1 |
44391756 |
Const. of Toilet near at Ram Mandir |
150000 |
Const. of Toilet near at Ram Mandir1 |
Completion of work |
-
latitude : 20.14523
Longitude : 85.73156666666667
file name : Image_15012021172358185.png
|
2021-01-15 17:23:58.241461 |
2 |
44391503 |
Const. of CC road from PMGSY road to Behera Sahi |
100000 |
Const. of CC road from PMGSY road to Behera Sahi 1 |
Completion of work |
-
latitude : 20.14601561
Longitude : 85.73177741
file name : Image_17022021113502144.png
|
2021-02-17 11:35:02.248589 |
3 |
44391690 |
Const. of incompeleted kitchen shed near at Rama Mandir |
150000 |
Const. of incompeleted kitchen shed near at Rama Mandir1 |
Completion of work |
-
latitude : 20.14537762,20.1453795
Longitude : 85.73157237,85.73157157
file name : Image_14032021141939401.png
|
2021-03-14 14:19:39.502865 |
4 |
44391527 |
Const. of CC road from Sangram Kesari house to Prakash Behera house |
100000 |
Const. of CC road from Sangram Kesari house to Prakash Behera house1 |
Completion of work |
-
latitude : 20.14690052
Longitude : 85.73787622
file name : Image_07072021132708134.png
|
2021-07-07 13:27:08.243441 |
5 |
44391460 |
Const. of CC road from Maga Patra house to Bhaskara Paschimakabata house |
100000 |
Const. of CC road from Maga Patra house to Bhaskara Paschimakabata house1 |
Completion of work |
-
latitude : 20.1463874
Longitude : 85.7366984
file name : Image_07072021132705005.png
|
2021-07-07 13:27:05.107342 |
6 |
44391579 |
Const. of CC road from PMGSY road to Basali Sahi |
300000 |
Const. of CC road from PMGSY road to Basali Sahi 1 |
Completion of work |
-
latitude : 20.14606929,20.14623356
Longitude : 85.73405222,85.73411354
file name : Image_23062021075156656.png
|
2021-06-23 07:51:56.754671 |
7 |
44391649 |
Const. of CC road from half constructed CC road to Mahavir Mandir,Bhansar |
300000 |
Const. of CC road from half constructed CC road to Mahavir Mandir,Bhansar1 |
Completion of work |
-
latitude : 20.12832011,20.1283203
Longitude : 85.73790079,85.7379001
file name : Image_02062021140715130.png
|
2021-06-02 14:07:15.213529 |
8 |
44391724 |
Const. of CC road from Jatani Pipli road to Pradhan house |
300000 |
Const. of CC road from Jatani Pipli road to Pradhan house1 |
Completion of work |
-
latitude : 20.14933117,20.1492791
Longitude : 85.73279284,85.73279859
file name : Image_02062021145010991.png
|
2021-06-02 14:50:11.08732 |
9 |
44391677 |
Const. of CC road from Bikas Parisad Sisu Mandir to Dilu Behera Shop |
200000 |
Const. of CC road from Bikas Parisad Sisu Mandir to Dilu Behera Shop1 |
Completion of work |
-
latitude : 20.14826479,20.14821784
Longitude : 85.73054867,85.73056388
file name : Image_07072021132711871.png
|
2021-07-07 13:27:12.004337 |
10 |
44391547 |
Const. of CC road from PMGSY road to Patana Sahi road via Bhuasuni Mandir |
300000 |
Const. of CC road from PMGSY road to Patana Sahi road via Bhuasuni Mandir1 |
Completion of work |
-
latitude : 20.14567302
Longitude : 85.73714328
file name : Image_28072021124704633.png
|
2021-07-28 12:47:04.733456 |
11 |
44391559 |
Const. of CC road from PMGSY road to Harirajpur Kalyanamandap |
200000 |
Const. of CC road from PMGSY road to Harirajpur Kalyanamandap 1 |
Completion of work |
-
latitude : 20.14523217
Longitude : 85.73826137
file name : Image_28072021123205646.png
|
2021-07-28 12:32:05.759983 |
12 |
44391431 |
MAINTENANCE OF GP MOBILE |
6000 |
MAINTENANCE OF GP MOBILE1 |
Completion of work |
-
latitude : 20.1499556
Longitude : 85.6995013
file name : Image_13082021110325872.png
|
2021-08-13 11:03:25.969455 |
13 |
44391447 |
MAINTENANCE OF GP COMPUTER |
6000 |
MAINTENANCE OF GP COMPUTER1 |
Completion of work |
-
latitude : 20.1499549
Longitude : 85.6995046
file name : Image_13082021110331118.png
|
2021-08-13 11:03:31.209648 |
14 |
44391392 |
COST OF DATA ENTRY |
6000 |
COST OF DATA ENTRY1 |
Completion of work |
-
latitude : 20.1499552
Longitude : 85.6995022
file name : Image_13082021110335672.png
|
2021-08-13 11:03:35.769187 |
15 |
44391337 |
ENERGY CHARGES OF PWS |
124763 |
ENERGY CHARGES OF PWS1 |
Completion of work |
-
latitude : 20.14562581
Longitude : 85.73788519
file name : Image_13082021110339816.png
|
2021-08-13 11:03:39.922312 |
16 |
44391290 |
SALARY OF SEM |
48000 |
SALARY OF SEM 1 |
Completion of work |
-
latitude : 20.14551555
Longitude : 85.7378762
file name : Image_31082021130750511.png
|
2021-08-31 13:07:50.605518 |
17 |
44391773 |
Repair & Maintanance of Harirajpur Pry. School |
114080 |
Repair & Maintanance of Harirajpur Pry. School1 |
Completion of work |
-
latitude : 20.144323333333332
Longitude : 85.73382166666667
file name : Image_20092021175716527.png
|
2021-09-20 17:57:16.662955 |
18 |
44391599 |
Const. of CC road from PMGSY road to Gajalaxmi Sahi road |
173391 |
Const. of CC road from PMGSY road to Gajalaxmi Sahi road1 |
