1 |
48079802 |
Rural Park at Pokharia Raja Bandha. |
200000 |
Rural Park at Pokharia Raja Bandha.1 |
Completion of work |
-
latitude : 22.248779525980353,22.248772862367332
Longitude : 86.53610726818442,86.53610383160412
file name : Image_05022022152426594.png
|
2022-02-05 15:24:26.678157 |
2 |
48079802 |
Rural Park at Pokharia Raja Bandha. |
200000 |
Rural Park at Pokharia Raja Bandha.1 |
Completion of work |
-
latitude : 22.24878543522209,22.24878543522209,22.24878543522209
Longitude : 86.53606125153601,86.53606125153601,86.53606125153601
file name : Image_05022022152431282.png
|
2022-02-05 15:24:31.36903 |
3 |
48079802 |
Rural Park at Pokharia Raja Bandha. |
200000 |
Rural Park at Pokharia Raja Bandha.1 |
Completion of work |
-
latitude : 22.248817747458816,22.248817747458816
Longitude : 86.53604976832867,86.53604976832867
file name : Image_05022022152436264.png
|
2022-02-05 15:24:36.341778 |
4 |
44199609 |
Connecting of approach road at Tilokdihi Madan house to Padana House. |
200000 |
Connecting of approach road at Tilokdihi Madan house to Padana House. 1 |
Completion of work |
-
latitude : 22.258477597497404,22.25844272878021
Longitude : 86.5729479957372,86.57290524803102
file name : Image_23032021132311571.png
|
2021-03-23 13:23:11.667082 |
5 |
44198814 |
Digging of new tube well at Jerkani Khirdihi Lusa House(D.T.H Tube Well ) |
105000 |
Digging of new tube well at Jerkani Khirdihi Lusa House(D.T.H Tube Well )1 |
Completion of work |
-
latitude : 22.2575158579275
Longitude : 86.57447006553411
file name : Image_24122020114204614.png
|
2020-12-24 11:42:04.697071 |
6 |
44199575 |
Connecting of approach road at Bankisole School Sahi |
200000 |
Connecting of approach road at Bankisole School Sahi 1 |
Completion of work |
-
latitude : 22.265136768110096,22.265168577432632
Longitude : 86.56388531439006,86.56395798549056
file name : Image_18022021133036304.png
|
2021-02-18 13:30:36.47058 |
7 |
44199035 |
Digging of new tube well at Jerkani Khairdihi Bikram Sahi(D.T.H Tube Well) |
105000 |
Digging of new tube well at Jerkani Khairdihi Bikram Sahi(D.T.H Tube Well)1 |
Completion of work |
-
latitude : 22.2567586787045
Longitude : 86.5732997842133
file name : Image_24122020113926611.png
|
2020-12-24 11:39:26.716726 |
8 |
44198942 |
Digging of new tube well at Pokharia Bhurkundbadi Bharat sahi near Bhima Marandi house.(D.T.H Tube W |
105000 |
Digging of new tube well at Pokharia Bhurkundbadi Bharat sahi near Bhima Marandi house.(D.T.H Tube W1 |
Completion of work |
-
latitude : 22.25305588915944
Longitude : 86.5473036468029
file name : Image_18032021121707584.png
|
2021-03-18 12:17:07.72979 |
9 |
44198969 |
Digging of new tube well at Jerkani near Loso Majhi House(D.T.H Tube Well ) |
105000 |
Digging of new tube well at Jerkani near Loso Majhi House(D.T.H Tube Well )1 |
Completion of work |
-
latitude : 22.25850961636752
Longitude : 86.56005570665002
file name : Image_25022021114146073.png
|
2021-02-25 11:41:46.168331 |
10 |
44198997 |
Digging of new tube well at Bankisole Mangal Sahi(D.T.H Tube Well ) |
105000 |
Digging of new tube well at Bankisole Mangal Sahi(D.T.H Tube Well )1 |
Completion of work |
-
latitude : 22.276095813140273
Longitude : 86.55800272710621
file name : Image_25022021115826849.png
|
2021-02-25 11:58:26.96144 |
11 |
44198885 |
Digging of new tube well at Nahadakacha Siba Temple.(D.T.H Tube Well ) |
105000 |
Digging of new tube well at Nahadakacha Siba Temple.(D.T.H Tube Well )1 |
Completion of work |
-
latitude : 22.246348271146417
Longitude : 86.52914743870497
file name : Image_25022021123742459.png
|
2021-02-25 12:37:42.561601 |
12 |
44199182 |
Comp. of Community Center at Manaharpur. |
200000 |
Comp. of Community Center at Manaharpur.1 |
Completion of work |
-
latitude : 22.244116589426994
Longitude : 86.58851905725896
file name : Image_31032021121806963.png
|
2021-03-31 12:18:07.083092 |
13 |
44199154 |
Comp. of Community Center at Kasiabeda. |
200000 |
Comp. of Community Center at Kasiabeda.1 |
Completion of work |
-
latitude : 22.251391117461026
Longitude : 86.55022088438272
file name : Image_26022021111745839.png
|
2021-02-26 11:17:45.931466 |
14 |
44199332 |
Const. of Damage well platform at Pokharia Bhalupahadi |
30000 |
Const. of Damage well platform at Pokharia Bhalupahadi1 |
Completion of work |
-
latitude : 22.244865051470697
Longitude : 86.56612822785974
file name : Image_18032021174731224.png
|
2021-03-18 17:47:31.339502 |
15 |
44199248 |
Const. of CD work and approach Road at Kherna Smasan Ghat |
200000 |
Const. of CD work and approach Road at Kherna Smasan Ghat1 |
Completion of work |
-
latitude : 22.245810320600867,22.24578924011439
Longitude : 86.5692318789661,86.56920237466693
file name : Image_18032021173922781.png
|
2021-03-18 17:39:22.935327 |
16 |
44199248 |
Const. of CD work and approach Road at Kherna Smasan Ghat |
200000 |
