1 |
44285461 |
ENERGY CHARGES OF PWS |
150000 |
ENERGY CHARGES OF PWS1 |
Completion of work |
-
latitude : 20.00477303
Longitude : 85.65247756
file name : Image_23042021095405468.png
|
2021-04-23 09:54:05.569702 |
2 |
44282468 |
SALARY OF SEM |
96000 |
SALARY OF SEM1 |
Completion of work |
-
latitude : 20.00477192
Longitude : 85.65244277
file name : Image_22042021165409219.png
|
2021-04-22 16:54:09.452294 |
3 |
44285950 |
COST OF DATA ENTRY |
6000 |
COST OF DATA ENTRY1 |
Completion of work |
-
latitude : 20.00477287
Longitude : 85.65243557
file name : Image_22042021165523496.png
|
2021-04-22 16:55:23.758993 |
4 |
44286119 |
CONST OF KALYANMANDAP AT BALAYEE |
1000000 |
CONST OF KALYANMANDAP AT BALAYEE1 |
Completion of work |
-
latitude : 20.0047477
Longitude : 85.65251759
file name : Image_10052021121749817.png
|
2021-05-10 12:17:49.89809 |
5 |
44285863 |
CONST OF CC ROAD (PRACHANDAPUR CC ROAD-200000,TIKARAPADA HARIJAN SAHI CC ROAD-200000) |
300000 |
CONST OF CC ROAD (PRACHANDAPUR CC ROAD-200000,TIKARAPADA HARIJAN SAHI CC ROAD-200000)1 |
Completion of work |
-
latitude : 20.00471915
Longitude : 85.65255991
file name : Image_22062021144116519.png
|
2021-06-22 14:41:16.633041 |
6 |
47849926 |
REPAIRE AND MAINTENANCE OF TUBEWELL PLATFORM AT DANDAMALA ROAD SIDE LEFT |
20000 |
REPAIRE AND MAINTENANCE OF TUBEWELL PLATFORM AT DANDAMALA ROAD SIDE LEFT1 |
Completion of work |
-
latitude : 20.00477145
Longitude : 85.65245855
file name : Image_23072021170749722.png
|
2021-07-23 17:07:49.812948 |
7 |
47849390 |
REPAIRE AND MAINTENANCE OF TUBEWELL PLATFORM AT TIKARPADA HARIJAN SAHI |
20000 |
REPAIRE AND MAINTENANCE OF TUBEWELL PLATFORM AT TIKARPADA HARIJAN SAHI1 |
Completion of work |
-
latitude : 20.00478292
Longitude : 85.65250288
file name : Image_23072021170753173.png
|
2021-07-23 17:07:53.273845 |
8 |
47890328 |
MAJHIPADA HARIJAN SAHI PHASE 2 |
100000 |
MAJHIPADA HARIJAN SAHI PHASE 21 |
Completion of work |
-
latitude : 20.00494355
Longitude : 85.65268423
file name : Image_09082021070237129.png
|
2021-08-09 07:02:37.210976 |
9 |
47850245 |
IMPROVEMENT OF KOTHAGHARA |
100000 |
IMPROVEMENT OF KOTHAGHARA1 |
Completion of work |
-
latitude : 20.00494355
Longitude : 85.65268423
file name : Image_09082021070130839.png
|
2021-08-09 07:01:30.940968 |
10 |
47847949 |
COST OF DATA ENTRY |
6000 |
COST OF DATA ENTRY1 |
Completion of work |
-
latitude : 20.00453089
Longitude : 85.65247091
file name : Image_19082021125347374.png
|
2021-08-19 12:53:47.493076 |
11 |
44285500 |
SUPPLY OF DRINKING WATER THROUGH TANKER |
130391 |
SUPPLY OF DRINKING WATER THROUGH TANKER1 |
Completion of work |
-
latitude : 20.00447906
Longitude : 85.64537268
file name : Image_08092021093108876.png
|
2021-09-08 09:31:08.987742 |
12 |
47850376 |
IMPROVEMENT OF KOTHAGHARA AT NARANPUR |
200000 |
IMPROVEMENT OF KOTHAGHARA AT NARANPUR1 |
Completion of work |
-
latitude : 20.00487706
Longitude : 85.65225263
file name : Image_17092021173049291.png
|
2021-09-17 17:30:49.425883 |
13 |
47848200 |
MAINTENANCE OF COMPUTER |
6000 |
MAINTENANCE OF COMPUTER1 |
Completion of work |
-
latitude : 19.81629008
Longitude : 85.84058499
file name : Image_12022022180244856.png
|
2022-02-12 18:02:45.000187 |
14 |
47848200 |
MAINTENANCE OF COMPUTER |
6000 |
MAINTENANCE OF COMPUTER1 |
Completion of work |
-
latitude : 19.8163143
Longitude : 85.8407202
file name : Image_12022022172747420.png
|
2022-02-12 17:27:47.544157 |
15 |
44286045 |
MAINTAINANCE OF COMPUTER |
6000 |
MAINTAINANCE OF COMPUTER1 |
Completion of work |
-
latitude : 19.8163043
Longitude : 85.8406929
file name : Image_12022022172547337.png
|
2022-02-12 17:25:47.498702 |
16 |
47843596 |
SALARY OF SEM |
96000 |
SALARY OF SEM1 |
Completion of work |
-
latitude : 20.07716565
Longitude : 85.73713434
file name : Image_15022022132756912.png
|
2022-02-15 13:27:56.991835 |
17 |
47843596 |
SALARY OF SEM |
96000 |
SALARY OF SEM1 |
Completion of work |
-
latitude : 20.07700796
Longitude : 85.73741612
file name : Image_15022022132753711.png
|
2022-02-15 13:27:53.798883 |
18 |
44285707 |
REPAIR AND MAINTAINANCE OF ARADA AWC BOUNDARY WALL |
100000 |
REPAIR AND MAINTAINANCE OF ARADA AWC BOUNDARY WALL1 |
Completion of work |
-
latitude : 19.8183319
Longitude : 85.8421906
file name : Image_01122021172908903.png
|
2021-12-01 17:29:09.044357 |
19 |
44285707 |
REPAIR AND MAINTAINANCE OF ARADA AWC BOUNDARY WALL |
100000 |
REPAIR AND MAINTAINANCE OF ARADA AWC BOUNDARY WALL1 |
Completion of work |
-
latitude : 19.81834643
Longitude : 85.84288148
file name : Image_01122021172356313.png
