1 |
48105998 |
COMPLETION OF BOUNDARY WALL AT JHIPABANDHA SCHOOL |
200000 |
COMPLETION OF BOUNDARY WALL AT JHIPABANDHA SCHOOL1 |
Completion of work |
-
latitude : 22.07482004072517
Longitude : 86.06420829892159
file name : Image_11102021125624646.png
|
2021-10-11 12:56:24.747392 |
2 |
48105998 |
COMPLETION OF BOUNDARY WALL AT JHIPABANDHA SCHOOL |
200000 |
COMPLETION OF BOUNDARY WALL AT JHIPABANDHA SCHOOL1 |
Completion of work |
-
latitude : 22.077548853121698
Longitude : 86.04892984963953
file name : Image_11102021125732014.png
|
2021-10-11 12:57:32.105326 |
3 |
44221759 |
COMPETION OF JHIPABANDHA UP SCHOOL BOUNDARY |
217600 |
COMPETION OF JHIPABANDHA UP SCHOOL BOUNDARY1 |
Roof laid |
-
latitude : 22.077148826792836
Longitude : 86.04896178469062
file name : Image_07012021113347897.png
|
2021-01-07 11:33:48.024559 |
4 |
44221759 |
COMPETION OF JHIPABANDHA UP SCHOOL BOUNDARY |
217600 |
COMPETION OF JHIPABANDHA UP SCHOOL BOUNDARY1 |
Plinth level |
-
latitude : 22.077189898118377
Longitude : 86.04898382909596
file name : Image_07012021112529547.png
|
2021-01-07 11:25:29.664443 |
5 |
44221726 |
COST. OF CANAL AND GUARD WALL AT JHIPABANDHA MAJURA BANDHA |
200000 |
COST. OF CANAL AND GUARD WALL AT JHIPABANDHA MAJURA BANDHA1 |
Roof laid |
-
latitude : 22.0769349206239,22.076919665560126
Longitude : 86.04747366160154,86.04763668961823
file name : Image_08012021120837886.png
|
2021-01-08 12:08:37.971733 |
6 |
44221726 |
COST. OF CANAL AND GUARD WALL AT JHIPABANDHA MAJURA BANDHA |
200000 |
COST. OF CANAL AND GUARD WALL AT JHIPABANDHA MAJURA BANDHA1 |
Plinth level |
-
latitude : 22.076929723843932,22.07698894198984
Longitude : 86.04762721806765,86.04761975817382
file name : Image_08012021120118210.png
|
2021-01-08 12:01:18.316375 |
7 |
44221444 |
IMPROVEMENT OF ROAD FROM BHANJA HOUSE TO NH 49 ROAD AT PANDUGONDI VILLAGE |
119466 |
IMPROVEMENT OF ROAD FROM BHANJA HOUSE TO NH 49 ROAD AT PANDUGONDI VILLAGE1 |
Roof laid |
-
latitude : 22.07657713908702,22.076627388596535
Longitude : 86.07935959473252,86.07933931052685
file name : Image_12012021150609068.png
|
2021-01-12 15:06:09.162563 |
8 |
44221444 |
IMPROVEMENT OF ROAD FROM BHANJA HOUSE TO NH 49 ROAD AT PANDUGONDI VILLAGE |
119466 |
IMPROVEMENT OF ROAD FROM BHANJA HOUSE TO NH 49 ROAD AT PANDUGONDI VILLAGE1 |
Plinth level |
-
latitude : 22.076626885682344,22.076633758842945
Longitude : 86.0793196130544,86.07930368743837
file name : Image_12012021144437397.png
|
2021-01-12 14:44:37.502336 |
9 |
44221514 |
CONST. OF BOUNDARY WALL AT POKARIA UP SCHOOL |
200000 |
CONST. OF BOUNDARY WALL AT POKARIA UP SCHOOL1 |
Roof laid |
-
latitude : 22.090014880523086
Longitude : 86.0545978602022
file name : Image_12012021173657186.png
|
2021-01-12 17:36:57.283843 |
10 |
44221514 |
CONST. OF BOUNDARY WALL AT POKARIA UP SCHOOL |
200000 |
CONST. OF BOUNDARY WALL AT POKARIA UP SCHOOL1 |
Plinth level |
-
latitude : 22.08992720581591
Longitude : 86.05460314080119
file name : Image_12012021173111181.png
|
2021-01-12 17:31:11.31049 |
11 |
44221392 |
IMPROVEMENT OF ROAD FROM RD ROAD TO PECHADARA VILLAGE ROAD |
100000 |
IMPROVEMENT OF ROAD FROM RD ROAD TO PECHADARA VILLAGE ROAD1 |
Plinth level |
-
latitude : 22.076149326749146,22.076206281781197,22.076225895434618
Longitude : 86.05388917028904,86.05390886776149,86.05390216223896
file name : Image_17032021124735484.png