Const. of CD work and approach Road at Kherna Smasan Ghat1 |
Completion of work |
-
latitude : 22.245811577886343,22.24588454235345
Longitude : 86.56916733831167,86.56913523562253
file name : Image_19032021104052626.png
|
2021-03-19 10:40:52.726322 |
17 |
44199077 |
Digging of new tube well at Jerkani Tilokdihi Sukram Sahi with Sock Pit.(D.T.H Tube Well ) |
110733 |
Digging of new tube well at Jerkani Tilokdihi Sukram Sahi with Sock Pit.(D.T.H Tube Well )1 |
Completion of work |
-
latitude : 22.259079376235604
Longitude : 86.57224047929049
file name : Image_31052021111052962.png
|
2021-05-31 11:10:53.07006 |
18 |
44199077 |
Digging of new tube well at Jerkani Tilokdihi Sukram Sahi with Sock Pit.(D.T.H Tube Well ) |
110733 |
Digging of new tube well at Jerkani Tilokdihi Sukram Sahi with Sock Pit.(D.T.H Tube Well )1 |
Completion of work |
-
latitude : 22.259105485863984
Longitude : 86.57224953174591
file name : Image_31052021111125454.png
|
2021-05-31 11:11:25.602633 |
19 |
44199077 |
Digging of new tube well at Jerkani Tilokdihi Sukram Sahi with Sock Pit.(D.T.H Tube Well ) |
110733 |
Digging of new tube well at Jerkani Tilokdihi Sukram Sahi with Sock Pit.(D.T.H Tube Well )1 |
Completion of work |
-
latitude : 22.25910703651607
Longitude : 86.57223084010184
file name : Image_31052021111158933.png
|
2021-05-31 11:11:59.046825 |
20 |
44199077 |
Digging of new tube well at Jerkani Tilokdihi Sukram Sahi with Sock Pit.(D.T.H Tube Well ) |
110733 |
Digging of new tube well at Jerkani Tilokdihi Sukram Sahi with Sock Pit.(D.T.H Tube Well )1 |
Completion of work |
-
latitude : 22.25909014698118
Longitude : 86.5722600929439
file name : Image_31052021111221793.png
|
2021-05-31 11:12:21.937492 |
21 |
44199077 |
Digging of new tube well at Jerkani Tilokdihi Sukram Sahi with Sock Pit.(D.T.H Tube Well ) |
110733 |
Digging of new tube well at Jerkani Tilokdihi Sukram Sahi with Sock Pit.(D.T.H Tube Well )1 |
Completion of work |
-
latitude : 22.259101043455303
Longitude : 86.57226000912488
file name : Image_31052021111232492.png
|
2021-05-31 11:12:32.60613 |
22 |
44199077 |
Digging of new tube well at Jerkani Tilokdihi Sukram Sahi with Sock Pit.(D.T.H Tube Well ) |
110733 |
Digging of new tube well at Jerkani Tilokdihi Sukram Sahi with Sock Pit.(D.T.H Tube Well )1 |
Completion of work |
-
latitude : 22.259078160859644
Longitude : 86.57222748734057
file name : Image_31052021111237038.png
|
2021-05-31 11:12:37.178789 |
23 |
44198916 |
Digging of new tube well at Pokharia Sarngidihi Harijan sahi near Banshidhara House.(D.T.H Tube Well |
105000 |
Digging of new tube well at Pokharia Sarngidihi Harijan sahi near Banshidhara House.(D.T.H Tube Well1 |
Completion of work |
-
latitude : 22.238043900579214
Longitude : 86.55677134171128
file name : Image_04012022133543755.png
|
2022-01-04 13:35:43.880381 |
24 |
44199311 |
Comp . Of GP Gate with GP Bulding repair & Colouring. |
250000 |
Comp . Of GP Gate with GP Bulding repair & Colouring.1 |
Completion of work |
-
latitude : 22.243271442130208
Longitude : 86.54601928777993
file name : Image_13082021122143811.png
|
2021-08-13 12:21:43.937762 |
25 |
48075572 |
Const. of Well Platform at Kotisole Play fild. |
28000 |
Const. of Well Platform at Kotisole Play fild.1 |
Completion of work |
-
latitude : 22.245512511581182
Longitude : 86.54172674752772
file name : Image_16082021105304037.png
|
2021-08-16 10:53:04.158789 |
26 |
48078403 |
Const. of Sock-pit at Monaharpur . |
30000 |
Const. of Sock-pit at Monaharpur .2 |
Completion of work |
-
latitude : 22.155581479892135
Longitude : 86.53966689482331
file name : Image_01102021153012358.png
|
2021-10-01 15:30:12.464913 |
27 |
55277488 |
DIGGING OF NEW TUBEWELL WITH PLATFORM AT NARANDIHI BINDHANI SAHI NEAR SHIBA TEMLE DTH TUBEWELL |
105000 |
DIGGING OF NEW TUBEWELL WITH PLATFORM AT NARANDIHI BINDHANI SAHI NEAR SHIBA TEMLE DTH TUBEWELL1 |
Completion of work |
-
latitude : 22.24676053505391
Longitude : 86.53774961829185
file name : Image_25112021132115811.png
|
2021-11-25 13:21:15.927272 |
28 |
48074041 |
Digging of new tube well with platform at Banisole Arjun Sahi(D.T.H Tube Well ) |
105000 |
Digging of new tube well with platform at Banisole Arjun Sahi(D.T.H Tube Well )1 |
Completion of work |
-
latitude : 22.26332812104374
Longitude : 86.56014715321362
file name : Image_25112021113704509.png
|
2021-11-25 11:37:04.641792 |
29 |
48074041 |
Digging of new tube well with platform at Banisole Arjun Sahi(D.T.H Tube Well ) |
105000 |
Digging of new tube well with platform at Banisole Arjun Sahi(D.T.H Tube Well )1 |
Completion of work |
-
latitude : 22.263331431895494
Longitude : 86.56016542576253
file name : Image_25112021113722813.png
|
2021-11-25 11:37:22.92041 |
30 |
48074531 |
Digging of new tube well with platform at Bankisole Basudev Sahi(D.T.H Tube Well ) |
105000 |