Roof laid |
-
latitude : 20.146013333333332,20.14601
Longitude : 85.73555,85.73559333333333
file name : Image_16112021141753256.png
|
2021-11-16 14:17:53.378078 |
19 |
44391599 |
Const. of CC road from PMGSY road to Gajalaxmi Sahi road |
173391 |
Const. of CC road from PMGSY road to Gajalaxmi Sahi road1 |
Plinth level |
-
latitude : 20.146101666666667,20.146048333333333
Longitude : 85.73548000000001,85.73551166666667
file name : Image_16112021140947218.png
|
2021-11-16 14:09:47.349444 |
20 |
44391599 |
Const. of CC road from PMGSY road to Gajalaxmi Sahi road |
173391 |
Const. of CC road from PMGSY road to Gajalaxmi Sahi road1 |
Completion of work |
-
latitude : 20.146066666666666,20.146088333333335
Longitude : 85.73547166666667,85.73544333333332
file name : Image_16112021140442759.png
|
2021-11-16 14:04:42.870075 |
21 |
59967946 |
ELECTRIC SUPPLY TO PIPELINE PROJECT UNDER GPDP 2022 23 |
600000 |
ELECTRIC SUPPLY TO PIPELINE PROJECT UNDER GPDP 2022 231 |
Completion of work |
-
latitude : 20.145376666666667
Longitude : 85.73787166666668
file name : Image_24112022125256453.png
|
2022-11-24 12:52:56.523497 |
22 |
47712322 |
ENERGY CHARGES OF PWS |
200000 |
ENERGY CHARGES OF PWS1 |
Completion of work |
-
latitude : 20.1498986
Longitude : 85.6996259
file name : Image_04102023170604025.png
|
2023-10-04 17:06:04.082524 |
23 |
47712322 |
ENERGY CHARGES OF PWS |
200000 |
ENERGY CHARGES OF PWS1 |
Completion of work |
-
latitude : 20.145483333333335
Longitude : 85.73783666666668
file name : Image_31012022124952415.png
|
2022-01-31 12:49:52.499389 |
24 |
47596377 |
MAINTAINANCE OF COMPUTER |
6000 |
MAINTAINANCE OF COMPUTER1 |
Completion of work |
-
latitude : 20.1499059
Longitude : 85.6995819
file name : Image_18072022212049395.png
|
2022-07-18 21:20:49.477472 |
25 |
47596564 |
MAINTAINANCE OF GP MOBILE |
6000 |
MAINTAINANCE OF GP MOBILE 1 |
Completion of work |
-
latitude : 20.1499055,20.1499055
Longitude : 85.6995773,85.6995773
file name : Image_18072022212052293.png
|
2022-07-18 21:20:52.366055 |
26 |
47594605 |
COST OF DATA ENTRY |
6000 |
COST OF DATA ENTRY1 |
Completion of work |
-
latitude : 20.1499061
Longitude : 85.6995756
file name : Image_18072022212046186.png
|
2022-07-18 21:20:46.285447 |
27 |
47594605 |
COST OF DATA ENTRY |
6000 |
COST OF DATA ENTRY1 |
Completion of work |
-
latitude : 20.1499049
Longitude : 85.699579
file name : Image_18072022212055307.png
|
2022-07-18 21:20:55.39693 |
28 |
47603399 |
CONSTRUCTION OF CC ROAD AT HARIRAJPUR ON EACH SIDE OF SOMNATH TEMPLE |
117578 |
CONSTRUCTION OF CC ROAD AT HARIRAJPUR ON EACH SIDE OF SOMNATH TEMPLE1 |
Roof laid |
-
latitude : 20.14544833333333,20.145410000000002,20.145405,20.145426666666665
Longitude : 85.72883500000002,85.72882833333333,85.72882333333334,85.72883666666667
file name : Image_30092022153838035.png
|
2022-09-30 15:38:38.103512 |
29 |
47603399 |
CONSTRUCTION OF CC ROAD AT HARIRAJPUR ON EACH SIDE OF SOMNATH TEMPLE |
117578 |
CONSTRUCTION OF CC ROAD AT HARIRAJPUR ON EACH SIDE OF SOMNATH TEMPLE1 |
Plinth level |
-
latitude : 20.145500000000002,20.145480000000003,20.145441666666667
Longitude : 85.72876666666667,85.72877666666666,85.72877333333332
file name : Image_30092022152435546.png
|
2022-09-30 15:24:35.614867 |
30 |
47603399 |
CONSTRUCTION OF CC ROAD AT HARIRAJPUR ON EACH SIDE OF SOMNATH TEMPLE |
117578 |
CONSTRUCTION OF CC ROAD AT HARIRAJPUR ON EACH SIDE OF SOMNATH TEMPLE1 |
Completion of work |
-
latitude : 20.145305,20.145465
Longitude : 85.72885833333333,85.72876999999998
file name : Image_30092022151635904.png
|
2022-09-30 15:16:35.961599 |
31 |
47597971 |
CONSTRUCTION OF CC ROAD AT BANG BARIK SAHI TO SOMNATH TEMPLE |
100000 |
CONSTRUCTION OF CC ROAD AT BANG BARIK SAHI TO SOMNATH TEMPLE1 |
Roof laid |
-
latitude : 20.145523333333333
Longitude : 85.72881666666666
file name : Image_30092022153730402.png
|
2022-09-30 15:37:30.471205 |
32 |
47597971 |
CONSTRUCTION OF CC ROAD AT BANG BARIK SAHI TO SOMNATH TEMPLE |
100000 |
CONSTRUCTION OF CC ROAD AT BANG BARIK SAHI TO SOMNATH TEMPLE1 |
Plinth level |
-
latitude : 20.145438333333335
Longitude : 85.72882833333333
file name : Image_30092022152206936.png
|
2022-09-30 15:22:07.018646 |
33 |
47597971 |
CONSTRUCTION OF CC ROAD AT BANG BARIK SAHI TO SOMNATH TEMPLE |
100000 |
CONSTRUCTION OF CC ROAD AT BANG BARIK SAHI TO SOMNATH TEMPLE1 |
Completion of work |
-
latitude : 20.145546666666668
Longitude : 85.72878833333334
file name : Image_30092022151638976.png
|
2022-09-30 15:16:39.083539 |
34 |
47605187 |
CONSTRUCTION OF CC ROAD ON EACH SIDE OF MAHAVIR TEMPLE AT TARADA |
100000 |
CONSTRUCTION OF CC ROAD ON EACH SIDE OF MAHAVIR TEMPLE AT TARADA1 |
Roof laid |
-
latitude : 20.126435,20.126235,20.126226666666664
Longitude : 85.73172166666667,85.73179833333333,85.73183666666667
file name : Image_30092022145537310.png