|
2021-03-17 12:47:35.59503 |
12 |
44221830 |
COMPLETION OF GP K OIL GODOWN |
100000 |
COMPLETION OF GP K OIL GODOWN1 |
Roof laid |
-
latitude : 22.078063376247883
Longitude : 86.04412131942809
file name : Image_29042021104342422.png
|
2021-04-29 10:43:42.526522 |
13 |
44221830 |
COMPLETION OF GP K OIL GODOWN |
100000 |
COMPLETION OF GP K OIL GODOWN1 |
Plinth level |
-
latitude : 22.078090282157063
Longitude : 86.04410212486982
file name : Image_29042021102906230.png
|
2021-04-29 10:29:06.331545 |
14 |
48108363 |
CONST. OF HAT PINDI AT JHIPABANDH ALUPUNG HAT |
200000 |
CONST. OF HAT PINDI AT JHIPABANDH ALUPUNG HAT1 |
Roof laid |
-
latitude : 22.075938270427287
Longitude : 86.05041797272861
file name : Image_09112021161206005.png
|
2021-11-09 16:12:06.077219 |
15 |
48108363 |
CONST. OF HAT PINDI AT JHIPABANDH ALUPUNG HAT |
200000 |
CONST. OF HAT PINDI AT JHIPABANDH ALUPUNG HAT1 |
Completion of work |
-
latitude : 22.075995937921107
Longitude : 86.05036416091025
file name : Image_09112021160340590.png
|
2021-11-09 16:03:40.656159 |
16 |
48107105 |
WATER SUPLY SYSTEM AT PATALA SAHI MISSION SHAKTI HOUSE |
200000 |
WATER SUPLY SYSTEM AT PATALA SAHI MISSION SHAKTI HOUSE1 |
Completion of work |
-
latitude : 22.065118993632495,22.06516274716705
Longitude : 86.05177072808146,86.05179428122938
file name : Image_27082021124829785.png
|
2021-08-27 12:48:29.880781 |
17 |
44221486 |
CONST. OF CULVERT AND GUARD AT PANDUGONDI GURUKONDA NALAHHA |
600000 |
CONST. OF CULVERT AND GUARD AT PANDUGONDI GURUKONDA NALAHHA1 |
Completion of work |
-
latitude : 22.070643757469952,22.070657797157764
Longitude : 86.07417454943061,86.07408343814313
file name : Image_09092021142051822.png
|
2021-09-09 14:20:51.912921 |
18 |
48107933 |
JALACHHATRA |
50000 |
JALACHHATRA1 |
Completion of work |
-
latitude : 22.086197
Longitude : 86.1136999
file name : Image_11112021174107117.png
|
2021-11-11 17:41:07.200444 |
19 |
48106118 |
COMPLETION OF BOUNDARY WALL AT POKHARIA UP SCHOOL |
150000 |
COMPLETION OF BOUNDARY WALL AT POKHARIA UP SCHOOL1 |
Completion of work |
-
latitude : 22.090030387043953
Longitude : 86.05437657795846
file name : Image_07122021132410891.png
|
2021-12-07 13:24:10.972223 |
20 |
48105826 |
CONST. OF REST SHED AT JHIPABANDHA SAMSAN |
200000 |
CONST. OF REST SHED AT JHIPABANDHA SAMSAN1 |
Completion of work |
-
latitude : 22.076383726671338
Longitude : 86.05211388319731
file name : Image_09122021142730063.png
|
2021-12-09 14:27:30.149571 |
21 |
48107512 |
CONST OF GUARD WALL WITH CANAL AT JHIPABANDHA CHATIRISAHI POKHARI |
127134 |
CONST OF GUARD WALL WITH CANAL AT JHIPABANDHA CHATIRISAHI POKHARI1 |
Completion of work |
-
latitude : 22.070918600074947,22.07091956399381,22.070924174040556,22.070933813229203
Longitude : 86.0484445374459,86.04844747111201,86.04844755493104,86.04844193905592
file name : Image_18122021110045646.png
|
2021-12-18 11:00:45.724485 |
22 |
48106713 |
CONST. OF GURD WALL WITH CANAL AT JHIPABANDHA CHATIRISAHI POKHARI |
58789 |
CONST. OF GURD WALL WITH CANAL AT JHIPABANDHA CHATIRISAHI POKHARI1 |
Completion of work |
-
latitude : 22.071205638349056
Longitude : 86.04846155270934
file name : Image_18122021105717737.png
|
2021-12-18 10:57:17.83554 |
23 |
48108121 |
IMP. OF DHODICHUA POKHARI SAHI ROAD |
120000 |
IMP. OF DHODICHUA POKHARI SAHI ROAD1 |
