1 |
44287993 |
SUPPLY OF DRINKING WATER THROUGH TANKER |
100000 |
SUPPLY OF DRINKING WATER THROUGH TANKER1 |
Completion of work |
-
latitude : 20.218965
Longitude : 85.8486356
file name : Image_25062022055234304.png
|
2022-06-25 05:52:34.396687 |
2 |
44306655 |
REPAIR MAINTENANCE OF GODASAHI PRIMARY SCHOOL |
200000 |
REPAIR MAINTENANCE OF GODASAHI PRIMARY SCHOOL1 |
Completion of work |
-
latitude : 20.12815515
Longitude : 85.71037888
file name : Image_23012021190428643.png
|
2021-01-23 19:04:28.720526 |
3 |
44306783 |
REPAIR AND MAINTENANCE OF SATYAPIRA NODAL PRIMARY SCHOOL |
300000 |
REPAIR AND MAINTENANCE OF SATYAPIRA NODAL PRIMARY SCHOOL1 |
Completion of work |
-
latitude : 20.13691733
Longitude : 85.70255216
file name : Image_23012021190333305.png
|
2021-01-23 19:03:33.370817 |
4 |
44357236 |
CONSTRUCTION OF CC ROAD AT HARIPUR |
100000 |
CONSTRUCTION OF CC ROAD AT HARIPUR 1 |
Completion of work |
-
latitude : 20.13528097
Longitude : 85.71014546
file name : Image_23012021190440374.png
|
2021-01-23 19:04:40.438465 |
5 |
44288074 |
CONSTRUCTION OF CC ROAD AT ARAGADA CREMATORIUM |
100000 |
CONSTRUCTION OF CC ROAD AT ARAGADA CREMATORIUM1 |
Completion of work |
-
latitude : 20.0854906
Longitude : 85.7114524
file name : Image_23012021190416608.png
|
2021-01-23 19:04:16.691546 |
6 |
44298118 |
REPAIR AND MAINTENANCE OF ARAGADA PRIMARY SCHOOL |
203520 |
REPAIR AND MAINTENANCE OF ARAGADA PRIMARY SCHOOL1 |
Completion of work |
-
latitude : 20.1171406
Longitude : 85.71726265
file name : Image_23012021190406150.png
|
2021-01-23 19:04:06.222471 |
7 |
44365819 |
CONSTRUCTION OF RAISED TUBEWELL PLATFORM WITH SOAK PIT AT GODASAHI PRIMARY SCHOOL |
20000 |
CONSTRUCTION OF RAISED TUBEWELL PLATFORM WITH SOAK PIT AT GODASAHI PRIMARY SCHOOL 1 |
Completion of work |
-
latitude : 20.12806964
Longitude : 85.7102434
file name : Image_23012021190434643.png
|
2021-01-23 19:04:34.705925 |
8 |
44365903 |
CONSTRUCTION OF RAISED TUBEWELL PLATFORM WITH SOAK PIT AT BARUNEI TEMPLE |
20000 |
CONSTRUCTION OF RAISED TUBEWELL PLATFORM WITH SOAK PIT AT BARUNEI TEMPLE1 |
Completion of work |
-
latitude : 20.13990312
Longitude : 85.6996789
file name : Image_23012021190337106.png
|
2021-01-23 19:03:37.169142 |
9 |
44366177 |
CONSTRUCTION OF RAISED TUBEWELL PLATFORM WITH SOAK PIT AT KHANDUALI TEMPLE ARAGADA |
20000 |
CONSTRUCTION OF RAISED TUBEWELL PLATFORM WITH SOAK PIT AT KHANDUALI TEMPLE ARAGADA1 |
Completion of work |
-
latitude : 20.12388027
Longitude : 85.71553735
file name : Image_23012021190400299.png
|
2021-01-23 19:04:00.365224 |
10 |
44322783 |
CONSTRUCTION OF CC ROAD AT GOPINATHPUR VILLAGE |
87000 |
CONSTRUCTION OF CC ROAD AT GOPINATHPUR VILLAGE1 |
Completion of work |
-
latitude : 20.15137963
Longitude : 85.69941179
file name : Image_22032021150350558.png
|
2021-03-22 15:03:50.701484 |
11 |
44345451 |
CONSTRUCTION OF MARKET COMPLEX AT GP CAMPUS |
600000 |
CONSTRUCTION OF MARKET COMPLEX AT GP CAMPUS1 |
Completion of work |
-
latitude : 20.1499305
Longitude : 85.6995351
file name : Image_08052021094115112.png
|
2021-05-08 09:41:15.311336 |
12 |
44287884 |
SALARY OF SEM |
72000 |
SALARY OF SEM10 |
Completion of work |
-
latitude : 20.12024857
Longitude : 85.73547116
file name : Image_24102021122626094.png
|
2021-10-24 12:26:26.21021 |
13 |
44299278 |
ENERGY CHARGES OF PWS |
40000 |
ENERGY CHARGES OF PWS1 |
Completion of work |
-
latitude : 20.13353347
Longitude : 85.71089093
file name : Image_06082021221009360.png
|
2021-08-06 22:10:09.444037 |
14 |
44288072 |
CONSTRUCTION OF CC ROAD AT HARIPUR CREMATORIUM |
200000 |
CONSTRUCTION OF CC ROAD AT HARIPUR CREMATORIUM 1 |
Completion of work |
-
latitude : 20.13371194
Longitude : 85.7117564
file name : Image_16112021160446061.png
|
2021-11-16 16:04:46.175166 |
15 |
44288072 |
CONSTRUCTION OF CC ROAD AT HARIPUR CREMATORIUM |
200000 |
CONSTRUCTION OF CC ROAD AT HARIPUR CREMATORIUM 1 |
Completion of work |
-
latitude : 20.13378677
Longitude : 85.7118134
file name : Image_16112021125446273.png
|
2021-11-16 12:54:46.397878 |
16 |
44288072 |
CONSTRUCTION OF CC ROAD AT HARIPUR CREMATORIUM |
200000 |
