1 |
44319948 |
CONST OF NEW TUBE WELL AND PLAT FROM IN REBANANUAGAON GO 2NOS |
140000 |
CONST OF NEW TUBE WELL AND PLAT FROM IN REBANANUAGAON GO 2NOS1 |
Completion of work |
-
latitude : 19.79287536
Longitude : 85.6996184
file name : Image_04022022134700471.png
|
2022-02-04 13:47:00.594341 |
2 |
47806068 |
repairing of cc road at jagateswara temple jagannathapur |
123391 |
repairing of cc road at jagateswara temple jagannathapur1 |
Completion of work |
-
latitude : 19.79749586,19.79749549
Longitude : 85.68615914,85.68615879
file name : Image_04022022133633693.png
|
2022-02-04 13:36:33.796169 |
3 |
47777016 |
annual salary of sem pump mechanics and pump house |
168000 |
annual salary of sem pump mechanics and pump house1 |
Completion of work |
-
latitude : 19.7995055
Longitude : 85.6667042
file name : Image_11122021113537108.png
|
2021-12-11 11:35:37.191014 |
4 |
44319488 |
Annual salary of S.E.M. pump mechanics and pump House |
168000 |
Annual salary of S.E.M. pump mechanics and pump House1 |
Completion of work |
-
latitude : 19.797913333333334
Longitude : 85.64659666666667
file name : Image_26102021115410192.png
|
2021-10-26 11:54:10.289044 |
5 |
44319488 |
Annual salary of S.E.M. pump mechanics and pump House |
168000 |
Annual salary of S.E.M. pump mechanics and pump House1 |
Completion of work |
-
latitude : 19.7994941
Longitude : 85.6667047
file name : Image_07072021120338253.png
|
2021-07-07 12:03:38.544651 |
6 |
47802298 |
const of new tub well at elishi bandha jagannathapur |
65000 |
const of new tub well at elishi bandha jagannathapur1 |
Completion of work |
-
latitude : 19.79842
Longitude : 85.68245
file name : Image_29102021141254285.png
|
2021-10-29 14:12:54.393222 |
7 |
47802087 |
const of new tub well at jagannathpur trinatha temple |
65000 |
const of new tub well at jagannathpur trinatha temple1 |
Completion of work |
-
latitude : 19.778191666666665
Longitude : 85.60306
file name : Image_02122021110522639.png
|
2021-12-02 11:05:22.73589 |
8 |
47802832 |
supply of pipe line connection patheswari temple to rebana nuagaon high school |
300000 |
supply of pipe line connection patheswari temple to rebana nuagaon high school1 |
Completion of work |
-
latitude : 19.797775
Longitude : 85.67583833333335
file name : Image_11122021114349493.png
|
2021-12-11 11:43:49.593196 |
9 |
44320530 |
IMPROVEMENT OF CC ROAD AT KATUAAREDI VILLAGE TO DAMIA POKHARI |
200000 |
IMPROVEMENT OF CC ROAD AT KATUAAREDI VILLAGE TO DAMIA POKHARI1 |
Completion of work |
-
latitude : 19.794541666666664,19.794541666666664
Longitude : 85.67335499999999,85.67335499999999
file name : Image_20122021112439823.png
|
2021-12-20 11:24:39.94951 |
10 |
47798455 |
improvement of cc road hatia north side at hatia |
100000 |
improvement of cc road hatia north side at hatia1 |
Completion of work |
-
latitude : 19.7994503,19.7994503
Longitude : 85.6663413,85.6663413
file name : Image_23122021154607764.png
|
2021-12-23 15:46:07.91204 |
11 |
47779013 |
supply of pipe line connection and hand wash platfrom at hatia village |
120000 |
supply of pipe line connection and hand wash platfrom at hatia village1 |
Completion of work |
-
latitude : 19.7995052
Longitude : 85.6667041
file name : Image_23122021154912147.png
|
2021-12-23 15:49:12.273788 |
12 |
47799888 |
improvement of cc road kathuaardi village to mega prakalpa kathuaredi |
150000 |
improvement of cc road kathuaardi village to mega prakalpa kathuaredi1 |