Digging of new tube well with platform at Bankisole Basudev Sahi(D.T.H Tube Well )1 |
Completion of work |
-
latitude : 22.26755926385522
Longitude : 86.55364723876119
file name : Image_25112021113941993.png
|
2021-11-25 11:39:42.109707 |
31 |
48083694 |
Connection of approach road at Pokharia Khadipahadi Hambar house to Anta house. |
200000 |
Connection of approach road at Pokharia Khadipahadi Hambar house to Anta house.1 |
Completion of work |
-
latitude : 22.24194898735732,22.24194898735732
Longitude : 86.53492148034275,86.53492148034275
file name : Image_08122021111544659.png
|
2021-12-08 11:15:44.76482 |
32 |
48082139 |
Maintains and extension of Pipe water supply. |
50000 |
Maintains and extension of Pipe water supply.1 |
Completion of work |
-
latitude : 22.24434730131179,22.24434730131179
Longitude : 86.5520940721035,86.5520940721035
file name : Image_25022022132325747.png
|
2022-02-25 13:23:25.825001 |
33 |
48079976 |
Connection of approach road at Monaharpur Durjadhana House to Nandi house. |
200000 |
Connection of approach road at Monaharpur Durjadhana House to Nandi house.1 |
Completion of work |
-
latitude : 22.24411176983267,22.24411176983267
Longitude : 86.58829157240689,86.58829157240689
file name : Image_18122021112802464.png
|
2021-12-18 11:28:02.580779 |
34 |
55277462 |
DIGGING OF NEW TUBEWELL WITH PLATFORM AT BHURKUNDIBADI DURJADHANA PATRA SAHI DTH TUBEWELL |
105000 |
DIGGING OF NEW TUBEWELL WITH PLATFORM AT BHURKUNDIBADI DURJADHANA PATRA SAHI DTH TUBEWELL1 |
Completion of work |
-
latitude : 22.25107876583934
Longitude : 86.54969165101647
file name : Image_03012022115223943.png
|
2022-01-03 11:52:24.098787 |
35 |
55277512 |
DIGGING OF NEW T UBEWELL WITH PLATFORM AT KASIA BEDA NUADIHI BANASAHI DTH TUBEWELL |
105000 |
DIGGING OF NEW T UBEWELL WITH PLATFORM AT KASIA BEDA NUADIHI BANASAHI DTH TUBEWELL1 |
Completion of work |
-
latitude : 22.26108935661614,22.261170744895935
Longitude : 86.544024143368,86.54398994520307
file name : Image_03012022114544947.png
|
2022-01-03 11:45:45.100507 |
36 |
48080274 |
Connection of approach road at Jerkani Khairdihi Thakura house to Bikram House. |
100000 |
Connection of approach road at Jerkani Khairdihi Thakura house to Bikram House.1 |
Completion of work |
-
latitude : 22.256880048662424,22.256912402808666
Longitude : 86.57281086780131,86.57276066020131
file name : Image_21012022142459576.png
|
2022-01-21 14:24:59.691227 |
37 |
48077761 |
Strom rain water Protecting system at Pokharia Sargidihi Harijan Sahi . |
200000 |
Strom rain water Protecting system at Pokharia Sargidihi Harijan Sahi .1 |
Completion of work |
-
latitude : 22.238425528630614,22.23844996187836
Longitude : 86.55786568298936,86.55779192224145
file name : Image_21012022134144593.png
|
2022-01-21 13:41:44.731393 |
38 |
48081529 |
Connection of approach road at Kasiabeda Babrubahan Sahi. |
100000 |
Connection of approach road at Kasiabeda Babrubahan Sahi.1 |
Completion of work |
-
latitude : 22.251782258972526,22.25179546047002
Longitude : 86.55407505109906,86.55406046658754
file name : Image_21012022144111164.png
|
2022-01-21 14:41:11.26965 |
39 |
48078047 |
Const. of SSG Building at Pokharia water supply and toilet. |
100000 |
Const. of SSG Building at Pokharia water supply and toilet.1 |
Completion of work |
-
latitude : 22.243673228658736
Longitude : 86.55182166025043
file name : Image_02022022124015211.png
|
2022-02-02 12:40:15.318125 |
40 |
48083378 |
Const. of Community Center at Pokharia Graingola. |
200000 |
Const. of Community Center at Pokharia Graingola.1 |
Completion of work |
-
latitude : 22.243150784634054
Longitude : 86.5456394199282
file name : Image_04052022100437889.png
|
2022-05-04 10:04:37.985083 |
41 |
48083903 |
Repair of Dhalangsahi Community Center . |
100000 |
Repair of Dhalangsahi Community Center . 1 |
Completion of work |
-
latitude : 22.2393148066476
Longitude : 86.54551897197962
file name : Image_04052022095719444.png
|
2022-05-04 09:57:19.530879 |
42 |
48082587 |
Renovation of Jerkani Khal at Kherna. |
100000 |
Renovation of Jerkani Khal at Kherna.1 |
Completion of work |
-
latitude : 22.245626840740442
Longitude : 86.5690537635237
file name : Image_21062022101432269.png
|
2022-06-21 10:14:32.349088 |
43 |
44199126 |
Development of Kherna Tentulimulia at Multiutuility tank(Model Tank) |
100000 |
Development of Kherna Tentulimulia at Multiutuility tank(Model Tank)1 |
Completion of work |
-
latitude : 22.24543514661491
Longitude : 86.57622054219246
file name : Image_21062022104032792.png
|
2022-06-21 10:40:32.886847 |
44 |
48083184 |
Const. of Sabhamandap at Pokharia Bhalupahadi |
100000 |
Const. of Sabhamandap at Pokharia Bhalupahadi1 |
Completion of work |
-
latitude : 22.241089548915625
Longitude : 86.56323873437941
file name : Image_12072022133431433.png
|
2022-07-12 13:34:31.513799 |
45 |
48083184 |
Const. of Sabhamandap at Pokharia Bhalupahadi |
