1 |
44162978 |
CONST OF BOUNDARY WALL AT BNRGKS BUILDING |
265540 |
CONST OF BOUNDARY WALL AT BNRGKS BUILDING1 |
Completion of work |
-

latitude : 19.67043689
Longitude : 82.47944174
file name : Image_30062021130846337.png
|
2021-06-30 13:08:46.413075 |
2 |
47609007 |
Construction of Boundry wall and repairing of AWC at Bharuamunda |
300000 |
Construction of Boundry wall and repairing of AWC at Bharuamunda1 |
Completion of work |
-

latitude : 19.6627569
Longitude : 82.50046613
file name : Image_01022022103058822.png
|
2022-02-01 10:30:58.953937 |
3 |
47609007 |
Construction of Boundry wall and repairing of AWC at Bharuamunda |
300000 |
Construction of Boundry wall and repairing of AWC at Bharuamunda1 |
Completion of work |
-

latitude : 19.66275544
Longitude : 82.50045612
file name : Image_01022022103045719.png
|
2022-02-01 10:30:45.851699 |
4 |
47609007 |
Construction of Boundry wall and repairing of AWC at Bharuamunda |
300000 |
Construction of Boundry wall and repairing of AWC at Bharuamunda1 |
Completion of work |
-

latitude : 19.66279613
Longitude : 82.50043776
file name : Image_29012022164535558.png
|
2022-01-29 16:45:35.687732 |
5 |
47609007 |
Construction of Boundry wall and repairing of AWC at Bharuamunda |
300000 |
Construction of Boundry wall and repairing of AWC at Bharuamunda1 |
Completion of work |
-

latitude : 19.66272474
Longitude : 82.50048279
file name : Image_29012022164531666.png
|
2022-01-29 16:45:31.813655 |
6 |
47609007 |
Construction of Boundry wall and repairing of AWC at Bharuamunda |
300000 |
Construction of Boundry wall and repairing of AWC at Bharuamunda1 |
Completion of work |
-

latitude : 19.66273212
Longitude : 82.50049249
file name : Image_29012022164527377.png
|
2022-01-29 16:45:27.523725 |
7 |
50793448 |
Construction of solid waste management at Chakalapadar |
120000 |
Construction of solid waste management at Chakalapadar1 |
Completion of work |
-

latitude : 19.67031266
Longitude : 82.4789272
file name : Image_05112021182724444.png
|
2021-11-05 18:27:24.546825 |
8 |
50793448 |
Construction of solid waste management at Chakalapadar |
120000 |
Construction of solid waste management at Chakalapadar1 |
Completion of work |
-

latitude : 19.6702966
Longitude : 82.47892412
file name : Image_05112021182731984.png
|
2021-11-05 18:27:32.080145 |
9 |
47599110 |
Construction of PWS in existing Tube-well at Lahandasil . |
410821 |
Construction of PWS in existing Tube-well at Lahandasil .1 |
Completion of work |
-

latitude : 19.70003484,19.7000307
Longitude : 82.54583459,82.54583658
file name : Image_10052022210153870.png
|
2022-05-10 21:01:53.983313 |
10 |
47599110 |
Construction of PWS in existing Tube-well at Lahandasil . |
410821 |
Construction of PWS in existing Tube-well at Lahandasil .1 |
Completion of work |
-

latitude : 19.69994512,19.69995184
Longitude : 82.54589675,82.5458956
file name : Image_01052022120041889.png
|
2022-05-01 12:00:42.03359 |
11 |
59473264 |
Renovation of Thakurani tank at Chatupakana |
300000 |
Renovation of Thakurani tank at Chatupakana1 |
Completion of work |
-

latitude : 19.64421323
Longitude : 82.49924819
file name : Image_01052022153507708.png
|
2022-05-01 15:35:07.877379 |
12 |
59474062 |
Renovation of Tank at Mundkhauguda |
300000 |
Renovation of Tank at Mundkhauguda1 |
Completion of work |
-

latitude : 19.64283663
Longitude : 82.50059699
file name : Image_01052022153531584.png
|
2022-05-01 15:35:31.711581 |
13 |
59468939 |
Const of Culvert Culvert and Guard wall at mundkhauguda |
500000 |
Const of Culvert Culvert and Guard wall at mundkhauguda1 |
Completion of work |
-

latitude : 19.6533385
Longitude : 82.49070545
file name : Image_01052022153558204.png
|
2022-05-01 15:35:58.339866 |
14 |
59469574 |
Const of CC drain at Chakalapadar near Stal |
200000 |
Const of CC drain at Chakalapadar near Stal1 |
Completion of work |
-

latitude : 19.64266109,19.64266203
Longitude : 82.38844438,82.38844197
file name : Image_25062022093327263.png
|
2022-06-25 09:33:27.361376 |
15 |
59469574 |
Const of CC drain at Chakalapadar near Stal |
200000 |
Const of CC drain at Chakalapadar near Stal1 |
Completion of work |
-

latitude : 19.64267386,19.64265243
Longitude : 82.3883809,82.38838923
file name : Image_25062022094509060.png
|
2022-06-25 09:45:09.237335 |
16 |
59469574 |
Const of CC drain at Chakalapadar near Stal |
200000 |
Const of CC drain at Chakalapadar near Stal1 |
Completion of work |
-

latitude : 19.64266099,19.64266112
Longitude : 82.3884249,82.38842524
file name : Image_25062022095516466.png
|
2022-06-25 09:55:16.566359 |
17 |
59461664 |
Repair of PWS at Chatupakana |
200000 |
Repair of PWS at Chatupakana1 |
Completion of work |
-

latitude : 19.64064671
Longitude : 82.50574451
file name : Image_01072022050514475.png
|
2022-07-01 05:05:14.554007 |
18 |
59462391 |
Const of PWS at Chatupakana |
200000 |
Const of PWS at Chatupakana1 |
Completion of work |
-

