROAD FROM NARASINGHA JENA HOUSE TO KUNDI POKHARI,KUAMARA1 |
Completion of work |
-
latitude : 21.62322375,21.62322276
Longitude : 86.72722598,86.72721023
file name : Image_30042021095237686.png
|
2021-04-30 09:52:37.842513 |
25 |
44157089 |
DRAINAGE SYSTEM AT KUAMARA TALASAHI |
300000 |
DRAINAGE SYSTEM AT KUAMARA TALASAHI1 |
Completion of work |
-
latitude : 21.61983593,21.61984674
Longitude : 86.73126668,86.7312706
file name : Image_02022021155515359.png
|
2021-02-02 15:55:15.504874 |
26 |
44156995 |
HONORARIUM OF SEM AND PUMP DRIVER |
96000 |
HONORARIUM OF SEM AND PUMP DRIVER1 |
Completion of work |
-
latitude : 21.58955108,21.58955036
Longitude : 86.65686814,86.65681712
file name : Image_12052021134524864.png
|
2021-05-12 13:45:25.014498 |
27 |
44157129 |
COM PRESSURE OF TUBE WELLS |
75000 |
COM PRESSURE OF TUBE WELLS1 |
Completion of work |
-
latitude : 21.6226777
Longitude : 86.7285918
file name : Image_12052021100321339.png
|
2021-05-12 10:03:21.452611 |
28 |
44157129 |
COM PRESSURE OF TUBE WELLS |
75000 |
COM PRESSURE OF TUBE WELLS1 |
Completion of work |
-
latitude : 21.6237004
Longitude : 86.72761884
file name : Image_12052021100446194.png
|
2021-05-12 10:04:46.335408 |
29 |
44157129 |
COM PRESSURE OF TUBE WELLS |
75000 |
COM PRESSURE OF TUBE WELLS2 |
Completion of work |
-
latitude : 21.6260655
Longitude : 86.72744681
file name : Image_12052021101141703.png
|
2021-05-12 10:11:41.824233 |
30 |
44157129 |
COM PRESSURE OF TUBE WELLS |
75000 |
COM PRESSURE OF TUBE WELLS2 |
Completion of work |
-
latitude : 21.6260736
Longitude : 86.72744722
file name : Image_12052021101249289.png
|
2021-05-12 10:12:49.42343 |
31 |
48009563 |
Development of road from Aganu house to Talakadada Tubewell |
200000 |
Development of road from Aganu house to Talakadada Tubewell1 |
Completion of work |
-
latitude : 21.61537179,21.61537179
Longitude : 86.74368456,86.74368458
file name : Image_30072021161702758.png
|
2021-07-30 16:17:02.918869 |
32 |
48009563 |
Development of road from Aganu house to Talakadada Tubewell |
200000 |
Development of road from Aganu house to Talakadada Tubewell1 |
Completion of work |
-
latitude : 21.61537117,21.61537101
Longitude : 86.74368474,86.74368483
file name : Image_30072021161818627.png
|
2021-07-30 16:18:18.844543 |
33 |
48013996 |
Jalachhatra during summer |
20000 |
Jalachhatra during summer1 |
Completion of work |
-
latitude : 21.64043566
Longitude : 86.7306181
file name : Image_29102021150339999.png
|
2021-10-29 15:03:40.11269 |
34 |
48013996 |
Jalachhatra during summer |
20000 |
Jalachhatra during summer1 |
Completion of work |
-
latitude : 21.64043822
Longitude : 86.73062149
file name : Image_29102021150709075.png
|
2021-10-29 15:07:09.198769 |
35 |
48013996 |
Jalachhatra during summer |
20000 |
Jalachhatra during summer1 |
Completion of work |
-
latitude : 21.64043864
Longitude : 86.73062129
file name : Image_29102021150854858.png
|
2021-10-29 15:08:54.972036 |
36 |
48013261 |
Honarrarium of SEMs/Pump Driver for 12 months |
96000 |
Honarrarium of SEMs/Pump Driver for 12 months1 |
Completion of work |
-
latitude : 21.58954723,21.58954306
Longitude : 86.65701585,86.65701756
file name : Image_06092021094836369.png
|
2021-09-06 09:48:36.488123 |
37 |
48013261 |
Honarrarium of SEMs/Pump Driver for 12 months |
96000 |
Honarrarium of SEMs/Pump Driver for 12 months1 |
Completion of work |
-
latitude : 21.58954172,21.58954179
Longitude : 86.65702047,86.65702054
file name : Image_06092021094949217.png
|
2021-09-06 09:49:49.340577 |
38 |
48017788 |
Development of road from Maheswar Bhanjababu house to AWC (A) at Kuamara |
200000 |
Development of road from Maheswar Bhanjababu house to AWC (A) at Kuamara1 |
Completion of work |
-
latitude : 21.62146405,21.62146089
Longitude : 86.73028532,86.73028843
