1 |
44161355 |
Const of Boundary wall at Koigam primary school. |
100000 |
Const of Boundary wall at Koigam primary school.1 |
Completion of work |
-
latitude : 19.572566666666667
Longitude : 82.34362666666667
file name : Image_03062021121148589.png
|
2021-06-03 12:11:48.661902 |
2 |
44161355 |
Const of Boundary wall at Koigam primary school. |
100000 |
Const of Boundary wall at Koigam primary school.1 |
Completion of work |
-
latitude : 19.572586666666666
Longitude : 82.34361333333332
file name : Image_06032021113336158.png
|
2021-03-06 11:33:36.230116 |
3 |
44161355 |
Const of Boundary wall at Koigam primary school. |
100000 |
Const of Boundary wall at Koigam primary school.1 |
Completion of work |
-
latitude : 19.572605
Longitude : 82.34361666666668
file name : Image_06032021113658658.png
|
2021-03-06 11:36:58.729743 |
4 |
44163058 |
Const of CC drain from Anta house to Banu house at Pujariguda |
200000 |
Const of CC drain from Anta house to Banu house at Pujariguda1 |
Completion of work |
-
latitude : 19.565586666666665,19.565585,19.565595,19.565611666666666
Longitude : 82.32361666666665,82.32364000000001,82.32363666666667,82.32363166666667
file name : Image_21052021125220379.png
|
2021-05-21 12:52:20.460032 |
5 |
44163058 |
Const of CC drain from Anta house to Banu house at Pujariguda |
200000 |
Const of CC drain from Anta house to Banu house at Pujariguda1 |
Completion of work |
-
latitude : 19.56548666666667,19.565569999999997
Longitude : 82.32358833333335,82.32356999999999
file name : Image_06032021113113530.png
|
2021-03-06 11:31:13.611729 |
6 |
44163120 |
Const of CC drain from Bindhani house to Samarath house at Kapsakutli |
100000 |
Const of CC drain from Bindhani house to Samarath house at Kapsakutli1 |
Completion of work |
-
latitude : 19.548305000000003,19.548336666666668
Longitude : 82.32302666666668,82.32296833333334
file name : Image_16082021123209354.png
|
2021-08-16 12:32:09.432877 |
7 |
44163120 |
Const of CC drain from Bindhani house to Samarath house at Kapsakutli |
100000 |
Const of CC drain from Bindhani house to Samarath house at Kapsakutli1 |
Completion of work |
-
latitude : 19.548221666666667,19.548181666666668
Longitude : 82.32299499999999,82.32295666666666
file name : Image_28062021115947326.png
|
2021-06-28 11:59:47.401631 |
8 |
44163252 |
Completion of incompeted school building at Majhiguda |
100000 |
Completion of incompeted school building at Majhiguda1 |
Completion of work |
-
latitude : 19.55158833333333
Longitude : 82.31554166666668
file name : Image_19052021162806228.png
|
2021-05-19 16:28:06.297167 |
9 |
44163252 |
Completion of incompeted school building at Majhiguda |
100000 |
Completion of incompeted school building at Majhiguda1 |
Completion of work |
-
latitude : 19.551558333333332
Longitude : 82.31558000000001
file name : Image_10032021082053700.png
|
2021-03-10 08:20:53.763606 |
10 |
44161295 |
Const. of rest shed at Haladiguda Masanipada |
100000 |
Const. of rest shed at Haladiguda Masanipada1 |
Completion of work |
-
latitude : 19.563651666666665
Longitude : 82.34976333333334
file name : Image_20052021120234912.png
|
2021-05-20 12:02:34.972476 |
11 |
44161295 |
Const. of rest shed at Haladiguda Masanipada |
100000 |
Const. of rest shed at Haladiguda Masanipada1 |
Completion of work |
-
latitude : 19.563576666666666
Longitude : 82.34974166666667
file name : Image_10032021082057089.png
|
2021-03-10 08:20:57.156392 |
12 |
44161328 |
Const. of sabha mandap at Dangiriguda near market |
30000 |
Const. of sabha mandap at Dangiriguda near market1 |
Completion of work |
-
latitude : 19.655154999999997
Longitude : 82.22040833333334
file name : Image_23032021193704864.png
|
2021-03-23 19:37:04.938765 |
13 |