latitude : 19.64019679
Longitude : 82.50668785
file name : Image_01072022050508792.png
|
2022-07-01 05:05:08.876399 |
19 |
59478538 |
Consst of Boundary wall at Bharkibhatta AWC |
200000 |
Consst of Boundary wall at Bharkibhatta AWC1 |
Completion of work |
-

latitude : 19.68601637
Longitude : 82.51989644
file name : Image_07122022153336607.png
|
2022-12-07 15:33:36.702522 |
20 |
59478538 |
Consst of Boundary wall at Bharkibhatta AWC |
200000 |
Consst of Boundary wall at Bharkibhatta AWC1 |
Completion of work |
-

latitude : 19.68602826
Longitude : 82.51996346
file name : Image_22022023172530439.png
|
2023-02-22 17:25:30.542387 |
21 |
59477838 |
Repairing of PWS at Bahar Karmari |
100000 |
Repairing of PWS at Bahar Karmari1 |
Completion of work |
-

latitude : 19.70486693
Longitude : 82.54849414
file name : Image_20082022115847036.png
|
2022-08-20 11:58:47.162727 |
22 |
59463493 |
Repair of PWS at Dokirikote |
100000 |
Repair of PWS at Dokirikote1 |
Completion of work |
-

latitude : 19.68550115
Longitude : 82.56221858
file name : Image_20082022115908224.png
|
2022-08-20 11:59:08.349684 |
23 |
59481113 |
Repair of PUP School at Dhaimal |
100000 |
Repair of PUP School at Dhaimal1 |
Completion of work |
-

latitude : 19.71428708
Longitude : 82.56387653
file name : Image_29092022143943087.png
|
2022-09-29 14:39:43.219759 |
24 |
59477303 |
Repairing of PWS at Mundkhauguda |
100000 |
Repairing of PWS at Mundkhauguda1 |
Completion of work |
-

latitude : 19.64065568
Longitude : 82.50571153
file name : Image_09092022171424784.png
|
2022-09-09 17:14:24.865035 |
25 |
59460920 |
const of PWS at Dhaimal |
200000 |
const of PWS at Dhaimal1 |
Completion of work |
-

latitude : 19.71415381
Longitude : 82.56385742
file name : Image_29092022143937957.png
|
2022-09-29 14:39:38.086739 |
26 |
47599511 |
Extention of Solar PWS at Baharkarmari. |
150000 |
Extention of Solar PWS at Baharkarmari.1 |
Completion of work |
-

latitude : 19.64469996,19.64469889
Longitude : 82.49627568,82.49627527
file name : Image_18112022150253604.png
|
2022-11-18 15:02:53.693768 |
27 |
44154246 |
Const.of C C Drain at Kongra . |
200000 |
Const.of C C Drain at Kongra .1 |
Completion of work |
-

latitude : 19.6843974,19.68439744,19.68439747
Longitude : 82.49066828,82.4906683,82.49066834
file name : Image_29072021135552775.png
|
2021-07-29 13:55:52.883689 |
28 |
44154246 |
Const.of C C Drain at Kongra . |
200000 |
Const.of C C Drain at Kongra .1 |
Roof laid |
-

latitude : 19.6844542,19.68445388
Longitude : 82.49076438,82.4907629
file name : Image_18122021152940240.png
|
2021-12-18 15:29:40.34619 |
29 |
44154246 |
Const.of C C Drain at Kongra . |
200000 |
Const.of C C Drain at Kongra .1 |
Roof laid |
-

latitude : 19.68446587,19.68444137
Longitude : 82.49092337,82.49085124
file name : Image_18122021152928823.png
|
2021-12-18 15:29:28.926408 |
30 |
44154246 |
Const.of C C Drain at Kongra . |
200000 |
Const.of C C Drain at Kongra .1 |
Roof laid |
-

latitude : 19.6844542,19.68445388
Longitude : 82.49076438,82.4907629
file name : Image_18122021152919968.png
|
2021-12-18 15:29:20.089822 |
31 |
44154246 |
Const.of C C Drain at Kongra . |
200000 |
Const.of C C Drain at Kongra .1 |
Roof laid |
-

latitude : 19.68446587,19.68444137
Longitude : 82.49092337,82.49085124
file name : Image_18122021152912625.png
|
2021-12-18 15:29:12.737692 |
32 |
44154246 |
Const.of C C Drain at Kongra . |
200000 |
Const.of C C Drain at Kongra .1 |
Roof laid |
-

latitude : 19.68447791,19.68447791
Longitude : 82.49066317,82.49066317
file name : Image_06122021193855900.png
|
2021-12-06 19:38:55.993613 |
33 |
44154246 |
Const.of C C Drain at Kongra . |
200000 |
Const.of C C Drain at Kongra .1 |
Roof laid |
-

latitude : 19.68447791,19.68447791
Longitude : 82.49066317,82.49066317
file name : Image_06122021194045300.png
|
2021-12-06 19:40:45.399285 |
34 |
44154246 |
Const.of C C Drain at Kongra . |
200000 |
Const.of C C Drain at Kongra .1 |
Roof laid |
-

latitude : 19.6845444,19.68454433
Longitude : 82.49043132,82.49043137
file name : Image_06122021194034723.png
|
2021-12-06 19:40:34.818031 |
35 |
44154246 |
Const.of C C Drain at Kongra . |
200000 |
Const.of C C Drain at Kongra .1 |
Roof laid |
-

latitude : 19.68455184,19.68454976,19.68454973,19.68454973,19.6845497,19.68454971
Longitude : 82.49036777,82.49038354,82.49038356,82.49038356,82.49038355,82.49038355
file name : Image_06122021194024556.png
|
2021-12-06 19:40:24.654798 |
36 |
44154246 |
Const.of C C Drain at Kongra . |
200000 |
Const.of C C Drain at Kongra .1 |
Roof laid |
-