file name : Image_08102021150650106.png
|
2021-10-08 15:06:50.278647 |
39 |
48017788 |
Development of road from Maheswar Bhanjababu house to AWC (A) at Kuamara |
200000 |
Development of road from Maheswar Bhanjababu house to AWC (A) at Kuamara1 |
Completion of work |
-
latitude : 21.62146974,21.62146962
Longitude : 86.73029261,86.73029267
file name : Image_08102021150654313.png
|
2021-10-08 15:06:54.442283 |
40 |
48001770 |
Complition of Gramsobha/Pallisobha Building at Chilima |
226376 |
Complition of Gramsobha/Pallisobha Building at Chilima1 |
Completion of work |
-
latitude : 21.62584375
Longitude : 86.7262513
file name : Image_09012022131943251.png
|
2022-01-09 13:19:43.389564 |
41 |
48001770 |
Complition of Gramsobha/Pallisobha Building at Chilima |
226376 |
Complition of Gramsobha/Pallisobha Building at Chilima1 |
Completion of work |
-
latitude : 21.62581107
Longitude : 86.72624418
file name : Image_09012022132053557.png
|
2022-01-09 13:20:53.703784 |
42 |
48018511 |
Const. of Community Hall near near Harijanasahi Kusumia |
216250 |
Const. of Community Hall near near Harijanasahi Kusumia1 |
Completion of work |
-
latitude : 21.65106329
Longitude : 86.74169764
file name : Image_21122021111512568.png
|
2021-12-21 11:15:12.71196 |
43 |
48018511 |
Const. of Community Hall near near Harijanasahi Kusumia |
216250 |
Const. of Community Hall near near Harijanasahi Kusumia1 |
Completion of work |
-
latitude : 21.65106668
Longitude : 86.74169893
file name : Image_21122021111754841.png
|
2021-12-21 11:17:54.971638 |
44 |
48014764 |
Const. of new Drain from Panda Sing house to Udapada |
164521 |
Const. of new Drain from Panda Sing house to Udapada1 |
Completion of work |
-
latitude : 21.62748395,21.62748364
Longitude : 86.72933225,86.72933293
file name : Image_10022022160119456.png
|
2022-02-10 16:01:19.594197 |
45 |
48014764 |
Const. of new Drain from Panda Sing house to Udapada |
164521 |
Const. of new Drain from Panda Sing house to Udapada1 |
Completion of work |
-
latitude : 21.6274785,21.62747852
Longitude : 86.72933352,86.72933351
file name : Image_10022022160237360.png
|
2022-02-10 16:02:37.462318 |
46 |
48016159 |
Const. of new Drain from Rabi Sing house to Tapan Behera house |
200000 |
Const. of new Drain from Rabi Sing house to Tapan Behera house1 |
Completion of work |
-
latitude : 21.62503107,21.62503139
Longitude : 86.72842575,86.72842529
file name : Image_10022022160830688.png
|
2022-02-10 16:08:30.84929 |
47 |
48016159 |
Const. of new Drain from Rabi Sing house to Tapan Behera house |
200000 |
Const. of new Drain from Rabi Sing house to Tapan Behera house1 |
Completion of work |
-
latitude : 21.62504391,21.62504423
Longitude : 86.7284031,86.72840315
file name : Image_10022022160945266.png
|
2022-02-10 16:09:45.375037 |
48 |
48011367 |
Imp. of road from Badam Sala to Sachindra Das house |
250000 |
Imp. of road from Badam Sala to Sachindra Das house1 |
Completion of work |
-
latitude : 21.64305261,21.64305262
Longitude : 86.73033437,86.73033439
file name : Image_07032022141337961.png
|
2022-03-07 14:13:38.090457 |
49 |
48011367 |
Imp. of road from Badam Sala to Sachindra Das house |
250000 |
Imp. of road from Badam Sala to Sachindra Das house1 |
Completion of work |
-
latitude : 21.64304283,21.64304296
Longitude : 86.73033784,86.73033781
file name : Image_07032022141436092.png
|
2022-03-07 14:14:36.234017 |
50 |
48011754 |
Development of road from Ledha Singh house to Anlabani road |
175000 |
Development of road from Ledha Singh house to Anlabani road1 |
Completion of work |
-
latitude : 21.63226702,21.63226714
Longitude : 86.73937447,86.73937447
file name : Image_25012022114416154.png
|
2022-01-25 11:44:16.296484 |
51 |
48011754 |
Development of road from Ledha Singh house to Anlabani road |