44162693 |
Const. of dress changing room at Haladiguda |
50000 |
Const. of dress changing room at Haladiguda1 |
Completion of work |
-
latitude : 19.563651666666665
Longitude : 82.35649
file name : Image_15082021205517583.png
|
2021-08-15 20:55:17.663317 |
14 |
44162693 |
Const. of dress changing room at Haladiguda |
50000 |
Const. of dress changing room at Haladiguda1 |
Completion of work |
-
latitude : 19.56359666666667
Longitude : 82.35642000000001
file name : Image_20052021120243526.png
|
2021-05-20 12:02:43.578388 |
15 |
44161487 |
Const. of CC drain near AWC building Majhiguda |
150000 |
Const. of CC drain near AWC building Majhiguda1 |
Completion of work |
-
latitude : 19.551526666666668,19.55152
Longitude : 82.31582833333331,82.31583166666665
file name : Image_19052021162802697.png
|
2021-05-19 16:28:02.767055 |
16 |
44161487 |
Const. of CC drain near AWC building Majhiguda |
150000 |
Const. of CC drain near AWC building Majhiguda1 |
Completion of work |
-
latitude : 19.551583333333333,19.55150666666667
Longitude : 82.31589333333335,82.31583333333334
file name : Image_03042021123334855.png
|
2021-04-03 12:33:34.940912 |
17 |
44160241 |
Remuneration of SEMs and pump driver |
120000 |
Remuneration of SEMs and pump driver1 |
Completion of work |
-
latitude : 19.6550474
Longitude : 82.2203596
file name : Image_10072021080036272.png
|
2021-07-10 08:00:36.384405 |
18 |
44161473 |
Const. of CC drain at Dubia Infront of primary school. |
150000 |
Const. of CC drain at Dubia Infront of primary school. 1 |
Completion of work |
-
latitude : 19.59049333333333,19.590491666666665
Longitude : 82.36898333333332,82.36898666666666
file name : Image_05112021120218373.png
|
2021-11-05 12:02:18.419675 |
19 |
48580245 |
Water Supply at Borajodi School |
45000 |
Water Supply at Borajodi School1 |
Completion of work |
-
latitude : 19.583881666666667,19.58385333333333
Longitude : 82.37837166666668,82.37839666666666
file name : Image_02052022102203664.png
|
2022-05-02 10:22:03.766509 |
20 |
44161114 |
Const. of CC drain from Kuma House to Mechanic sahi at Haldiguda |
100000 |
Const. of CC drain from Kuma House to Mechanic sahi at Haldiguda1 |
Completion of work |
-
latitude : 19.565440000000002,19.565455
Longitude : 82.35103333333333,82.35104000000001
file name : Image_03012022120302813.png
|
2022-01-03 12:03:02.873319 |
21 |
44161238 |
Const. of CC drain from Dubia to Chitrangi nadi |
100000 |
Const. of CC drain from Dubia to Chitrangi nadi1 |
Completion of work |
-
latitude : 19.59022333333333,19.590198333333333
Longitude : 82.369945,82.37001166666666
file name : Image_03012022120306697.png
|
2022-01-03 12:03:06.751963 |
22 |
44161238 |
Const. of CC drain from Dubia to Chitrangi nadi |
100000 |
Const. of CC drain from Dubia to Chitrangi nadi1 |
Completion of work |
-
latitude : 19.59021166666667,19.590186666666668
Longitude : 82.36990499999999,82.36994333333332
file name : Image_03012022120438013.png
|
2022-01-03 12:04:38.088517 |
23 |
44160381 |
Cleaning of darinage system and morroum spreading at Dangiriguda Harijan sahi |
60000 |
Cleaning of darinage system and morroum spreading at Dangiriguda Harijan sahi1 |
Completion of work |
-
latitude : 19.559735,19.559748333333335
Longitude : 82.32341833333334,82.32339833333332
file name : Image_03012022111017538.png
|
2022-01-03 11:10:17.626996 |
24 |
63220323 |
water supplyat Koigam school |
45000 |
water supplyat Koigam school1 |
Completion of work |
-
latitude : 19.57289203,19.57288823
Longitude : 82.34392549,82.34390731
file name : Image_08052022095113106.png
|
2022-05-08 09:51:13.218739 |
25 |
63220233 |
water supply at Dubia School |
45000 |
water supply at Dubia School1 |
Completion of work |
-
latitude : 19.59027591