latitude : 19.6845444,19.68454433
Longitude : 82.49043132,82.49043137
file name : Image_06122021193845005.png
|
2021-12-06 19:38:45.099765 |
37 |
44154246 |
Const.of C C Drain at Kongra . |
200000 |
Const.of C C Drain at Kongra .1 |
Roof laid |
-

latitude : 19.68455184,19.68454976,19.68454973,19.68454973,19.6845497,19.68454971
Longitude : 82.49036777,82.49038354,82.49038356,82.49038356,82.49038355,82.49038355
file name : Image_06122021193832807.png
|
2021-12-06 19:38:32.920094 |
38 |
44162950 |
REPAIR OF AWC BUILDING AT BHARKBHATTA |
100000 |
REPAIR OF AWC BUILDING AT BHARKBHATTA1 |
Completion of work |
-

latitude : 19.70424731
Longitude : 82.54955441
file name : Image_15122021165259042.png
|
2021-12-15 16:52:59.165098 |
39 |
44162950 |
REPAIR OF AWC BUILDING AT BHARKBHATTA |
100000 |
REPAIR OF AWC BUILDING AT BHARKBHATTA1 |
Completion of work |
-

latitude : 19.70423778
Longitude : 82.54954561
file name : Image_15122021165303164.png
|
2021-12-15 16:53:03.274194 |
40 |
44162923 |
CONST OF PUCCA DRAIN AT KONGRA AWC |
100000 |
CONST OF PUCCA DRAIN AT KONGRA AWC1 |
Completion of work |
-

latitude : 19.68439192,19.68439248,19.68439252
Longitude : 82.49065532,82.49065553,82.49065558
file name : Image_29072021135556398.png
|
2021-07-29 13:55:56.510086 |
41 |
44153822 |
Repair of Govt.Pry.School at Bhitarkarmari |
150000 |
Repair of Govt.Pry.School at Bhitarkarmari1 |
Completion of work |
-

latitude : 19.71836085
Longitude : 82.53189467
file name : Image_15122021165255082.png
|
2021-12-15 16:52:55.203768 |
42 |
44153822 |
Repair of Govt.Pry.School at Bhitarkarmari |
150000 |
Repair of Govt.Pry.School at Bhitarkarmari1 |
Completion of work |
-

latitude : 19.71836085
Longitude : 82.53189467
file name : Image_15122021163305420.png
|
2021-12-15 16:33:05.528168 |
43 |
44153822 |
Repair of Govt.Pry.School at Bhitarkarmari |
150000 |
Repair of Govt.Pry.School at Bhitarkarmari1 |
Completion of work |
-

latitude : 19.71834204
Longitude : 82.53188687
file name : Image_15122021163259484.png
|
2021-12-15 16:32:59.602657 |
44 |
44152174 |
Renovation of Pipe Line |
145643 |
Renovation of Pipe Line1 |
Completion of work |
-

latitude : 19.644544,19.64464057
Longitude : 82.49635049,82.49637498
file name : Image_06102021124635294.png
|
2021-10-06 12:46:35.411611 |
45 |
44152174 |
Renovation of Pipe Line |
145643 |
Renovation of Pipe Line1 |
Completion of work |
-

latitude : 19.6447325,19.6447383
Longitude : 82.49664855,82.49664559
file name : Image_01102021112130952.png
|
2021-10-01 11:21:31.049046 |
46 |
44152174 |
Renovation of Pipe Line |
145643 |
Renovation of Pipe Line1 |
Completion of work |
-

latitude : 19.6447325,19.6447383
Longitude : 82.49664855,82.49664559
file name : Image_01102021112043319.png
|
2021-10-01 11:20:43.422951 |
47 |
50791815 |
Repair and maintenace of PWS at Chakalapadar |
100000 |
Repair and maintenace of PWS at Chakalapadar1 |
Completion of work |
-

latitude : 19.64471815,19.64450474
Longitude : 82.49670167,82.49645203
file name : Image_30092021125159651.png
|
2021-09-30 12:51:59.757595 |
48 |
50791815 |
Repair and maintenace of PWS at Chakalapadar |
100000 |
Repair and maintenace of PWS at Chakalapadar1 |
Completion of work |
-

latitude : 19.64471815,19.64450474
Longitude : 82.49670167,82.49645203
file name : Image_30092021124453927.png
|
2021-09-30 12:44:54.033414 |
49 |
50791815 |
Repair and maintenace of PWS at Chakalapadar |
100000 |
Repair and maintenace of PWS at Chakalapadar1 |
Completion of work |
-

latitude : 19.67039471,19.67039208
Longitude : 82.47892593,82.47892592
file name : Image_19112022081524975.png
|
2022-11-19 08:15:25.072801 |
50 |
50791815 |
Repair and maintenace of PWS at Chakalapadar |
100000 |
Repair and maintenace of PWS at Chakalapadar1 |
Completion of work |
-

latitude : 19.64520911,19.64521098,19.64521098
Longitude : 82.49768649,82.49768561,82.49768561
file name : Image_05102021093145229.png
|
2021-10-05 09:31:45.336923 |
51 |
50791815 |
Repair and maintenace of PWS at Chakalapadar |
100000 |
Repair and maintenace of PWS at Chakalapadar1 |
Completion of work |
-

latitude : 19.6459149,19.64589897
Longitude : 82.49646949,82.49646309
file name : Image_18112022150303567.png
|
2022-11-18 15:03:03.646643 |
52 |
44187068 |
Construction .of C C Drain at Chatupakhana School. |
100000 |
Construction .of C C Drain at Chatupakhana School.1 |
Completion of work |
-

latitude : 19.64469223,19.64473177
Longitude : 82.49673571,82.49670694
file name : Image_30092021125344286.png
|
2021-09-30 12:53:44.388535 |
53 |
44187068 |
Construction .of C C Drain at Chatupakhana School. |
100000 |
Construction .of C C Drain at Chatupakhana School.1 |
Completion of work |
-

