1 |
44312272 |
CONST OF KALYAN MANDAP |
643120 |
CONST OF KALYAN MANDAP1 |
Completion of work |
-
latitude : 19.98600305
Longitude : 85.72357445
file name : Image_20032021125512688.png
|
2021-03-20 12:55:12.482483 |
2 |
44312411 |
CONST OF INDIPUR BADHEI SAHI HARIJAN ROAD |
300000 |
CONST OF INDIPUR BADHEI SAHI HARIJAN ROAD1 |
Completion of work |
-
latitude : 19.98871929,19.98871941
Longitude : 85.72975066,85.72975059
file name : Image_15082021082145865.png
|
2021-08-15 08:21:45.968999 |
3 |
44311923 |
SALARY OF SEM |
60000 |
SALARY OF SEM1 |
Completion of work |
-
latitude : 19.97487212
Longitude : 85.71745035
file name : Image_19082021070405794.png
|
2021-08-19 07:04:05.899607 |
4 |
44313046 |
CONST OF R D ROAD NMEDICAL CHHAK TO KANA POKHARI |
279835 |
CONST OF R D ROAD NMEDICAL CHHAK TO KANA POKHARI1 |
Plinth level |
-
latitude : 19.98523537,19.9852327
Longitude : 85.72419528,85.72418922
file name : Image_31082021171450803.png
|
2021-08-31 17:14:50.888037 |
5 |
44313046 |
CONST OF R D ROAD NMEDICAL CHHAK TO KANA POKHARI |
279835 |
CONST OF R D ROAD NMEDICAL CHHAK TO KANA POKHARI1 |
Plinth level |
-
latitude : 19.98520986,19.9852099
Longitude : 85.72425026,85.72425068
file name : Image_31082021154000099.png
|
2021-08-31 15:40:00.205501 |
6 |
44313046 |
CONST OF R D ROAD NMEDICAL CHHAK TO KANA POKHARI |
279835 |
CONST OF R D ROAD NMEDICAL CHHAK TO KANA POKHARI1 |
Completion of work |
-
latitude : 19.98521958,19.98522294
Longitude : 85.72425471,85.72426487
file name : Image_31082021150821673.png
|
2021-08-31 15:08:21.766585 |
7 |
44312028 |
SUPPLY OF DRINKING WATER THROUGH TANKER |
170000 |
SUPPLY OF DRINKING WATER THROUGH TANKER1 |
Plinth level |
-
latitude : 20.0065027
Longitude : 85.65437243
file name : Image_13092021213725123.png
|
2021-09-13 21:37:25.249747 |
8 |
44312028 |
SUPPLY OF DRINKING WATER THROUGH TANKER |
170000 |
SUPPLY OF DRINKING WATER THROUGH TANKER1 |
Plinth level |
-
latitude : 20.00648899
Longitude : 85.65433674
file name : Image_13092021213846474.png
|
2021-09-13 21:38:46.586195 |
9 |
44312028 |
SUPPLY OF DRINKING WATER THROUGH TANKER |
170000 |
SUPPLY OF DRINKING WATER THROUGH TANKER1 |
Completion of work |
-
latitude : 20.00640632
Longitude : 85.65442099
file name : Image_13092021204655837.png
|
2021-09-13 20:46:55.943848 |
10 |
44312046 |
OPENING OF JALACHHATRA |
10000 |
OPENING OF JALACHHATRA1 |
Completion of work |
-
latitude : 20.00640561
Longitude : 85.65437317
file name : Image_13092021204909643.png
|
2021-09-13 20:49:09.750446 |
11 |
47706001 |
CONSTRUCTION OF POKHARI STEP AT DALITA SAHI |
98917 |
CONSTRUCTION OF POKHARI STEP AT DALITA SAHI1 |
Roof laid |
-
latitude : 19.98863378
Longitude : 85.72965314
file name : Image_28122021165507467.png
|
2021-12-28 16:55:07.621231 |
12 |
47706001 |
CONSTRUCTION OF POKHARI STEP AT DALITA SAHI |
98917 |
CONSTRUCTION OF POKHARI STEP AT DALITA SAHI1 |
Plinth level |
-
latitude : 19.98851108
Longitude : 85.72979816
file name : Image_28122021164954918.png
|
2021-12-28 16:49:55.136203 |
13 |
47706001 |
CONSTRUCTION OF POKHARI STEP AT DALITA SAHI |
98917 |
CONSTRUCTION OF POKHARI STEP AT DALITA SAHI1 |
Completion of work |