|
2022-09-30 14:55:37.394914 |
35 |
47605187 |
CONSTRUCTION OF CC ROAD ON EACH SIDE OF MAHAVIR TEMPLE AT TARADA |
100000 |
CONSTRUCTION OF CC ROAD ON EACH SIDE OF MAHAVIR TEMPLE AT TARADA1 |
Plinth level |
-
latitude : 20.12623,20.126228333333334
Longitude : 85.73193,85.73194666666669
file name : Image_30092022145226681.png
|
2022-09-30 14:52:26.766453 |
36 |
47605187 |
CONSTRUCTION OF CC ROAD ON EACH SIDE OF MAHAVIR TEMPLE AT TARADA |
100000 |
CONSTRUCTION OF CC ROAD ON EACH SIDE OF MAHAVIR TEMPLE AT TARADA1 |
Completion of work |
-
latitude : 20.126273333333334,20.126235,20.126208333333334,20.12620666666667,20.126183333333334
Longitude : 85.73193666666666,85.73193166666667,85.73185166666666,85.73183333333333,85.73190000000001
file name : Image_30092022120359175.png
|
2022-09-30 12:03:59.240274 |
37 |
59965076 |
SALARY OF SEM UNDER GPDP 2022 23 |
48000 |
SALARY OF SEM UNDER GPDP 2022 231 |
Completion of work |
-
latitude : 20.14536
Longitude : 85.73756166666665
file name : Image_26092023134111548.png
|
2023-09-26 13:41:11.607724 |
38 |
59965076 |
SALARY OF SEM UNDER GPDP 2022 23 |
48000 |
SALARY OF SEM UNDER GPDP 2022 231 |
Completion of work |
-
latitude : 20.145606666666666
Longitude : 85.73790833333332
file name : Image_23082022135619458.png
|
2022-08-23 13:56:19.594708 |
39 |
59965076 |
SALARY OF SEM UNDER GPDP 2022 23 |
48000 |
SALARY OF SEM UNDER GPDP 2022 231 |
Completion of work |
-
latitude : 20.14561666666667
Longitude : 85.73791666666666
file name : Image_23082022135718884.png
|
2022-08-23 13:57:18.966832 |
40 |
44391711 |
Const. of CC road from PWD road to Bhoi Sahi |
100000 |
Const. of CC road from PWD road to Bhoi Sahi 1 |
Roof laid |
-
latitude : 20.149221666666666,20.149206666666664,20.149205
Longitude : 85.73379500000001,85.73375666666668,85.73374666666665
file name : Image_30112022155346097.png
|
2022-11-30 15:53:46.171111 |
41 |
44391711 |
Const. of CC road from PWD road to Bhoi Sahi |
100000 |
Const. of CC road from PWD road to Bhoi Sahi 1 |
Plinth level |
-
latitude : 20.149178333333335,20.149171666666668
Longitude : 85.73382000000001,85.73382000000001
file name : Image_30112022154012121.png
|
2022-11-30 15:40:12.209766 |
42 |
44391711 |
Const. of CC road from PWD road to Bhoi Sahi |
100000 |
Const. of CC road from PWD road to Bhoi Sahi 1 |
Completion of work |
-
latitude : 20.149396666666668,20.149093333333333,20.149133333333335
Longitude : 85.733675,85.73370500000001,85.73376000000002
file name : Image_30112022152511511.png
|
2022-11-30 15:25:11.572254 |
43 |
44391623 |
Const. of CC road from Utarani Mandir to Harijansahi |
100000 |
Const. of CC road from Utarani Mandir to Harijansahi1 |
Roof laid |
-
latitude : 20.149163333333334,20.14978166666667,20.149765
Longitude : 85.73380666666665,85.73375833333333,85.73375
file name : Image_30112022155349380.png
|
2022-11-30 15:53:49.490069 |
44 |
44391623 |
Const. of CC road from Utarani Mandir to Harijansahi |
100000 |
Const. of CC road from Utarani Mandir to Harijansahi1 |
Plinth level |
-
latitude : 20.149771666666666,20.149725
Longitude : 85.73374666666665,85.73363166666668
file name : Image_30112022154008737.png
|
2022-11-30 15:40:08.825828 |
45 |
44391623 |
Const. of CC road from Utarani Mandir to Harijansahi |
100000 |
Const. of CC road from Utarani Mandir to Harijansahi1 |
Completion of work |
-
latitude : 20.149723333333334,20.149715
Longitude : 85.73368,85.73370333333332
file name : Image_30112022152508155.png
|
2022-11-30 15:25:08.223394 |
46 |
47595807 |
SOCIAL AUDIT GRAM SABHA |
18000 |
SOCIAL AUDIT GRAM SABHA1 |
Completion of work |
-
latitude : 20.1499023
Longitude : 85.6995853
file name : Image_30112022201601063.png
|
2022-11-30 20:16:01.121784 |
47 |
47598278 |
CONSTRUCTION OF CC ROAD FROM DAKA GHARA TO BABUA GHARA CHHAK AT HARIRAJPUR |
100000 |
CONSTRUCTION OF CC ROAD FROM DAKA GHARA TO BABUA GHARA CHHAK AT HARIRAJPUR1 |
Roof laid |
-
latitude : 20.147301666666667
Longitude : 85.72980000000001
file name : Image_25122022165705604.png
|
2022-12-25 16:57:05.684597 |
48 |
47598278 |
CONSTRUCTION OF CC ROAD FROM DAKA GHARA TO BABUA GHARA CHHAK AT HARIRAJPUR |
100000 |
CONSTRUCTION OF CC ROAD FROM DAKA GHARA TO BABUA GHARA CHHAK AT HARIRAJPUR1 |
Roof laid |
-
latitude : 20.147308333333335
Longitude : 85.72975666666667
file name : Image_25122022165702760.png
|
2022-12-25 16:57:02.850149 |
49 |
47598278 |
CONSTRUCTION OF CC ROAD FROM DAKA GHARA TO BABUA GHARA CHHAK AT HARIRAJPUR |
100000 |
CONSTRUCTION OF CC ROAD FROM DAKA GHARA TO BABUA GHARA CHHAK AT HARIRAJPUR1 |
Roof laid |
-
latitude : 20.147251666666666
Longitude : 85.72963166666665
file name : Image_25122022165659745.png
|
2022-12-25 16:56:59.806061 |
50 |
47598278 |
CONSTRUCTION OF CC ROAD FROM DAKA GHARA TO BABUA GHARA CHHAK AT HARIRAJPUR |
100000 |