100000 |
Const. of Sabhamandap at Pokharia Bhalupahadi1 |
Completion of work |
-
latitude : 22.24108657334
Longitude : 86.5632458589971
file name : Image_12072022140421375.png
|
2022-07-12 14:04:21.441789 |
46 |
55277659 |
STORM RAIN WATER PROTECTING SYSTEM AT BANKISOLE PRADHAN SAHI |
200000 |
STORM RAIN WATER PROTECTING SYSTEM AT BANKISOLE PRADHAN SAHI1 |
Completion of work |
-
latitude : 22.2692783921957
Longitude : 86.55027251690626
file name : Image_22082022102745491.png
|
2022-08-22 10:27:45.566839 |
47 |
55277659 |
STORM RAIN WATER PROTECTING SYSTEM AT BANKISOLE PRADHAN SAHI |
200000 |
STORM RAIN WATER PROTECTING SYSTEM AT BANKISOLE PRADHAN SAHI1 |
Completion of work |
-
latitude : 22.26937331724912
Longitude : 86.55037494376302
file name : Image_22082022102751172.png
|
2022-08-22 10:27:51.243788 |
48 |
44199218 |
Repairing & Maintenance of Pokharia UPUG TMC under Pokharia GP. |
250000 |
Repairing & Maintenance of Pokharia UPUG TMC under Pokharia GP.1 |
Completion of work |
-
latitude : 22.24322488065809
Longitude : 86.54642757028341
file name : Image_22082022095735933.png
|
2022-08-22 09:57:36.019858 |
49 |
55277711 |
CONSTOF SOAKPIT AT MONAHARPUR NEAR TENTULI MULA TUBEWELL |
15000 |
CONSTOF SOAKPIT AT MONAHARPUR NEAR TENTULI MULA TUBEWELL1 |
Completion of work |
-
latitude : 22.240820741280913,22.240820741280913
Longitude : 86.58763149753213,86.58763149753213
file name : Image_05092022104614376.png
|
2022-09-05 10:46:14.465754 |
50 |
55277745 |
CLEANING OF VILLAGE STREET AND DRAIN AREA AT MONAHARPUR |
23789 |
CLEANING OF VILLAGE STREET AND DRAIN AREA AT MONAHARPUR1 |
Completion of work |
-
latitude : 22.2442849,22.2442849
Longitude : 86.588345,86.588345
file name : Image_03092022141909459.png
|
2022-09-03 14:19:09.571121 |
51 |
64975322 |
Creation of Shed for segregation and processing of wet and dry waste |
30000 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 22.245927792973816
Longitude : 86.5609928034246
file name : Image_14092022131620319.png
|
2022-09-14 13:16:20.397706 |
52 |
55277827 |
COMP OF POKHARIA MARKET COMPLEX |
200000 |
COMP OF POKHARIA MARKET COMPLEX1 |
Completion of work |
-
latitude : 22.243311842903495
Longitude : 86.54567604884505
file name : Image_27102022140151170.png
|
2022-10-27 14:01:51.27068 |
53 |
58343067 |
Comp. Of Pokharia G.P. Cycle Stand |
200000 |
Comp. Of Pokharia G.P. Cycle Stand1 |
Completion of work |
-
latitude : 22.243719
Longitude : 86.5459259
file name : Image_19102022114039801.png
|
2022-10-19 11:40:39.923331 |
54 |
58340805 |
Construction of Approch Road At Bankisole Mangal sahi Simal House to Kanhu House |
200000 |
Construction of Approch Road At Bankisole Mangal sahi Simal House to Kanhu House1 |
Completion of work |
-
latitude : 22.275086799636483,22.27505545131862
Longitude : 86.55890461988747,86.55891752801836
file name : Image_22102022112349709.png
|
2022-10-22 11:23:49.802043 |
55 |
58340805 |
Construction of Approch Road At Bankisole Mangal sahi Simal House to Kanhu House |
200000 |
Construction of Approch Road At Bankisole Mangal sahi Simal House to Kanhu House1 |
Completion of work |
-
latitude : 22.27509736083448,22.275067646987736
Longitude : 86.55891065485775,86.5588891133666
file name : Image_22102022112452759.png
|
2022-10-22 11:24:52.874437 |
56 |
55277812 |
CONNECTION OF APPRACH ROAD AT JERKANI BEHERA SAHI NARENDRA HOUSE TO BARAMULA CHHAKA |
100000 |
CONNECTION OF APPRACH ROAD AT JERKANI BEHERA SAHI NARENDRA HOUSE TO BARAMULA CHHAKA1 |
Completion of work |
-
latitude : 22.25681320298463,22.256786548532546
Longitude : 86.56186376698315,86.56191288493574
file name : Image_22102022110922102.png
|
2022-10-22 11:09:22.19421 |
57 |
64976269 |
Creation of Small-bore pipe conveyance system |
129292 |
Creation of Small-bore pipe conveyance system1 |
Completion of work |
-
latitude : 22.2459208779037
Longitude : 86.5290283318609
file name : Image_22102022103511385.png
|
2022-10-22 10:35:11.484653 |
58 |
44199282 |
Repair of Pokharia UGUP kitchen House |
50000 |
Repair of Pokharia UGUP kitchen House1 |
Completion of work |
-
latitude : 22.2436719
Longitude : 86.5458074
file name : Image_05112022112251929.png
|
2022-11-05 11:22:52.027735 |
59 |
64980638 |
Const. Of Approch Road At Kasiabeda Bideshi House To Atul House |
193500 |
Const. Of Approch Road At Kasiabeda Bideshi House To Atul House1 |
Completion of work |
-
latitude : 22.25188145879656,22.25190220400691
Longitude : 86.55328799039125,86.55332143418491
file name : Image_18112022124631445.png
|
2022-11-18 12:46:31.560971 |
60 |
64980696 |
Water Supply to villages |
71388 |
Water Supply to villages1 |
Completion of work |
-
latitude : 22.24504651967436
Longitude : 86.55355922877789
file name : Image_01122022112332743.png
|
2022-12-01 11:23:32.81269 |
61 |
64975307 |
Creation of Shed for segregation and processing of wet and dry waste |