Longitude : 82.36971182
file name : Image_08052022100437837.png
|
2022-05-08 10:04:37.97641 |
26 |
63220300 |
water supply at Borajodi school |
45000 |
water supply at Borajodi school1 |
Completion of work |
-
latitude : 19.58391159,19.58391456
Longitude : 82.37839594,82.37840071
file name : Image_08052022100951340.png
|
2022-05-08 10:09:51.439225 |
27 |
63220276 |
water supply at Chotaguda school |
45000 |
water supply at Chotaguda school1 |
Completion of work |
-
latitude : 19.65977933,19.57058198
Longitude : 82.21588749,82.32257129
file name : Image_08052022093817038.png
|
2022-05-08 09:38:17.206265 |
28 |
47430730 |
Const of culvert on road from Kapashakutali to Jungle road at Kapshakutali |
200000 |
Const of culvert on road from Kapashakutali to Jungle road at Kapshakutali1 |
Completion of work |
-
latitude : 19.5443,19.544333333333334
Longitude : 82.33233,82.33226166666667
file name : Image_02052022091427918.png
|
2022-05-02 09:14:28.02181 |
29 |
48579535 |
Water supply at Koigam school |
45000 |
Water supply at Koigam school1 |
Completion of work |
-
latitude : 19.57285166666667,19.572850000000003
Longitude : 82.343875,82.34383833333335
file name : Image_02052022100258478.png
|
2022-05-02 10:02:58.572466 |
30 |
44161344 |
Const of Boundary wall at Dangiriguda High school |
150000 |
Const of Boundary wall at Dangiriguda High school1 |
Completion of work |
-
latitude : 19.564033333333334
Longitude : 82.32303166666667
file name : Image_02052022083825049.png
|
2022-05-02 08:38:25.172371 |
31 |
48580045 |
Water Supply at Dubia School |
45000 |
Water Supply at Dubia School1 |
Completion of work |
-
latitude : 19.590151666666667,19.59014833333333
Longitude : 82.36963499999999,82.36966333333334
file name : Image_02052022101642508.png
|
2022-05-02 10:16:42.746719 |
32 |
48583061 |
water supply at Haladiguda School |
46600 |
water supply at Haladiguda School1 |
Completion of work |
-
latitude : 19.56056,19.56061
Longitude : 82.35979999999999,82.35979999999999
file name : Image_02052022103552215.png
|
2022-05-02 10:35:52.338433 |
33 |
48579241 |
Water supply at Chotaguda School |
45000 |
Water supply at Chotaguda School1 |
Completion of work |
-
latitude : 19.57088,19.570563333333332
Longitude : 82.32281333333334,82.32250833333335
file name : Image_02052022095205559.png
|
2022-05-02 09:52:05.688443 |
34 |
44163314 |
Renovation of govt aided primary school (up to 8th) at Majhiguda with Kitchen room. |
100000 |
Renovation of govt aided primary school (up to 8th) at Majhiguda with Kitchen room.1 |
Completion of work |
-
latitude : 19.551565
Longitude : 82.31553000000001
file name : Image_22042023163251931.png
|
2023-04-22 16:32:52.07857 |
35 |
47403850 |
CONST OF BOUNDARY WALL AT MAJHIGUDA PRIMERY SCHOOL |
150000 |
CONST OF BOUNDARY WALL AT MAJHIGUDA PRIMERY SCHOOL 1 |
Completion of work |
-
latitude : 19.551243333333332
Longitude : 82.31553000000001
file name : Image_22042023165420050.png
|
2023-04-22 16:54:20.200529 |
36 |
47403994 |
CONST OF BOUNDARY WALL AT SANA HALADIGUDA ADHIBASI SCHOOL |
150000 |
CONST OF BOUNDARY WALL AT SANA HALADIGUDA ADHIBASI SCHOOL1 |
Completion of work |
-
latitude : 19.560760000000002
Longitude : 82.35982833333334
file name : Image_22042023171119207.png
|
2023-04-22 17:11:19.313947 |
37 |
65998931 |
CONST OF BOUNDARY WALL AT KOIGAM GOVT PS |
150000 |
CONST OF BOUNDARY WALL AT KOIGAM GOVT PS1 |
Completion of work |
-
latitude : 19.5654543
Longitude : 82.3480711
file name : Image_22042023165728853.png
|
2023-04-22 16:57:29.011969 |
38 |
65998959 |
CONST OF KITCHEN ROOM AT KOIGAM GOVT PS |
150000 |
CONST OF KITCHEN ROOM AT KOIGAM GOVT PS1 |
Completion of work |
-
latitude : 19.572861666666665
Longitude : 82.34389333333333