Completion of work |
-
latitude : 22.065093470737338,22.0650989189744
Longitude : 86.0290417727083,86.02906432002783
file name : Image_03012022163724529.png
|
2022-01-03 16:37:24.611257 |
24 |
48107233 |
CONST. OF OF GUARD WALL AT PANDUGANDI BADA BANDHA |
285922 |
CONST. OF OF GUARD WALL AT PANDUGANDI BADA BANDHA1 |
Completion of work |
-
latitude : 22.08136127796024,22.081372761167586,22.08137351553887
Longitude : 86.07608570717275,86.0759708750993,86.07597045600414
file name : Image_08012022094808200.png
|
2022-01-08 09:48:08.313605 |
25 |
48106533 |
IMP. OF GP OFFICE |
195052 |
IMP. OF GP OFFICE1 |
Completion of work |
-
latitude : 22.086095460690558
Longitude : 86.11382740549743
file name : Image_25012022124325700.png
|
2022-01-25 12:43:25.822623 |
26 |
83163492 |
Creation of community soak pits for group of Households |
29700 |
Creation of community soak pits for group of Households1 |
Roof laid |
-
latitude : 22.0861805
Longitude : 86.1137176
file name : Image_18122023170742978.png
|
2023-12-18 17:07:43.039726 |
27 |
83163492 |
Creation of community soak pits for group of Households |
29700 |
Creation of community soak pits for group of Households1 |
Plinth level |
-
latitude : 22.0862451
Longitude : 86.1137681
file name : Image_18122023170510938.png
|
2023-12-18 17:05:10.997653 |
28 |
83163492 |
Creation of community soak pits for group of Households |
29700 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 22.0924314
Longitude : 86.11216406
file name : Image_25112023164059223.png
|
2023-11-25 16:40:59.279178 |
29 |
83162018 |
Operation and Maintenance of drinking water supply system |
85279 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 22.0862466
Longitude : 86.1138068
file name : Image_20102023120539120.png
|
2023-10-20 12:05:39.183706 |
30 |
83162018 |
Operation and Maintenance of drinking water supply system |
85279 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 22.0863279
Longitude : 86.1140318
file name : Image_20102023115503596.png
|
2023-10-20 11:55:03.665836 |
31 |
83162018 |
Operation and Maintenance of drinking water supply system |
85279 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 22.0863452
Longitude : 86.1140454
file name : Image_20102023114723575.png
|
2023-10-20 11:47:23.650265 |
32 |
83161902 |
Installation of Tubewell |
400000 |
Installation of Tubewell1 |
Roof laid |
-
latitude : 22.0861521
Longitude : 86.1137277
file name : Image_11062024104330528.png
|
2024-06-11 10:43:30.595229 |
33 |
83161902 |
Installation of Tubewell |
400000 |
Installation of Tubewell1 |
Roof laid |
-
latitude : 22.08621823
Longitude : 86.11365522
file name : Image_18042024113910829.png
|
2024-04-18 11:39:12.234403 |
34 |
83161902 |
Installation of Tubewell |
400000 |
Installation of Tubewell1 |
Plinth level |
-
latitude : 22.08618729
Longitude : 86.11366637
file name : Image_18042024113033871.png
|
2024-04-18 11:30:33.950933 |
35 |
83161902 |
Installation of Tubewell |
400000 |
Installation of Tubewell1 |
Completion of work |
-
latitude : 22.08618951
Longitude : 86.11364353
file name : Image_18042024111236884.png
|
2024-04-18 11:12:36.961836 |
36 |
83162131 |
Operation and Maintenance of piped water supply system |
100000 |
Operation and Maintenance of piped water supply system1 |
Roof laid |
-
latitude : 22.0861514
Longitude : 86.1137282