30000 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 22.27593144401908
Longitude : 86.55789233744144
file name : Image_29112022134254647.png
|
2022-11-29 13:42:54.719516 |
62 |
64980757 |
CONSTRUCTION OF APPROCH ROAD AT SUDHANGSHU HOUSE TO DWARSUNI TEMPLE |
100000 |
CONSTRUCTION OF APPROCH ROAD AT SUDHANGSHU HOUSE TO DWARSUNI TEMPLE1 |
Completion of work |
-
latitude : 22.24372419063002,22.243719790130854
Longitude : 86.57488656230271,86.57489301636815
file name : Image_09012023121808100.png
|
2023-01-09 12:18:08.166904 |
63 |
58324706 |
Digging of new tube-well platform at Jerkani Near Shiba House(Transfer of Fund/RWSS Account) |
105000 |
Digging of new tube-well platform at Jerkani Near Shiba House(Transfer of Fund/RWSS Account)1 |
Completion of work |
-
latitude : 22.25378850940615
Longitude : 86.56188069842756
file name : Image_17032023102954865.png
|
2023-03-17 10:29:54.925018 |
64 |
64976185 |
Creation of drainage channel for management of grey water |
39600 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 22.23920106422156
Longitude : 86.5463574975729
file name : Image_09012023145708913.png
|
2023-01-09 14:57:08.998515 |
65 |
64981650 |
Cons. of Approch Road At Manaharpur Duryadhan House to Nandi House. |
200000 |
Cons. of Approch Road At Manaharpur Duryadhan House to Nandi House.1 |
Completion of work |
-
latitude : 22.244082475081086,22.24407019559294
Longitude : 86.58822418190539,86.58819828182459
file name : Image_11012023135044924.png
|
2023-01-11 13:50:44.996973 |
66 |
64976392 |
Water Supply to villages |
100000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 22.245894349180162,22.245894349180162
Longitude : 86.56918720342219,86.56918720342219
file name : Image_09022023141730704.png
|
2023-02-09 14:17:30.761041 |
67 |
64976213 |
Repair of drainage channel |
5500 |
Repair of drainage channel1 |
Completion of work |
-
latitude : 22.243176139891148
Longitude : 86.54588274657726
file name : Image_09062023092849430.png
|
2023-06-09 09:28:49.490549 |
68 |
64976213 |
Repair of drainage channel |
5500 |
Repair of drainage channel1 |
Completion of work |
-
latitude : 22.2433936
Longitude : 86.5459173
file name : Image_09062023092854756.png
|
2023-06-09 09:28:54.821095 |
69 |
55277628 |
CONST OF GP TUBEWELL PLATFORM |
5789 |
CONST OF GP TUBEWELL PLATFORM1 |
Completion of work |
-
latitude : 22.2433933,22.2433933
Longitude : 86.5459185,86.5459185
file name : Image_09062023092900326.png
|
2023-06-09 09:29:00.395707 |
70 |
64981734 |
Community Centre At Karunasole |
200000 |
Community Centre At Karunasole1 |
Completion of work |
-
latitude : 22.261687866412103
Longitude : 86.5628475509584
file name : Image_09062023092905086.png
|
2023-06-09 09:29:05.144495 |
71 |
58331506 |
Digging ofnew Tubewell Platform AtBhurkundbadiNear Kalicharan DasHouse(TransferofFund inRWSS Account |
105000 |
Digging ofnew Tubewell Platform AtBhurkundbadiNear Kalicharan DasHouse(TransferofFund inRWSS Account1 |
Completion of work |
-
latitude : 22.250149715691805
Longitude : 86.55083301477134
file name : Image_26062023103028347.png
|
2023-06-26 10:30:28.409865 |
72 |
58327364 |
Digging of NewTubeWell Platform AtBankisole MangalSahi Near Kanhu House(TransferofFundinRWSS Account |
105000 |
Digging of NewTubeWell Platform AtBankisole MangalSahi Near Kanhu House(TransferofFundinRWSS Account1 |
Completion of work |
-
latitude : 22.27443556766957
Longitude : 86.55852793715894
file name : Image_26062023104806414.png
|
2023-06-26 10:48:06.478389 |
73 |
58329296 |
Digging of NewTubewell Platform AtBankisoleMadhadihi nearBanauHouse(Transfer ofFund in RWSS Account) |
105000 |
Digging of NewTubewell Platform AtBankisoleMadhadihi nearBanauHouse(Transfer ofFund in RWSS Account)1 |
Completion of work |
-
latitude : 22.264686282724142
Longitude : 86.54379707761109
file name : Image_26062023103629999.png
|
2023-06-26 10:36:30.061551 |
74 |
64981806 |
RENOVATION OF RAJA BANDH |
100000 |
RENOVATION OF RAJA BANDH 1 |
Completion of work |
-
latitude : 22.24768828600645,22.24768828600645
Longitude : 86.53509565629065,86.53509565629065
file name : Image_07092023125512328.png
|
2023-09-07 12:55:12.380329 |
75 |
64981806 |
RENOVATION OF RAJA BANDH |
100000 |
RENOVATION OF RAJA BANDH 1 |
Completion of work |
-
latitude : 22.247617333196104,22.24768011365086
Longitude : 86.53515625745058,86.53508375398815
file name : Image_07092023125505341.png
|
2023-09-07 12:55:05.394187 |
76 |
64981806 |
RENOVATION OF RAJA BANDH |
100000 |
RENOVATION OF RAJA BANDH 1 |
Completion of work |
-
latitude : 22.24765521939844,22.247688327915967
Longitude : 86.53509414754808,86.53509481810033
file name : Image_07092023125508977.png
|
2023-09-07 12:55:09.042321 |
77 |
64981806 |
RENOVATION OF RAJA BANDH |
100000 |
RENOVATION OF RAJA BANDH 1 |
Completion of work |
-
latitude : 22.247615782544017,22.24761159159243