latitude : 19.64472637,19.64472713
Longitude : 82.49664608,82.49664576
file name : Image_01102021112024168.png
|
2021-10-01 11:20:24.29699 |
54 |
44187068 |
Construction .of C C Drain at Chatupakhana School. |
100000 |
Construction .of C C Drain at Chatupakhana School.1 |
Completion of work |
-

latitude : 19.64469223,19.64473177
Longitude : 82.49673571,82.49670694
file name : Image_30092021124757318.png
|
2021-09-30 12:47:57.424098 |
55 |
44187068 |
Construction .of C C Drain at Chatupakhana School. |
100000 |
Construction .of C C Drain at Chatupakhana School.1 |
Completion of work |
-

latitude : 19.64470021,19.64469281
Longitude : 82.49671675,82.49670472
file name : Image_30092021124426103.png
|
2021-09-30 12:44:26.217103 |
56 |
44154366 |
Const.of C C Drain at Mundakhaguda . |
125643 |
Const.of C C Drain at Mundakhaguda .1 |
Completion of work |
-

latitude : 19.64071806,19.64070696
Longitude : 82.5051763,82.50519536
file name : Image_30092021125224367.png
|
2021-09-30 12:52:24.46741 |
57 |
44154366 |
Const.of C C Drain at Mundakhaguda . |
125643 |
Const.of C C Drain at Mundakhaguda .1 |
Completion of work |
-

latitude : 19.64072662,19.64070248
Longitude : 82.50517346,82.50520507
file name : Image_30092021125250205.png
|
2021-09-30 12:52:50.312188 |
58 |
44154366 |
Const.of C C Drain at Mundakhaguda . |
125643 |
Const.of C C Drain at Mundakhaguda .1 |
Completion of work |
-

latitude : 19.64069157,19.64069342
Longitude : 82.5052025,82.5052107
file name : Image_30092021125315764.png
|
2021-09-30 12:53:15.867538 |
59 |
44154366 |
Const.of C C Drain at Mundakhaguda . |
125643 |
Const.of C C Drain at Mundakhaguda .1 |
Completion of work |
-

latitude : 19.64071806,19.64070696
Longitude : 82.5051763,82.50519536
file name : Image_30092021124523677.png
|
2021-09-30 12:45:23.782029 |
60 |
44154366 |
Const.of C C Drain at Mundakhaguda . |
125643 |
Const.of C C Drain at Mundakhaguda .1 |
Completion of work |
-

latitude : 19.64072662,19.64070248
Longitude : 82.50517346,82.50520507
file name : Image_30092021124629364.png
|
2021-09-30 12:46:29.479979 |
61 |
44154366 |
Const.of C C Drain at Mundakhaguda . |
125643 |
Const.of C C Drain at Mundakhaguda .1 |
Completion of work |
-

latitude : 19.64069157,19.64069342
Longitude : 82.5052025,82.5052107
file name : Image_30092021124706929.png
|
2021-09-30 12:47:07.031817 |
62 |
44154366 |
Const.of C C Drain at Mundakhaguda . |
125643 |
Const.of C C Drain at Mundakhaguda .1 |
Completion of work |
-

latitude : 19.64070415,19.64070461
Longitude : 82.5051999,82.5051996
file name : Image_01102021112155923.png
|
2021-10-01 11:21:56.013817 |
63 |
44154366 |
Const.of C C Drain at Mundakhaguda . |
125643 |
Const.of C C Drain at Mundakhaguda .1 |
Completion of work |
-

latitude : 19.64070415,19.64070461
Longitude : 82.5051999,82.5051996
file name : Image_01102021112108184.png
|
2021-10-01 11:21:08.30182 |
64 |
44186884 |
Repair and Bounry wall of Govt.Pry.School at Baharkarmari |
150000 |
Repair and Bounry wall of Govt.Pry.School at Baharkarmari1 |
Completion of work |
-

latitude : 19.71847405
Longitude : 82.53196504
file name : Image_15122021163253585.png
|
2021-12-15 16:32:53.692687 |
65 |
44186884 |
Repair and Bounry wall of Govt.Pry.School at Baharkarmari |
150000 |
Repair and Bounry wall of Govt.Pry.School at Baharkarmari1 |
Completion of work |
-

latitude : 19.70419207
Longitude : 82.54965168
file name : Image_20052022060319559.png
|
2022-05-20 06:03:19.68795 |
66 |
44154487 |
Completion of In-complete Market Complex at Chakalapadar . |
400000 |
Completion of In-complete Market Complex at Chakalapadar .1 |
Completion of work |
-

latitude : 19.67013024
Longitude : 82.47866094
file name : Image_25062022121137695.png
|
2022-06-25 12:11:37.819248 |
67 |
44154487 |
Completion of In-complete Market Complex at Chakalapadar . |
400000 |
Completion of In-complete Market Complex at Chakalapadar .1 |
Completion of work |
-

latitude : 19.67012931
Longitude : 82.47865147
file name : Image_25062022121116410.png
|
2022-06-25 12:11:16.52665 |
68 |
50793772 |
Maintenance of Old GP Building at Chakalapadar |
100000 |
Maintenance of Old GP Building at Chakalapadar1 |
Completion of work |
-

latitude : 19.67058325
Longitude : 82.47906211
file name : Image_15122021163248824.png
|
2021-12-15 16:32:48.969186 |
69 |
50793772 |
Maintenance of Old GP Building at Chakalapadar |
100000 |
Maintenance of Old GP Building at Chakalapadar1 |
Completion of work |
-

latitude : 19.67058948
Longitude : 82.47901026
file name : Image_05112021182745492.png
|
2021-11-05 18:27:45.589369 |
70 |
50793772 |
Maintenance of Old GP Building at Chakalapadar |
100000 |
Maintenance of Old GP Building at Chakalapadar1 |
Completion of work |
-