-
latitude : 19.98852053
Longitude : 85.72979896
file name : Image_28122021164419096.png
|
2021-12-28 16:44:19.210518 |
14 |
44312342 |
IMPROVEMENT OF ROAD FROM KALIA SAHOONTO CANAL BANDHA |
150000 |
IMPROVEMENT OF ROAD FROM KALIA SAHOONTO CANAL BANDHA1 |
Roof laid |
-
latitude : 19.98808538,19.9880854
Longitude : 85.72835465,85.7283546
file name : Image_30122021141206771.png
|
2021-12-30 14:12:06.882298 |
15 |
44312342 |
IMPROVEMENT OF ROAD FROM KALIA SAHOONTO CANAL BANDHA |
150000 |
IMPROVEMENT OF ROAD FROM KALIA SAHOONTO CANAL BANDHA1 |
Roof laid |
-
latitude : 19.9880858,19.98808581
Longitude : 85.72834531,85.7283455
file name : Image_31122021131905166.png
|
2021-12-31 13:19:05.274321 |
16 |
44312342 |
IMPROVEMENT OF ROAD FROM KALIA SAHOONTO CANAL BANDHA |
150000 |
IMPROVEMENT OF ROAD FROM KALIA SAHOONTO CANAL BANDHA1 |
Plinth level |
-
latitude : 19.98783663,19.98783647
Longitude : 85.72844941,85.72844914
file name : Image_28122021170415278.png
|
2021-12-28 17:04:15.385996 |
17 |
44312342 |
IMPROVEMENT OF ROAD FROM KALIA SAHOONTO CANAL BANDHA |
150000 |
IMPROVEMENT OF ROAD FROM KALIA SAHOONTO CANAL BANDHA1 |
Completion of work |
-
latitude : 19.98786937,19.98786936
Longitude : 85.72838414,85.72838445
file name : Image_28122021170041177.png
|
2021-12-28 17:00:41.298883 |
18 |
47707103 |
SALARY OF SEM |
105000 |
SALARY OF SEM1 |
Completion of work |
-
latitude : 19.98457599
Longitude : 85.72796238
file name : Image_31122021134506313.png
|
2021-12-31 13:45:06.445646 |
19 |
44312530 |
MANTENANCE OF GP COMPUTER |
6000 |
MANTENANCE OF GP COMPUTER1 |
Completion of work |
-
latitude : 19.98564238
Longitude : 85.72409435
file name : Image_31122021162122811.png
|
2021-12-31 16:21:22.931515 |
20 |
44312433 |
COST OF DATA ENTRY |
6000 |
COST OF DATA ENTRY1 |
Completion of work |
-
latitude : 19.98567135
Longitude : 85.72406222
file name : Image_31122021161806832.png
|
2021-12-31 16:18:06.938757 |
21 |
44312556 |
MAINTENANCE OF GP MOBILE |
6000 |
MAINTENANCE OF GP MOBILE1 |
Completion of work |
-
latitude : 19.98567373
Longitude : 85.72405944
file name : Image_31122021161452904.png
|
2021-12-31 16:14:53.071403 |
22 |
44312198 |
CONST OF DRAIN INDIPUR PRATIGYANA SAHI DRAIN |
100000 |
CONST OF DRAIN INDIPUR PRATIGYANA SAHI DRAIN1 |
Roof laid |
-
latitude : 19.98322993,19.98322785
Longitude : 85.72715915,85.72716316
file name : Image_30012022135853321.png
|
2022-01-30 13:58:53.442929 |
23 |
44312198 |
CONST OF DRAIN INDIPUR PRATIGYANA SAHI DRAIN |
100000 |
CONST OF DRAIN INDIPUR PRATIGYANA SAHI DRAIN1 |
Roof laid |
-
latitude : 19.98327039,19.98327111
Longitude : 85.72716571,85.72716426
file name : Image_30012022135033691.png
|
2022-01-30 13:50:33.807689 |
24 |
44312198 |
CONST OF DRAIN INDIPUR PRATIGYANA SAHI DRAIN |
100000 |
CONST OF DRAIN INDIPUR PRATIGYANA SAHI DRAIN1 |
Plinth level |
-
latitude : 19.98323859,19.98323891
Longitude : 85.72715233,85.72715249
file name : Image_30012022134554298.png
|
2022-01-30 13:45:54.412033 |
25 |
44312198 |
CONST OF DRAIN INDIPUR PRATIGYANA SAHI DRAIN |
100000 |
CONST OF DRAIN INDIPUR PRATIGYANA SAHI DRAIN1 |
Completion of work |
-