CONSTRUCTION OF CC ROAD AT HARIPUR CREMATORIUM 1 |
Completion of work |
-
latitude : 20.13401497
Longitude : 85.71191362
file name : Image_16112021111141441.png
|
2021-11-16 11:11:41.576087 |
17 |
44288029 |
SOCIAL AUDIT /GRAM SABHA |
10000 |
SOCIAL AUDIT /GRAM SABHA1 |
Completion of work |
-
latitude : 20.07739578
Longitude : 85.73673041
file name : Image_22122021161111838.png
|
2021-12-22 16:11:11.936632 |
18 |
44365753 |
REPAIR and MAINTENANCE OF BADACHHAPURI PRIMARY SCHOOL |
203520 |
REPAIR and MAINTENANCE OF BADACHHAPURI PRIMARY SCHOOL1 |
Roof laid |
-
latitude : 20.15783641
Longitude : 85.69149763
file name : Image_23122021184651560.png
|
2021-12-23 18:46:51.66858 |
19 |
44365753 |
REPAIR and MAINTENANCE OF BADACHHAPURI PRIMARY SCHOOL |
203520 |
REPAIR and MAINTENANCE OF BADACHHAPURI PRIMARY SCHOOL1 |
Plinth level |
-
latitude : 20.15778439
Longitude : 85.69155839
file name : Image_23122021143335714.png
|
2021-12-23 14:33:35.815672 |
20 |
44365753 |
REPAIR and MAINTENANCE OF BADACHHAPURI PRIMARY SCHOOL |
203520 |
REPAIR and MAINTENANCE OF BADACHHAPURI PRIMARY SCHOOL1 |
Completion of work |
-
latitude : 20.15787154
Longitude : 85.6915532
file name : Image_23122021142600781.png
|
2021-12-23 14:26:00.981283 |
21 |
47930964 |
REPAIR AND MAINTAINANCE OF BINAYAK COMMUNITY HALL |
100000 |
REPAIR AND MAINTAINANCE OF BINAYAK COMMUNITY HALL1 |
Roof laid |
-
latitude : 20.13598509
Longitude : 85.70811396
file name : Image_31012022164105962.png
|
2022-01-31 16:41:06.196259 |
22 |
47930964 |
REPAIR AND MAINTAINANCE OF BINAYAK COMMUNITY HALL |
100000 |
REPAIR AND MAINTAINANCE OF BINAYAK COMMUNITY HALL1 |
Plinth level |
-
latitude : 20.1359135
Longitude : 85.70800501
file name : Image_31012022155254882.png
|
2022-01-31 15:52:55.002653 |
23 |
47930964 |
REPAIR AND MAINTAINANCE OF BINAYAK COMMUNITY HALL |
100000 |
REPAIR AND MAINTAINANCE OF BINAYAK COMMUNITY HALL1 |
Completion of work |
-
latitude : 20.13592392
Longitude : 85.70808571
file name : Image_31012022154028210.png
|
2022-01-31 15:40:28.371179 |
24 |
47930964 |
REPAIR AND MAINTAINANCE OF BINAYAK COMMUNITY HALL |
100000 |
REPAIR AND MAINTAINANCE OF BINAYAK COMMUNITY HALL1 |
Completion of work |
-
latitude : 20.13589492
Longitude : 85.70807371
file name : Image_31012022154711521.png
|
2022-01-31 15:47:11.668356 |
25 |
47659480 |
ENERGY CHARGES OF PWS |
40000 |
ENERGY CHARGES OF PWS1 |
Completion of work |
-
latitude : 20.13349238
Longitude : 85.71089595
file name : Image_31012022162837477.png
|
2022-01-31 16:28:37.623718 |
26 |
47659480 |
ENERGY CHARGES OF PWS |
40000 |
ENERGY CHARGES OF PWS1 |
Completion of work |
-
latitude : 20.13351585
Longitude : 85.71087827
file name : Image_31012022162846207.png
|
2022-01-31 16:28:46.333817 |
27 |
47659480 |
ENERGY CHARGES OF PWS |
40000 |
ENERGY CHARGES OF PWS1 |
Completion of work |
-
latitude : 20.13351289
Longitude : 85.71087753
file name : Image_31012022162841746.png
|
2022-01-31 16:28:41.875547 |
28 |
47928274 |
OPENING OF JALACHATRA |
10000 |
OPENING OF JALACHATRA1 |
Completion of work |
-
latitude : 20.120311975479126
Longitude : 85.73435962200165
file name : Image_09032022073119694.png
|
2022-03-09 07:31:19.78987 |
29 |
47929996 |
CONSTRUCTION OF NUASAHI COMMUNITY HALL HARIPUR |
100000 |
CONSTRUCTION OF NUASAHI COMMUNITY HALL HARIPUR1 |
Completion of work |
-
latitude : 20.13252357
Longitude : 85.71238315
file name : Image_08032022083721395.png
|
2022-03-08 08:37:21.50136 |
30 |
47929996 |
CONSTRUCTION OF NUASAHI COMMUNITY HALL HARIPUR |
100000 |
CONSTRUCTION OF NUASAHI COMMUNITY HALL HARIPUR1 |
Plinth level |
-
latitude : 20.13252357
Longitude : 85.71238315
file name : Image_08032022110925997.png
|
2022-03-08 11:09:26.087504 |
31 |
47929996 |
CONSTRUCTION OF NUASAHI COMMUNITY HALL HARIPUR |
100000 |
CONSTRUCTION OF NUASAHI COMMUNITY HALL HARIPUR1 |
Roof laid |
-
latitude : 20.13446488
Longitude : 85.70772977
file name : Image_08032022121148811.png
|
2022-03-08 12:11:48.899657 |
32 |
47930417 |
CONSTRUCTION OF MALLIK SAHI COMMUNITY HALL |
100000 |
CONSTRUCTION OF MALLIK SAHI COMMUNITY HALL1 |
Roof laid |
-
latitude : 20.13251962
Longitude : 85.71238528