file name : Image_11062024104622336.png
|
2024-06-11 10:46:22.431601 |
37 |
83162131 |
Operation and Maintenance of piped water supply system |
100000 |
Operation and Maintenance of piped water supply system1 |
Roof laid |
-
latitude : 22.08621227
Longitude : 86.1136576
file name : Image_18042024114019763.png
|
2024-04-18 11:40:21.064662 |
38 |
83162131 |
Operation and Maintenance of piped water supply system |
100000 |
Operation and Maintenance of piped water supply system1 |
Plinth level |
-
latitude : 22.08617569
Longitude : 86.11365716
file name : Image_18042024113158488.png
|
2024-04-18 11:31:58.579725 |
39 |
83162131 |
Operation and Maintenance of piped water supply system |
100000 |
Operation and Maintenance of piped water supply system1 |
Completion of work |
-
latitude : 22.0861969
Longitude : 86.11366903
file name : Image_18042024111541730.png
|
2024-04-18 11:15:41.817243 |
40 |
83156514 |
Maintenance of Panchayat Bhawan |
109052 |
Maintenance of Panchayat Bhawan1 |
Plinth level |
-
latitude : 22.0861981
Longitude : 86.113688
file name : Image_22122023162147797.png
|
2023-12-22 16:21:47.868263 |
41 |
83156514 |
Maintenance of Panchayat Bhawan |
109052 |
Maintenance of Panchayat Bhawan1 |
Completion of work |
-
latitude : 22.0861977
Longitude : 86.113688
file name : Image_22122023161638385.png
|
2023-12-22 16:16:38.471771 |
42 |
83164106 |
Maintenance of Panchayat Bhawan |
230000 |
Maintenance of Panchayat Bhawan1 |
Plinth level |
-
latitude : 22.0862148
Longitude : 86.1137278
file name : Image_12032024172145153.png
|
2024-03-12 17:21:45.227731 |
43 |
83164106 |
Maintenance of Panchayat Bhawan |
230000 |
Maintenance of Panchayat Bhawan1 |
Completion of work |
-
latitude : 22.0862045
Longitude : 86.1136946
file name : Image_12032024171511239.png
|
2024-03-12 17:15:11.29909 |
44 |
83156410 |
Construction of Paver Block |
200000 |
Construction of Paver Block1 |
Plinth level |
-
latitude : 22.0862128
Longitude : 86.1137016
file name : Image_19032024173803125.png
|
2024-03-19 17:38:03.194802 |
45 |
83156410 |
Construction of Paver Block |
200000 |
Construction of Paver Block1 |
Completion of work |
-
latitude : 22.0862382
Longitude : 86.1137233
file name : Image_19032024173058561.png
|
2024-03-19 17:30:58.648454 |
46 |
65804710 |
Operation & maintenance of drinking water supply system |
28911 |
Operation & maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 22.0862092
Longitude : 86.1136946
file name : Image_24092024151159048.png
|
2024-09-24 15:11:59.148596 |
47 |
65804710 |
Operation & maintenance of drinking water supply system |
28911 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 22.0861965
Longitude : 86.1136794
file name : Image_24092024150504068.png
|
2024-09-24 15:05:04.177195 |
48 |
101952646 |
Operation and Maintenance of drinking/piped water supply system |
432000 |
Operation and Maintenance of drinking/piped water supply system1 |
Plinth level |
-
latitude : 22.086283333333334
Longitude : 86.11371833333332
file name : Image_26092024155330024.png
|
2024-09-26 15:53:30.302891 |
49 |
101952646 |
Operation and Maintenance of drinking/piped water supply system |
432000 |
Operation and Maintenance of drinking/piped water supply system1 |
Completion of work |
-
latitude : 22.0861489
Longitude : 86.1137241
file name : Image_26092024154405646.png
|