175000 |
Development of road from Ledha Singh house to Anlabani road1 |
Completion of work |
-
latitude : 21.63227357,21.63227521
Longitude : 86.73937932,86.73938138
file name : Image_25012022114521027.png
|
2022-01-25 11:45:21.18473 |
52 |
48012801 |
Energy charges of pipe water supply system I and II |
180000 |
Energy charges of pipe water supply system I and II1 |
Completion of work |
-
latitude : 21.61547472,21.61547472
Longitude : 86.74377285,86.74377285
file name : Image_12092022133156175.png
|
2022-09-12 13:31:56.300684 |
53 |
48012801 |
Energy charges of pipe water supply system I and II |
180000 |
Energy charges of pipe water supply system I and II1 |
Completion of work |
-
latitude : 21.58961077,21.58961183
Longitude : 86.65695467,86.65694649
file name : Image_13012022125233959.png
|
2022-01-13 12:52:34.104381 |
54 |
48012801 |
Energy charges of pipe water supply system I and II |
180000 |
Energy charges of pipe water supply system I and II1 |
Completion of work |
-
latitude : 21.58959676,21.58959683
Longitude : 86.65695812,86.65695727
file name : Image_13012022125407892.png
|
2022-01-13 12:54:08.049731 |
55 |
48008605 |
Reparing of SHG Chokadala Building at Sikidia |
100000 |
Reparing of SHG Chokadala Building at Sikidia1 |
Completion of work |
-
latitude : 21.64136211
Longitude : 86.7299401
file name : Image_07032022142044947.png
|
2022-03-07 14:20:45.081621 |
56 |
48008605 |
Reparing of SHG Chokadala Building at Sikidia |
100000 |
Reparing of SHG Chokadala Building at Sikidia1 |
Completion of work |
-
latitude : 21.64134112
Longitude : 86.72994058
file name : Image_07032022142240147.png
|
2022-03-07 14:22:40.294732 |
57 |
48013779 |
Maintenance of existing PWSS and water supply connection to school/AWC and compressor of washing tub |
518522 |
Maintenance of existing PWSS and water supply connection to school/AWC and compressor of washing tub1 |
Completion of work |
-
latitude : 21.6261706,21.6261699,21.6261699
Longitude : 86.7323451,86.7323448,86.7323448
file name : Image_12092022132857633.png
|
2022-09-12 13:28:57.748107 |
58 |
48013779 |
Maintenance of existing PWSS and water supply connection to school/AWC and compressor of washing tub |
518522 |
Maintenance of existing PWSS and water supply connection to school/AWC and compressor of washing tub1 |
Completion of work |
-
latitude : 21.64292029,21.64292086,21.64292085,21.64292084,21.64292087
Longitude : 86.7307676,86.7307676,86.73076756,86.73076758,86.73076761
file name : Image_24062022122631193.png
|
2022-06-24 12:26:31.295604 |
59 |
48016506 |
Comp. of Sanitary Drain from Alock Sethi house to Dinabandhu Rout house |
250000 |
Comp. of Sanitary Drain from Alock Sethi house to Dinabandhu Rout house1 |
Completion of work |
-
latitude : 21.6429313,21.64293088,21.64292767
Longitude : 86.73077912,86.73076871,86.73076127
file name : Image_22062022105148696.png
|
2022-06-22 10:51:48.827882 |
60 |
83075813 |
Chlorinization of drinking water source |
16000 |
Chlorinization of drinking water source1 |
Roof laid |
-
latitude : 21.7119321
Longitude : 86.6236185
file name : Image_27082024124354962.png
|
2024-08-27 12:43:55.618613 |
61 |
83075813 |
Chlorinization of drinking water source |
16000 |
Chlorinization of drinking water source1 |
Plinth level |
-
latitude : 21.7119274
Longitude : 86.6236183
file name : Image_27082024124100482.png
|
2024-08-27 12:41:01.118503 |
62 |
83075813 |
Chlorinization of drinking water source |
16000 |
Chlorinization of drinking water source1 |
Completion of work |
-
latitude : 21.7119518
Longitude : 86.6236201
file name : Image_27082024123633982.png
|
2024-08-27 12:36:34.753348 |
63 |
44156963 |
ELECTRICITY FOR TWO PWS PROJECTS |
180000 |
ELECTRICITY FOR TWO PWS PROJECTS1 |
Completion of work |
-
latitude : 21.61547472