Longitude : 86.53519682586193,86.53513907454908
file name : Image_07092023125502081.png
|
2023-09-07 12:55:02.138413 |
78 |
64975423 |
Operation & maintenance of Faecal Sludge Management Plant |
106920 |
Operation & maintenance of Faecal Sludge Management Plant1 |
Completion of work |
-
latitude : 22.24340781569481
Longitude : 86.54616387560964
file name : Image_01102023102809602.png
|
2023-10-01 10:28:09.674963 |
79 |
77852215 |
Construction and Maintenance of Classroom Flooring |
50000 |
Construction and Maintenance of Classroom Flooring1 |
Roof laid |
-
latitude : 22.2416066
Longitude : 86.5886695
file name : Image_29012024170109468.png
|
2024-01-29 17:01:09.520223 |
80 |
77852215 |
Construction and Maintenance of Classroom Flooring |
50000 |
Construction and Maintenance of Classroom Flooring1 |
Plinth level |
-
latitude : 22.2415809
Longitude : 86.5887202
file name : Image_29012024165020348.png
|
2024-01-29 16:50:20.406983 |
81 |
77852215 |
Construction and Maintenance of Classroom Flooring |
50000 |
Construction and Maintenance of Classroom Flooring1 |
Completion of work |
-
latitude : 22.25581320002675
Longitude : 86.54860460199416
file name : Image_26012024131243870.png
|
2024-01-26 13:12:43.931667 |
82 |
77852215 |
Construction and Maintenance of Classroom Flooring |
50000 |
Construction and Maintenance of Classroom Flooring1 |
Completion of work |
-
latitude : 22.25581198465079
Longitude : 86.54866377823055
file name : Image_26012024130922228.png
|
2024-01-26 13:09:22.295883 |
83 |
77852215 |
Construction and Maintenance of Classroom Flooring |
50000 |
Construction and Maintenance of Classroom Flooring1 |
Completion of work |
-
latitude : 22.25589404348284
Longitude : 86.54842246323824
file name : Image_26012024130657575.png
|
2024-01-26 13:06:57.635042 |
84 |
77692150 |
Construction of Building |
50000 |
Construction of Building1 |
Completion of work |
-
latitude : 22.260556519031525
Longitude : 86.57163748517632
file name : Image_26012024122945786.png
|
2024-01-26 12:29:45.841782 |
85 |
77692150 |
Construction of Building |
50000 |
Construction of Building1 |
Plinth level |
-
latitude : 22.260557315312326
Longitude : 86.57167277298868
file name : Image_26012024124401619.png
|
2024-01-26 12:44:01.676017 |
86 |
77692150 |
Construction of Building |
50000 |
Construction of Building1 |
Plinth level |
-
latitude : 22.260592142120004
Longitude : 86.57169020734727
file name : Image_26012024124046577.png
|
2024-01-26 12:40:46.629359 |
87 |
77692150 |
Construction of Building |
50000 |
Construction of Building1 |
Completion of work |
-
latitude : 22.260562595911324
Longitude : 86.5716387424618
file name : Image_26012024122338199.png
|
2024-01-26 12:23:38.259108 |
88 |
64981408 |
Water Supply to villages |
58542 |
Water Supply to villages1 |
Completion of work |
-
latitude : 22.236442621797323
Longitude : 86.57504514791071
file name : Image_02022024130337779.png
|
2024-02-02 13:03:37.840587 |
89 |
77854793 |
Construction and Maintenance of Classroom Flooring |
130000 |
Construction and Maintenance of Classroom Flooring1 |
Roof laid |
-
latitude : 22.25585791748017
Longitude : 86.54865791089833
file name : Image_04122023145047400.png
|
2023-12-04 14:50:47.573 |
90 |
77854793 |
Construction and Maintenance of Classroom Flooring |
130000 |
Construction and Maintenance of Classroom Flooring1 |
Plinth level |
-
latitude : 22.255830843932927
Longitude : 86.54863871634007
file name : Image_04122023144633678.png
|
2023-12-04 14:46:33.735024 |
91 |
77854793 |
Construction and Maintenance of Classroom Flooring |
130000 |
Construction and Maintenance of Classroom Flooring1 |
Completion of work |
-
latitude : 22.255967427045107
Longitude : 86.54843009077013
file name : Image_04122023144218146.png
|
2023-12-04 14:42:18.223054 |
92 |
83237875 |
Construction of roads |
165502 |
Construction of roads1 |
Roof laid |
-
latitude : 22.243395913392305,22.243395913392305
Longitude : 86.54603387229145,86.54603387229145
file name : Image_14032024132632254.png
|
2024-03-14 13:26:32.304317 |
93 |
83237875 |
Construction of roads |
165502 |
Construction of roads1 |
Plinth level |
-
latitude : 22.243414856493473,22.243494568392634
Longitude : 86.54596514068544,86.54602180235088
file name : Image_14032024131504596.png
|
2024-03-14 13:15:04.660516 |
94 |
83237875 |
Construction of roads |
165502 |
Construction of roads1 |
Completion of work |
-
latitude : 22.243352830410004,22.243473487906158
Longitude : 86.5459742769599,86.5459708403796
file name : Image_14032024130900466.png
|
2024-03-14 13:09:00.528827 |
95 |
78082282 |
Creation of a new source of drinking water |
110000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 22.24358984
Longitude : 86.57040868
file name : Image_20052024111624849.png
|
2024-05-20 11:16:24.942317 |
96 |
78082282 |
Creation of a new source of drinking water |