file name : Image_08032022082128104.png
|
2022-03-08 08:21:28.200714 |
33 |
47930417 |
CONSTRUCTION OF MALLIK SAHI COMMUNITY HALL |
100000 |
CONSTRUCTION OF MALLIK SAHI COMMUNITY HALL1 |
Plinth level |
-
latitude : 20.13291175
Longitude : 85.71204145
file name : Image_08032022081626372.png
|
2022-03-08 08:16:26.46128 |
34 |
47930417 |
CONSTRUCTION OF MALLIK SAHI COMMUNITY HALL |
100000 |
CONSTRUCTION OF MALLIK SAHI COMMUNITY HALL1 |
Completion of work |
-
latitude : 20.13266623020172
Longitude : 85.71220993995667
file name : Image_08032022081220835.png
|
2022-03-08 08:12:20.926167 |
35 |
47933277 |
MAINTAINANCE OF GP MOBILE |
6000 |
MAINTAINANCE OF GP MOBILE1 |
Completion of work |
-
latitude : 20.120542645454407
Longitude : 85.73409140110016
file name : Image_09032022091851155.png
|
2022-03-09 09:18:51.258344 |
36 |
44288050 |
MAINTENANCE OF GP COMPUTER |
6000 |
MAINTENANCE OF GP COMPUTER1 |
Completion of work |
-
latitude : 20.12056873
Longitude : 85.73406589
file name : Image_09032022091847662.png
|
2022-03-09 09:18:47.755872 |
37 |
44287949 |
OPENING OF JALACHATRA |
10000 |
OPENING OF JALACHATRA1 |
Roof laid |
-
latitude : 20.22483513
Longitude : 85.84347444
file name : Image_22062022193035842.png
|
2022-06-22 19:30:35.966887 |
38 |
44287949 |
OPENING OF JALACHATRA |
10000 |
OPENING OF JALACHATRA1 |
Roof laid |
-
latitude : 20.16037339
Longitude : 85.70526207
file name : Image_09032022092550952.png
|
2022-03-09 09:25:51.047148 |
39 |
44287949 |
OPENING OF JALACHATRA |
10000 |
OPENING OF JALACHATRA1 |
Plinth level |
-
latitude : 20.120859146118164
Longitude : 85.73378562927246
file name : Image_09032022084354185.png
|
2022-03-09 08:43:54.275231 |
40 |
44322744 |
REPAIR and MAINTENANCE OF MANAPUR PRIMARY SCHOOL |
173391 |
REPAIR and MAINTENANCE OF MANAPUR PRIMARY SCHOOL1 |
Roof laid |
-
latitude : 20.150974988937378
Longitude : 85.68676114082336
file name : Image_31052022084244476.png
|
2022-05-31 08:42:44.600335 |
41 |
44322744 |
REPAIR and MAINTENANCE OF MANAPUR PRIMARY SCHOOL |
173391 |
REPAIR and MAINTENANCE OF MANAPUR PRIMARY SCHOOL1 |
Plinth level |
-
latitude : 20.151007175445557
Longitude : 85.68678259849548
file name : Image_31052022083809368.png
|
2022-05-31 08:38:09.482901 |
42 |
44322744 |
REPAIR and MAINTENANCE OF MANAPUR PRIMARY SCHOOL |
173391 |
REPAIR and MAINTENANCE OF MANAPUR PRIMARY SCHOOL1 |
Completion of work |
-
latitude : 20.15090473
Longitude : 85.68684822
file name : Image_06072021084446923.png
|
2021-07-06 08:44:47.028374 |
43 |
47933146 |
SOCIAL AUDIT GRAM SABHA |
10000 |
SOCIAL AUDIT GRAM SABHA1 |
Completion of work |
-
latitude : 20.077214241027832
Longitude : 85.7369077205658
file name : Image_29062022153617008.png
|
2022-06-29 15:36:17.106535 |
44 |
47932980 |
MAINTAINANCE OF GP MOBILE |
6000 |
MAINTAINANCE OF GP MOBILE 1 |
Completion of work |
-
latitude : 20.13720084
Longitude : 85.70618203
file name : Image_01032024125102008.png
|
2024-03-01 12:51:02.083236 |
45 |
47932980 |
MAINTAINANCE OF GP MOBILE |
6000 |
MAINTAINANCE OF GP MOBILE 1 |
Completion of work |
-
latitude : 20.077208876609802
Longitude : 85.73691308498383
file name : Image_29062022153345720.png
|
2022-06-29 15:33:45.846049 |
46 |
44288057 |
COST OF CASH BOOK ENTRY IN PRIYA SOFT |
6000 |
COST OF CASH BOOK ENTRY IN PRIYA SOFT1 |
Completion of work |
-
latitude : 20.077203512191772
Longitude : 85.7369077205658
file name : Image_29062022153131450.png
|
2022-06-29 15:31:31.538304 |
47 |
44288053 |
MAINTENANCE OF GP MOBILE |
6000 |
MAINTENANCE OF GP MOBILE1 |
Completion of work |
-
latitude : 20.09566294
Longitude : 85.73011626
file name : Image_29062022153018052.png
|
2022-06-29 15:30:18.146706 |
48 |
47931329 |
COST OF DATA ENTRY |
6000 |
COST OF DATA ENTRY1 |
Completion of work |
-
latitude : 20.13719894
Longitude : 85.70620477
file name : Image_01032024125857795.png
|
2024-03-01 12:58:57.855678 |
49 |
47931329 |
COST OF DATA ENTRY |
6000 |
COST OF DATA ENTRY1 |
Completion of work |
-
latitude : 20.077203512191772
Longitude : 85.7369077205658
file name : Image_29062022153250567.png
|
2022-06-29 15:32:50.669974 |
50 |