latitude : 19.98325173,19.98325014
Longitude : 85.72714065,85.72716398
file name : Image_30012022134109741.png
|
2022-01-30 13:41:09.860965 |
26 |
47703173 |
REPAIR MAINTAINANCE OF PIPELINE AND MOTOR |
100000 |
REPAIR MAINTAINANCE OF PIPELINE AND MOTOR1 |
Plinth level |
-
latitude : 19.98516091
Longitude : 85.72421758
file name : Image_30012022141350723.png
|
2022-01-30 14:13:50.816102 |
27 |
47703173 |
REPAIR MAINTAINANCE OF PIPELINE AND MOTOR |
100000 |
REPAIR MAINTAINANCE OF PIPELINE AND MOTOR1 |
Plinth level |
-
latitude : 19.98510876
Longitude : 85.72422187
file name : Image_30012022141304219.png
|
2022-01-30 14:13:04.314175 |
28 |
47703173 |
REPAIR MAINTAINANCE OF PIPELINE AND MOTOR |
100000 |
REPAIR MAINTAINANCE OF PIPELINE AND MOTOR1 |
Completion of work |
-
latitude : 19.98513717
Longitude : 85.72412756
file name : Image_30012022140906917.png
|
2022-01-30 14:09:07.017206 |
29 |
47706390 |
CONST OF ROAD FROM ABHAYMUKHI ATM CHHAK TO BHOI SAHI |
100000 |
CONST OF ROAD FROM ABHAYMUKHI ATM CHHAK TO BHOI SAHI1 |
Roof laid |
-
latitude : 19.97521966
Longitude : 85.7176186
file name : Image_30012022144246808.png
|
2022-01-30 14:42:46.943656 |
30 |
47706390 |
CONST OF ROAD FROM ABHAYMUKHI ATM CHHAK TO BHOI SAHI |
100000 |
CONST OF ROAD FROM ABHAYMUKHI ATM CHHAK TO BHOI SAHI1 |
Plinth level |
-
latitude : 19.97525042
Longitude : 85.71762155
file name : Image_30012022143344525.png
|
2022-01-30 14:33:44.639813 |
31 |
47706390 |
CONST OF ROAD FROM ABHAYMUKHI ATM CHHAK TO BHOI SAHI |
100000 |
CONST OF ROAD FROM ABHAYMUKHI ATM CHHAK TO BHOI SAHI1 |
Completion of work |
-
latitude : 19.97526955
Longitude : 85.71762472
file name : Image_30012022142643054.png
|
2022-01-30 14:26:43.17133 |
32 |
47707407 |
CONST OF KALYANI MANDAP INDIPUR |
588198 |
CONST OF KALYANI MANDAP INDIPUR1 |
Roof laid |
-
latitude : 19.98614521
Longitude : 85.72361823
file name : Image_06052022142031568.png
|
2022-05-06 14:20:31.701012 |
33 |
47707407 |
CONST OF KALYANI MANDAP INDIPUR |
588198 |
CONST OF KALYANI MANDAP INDIPUR1 |
Plinth level |
-
latitude : 19.98613433
Longitude : 85.7236704
file name : Image_06052022140559544.png
|
2022-05-06 14:05:59.629547 |
34 |
47707407 |
CONST OF KALYANI MANDAP INDIPUR |
588198 |
CONST OF KALYANI MANDAP INDIPUR1 |
Completion of work |
-
latitude : 19.98611694
Longitude : 85.72366119
file name : Image_06052022140122643.png
|
2022-05-06 14:01:22.762094 |
35 |
44312288 |
SOLID WASTE MANAGEMENT WORK AT GP |
300000 |
SOLID WASTE MANAGEMENT WORK AT GP1 |
Roof laid |
-
latitude : 19.97487211
Longitude : 85.71538033
file name : Image_25062022150434428.png
|
2022-06-25 15:04:34.521597 |
36 |
44312288 |
SOLID WASTE MANAGEMENT WORK AT GP |
300000 |
SOLID WASTE MANAGEMENT WORK AT GP1 |
Plinth level |
-
latitude : 19.97488666
Longitude : 85.71538614
file name : Image_25062022145446213.png
|
2022-06-25 14:54:46.3362 |
37 |
44312288 |
SOLID WASTE MANAGEMENT WORK AT GP |
300000 |
SOLID WASTE MANAGEMENT WORK AT GP1 |
Completion of work |
-
latitude : 19.9748884
Longitude : 85.71539341
file name : Image_25062022143950491.png
|
2022-06-25 14:39:50.616009 |
38 |
47707837 |
CONST OF CC ROAD FROM MISHRA GORADA TO UTTARAKHANDA PWD |