file name : Image_22042023165529399.png
|
2023-04-22 16:55:29.500872 |
39 |
65999057 |
CONST OF KITCHEN ROOM AT TUTIGUDA GOVT PS |
150000 |
CONST OF KITCHEN ROOM AT TUTIGUDA GOVT PS1 |
Completion of work |
-
latitude : 19.572838333333333
Longitude : 82.34652333333334
file name : Image_22042023170025354.png
|
2023-04-22 17:00:25.457217 |
40 |
48585928 |
water supply at Dangariguda new PEO quater |
97143 |
water supply at Dangariguda new PEO quater1 |
Completion of work |
-
latitude : 19.563004999999997,19.56302833333333
Longitude : 82.32369166666668,82.32377
file name : Image_04082022092435874.png
|
2022-08-04 09:24:35.992799 |
41 |
47402745 |
CONST OF CC DRAIN FROM SUBASH GHAR TO HARI GHAR AT BORAJODI |
134733 |
CONST OF CC DRAIN FROM SUBASH GHAR TO HARI GHAR AT BORAJODI1 |
Completion of work |
-
latitude : 19.58641833333333,19.586386666666666
Longitude : 82.38004166666666,82.37998666666665
file name : Image_04082022100328983.png
|
2022-08-04 10:03:29.070466 |
42 |
47404492 |
CONST OF INCOMPLETE REST SHADE AT HALADIGUDA SMASAN |
150000 |
CONST OF INCOMPLETE REST SHADE AT HALADIGUDA SMASAN1 |
Completion of work |
-
latitude : 19.563691666666667
Longitude : 82.34970999999999
file name : Image_04082022094258295.png
|
2022-08-04 09:42:58.407705 |
43 |
47403109 |
CONST OF CC DRAIN FROM RADHA GHAR TO GOPAL GHAR AT DANGARIGUDA |
136000 |
CONST OF CC DRAIN FROM RADHA GHAR TO GOPAL GHAR AT DANGARIGUDA1 |
Completion of work |
-
latitude : 19.561668333333333,19.561641666666667,19.561641666666667
Longitude : 82.32430000000001,82.32428,82.32428
file name : Image_04082022075447726.png
|
2022-08-04 07:54:47.833602 |
44 |
44160098 |
Energyy Charges for community system |
100000 |
Energyy Charges for community system1 |
Completion of work |
-
latitude : 19.7183807,19.7183781,19.7183781
Longitude : 82.3701722,82.3701726,82.3701726
file name : Image_29092022171414061.png
|
2022-09-29 17:14:14.197126 |
45 |
65998556 |
Operation & maintenance of drinking water supply system |
120000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 19.559396666666665
Longitude : 82.32647999999999
file name : Image_10052023161519331.png
|
2023-05-10 16:15:19.443216 |
46 |
47470781 |
const of CC drain from AWC to Banu gharat Tutiguda |
128832 |
const of CC drain from AWC to Banu gharat Tutiguda1 |
Completion of work |
-
latitude : 19.572556666666667,19.572555
Longitude : 82.34677000000002,82.34670333333334
file name : Image_03062023093144435.png
|
2023-06-03 09:31:44.538756 |
47 |
47474852 |
Const of drain from AGAB to AWC at Koigam |
143168 |
Const of drain from AGAB to AWC at Koigam1 |
Completion of work |
-
latitude : 19.574313333333336,19.574311666666667
Longitude : 82.33761833333334,82.33759333333334
file name : Image_08072023185112533.png
|
2023-07-08 18:51:12.626804 |
48 |
47402349 |
WATER SUPPLY AT MAJHIGUDA AWC |
50000 |
WATER SUPPLY AT MAJHIGUDA AWC1 |
Completion of work |
-
latitude : 19.551326666666668
Longitude : 82.31585666666666
file name : Image_09072023164218503.png
|
2023-07-09 16:42:18.597939 |
49 |
47403216 |
CONST OFCC DRAIN AT PAKHANAGUDA |
136000 |
CONST OFCC DRAIN AT PAKHANAGUDA1 |
Completion of work |
-
latitude : 19.58346166666667,19.583438333333334
Longitude : 82.35495166666666,82.35498833333334
file name : Image_08072023184103204.png
|
2023-07-08 18:41:03.29927 |
50 |
47402856 |
CONST OF CC DRAIN AT BADA HALADIGUDA |
136000 |
CONST OF CC DRAIN AT BADA HALADIGUDA1 |
Completion of work |
-
latitude : 19.565434999999997,19.56543333333333
Longitude : 82.348655,82.34865666666668
file name : Image_08072023153743504.png
|
2023-07-08 15:37:43.606512 |
51 |
44161450 |
Const of Garbage pit at Koigam |
40000 |
Const of Garbage pit at Koigam1 |
Completion of work |
-
latitude : 19.573855