44366042 |
CONSTRUCTION OF RAISED TUBEWELL PLATFORM AT SURA DAS HOUSE |
20000 |
CONSTRUCTION OF RAISED TUBEWELL PLATFORM AT SURA DAS HOUSE1 |
Completion of work |
-
latitude : 20.24489197
Longitude : 85.84064877
file name : Image_18072022064328897.png
|
2022-07-18 06:43:29.001044 |
51 |
44366099 |
CONSTRUCTION OF RAISED TUBEWELL PLATFORM AT JATIA DAS HOUSE BARAPADA |
20000 |
CONSTRUCTION OF RAISED TUBEWELL PLATFORM AT JATIA DAS HOUSE BARAPADA1 |
Completion of work |
-
latitude : 20.24489197
Longitude : 85.84064877
file name : Image_15072022184726427.png
|
2022-07-15 18:47:26.539885 |
52 |
44365974 |
CONSTRUCTION OF RAISED TUBEWELL PLATFORM AT BARAPADA SCHOOL |
20000 |
CONSTRUCTION OF RAISED TUBEWELL PLATFORM AT BARAPADA SCHOOL1 |
Completion of work |
-
latitude : 20.24489197
Longitude : 85.84064877
file name : Image_15072022184529219.png
|
2022-07-15 18:45:29.333295 |
53 |
44306900 |
CONSTRUCTION OF RAISED TUBEWELL PLATFORM WITH SOAK PIT AT MAHAVIR TEMPLE ARAGADA |
23391 |
CONSTRUCTION OF RAISED TUBEWELL PLATFORM WITH SOAK PIT AT MAHAVIR TEMPLE ARAGADA1 |
Completion of work |
-
latitude : 20.158517360687256
Longitude : 85.70596039295197
file name : Image_18072022132206671.png
|
2022-07-18 13:22:06.791923 |
54 |
60693368 |
ENERGY CHARGES PWS UNDER GPDP 2022 23 |
100000 |
ENERGY CHARGES PWS UNDER GPDP 2022 231 |
Completion of work |
-
latitude : 20.2188778
Longitude : 85.8482013
file name : Image_29092022105733938.png
|
2022-09-29 10:57:34.063617 |
55 |
60721113 |
RENOVATION OF MANAPUR POKHARI UNDER GPDP 2022-23 |
200000 |
RENOVATION OF MANAPUR POKHARI UNDER GPDP 2022-231 |
Roof laid |
-
latitude : 20.15148537
Longitude : 85.68910522
file name : Image_24032023133104957.png
|
2023-03-24 13:31:05.051834 |
56 |
60721113 |
RENOVATION OF MANAPUR POKHARI UNDER GPDP 2022-23 |
200000 |
RENOVATION OF MANAPUR POKHARI UNDER GPDP 2022-231 |
Roof laid |
-
latitude : 20.1515291
Longitude : 85.68906237
file name : Image_24032023133053011.png
|
2023-03-24 13:30:53.138196 |
57 |
60721113 |
RENOVATION OF MANAPUR POKHARI UNDER GPDP 2022-23 |
200000 |
RENOVATION OF MANAPUR POKHARI UNDER GPDP 2022-231 |
Plinth level |
-
latitude : 20.15131798
Longitude : 85.68916964
file name : Image_24032023130848393.png
|
2023-03-24 13:08:48.489852 |
58 |
60721113 |
RENOVATION OF MANAPUR POKHARI UNDER GPDP 2022-23 |
200000 |
RENOVATION OF MANAPUR POKHARI UNDER GPDP 2022-231 |
Completion of work |
-
latitude : 20.15137852
Longitude : 85.68945368
file name : Image_24032023121508919.png
|
2023-03-24 12:15:09.079634 |
59 |
60719693 |
REPAIR AND MAINTAINANCE OF ARAGARH PRIMARY SCHOOL UNDER GPDP 2022-23 |
300000 |
REPAIR AND MAINTAINANCE OF ARAGARH PRIMARY SCHOOL UNDER GPDP 2022-231 |
Roof laid |
-
latitude : 20.11714894
Longitude : 85.71709761
file name : Image_23032023111007318.png
|
2023-03-23 11:10:07.416577 |
60 |
60719693 |
REPAIR AND MAINTAINANCE OF ARAGARH PRIMARY SCHOOL UNDER GPDP 2022-23 |
300000 |
REPAIR AND MAINTAINANCE OF ARAGARH PRIMARY SCHOOL UNDER GPDP 2022-231 |
Plinth level |
-
latitude : 20.11743141
Longitude : 85.71724103
file name : Image_23032023105757719.png
|
2023-03-23 10:57:57.822591 |
61 |
60719693 |
REPAIR AND MAINTAINANCE OF ARAGARH PRIMARY SCHOOL UNDER GPDP 2022-23 |
300000 |
REPAIR AND MAINTAINANCE OF ARAGARH PRIMARY SCHOOL UNDER GPDP 2022-231 |
Completion of work |
-
latitude : 20.11730373
Longitude : 85.71716374
file name : Image_23032023104900472.png
|
2023-03-23 10:49:00.568724 |
62 |
60719571 |
COMPLETION OF INCOMPLETE LI CENTRE AT GP CAMPUS UNDER GPDP 2022 23 |
200000 |
COMPLETION OF INCOMPLETE LI CENTRE AT GP CAMPUS UNDER GPDP 2022 231 |
Roof laid |
-
latitude : 20.13746311
Longitude : 85.7062082
file name : Image_23032023121637171.png
|
2023-03-23 12:16:37.267503 |
63 |
60719571 |
COMPLETION OF INCOMPLETE LI CENTRE AT GP CAMPUS UNDER GPDP 2022 23 |
200000 |
COMPLETION OF INCOMPLETE LI CENTRE AT GP CAMPUS UNDER GPDP 2022 231 |
Roof laid |
-
latitude : 20.13773144
Longitude : 85.70650212
file name : Image_23032023122330385.png
|
2023-03-23 12:23:30.491115 |
64 |
60719571 |
COMPLETION OF INCOMPLETE LI CENTRE AT GP CAMPUS UNDER GPDP 2022 23 |