|
2021-12-01 17:23:56.409275 |
20 |
44285707 |
REPAIR AND MAINTAINANCE OF ARADA AWC BOUNDARY WALL |
100000 |
REPAIR AND MAINTAINANCE OF ARADA AWC BOUNDARY WALL1 |
Completion of work |
-
latitude : 19.81829037
Longitude : 85.84283065
file name : Image_01122021171909242.png
|
2021-12-01 17:19:09.338133 |
21 |
44285762 |
REPAIR AND MAINTAINANCE OFNALIBASANTA PRY SCHOOL BOUNDARY WALL |
100000 |
REPAIR AND MAINTAINANCE OFNALIBASANTA PRY SCHOOL BOUNDARY WALL1 |
Completion of work |
-
latitude : 19.8174735
Longitude : 85.8432395
file name : Image_02122021091757137.png
|
2021-12-02 09:17:57.227666 |
22 |
44285762 |
REPAIR AND MAINTAINANCE OFNALIBASANTA PRY SCHOOL BOUNDARY WALL |
100000 |
REPAIR AND MAINTAINANCE OFNALIBASANTA PRY SCHOOL BOUNDARY WALL1 |
Completion of work |
-
latitude : 19.81773156
Longitude : 85.84316186
file name : Image_02122021091420959.png
|
2021-12-02 09:14:21.066604 |
23 |
44285762 |
REPAIR AND MAINTAINANCE OFNALIBASANTA PRY SCHOOL BOUNDARY WALL |
100000 |
REPAIR AND MAINTAINANCE OFNALIBASANTA PRY SCHOOL BOUNDARY WALL1 |
Completion of work |
-
latitude : 19.81826955
Longitude : 85.84332188
file name : Image_02122021084326067.png
|
2021-12-02 08:43:26.151178 |
24 |
47847241 |
REPAIRE MAINTENACE OF NARANPUR SCHOOL BOUNDARY WALL |
100000 |
REPAIRE MAINTENACE OF NARANPUR SCHOOL BOUNDARY WALL1 |
Completion of work |
-
latitude : 19.8175282
Longitude : 85.8432164
file name : Image_02122021093741031.png
|
2021-12-02 09:37:41.144381 |
25 |
47847241 |
REPAIRE MAINTENACE OF NARANPUR SCHOOL BOUNDARY WALL |
100000 |
REPAIRE MAINTENACE OF NARANPUR SCHOOL BOUNDARY WALL1 |
Completion of work |
-
latitude : 19.8175647
Longitude : 85.8432268
file name : Image_02122021093114554.png
|
2021-12-02 09:31:14.670716 |
26 |
47847241 |
REPAIRE MAINTENACE OF NARANPUR SCHOOL BOUNDARY WALL |
100000 |
REPAIRE MAINTENACE OF NARANPUR SCHOOL BOUNDARY WALL1 |
Completion of work |
-
latitude : 19.8174997
Longitude : 85.8431933
file name : Image_02122021092417105.png
|
2021-12-02 09:24:17.220105 |
27 |
47849820 |
REPAIRE AND MAINTENANCE OF TUBEWELL PLATFORM AT KAPILESWAR SCHOOL |
20000 |
REPAIRE AND MAINTENANCE OF TUBEWELL PLATFORM AT KAPILESWAR SCHOOL1 |
Completion of work |
-
latitude : 20.3515595
Longitude : 85.88935978
file name : Image_02122021162323169.png
|
2021-12-02 16:23:23.288266 |
28 |
47849820 |
REPAIRE AND MAINTENANCE OF TUBEWELL PLATFORM AT KAPILESWAR SCHOOL |
20000 |
REPAIRE AND MAINTENANCE OF TUBEWELL PLATFORM AT KAPILESWAR SCHOOL1 |
Completion of work |
-
latitude : 20.35143128
Longitude : 85.88941847
file name : Image_02122021161910681.png
|
2021-12-02 16:19:10.782821 |
29 |
47849820 |
REPAIRE AND MAINTENANCE OF TUBEWELL PLATFORM AT KAPILESWAR SCHOOL |
20000 |
REPAIRE AND MAINTENANCE OF TUBEWELL PLATFORM AT KAPILESWAR SCHOOL1 |
Completion of work |
-
latitude : 20.35157839
Longitude : 85.8894961
file name : Image_02122021161615279.png
|
2021-12-02 16:16:15.372674 |
30 |
47849629 |
REPAIRE MAINTENANCE OF TUBEWELL PALTFORM |
20000 |
REPAIRE MAINTENANCE OF TUBEWELL PALTFORM1 |
Completion of work |
-
latitude : 20.310422
Longitude : 85.8923394
file name : Image_02122021170909050.png
|
2021-12-02 17:09:09.150111 |
31 |
47849629 |
REPAIRE MAINTENANCE OF TUBEWELL PALTFORM |
20000 |
REPAIRE MAINTENANCE OF TUBEWELL PALTFORM1 |
Completion of work |
-
latitude : 20.310289
Longitude : 85.8922414
file name : Image_02122021170723171.png
|
2021-12-02 17:07:23.26536 |
32 |
47849629 |
REPAIRE MAINTENANCE OF TUBEWELL PALTFORM |
20000 |
REPAIRE MAINTENANCE OF TUBEWELL PALTFORM1 |
Completion of work |
-
latitude : 20.31015458
Longitude : 85.8917745
file name : Image_02122021170326759.png
|
2021-12-02 17:03:26.869297 |
33 |
44286062 |
MAINTAINANCE OF GP MOBILE |
6000 |
MAINTAINANCE OF GP MOBILE1 |
Completion of work |
-
latitude : 20.07730214
Longitude : 85.73676858
file name : Image_22012022132850079.png
|
2022-01-22 13:28:50.172585 |
34 |
47848280 |
MAINTENNACE OF GP MOBILE |
6000 |
MAINTENNACE OF GP MOBILE1 |
Completion of work |
-
latitude : 20.07739201
Longitude : 85.73679255
file name : Image_22012022135416752.png
|
2022-01-22 13:54:16.853386 |
35 |
44286185 |
REPAIR AND MAINTAINANCE OF UPPER PRYMARY SCHOOL BOUNDARY WALL KAPILESWAR SCHOOL |
223391 |
REPAIR AND MAINTAINANCE OF UPPER PRYMARY SCHOOL BOUNDARY WALL KAPILESWAR SCHOOL1 |
Roof laid |
-
latitude : 19.98790641
Longitude : 85.69908598
file name : Image_31012022140613513.png
|
2022-01-31 14:06:13.628416 |
36 |
44286185 |
REPAIR AND MAINTAINANCE OF UPPER PRYMARY SCHOOL BOUNDARY WALL KAPILESWAR SCHOOL |