110000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 22.24358459
Longitude : 86.5704039
file name : Image_20052024111231623.png
|
2024-05-20 11:12:31.72742 |
97 |
78082282 |
Creation of a new source of drinking water |
110000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 22.24362263
Longitude : 86.57040451
file name : Image_20052024105741317.png
|
2024-05-20 10:57:41.416239 |
98 |
78387038 |
Repairing/Construction of Building |
143200 |
Repairing/Construction of Building1 |
Roof laid |
-
latitude : 22.243346041068435
Longitude : 86.54596539214253
file name : Image_21032024131145902.png
|
2024-03-21 13:11:45.9581 |
99 |
78387038 |
Repairing/Construction of Building |
143200 |
Repairing/Construction of Building1 |
Plinth level |
-
latitude : 22.24334205966443
Longitude : 86.54594192281365
file name : Image_21032024130759720.png
|
2024-03-21 13:07:59.793694 |
100 |
78387038 |
Repairing/Construction of Building |
143200 |
Repairing/Construction of Building1 |
Completion of work |
-
latitude : 22.243359703570604
Longitude : 86.54598240740597
file name : Image_21032024130422869.png
|
2024-03-21 13:04:22.96437 |
101 |
83295202 |
Drainage Construction |
150000 |
Drainage Construction1 |
Roof laid |
-
latitude : 22.2434117551893
Longitude : 86.54599288478494
file name : Image_21032024140327381.png
|
2024-03-21 14:03:27.446737 |
102 |
83295202 |
Drainage Construction |
150000 |
Drainage Construction1 |
Plinth level |
-
latitude : 22.24340295419097
Longitude : 86.54600428417325
file name : Image_21032024135722391.png
|
2024-03-21 13:57:22.435529 |
103 |
83295202 |
Drainage Construction |
150000 |
Drainage Construction1 |
Completion of work |
-
latitude : 22.243532370775938
Longitude : 86.54597201384604
file name : Image_21032024135517597.png
|
2024-03-21 13:55:17.654696 |
104 |
77678865 |
Construction of roads |
223370 |
Construction of roads1 |
Roof laid |
-
latitude : 22.24338564556092,22.243543560616672
Longitude : 86.54604627750814,86.54553674161434
file name : Image_21032024142236294.png
|
2024-03-21 14:22:36.349471 |
105 |
77678865 |
Construction of roads |
223370 |
Construction of roads1 |
Plinth level |
-
latitude : 22.24331087898463,22.243533837608993
Longitude : 86.54621366411448,86.54622489586473
file name : Image_21032024141934721.png
|
2024-03-21 14:19:34.789895 |
106 |
77678865 |
Construction of roads |
223370 |
Construction of roads1 |
Completion of work |
-
latitude : 22.24316113628447,22.243374749086797
Longitude : 86.54654583893716,86.54606597498059
file name : Image_21032024141634266.png
|
2024-03-21 14:16:34.321301 |
107 |
78484379 |
Providing piped water supply to public institutions |
77250 |
Providing piped water supply to public institutions1 |
Roof laid |
-
latitude : 22.24349433
Longitude : 86.54586799
file name : Image_21062024151654598.png
|
2024-06-21 15:16:54.687752 |
108 |
78484379 |
Providing piped water supply to public institutions |
77250 |
Providing piped water supply to public institutions1 |
Plinth level |
-
latitude : 22.24349544
Longitude : 86.54586701
file name : Image_21062024151451927.png
|
2024-06-21 15:14:52.023784 |
109 |
78484379 |
Providing piped water supply to public institutions |
77250 |
Providing piped water supply to public institutions1 |
Completion of work |
-
latitude : 22.24349916
Longitude : 86.54585052
file name : Image_21062024151257308.png
|
2024-06-21 15:12:57.38087 |
110 |
78096017 |
Water Supply to villages |
45000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 22.24343117
Longitude : 86.54604636
file name : Image_21062024155904923.png
|
2024-06-21 15:59:05.007847 |
111 |
78096017 |
Water Supply to villages |
45000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 22.24341565
Longitude : 86.54603615
file name : Image_21062024155638795.png
|
2024-06-21 15:56:38.883064 |
112 |
78096017 |
Water Supply to villages |
45000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 22.24343268
Longitude : 86.54602767
file name : Image_21062024155102205.png
|
2024-06-21 15:51:02.297848 |
113 |
77689859 |
Construction and Maintenance of Community Centre |
220000 |
Construction and Maintenance of Community Centre1 |
Roof laid |
-
latitude : 22.23792935
Longitude : 86.55387262
file name : Image_19072024142110910.png
|
2024-07-19 14:21:11.012427 |
114 |
77689859 |
Construction and Maintenance of Community Centre |
220000 |
Construction and Maintenance of Community Centre1 |
Plinth level |
-
latitude : 22.23794888
Longitude : 86.55389989
file name : Image_19072024141437181.png
|
2024-07-19 14:14:37.271677 |
115 |
77689859 |
Construction and Maintenance of Community Centre |
220000 |
Construction and Maintenance of Community Centre1 |
Completion of work |
-
latitude : 22.23798608
Longitude : 86.55386012
file name : Image_19072024140323604.png
|
2024-07-19 14:03:23.70613 |
116 |
83240232 |
Drainage Construction |