Completion of work |
-
latitude : 19.79449175,19.79452286
Longitude : 85.67338179,85.67338972
file name : Image_20012022112320956.png
|
2022-01-20 11:23:21.062009 |
13 |
47800161 |
improvement of cc road kappa gadia road at rebana nuagaon |
114080 |
improvement of cc road kappa gadia road at rebana nuagaon1 |
Completion of work |
-
latitude : 19.79943829,19.79947402
Longitude : 85.69471674,85.69470941
file name : Image_19012022153413761.png
|
2022-01-19 15:34:13.884009 |
14 |
44320868 |
IMP OF CC ROAD AT REBANA NUAGAON SOUTH SIDE |
150000 |
IMP OF CC ROAD AT REBANA NUAGAON SOUTH SIDE1 |
Completion of work |
-
latitude : 19.7994723,19.79946194
Longitude : 85.69472316,85.69471804
file name : Image_19012022152624653.png
|
2022-01-19 15:26:24.758564 |
15 |
44320175 |
CONST OF BATHING HGAT AND DRESS CHANGING ROOM DASH SAHI POKHARI AT KATHUAAREDI |
150000 |
CONST OF BATHING HGAT AND DRESS CHANGING ROOM DASH SAHI POKHARI AT KATHUAAREDI1 |
Completion of work |
-
latitude : 19.7927189
Longitude : 85.67528421
file name : Image_20012022112911871.png
|
2022-01-20 11:29:11.969458 |
16 |
47799083 |
improvement of cc road at jagannathapur school to village jagannathapur |
200000 |
improvement of cc road at jagannathapur school to village jagannathapur1 |
Completion of work |
-
latitude : 19.79802307,19.7980222
Longitude : 85.68625046,85.68623081
file name : Image_03022022123917965.png
|
2022-02-03 12:39:18.085493 |
17 |
44319764 |
Const. Of Tube well plat from of Rebana nuagaon GP(3nos) |
60000 |
Const. Of Tube well plat from of Rebana nuagaon GP(3nos)1 |
Completion of work |
-
latitude : 19.7995062
Longitude : 85.6667049
file name : Image_10062022174328700.png
|
2022-06-10 17:43:28.808048 |
18 |
44319415 |
The purchase of Tube well and pipeline supply of drinking water spares parts |
200000 |
The purchase of Tube well and pipeline supply of drinking water spares parts1 |
Completion of work |
-
latitude : 19.7995057
Longitude : 85.6667051
file name : Image_10062022174047114.png
|
2022-06-10 17:40:47.200142 |
19 |
44319415 |
The purchase of Tube well and pipeline supply of drinking water spares parts |
200000 |
The purchase of Tube well and pipeline supply of drinking water spares parts1 |
Completion of work |
-
latitude : 20.4900742
Longitude : 84.48510206
file name : Image_10032022212331299.png
|
2022-03-10 21:23:31.415638 |
20 |
47802546 |
salid waste management at rebana nuagaon gp |
100000 |
salid waste management at rebana nuagaon gp1 |
Completion of work |
-
latitude : 19.7995062
Longitude : 85.6667049
file name : Image_10062022175757053.png
|
2022-06-10 17:57:57.175458 |
21 |
47798764 |
improvement of cc road at hatia village to surya mishara house |
100000 |
improvement of cc road at hatia village to surya mishara house1 |
Completion of work |
-
latitude : 19.7995057,19.7995057
Longitude : 85.6667052,85.6667051
file name : Image_30072022105444581.png
|
2022-07-30 10:54:44.690682 |
22 |
60382935 |
annual salary of sem and pump driver |
170000 |
annual salary of sem and pump driver1 |
Completion of work |
-
latitude : 19.7994596
Longitude : 85.6667042
file name : Image_19072022142716487.png
|
2022-07-19 14:27:16.624951 |
23 |
47805366 |
const of new cul vert chhoti baragacha canal at rebana nuagaon gp |
150000 |
const of new cul vert chhoti baragacha canal at rebana nuagaon gp1 |
Completion of work |
-
latitude : 19.7994587
Longitude : 85.6667031
file name : Image_25072022155215638.png