Longitude : 82.335765
file name : Image_08072023153138286.png
|
2023-07-08 15:31:38.390814 |
52 |
44161462 |
Const of Garbage pit at Haladiguda |
40000 |
Const of Garbage pit at Haladiguda1 |
Completion of work |
-
latitude : 19.562671666666667
Longitude : 82.35654333333332
file name : Image_08072023154258448.png
|
2023-07-08 15:42:58.561533 |
53 |
47404150 |
CONST OF BOUNDARY WALL AT CHOTAGUDA PRIMERY SCHOOL |
150000 |
CONST OF BOUNDARY WALL AT CHOTAGUDA PRIMERY SCHOOL1 |
Completion of work |
-
latitude : 19.570816666666666
Longitude : 82.32280666666665
file name : Image_11072023154857027.png
|
2023-07-11 15:48:57.129458 |
54 |
47429617 |
New tube well at Dubia AWC |
112000 |
New tube well at Dubia AWC1 |
Completion of work |
-
latitude : 19.589546666666667
Longitude : 82.37150666666666
file name : Image_11072023163905406.png
|
2023-07-11 16:39:05.507584 |
55 |
47402087 |
NEW TUBEWELL AT KAPSHAKUTALI AWC |
112000 |
NEW TUBEWELL AT KAPSHAKUTALI AWC1 |
Completion of work |
-
latitude : 19.561646666666665
Longitude : 82.32424333333331
file name : Image_17072023093454550.png
|
2023-07-17 09:34:54.652057 |
56 |
65999082 |
Operation & maintenance of drinking water supply system |
150000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 19.56269
Longitude : 82.32495500000002
file name : Image_11072023152943419.png
|
2023-07-11 15:29:43.5445 |
57 |
65999082 |
Operation & maintenance of drinking water supply system |
150000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 19.649778333333334
Longitude : 82.22918499999999
file name : Image_30032023195356007.png
|
2023-03-30 19:53:56.090157 |
58 |
65998698 |
Creation of a new source of drinking water |
132000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 19.574111666666667
Longitude : 82.35677333333334
file name : Image_11072023160953272.png
|
2023-07-11 16:09:53.446216 |
59 |
65999107 |
Creation of a new source of drinking water |
132000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 19.580289999999998
Longitude : 82.35996666666666
file name : Image_11072023162311478.png
|
2023-07-11 16:23:11.579347 |
60 |
65998916 |
REPAIR OF AWC BUILDING AT HALADIGUDA-1 |
150000 |
REPAIR OF AWC BUILDING AT HALADIGUDA-11 |
Completion of work |
-
latitude : 19.56277833333333
Longitude : 82.35650833333332
file name : Image_17072023111620626.png
|
2023-07-17 11:16:20.814481 |
61 |
47403594 |
CONST OF CULVERT ON ROAD FROM TANKA HOUSE TO NUASAHI AT DANGARIGUDA |
200000 |
CONST OF CULVERT ON ROAD FROM TANKA HOUSE TO NUASAHI AT DANGARIGUDA1 |
Completion of work |
-
latitude : 19.56171833333333,19.561719999999998
Longitude : 82.32281833333333,82.322785
file name : Image_12042024090721502.png
|
2024-04-12 09:07:21.591853 |
62 |
47427817 |
const of 2 numbers stall room at Dangariguda |
300000 |
const of 2 numbers stall room at Dangariguda1 |
Completion of work |
-
latitude : 19.56505
Longitude : 82.33029833333333
file name : Image_13042024133334617.png
|
2024-04-13 13:33:34.73329 |
63 |
44163209 |
Renovation of Govt aided Primary School (up to fifth ) with addl classroom at Chataguda |
200000 |
Renovation of Govt aided Primary School (up to fifth ) with addl classroom at Chataguda1 |
Completion of work |
-
latitude : 19.57077
Longitude : 82.32244999999999
file name : Image_19092023152152068.png
|
2023-09-19 15:21:52.219082 |
64 |
44163209 |
Renovation of Govt aided Primary School (up to fifth ) with addl classroom at Chataguda |
200000 |
Renovation of Govt aided Primary School (up to fifth ) with addl classroom at Chataguda1 |
Completion of work |
-
latitude : 19.570801666666668
Longitude : 82.32244833333334
file name : Image_19092023152155719.png
|
2023-09-19 15:21:55.868112 |
65 |
44163209 |