223391 |
REPAIR AND MAINTAINANCE OF UPPER PRYMARY SCHOOL BOUNDARY WALL KAPILESWAR SCHOOL1 |
Completion of work |
-
latitude : 19.99527225
Longitude : 85.70659619
file name : Image_29012022153508508.png
|
2022-01-29 15:35:08.62066 |
37 |
44286185 |
REPAIR AND MAINTAINANCE OF UPPER PRYMARY SCHOOL BOUNDARY WALL KAPILESWAR SCHOOL |
223391 |
REPAIR AND MAINTAINANCE OF UPPER PRYMARY SCHOOL BOUNDARY WALL KAPILESWAR SCHOOL1 |
Plinth level |
-
latitude : 19.98790455
Longitude : 85.69908169
file name : Image_31012022140240871.png
|
2022-01-31 14:02:40.974412 |
38 |
44286185 |
REPAIR AND MAINTAINANCE OF UPPER PRYMARY SCHOOL BOUNDARY WALL KAPILESWAR SCHOOL |
223391 |
REPAIR AND MAINTAINANCE OF UPPER PRYMARY SCHOOL BOUNDARY WALL KAPILESWAR SCHOOL1 |
Completion of work |
-
latitude : 19.99526044
Longitude : 85.70659323
file name : Image_29012022153513644.png
|
2022-01-29 15:35:13.710654 |
39 |
47850162 |
IMPROEMENT OF KOTHAGHARA AT BALAYEE PHASE -2 |
114080 |
IMPROEMENT OF KOTHAGHARA AT BALAYEE PHASE -21 |
Roof laid |
-
latitude : 19.99543681
Longitude : 85.70587281
file name : Image_29012022152736691.png
|
2022-01-29 15:27:36.815837 |
40 |
47850162 |
IMPROEMENT OF KOTHAGHARA AT BALAYEE PHASE -2 |
114080 |
IMPROEMENT OF KOTHAGHARA AT BALAYEE PHASE -21 |
Roof laid |
-
latitude : 19.99540013
Longitude : 85.70585462
file name : Image_29012022152740687.png
|
2022-01-29 15:27:40.793073 |
41 |
47850162 |
IMPROEMENT OF KOTHAGHARA AT BALAYEE PHASE -2 |
114080 |
IMPROEMENT OF KOTHAGHARA AT BALAYEE PHASE -21 |
Plinth level |
-
latitude : 19.9954576
Longitude : 85.70583281
file name : Image_29012022151921098.png
|
2022-01-29 15:19:21.190127 |
42 |
47850162 |
IMPROEMENT OF KOTHAGHARA AT BALAYEE PHASE -2 |
114080 |
IMPROEMENT OF KOTHAGHARA AT BALAYEE PHASE -21 |
Completion of work |
-
latitude : 19.99544455
Longitude : 85.70583495
file name : Image_29012022151542906.png
|
2022-01-29 15:15:43.001628 |
43 |
44286248 |
IMPROVEMENT OF KOTHAGHARA(MAJIPADA HARIJAN SAHI,BALAYEE KOTHAGHARA,SARADHAPAPUR KOTHAGHARA) |
600000 |
IMPROVEMENT OF KOTHAGHARA(MAJIPADA HARIJAN SAHI,BALAYEE KOTHAGHARA,SARADHAPAPUR KOTHAGHARA)1 |
Roof laid |
-
latitude : 19.99638018
Longitude : 85.71062258
file name : Image_31012022145802225.png
|
2022-01-31 14:58:02.35824 |
44 |
44286248 |
IMPROVEMENT OF KOTHAGHARA(MAJIPADA HARIJAN SAHI,BALAYEE KOTHAGHARA,SARADHAPAPUR KOTHAGHARA) |
600000 |
IMPROVEMENT OF KOTHAGHARA(MAJIPADA HARIJAN SAHI,BALAYEE KOTHAGHARA,SARADHAPAPUR KOTHAGHARA)1 |
Plinth level |
-
latitude : 19.98788206
Longitude : 85.69904571
file name : Image_31012022142114356.png
|
2022-01-31 14:21:14.445221 |
45 |
44286248 |
IMPROVEMENT OF KOTHAGHARA(MAJIPADA HARIJAN SAHI,BALAYEE KOTHAGHARA,SARADHAPAPUR KOTHAGHARA) |
600000 |
IMPROVEMENT OF KOTHAGHARA(MAJIPADA HARIJAN SAHI,BALAYEE KOTHAGHARA,SARADHAPAPUR KOTHAGHARA)1 |
Completion of work |
-
latitude : 19.98783074
Longitude : 85.69904239
file name : Image_31012022141504245.png
|
2022-01-31 14:15:04.407895 |
46 |
44286248 |
IMPROVEMENT OF KOTHAGHARA(MAJIPADA HARIJAN SAHI,BALAYEE KOTHAGHARA,SARADHAPAPUR KOTHAGHARA) |
600000 |
IMPROVEMENT OF KOTHAGHARA(MAJIPADA HARIJAN SAHI,BALAYEE KOTHAGHARA,SARADHAPAPUR KOTHAGHARA)1 |
Completion of work |
-
latitude : 19.99449828
Longitude : 85.70689335
file name : Image_21042021182832552.png
|
2021-04-21 18:28:32.862841 |
47 |
44286248 |
IMPROVEMENT OF KOTHAGHARA(MAJIPADA HARIJAN SAHI,BALAYEE KOTHAGHARA,SARADHAPAPUR KOTHAGHARA) |
600000 |
IMPROVEMENT OF KOTHAGHARA(MAJIPADA HARIJAN SAHI,BALAYEE KOTHAGHARA,SARADHAPAPUR KOTHAGHARA)1 |
Completion of work |
-
latitude : 19.99452965
Longitude : 85.70681305
file name : Image_21012021153120385.png
|
2021-01-21 15:31:20.493787 |
48 |
59861131 |
Repair And Maintenance Of Tubewell Platformat Biseswar UP School Under GPDP 2022-2023 |
20000 |
Repair And Maintenance Of Tubewell Platformat Biseswar UP School Under GPDP 2022-20231 |
Roof laid |
-
latitude : 19.95630507
Longitude : 85.71180653
file name : Image_19072022123407120.png
|
2022-07-19 12:34:07.234353 |
49 |
59861131 |
Repair And Maintenance Of Tubewell Platformat Biseswar UP School Under GPDP 2022-2023 |
20000 |
Repair And Maintenance Of Tubewell Platformat Biseswar UP School Under GPDP 2022-20231 |
Plinth level |
-
latitude : 19.95633056
Longitude : 85.71182412
file name : Image_19072022123019058.png
|
2022-07-19 12:30:19.151566 |
50 |
59861131 |
Repair And Maintenance Of Tubewell Platformat Biseswar UP School Under GPDP 2022-2023 |
20000 |
Repair And Maintenance Of Tubewell Platformat Biseswar UP School Under GPDP 2022-20231 |