|
2022-07-25 15:52:15.742114 |
24 |
47805615 |
const of gard wall mathha pokhari at aliaaput |
150000 |
const of gard wall mathha pokhari at aliaaput1 |
Completion of work |
-
latitude : 19.795881
Longitude : 85.69238237
file name : Image_02092022161520235.png
|
2022-09-02 16:15:20.342998 |
25 |
44320219 |
CONST OF ALIAPUT NUA POKHARI GARD WALL |
250000 |
CONST OF ALIAPUT NUA POKHARI GARD WALL1 |
Completion of work |
-
latitude : 19.79380552
Longitude : 85.68900936
file name : Image_02092022161523651.png
|
2022-09-02 16:15:23.773508 |
26 |
63369526 |
Implemantation of SLWM under rebananuagoan gp |
734030 |
Implemantation of SLWM under rebananuagoan gp1 |
Completion of work |
-
latitude : 19.7995058
Longitude : 85.666704
file name : Image_13092022120751473.png
|
2022-09-13 12:07:51.589674 |
27 |
47801874 |
bleaching cleaning soak pit and drinki water of all village |
31695 |
bleaching cleaning soak pit and drinki water of all village1 |
Completion of work |
-
latitude : 19.7995057
Longitude : 85.6667058
file name : Image_23092022144916520.png
|
2022-09-23 14:49:16.653015 |
28 |
60383240 |
annual energy charges of gp office pump house and street light |
160000 |
annual energy charges of gp office pump house and street light1 |
Completion of work |
-
latitude : 19.7995051
Longitude : 85.666705
file name : Image_30092022153033037.png
|
2022-09-30 15:30:33.156263 |
29 |
60392435 |
Infrastructure Development at Jagannathpur UP School |
200000 |
Infrastructure Development at Jagannathpur UP School1 |
Completion of work |
-
latitude : 19.79793411
Longitude : 85.68571961
file name : Image_19102022163228963.png
|
2022-10-19 16:32:29.077777 |
30 |
44320895 |
IMP OF CC ROAD AT UTTERESWAR TEMOLE PRANGANA HATIA |
150000 |
IMP OF CC ROAD AT UTTERESWAR TEMOLE PRANGANA HATIA1 |
Completion of work |
-
latitude : 19.79835674,19.79839922
Longitude : 85.66547244,85.66549493
file name : Image_10112022125717462.png
|
2022-11-10 12:57:17.579727 |
31 |
47829477 |
cement concrete at gp office campus |
100000 |
cement concrete at gp office campus1 |
Completion of work |
-
latitude : 19.80046312,19.8004595
Longitude : 85.69409222,85.69409103
file name : Image_10112022125934524.png
|
2022-11-10 12:59:34.635107 |
32 |
60392739 |
Infrastructure Development at Rebananuagaon UP School |
350000 |
Infrastructure Development at Rebananuagaon UP School1 |
Completion of work |
-
latitude : 19.80031716
Longitude : 85.69353867
file name : Image_10112022125720784.png
|
2022-11-10 12:57:20.898699 |
33 |
47796335 |
annual elictri charges of gp office and other electrie parts repairing |
50000 |
annual elictri charges of gp office and other electrie parts repairing1 |
Completion of work |
-
latitude : 19.79875452
Longitude : 85.66503713
file name : Image_22112022165004657.png
|
2022-11-22 16:50:04.801823 |
34 |
60394927 |
Infrastrucure Development of AWC at Rebananuagaon |
117600 |
Infrastrucure Development of AWC at Rebananuagaon1 |
Completion of work |
-
latitude : 19.80077847
Longitude : 85.69505988
file name : Image_11012023144043186.png
|
2023-01-11 14:40:43.291364 |
35 |
60394927 |
Infrastrucure Development of AWC at Rebananuagaon |
117600 |
Infrastrucure Development of AWC at Rebananuagaon1 |
Completion of work |
-
latitude : 19.80084835
Longitude : 85.69498731
file name : Image_11012023143745926.png
|
2023-01-11 14:37:46.131455 |
36 |
60394927 |
Infrastrucure Development of AWC at Rebananuagaon |