200000 |
COMPLETION OF INCOMPLETE LI CENTRE AT GP CAMPUS UNDER GPDP 2022 231 |
Plinth level |
-
latitude : 20.1374945
Longitude : 85.70625485
file name : Image_23032023120540007.png
|
2023-03-23 12:05:40.116046 |
65 |
60719571 |
COMPLETION OF INCOMPLETE LI CENTRE AT GP CAMPUS UNDER GPDP 2022 23 |
200000 |
COMPLETION OF INCOMPLETE LI CENTRE AT GP CAMPUS UNDER GPDP 2022 231 |
Completion of work |
-
latitude : 20.13771202
Longitude : 85.70586507
file name : Image_23032023113456755.png
|
2023-03-23 11:34:56.868685 |
66 |
60719571 |
COMPLETION OF INCOMPLETE LI CENTRE AT GP CAMPUS UNDER GPDP 2022 23 |
200000 |
COMPLETION OF INCOMPLETE LI CENTRE AT GP CAMPUS UNDER GPDP 2022 231 |
Completion of work |
-
latitude : 20.13746808
Longitude : 85.70607725
file name : Image_23032023112451934.png
|
2023-03-23 11:24:52.063092 |
67 |
60720913 |
COSTRUCTION OF CC ROAD FROM DALEI HOUSE TO GOPAL DAS HOUSE ATGOPINATHPUR UNDER GPDP 2022-23 |
100000 |
COSTRUCTION OF CC ROAD FROM DALEI HOUSE TO GOPAL DAS HOUSE ATGOPINATHPUR UNDER GPDP 2022-231 |
Plinth level |
-
latitude : 20.15156355,20.15156355,20.15156321
Longitude : 85.7011549,85.7011549,85.70115461
file name : Image_28032023124823011.png
|
2023-03-28 12:48:23.389081 |
68 |
60720913 |
COSTRUCTION OF CC ROAD FROM DALEI HOUSE TO GOPAL DAS HOUSE ATGOPINATHPUR UNDER GPDP 2022-23 |
100000 |
COSTRUCTION OF CC ROAD FROM DALEI HOUSE TO GOPAL DAS HOUSE ATGOPINATHPUR UNDER GPDP 2022-231 |
Roof laid |
-
latitude : 20.1515091,20.15151939,20.15151936
Longitude : 85.70139,85.70115985,85.70115985
file name : Image_28032023134131537.png
|
2023-03-28 13:41:31.626461 |
69 |
60720913 |
COSTRUCTION OF CC ROAD FROM DALEI HOUSE TO GOPAL DAS HOUSE ATGOPINATHPUR UNDER GPDP 2022-23 |
100000 |
COSTRUCTION OF CC ROAD FROM DALEI HOUSE TO GOPAL DAS HOUSE ATGOPINATHPUR UNDER GPDP 2022-231 |
Completion of work |
-
latitude : 20.1515542,20.15155716
Longitude : 85.7014049,85.70111443
file name : Image_24032023134452813.png
|
2023-03-24 13:44:52.910185 |
70 |
47929216 |
REPAIR AND MAINTAINANCE OF GODASAHI PRIMARY SCHOOL |
153696 |
REPAIR AND MAINTAINANCE OF GODASAHI PRIMARY SCHOOL1 |
Roof laid |
-
latitude : 20.12750525
Longitude : 85.70976638
file name : Image_29032023084159238.png
|
2023-03-29 08:41:59.333548 |
71 |
47929216 |
REPAIR AND MAINTAINANCE OF GODASAHI PRIMARY SCHOOL |
153696 |
REPAIR AND MAINTAINANCE OF GODASAHI PRIMARY SCHOOL1 |
Plinth level |
-
latitude : 20.12748894
Longitude : 85.70979682
file name : Image_29032023083344591.png
|
2023-03-29 08:33:44.691838 |
72 |
47929216 |
REPAIR AND MAINTAINANCE OF GODASAHI PRIMARY SCHOOL |
153696 |
REPAIR AND MAINTAINANCE OF GODASAHI PRIMARY SCHOOL1 |
Completion of work |
-
latitude : 20.127553939819336
Longitude : 85.70976912975311
file name : Image_29032023082627400.png
|
2023-03-29 08:26:27.500261 |
73 |
47929599 |
REPAIR AND MAINTAINANCE OF SATYAPIRA NODAL SCHOOL |
203391 |
REPAIR AND MAINTAINANCE OF SATYAPIRA NODAL SCHOOL1 |
Roof laid |
-
latitude : 20.13690101
Longitude : 85.70243611
file name : Image_29032023085831262.png
|
2023-03-29 08:58:31.390023 |
74 |
47929599 |
REPAIR AND MAINTAINANCE OF SATYAPIRA NODAL SCHOOL |
203391 |
REPAIR AND MAINTAINANCE OF SATYAPIRA NODAL SCHOOL1 |
Plinth level |
-
latitude : 20.13688449
Longitude : 85.70242072
file name : Image_29032023085616175.png
|
2023-03-29 08:56:16.274916 |
75 |
47929599 |
REPAIR AND MAINTAINANCE OF SATYAPIRA NODAL SCHOOL |
203391 |
REPAIR AND MAINTAINANCE OF SATYAPIRA NODAL SCHOOL1 |
Completion of work |
-
latitude : 20.13694161
Longitude : 85.70243663
file name : Image_29032023085333324.png
|
2023-03-29 08:53:33.418226 |
76 |
47929036 |
COMPLETION OF INCOMPLETE MARKET COMPLETE |
300000 |
COMPLETION OF INCOMPLETE MARKET COMPLETE1 |
Roof laid |
-
latitude : 20.13730436
Longitude : 85.70621096
file name : Image_29032023093656171.png
|
2023-03-29 09:36:56.413352 |
77 |
47929036 |
COMPLETION OF INCOMPLETE MARKET COMPLETE |
300000 |
COMPLETION OF INCOMPLETE MARKET COMPLETE1 |
Roof laid |
-
latitude : 20.13730664
Longitude : 85.70620838
file name : Image_29032023093701256.png
|
2023-03-29 09:37:01.462004 |