Completion of work |
-
latitude : 19.94659264
Longitude : 85.7133521
file name : Image_19072022114125316.png
|
2022-07-19 11:41:25.428236 |
51 |
59905640 |
Improvement Of Kotha Ghara At Naranapur Phase-2 Under GPDP 2022-2023 |
200000 |
Improvement Of Kotha Ghara At Naranapur Phase-2 Under GPDP 2022-20231 |
Roof laid |
-
latitude : 19.99720079
Longitude : 85.69048743
file name : Image_19072022133113455.png
|
2022-07-19 13:31:13.578006 |
52 |
59905640 |
Improvement Of Kotha Ghara At Naranapur Phase-2 Under GPDP 2022-2023 |
200000 |
Improvement Of Kotha Ghara At Naranapur Phase-2 Under GPDP 2022-20231 |
Plinth level |
-
latitude : 19.99719756
Longitude : 85.69046415
file name : Image_19072022132154104.png
|
2022-07-19 13:21:54.227972 |
53 |
59905640 |
Improvement Of Kotha Ghara At Naranapur Phase-2 Under GPDP 2022-2023 |
200000 |
Improvement Of Kotha Ghara At Naranapur Phase-2 Under GPDP 2022-20231 |
Completion of work |
-
latitude : 19.99718471
Longitude : 85.69050065
file name : Image_19072022125808000.png
|
2022-07-19 12:58:08.12065 |
54 |
63486863 |
IMPROVEMENT OF COMMNITY HALL BALAYEE PHASE III |
150000 |
IMPROVEMENT OF COMMNITY HALL BALAYEE PHASE III1 |
Roof laid |
-
latitude : 19.9972664
Longitude : 85.69054314
file name : Image_19072022135153486.png
|
2022-07-19 13:51:53.589041 |
55 |
63486863 |
IMPROVEMENT OF COMMNITY HALL BALAYEE PHASE III |
150000 |
IMPROVEMENT OF COMMNITY HALL BALAYEE PHASE III1 |
Plinth level |
-
latitude : 19.99722458
Longitude : 85.69051583
file name : Image_19072022134957370.png
|
2022-07-19 13:49:57.60167 |
56 |
63486863 |
IMPROVEMENT OF COMMNITY HALL BALAYEE PHASE III |
150000 |
IMPROVEMENT OF COMMNITY HALL BALAYEE PHASE III1 |
Completion of work |
-
latitude : 19.99725317
Longitude : 85.69051383
file name : Image_19072022134704522.png
|
2022-07-19 13:47:04.637034 |
57 |
47844485 |
ENERGY CHARGES OF PWS |
150000 |
ENERGY CHARGES OF PWS1 |
Completion of work |
-
latitude : 20.1019949
Longitude : 85.8348467
file name : Image_29092022194458382.png
|
2022-09-29 19:44:58.505864 |
58 |
47844485 |
ENERGY CHARGES OF PWS |
150000 |
ENERGY CHARGES OF PWS1 |
Completion of work |
-
latitude : 19.98458553
Longitude : 85.69861169
file name : Image_27092022145336010.png
|
2022-09-27 14:53:36.150243 |
59 |
59833555 |
Supply Of Drinking Waterthrough Tanker Under GPDP 2022-2023 |
100000 |
Supply Of Drinking Waterthrough Tanker Under GPDP 2022-20231 |
Roof laid |
-
latitude : 19.98462686
Longitude : 85.69859529
file name : Image_27092022135047205.png
|
2022-09-27 13:50:47.341945 |
60 |
59833555 |
Supply Of Drinking Waterthrough Tanker Under GPDP 2022-2023 |
100000 |
Supply Of Drinking Waterthrough Tanker Under GPDP 2022-20231 |
Plinth level |
-
latitude : 19.98461889
Longitude : 85.69857988
file name : Image_27092022134118448.png
|
2022-09-27 13:41:18.57993 |
61 |
59833555 |
Supply Of Drinking Waterthrough Tanker Under GPDP 2022-2023 |
100000 |
Supply Of Drinking Waterthrough Tanker Under GPDP 2022-20231 |
Completion of work |
-
latitude : 19.98461039
Longitude : 85.69851803
file name : Image_27092022133648572.png
|
2022-09-27 13:36:48.694977 |
62 |
59836361 |
Opening Of Jalachatra Under GPDP 2022-2023 |
10000 |
Opening Of Jalachatra Under GPDP 2022-20231 |
Roof laid |
-
latitude : 19.98497491
Longitude : 85.69866332
file name : Image_27092022141346923.png
|
2022-09-27 14:13:47.003384 |
63 |
59836361 |
Opening Of Jalachatra Under GPDP 2022-2023 |
10000 |
Opening Of Jalachatra Under GPDP 2022-20231 |
Plinth level |
-
latitude : 19.98460747
Longitude : 85.69862899
file name : Image_27092022140740380.png
|
2022-09-27 14:07:40.468961 |
64 |
59836361 |
Opening Of Jalachatra Under GPDP 2022-2023 |
10000 |
Opening Of Jalachatra Under GPDP 2022-20231 |
Completion of work |
-
latitude : 19.98467136
Longitude : 85.69848553
file name : Image_27092022140251024.png
|
2022-09-27 14:02:51.114305 |
65 |
59832720 |
Energy Charges Of Pws Under GPDP 2022-2023 |
300000 |
Energy Charges Of Pws Under GPDP 2022-20231 |
Plinth level |
-
latitude : 20.07738219
Longitude : 85.73671209
file name : Image_20102022131338010.png
|
2022-10-20 13:13:38.132258 |
66 |
59895439 |
Repair Maintance Of Nalibasnta UP School Baundry Wall Under GPDP 2022-2023 |
100000 |
Repair Maintance Of Nalibasnta UP School Baundry Wall Under GPDP 2022-20231 |
Roof laid |
-
latitude : 19.97485308
Longitude : 85.69548672
file name : Image_19102022125650905.png
|
2022-10-19 12:56:51.058917 |
67 |
59895439 |
Repair Maintance Of Nalibasnta UP School Baundry Wall Under GPDP 2022-2023 |
100000 |