143120 |
CONST OF CC ROAD FROM MISHRA GORADA TO UTTARAKHANDA PWD1 |
Roof laid |
-
latitude : 19.98427356,19.98427355
Longitude : 85.72757168,85.72757156
file name : Image_25062022140141972.png
|
2022-06-25 14:01:42.055505 |
39 |
47707837 |
CONST OF CC ROAD FROM MISHRA GORADA TO UTTARAKHANDA PWD |
143120 |
CONST OF CC ROAD FROM MISHRA GORADA TO UTTARAKHANDA PWD1 |
Plinth level |
-
latitude : 19.98871625,19.98871734
Longitude : 85.7318667,85.73186839
file name : Image_25062022133411112.png
|
2022-06-25 13:34:11.224658 |
40 |
47707837 |
CONST OF CC ROAD FROM MISHRA GORADA TO UTTARAKHANDA PWD |
143120 |
CONST OF CC ROAD FROM MISHRA GORADA TO UTTARAKHANDA PWD1 |
Completion of work |
-
latitude : 19.98881645,19.98882618
Longitude : 85.732055,85.732046
file name : Image_25062022132244831.png
|
2022-06-25 13:22:44.940593 |
41 |
47706732 |
VASUDHA SCHEME |
500000 |
VASUDHA SCHEME1 |
Completion of work |
-
latitude : 19.98570932,19.98570013
Longitude : 85.72417487,85.72417574
file name : Image_14072022142108336.png
|
2022-07-14 14:21:08.432482 |
42 |
63491013 |
SUPPLY OF DRINKING WATER THROUGH TANKER |
100000 |
SUPPLY OF DRINKING WATER THROUGH TANKER1 |
Roof laid |
-
latitude : 20.00654812
Longitude : 85.65438727
file name : Image_08092022231238976.png
|
2022-09-08 23:12:39.08081 |
43 |
63491013 |
SUPPLY OF DRINKING WATER THROUGH TANKER |
100000 |
SUPPLY OF DRINKING WATER THROUGH TANKER1 |
Plinth level |
-
latitude : 20.00655872
Longitude : 85.65424172
file name : Image_08092022222202928.png
|
2022-09-08 22:22:03.027594 |
44 |
63491013 |
SUPPLY OF DRINKING WATER THROUGH TANKER |
100000 |
SUPPLY OF DRINKING WATER THROUGH TANKER1 |
Completion of work |
-
latitude : 20.00645233
Longitude : 85.65434453
file name : Image_08092022215011899.png
|
2022-09-08 21:50:12.009974 |
45 |
59631790 |
JALACHHATRA UNDER GPDP 22-23 |
10000 |
JALACHHATRA UNDER GPDP 22-231 |
Roof laid |
-
latitude : 20.00654812
Longitude : 85.65438727
file name : Image_08092022230939766.png
|
2022-09-08 23:09:39.861542 |
46 |
59631790 |
JALACHHATRA UNDER GPDP 22-23 |
10000 |
JALACHHATRA UNDER GPDP 22-231 |
Plinth level |
-
latitude : 20.00560573
Longitude : 85.6542693
file name : Image_08092022221815475.png
|
2022-09-08 22:18:15.56236 |
47 |
59631790 |
JALACHHATRA UNDER GPDP 22-23 |
10000 |
JALACHHATRA UNDER GPDP 22-231 |
Completion of work |
-
latitude : 20.00647165
Longitude : 85.65433334
file name : Image_08092022215127183.png
|
2022-09-08 21:51:27.295222 |
48 |
44312464 |
GRAM SABHA AND SOCIAL AUDIT |
10000 |
GRAM SABHA AND SOCIAL AUDIT1 |
Roof laid |
-
latitude : 20.00654466
Longitude : 85.65422113
file name : Image_08092022230635245.png
|
2022-09-08 23:06:35.349768 |
49 |
44312464 |
GRAM SABHA AND SOCIAL AUDIT |
10000 |
GRAM SABHA AND SOCIAL AUDIT1 |
Plinth level |
-
latitude : 20.00636033
Longitude : 85.65420577
file name : Image_08092022220701074.png
|
2022-09-08 22:07:01.156962 |
50 |
44312464 |
GRAM SABHA AND SOCIAL AUDIT |
10000 |
GRAM SABHA AND SOCIAL AUDIT1 |
Completion of work |
-
latitude : 20.00642374
Longitude : 85.65433229
file name : Image_08092022214310325.png
|
2022-09-08 21:43:10.445841 |