Longitude : 86.74377285
file name : Image_11112022170611824.png
|
2022-11-11 17:06:11.917633 |
64 |
44156963 |
ELECTRICITY FOR TWO PWS PROJECTS |
180000 |
ELECTRICITY FOR TWO PWS PROJECTS1 |
Completion of work |
-
latitude : 21.61547472
Longitude : 86.74377285
file name : Image_12092022133609233.png
|
2022-09-12 13:36:09.347128 |
65 |
65755378 |
Providing piped water supply to public institutions |
96000 |
Providing piped water supply to public institutions1 |
Completion of work |
-
latitude : 21.62628187,21.62625983
Longitude : 86.73244458,86.73243863
file name : Image_30112022115113988.png
|
2022-11-30 11:51:14.10917 |
66 |
65755378 |
Providing piped water supply to public institutions |
96000 |
Providing piped water supply to public institutions1 |
Completion of work |
-
latitude : 21.65755939,21.65756217,21.65756217,21.65756217,21.65756218,21.65756218,21.65755678,21.65755679,21.65755682,21.65755682
Longitude : 86.71846014,86.71846122,86.71846122,86.71846121,86.71846121,86.7184612,86.7184558,86.7184558,86.71845571,86.71845569
file name : Image_11112022171949374.png
|
2022-11-11 17:19:49.466086 |
67 |
65755378 |
Providing piped water supply to public institutions |
96000 |
Providing piped water supply to public institutions1 |
Completion of work |
-
latitude : 21.65755742,21.65762132,21.65762132,21.65762132
Longitude : 86.7185024,86.71828005,86.71828005,86.71828005
file name : Image_11112022172137652.png
|
2022-11-11 17:21:37.769959 |
68 |
65755422 |
Operation & maintenance of drinking water supply system |
62500 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.62375158
Longitude : 86.72771384
file name : Image_30112022115211139.png
|
2022-11-30 11:52:11.268246 |
69 |
65760687 |
Water Supply to villages |
12500 |
Water Supply to villages1 |
Completion of work |
-
latitude : 21.65788064
Longitude : 86.71736452
file name : Image_01122022170214952.png
|
2022-12-01 17:02:15.06085 |
70 |
65761347 |
CLEANING OF DRAIN FROM TAGA CHHAKA TO GIRISH BEHERA HOUSE AT KUAMARA |
10000 |
CLEANING OF DRAIN FROM TAGA CHHAKA TO GIRISH BEHERA HOUSE AT KUAMARA1 |
Completion of work |
-
latitude : 21.62104658,21.62103528
Longitude : 86.73083352,86.73082582
file name : Image_17112023125437398.png
|
2023-11-17 12:54:37.529946 |
71 |
65761347 |
CLEANING OF DRAIN FROM TAGA CHHAKA TO GIRISH BEHERA HOUSE AT KUAMARA |
10000 |
CLEANING OF DRAIN FROM TAGA CHHAKA TO GIRISH BEHERA HOUSE AT KUAMARA1 |
Completion of work |
-
latitude : 21.6580587,21.65805602,21.65805586,21.65805608,21.65805575
Longitude : 86.71734651,86.71734905,86.71734965,86.71734992,86.71735024
file name : Image_17122022155933710.png
|
2022-12-17 15:59:33.84349 |
72 |
65761400 |
CLEANING OF DRAIN FROM KUNDI POKHARI TO KRUSHNA SAGAR POND AT KUAMARA |
20000 |
CLEANING OF DRAIN FROM KUNDI POKHARI TO KRUSHNA SAGAR POND AT KUAMARA1 |
Completion of work |
-
latitude : 21.65805053,21.65805199,21.6580524
Longitude : 86.71735695,86.71735703,86.717357
file name : Image_17122022155937385.png
|
2022-12-17 15:59:37.505908 |
73 |
65761230 |
IMP OF ROAD FROM PWD ROAD TO MANGALA MANDIR AT CHILIMA |
370000 |
IMP OF ROAD FROM PWD ROAD TO MANGALA MANDIR AT CHILIMA1 |
Completion of work |
-
latitude : 21.63291597,21.6329515,21.6329515
Longitude : 86.73899876,86.7389925,86.7389925
file name : Image_03032023110806720.png
|
2023-03-03 11:08:06.820599 |
74 |
65760546 |
CONST OF C C ROAD FROM TINGIRI SING HOUSE TO ANABANI ROAD UPARKADADA |
315000 |
CONST OF C C ROAD FROM TINGIRI SING HOUSE TO ANABANI ROAD UPARKADADA1 |
Completion of work |
-
latitude : 21.6311785,21.63274886
Longitude : 86.7387046,86.73910058
file name : Image_03032023110702888.png
|
2023-03-03 11:07:02.983564 |
75 |
65761291 |
CONST OF UNCOMPLETED CANDAN PADIA ROAD AT TALAKADADA |
30000 |