CONSTRUCTION OF CC ROAD FROM DAKA GHARA TO BABUA GHARA CHHAK AT HARIRAJPUR1 |
Plinth level |
-
latitude : 20.147238333333334
Longitude : 85.72969666666668
file name : Image_25122022164007380.png
|
2022-12-25 16:40:07.462171 |
51 |
47598278 |
CONSTRUCTION OF CC ROAD FROM DAKA GHARA TO BABUA GHARA CHHAK AT HARIRAJPUR |
100000 |
CONSTRUCTION OF CC ROAD FROM DAKA GHARA TO BABUA GHARA CHHAK AT HARIRAJPUR1 |
Completion of work |
-
latitude : 20.147221666666667
Longitude : 85.72982166666667
file name : Image_25122022163625198.png
|
2022-12-25 16:36:25.29812 |
52 |
47686164 |
CONSTRUCTION OF CC ROAD AT HARIRAJPUR RANASINGH SAHI |
72671 |
CONSTRUCTION OF CC ROAD AT HARIRAJPUR RANASINGH SAHI1 |
Roof laid |
-
latitude : 20.147323333333336
Longitude : 85.73405333333334
file name : Image_01022023150020293.png
|
2023-02-01 15:00:20.370698 |
53 |
47686164 |
CONSTRUCTION OF CC ROAD AT HARIRAJPUR RANASINGH SAHI |
72671 |
CONSTRUCTION OF CC ROAD AT HARIRAJPUR RANASINGH SAHI1 |
Plinth level |
-
latitude : 20.147161666666666
Longitude : 85.73405166666667
file name : Image_01022023145640191.png
|
2023-02-01 14:56:40.26653 |
54 |
47686164 |
CONSTRUCTION OF CC ROAD AT HARIRAJPUR RANASINGH SAHI |
72671 |
CONSTRUCTION OF CC ROAD AT HARIRAJPUR RANASINGH SAHI1 |
Completion of work |
-
latitude : 20.147168333333333
Longitude : 85.73403333333333
file name : Image_01022023135152292.png
|
2023-02-01 13:51:52.361615 |
55 |
59974918 |
CONSTRUCTION OF TUBEWELL PLATFORM AT HARIRAJPUR WARD NO 5 UNDER GPDP 2022 23 |
18000 |
CONSTRUCTION OF TUBEWELL PLATFORM AT HARIRAJPUR WARD NO 5 UNDER GPDP 2022 231 |
Plinth level |
-
latitude : 20.146093333333333
Longitude : 85.73538166666667
file name : Image_04052023144734215.png
|
2023-05-04 14:47:34.328199 |
56 |
59974918 |
CONSTRUCTION OF TUBEWELL PLATFORM AT HARIRAJPUR WARD NO 5 UNDER GPDP 2022 23 |
18000 |
CONSTRUCTION OF TUBEWELL PLATFORM AT HARIRAJPUR WARD NO 5 UNDER GPDP 2022 231 |
Roof laid |
-
latitude : 20.146025
Longitude : 85.73551666666665
file name : Image_06052023122417824.png
|
2023-05-06 12:24:17.901846 |
57 |
59974918 |
CONSTRUCTION OF TUBEWELL PLATFORM AT HARIRAJPUR WARD NO 5 UNDER GPDP 2022 23 |
18000 |
CONSTRUCTION OF TUBEWELL PLATFORM AT HARIRAJPUR WARD NO 5 UNDER GPDP 2022 231 |
Plinth level |
-
latitude : 20.146091666666667
Longitude : 85.73542
file name : Image_02052023114559469.png
|
2023-05-02 11:45:59.532285 |
58 |
59974918 |
CONSTRUCTION OF TUBEWELL PLATFORM AT HARIRAJPUR WARD NO 5 UNDER GPDP 2022 23 |
18000 |
CONSTRUCTION OF TUBEWELL PLATFORM AT HARIRAJPUR WARD NO 5 UNDER GPDP 2022 231 |
Completion of work |
-
latitude : 20.146046666666667
Longitude : 85.73546166666665
file name : Image_01052023122002373.png
|
2023-05-01 12:20:02.495207 |
59 |
59974918 |
CONSTRUCTION OF TUBEWELL PLATFORM AT HARIRAJPUR WARD NO 5 UNDER GPDP 2022 23 |
18000 |
CONSTRUCTION OF TUBEWELL PLATFORM AT HARIRAJPUR WARD NO 5 UNDER GPDP 2022 231 |
Completion of work |
-
latitude : 20.146093333333333
Longitude : 85.73540833333333
file name : Image_27042023132834402.png
|
2023-04-27 13:28:34.486704 |
60 |
47603725 |
CONSTRUCTION OF CC ROAD AT PWD ROAD TO RI OFFICE |
150000 |
CONSTRUCTION OF CC ROAD AT PWD ROAD TO RI OFFICE 1 |
Roof laid |
-
latitude : 20.149545,20.149535
Longitude : 85.72962333333335,85.72957999999998
file name : Image_04052023144737769.png
|
2023-05-04 14:47:37.836734 |
61 |
47603725 |
CONSTRUCTION OF CC ROAD AT PWD ROAD TO RI OFFICE |
150000 |
CONSTRUCTION OF CC ROAD AT PWD ROAD TO RI OFFICE 1 |
Plinth level |
-
latitude : 20.149565,20.14957666666667,20.149588333333334
Longitude : 85.72974833333335,85.72973166666667,85.72972499999999
file name : Image_02052023113827592.png
|
2023-05-02 11:38:27.703474 |
62 |
47603725 |
CONSTRUCTION OF CC ROAD AT PWD ROAD TO RI OFFICE |
150000 |
CONSTRUCTION OF CC ROAD AT PWD ROAD TO RI OFFICE 1 |
Completion of work |
-
latitude : 20.14967,20.14964666666667
Longitude : 85.72975166666666,85.72975
file name : Image_01052023123625403.png
|
2023-05-01 12:36:25.470036 |
63 |
47603725 |
CONSTRUCTION OF CC ROAD AT PWD ROAD TO RI OFFICE |
150000 |
CONSTRUCTION OF CC ROAD AT PWD ROAD TO RI OFFICE 1 |
Completion of work |
-
latitude : 20.149716666666666,20.149716666666666,20.149706666666667
Longitude : 85.72966833333334,85.72965666666666,85.729665
file name : Image_01052023103139691.png
|
2023-05-01 10:31:39.873838 |
64 |
47604444 |
CONSTRUCTION OF CC ROAD FROM SUBASH BARIK HOUSE TO PMGSY ROAD VIA MANGULI BARIK GHARA AT HARIRAJPUR |
100000 |
CONSTRUCTION OF CC ROAD FROM SUBASH BARIK HOUSE TO PMGSY ROAD VIA MANGULI BARIK GHARA AT HARIRAJPUR1 |
Roof laid |
-
latitude : 20.146045,20.146038333333333,20.14609,20.146093333333333
Longitude : 85.73517333333332,85.735165,85.73516833333333,85.73515
file name : Image_01052023121953781.png
|
2023-05-01 12:19:53.845784 |
65 |
47604444 |