51 |
47705007 |
SOCIAL AUDIT /GRAM SABHA |
10000 |
SOCIAL AUDIT /GRAM SABHA1 |
Roof laid |
-
latitude : 20.00654812
Longitude : 85.65438727
file name : Image_08092022230817934.png
|
2022-09-08 23:08:18.04959 |
52 |
47705007 |
SOCIAL AUDIT /GRAM SABHA |
10000 |
SOCIAL AUDIT /GRAM SABHA1 |
Plinth level |
-
latitude : 20.00626536
Longitude : 85.65427997
file name : Image_08092022221026581.png
|
2022-09-08 22:10:26.668834 |
53 |
47705007 |
SOCIAL AUDIT /GRAM SABHA |
10000 |
SOCIAL AUDIT /GRAM SABHA1 |
Completion of work |
-
latitude : 20.00646782
Longitude : 85.65432744
file name : Image_08092022214820033.png
|
2022-09-08 21:48:20.152686 |
54 |
44311983 |
ENERGY CHARGES OF PWS |
100000 |
ENERGY CHARGES OF PWS1 |
Completion of work |
-
latitude : 20.0051303
Longitude : 85.6558497
file name : Image_29092022151239605.png
|
2022-09-29 15:12:39.671821 |
55 |
59629640 |
SEM SALARY UNDER GPDP 22-23 |
96000 |
SEM SALARY UNDER GPDP 22-231 |
Completion of work |
-
latitude : 19.96617353
Longitude : 85.71316589
file name : Image_07062023185243622.png
|
2023-06-07 18:52:43.712195 |
56 |
59629640 |
SEM SALARY UNDER GPDP 22-23 |
96000 |
SEM SALARY UNDER GPDP 22-231 |
Completion of work |
-
latitude : 20.00641579
Longitude : 85.65423244
file name : Image_06062023135842235.png
|
2023-06-06 13:58:42.332228 |
57 |
59629640 |
SEM SALARY UNDER GPDP 22-23 |
96000 |
SEM SALARY UNDER GPDP 22-231 |
Completion of work |
-
latitude : 20.07718242
Longitude : 85.73714128
file name : Image_29122022173337791.png
|
2022-12-29 17:33:37.890384 |
58 |
47561855 |
ENERGY CHARGES OF PWS |
350918 |
ENERGY CHARGES OF PWS1 |
Completion of work |
-
latitude : 20.006692
Longitude : 85.65448251
file name : Image_28022023134844855.png
|
2023-02-28 13:48:44.989125 |
59 |
59636227 |
SOCIAL AUDIT AND GRAMASABHA UNDER GPDP 22-23 |
10000 |
SOCIAL AUDIT AND GRAMASABHA UNDER GPDP 22-231 |
Completion of work |
-
latitude : 19.96621362
Longitude : 85.71317089
file name : Image_07062023185130657.png
|
2023-06-07 18:51:30.745434 |
60 |
59635410 |
COST OF DATA ENTRY UNDER GPDP 22-23 |
6000 |
COST OF DATA ENTRY UNDER GPDP 22-231 |
Completion of work |
-
latitude : 19.96623183
Longitude : 85.71316682
file name : Image_07062023185026690.png
|
2023-06-07 18:50:26.894688 |
61 |
59634763 |
MAINTENANCE OF GP MOBILE UNDER GPDP 22-23 |
6000 |
MAINTENANCE OF GP MOBILE UNDER GPDP 22-231 |
Completion of work |
-
latitude : 19.96624427
Longitude : 85.71316635
file name : Image_07062023184809332.png
|
2023-06-07 18:48:09.425367 |
62 |
59633908 |
MAINTENANCE OF COMPUTER UNDER GPDP 22-23 |
6000 |
MAINTENANCE OF COMPUTER UNDER GPDP 22-231 |
Completion of work |
-
latitude : 19.974832
Longitude : 85.7174306
file name : Image_20092024150116117.png
|
2024-09-20 15:01:16.228833 |
63 |
59633908 |
MAINTENANCE OF COMPUTER UNDER GPDP 22-23 |
6000 |
MAINTENANCE OF COMPUTER UNDER GPDP 22-231 |
Completion of work |
-
latitude : 19.96623517
Longitude : 85.71316571
file name : Image_07062023184915568.png
|
2023-06-07 18:49:15.683293 |
64 |
67883107 |
BNRGSK GATE AND WALL UNDER GPDP 22 23 |
450000 |
BNRGSK GATE AND WALL UNDER GPDP 22 231 |
Roof laid |
-