Repair Maintance Of Nalibasnta UP School Baundry Wall Under GPDP 2022-20231 |
Plinth level |
-
latitude : 19.97444318
Longitude : 85.69520597
file name : Image_19102022125306953.png
|
2022-10-19 12:53:07.1533 |
68 |
59895439 |
Repair Maintance Of Nalibasnta UP School Baundry Wall Under GPDP 2022-2023 |
100000 |
Repair Maintance Of Nalibasnta UP School Baundry Wall Under GPDP 2022-20231 |
Completion of work |
-
latitude : 19.97444004
Longitude : 85.69517465
file name : Image_19102022123109090.png
|
2022-10-19 12:31:09.253591 |
69 |
59891237 |
Const. Of Batya Ashrayastalli Front Road Under GPDP 2022-2023 |
100000 |
Const. Of Batya Ashrayastalli Front Road Under GPDP 2022-20231 |
Roof laid |
-
latitude : 19.98451984,19.98443781
Longitude : 85.69802746,85.6981893
file name : Image_19102022133648333.png
|
2022-10-19 13:36:48.445392 |
70 |
59891237 |
Const. Of Batya Ashrayastalli Front Road Under GPDP 2022-2023 |
100000 |
Const. Of Batya Ashrayastalli Front Road Under GPDP 2022-20231 |
Plinth level |
-
latitude : 19.98456388,19.98449905
Longitude : 85.69805104,85.69812215
file name : Image_19102022132337069.png
|
2022-10-19 13:23:37.219552 |
71 |
59891237 |
Const. Of Batya Ashrayastalli Front Road Under GPDP 2022-2023 |
100000 |
Const. Of Batya Ashrayastalli Front Road Under GPDP 2022-20231 |
Completion of work |
-
latitude : 19.98448526,19.9844796
Longitude : 85.69802734,85.69800475
file name : Image_19102022131145788.png
|
2022-10-19 13:11:45.936288 |
72 |
59889876 |
Repair Maintance Of Tabewall Dhankera GP Under GPDP 2022-2023 |
14910 |
Repair Maintance Of Tabewall Dhankera GP Under GPDP 2022-20231 |
Plinth level |
-
latitude : 20.00865387
Longitude : 85.69788349
file name : Image_30122022124615859.png
|
2022-12-30 12:46:15.974407 |
73 |
59889876 |
Repair Maintance Of Tabewall Dhankera GP Under GPDP 2022-2023 |
14910 |
Repair Maintance Of Tabewall Dhankera GP Under GPDP 2022-20231 |
Roof laid |
-
latitude : 20.00861443
Longitude : 85.69782805
file name : Image_30122022125653035.png
|
2022-12-30 12:56:53.155502 |
74 |
59889876 |
Repair Maintance Of Tabewall Dhankera GP Under GPDP 2022-2023 |
14910 |
Repair Maintance Of Tabewall Dhankera GP Under GPDP 2022-20231 |
Completion of work |
-
latitude : 19.98497687
Longitude : 85.69864967
file name : Image_30122022121233463.png
|
2022-12-30 12:12:33.557997 |
75 |
47849735 |
REPAIRE MAINTENNACE OF TUBEWELL PLATFORM AT JUILUNDA PADANEI MANDIRA |
20000 |
REPAIRE MAINTENNACE OF TUBEWELL PLATFORM AT JUILUNDA PADANEI MANDIRA1 |
Roof laid |
-
latitude : 20.00863385
Longitude : 85.69778453
file name : Image_30122022131402892.png
|
2022-12-30 13:14:02.986489 |
76 |
47849735 |
REPAIRE MAINTENNACE OF TUBEWELL PLATFORM AT JUILUNDA PADANEI MANDIRA |
20000 |
REPAIRE MAINTENNACE OF TUBEWELL PLATFORM AT JUILUNDA PADANEI MANDIRA1 |
Plinth level |
-
latitude : 20.00866252
Longitude : 85.6977063
file name : Image_30122022131116055.png
|
2022-12-30 13:11:16.153568 |
77 |
47849735 |
REPAIRE MAINTENNACE OF TUBEWELL PLATFORM AT JUILUNDA PADANEI MANDIRA |
20000 |
REPAIRE MAINTENNACE OF TUBEWELL PLATFORM AT JUILUNDA PADANEI MANDIRA1 |
Completion of work |
-
latitude : 20.00856819
Longitude : 85.69791545
file name : Image_30122022130317772.png
|
2022-12-30 13:03:17.86574 |
78 |
59894086 |
Const of Balayee Mission Sakti House Under GPDP 2022-2023 |
200000 |
Const of Balayee Mission Sakti House Under GPDP 2022-20231 |
Roof laid |
-
latitude : 19.99530986
Longitude : 85.71158306
file name : Image_30122022134032553.png
|
2022-12-30 13:40:32.66563 |
79 |
59894086 |
Const of Balayee Mission Sakti House Under GPDP 2022-2023 |
200000 |
Const of Balayee Mission Sakti House Under GPDP 2022-20231 |
Plinth level |
-
latitude : 19.99528284
Longitude : 85.71160432
file name : Image_30122022133527628.png
|
2022-12-30 13:35:27.792965 |
80 |
59894086 |
Const of Balayee Mission Sakti House Under GPDP 2022-2023 |
200000 |
Const of Balayee Mission Sakti House Under GPDP 2022-20231 |
Completion of work |
-
latitude : 19.99523917
Longitude : 85.71167944
file name : Image_30122022132748619.png
|
2022-12-30 13:27:48.72561 |
81 |
59842465 |
Repair Maintenance Of Pipe Line & Motor Under GPDP 2022-2023 |
100000 |
Repair Maintenance Of Pipe Line & Motor Under GPDP 2022-20231 |
Roof laid |
-
latitude : 19.9998106
Longitude : 85.71056313
file name : Image_30122022135611008.png
|
2022-12-30 13:56:11.143911 |
82 |
59842465 |
Repair Maintenance Of Pipe Line & Motor Under GPDP 2022-2023 |
100000 |
Repair Maintenance Of Pipe Line & Motor Under GPDP 2022-20231 |