2024-09-26 15:44:05.796274 |
50 |
65804150 |
Completion of guardwall at Gaubandha to Mohanta Sahi road at Jhipabandh |
200000 |
Completion of guardwall at Gaubandha to Mohanta Sahi road at Jhipabandh 1 |
Roof laid |
-
latitude : 22.0861983,22.0861982
Longitude : 86.1136872,86.1136879
file name : Image_27072024122051659.png
|
2024-07-27 12:20:51.725321 |
51 |
65804150 |
Completion of guardwall at Gaubandha to Mohanta Sahi road at Jhipabandh |
200000 |
Completion of guardwall at Gaubandha to Mohanta Sahi road at Jhipabandh 1 |
Plinth level |
-
latitude : 22.0861975,22.0861983
Longitude : 86.1136896,86.1136876
file name : Image_26072024155115418.png
|
2024-07-26 15:51:15.406106 |
52 |
65804150 |
Completion of guardwall at Gaubandha to Mohanta Sahi road at Jhipabandh |
200000 |
Completion of guardwall at Gaubandha to Mohanta Sahi road at Jhipabandh 1 |
Plinth level |
-
latitude : 22.0861977,22.0861979
Longitude : 86.1136956,86.113688
file name : Image_26072024153150001.png
|
2024-07-26 15:31:50.073012 |
53 |
65804150 |
Completion of guardwall at Gaubandha to Mohanta Sahi road at Jhipabandh |
200000 |
Completion of guardwall at Gaubandha to Mohanta Sahi road at Jhipabandh 1 |
Completion of work |
-
latitude : 22.086193,22.0863439
Longitude : 86.1137242,86.1138844
file name : Image_26072024143659329.png
|
2024-07-26 14:36:59.408098 |
54 |
83156458 |
Construction of Paver Block |
200000 |
Construction of Paver Block1 |
Plinth level |
-
latitude : 22.0861964
Longitude : 86.1136887
file name : Image_27072024122404261.png
|
2024-07-27 12:24:04.333627 |
55 |
83156458 |
Construction of Paver Block |
200000 |
Construction of Paver Block1 |
Completion of work |
-
latitude : 22.0863846
Longitude : 86.1139171
file name : Image_26072024143335155.png
|
2024-07-26 14:33:35.223807 |
56 |
83156458 |
Construction of Paver Block |
200000 |
Construction of Paver Block1 |
Completion of work |
-
latitude : 22.0863846
Longitude : 86.1139171
file name : Image_26072024143345169.png
|
2024-07-26 14:33:45.242836 |
57 |
83156458 |
Construction of Paver Block |
200000 |
Construction of Paver Block1 |
Completion of work |
-
latitude : 22.0861984
Longitude : 86.1137238
file name : Image_26072024143331381.png
|
2024-07-26 14:33:31.44934 |
58 |
101951815 |
Installation of Tubewell |
100000 |
Installation of Tubewell1 |
Roof laid |
-
latitude : 22.0861517
Longitude : 86.1136877
file name : Image_08102024162208253.png
|
2024-10-08 16:22:08.331172 |
59 |
101951815 |
Installation of Tubewell |
100000 |
Installation of Tubewell1 |
Plinth level |
-
latitude : 22.0861517
Longitude : 86.1136877
file name : Image_08102024161536158.png
|
2024-10-08 16:15:36.239826 |
60 |
101951815 |
Installation of Tubewell |
100000 |
Installation of Tubewell1 |
Completion of work |
-
latitude : 22.0861516
Longitude : 86.1136877
file name : Image_08102024160511260.png
|
2024-10-08 16:05:11.355457 |
61 |
101951815 |
Installation of Tubewell |
100000 |
Installation of Tubewell1 |
Completion of work |
-
latitude : 22.0861505
Longitude : 86.1136884
file name : Image_08102024155818730.png
|
2024-10-08 15:58:18.817359 |
62 |
101951815 |
Installation of Tubewell |
100000 |
Installation of Tubewell1 |
Completion of work |
-
latitude : 22.0861517
Longitude : 86.1136872
file name : Image_08102024153756527.png
|
2024-10-08 15:37:56.991508 |