Renovation of Govt aided Primary School (up to fifth ) with addl classroom at Chataguda |
200000 |
Renovation of Govt aided Primary School (up to fifth ) with addl classroom at Chataguda1 |
Completion of work |
-
latitude : 19.570771666666666
Longitude : 82.322445
file name : Image_19092023152259668.png
|
2023-09-19 15:22:59.814667 |
66 |
47457933 |
Solid waste management tank at Pujariguda |
108800 |
Solid waste management tank at Pujariguda1 |
Completion of work |
-
latitude : 19.565835
Longitude : 82.32300666666667
file name : Image_19092023145254923.png
|
2023-09-19 14:52:55.115112 |
67 |
83390198 |
Piped drinking water to public institutions |
200000 |
Piped drinking water to public institutions1 |
Plinth level |
-
latitude : 19.559408333333334
Longitude : 82.32644333333334
file name : Image_26022024144914728.png
|
2024-02-26 14:49:14.838523 |
68 |
83390198 |
Piped drinking water to public institutions |
200000 |
Piped drinking water to public institutions1 |
Completion of work |
-
latitude : 19.562986666666667
Longitude : 82.35292333333334
file name : Image_05112023085447089.png
|
2023-11-05 08:54:47.212492 |
69 |
83390198 |
Piped drinking water to public institutions |
200000 |
Piped drinking water to public institutions1 |
Completion of work |
-
latitude : 19.55943166666667
Longitude : 82.32648333333333
file name : Image_02112023145357287.png
|
2023-11-02 14:53:57.494641 |
70 |
47430820 |
Const of culvert at pakanaguda near AWC |
200000 |
Const of culvert at pakanaguda near AWC1 |
Completion of work |
-
latitude : 19.5803,19.580305
Longitude : 82.36005333333333,82.36004666666668
file name : Image_05012024141644371.png
|
2024-01-05 14:16:44.485523 |
71 |
83408520 |
Construction of Boundary Wall |
100000 |
Construction of Boundary Wall1 |
Plinth level |
-
latitude : 19.574585000000003
Longitude : 82.33772833333333
file name : Image_15012024170419321.png
|
2024-01-15 17:04:19.448475 |
72 |
83408520 |
Construction of Boundary Wall |
100000 |
Construction of Boundary Wall1 |
Plinth level |
-
latitude : 19.574355
Longitude : 82.33775166666668
file name : Image_12012024131519199.png
|
2024-01-12 13:15:19.3111 |
73 |
83408520 |
Construction of Boundary Wall |
100000 |
Construction of Boundary Wall1 |
Plinth level |
-
latitude : 19.574425
Longitude : 82.33780999999999
file name : Image_11012024123117949.png
|
2024-01-11 12:31:18.043451 |
74 |
83408520 |
Construction of Boundary Wall |
100000 |
Construction of Boundary Wall1 |
Completion of work |
-
latitude : 19.57437666666667
Longitude : 82.33765166666666
file name : Image_05012024140437471.png
|
2024-01-05 14:04:37.562866 |
75 |
65998878 |
COMPLITION OF INCOMPLETE ADDL CLASS ROOM AT CHHATAGUDA SCHOOL |
300000 |
COMPLITION OF INCOMPLETE ADDL CLASS ROOM AT CHHATAGUDA SCHOOL1 |
Completion of work |
-
latitude : 19.57078166666667
Longitude : 82.32243666666666
file name : Image_05012024135259888.png
|
2024-01-05 13:53:00.012602 |
76 |
83407168 |
Creation of other water recharging structure |
50000 |
Creation of other water recharging structure1 |
Plinth level |
-
latitude : 19.551585
Longitude : 82.31574333333334
file name : Image_15012024094734608.png
|
2024-01-15 09:47:34.694812 |
77 |
83407168 |
Creation of other water recharging structure |
50000 |
Creation of other water recharging structure1 |
Plinth level |
-
latitude : 19.551606666666665
Longitude : 82.315445
file name : Image_12012024095539562.png
|
2024-01-12 09:55:39.651425 |
78 |
83407168 |
Creation of other water recharging structure |
50000 |
Creation of other water recharging structure1 |
Completion of work |
-
latitude : 19.551696666666665
Longitude : 82.315505
file name : Image_10012024140928121.png
|
2024-01-10 14:09:28.219612 |
79 |
83407168 |