latitude : 19.6705423
Longitude : 82.47907094
file name : Image_05112021182738412.png
|
2021-11-05 18:27:38.518407 |
71 |
50787737 |
Installation of Water supply system at Chakalapadar AWC |
50000 |
Installation of Water supply system at Chakalapadar AWC1 |
Completion of work |
-

latitude : 19.71871089,19.71872907
Longitude : 82.37044896,82.37045848
file name : Image_19112022124625502.png
|
2022-11-19 12:46:25.62298 |
72 |
44152306 |
Const.of BASUDHA PWS at Kongra |
1000000 |
Const.of BASUDHA PWS at Kongra1 |
Completion of work |
-

latitude : 19.7183755,19.7183755
Longitude : 82.3702203,82.3702203
file name : Image_05082021203001532.png
|
2021-08-05 20:30:01.608669 |
73 |
47603543 |
Construction of Boundry wall at Pry.School,Gaibandha |
133643 |
Construction of Boundry wall at Pry.School,Gaibandha1 |
Completion of work |
-

latitude : 19.68245876
Longitude : 82.54427306
file name : Image_23052022151221589.png
|
2022-05-23 15:12:21.719841 |
74 |
47605896 |
Construction of Boundry wall at Lahandasil AWC |
200000 |
Construction of Boundry wall at Lahandasil AWC1 |
Completion of work |
-

latitude : 19.69902454
Longitude : 82.54595908
file name : Image_09012022210808062.png
|
2022-01-09 21:08:08.208488 |
75 |
47605896 |
Construction of Boundry wall at Lahandasil AWC |
200000 |
Construction of Boundry wall at Lahandasil AWC1 |
Completion of work |
-

latitude : 19.69916282
Longitude : 82.54603359
file name : Image_01022022103011432.png
|
2022-02-01 10:30:11.56772 |
76 |
47605896 |
Construction of Boundry wall at Lahandasil AWC |
200000 |
Construction of Boundry wall at Lahandasil AWC1 |
Completion of work |
-

latitude : 19.69916073
Longitude : 82.54603064
file name : Image_01022022103035225.png
|
2022-02-01 10:30:35.353984 |
77 |
47605896 |
Construction of Boundry wall at Lahandasil AWC |
200000 |
Construction of Boundry wall at Lahandasil AWC1 |
Completion of work |
-

latitude : 19.69916073
Longitude : 82.54603064
file name : Image_01022022103108921.png
|
2022-02-01 10:31:09.051227 |
78 |
47605896 |
Construction of Boundry wall at Lahandasil AWC |
200000 |
Construction of Boundry wall at Lahandasil AWC1 |
Completion of work |
-

latitude : 19.69902454
Longitude : 82.54595908
file name : Image_09012022211301833.png
|
2022-01-09 21:13:01.941105 |
79 |
47608544 |
Construction of 10 Nos.of Tube-well platform with soak pit |
150000 |
Construction of 10 Nos.of Tube-well platform with soak pit1 |
Completion of work |
-

latitude : 19.6681367
Longitude : 82.4784909
file name : Image_06082022211601284.png
|
2022-08-06 21:16:01.375042 |
80 |
47607996 |
Construction of Boundry wall at Pry.School ,Dokrikote |
227540 |
Construction of Boundry wall at Pry.School ,Dokrikote1 |
Completion of work |
-

latitude : 19.68553914
Longitude : 82.56253386
file name : Image_09012022210331413.png
|
2022-01-09 21:03:31.524195 |
81 |
47607996 |
Construction of Boundry wall at Pry.School ,Dokrikote |
227540 |
Construction of Boundry wall at Pry.School ,Dokrikote1 |
Completion of work |
-

latitude : 19.68550708
Longitude : 82.56254484
file name : Image_09012022210531120.png
|
2022-01-09 21:05:31.232972 |
82 |
47607996 |
Construction of Boundry wall at Pry.School ,Dokrikote |
227540 |
Construction of Boundry wall at Pry.School ,Dokrikote1 |
Completion of work |
-

latitude : 19.68550708
Longitude : 82.56254484
file name : Image_09012022211026865.png
|
2022-01-09 21:10:26.967481 |
83 |
47603822 |
Construction of C.C. Drain at Kongra |
200000 |
Construction of C.C. Drain at Kongra1 |
Completion of work |
-

latitude : 19.68447605,19.68447605,19.68447504
Longitude : 82.4906486,82.4906486,82.49064777
file name : Image_20122021123756823.png
|
2021-12-20 12:37:56.9457 |
84 |
47603822 |
Construction of C.C. Drain at Kongra |
200000 |
Construction of C.C. Drain at Kongra1 |
Completion of work |
-

latitude : 19.68444963,19.68445793
Longitude : 82.49079355,82.49079904
file name : Image_20122021134308275.png
|
2021-12-20 13:43:08.377281 |
85 |
47603822 |
Construction of C.C. Drain at Kongra |
200000 |
Construction of C.C. Drain at Kongra1 |
Completion of work |
-

latitude : 19.68444963,19.68445793
Longitude : 82.49079355,82.49079904
file name : Image_20122021134143956.png
|
2021-12-20 13:41:44.058851 |
86 |
47603822 |
Construction of C.C. Drain at Kongra |
200000 |
Construction of C.C. Drain at Kongra1 |
Completion of work |
-

latitude : 19.68444515,19.68444214
Longitude : 82.49080514,82.49079477
file name : Image_20122021134116450.png
|
2021-12-20 13:41:16.565479 |
87 |
47604526 |
Construction of RCC Culvert at Harijan Sahi,Kongra |
100000 |
Construction of RCC Culvert at Harijan Sahi,Kongra1 |
Completion of work |
-