CONSTRUCTION OF CC ROAD FROM SUBASH BARIK HOUSE TO PMGSY ROAD VIA MANGULI BARIK GHARA AT HARIRAJPUR |
100000 |
CONSTRUCTION OF CC ROAD FROM SUBASH BARIK HOUSE TO PMGSY ROAD VIA MANGULI BARIK GHARA AT HARIRAJPUR1 |
Roof laid |
-
latitude : 20.146045,20.146038333333333,20.14609,20.146093333333333
Longitude : 85.73517333333332,85.735165,85.73516833333333,85.73515
file name : Image_01052023122008595.png
|
2023-05-01 12:20:08.660342 |
66 |
47604444 |
CONSTRUCTION OF CC ROAD FROM SUBASH BARIK HOUSE TO PMGSY ROAD VIA MANGULI BARIK GHARA AT HARIRAJPUR |
100000 |
CONSTRUCTION OF CC ROAD FROM SUBASH BARIK HOUSE TO PMGSY ROAD VIA MANGULI BARIK GHARA AT HARIRAJPUR1 |
Plinth level |
-
latitude : 20.146081666666664,20.146118333333334,20.14614
Longitude : 85.73520333333333,85.735165,85.73515333333334
file name : Image_01052023110644165.png
|
2023-05-01 11:06:44.238467 |
67 |
47604444 |
CONSTRUCTION OF CC ROAD FROM SUBASH BARIK HOUSE TO PMGSY ROAD VIA MANGULI BARIK GHARA AT HARIRAJPUR |
100000 |
CONSTRUCTION OF CC ROAD FROM SUBASH BARIK HOUSE TO PMGSY ROAD VIA MANGULI BARIK GHARA AT HARIRAJPUR1 |
Plinth level |
-
latitude : 20.146128333333333,20.146128333333333
Longitude : 85.73514833333333,85.73514833333333
file name : Image_01052023110653515.png
|
2023-05-01 11:06:53.573386 |
68 |
47604444 |
CONSTRUCTION OF CC ROAD FROM SUBASH BARIK HOUSE TO PMGSY ROAD VIA MANGULI BARIK GHARA AT HARIRAJPUR |
100000 |
CONSTRUCTION OF CC ROAD FROM SUBASH BARIK HOUSE TO PMGSY ROAD VIA MANGULI BARIK GHARA AT HARIRAJPUR1 |
Completion of work |
-
latitude : 20.146111666666666,20.145868333333333
Longitude : 85.73515333333334,85.73505500000002
file name : Image_27042023132828142.png
|
2023-04-27 13:28:28.47449 |
69 |
47836139 |
CONSTRUCTION OF ROAD FROM GAJALAXMI PMGSY ROAD TO MELANA PADIA |
100000 |
CONSTRUCTION OF ROAD FROM GAJALAXMI PMGSY ROAD TO MELANA PADIA1 |
Roof laid |
-
latitude : 20.14519
Longitude : 85.73612333333334
file name : Image_27072023101716712.png
|
2023-07-27 10:17:16.781881 |
70 |
47836139 |
CONSTRUCTION OF ROAD FROM GAJALAXMI PMGSY ROAD TO MELANA PADIA |
100000 |
CONSTRUCTION OF ROAD FROM GAJALAXMI PMGSY ROAD TO MELANA PADIA1 |
Roof laid |
-
latitude : 20.145201666666665
Longitude : 85.73607333333332
file name : Image_27072023101719499.png
|
2023-07-27 10:17:19.588305 |
71 |
47836139 |
CONSTRUCTION OF ROAD FROM GAJALAXMI PMGSY ROAD TO MELANA PADIA |
100000 |
CONSTRUCTION OF ROAD FROM GAJALAXMI PMGSY ROAD TO MELANA PADIA1 |
Roof laid |
-
latitude : 20.145148333333335
Longitude : 85.73610333333333
file name : Image_27072023101722433.png
|
2023-07-27 10:17:22.525563 |
72 |
47836139 |
CONSTRUCTION OF ROAD FROM GAJALAXMI PMGSY ROAD TO MELANA PADIA |
100000 |
CONSTRUCTION OF ROAD FROM GAJALAXMI PMGSY ROAD TO MELANA PADIA1 |
Plinth level |
-
latitude : 20.145343333333336
Longitude : 85.73592833333332
file name : Image_06052023144429578.png
|
2023-05-06 14:44:29.630947 |
73 |
47836139 |
CONSTRUCTION OF ROAD FROM GAJALAXMI PMGSY ROAD TO MELANA PADIA |
100000 |
CONSTRUCTION OF ROAD FROM GAJALAXMI PMGSY ROAD TO MELANA PADIA1 |
Completion of work |
-
latitude : 20.145168333333334
Longitude : 85.73605666666666
file name : Image_06052023143844525.png
|
2023-05-06 14:38:44.618648 |
74 |
60018787 |
DEVELOPMENT OF RURAL PARK AT HARIRAJPUR UNDER GPDP 2022 23 |
500000 |
DEVELOPMENT OF RURAL PARK AT HARIRAJPUR UNDER GPDP 2022 231 |
Roof laid |
-
latitude : 20.143713333333334,20.143718333333332,20.143723333333334,20.143725
Longitude : 85.73016166666666,85.73015833333332,85.73013999999999,85.730135
file name : Image_29072023155601649.png
|
2023-07-29 15:56:01.721971 |
75 |
60018787 |
DEVELOPMENT OF RURAL PARK AT HARIRAJPUR UNDER GPDP 2022 23 |
500000 |
DEVELOPMENT OF RURAL PARK AT HARIRAJPUR UNDER GPDP 2022 231 |
Plinth level |
-
latitude : 20.143831666666664,20.143821666666668
Longitude : 85.73024,85.73022666666665
file name : Image_29072023154651259.png
|
2023-07-29 15:46:51.323304 |
76 |
60018787 |
DEVELOPMENT OF RURAL PARK AT HARIRAJPUR UNDER GPDP 2022 23 |
500000 |
DEVELOPMENT OF RURAL PARK AT HARIRAJPUR UNDER GPDP 2022 231 |
Completion of work |
-
latitude : 20.144448333333333,20.144445,20.14443,20.144471666666668,20.144536666666667
Longitude : 85.73026,85.73025833333334,85.73029833333334,85.73015833333332,85.73028166666667
file name : Image_29072023153725861.png
|
2023-07-29 15:37:25.928355 |
77 |
60018787 |
DEVELOPMENT OF RURAL PARK AT HARIRAJPUR UNDER GPDP 2022 23 |
500000 |
DEVELOPMENT OF RURAL PARK AT HARIRAJPUR UNDER GPDP 2022 231 |
Plinth level |
-
latitude : 20.143745000000003,20.1462482,20.14373833333333,20.143761666666666
Longitude : 85.73020666666667,85.7309276,85.73020666666667,85.73021666666666
file name : Image_29072023154413478.png
|
2023-07-29 15:44:13.539167 |
78 |
60018787 |
DEVELOPMENT OF RURAL PARK AT HARIRAJPUR UNDER GPDP 2022 23 |