78 |
47929036 |
COMPLETION OF INCOMPLETE MARKET COMPLETE |
300000 |
COMPLETION OF INCOMPLETE MARKET COMPLETE1 |
Roof laid |
-
latitude : 20.13730194
Longitude : 85.70601098
file name : Image_29032023092140307.png
|
2023-03-29 09:21:40.409477 |
79 |
47929036 |
COMPLETION OF INCOMPLETE MARKET COMPLETE |
300000 |
COMPLETION OF INCOMPLETE MARKET COMPLETE1 |
Plinth level |
-
latitude : 20.137247443199158
Longitude : 85.7060194015503
file name : Image_29032023091743656.png
|
2023-03-29 09:17:43.757076 |
80 |
47929036 |
COMPLETION OF INCOMPLETE MARKET COMPLETE |
300000 |
COMPLETION OF INCOMPLETE MARKET COMPLETE1 |
Completion of work |
-
latitude : 20.13723983
Longitude : 85.70600827
file name : Image_29032023090611984.png
|
2023-03-29 09:06:12.078122 |
81 |
60688391 |
SALARY OF SEM UNDER GPDP 2022 23 |
72000 |
SALARY OF SEM UNDER GPDP 2022 231 |
Completion of work |
-
latitude : 20.13349986
Longitude : 85.71087211
file name : Image_12062023090907004.png
|
2023-06-12 09:09:07.079182 |
82 |
60688391 |
SALARY OF SEM UNDER GPDP 2022 23 |
72000 |
SALARY OF SEM UNDER GPDP 2022 231 |
Completion of work |
-
latitude : 20.3054696
Longitude : 85.8315676
file name : Image_09062023151607167.png
|
2023-06-09 15:16:07.240994 |
83 |
60719948 |
REPAIR AND MAINTENANCE OF BADAICCHAPUR PRIMARY SCHOOL UNDER GPDP 2022-23 |
238000 |
REPAIR AND MAINTENANCE OF BADAICCHAPUR PRIMARY SCHOOL UNDER GPDP 2022-231 |
Roof laid |
-
latitude : 20.15777932
Longitude : 85.69123363
file name : Image_12062023120827956.png
|
2023-06-12 12:08:28.021741 |
84 |
60719948 |
REPAIR AND MAINTENANCE OF BADAICCHAPUR PRIMARY SCHOOL UNDER GPDP 2022-23 |
238000 |
REPAIR AND MAINTENANCE OF BADAICCHAPUR PRIMARY SCHOOL UNDER GPDP 2022-231 |
Roof laid |
-
latitude : 20.15781471
Longitude : 85.69127619
file name : Image_12062023120428734.png
|
2023-06-12 12:04:28.797415 |
85 |
60719948 |
REPAIR AND MAINTENANCE OF BADAICCHAPUR PRIMARY SCHOOL UNDER GPDP 2022-23 |
238000 |
REPAIR AND MAINTENANCE OF BADAICCHAPUR PRIMARY SCHOOL UNDER GPDP 2022-231 |
Roof laid |
-
latitude : 20.15779176
Longitude : 85.69131731
file name : Image_12062023115131308.png
|
2023-06-12 11:51:31.378687 |
86 |
60719948 |
REPAIR AND MAINTENANCE OF BADAICCHAPUR PRIMARY SCHOOL UNDER GPDP 2022-23 |
238000 |
REPAIR AND MAINTENANCE OF BADAICCHAPUR PRIMARY SCHOOL UNDER GPDP 2022-231 |
Plinth level |
-
latitude : 20.15781056
Longitude : 85.69149653
file name : Image_12062023113959798.png
|
2023-06-12 11:39:59.865319 |
87 |
60719948 |
REPAIR AND MAINTENANCE OF BADAICCHAPUR PRIMARY SCHOOL UNDER GPDP 2022-23 |
238000 |
REPAIR AND MAINTENANCE OF BADAICCHAPUR PRIMARY SCHOOL UNDER GPDP 2022-231 |
Plinth level |
-
latitude : 20.1578094
Longitude : 85.69125915
file name : Image_12062023113902269.png
|
2023-06-12 11:39:02.339346 |
88 |
60719948 |
REPAIR AND MAINTENANCE OF BADAICCHAPUR PRIMARY SCHOOL UNDER GPDP 2022-23 |
238000 |
REPAIR AND MAINTENANCE OF BADAICCHAPUR PRIMARY SCHOOL UNDER GPDP 2022-231 |
Plinth level |
-
latitude : 20.15774499
Longitude : 85.6919124
file name : Image_12062023113621641.png
|
2023-06-12 11:36:21.700837 |
89 |
60719948 |
REPAIR AND MAINTENANCE OF BADAICCHAPUR PRIMARY SCHOOL UNDER GPDP 2022-23 |
238000 |
REPAIR AND MAINTENANCE OF BADAICCHAPUR PRIMARY SCHOOL UNDER GPDP 2022-231 |
Completion of work |
-
latitude : 20.15775237
Longitude : 85.69171528
file name : Image_12062023113302366.png
|
2023-06-12 11:33:02.438842 |
90 |
47930203 |
CONSTRUCTION OF DRAIN AT SETHI SAHI BADAICCHAPUR |
100000 |
CONSTRUCTION OF DRAIN AT SETHI SAHI BADAICCHAPUR1 |
Roof laid |
-
latitude : 20.1542262
Longitude : 85.69223716
file name : Image_26072023130956951.png
|
2023-07-26 13:09:57.013461 |
91 |
47930203 |
CONSTRUCTION OF DRAIN AT SETHI SAHI BADAICCHAPUR |
100000 |
CONSTRUCTION OF DRAIN AT SETHI SAHI BADAICCHAPUR1 |
Roof laid |
-
latitude : 20.15419116
Longitude : 85.69221364
file name : Image_26072023130655477.png
|
2023-07-26 13:06:55.55263 |
92 |
47930203 |
CONSTRUCTION OF DRAIN AT SETHI SAHI BADAICCHAPUR |
100000 |
CONSTRUCTION OF DRAIN AT SETHI SAHI BADAICCHAPUR1 |
Plinth level |
-
latitude : 20.15419804
Longitude : 85.69211256