latitude : 19.631297269052048
Longitude : 82.38468308937226
file name : Image_12122021140457943.png
|
2021-12-12 14:04:58.02019 |
88 |
47603183 |
Construction of Boundry wall at Pry.School ,Chatupakhana |
200000 |
Construction of Boundry wall at Pry.School ,Chatupakhana1 |
Completion of work |
-

latitude : 19.64473016
Longitude : 82.49684278
file name : Image_26102021122104902.png
|
2021-10-26 12:21:05.009498 |
89 |
47603183 |
Construction of Boundry wall at Pry.School ,Chatupakhana |
200000 |
Construction of Boundry wall at Pry.School ,Chatupakhana1 |
Completion of work |
-

latitude : 19.64479834
Longitude : 82.49691244
file name : Image_27102021131132766.png
|
2021-10-27 13:11:32.859672 |
90 |
47603183 |
Construction of Boundry wall at Pry.School ,Chatupakhana |
200000 |
Construction of Boundry wall at Pry.School ,Chatupakhana1 |
Completion of work |
-

latitude : 19.6446955
Longitude : 82.49671985
file name : Image_29102021103429612.png
|
2021-10-29 10:34:29.70953 |
91 |
47604126 |
Construction of C.C. Drain at Baharkarmari |
200000 |
Construction of C.C. Drain at Baharkarmari1 |
Completion of work |
-

latitude : 19.70401269,19.70400718
Longitude : 82.5496972,82.54970294
file name : Image_05112021182717272.png
|
2021-11-05 18:27:17.370012 |
92 |
47604126 |
Construction of C.C. Drain at Baharkarmari |
200000 |
Construction of C.C. Drain at Baharkarmari1 |
Completion of work |
-

latitude : 19.70438944,19.70438688
Longitude : 82.54922877,82.54922755
file name : Image_29102021155703075.png
|
2021-10-29 15:57:03.184345 |
93 |
47604126 |
Construction of C.C. Drain at Baharkarmari |
200000 |
Construction of C.C. Drain at Baharkarmari1 |
Completion of work |
-

latitude : 19.70433766,19.70432946
Longitude : 82.54923209,82.54922755
file name : Image_29102021155706663.png
|
2021-10-29 15:57:06.760545 |
94 |
47604126 |
Construction of C.C. Drain at Baharkarmari |
200000 |
Construction of C.C. Drain at Baharkarmari1 |
Completion of work |
-

latitude : 19.70433766,19.70432946
Longitude : 82.54923209,82.54922755
file name : Image_29102021155717445.png
|
2021-10-29 15:57:17.539102 |
95 |
47604126 |
Construction of C.C. Drain at Baharkarmari |
200000 |
Construction of C.C. Drain at Baharkarmari1 |
Completion of work |
-

latitude : 19.70438944,19.70438688
Longitude : 82.54922877,82.54922755
file name : Image_29102021155713627.png
|
2021-10-29 15:57:13.724129 |
96 |
47604126 |
Construction of C.C. Drain at Baharkarmari |
200000 |
Construction of C.C. Drain at Baharkarmari1 |
Completion of work |
-

latitude : 19.70402437,19.70400937
Longitude : 82.54968809,82.549689
file name : Image_05112021182710610.png
|
2021-11-05 18:27:10.719014 |
97 |
47605244 |
Completion of Incomplete AWC Building at Chuimati |
200000 |
Completion of Incomplete AWC Building at Chuimati1 |
Completion of work |
-

latitude : 19.70812273
Longitude : 82.48402924
file name : Image_29102021155659662.png
|
2021-10-29 15:56:59.756556 |
98 |
47605244 |
Completion of Incomplete AWC Building at Chuimati |
200000 |
Completion of Incomplete AWC Building at Chuimati1 |
Completion of work |
-

latitude : 19.70812273
Longitude : 82.48402924
file name : Image_29102021155710048.png
|
2021-10-29 15:57:10.143248 |
99 |
47605244 |
Completion of Incomplete AWC Building at Chuimati |
200000 |
Completion of Incomplete AWC Building at Chuimati1 |
Completion of work |
-

latitude : 19.70807543
Longitude : 82.48404559
file name : Image_05112021182704646.png
|
2021-11-05 18:27:04.738337 |
100 |
47605244 |
Completion of Incomplete AWC Building at Chuimati |
200000 |
Completion of Incomplete AWC Building at Chuimati1 |
Completion of work |
-

latitude : 19.70808841
Longitude : 82.48399308
file name : Image_05112021182658173.png
|
2021-11-05 18:26:58.269333 |
101 |
47605244 |
Completion of Incomplete AWC Building at Chuimati |
200000 |
Completion of Incomplete AWC Building at Chuimati1 |
Completion of work |
-

latitude : 19.70812468
Longitude : 82.48385418
file name : Image_29102021155656163.png
|
2021-10-29 15:56:56.269638 |
102 |
67496041 |
Construction of toilets in public institutions |
750000 |
Construction of toilets in public institutions1 |
Completion of work |
-

latitude : 19.7183845
Longitude : 82.3701752
file name : Image_31032023173716831.png
|
2023-03-31 17:37:16.977014 |
103 |
67496616 |
CONSTRUCTION OF 5T HIGH SCHOOL TRANSFORMATION PHASE III |
400000 |
CONSTRUCTION OF 5T HIGH SCHOOL TRANSFORMATION PHASE III1 |
Completion of work |
-

latitude : 19.7183844
Longitude : 82.3701654
file name : Image_31032023173813597.png
|
2023-03-31 17:38:13.71467 |
104 |
67497225 |
CONSTRUCTION OF 5T HIGH SCHOOL TRANSFORMATION PHASE III PART 3 |
350000 |
CONSTRUCTION OF 5T HIGH SCHOOL TRANSFORMATION PHASE III PART 31 |
Completion of work |
-

latitude : 19.7183942
Longitude : 82.3701691
file name : Image_31032023173608344.png
|
2023-03-31 17:36:08.480137 |
105 |
83510704 |
Creation of Shed for segregation and processing of wet and dry waste |
400000 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-