500000 |
DEVELOPMENT OF RURAL PARK AT HARIRAJPUR UNDER GPDP 2022 231 |
Completion of work |
-
latitude : 20.144493333333333,20.144478333333332
Longitude : 85.7302,85.73024500000001
file name : Image_28072023155724515.png
|
2023-07-28 15:57:24.577153 |
79 |
44391376 |
REPAIR MAINTENANCE OF PIPELINE MOTOR AND PUMP HOUSE |
100000 |
REPAIR MAINTENANCE OF PIPELINE MOTOR AND PUMP HOUSE1 |
Plinth level |
-
latitude : 20.145445
Longitude : 85.73785833333335
file name : Image_10082023131343761.png
|
2023-08-10 13:13:43.829341 |
80 |
44391376 |
REPAIR MAINTENANCE OF PIPELINE MOTOR AND PUMP HOUSE |
100000 |
REPAIR MAINTENANCE OF PIPELINE MOTOR AND PUMP HOUSE1 |
Completion of work |
-
latitude : 20.1498786
Longitude : 85.6996271
file name : Image_10082023124129493.png
|
2023-08-10 12:41:29.556853 |
81 |
82702851 |
Tap water connections to households |
446279 |
Tap water connections to households1 |
Plinth level |
-
latitude : 20.1498976
Longitude : 85.6996249
file name : Image_04102023225817984.png
|
2023-10-04 22:58:18.062848 |
82 |
82702851 |
Tap water connections to households |
446279 |
Tap water connections to households1 |
Completion of work |
-
latitude : 20.14985666666667
Longitude : 85.69927000000001
file name : Image_04102023225153991.png
|
2023-10-04 22:51:54.049481 |
83 |
60016081 |
IMPROVEMENT OF GOLAPADA ANGANWADI CENTREUNDER GPDP 2022 23 |
181882 |
IMPROVEMENT OF GOLAPADA ANGANWADI CENTREUNDER GPDP 2022 231 |
Roof laid |
-
latitude : 20.123675
Longitude : 85.73930333333334
file name : Image_22092023164532830.png
|
2023-09-22 16:45:32.895021 |
84 |
60016081 |
IMPROVEMENT OF GOLAPADA ANGANWADI CENTREUNDER GPDP 2022 23 |
181882 |
IMPROVEMENT OF GOLAPADA ANGANWADI CENTREUNDER GPDP 2022 231 |
Plinth level |
-
latitude : 20.12377
Longitude : 85.73932666666666
file name : Image_22092023162521256.png
|
2023-09-22 16:25:21.318617 |
85 |
60016081 |
IMPROVEMENT OF GOLAPADA ANGANWADI CENTREUNDER GPDP 2022 23 |
181882 |
IMPROVEMENT OF GOLAPADA ANGANWADI CENTREUNDER GPDP 2022 231 |
Completion of work |
-
latitude : 20.12374833333333
Longitude : 85.73936499999999
file name : Image_18092023173200519.png
|
2023-09-18 17:32:00.566778 |
86 |
47715191 |
CONST OF CC ROAD AT RAMMANDIR HARIRAJPUR |
100000 |
CONST OF CC ROAD AT RAMMANDIR HARIRAJPUR1 |
Roof laid |
-
latitude : 20.14553
Longitude : 85.73180499999998
file name : Image_26092023133156145.png
|
2023-09-26 13:31:56.199041 |
87 |
47715191 |
CONST OF CC ROAD AT RAMMANDIR HARIRAJPUR |
100000 |
CONST OF CC ROAD AT RAMMANDIR HARIRAJPUR1 |
Roof laid |
-
latitude : 20.145513333333334
Longitude : 85.73182333333334
file name : Image_26092023133150185.png
|
2023-09-26 13:31:50.242682 |
88 |
47715191 |
CONST OF CC ROAD AT RAMMANDIR HARIRAJPUR |
100000 |
CONST OF CC ROAD AT RAMMANDIR HARIRAJPUR1 |
Plinth level |
-
latitude : 20.145505
Longitude : 85.73182
file name : Image_22092023125425764.png
|
2023-09-22 12:54:25.837751 |
89 |
47715191 |
CONST OF CC ROAD AT RAMMANDIR HARIRAJPUR |
100000 |
CONST OF CC ROAD AT RAMMANDIR HARIRAJPUR1 |
Completion of work |
-
latitude : 20.145609999999998
Longitude : 85.73179499999999
file name : Image_18092023175918165.png
|
2023-09-18 17:59:18.216037 |
90 |
47593545 |
SALARY OF SEM |
48000 |
SALARY OF SEM1 |
Completion of work |
-
latitude : 20.1498954
Longitude : 85.699627
file name : Image_04102023140325502.png
|
2023-10-04 14:03:25.761399 |
91 |
47593545 |
SALARY OF SEM |
48000 |
SALARY OF SEM1 |
Completion of work |
-
latitude : 20.1498976
Longitude : 85.6996249
file name : Image_04102023140321163.png
|
2023-10-04 14:03:22.159563 |
92 |
60014973 |
IMPROVEMENT OF SOMNATHDEV 5 T SCHOOL UNDER GPDP 2022 23 |
470000 |
IMPROVEMENT OF SOMNATHDEV 5 T SCHOOL UNDER GPDP 2022 231 |
Roof laid |
-
latitude : 20.147353333333335
Longitude : 85.74036333333333
file name : Image_31012024155853280.png
|
2024-01-31 15:58:53.332111 |
93 |
60014973 |
IMPROVEMENT OF SOMNATHDEV 5 T SCHOOL UNDER GPDP 2022 23 |
470000 |
IMPROVEMENT OF SOMNATHDEV 5 T SCHOOL UNDER GPDP 2022 231 |
Roof laid |
-
latitude : 20.14735166666667
Longitude : 85.74032333333335
file name : Image_31012024154922730.png
|
2024-01-31 15:49:22.780669 |
94 |
60014973 |
IMPROVEMENT OF SOMNATHDEV 5 T SCHOOL UNDER GPDP 2022 23 |
470000 |
IMPROVEMENT OF SOMNATHDEV 5 T SCHOOL UNDER GPDP 2022 231 |
Plinth level |
-
latitude : 20.147375
Longitude : 85.74035166666665
file name : Image_31012024154427449.png
|
2024-01-31 15:44:27.505033 |
95 |
60014973 |
IMPROVEMENT OF SOMNATHDEV 5 T SCHOOL UNDER GPDP 2022 23 |
470000 |
IMPROVEMENT OF SOMNATHDEV 5 T SCHOOL UNDER GPDP 2022 231 |
Completion of work |
-
latitude : 20.147361666666665
Longitude : 85.74031166666667
file name : Image_31012024153819968.png
|
2024-01-31 15:38:20.033027 |
96 |
60014973 |
IMPROVEMENT OF SOMNATHDEV 5 T SCHOOL UNDER GPDP 2022 23 |
470000 |