Creation of other water recharging structure |
50000 |
Creation of other water recharging structure1 |
Completion of work |
-
latitude : 19.551733333333335
Longitude : 82.31533333333333
file name : Image_10012024140824430.png
|
2024-01-10 14:08:24.536358 |
80 |
83407168 |
Creation of other water recharging structure |
50000 |
Creation of other water recharging structure1 |
Completion of work |
-
latitude : 19.551548333333336
Longitude : 82.31516666666667
file name : Image_05012024155247599.png
|
2024-01-05 15:52:47.695925 |
81 |
44161268 |
Const. of govt aided primary school up to 8th at Dubia primary school |
200000 |
Const. of govt aided primary school up to 8th at Dubia primary school1 |
Completion of work |
-
latitude : 19.59022666666667
Longitude : 82.36966
file name : Image_05012024142349022.png
|
2024-01-05 14:23:49.113202 |
82 |
83412579 |
Construction of Boundary Wall |
150000 |
Construction of Boundary Wall1 |
Roof laid |
-
latitude : 19.572743333333335
Longitude : 82.34669000000001
file name : Image_02022024121800731.png
|
2024-02-02 12:18:00.874958 |
83 |
83412579 |
Construction of Boundary Wall |
150000 |
Construction of Boundary Wall1 |
Plinth level |
-
latitude : 19.572805000000002
Longitude : 82.34637333333333
file name : Image_02022024121606215.png
|
2024-02-02 12:16:06.331978 |
84 |
83412579 |
Construction of Boundary Wall |
150000 |
Construction of Boundary Wall1 |
Completion of work |
-
latitude : 19.572808333333334
Longitude : 82.34624166666666
file name : Image_02022024121124345.png
|
2024-02-02 12:11:24.520089 |
85 |
83412579 |
Construction of Boundary Wall |
150000 |
Construction of Boundary Wall1 |
Completion of work |
-
latitude : 19.572705
Longitude : 82.34638000000001
file name : Image_02022024121120634.png
|
2024-02-02 12:11:20.756066 |
86 |
83412579 |
Construction of Boundary Wall |
150000 |
Construction of Boundary Wall1 |
Completion of work |
-
latitude : 19.572795
Longitude : 82.34640499999999
file name : Image_01022024120625646.png
|
2024-02-01 12:06:25.74527 |
87 |
83412579 |
Construction of Boundary Wall |
150000 |
Construction of Boundary Wall1 |
Completion of work |
-
latitude : 19.57278
Longitude : 82.34632000000002
file name : Image_27012024125335769.png
|
2024-01-27 12:53:35.863479 |
88 |
83412579 |
Construction of Boundary Wall |
150000 |
Construction of Boundary Wall1 |
Completion of work |
-
latitude : 19.572728333333334
Longitude : 82.34644666666667
file name : Image_27012024125331993.png
|
2024-01-27 12:53:32.085996 |
89 |
83412579 |
Construction of Boundary Wall |
150000 |
Construction of Boundary Wall1 |
Completion of work |
-
latitude : 19.572688333333335
Longitude : 82.34636333333334
file name : Image_18012024120018027.png
|
2024-01-18 12:00:18.1602 |
90 |
65998799 |
Creation of Shed for segregation and processing of wet and dry waste |
415000 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 19.56176333333333
Longitude : 82.32428999999999
file name : Image_06122023170233196.png
|
2023-12-06 17:02:33.269913 |
91 |
83409437 |
Electricity |
51151 |
Electricity1 |
Completion of work |
-
latitude : 19.559253333333334
Longitude : 82.32633666666668
file name : Image_25022024101048923.png
|
2024-02-25 10:10:49.018145 |
92 |
83409437 |
Electricity |
51151 |
Electricity1 |
Completion of work |
-
latitude : 19.559238333333333
Longitude : 82.32640333333332
file name : Image_25022024100929113.png
|
2024-02-25 10:09:29.216954 |
93 |
83389698 |
Creation of a new source of drinking water |
120000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 19.559305
Longitude : 82.326435
file name : Image_12042024082437334.png
|
2024-04-12 08:24:37.440521 |
94 |
83389698 |
Creation of a new source of drinking water |