latitude : 19.7183708
Longitude : 82.3702039
file name : Image_30012024171755747.png
|
2024-01-30 17:17:55.8692 |
106 |
83510704 |
Creation of Shed for segregation and processing of wet and dry waste |
400000 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-

latitude : 19.7183712
Longitude : 82.3702022
file name : Image_30012024171509221.png
|
2024-01-30 17:15:09.343723 |
107 |
83510704 |
Creation of Shed for segregation and processing of wet and dry waste |
400000 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-

latitude : 19.7183707
Longitude : 82.3702035
file name : Image_30012024171923313.png
|
2024-01-30 17:19:23.42166 |
108 |
83507909 |
Operation and Maintenance of drinking water supply system |
243779 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-

latitude : 19.7183554
Longitude : 82.3701988
file name : Image_25072024151622913.png
|
2024-07-25 15:16:23.273802 |
109 |
83507909 |
Operation and Maintenance of drinking water supply system |
243779 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-

latitude : 19.7183722
Longitude : 82.3701808
file name : Image_25072024151952328.png
|
2024-07-25 15:19:52.435603 |
110 |
83507909 |
Operation and Maintenance of drinking water supply system |
243779 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-

latitude : 19.7183742
Longitude : 82.3701868
file name : Image_25072024152502489.png
|
2024-07-25 15:25:02.64012 |
111 |
83508291 |
Operation and Maintenance of drinking water supply system |
72000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-

latitude : 19.7184171
Longitude : 82.3702241
file name : Image_27022024164313066.png
|
2024-02-27 16:43:13.192441 |
112 |
83508291 |
Operation and Maintenance of drinking water supply system |
72000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-

latitude : 19.7184171
Longitude : 82.3702241
file name : Image_27022024164611567.png
|
2024-02-27 16:46:11.694695 |
113 |
83605517 |
Creation of a new source of drinking water |
350000 |
Creation of a new source of drinking water1 |
Completion of work |
-

latitude : 19.7190175
Longitude : 82.3704462
file name : Image_06052024124520313.png
|
2024-05-06 12:45:20.376881 |
114 |
83605517 |
Creation of a new source of drinking water |
350000 |
Creation of a new source of drinking water1 |
Plinth level |
-

latitude : 19.718396
Longitude : 82.3702029
file name : Image_06052024124751540.png
|
2024-05-06 12:47:51.604239 |
115 |
83605517 |
Creation of a new source of drinking water |
350000 |
Creation of a new source of drinking water1 |
Roof laid |
-

latitude : 19.7183936
Longitude : 82.3702003
file name : Image_06052024124940637.png
|
2024-05-06 12:49:40.704991 |
116 |
83506883 |
Repair of pipe drinking water |
100000 |
Repair of pipe drinking water1 |
Plinth level |
-

latitude : 19.7183674
Longitude : 82.3702047
file name : Image_27052024132048955.png
|
2024-05-27 13:20:49.020952 |
117 |
83506883 |
Repair of pipe drinking water |
100000 |
Repair of pipe drinking water1 |
Completion of work |
-

latitude : 19.7183706
Longitude : 82.3702044
file name : Image_27052024131529110.png
|
2024-05-27 13:15:29.180209 |
118 |
83506883 |
Repair of pipe drinking water |
100000 |
Repair of pipe drinking water1 |
Roof laid |
-

latitude : 19.7183751
Longitude : 82.3702041
file name : Image_27052024132534035.png
|
2024-05-27 13:25:34.088551 |
119 |
83620041 |
Operation and Maintenance of piped water supply system |
100000 |
Operation and Maintenance of piped water supply system1 |
Completion of work |
-

latitude : 19.7183704
Longitude : 82.3702048
file name : Image_27052024131647879.png
|
2024-05-27 13:16:47.962987 |
120 |
83620041 |
Operation and Maintenance of piped water supply system |
100000 |
Operation and Maintenance of piped water supply system1 |
Plinth level |
-

latitude : 19.718371
Longitude : 82.3702047
file name : Image_27052024132252166.png
|
2024-05-27 13:22:52.24194 |
121 |
83620041 |
Operation and Maintenance of piped water supply system |
100000 |
Operation and Maintenance of piped water supply system1 |
Roof laid |
-

latitude : 19.7183727
Longitude : 82.3702054
file name : Image_27052024132648886.png
|
2024-05-27 13:26:48.95183 |
122 |
47607349 |
Energy Charges |
80000 |
Energy Charges1 |
Completion of work |
-

latitude : 19.71838792
Longitude : 82.37021505
file name : Image_09032022115614528.png
|
2022-03-09 11:56:14.676296 |
123 |
47607349 |
Energy Charges |
80000 |
Energy Charges1 |
Completion of work |
-

latitude : 19.71834709
Longitude : 82.37017301
file name : Image_23032024185720327.png
|
2024-03-23 18:57:20.402584 |
124 |
47606597 |
Payment of SEM Salary |
72000 |
Payment of SEM Salary1 |
Completion of work |
-

latitude : 19.71834747
Longitude : 82.37017234
file name : Image_23032024185633565.png
|
2024-03-23 18:56:33.660531 |
125 |
47600961 |
Construction of solid waste management at Kongra |
197822 |
Construction of solid waste management at Kongra1 |
Completion of work |
-

latitude : 19.71834895
Longitude : 82.3701724
file name : Image_23032024185448890.png
|
2024-03-23 18:54:48.991897 |
126 |
83528834 |
Repairing/Construction of Building |
200000 |
Repairing/Construction of Building1 |
Completion of work |
-

latitude : 19.7183765
Longitude : 82.370184
file name : Image_25072024151441903.png
|
2024-07-25 15:14:41.97923 |
127 |
83528834 |
Repairing/Construction of Building |
200000 |
Repairing/Construction of Building1 |
Plinth level |
-