latitude : 19.95197403
Longitude : 85.80345175
file name : Image_27092023164346836.png
|
2023-09-27 16:43:46.913376 |
65 |
67883107 |
BNRGSK GATE AND WALL UNDER GPDP 22 23 |
450000 |
BNRGSK GATE AND WALL UNDER GPDP 22 231 |
Plinth level |
-
latitude : 19.95197864
Longitude : 85.80360019
file name : Image_27092023160417147.png
|
2023-09-27 16:04:17.216816 |
66 |
67883107 |
BNRGSK GATE AND WALL UNDER GPDP 22 23 |
450000 |
BNRGSK GATE AND WALL UNDER GPDP 22 231 |
Completion of work |
-
latitude : 19.95195732
Longitude : 85.80363836
file name : Image_27092023155327246.png
|
2023-09-27 15:53:27.325574 |
67 |
67883107 |
BNRGSK GATE AND WALL UNDER GPDP 22 23 |
450000 |
BNRGSK GATE AND WALL UNDER GPDP 22 231 |
Completion of work |
-
latitude : 20.00657745
Longitude : 85.65416091
file name : Image_31032023195727513.png
|
2023-03-31 19:57:27.624359 |
68 |
59630804 |
ENGAGE CHARGES OF P.W.S UNDER GPDP 22-23 |
263000 |
ENGAGE CHARGES OF P.W.S UNDER GPDP 22-231 |
Completion of work |
-
latitude : 19.9512478
Longitude : 85.8141527
file name : Image_03102023233304254.png
|
2023-10-03 23:33:04.343077 |
69 |
83001111 |
Piped water supply to HH |
72000 |
Piped water supply to HH1 |
Plinth level |
-
latitude : 19.9512234
Longitude : 85.814152
file name : Image_23102023221945517.png
|
2023-10-23 22:19:45.59368 |
70 |
83001111 |
Piped water supply to HH |
72000 |
Piped water supply to HH1 |
Completion of work |
-
latitude : 19.9512246
Longitude : 85.8141527
file name : Image_23102023221049981.png
|
2023-10-23 22:10:50.291283 |
71 |
83139718 |
Providing piped water supply to public institutions |
100000 |
Providing piped water supply to public institutions1 |
|
-
latitude : 19.9512286
Longitude : 85.8141302
file name : Image_16112023125731064.png
|
2023-11-16 12:57:31.170662 |
72 |
83004286 |
Installation of Street Lights |
226723 |
Installation of Street Lights1 |
|
-
latitude : 19.9512184
Longitude : 85.8141378
file name : Image_25112023205743523.png
|
2023-11-25 20:57:43.609075 |
73 |
83000809 |
Operation and Maintenance of drinking water supply system |
366060 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 19.95132527
Longitude : 85.81429255
file name : Image_26022024235938438.png
|
2024-02-26 23:59:38.509939 |
74 |
104497973 |
Piped drinking water to public institutions/markets/mela grounds/public health centre/residential schools/playground |
171000 |
Piped drinking water to public institutions/markets/mela grounds/public health centre/residential schools/playground1 |
Completion of work |
-
latitude : 19.9748322
Longitude : 85.7174297
file name : Image_20092024162717517.png
|
2024-09-20 16:27:17.666258 |
75 |
67883266 |
PATHAGAR UNDER GPDP 22 23 |
50000 |
PATHAGAR UNDER GPDP 22 231 |
Completion of work |
-
latitude : 19.9748319
Longitude : 85.7174303
file name : Image_28092024065725246.png
|
2024-09-28 06:57:25.321582 |
76 |
67883266 |
PATHAGAR UNDER GPDP 22 23 |
50000 |
PATHAGAR UNDER GPDP 22 231 |
Completion of work |
-
latitude : 19.9748319
Longitude : 85.7174306
file name : Image_27092024165847818.png
|
2024-09-27 16:58:47.906016 |
77 |
102550529 |
Creation of a new source of drinking water |