file name : Image_26072023130251963.png
|
2023-07-26 13:02:52.029 |
93 |
47930203 |
CONSTRUCTION OF DRAIN AT SETHI SAHI BADAICCHAPUR |
100000 |
CONSTRUCTION OF DRAIN AT SETHI SAHI BADAICCHAPUR1 |
Completion of work |
-
latitude : 20.15421777
Longitude : 85.69208931
file name : Image_26072023125943880.png
|
2023-07-26 12:59:43.94239 |
94 |
60690368 |
OPENING OF JALACHATRA UNDER GPDP 2022 23 |
10000 |
OPENING OF JALACHATRA UNDER GPDP 2022 231 |
Plinth level |
-
latitude : 20.2188657
Longitude : 85.8485128
file name : Image_26102023154205198.png
|
2023-10-26 15:42:05.26801 |
95 |
60690368 |
OPENING OF JALACHATRA UNDER GPDP 2022 23 |
10000 |
OPENING OF JALACHATRA UNDER GPDP 2022 231 |
Completion of work |
-
latitude : 20.11986827
Longitude : 85.7339656
file name : Image_25102023172227538.png
|
2023-10-25 17:22:27.606187 |
96 |
60692090 |
ENGAGEMENT OF MOBILE VAN DURING SUMMER |
95500 |
ENGAGEMENT OF MOBILE VAN DURING SUMMER1 |
Plinth level |
-
latitude : 20.2189076
Longitude : 85.8484887
file name : Image_26102023154333231.png
|
2023-10-26 15:43:33.325971 |
97 |
60692090 |
ENGAGEMENT OF MOBILE VAN DURING SUMMER |
95500 |
ENGAGEMENT OF MOBILE VAN DURING SUMMER1 |
Completion of work |
-
latitude : 20.11984311
Longitude : 85.73394152
file name : Image_26102023153929594.png
|
2023-10-26 15:39:29.689194 |
98 |
60692090 |
ENGAGEMENT OF MOBILE VAN DURING SUMMER |
95500 |
ENGAGEMENT OF MOBILE VAN DURING SUMMER1 |
Completion of work |
-
latitude : 20.1198418
Longitude : 85.73394176
file name : Image_25102023172223249.png
|
2023-10-25 17:22:23.317216 |
99 |
60692090 |
ENGAGEMENT OF MOBILE VAN DURING SUMMER |
95500 |
ENGAGEMENT OF MOBILE VAN DURING SUMMER1 |
Completion of work |
-
latitude : 20.11986223
Longitude : 85.73396311
file name : Image_25102023172611751.png
|
2023-10-25 17:26:11.823576 |
100 |
82431318 |
Electricity in GP Bhawan |
300002 |
Electricity in GP Bhawan1 |
Completion of work |
-
latitude : 20.2186833
Longitude : 85.8481721
file name : Image_08112023074412246.png
|
2023-11-08 07:44:12.304521 |
101 |
60691000 |
MAINATAINANCE OF GP COMPUTER UNDER GPDP 2022 23 |
6000 |
MAINATAINANCE OF GP COMPUTER UNDER GPDP 2022 231 |
Completion of work |
-
latitude : 20.13705069
Longitude : 85.70614903
file name : Image_01032024124100449.png
|
2024-03-01 12:41:00.518276 |
102 |
60691000 |
MAINATAINANCE OF GP COMPUTER UNDER GPDP 2022 23 |
6000 |
MAINATAINANCE OF GP COMPUTER UNDER GPDP 2022 231 |
Completion of work |
-
latitude : 20.13720775
Longitude : 85.7062359
file name : Image_01032024124105013.png
|
2024-03-01 12:41:05.083578 |
103 |
75895273 |
Installation of Street Lights |
226723 |
Installation of Street Lights1 |
Completion of work |
-
latitude : 20.2189015
Longitude : 85.8484933
file name : Image_01122023094725109.png
|
2023-12-01 09:47:25.165313 |
104 |
82428791 |
Maintenance of Panchayat Bhawan |
235662 |
Maintenance of Panchayat Bhawan1 |
Roof laid |
-
latitude : 20.13570816
Longitude : 85.69903091
file name : Image_25122023075313070.png
|
2023-12-25 07:53:12.268255 |
105 |
82428791 |
Maintenance of Panchayat Bhawan |
235662 |
Maintenance of Panchayat Bhawan1 |
Completion of work |
-
latitude : 20.13576469
Longitude : 85.69928198
file name : Image_23122023155247699.png
|
2023-12-23 15:52:46.666468 |
106 |
82428791 |
Maintenance of Panchayat Bhawan |
235662 |
Maintenance of Panchayat Bhawan1 |
Plinth level |
-
latitude : 20.135751
Longitude : 85.69925009
file name : Image_23122023155647900.png
|
2023-12-23 15:56:47.660182 |
107 |
82428791 |
Maintenance of Panchayat Bhawan |
235662 |
Maintenance of Panchayat Bhawan1 |
Completion of work |
-
latitude : 20.13576469
Longitude : 85.69928198
file name : Image_23122023155408002.png
|
2023-12-23 15:54:08.062468 |
108 |
82428791 |
Maintenance of Panchayat Bhawan |
235662 |
Maintenance of Panchayat Bhawan1 |
Completion of work |
-
latitude : 20.07721743
Longitude : 85.73710119
file name : Image_20122023132822577.png
|
2023-12-20 13:28:22.633236 |
109 |
47930771 |
CONSTRUCTION OF COMMUNITY SANITARY COMPLEX |
270000 |
CONSTRUCTION OF COMMUNITY SANITARY COMPLEX1 |
Plinth level |