CONST OF UNCOMPLETED CANDAN PADIA ROAD AT TALAKADADA1 |
Completion of work |
-
latitude : 21.6262631,21.6262634,21.6262634
Longitude : 86.7323448,86.7323446,86.7323446
file name : Image_28032023114008182.png
|
2023-03-28 11:40:08.284358 |
76 |
65760586 |
CONST OF C C ROAD FROM BASANTA KAR HOUSE TO RAUTA POKHARI AT TALAKADADA |
130000 |
CONST OF C C ROAD FROM BASANTA KAR HOUSE TO RAUTA POKHARI AT TALAKADADA1 |
Completion of work |
-
latitude : 21.6262646,21.6262634
Longitude : 86.7323449,86.7323446
file name : Image_28032023113816373.png
|
2023-03-28 11:38:16.512702 |
77 |
65760877 |
CONST OF ROAD FROM ROUTA POKHARI TO RAM CHANDRA HOUSE AT TALAKADADA |
220000 |
CONST OF ROAD FROM ROUTA POKHARI TO RAM CHANDRA HOUSE AT TALAKADADA1 |
Completion of work |
-
latitude : 21.6262642,21.6262631,21.6262631
Longitude : 86.7323448,86.7323448,86.7323447
file name : Image_28032023114339538.png
|
2023-03-28 11:43:39.658521 |
78 |
65755329 |
Operation & maintenance of drinking water supply system |
300000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.626262
Longitude : 86.7323415
file name : Image_28032023120448269.png
|
2023-03-28 12:04:48.402436 |
79 |
65760498 |
CONST OF C C ROAD FROM BEDGA SING HOUSE TO LALE SING HOUSE AT UPARKADADA |
350000 |
CONST OF C C ROAD FROM BEDGA SING HOUSE TO LALE SING HOUSE AT UPARKADADA1 |
Completion of work |
-
latitude : 21.6262634,21.6262638,21.6262638
Longitude : 86.7323446,86.7323447,86.7323447
file name : Image_28032023120641794.png
|
2023-03-28 12:06:41.920783 |
80 |
65761106 |
CONST OF APPROACH ROAD FROM TAPAN BEHERA HOUSE TO RI OFFICE AT KUAMARA |
200000 |
CONST OF APPROACH ROAD FROM TAPAN BEHERA HOUSE TO RI OFFICE AT KUAMARA1 |
Completion of work |
-
latitude : 21.65790732,21.65791715,21.65790965,21.65790751
Longitude : 86.71737402,86.7173754,86.71736836,86.71735355
file name : Image_17052023102020279.png
|
2023-05-17 10:20:20.377376 |
81 |
65760739 |
CONST OF BATHING GHAT AT PATUA TALAGADI POKHARI |
100000 |
CONST OF BATHING GHAT AT PATUA TALAGADI POKHARI1 |
Completion of work |
-
latitude : 21.65772935
Longitude : 86.71729787
file name : Image_23062023111452826.png
|
2023-06-23 11:14:52.926798 |
82 |
65755477 |
Operation & maintenance of drinking water supply system |
225000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.65799969
Longitude : 86.72052399
file name : Image_11072023152023200.png
|
2023-07-11 15:20:23.296821 |
83 |
65755921 |
Creation of community soak pits for group of Households |
100000 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 21.6578989
Longitude : 86.71739879
file name : Image_17102023172952288.png
|
2023-10-17 17:29:52.405751 |
84 |
83072558 |
Piped water supply to HH |
96000 |
Piped water supply to HH1 |
|
-
latitude : 21.7119307
Longitude : 86.6236018
file name : Image_19102023132524191.png
|
2023-10-19 13:25:24.274726 |
85 |
65755921 |
Creation of community soak pits for group of Households |
100000 |
Creation of community soak pits for group of Households20 |
Completion of work |
-
latitude : 21.65793884
Longitude : 86.71735766
file name : Image_17102023172900488.png
|
2023-10-17 17:29:00.588684 |
86 |
83088243 |
Construction and Maintenance of Community Centre |
117000 |
Construction and Maintenance of Community Centre1 |
Roof laid |
-
latitude : 21.71170068
Longitude : 86.63539959
file name : Image_16112023170323084.png
|
2023-11-16 17:03:23.176658 |
87 |
83088243 |
Construction and Maintenance of Community Centre |
117000 |
Construction and Maintenance of Community Centre1 |
Plinth level |
-
latitude : 21.65750916
Longitude : 86.71838129
file name : Image_13112023135223458.png
|
2023-11-13 13:52:23.543874 |
88 |
83088243 |
Construction and Maintenance of Community Centre |
117000 |
Construction and Maintenance of Community Centre1 |
Completion of work |