Plinth level |
-
latitude : 19.99979936
Longitude : 85.71056847
file name : Image_30122022135234571.png
|
2022-12-30 13:52:34.70517 |
83 |
59842465 |
Repair Maintenance Of Pipe Line & Motor Under GPDP 2022-2023 |
100000 |
Repair Maintenance Of Pipe Line & Motor Under GPDP 2022-20231 |
Completion of work |
-
latitude : 19.99965592
Longitude : 85.71051171
file name : Image_30122022134804912.png
|
2022-12-30 13:48:05.04131 |
84 |
59841956 |
Maintainance Of Gp Mobile Under GPDP 2022-2023 |
6000 |
Maintainance Of Gp Mobile Under GPDP 2022-20231 |
Completion of work |
-
latitude : 20.0773632
Longitude : 85.7368395
file name : Image_30122022173108703.png
|
2022-12-30 17:31:08.820322 |
85 |
59838899 |
Cost Of Data Entry Under GPDP 2022-2023 |
6000 |
Cost Of Data Entry Under GPDP 2022-20231 |
Completion of work |
-
latitude : 20.0773632
Longitude : 85.7368394
file name : Image_30122022172949110.png
|
2022-12-30 17:29:49.242269 |
86 |
47849167 |
REPAIRE AND MAINTENANCE OF CC ROAD HURUHURA PMC ROAD TO NUAGAN GURD WALL WITH ROAD |
150000 |
REPAIRE AND MAINTENANCE OF CC ROAD HURUHURA PMC ROAD TO NUAGAN GURD WALL WITH ROAD1 |
Roof laid |
-
latitude : 19.98458456,19.9848262
Longitude : 85.69853797,85.6982273
file name : Image_15022023131329506.png
|
2023-02-15 13:13:29.631572 |
87 |
47849167 |
REPAIRE AND MAINTENANCE OF CC ROAD HURUHURA PMC ROAD TO NUAGAN GURD WALL WITH ROAD |
150000 |
REPAIRE AND MAINTENANCE OF CC ROAD HURUHURA PMC ROAD TO NUAGAN GURD WALL WITH ROAD1 |
Roof laid |
-
latitude : 19.98458919,19.98458944
Longitude : 85.6985386,85.69853846
file name : Image_15022023131257436.png
|
2023-02-15 13:12:57.562137 |
88 |
47849167 |
REPAIRE AND MAINTENANCE OF CC ROAD HURUHURA PMC ROAD TO NUAGAN GURD WALL WITH ROAD |
150000 |
REPAIRE AND MAINTENANCE OF CC ROAD HURUHURA PMC ROAD TO NUAGAN GURD WALL WITH ROAD1 |
Plinth level |
-
latitude : 19.98452768,19.9848234
Longitude : 85.69856071,85.6982284
file name : Image_15022023125308689.png
|
2023-02-15 12:53:08.804441 |
89 |
47849167 |
REPAIRE AND MAINTENANCE OF CC ROAD HURUHURA PMC ROAD TO NUAGAN GURD WALL WITH ROAD |
150000 |
REPAIRE AND MAINTENANCE OF CC ROAD HURUHURA PMC ROAD TO NUAGAN GURD WALL WITH ROAD1 |
Completion of work |
-
latitude : 19.9846359,19.98459872
Longitude : 85.69862025,85.69861571
file name : Image_15022023115953746.png
|
2023-02-15 11:59:53.838089 |
90 |
59831069 |
Salary Of SEM Under GPDP 2022-2023 |
96000 |
Salary Of SEM Under GPDP 2022-20231 |
Completion of work |
-
latitude : 20.07730332
Longitude : 85.73709766
file name : Image_22022023130452009.png
|
2023-02-22 13:04:52.155088 |
91 |
47848028 |
SOCIAL AUDIT/GRAM SABHA |
5000 |
SOCIAL AUDIT/GRAM SABHA1 |
Completion of work |
-
latitude : 20.07736506
Longitude : 85.73681061
file name : Image_07062023115724526.png
|
2023-06-07 11:57:24.623614 |
92 |
59841516 |
Maintenance Of Computer Under GPDP 2022-2023 |
6000 |
Maintenance Of Computer Under GPDP 2022-20231 |
Completion of work |
-
latitude : 20.0773157
Longitude : 85.7367988
file name : Image_07062023113357478.png
|
2023-06-07 11:33:57.57616 |
93 |
59840126 |
Social Audit/Gram Sabha Under GPDP 2022-2023 |
5000 |
Social Audit/Gram Sabha Under GPDP 2022-20231 |
Completion of work |
-
latitude : 20.0773144
Longitude : 85.7367972
file name : Image_07062023114509413.png
|
2023-06-07 11:45:09.505233 |
94 |
59905361 |
Improvement Of Kapileswar school Dhankera GP Under GPDP 2022-2023 |
250000 |
Improvement Of Kapileswar school Dhankera GP Under GPDP 2022-20231 |
Roof laid |
-
latitude : 19.9847795
Longitude : 85.6981949
file name : Image_28062023115332175.png
|
2023-06-28 11:53:32.293668 |
95 |
59905361 |
Improvement Of Kapileswar school Dhankera GP Under GPDP 2022-2023 |
250000 |
Improvement Of Kapileswar school Dhankera GP Under GPDP 2022-20231 |
Plinth level |
-
latitude : 19.9847803
Longitude : 85.6981944
file name : Image_28062023114456464.png
|
2023-06-28 11:44:56.559932 |
96 |
59905361 |
Improvement Of Kapileswar school Dhankera GP Under GPDP 2022-2023 |
250000 |
Improvement Of Kapileswar school Dhankera GP Under GPDP 2022-20231 |
Completion of work |
-
latitude : 19.9847797
Longitude : 85.6981946
file name : Image_28062023114027557.png
|
2023-06-28 11:40:27.665298 |
97 |
47847513 |
CONST OF DRAIN SIDE GUARD WALL BIRAMAKUNDPUR |
100000 |
CONST OF DRAIN SIDE GUARD WALL BIRAMAKUNDPUR1 |
Roof laid |
-
latitude : 19.99722525
Longitude : 85.72477309
file name : Image_28062023125642573.png
|
2023-06-28 12:56:42.66803 |
98 |
47847513 |
CONST OF DRAIN SIDE GUARD WALL BIRAMAKUNDPUR |
100000 |