-
latitude : 20.13594395
Longitude : 85.69314755
file name : Image_25122023081752140.png
|
2023-12-25 08:17:50.483971 |
110 |
47930771 |
CONSTRUCTION OF COMMUNITY SANITARY COMPLEX |
270000 |
CONSTRUCTION OF COMMUNITY SANITARY COMPLEX1 |
Plinth level |
-
latitude : 20.13603317
Longitude : 85.69315271
file name : Image_23122023162838797.png
|
2023-12-23 16:28:38.779378 |
111 |
47930771 |
CONSTRUCTION OF COMMUNITY SANITARY COMPLEX |
270000 |
CONSTRUCTION OF COMMUNITY SANITARY COMPLEX1 |
Completion of work |
-
latitude : 20.13604274
Longitude : 85.69312774
file name : Image_23122023162201059.png
|
2023-12-23 16:22:00.683604 |
112 |
44298387 |
CONSTRUCTION OF KALYAN MANDAP |
227040 |
CONSTRUCTION OF KALYAN MANDAP1 |
Roof laid |
-
latitude : 20.13570686
Longitude : 85.69904924
file name : Image_25122023080036006.png
|
2023-12-25 08:00:35.736409 |
113 |
44298387 |
CONSTRUCTION OF KALYAN MANDAP |
227040 |
CONSTRUCTION OF KALYAN MANDAP1 |
Plinth level |
-
latitude : 20.13587504
Longitude : 85.6990803
file name : Image_23122023153834815.png
|
2023-12-23 15:38:34.887879 |
114 |
44298387 |
CONSTRUCTION OF KALYAN MANDAP |
227040 |
CONSTRUCTION OF KALYAN MANDAP1 |
Completion of work |
-
latitude : 20.13573988
Longitude : 85.69907622
file name : Image_23122023153504992.png
|
2023-12-23 15:35:05.065385 |
115 |
44298387 |
CONSTRUCTION OF KALYAN MANDAP |
227040 |
CONSTRUCTION OF KALYAN MANDAP1 |
Completion of work |
-
latitude : 20.218812
Longitude : 85.8485129
file name : Image_21122023095346081.png
|
2023-12-21 09:53:46.155011 |
116 |
63489285 |
Implementation of Solid Liquid managemnt of all village of Godiput Matiapada GP GPDP-2022-23 |
704322 |
Implementation of Solid Liquid managemnt of all village of Godiput Matiapada GP GPDP-2022-231 |
Plinth level |
-
latitude : 20.1169126
Longitude : 85.70206146
file name : Image_01052024132806982.png
|
2024-05-01 13:28:07.041929 |
117 |
63489285 |
Implementation of Solid Liquid managemnt of all village of Godiput Matiapada GP GPDP-2022-23 |
704322 |
Implementation of Solid Liquid managemnt of all village of Godiput Matiapada GP GPDP-2022-231 |
Plinth level |
-
latitude : 20.13626801
Longitude : 85.69369221
file name : Image_23122023162155961.png
|
2023-12-23 16:21:55.94288 |
118 |
63489285 |
Implementation of Solid Liquid managemnt of all village of Godiput Matiapada GP GPDP-2022-23 |
704322 |
Implementation of Solid Liquid managemnt of all village of Godiput Matiapada GP GPDP-2022-231 |
Plinth level |
-
latitude : 20.13626801
Longitude : 85.69369221
file name : Image_23122023161610529.png
|
2023-12-23 16:16:09.283659 |
119 |
63489285 |
Implementation of Solid Liquid managemnt of all village of Godiput Matiapada GP GPDP-2022-23 |
704322 |
Implementation of Solid Liquid managemnt of all village of Godiput Matiapada GP GPDP-2022-231 |
Completion of work |
-
latitude : 20.13625971
Longitude : 85.69372376
file name : Image_23122023161154816.png
|
2023-12-23 16:11:54.917901 |
120 |
63489285 |
Implementation of Solid Liquid managemnt of all village of Godiput Matiapada GP GPDP-2022-23 |
704322 |
Implementation of Solid Liquid managemnt of all village of Godiput Matiapada GP GPDP-2022-231 |
Completion of work |
-
latitude : 20.07721743
Longitude : 85.73710119
file name : Image_21122023095115412.png
|
2023-12-21 09:51:15.468072 |
121 |
60720580 |
REPAIR AND MAINTAINANCE OF CENTRE PRIMARY SCHOOL AT HARIPUR UNDER GPDP 2022-23 |
300000 |
REPAIR AND MAINTAINANCE OF CENTRE PRIMARY SCHOOL AT HARIPUR UNDER GPDP 2022-231 |
Completion of work |
-
latitude : 20.13209164
Longitude : 85.70955993
file name : Image_11062024085915228.png
|
2024-06-11 08:59:15.287463 |
122 |
76064559 |
Creation of a new source of drinking water |
105901 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 20.13537571
Longitude : 85.69982812
file name : Image_11062024094522775.png
|
2024-06-11 09:45:22.852909 |
123 |
76064559 |
Creation of a new source of drinking water |
105901 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 20.1173073
Longitude : 85.7190453
file name : Image_11062024085007482.png
|
2024-06-11 08:50:07.547901 |