-
latitude : 21.63219649
Longitude : 86.73385975
file name : Image_13112023130323032.png
|
2023-11-13 13:03:23.12974 |
89 |
83088243 |
Construction and Maintenance of Community Centre |
117000 |
Construction and Maintenance of Community Centre1 |
Completion of work |
-
latitude : 21.62890264
Longitude : 86.73255693
file name : Image_08112023120446574.png
|
2023-11-08 12:04:46.670439 |
90 |
65755835 |
Operation & maintenance of community compost pits |
140000 |
Operation & maintenance of community compost pits1 |
Completion of work |
-
latitude : 21.62078077
Longitude : 86.73055116
file name : Image_17112023124920174.png
|
2023-11-17 12:49:20.269718 |
91 |
65755835 |
Operation & maintenance of community compost pits |
140000 |
Operation & maintenance of community compost pits1 |
Completion of work |
-
latitude : 21.6413257
Longitude : 86.7298497
file name : Image_17112023124501069.png
|
2023-11-17 12:45:01.158875 |
92 |
65755978 |
Operation & maintenance of community soak pits |
119700 |
Operation & maintenance of community soak pits1 |
Completion of work |
-
latitude : 21.62061717
Longitude : 86.74250887
file name : Image_29112023122937164.png
|
2023-11-29 12:29:37.261689 |
93 |
65755978 |
Operation & maintenance of community soak pits |
119700 |
Operation & maintenance of community soak pits1 |
Completion of work |
-
latitude : 21.65161738
Longitude : 86.73895679
file name : Image_23112023124104529.png
|
2023-11-23 12:41:04.619186 |
94 |
83084892 |
Construction of roads |
299832 |
Construction of roads1 |
Roof laid |
-
latitude : 21.62926899,21.62931678
Longitude : 86.73998575,86.73999722
file name : Image_12062024105549259.png
|
2024-06-12 10:55:49.36085 |
95 |
83084892 |
Construction of roads |
299832 |
Construction of roads1 |
Roof laid |
-
latitude : 21.62045942,21.62045586,21.62044866
Longitude : 86.66456299,86.6645721,86.6645819
file name : Image_05122023152938015.png
|
2023-12-05 15:29:38.136493 |
96 |
83084892 |
Construction of roads |
299832 |
Construction of roads1 |
Plinth level |
-
latitude : 21.62849996,21.62848524
Longitude : 86.72428216,86.7242753
file name : Image_01122023133653164.png
|
2023-12-01 13:36:53.28186 |
97 |
83084892 |
Construction of roads |
299832 |
Construction of roads1 |
Completion of work |
-
latitude : 21.66095504,21.6609524
Longitude : 86.71594914,86.71594719
file name : Image_29112023123240905.png
|
2023-11-29 12:32:41.00335 |
98 |
83091925 |
Use of LED buls/LED tubelights for street lights |
105593 |
Use of LED buls/LED tubelights for street lights1 |
Roof laid |
-
latitude : 21.657995
Longitude : 86.71746285
file name : Image_20032024163211308.png
|
2024-03-20 16:32:11.385982 |
99 |
83091925 |
Use of LED buls/LED tubelights for street lights |
105593 |
Use of LED buls/LED tubelights for street lights1 |
Roof laid |
-
latitude : 21.65803072
Longitude : 86.71895231
file name : Image_20122023114506220.png
|
2023-12-20 11:45:06.318856 |
100 |
83091925 |
Use of LED buls/LED tubelights for street lights |
105593 |
Use of LED buls/LED tubelights for street lights1 |
Plinth level |
-
latitude : 21.6336763
Longitude : 86.7951689
file name : Image_13122023174918839.png
|
2023-12-13 17:49:18.905168 |
101 |
83091925 |
Use of LED buls/LED tubelights for street lights |
105593 |
Use of LED buls/LED tubelights for street lights1 |
Completion of work |
-
latitude : 21.6313678
Longitude : 86.7082447
file name : Image_13122023121500676.png
|
2023-12-13 12:15:00.803402 |
102 |
83091925 |
Use of LED buls/LED tubelights for street lights |
105593 |
Use of LED buls/LED tubelights for street lights1 |
Completion of work |
-
latitude : 21.65820718
Longitude : 86.71911986
file name : Image_11122023200646439.png
|
2023-12-11 20:06:46.59842 |
103 |
83091925 |