latitude : 19.7183793
Longitude : 82.3701946
file name : Image_25072024152047224.png
|
2024-07-25 15:20:47.381871 |
128 |
83528834 |
Repairing/Construction of Building |
200000 |
Repairing/Construction of Building1 |
Roof laid |
-

latitude : 19.718393
Longitude : 82.3702085
file name : Image_25072024152403331.png
|
2024-07-25 15:24:03.404197 |
129 |
83526713 |
Repairing/Construction of Building |
200000 |
Repairing/Construction of Building1 |
Completion of work |
-

latitude : 19.7183916
Longitude : 82.3701598
file name : Image_12082024165743317.png
|
2024-08-12 16:57:43.405572 |
130 |
83526713 |
Repairing/Construction of Building |
200000 |
Repairing/Construction of Building1 |
Plinth level |
-

latitude : 19.7183829
Longitude : 82.3701909
file name : Image_12082024170337225.png
|
2024-08-12 17:03:37.210322 |
131 |
83526713 |
Repairing/Construction of Building |
200000 |
Repairing/Construction of Building1 |
Roof laid |
-

latitude : 19.7183912
Longitude : 82.3701597
file name : Image_12082024170713976.png
|
2024-08-12 17:07:14.055541 |
132 |
83508761 |
Operation and Maintenance of drinking water supply system |
37500 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-

latitude : 19.71843585
Longitude : 82.37018942
file name : Image_12082024165525146.png
|
2024-08-12 16:55:25.25611 |
133 |
83508761 |
Operation and Maintenance of drinking water supply system |
37500 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-

latitude : 19.7183911
Longitude : 82.3701611
file name : Image_12082024170255682.png
|
2024-08-12 17:02:55.782199 |
134 |
83508761 |
Operation and Maintenance of drinking water supply system |
37500 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-

latitude : 19.7183934
Longitude : 82.3701516
file name : Image_12082024170558035.png
|
2024-08-12 17:05:57.814719 |
135 |
83529564 |
Construction of Building |
200000 |
Construction of Building1 |
Completion of work |
-

latitude : 19.7184135
Longitude : 82.370088
file name : Image_07112024125731666.png
|
2024-11-07 12:57:31.737081 |
136 |
83529564 |
Construction of Building |
200000 |
Construction of Building1 |
Plinth level |
-

latitude : 19.718394
Longitude : 82.3701796
file name : Image_07112024130451171.png
|
2024-11-07 13:04:51.233972 |
137 |
83529564 |
Construction of Building |
200000 |
Construction of Building1 |
Roof laid |
-

latitude : 19.7184019
Longitude : 82.3701494
file name : Image_07112024130724741.png
|
2024-11-07 13:07:24.804689 |
138 |
83511605 |
Drainage Construction |
100000 |
Drainage Construction1 |
Completion of work |
-

latitude : 19.7184142
Longitude : 82.3701131
file name : Image_07112024125612486.png
|
2024-11-07 12:56:12.575602 |
139 |
83511605 |
Drainage Construction |
100000 |
Drainage Construction1 |
Plinth level |
-

latitude : 19.7183932
Longitude : 82.3701918
file name : Image_07112024130408982.png
|
2024-11-07 13:04:09.053171 |
140 |
83511605 |
Drainage Construction |
100000 |
Drainage Construction1 |
Roof laid |
-

latitude : 19.7184061
Longitude : 82.3701077
file name : Image_07112024130807355.png
|
2024-11-07 13:08:07.420265 |
141 |
83603966 |
Repair and Maintenance of Hostels and Schools |
100000 |
Repair and Maintenance of Hostels and Schools1 |
Completion of work |
-

latitude : 19.7178943
Longitude : 82.3701072
file name : Image_07112024125352749.png
|
2024-11-07 12:53:52.810687 |
142 |
83603966 |
Repair and Maintenance of Hostels and Schools |
100000 |
Repair and Maintenance of Hostels and Schools1 |
Plinth level |
-

latitude : 19.7184004
Longitude : 82.3701374
file name : Image_07112024130325939.png
|
2024-11-07 13:03:26.041894 |
143 |
83603966 |
Repair and Maintenance of Hostels and Schools |
100000 |
Repair and Maintenance of Hostels and Schools1 |
Roof laid |
-

latitude : 19.7183942
Longitude : 82.3702038
file name : Image_07112024131015093.png
|
2024-11-07 13:10:15.182748 |
144 |
101524496 |
Construction of new Piped Water Supply schemes |
430863 |
Construction of new Piped Water Supply schemes1 |
Completion of work |
-

latitude : 19.7183767
Longitude : 82.370198
file name : Image_19122024122613220.png
|
2024-12-19 12:26:13.298093 |
145 |
101524496 |
Construction of new Piped Water Supply schemes |
430863 |
Construction of new Piped Water Supply schemes1 |
Plinth level |
-

latitude : 19.7183807
Longitude : 82.3701933
file name : Image_19122024122812661.png
|
2024-12-19 12:28:12.727373 |
146 |
83529967 |
Repairing/Construction of Building |
200000 |
Repairing/Construction of Building1 |
Completion of work |
-

latitude : 19.7183938
Longitude : 82.3701817
file name : Image_19122024121600822.png
|
2024-12-19 12:16:00.893063 |
147 |
83529967 |
Repairing/Construction of Building |
200000 |
Repairing/Construction of Building1 |
Plinth level |
-

latitude : 19.7183858
Longitude : 82.3701918
file name : Image_19122024121737788.png
|
2024-12-19 12:17:37.85554 |
148 |
83529967 |
Repairing/Construction of Building |
200000 |
Repairing/Construction of Building1 |
Roof laid |
-

latitude : 19.7183913
Longitude : 82.3701846
file name : Image_19122024121857607.png
|
2024-12-19 12:18:57.668758 |