IMPROVEMENT OF SOMNATHDEV 5 T SCHOOL UNDER GPDP 2022 231 |
Completion of work |
-
latitude : 20.147735
Longitude : 85.74055166666668
file name : Image_31012024153015815.png
|
2024-01-31 15:30:15.880673 |
97 |
59972521 |
MAINTAINANCE OF GP MOBILE UNDER GPDP 2022 23 |
6000 |
MAINTAINANCE OF GP MOBILE UNDER GPDP 2022 231 |
Completion of work |
-
latitude : 20.1498501
Longitude : 85.6996116
file name : Image_30112023211745721.png
|
2023-11-30 21:17:45.783557 |
98 |
59971617 |
COST OF DATA ENTRY UNDER GPDP 2022 23 |
6000 |
COST OF DATA ENTRY UNDER GPDP 2022 231 |
Completion of work |
-
latitude : 20.1498509
Longitude : 85.6996102
file name : Image_30112023211737995.png
|
2023-11-30 21:17:38.059002 |
99 |
59987780 |
MAINTAINANCE OF COMPUTER UNDER GPDP 2022 23 |
6000 |
MAINTAINANCE OF COMPUTER UNDER GPDP 2022 231 |
Completion of work |
-
latitude : 20.1498511
Longitude : 85.6996107
file name : Image_30112023211754615.png
|
2023-11-30 21:17:54.67506 |
100 |
75576589 |
Installation of Street Lights |
226723 |
Installation of Street Lights1 |
Completion of work |
-
latitude : 20.149998333333333
Longitude : 85.69926833333332
file name : Image_30112023211730160.png
|
2023-11-30 21:17:30.220237 |
101 |
82845949 |
Maintenance of Water treatment plant |
150000 |
Maintenance of Water treatment plant1 |
Completion of work |
-
latitude : 20.1499221
Longitude : 85.6994961
file name : Image_29032024230505394.png
|
2024-03-29 23:05:05.447974 |
102 |
47604806 |
CONSTRUCTION OF CC ROAD FROM GOLAPADA DANDA TO ROAD TO MAHAVIR ROAD |
100000 |
CONSTRUCTION OF CC ROAD FROM GOLAPADA DANDA TO ROAD TO MAHAVIR ROAD1 |
Roof laid |
-
latitude : 20.12801165,20.12799211
Longitude : 85.73781351,85.73781895
file name : Image_12072024154406851.png
|
2024-07-12 15:44:06.941049 |
103 |
47604806 |
CONSTRUCTION OF CC ROAD FROM GOLAPADA DANDA TO ROAD TO MAHAVIR ROAD |
100000 |
CONSTRUCTION OF CC ROAD FROM GOLAPADA DANDA TO ROAD TO MAHAVIR ROAD1 |
Roof laid |
-
latitude : 20.12801617,20.1280097,20.12800901
Longitude : 85.73782418,85.73782012,85.73781812
file name : Image_12072024154650529.png
|
2024-07-12 15:46:50.625778 |
104 |
47604806 |
CONSTRUCTION OF CC ROAD FROM GOLAPADA DANDA TO ROAD TO MAHAVIR ROAD |
100000 |
CONSTRUCTION OF CC ROAD FROM GOLAPADA DANDA TO ROAD TO MAHAVIR ROAD1 |
Plinth level |
-
latitude : 20.12801414,20.12801446
Longitude : 85.73782313,85.73782328
file name : Image_12072024153435185.png
|
2024-07-12 15:34:35.272747 |
105 |
47604806 |
CONSTRUCTION OF CC ROAD FROM GOLAPADA DANDA TO ROAD TO MAHAVIR ROAD |
100000 |
CONSTRUCTION OF CC ROAD FROM GOLAPADA DANDA TO ROAD TO MAHAVIR ROAD1 |
Completion of work |
-
latitude : 20.12794202,20.12794343
Longitude : 85.73776137,85.73775774
file name : Image_12072024152917819.png
|
2024-07-12 15:29:17.927474 |
106 |
75576711 |
Piped drinking water to public institutions |
30000 |
Piped drinking water to public institutions1 |
|
-
latitude : 20.1499103
Longitude : 85.69955
file name : Image_12072024231658199.png
|
2024-07-12 23:16:58.292209 |
107 |
79166169 |
Construction of Gym and Youth Club |
150000 |
Construction of Gym and Youth Club1 |
Roof laid |
-
latitude : 20.131515
Longitude : 85.74356666666667
file name : Image_29102024140717748.png
|
2024-10-29 14:07:17.890838 |
108 |
79166169 |
Construction of Gym and Youth Club |
150000 |
Construction of Gym and Youth Club1 |
Plinth level |
-
latitude : 20.131745000000002
Longitude : 85.74370666666667
file name : Image_29102024135606371.png
|
2024-10-29 13:56:06.420859 |
109 |
79166169 |
Construction of Gym and Youth Club |
150000 |
Construction of Gym and Youth Club1 |
Completion of work |
-
latitude : 20.13158333333333
Longitude : 85.74360499999999
file name : Image_10102024065903267.png
|
2024-10-10 06:59:03.139697 |
110 |
47605521 |
CONSTRUCTION OF CC ROAD AT HARIRAJPUR MELANA PADIA KALYANI MANDAP ON BOTH SIDE |
100000 |
CONSTRUCTION OF CC ROAD AT HARIRAJPUR MELANA PADIA KALYANI MANDAP ON BOTH SIDE1 |
Roof laid |
-
latitude : 20.14351333333333,20.14350166666667,20.143505
Longitude : 85.73726166666665,85.73726,85.73726666666668
file name : Image_29102024133126599.png
|
2024-10-29 13:31:26.686213 |
111 |
47605521 |
CONSTRUCTION OF CC ROAD AT HARIRAJPUR MELANA PADIA KALYANI MANDAP ON BOTH SIDE |
100000 |
CONSTRUCTION OF CC ROAD AT HARIRAJPUR MELANA PADIA KALYANI MANDAP ON BOTH SIDE1 |
Plinth level |
-
latitude : 20.143616666666667,20.143471666666667,20.14345666666667,20.143465,20.1490111
Longitude : 85.73719666666666,85.73713833333335,85.73714666666667,85.73712666666667,85.7376602
file name : Image_29102024130300989.png
|
2024-10-29 13:03:01.103343 |
112 |
47605521 |
CONSTRUCTION OF CC ROAD AT HARIRAJPUR MELANA PADIA KALYANI MANDAP ON BOTH SIDE |
100000 |
CONSTRUCTION OF CC ROAD AT HARIRAJPUR MELANA PADIA KALYANI MANDAP ON BOTH SIDE1 |
Completion of work |