Use of LED buls/LED tubelights for street lights |
105593 |
Use of LED buls/LED tubelights for street lights1 |
Completion of work |
-
latitude : 21.7119244
Longitude : 86.6236406
file name : Image_29112023171545215.png
|
2023-11-29 17:15:45.315342 |
104 |
83089694 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.71085648,21.7108543,21.71085339
Longitude : 86.6290026,86.62900528,86.62900407
file name : Image_19032024131356205.png
|
2024-03-19 13:13:56.699049 |
105 |
83089694 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.70574681,21.70574659
Longitude : 86.63988022,86.63988124
file name : Image_15032024093429334.png
|
2024-03-15 09:34:29.433961 |
106 |
83089694 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.62589114,21.62589115
Longitude : 86.73026601,86.73026595
file name : Image_12032024123752570.png
|
2024-03-12 12:37:52.667732 |
107 |
83089694 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.65937905,21.65937937
Longitude : 86.71247635,86.71247793
file name : Image_11032024081943491.png
|
2024-03-11 08:19:43.579258 |
108 |
83089346 |
Construction of roads |
150000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.71095511,21.71095511,21.71095511
Longitude : 86.63069653,86.63069653,86.63069653
file name : Image_19032024131301282.png
|
2024-03-19 13:13:01.42147 |
109 |
83089346 |
Construction of roads |
150000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.70573162,21.70573646,21.70573868
Longitude : 86.63990022,86.63988532,86.63988676
file name : Image_15032024093328628.png
|
2024-03-15 09:33:28.592738 |
110 |
83089346 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.62588433,21.62588688,21.62588698
Longitude : 86.73026952,86.73026888,86.73026881
file name : Image_12032024123657571.png
|
2024-03-12 12:36:57.669292 |
111 |
83089346 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.65947145,21.65945706,21.65945941,21.65945572
Longitude : 86.71221713,86.71219547,86.71219817,86.71219886
file name : Image_11032024081823991.png
|
2024-03-11 08:18:24.075965 |
112 |
83085687 |
Creation of drainage channel for management of grey water |
275000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 21.71206022
Longitude : 86.62364164
file name : Image_02072024192327408.png
|
2024-07-02 19:23:27.509484 |
113 |
83085687 |
Creation of drainage channel for management of grey water |
275000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 21.71206398
Longitude : 86.62366166
file name : Image_02072024192220799.png
|
2024-07-02 19:22:20.888576 |
114 |
83085687 |
Creation of drainage channel for management of grey water |
275000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 21.62554975
Longitude : 86.72354766
file name : Image_28062024140412292.png
|
2024-06-28 14:04:12.388117 |
115 |
83085687 |
Creation of drainage channel for management of grey water |
275000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 21.62555966
Longitude : 86.72352957
file name : Image_28062024140338220.png
|
2024-06-28 14:03:38.323643 |
116 |
83085687 |
Creation of drainage channel for management of grey water |
275000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 21.62552544
Longitude : 86.7234859
file name : Image_13062024111045521.png
|
2024-06-13 11:10:45.612936 |
117 |
83087430 |
Construction of roads |
215500 |
Construction of roads1 |
Roof laid |
-
latitude : 21.71205669,21.71205481
Longitude : 86.62385965,86.6238699
file name : Image_02072024192813183.png
|
2024-07-02 19:28:13.274915 |
118 |
83087430 |
Construction of roads |
215500 |
Construction of roads1 |
Plinth level |
-
latitude : 21.7120615,21.71206223
Longitude : 86.62360698,86.62360746
file name : Image_02072024191057983.png
|
2024-07-02 19:10:58.07016 |
119 |
83087430 |
Construction of roads |
215500 |
Construction of roads1 |