29839 |
Drainage Construction1 |
Roof laid |
-
latitude : 22.23869902
Longitude : 86.54718409
file name : Image_19072024143502269.png
|
2024-07-19 14:35:02.365807 |
117 |
83240232 |
Drainage Construction |
29839 |
Drainage Construction1 |
Plinth level |
-
latitude : 22.23871947
Longitude : 86.54717308
file name : Image_19072024143226745.png
|
2024-07-19 14:32:26.836617 |
118 |
83240232 |
Drainage Construction |
29839 |
Drainage Construction1 |
Completion of work |
-
latitude : 22.23870898
Longitude : 86.54718049
file name : Image_19072024142708453.png
|
2024-07-19 14:27:08.551683 |
119 |
77855540 |
Repair of School Doors/Windows/Gates/Fixtures |
39400 |
Repair of School Doors/Windows/Gates/Fixtures1 |
Roof laid |
-
latitude : 22.14595107
Longitude : 86.54021385
file name : Image_08102024181551333.png
|
2024-10-08 18:15:51.43581 |
120 |
77855540 |
Repair of School Doors/Windows/Gates/Fixtures |
39400 |
Repair of School Doors/Windows/Gates/Fixtures1 |
Plinth level |
-
latitude : 22.24337415
Longitude : 86.54605386
file name : Image_08102024145840738.png
|
2024-10-08 14:58:40.848295 |
121 |
77855540 |
Repair of School Doors/Windows/Gates/Fixtures |
39400 |
Repair of School Doors/Windows/Gates/Fixtures1 |
Completion of work |
-
latitude : 22.24329413
Longitude : 86.54609882
file name : Image_08102024143615973.png
|
2024-10-08 14:36:16.051318 |
122 |
78087582 |
Creation of a new source of drinking water |
110000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 22.26203742
Longitude : 86.555402
file name : Image_24072024141919504.png
|
2024-07-24 14:19:19.611099 |
123 |
78087582 |
Creation of a new source of drinking water |
110000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 22.26198947
Longitude : 86.55542107
file name : Image_24072024141635631.png
|
2024-07-24 14:16:35.718415 |
124 |
78087582 |
Creation of a new source of drinking water |
110000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 22.26203101
Longitude : 86.55543044
file name : Image_24072024141219629.png
|
2024-07-24 14:12:19.728967 |
125 |
78090119 |
Creation of a new source of drinking water |
100000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 22.25244398
Longitude : 86.53022725
file name : Image_24072024145912683.png
|
2024-07-24 14:59:12.773728 |
126 |
78090119 |
Creation of a new source of drinking water |
100000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 22.25247137
Longitude : 86.53027837
file name : Image_24072024145623057.png
|
2024-07-24 14:56:23.144383 |
127 |
78090119 |
Creation of a new source of drinking water |
100000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 22.25244169
Longitude : 86.5302562
file name : Image_24072024145226174.png
|
2024-07-24 14:52:26.262009 |
128 |
78302822 |
Procurement of Sports Items |
30000 |
Procurement of Sports Items1 |
Roof laid |
-
latitude : 22.24345087
Longitude : 86.54604514
file name : Image_30102024134848187.png
|
2024-10-30 13:48:48.297612 |
129 |
78302822 |
Procurement of Sports Items |
30000 |
Procurement of Sports Items1 |
Completion of work |
-
latitude : 22.24342337
Longitude : 86.54596679
file name : Image_30102024134055051.png
|
2024-10-30 13:40:55.191882 |
130 |
78302822 |
Procurement of Sports Items |
30000 |
Procurement of Sports Items1 |
Plinth level |
-
latitude : 22.24345622
Longitude : 86.54605395
file name : Image_30102024134527321.png
|
2024-10-30 13:45:27.419536 |
131 |
78302822 |
Procurement of Sports Items |
30000 |
Procurement of Sports Items1 |
Completion of work |
-
latitude : 22.24345887
Longitude : 86.54602917
file name : Image_30102024134058971.png
|
2024-10-30 13:40:59.078691 |
132 |
103367648 |
Drainage Construction |
217798 |
Drainage Construction1 |
Roof laid |
-
latitude : 22.26611918
Longitude : 86.55117014
file name : Image_12112024150224674.png
|
2024-11-12 15:02:24.773247 |
133 |
103367648 |
Drainage Construction |
217798 |
Drainage Construction1 |
Plinth level |
-
latitude : 22.26613729
Longitude : 86.55119852
file name : Image_12112024150029110.png
|
2024-11-12 15:00:29.211424 |
134 |
103367648 |
Drainage Construction |
217798 |
Drainage Construction1 |
Completion of work |
-
latitude : 22.26608561
Longitude : 86.5512048
file name : Image_12112024145647776.png
|
2024-11-12 14:56:47.864345 |
135 |
101061949 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 22.2433952,22.2433958
Longitude : 86.5459654,86.5459646
file name : Image_21112024125935982.png
|
2024-11-21 12:59:36.073259 |
136 |
101061949 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 22.25586925,22.25586846
Longitude : 86.54867212,86.54867149
file name : Image_12112024160451166.png
|
2024-11-12 16:04:51.317747 |
137 |
101061949 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 22.2558741,22.2558769
Longitude : 86.54868318,86.54868074
file name : Image_12112024153949032.png
|
2024-11-12 15:39:49.161547 |