CONST OF DRAIN SIDE GUARD WALL BIRAMAKUNDPUR1 |
Plinth level |
-
latitude : 19.99723838
Longitude : 85.72480425
file name : Image_28062023125310758.png
|
2023-06-28 12:53:10.861803 |
99 |
47847513 |
CONST OF DRAIN SIDE GUARD WALL BIRAMAKUNDPUR |
100000 |
CONST OF DRAIN SIDE GUARD WALL BIRAMAKUNDPUR1 |
Completion of work |
-
latitude : 19.99731453
Longitude : 85.72475821
file name : Image_28062023124936587.png
|
2023-06-28 12:49:36.552816 |
100 |
47847651 |
CONST OF DRAIN SIDE GUARD WALL AT MAJHIPADA HARIJAN SAHI MANDIR |
100000 |
CONST OF DRAIN SIDE GUARD WALL AT MAJHIPADA HARIJAN SAHI MANDIR1 |
Roof laid |
-
latitude : 19.99448244
Longitude : 85.70704561
file name : Image_28062023122404779.png
|
2023-06-28 12:24:04.877065 |
101 |
47847651 |
CONST OF DRAIN SIDE GUARD WALL AT MAJHIPADA HARIJAN SAHI MANDIR |
100000 |
CONST OF DRAIN SIDE GUARD WALL AT MAJHIPADA HARIJAN SAHI MANDIR1 |
Plinth level |
-
latitude : 19.99446198
Longitude : 85.70706836
file name : Image_28062023122059444.png
|
2023-06-28 12:20:59.532259 |
102 |
47847651 |
CONST OF DRAIN SIDE GUARD WALL AT MAJHIPADA HARIJAN SAHI MANDIR |
100000 |
CONST OF DRAIN SIDE GUARD WALL AT MAJHIPADA HARIJAN SAHI MANDIR1 |
Completion of work |
-
latitude : 19.99444151
Longitude : 85.70707138
file name : Image_28062023121631562.png
|
2023-06-28 12:16:31.658142 |
103 |
47848985 |
CONST OF NALIBASANTA BADASHI SMASHAN ROAD |
100000 |
CONST OF NALIBASANTA BADASHI SMASHAN ROAD1 |
Roof laid |
-
latitude : 19.97557494,19.97556275
Longitude : 85.69590113,85.69593502
file name : Image_24072023161914274.png
|
2023-07-24 16:19:14.386511 |
104 |
47848985 |
CONST OF NALIBASANTA BADASHI SMASHAN ROAD |
100000 |
CONST OF NALIBASANTA BADASHI SMASHAN ROAD1 |
Plinth level |
-
latitude : 19.97556814,19.97556694
Longitude : 85.69593807,85.69593743
file name : Image_24072023161555623.png
|
2023-07-24 16:15:55.722367 |
105 |
47848985 |
CONST OF NALIBASANTA BADASHI SMASHAN ROAD |
100000 |
CONST OF NALIBASANTA BADASHI SMASHAN ROAD1 |
Completion of work |
-
latitude : 19.97556031,19.97555941,19.97556016,19.97556001
Longitude : 85.69591084,85.69591244,85.69591376,85.69590626
file name : Image_24072023161324908.png
|
2023-07-24 16:13:25.007361 |
106 |
47847357 |
REPAIRE MAINTENANCE OF DHANAKERA UP SCHOOL BOUNDARY WALL |
100000 |
REPAIRE MAINTENANCE OF DHANAKERA UP SCHOOL BOUNDARY WALL1 |
Roof laid |
-
latitude : 19.99195484
Longitude : 85.70363549
file name : Image_24072023165537083.png
|
2023-07-24 16:55:37.165696 |
107 |
47847357 |
REPAIRE MAINTENANCE OF DHANAKERA UP SCHOOL BOUNDARY WALL |
100000 |
REPAIRE MAINTENANCE OF DHANAKERA UP SCHOOL BOUNDARY WALL1 |
Plinth level |
-
latitude : 19.99195439
Longitude : 85.70358076
file name : Image_24072023165148031.png
|
2023-07-24 16:51:48.119453 |
108 |
47847357 |
REPAIRE MAINTENANCE OF DHANAKERA UP SCHOOL BOUNDARY WALL |
100000 |
REPAIRE MAINTENANCE OF DHANAKERA UP SCHOOL BOUNDARY WALL1 |
Completion of work |
-
latitude : 19.99196278
Longitude : 85.7036009
file name : Image_24072023164712616.png
|
2023-07-24 16:47:12.703284 |
109 |
47850325 |
IMPROVEMENT OF KOTHAGHARA AT SARADHAPUR PHASE-2 |
100000 |
IMPROVEMENT OF KOTHAGHARA AT SARADHAPUR PHASE-21 |
Roof laid |
-
latitude : 19.99537748
Longitude : 85.70587742
file name : Image_24072023171243592.png
|
2023-07-24 17:12:43.700843 |
110 |
47850325 |
IMPROVEMENT OF KOTHAGHARA AT SARADHAPUR PHASE-2 |
100000 |
IMPROVEMENT OF KOTHAGHARA AT SARADHAPUR PHASE-21 |
Plinth level |
-
latitude : 19.99535662
Longitude : 85.70584711
file name : Image_24072023170637867.png
|
2023-07-24 17:06:37.966696 |
111 |
47850325 |
IMPROVEMENT OF KOTHAGHARA AT SARADHAPUR PHASE-2 |
100000 |
IMPROVEMENT OF KOTHAGHARA AT SARADHAPUR PHASE-21 |
Completion of work |
-
latitude : 19.99538606
Longitude : 85.70587324
file name : Image_24072023170335579.png
|
2023-07-24 17:03:35.667274 |
112 |
82836354 |
Operation and Maintenance of piped water supply system |
489279 |
Operation and Maintenance of piped water supply system1 |
Roof laid |
-
latitude : 19.98455391
Longitude : 85.69863798
file name : Image_11102023212006855.png
|
2023-10-11 21:20:06.974643 |
113 |
82836354 |
Operation and Maintenance of piped water supply system |
489279 |
Operation and Maintenance of piped water supply system1 |
Roof laid |
-
latitude : 19.98455391
Longitude : 85.69863798
file name : Image_11102023212001006.png
|
2023-10-11 21:20:01.151908 |
114 |
82836354 |
Operation and Maintenance of piped water supply system |
489279 |
Operation and Maintenance of piped water supply system1 |
Plinth level |