Plinth level |
-
latitude : 21.71206087,21.71206056
Longitude : 86.62360325,86.62360367
file name : Image_02072024191047166.png
|
2024-07-02 19:10:47.238762 |
120 |
83087430 |
Construction of roads |
215500 |
Construction of roads1 |
Completion of work |
-
latitude : 21.61520749,21.61520422
Longitude : 86.74448125,86.74448007
file name : Image_29062024121140052.png
|
2024-06-29 12:11:40.144864 |
121 |
83087430 |
Construction of roads |
215500 |
Construction of roads1 |
Completion of work |
-
latitude : 21.61521277,21.6152163,21.615219,21.61522076
Longitude : 86.74448029,86.744466,86.74446546,86.74446476
file name : Image_29062024121031012.png
|
2024-06-29 12:10:31.112493 |
122 |
83087430 |
Construction of roads |
215500 |
Construction of roads1 |
Completion of work |
-
latitude : 21.61517044,21.61517057
Longitude : 86.74444811,86.74444929
file name : Image_25062024101742406.png
|
2024-06-25 10:17:42.510081 |
123 |
83087430 |
Construction of roads |
215500 |
Construction of roads1 |
Completion of work |
-
latitude : 21.61523095,21.61522466
Longitude : 86.7444624,86.74446223
file name : Image_12062024103937537.png
|
2024-06-12 10:39:37.624915 |
124 |
83088778 |
Construction of roads |
150000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.71206747,21.71206747
Longitude : 86.62365922,86.62365922
file name : Image_02072024192013324.png
|
2024-07-02 19:20:13.409724 |
125 |
83088778 |
Construction of roads |
150000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.71205455,21.71205396
Longitude : 86.62362802,86.6236374
file name : Image_02072024181749725.png
|
2024-07-02 18:17:49.808402 |
126 |
83088778 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.6428355,21.64283368,21.64283371,21.64283371
Longitude : 86.73017557,86.73017202,86.73017201,86.73017201
file name : Image_13062024113221269.png
|
2024-06-13 11:32:21.361152 |
127 |
83086201 |
Construction of roads |
299832 |
Construction of roads1 |
Roof laid |
-
latitude : 21.71205832,21.71205795
Longitude : 86.62364341,86.62364269
file name : Image_02072024192438672.png
|
2024-07-02 19:24:38.755402 |
128 |
83086201 |
Construction of roads |
299832 |
Construction of roads1 |
Plinth level |
-
latitude : 21.62924547,21.62925374
Longitude : 86.73994619,86.73995765
file name : Image_25062024102628657.png
|
2024-06-25 10:26:28.755191 |
129 |
83086201 |
Construction of roads |
299832 |
Construction of roads1 |
Completion of work |
-
latitude : 21.6292427,21.62924281
Longitude : 86.73993567,86.73993504
file name : Image_13062024105654461.png
|
2024-06-13 10:56:54.570488 |
130 |
83113208 |
Creation of a new source of drinking water |
116498 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 21.64080323
Longitude : 86.73058286
file name : Image_18062024163154444.png
|
2024-06-18 16:31:54.569825 |
131 |
83072224 |
Chlorinization of drinking water source |
360000 |
Chlorinization of drinking water source1 |
Plinth level |
-
latitude : 21.61392434
Longitude : 86.81727562
file name : Image_30092024184013716.png
|
2024-09-30 18:40:13.809065 |
132 |
83072224 |
Chlorinization of drinking water source |
360000 |
Chlorinization of drinking water source1 |
Completion of work |
-
latitude : 21.61393718
Longitude : 86.81729079
file name : Image_30092024183636534.png
|
2024-09-30 18:36:36.607907 |
133 |
83072224 |
Chlorinization of drinking water source |
360000 |
Chlorinization of drinking water source1 |
Completion of work |
-
latitude : 21.61395497
Longitude : 86.81731269
file name : Image_30092024183305321.png
|
2024-09-30 18:33:05.401578 |
134 |
83078602 |
Connecting septic tanks with soak pits |
160200 |
Connecting septic tanks with soak pits1 |
|
-
latitude : 21.7119191
Longitude : 86.6236007
file name : Image_22102024134238731.png
|
2024-10-22 13:42:38.892736 |