117600 |
Infrastrucure Development of AWC at Rebananuagaon1 |
Completion of work |
-
latitude : 19.80084293
Longitude : 85.69499327
file name : Image_10012023154747823.png
|
2023-01-10 15:47:47.935921 |
37 |
60394003 |
Infrastrucure Development of Rebana Nuagaon School |
250000 |
Infrastrucure Development of Rebana Nuagaon School1 |
Completion of work |
-
latitude : 19.80052882
Longitude : 85.69342719
file name : Image_11012023143002952.png
|
2023-01-11 14:30:03.055421 |
38 |
60394003 |
Infrastrucure Development of Rebana Nuagaon School |
250000 |
Infrastrucure Development of Rebana Nuagaon School1 |
Completion of work |
-
latitude : 19.80058367
Longitude : 85.69342779
file name : Image_11012023142722290.png
|
2023-01-11 14:27:22.381448 |
39 |
60394003 |
Infrastrucure Development of Rebana Nuagaon School |
250000 |
Infrastrucure Development of Rebana Nuagaon School1 |
Completion of work |
-
latitude : 19.80055682
Longitude : 85.69345224
file name : Image_10012023154741565.png
|
2023-01-10 15:47:41.671761 |
40 |
60392908 |
Completion of AWC at Rebananuagaon |
150000 |
Completion of AWC at Rebananuagaon1 |
Completion of work |
-
latitude : 19.80081328
Longitude : 85.69504771
file name : Image_11012023144200062.png
|
2023-01-11 14:42:00.19143 |
41 |
60392908 |
Completion of AWC at Rebananuagaon |
150000 |
Completion of AWC at Rebananuagaon1 |
Completion of work |
-
latitude : 19.80094681
Longitude : 85.69503282
file name : Image_11012023143633132.png
|
2023-01-11 14:36:33.245608 |
42 |
60392908 |
Completion of AWC at Rebananuagaon |
150000 |
Completion of AWC at Rebananuagaon1 |
Completion of work |
-
latitude : 19.80088774
Longitude : 85.69500041
file name : Image_10012023154744710.png
|
2023-01-10 15:47:44.820347 |
43 |
60384247 |
pipe line connection at nh 316 road to rebananuagaon up school |
100000 |
pipe line connection at nh 316 road to rebananuagaon up school1 |
Completion of work |
-
latitude : 19.80041748,19.80040937
Longitude : 85.69337856,85.69342823
file name : Image_18052023124746118.png
|
2023-05-18 12:47:46.232983 |
44 |
60384247 |
pipe line connection at nh 316 road to rebananuagaon up school |
100000 |
pipe line connection at nh 316 road to rebananuagaon up school1 |
Completion of work |
-
latitude : 19.7999017,19.8003452
Longitude : 85.6930153,85.69354996
file name : Image_18052023124613115.png
|
2023-05-18 12:46:13.221521 |
45 |
60384247 |
pipe line connection at nh 316 road to rebananuagaon up school |
100000 |
pipe line connection at nh 316 road to rebananuagaon up school1 |
Completion of work |
-
latitude : 19.8004129,19.80040505
Longitude : 85.69348654,85.69351441
file name : Image_18052023124046727.png
|
2023-05-18 12:40:46.833724 |
46 |
60382580 |
repair and maintance tube well and pipe line connection |
100000 |
repair and maintance tube well and pipe line connection1 |
Completion of work |
-
latitude : 19.8003042
Longitude : 85.66683355
file name : Image_16082023172316090.png
|
2023-08-16 17:23:16.181 |
47 |
60382580 |
repair and maintance tube well and pipe line connection |
100000 |
repair and maintance tube well and pipe line connection1 |
Completion of work |
-
latitude : 19.80030009
Longitude : 85.66681068
file name : Image_16082023171715571.png
|
2023-08-16 17:17:15.678347 |
48 |
60384960 |
pipe line connection at kathuaredi up school |
44030 |
pipe line connection at kathuaredi up school1 |
Plinth level |
-
latitude : 19.80030654,19.8003093