128000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 20.0773329
Longitude : 85.7367828
file name : Image_30092024162651834.png
|
2024-09-30 16:26:51.941146 |
78 |
83141919 |
Boundary wall and Gate |
173420 |
Boundary wall and Gate1 |
Roof laid |
-
latitude : 19.97516166666667
Longitude : 85.717575
file name : Image_15072024141825224.png
|
2024-07-15 14:18:25.888723 |
79 |
83141919 |
Boundary wall and Gate |
173420 |
Boundary wall and Gate1 |
Plinth level |
-
latitude : 19.975046666666668
Longitude : 85.71753333333332
file name : Image_15072024140904508.png
|
2024-07-15 14:09:04.57139 |
80 |
83141919 |
Boundary wall and Gate |
173420 |
Boundary wall and Gate1 |
Completion of work |
-
latitude : 19.975138333333334
Longitude : 85.71746999999999
file name : Image_13072024125450098.png
|
2024-07-13 12:54:50.156561 |
81 |
63489138 |
BLEACHING AND ALAM |
7600 |
BLEACHING AND ALAM1 |
Completion of work |
-
latitude : 19.97491763
Longitude : 85.71733748
file name : Image_31082024165631097.png
|
2024-08-31 16:56:31.947761 |
82 |
102524681 |
Construction of new Piped Water Supply schemes |
20000 |
Construction of new Piped Water Supply schemes1 |
Completion of work |
-
latitude : 20.0771927
Longitude : 85.7367513
file name : Image_30092024162845181.png
|
2024-09-30 16:28:45.287274 |
83 |
74948994 |
Computer in GP Bhawan |
6000 |
Computer in GP Bhawan1 |
Completion of work |
-
latitude : 19.97492484
Longitude : 85.71734876
file name : Image_31082024170658768.png
|
2024-08-31 17:06:58.975695 |
84 |
63489114 |
IMPLEMENTATION OF SOLID AND LIQUID WASTE MANAGEMENT AT ABHAYAMUKHI GP |
571900 |
IMPLEMENTATION OF SOLID AND LIQUID WASTE MANAGEMENT AT ABHAYAMUKHI GP1 |
Plinth level |
-
latitude : 19.97497609
Longitude : 85.72177585
file name : Image_12082024140651579.png
|
2024-08-12 14:06:51.68223 |
85 |
63489114 |
IMPLEMENTATION OF SOLID AND LIQUID WASTE MANAGEMENT AT ABHAYAMUKHI GP |
571900 |
IMPLEMENTATION OF SOLID AND LIQUID WASTE MANAGEMENT AT ABHAYAMUKHI GP1 |
Completion of work |
-
latitude : 19.97497223
Longitude : 85.72179514
file name : Image_08082024103051039.png
|
2024-08-08 10:30:51.144471 |
86 |
63489114 |
IMPLEMENTATION OF SOLID AND LIQUID WASTE MANAGEMENT AT ABHAYAMUKHI GP |
571900 |
IMPLEMENTATION OF SOLID AND LIQUID WASTE MANAGEMENT AT ABHAYAMUKHI GP1 |
Completion of work |
-
latitude : 19.97492816
Longitude : 85.7217543
file name : Image_12082024122053405.png
|
2024-08-12 12:20:53.521543 |
87 |
102927952 |
Repair of pipe drinking water |
212756 |
Repair of pipe drinking water1 |
Roof laid |
-
latitude : 19.979445
Longitude : 85.72111500000001
file name : Image_18112024154548704.png
|
2024-11-18 15:45:48.816787 |
88 |
102927952 |
Repair of pipe drinking water |
212756 |
Repair of pipe drinking water1 |
Plinth level |
-
latitude : 19.980345
Longitude : 85.72220666666665
file name : Image_18112024153843438.png
|
2024-11-18 15:38:43.527963 |
89 |
102927952 |
Repair of pipe drinking water |
212756 |
Repair of pipe drinking water1 |
Completion of work |
-
latitude : 19.987595
Longitude : 85.73298333333332
file name : Image_18112024151253957.png
|
2024-11-18 15:12:54.051427 |