-
latitude : 19.98458199
Longitude : 85.69863331
file name : Image_11102023153154025.png
|
2023-10-11 15:31:54.23386 |
115 |
82836354 |
Operation and Maintenance of piped water supply system |
489279 |
Operation and Maintenance of piped water supply system1 |
Completion of work |
-
latitude : 19.98458092
Longitude : 85.69859752
file name : Image_11102023143930046.png
|
2023-10-11 14:39:30.224104 |
116 |
81820311 |
Repair of hand pump platform |
20000 |
Repair of hand pump platform1 |
Roof laid |
-
latitude : 19.9847902
Longitude : 85.6981647
file name : Image_25042024141936914.png
|
2024-04-25 14:19:36.992448 |
117 |
81820311 |
Repair of hand pump platform |
20000 |
Repair of hand pump platform1 |
Plinth level |
-
latitude : 19.9847904
Longitude : 85.6981642
file name : Image_25042024140613224.png
|
2024-04-25 14:06:13.287139 |
118 |
81820311 |
Repair of hand pump platform |
20000 |
Repair of hand pump platform1 |
Completion of work |
-
latitude : 19.9847912
Longitude : 85.6981921
file name : Image_25042024135434389.png
|
2024-04-25 13:54:34.454053 |
119 |
59861750 |
Repair And Maintenance Of Tubewell Platform at Naranpur Under GPDP 2022-2023 |
20000 |
Repair And Maintenance Of Tubewell Platform at Naranpur Under GPDP 2022-20231 |
Completion of work |
-
latitude : 19.98101266
Longitude : 85.68121704
file name : Image_25042024143029477.png
|
2024-04-25 14:30:29.543198 |
120 |
81781841 |
Construction of Child Friendly Corners in schools |
160372 |
Construction of Child Friendly Corners in schools1 |
Plinth level |
-
latitude : 19.99197007
Longitude : 85.70357034
file name : Image_25042024123747053.png
|
2024-04-25 12:37:47.125672 |
121 |
81781841 |
Construction of Child Friendly Corners in schools |
160372 |
Construction of Child Friendly Corners in schools1 |
Completion of work |
-
latitude : 19.99202467
Longitude : 85.70362111
file name : Image_25042024122036724.png
|
2024-04-25 12:20:36.796249 |
122 |
81683041 |
Installation of Street Light |
226723 |
Installation of Street Light1 |
Roof laid |
-
latitude : 20.07743259
Longitude : 85.73658639
file name : Image_22112023131613006.png
|
2023-11-22 13:16:13.084795 |
123 |
81683041 |
Installation of Street Light |
226723 |
Installation of Street Light1 |
Plinth level |
-
latitude : 20.0771753
Longitude : 85.7367186
file name : Image_22112023131321873.png
|
2023-11-22 13:13:21.96922 |
124 |
81683041 |
Installation of Street Light |
226723 |
Installation of Street Light1 |
Completion of work |
-
latitude : 20.0771756
Longitude : 85.736719
file name : Image_22112023130137990.png
|
2023-11-22 13:01:38.056964 |
125 |
81782024 |
Maintenance of Separate toilets for girls and boys in schools |
100000 |
Maintenance of Separate toilets for girls and boys in schools1 |
Plinth level |
-
latitude : 20.00187053
Longitude : 85.71678395
file name : Image_25042024152018880.png
|
2024-04-25 15:20:18.947155 |
126 |
81782024 |
Maintenance of Separate toilets for girls and boys in schools |
100000 |
Maintenance of Separate toilets for girls and boys in schools1 |
Completion of work |
-
latitude : 20.00191323
Longitude : 85.71676838
file name : Image_25042024151519579.png
|
2024-04-25 15:15:19.638253 |
127 |
81782024 |
Maintenance of Separate toilets for girls and boys in schools |
100000 |
Maintenance of Separate toilets for girls and boys in schools1 |
Completion of work |
-
latitude : 19.9919626
Longitude : 85.70357035
file name : Image_25042024123240585.png
|
2024-04-25 12:32:40.663803 |
128 |
59853940 |
Implementation of Soidliquid waste mangement of Dhankera GPall village Under GPDP 2022-2023 |
619120 |
Implementation of Soidliquid waste mangement of Dhankera GPall village Under GPDP 2022-20231 |
Plinth level |
-
latitude : 19.94723651
Longitude : 85.70317389
file name : Image_25042024131237653.png
|
2024-04-25 13:12:37.758934 |
129 |
59853940 |
Implementation of Soidliquid waste mangement of Dhankera GPall village Under GPDP 2022-2023 |
619120 |
Implementation of Soidliquid waste mangement of Dhankera GPall village Under GPDP 2022-20231 |
Plinth level |
-
latitude : 19.98518971
Longitude : 85.69832589
file name : Image_27092022144947551.png
|
2022-09-27 14:49:47.669111 |
130 |
59853940 |
Implementation of Soidliquid waste mangement of Dhankera GPall village Under GPDP 2022-2023 |
619120 |
Implementation of Soidliquid waste mangement of Dhankera GPall village Under GPDP 2022-20231 |
Completion of work |
-
latitude : 19.984777
Longitude : 85.6981133
file name : Image_27092022142654330.png
|
2022-09-27 14:26:54.421142 |