Longitude : 85.66680121,85.66678482
file name : Image_16082023173039141.png
|
2023-08-16 17:30:39.235215 |
49 |
60384960 |
pipe line connection at kathuaredi up school |
44030 |
pipe line connection at kathuaredi up school1 |
Completion of work |
-
latitude : 19.80021434,19.80011997
Longitude : 85.66695043,85.66674415
file name : Image_16082023170914071.png
|
2023-08-16 17:09:14.178392 |
50 |
82650747 |
Repair and Maintenance of Hostels and Schools |
301698 |
Repair and Maintenance of Hostels and Schools1 |
Completion of work |
-
latitude : 19.80031635
Longitude : 85.66682211
file name : Image_25092023131410692.png
|
2023-09-25 13:14:10.8254 |
51 |
82785453 |
Water Supply to villages |
90000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 19.8091044
Longitude : 85.8139026
file name : Image_19102023214604862.png
|
2023-10-19 21:46:04.971758 |
52 |
82785866 |
Water Supply to villages |
90000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 19.79788317
Longitude : 85.67721691
file name : Image_19102023215344131.png
|
2023-10-19 21:53:44.23227 |
53 |
82785062 |
Water Supply to villages |
200000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 19.8002423
Longitude : 85.6665036
file name : Image_16112023173114364.png
|
2023-11-16 17:31:14.478499 |
54 |
44320801 |
CONST OF BOUNDRY WALL AT REBANA NUAGAON GP OFFICE |
350000 |
CONST OF BOUNDRY WALL AT REBANA NUAGAON GP OFFICE1 |
Plinth level |
-
latitude : 19.80042957
Longitude : 85.69429609
file name : Image_17112023121036543.png
|
2023-11-17 12:10:36.640644 |
55 |
44320801 |
CONST OF BOUNDRY WALL AT REBANA NUAGAON GP OFFICE |
350000 |
CONST OF BOUNDRY WALL AT REBANA NUAGAON GP OFFICE1 |
Completion of work |
-
latitude : 19.80048263
Longitude : 85.69421034
file name : Image_17112023115814409.png
|
2023-11-17 11:58:14.512352 |
56 |
44320801 |
CONST OF BOUNDRY WALL AT REBANA NUAGAON GP OFFICE |
350000 |
CONST OF BOUNDRY WALL AT REBANA NUAGAON GP OFFICE1 |
Completion of work |
-
latitude : 19.80038397
Longitude : 85.6940381
file name : Image_17112023114858615.png
|
2023-11-17 11:48:58.730556 |
57 |
82786374 |
Water Supply to villages |
76000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 19.82117462
Longitude : 85.83237271
file name : Image_17022024133727927.png
|
2024-02-17 13:37:28.187807 |
58 |
82786374 |
Water Supply to villages |
76000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 19.8002859
Longitude : 85.6667487
file name : Image_17022024132453000.png
|
2024-02-17 13:24:53.1083 |
59 |
82786374 |
Water Supply to villages |
76000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 19.8003061
Longitude : 85.6667728
file name : Image_17022024122544911.png
|
2024-02-17 12:25:45.007621 |
60 |
44320320 |
IMPROVEMENT OF CC ROAD AT REBANA NUAGAON NORTH SIDE |
200000 |
IMPROVEMENT OF CC ROAD AT REBANA NUAGAON NORTH SIDE1 |
Completion of work |
-
latitude : 19.80241328,19.80241592
Longitude : 85.69753287,85.69753465
file name : Image_11032024154047853.png
|
2024-03-11 15:40:47.960704 |
61 |
44320320 |
IMPROVEMENT OF CC ROAD AT REBANA NUAGAON NORTH SIDE |
200000 |
IMPROVEMENT OF CC ROAD AT REBANA NUAGAON NORTH SIDE1 |
Completion of work |
-
latitude : 19.80245587,19.80243609
Longitude : 85.69749492,85.69751401
file name : Image_11032024153328400.png
|
2024-03-11 15:33:28.501029 |
62 |
44320558 |
IMPROVEMENT OF CC ROAD AT ALIPUT VILLAGE TO PRIMARY SCHOOL |
150000 |
IMPROVEMENT OF CC ROAD AT ALIPUT VILLAGE TO PRIMARY SCHOOL1 |