120000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 19.561680000000003
Longitude : 82.32422833333334
file name : Image_22122023124048597.png
|
2023-12-22 12:40:48.682216 |
95 |
83401035 |
Piped drinking water to public institutions |
200000 |
Piped drinking water to public institutions1 |
Roof laid |
-
latitude : 19.563019999999998
Longitude : 82.32381500000001
file name : Image_30032024153125570.png
|
2024-03-30 15:31:25.686144 |
96 |
83401035 |
Piped drinking water to public institutions |
200000 |
Piped drinking water to public institutions1 |
Plinth level |
-
latitude : 19.56306
Longitude : 82.32418166666666
file name : Image_18032024180144150.png
|
2024-03-18 18:01:44.23881 |
97 |
83401035 |
Piped drinking water to public institutions |
200000 |
Piped drinking water to public institutions1 |
Completion of work |
-
latitude : 19.563018333333332
Longitude : 82.32406166666667
file name : Image_07032024162417550.png
|
2024-03-07 16:24:17.690239 |
98 |
83411275 |
Construction of Water treatment plant |
300000 |
Construction of Water treatment plant1 |
Plinth level |
-
latitude : 19.562661666666667
Longitude : 82.35367833333333
file name : Image_23042024115324909.png
|
2024-04-23 11:53:25.012594 |
99 |
83411275 |
Construction of Water treatment plant |
300000 |
Construction of Water treatment plant1 |
Completion of work |
-
latitude : 19.562666666666665
Longitude : 82.35365500000002
file name : Image_23042024105721454.png
|
2024-04-23 10:57:21.541152 |
100 |
83411275 |
Construction of Water treatment plant |
300000 |
Construction of Water treatment plant1 |
Completion of work |
-
latitude : 19.562745
Longitude : 82.35375166666667
file name : Image_13042024133229288.png
|
2024-04-13 13:32:29.408297 |
101 |
65998669 |
Operation & maintenance of drinking water supply system |
281542 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 19.559336666666663
Longitude : 82.32638
file name : Image_22032024091455098.png
|
2024-03-22 09:14:55.206588 |
102 |
83412028 |
Construction of Store Room in GP Bhawan |
200000 |
Construction of Store Room in GP Bhawan1 |
Plinth level |
-
latitude : 19.563186666666663
Longitude : 82.32382166666666
file name : Image_11092024102324101.png
|
2024-09-11 10:25:43.568901 |
103 |
83412028 |
Construction of Store Room in GP Bhawan |
200000 |
Construction of Store Room in GP Bhawan1 |
Completion of work |
-
latitude : 19.563035
Longitude : 82.32391333333335
file name : Image_09092024084726263.png
|
2024-09-09 08:49:06.079046 |
104 |
65998900 |
REPAIR OF GOVT PS AT PAKANAGUDA |
171388 |
REPAIR OF GOVT PS AT PAKANAGUDA1 |
Completion of work |
-
latitude : 19.581068333333334
Longitude : 82.35967166666666
file name : Image_31032024105727727.png
|
2024-03-31 10:57:27.84019 |
105 |
83413255 |
Construction of Ghats |
60000 |
Construction of Ghats1 |
Plinth level |
-
latitude : 19.5632078
Longitude : 82.3239719
file name : Image_31032024152105790.png
|
2024-03-31 15:21:05.889823 |
106 |
83413255 |
Construction of Ghats |
60000 |
Construction of Ghats1 |
Completion of work |
-
latitude : 19.562941666666667
Longitude : 82.32409333333332
file name : Image_31032024111904318.png
|
2024-03-31 11:19:04.418301 |
107 |
101182233 |
Creation of a new rainwater harvesting structure |
234000 |
Creation of a new rainwater harvesting structure1 |
Completion of work |
-
latitude : 19.56294
Longitude : 82.340445
file name : Image_31082024115155945.png
|
2024-08-31 11:51:56.706955 |
108 |
101182233 |
Creation of a new rainwater harvesting structure |
234000 |
Creation of a new rainwater harvesting structure1 |
Completion of work |
-
latitude : 19.559256666666666
Longitude : 82.32637166666667
file name : Image_22062024160334907.png
|
2024-06-22 16:03:35.093074 |