Roof laid |
-
latitude : 19.79351412,19.79351418
Longitude : 85.68839474,85.68839475
file name : Image_11032024170102678.png
|
2024-03-11 17:01:02.784055 |
63 |
44320558 |
IMPROVEMENT OF CC ROAD AT ALIPUT VILLAGE TO PRIMARY SCHOOL |
150000 |
IMPROVEMENT OF CC ROAD AT ALIPUT VILLAGE TO PRIMARY SCHOOL1 |
Plinth level |
-
latitude : 19.79351384,19.79351385
Longitude : 85.68839486,85.68839481
file name : Image_11032024165956097.png
|
2024-03-11 16:59:56.19986 |
64 |
44320558 |
IMPROVEMENT OF CC ROAD AT ALIPUT VILLAGE TO PRIMARY SCHOOL |
150000 |
IMPROVEMENT OF CC ROAD AT ALIPUT VILLAGE TO PRIMARY SCHOOL1 |
Plinth level |
-
latitude : 19.79351416,19.79351407
Longitude : 85.68839506,85.688395
file name : Image_11032024165804817.png
|
2024-03-11 16:58:04.93257 |
65 |
44320558 |
IMPROVEMENT OF CC ROAD AT ALIPUT VILLAGE TO PRIMARY SCHOOL |
150000 |
IMPROVEMENT OF CC ROAD AT ALIPUT VILLAGE TO PRIMARY SCHOOL1 |
Completion of work |
-
latitude : 19.79471041,19.79454146,19.79348822,19.79349267,19.79349032
Longitude : 85.68685871,85.68688585,85.68838332,85.68838425,85.68837555
file name : Image_11032024164745114.png
|
2024-03-11 16:47:45.208448 |
66 |
82644737 |
Construction of Sheds |
250000 |
Construction of Sheds1 |
Plinth level |
-
latitude : 19.7981918
Longitude : 85.69126394
file name : Image_02072024162311831.png
|
2024-07-02 16:23:11.933672 |
67 |
82644737 |
Construction of Sheds |
250000 |
Construction of Sheds1 |
Plinth level |
-
latitude : 19.79819058
Longitude : 85.69125874
file name : Image_26062024173127768.png
|
2024-06-26 17:31:27.844607 |
68 |
82644737 |
Construction of Sheds |
250000 |
Construction of Sheds1 |
Completion of work |
-
latitude : 19.79816902
Longitude : 85.69128504
file name : Image_26062024172029663.png
|
2024-06-26 17:20:29.751622 |
69 |
82643800 |
Construction and Maintenance of e Library |
250000 |
Construction and Maintenance of e Library1 |
Plinth level |
-
latitude : 19.8003594
Longitude : 85.6940272
file name : Image_28032024161111458.png
|
2024-03-28 16:11:11.553615 |
70 |
82643800 |
Construction and Maintenance of e Library |
250000 |
Construction and Maintenance of e Library1 |
Completion of work |
-
latitude : 19.80026994
Longitude : 85.69408688
file name : Image_28032024160930650.png
|
2024-03-28 16:09:30.749284 |
71 |
82643800 |
Construction and Maintenance of e Library |
250000 |
Construction and Maintenance of e Library1 |
Completion of work |
-
latitude : 19.8003596
Longitude : 85.6940262
file name : Image_28032024160013409.png
|
2024-03-28 16:00:13.498715 |
72 |
82642193 |
Construction and Maintenance of Community Centre |
6000 |
Construction and Maintenance of Community Centre1 |
Completion of work |
-
latitude : 19.8002674
Longitude : 85.6667629
file name : Image_02072024162534028.png
|
2024-07-02 16:25:34.204058 |
73 |
47776477 |
repairing of tube well and pipe line connection |
153696 |
repairing of tube well and pipe line connection1 |
Plinth level |
-
latitude : 19.80841326,19.80841326
Longitude : 85.81297945,85.81297945
file name : Image_12072024184818543.png
|
2024-07-12 18:48:18.62706 |
74 |
47776477 |
repairing of tube well and pipe line connection |
153696 |
repairing of tube well and pipe line connection1 |
Completion of work |
-
latitude : 19.80988246,19.80988246,19.80988246
Longitude : 85.81260556,85.81260556,85.81260556
file name : Image_12072024184100635.png
|
2024-07-12 18:41:00.727968 |