-
latitude : 20.143469999999997,20.143478333333334,20.14346833333333
Longitude : 85.73717666666668,85.73741,85.73745500000001
file name : Image_10102024074033375.png
|
2024-10-10 07:40:33.436853 |
113 |
82705587 |
Construction works relating to revival of traditional Ponds / Tanks |
150000 |
Construction works relating to revival of traditional Ponds / Tanks1 |
Roof laid |
-
latitude : 20.14411,20.144101666666664,20.14405
Longitude : 85.74723333333334,85.74722333333332,85.74723
file name : Image_16082024141424719.png
|
2024-08-16 14:14:24.777367 |
114 |
82705587 |
Construction works relating to revival of traditional Ponds / Tanks |
150000 |
Construction works relating to revival of traditional Ponds / Tanks1 |
Roof laid |
-
latitude : 20.144115,20.144115,20.14410333333333,20.144093333333334,20.144086666666666
Longitude : 85.74725333333332,85.74725333333332,85.74721166666669,85.74718166666668,85.74716333333332
file name : Image_16082024140923220.png
|
2024-08-16 14:09:23.279875 |
115 |
82705587 |
Construction works relating to revival of traditional Ponds / Tanks |
150000 |
Construction works relating to revival of traditional Ponds / Tanks1 |
Plinth level |
-
latitude : 20.144099999999998,20.144099999999998,20.144116666666665,20.14412666666667,20.144285,20.144248333333334
Longitude : 85.74721333333333,85.74721333333333,85.74722166666668,85.747215,85.74712833333334,85.74716166666667
file name : Image_16082024134224515.png
|
2024-08-16 13:42:24.579416 |
116 |
82705587 |
Construction works relating to revival of traditional Ponds / Tanks |
150000 |
Construction works relating to revival of traditional Ponds / Tanks1 |
Completion of work |
-
latitude : 20.14422666666667,20.144246666666668,20.14422,20.144221666666667,20.14428666666667
Longitude : 85.747235,85.74723,85.74722166666668,85.747265,85.74728166666667
file name : Image_15082024114124160.png
|
2024-08-15 11:41:24.211597 |
117 |
60017078 |
IMPROVEMENT OF HARIRAJPUR KALYAN MANDAP KITCHEN UNDER GPDP 2022 23 |
120000 |
IMPROVEMENT OF HARIRAJPUR KALYAN MANDAP KITCHEN UNDER GPDP 2022 231 |
Roof laid |
-
latitude : 20.145321666666668
Longitude : 85.73785666666666
file name : Image_16082024131617220.png
|
2024-08-16 13:16:17.271307 |
118 |
60017078 |
IMPROVEMENT OF HARIRAJPUR KALYAN MANDAP KITCHEN UNDER GPDP 2022 23 |
120000 |
IMPROVEMENT OF HARIRAJPUR KALYAN MANDAP KITCHEN UNDER GPDP 2022 231 |
Roof laid |
-
latitude : 20.144986666666668
Longitude : 85.73753
file name : Image_16082024131201981.png
|
2024-08-16 13:12:02.037033 |
119 |
60017078 |
IMPROVEMENT OF HARIRAJPUR KALYAN MANDAP KITCHEN UNDER GPDP 2022 23 |
120000 |
IMPROVEMENT OF HARIRAJPUR KALYAN MANDAP KITCHEN UNDER GPDP 2022 231 |
Plinth level |
-
latitude : 20.145263333333332
Longitude : 85.73781333333334
file name : Image_16082024125501781.png
|
2024-08-16 12:55:01.848151 |
120 |
60017078 |
IMPROVEMENT OF HARIRAJPUR KALYAN MANDAP KITCHEN UNDER GPDP 2022 23 |
120000 |
IMPROVEMENT OF HARIRAJPUR KALYAN MANDAP KITCHEN UNDER GPDP 2022 231 |
Completion of work |
-
latitude : 20.145251666666663
Longitude : 85.73784499999998
file name : Image_16082024125139540.png
|
2024-08-16 12:51:39.601083 |
121 |
60017078 |
IMPROVEMENT OF HARIRAJPUR KALYAN MANDAP KITCHEN UNDER GPDP 2022 23 |
120000 |
IMPROVEMENT OF HARIRAJPUR KALYAN MANDAP KITCHEN UNDER GPDP 2022 231 |
Completion of work |
-
latitude : 20.14529
Longitude : 85.73790499999998
file name : Image_16082024123022045.png
|
2024-08-16 12:30:22.09602 |
122 |
101305306 |
Electricity Connection/ Electricity bill payment in Gram Panchayat Bhawan |
108080 |
Electricity Connection/ Electricity bill payment in Gram Panchayat Bhawan1 |
Completion of work |
-
latitude : 20.0773106
Longitude : 85.7367586
file name : Image_14082024131821092.png
|
2024-08-14 13:18:21.153478 |
123 |
63489480 |
IMPLEMENTATION OF SOLID WASTE MAGEMENT IN HARIRAJPUR GP |
442200 |
IMPLEMENTATION OF SOLID WASTE MAGEMENT IN HARIRAJPUR GP1 |
Completion of work |
-
latitude : 20.143520000000002
Longitude : 85.73563166666666
file name : Image_31012024161005330.png
|
2024-01-31 16:10:05.403128 |
124 |
63489480 |
IMPLEMENTATION OF SOLID WASTE MAGEMENT IN HARIRAJPUR GP |
442200 |
IMPLEMENTATION OF SOLID WASTE MAGEMENT IN HARIRAJPUR GP2 |
Plinth level |
-
latitude : 20.141988333333334
Longitude : 85.73780333333335
file name : Image_30042024092035330.png
|
2024-04-30 09:20:35.43447 |
125 |
63489480 |
IMPLEMENTATION OF SOLID WASTE MAGEMENT IN HARIRAJPUR GP |
442200 |
IMPLEMENTATION OF SOLID WASTE MAGEMENT IN HARIRAJPUR GP2 |
Completion of work |
-
latitude : 20.14349
Longitude : 85.73565166666667
file name : Image_31012024161009011.png
|
2024-01-31 16:10:09.076971 |
126 |
63489480 |
IMPLEMENTATION OF SOLID WASTE MAGEMENT IN HARIRAJPUR GP |
442200 |
IMPLEMENTATION OF SOLID WASTE MAGEMENT IN HARIRAJPUR GP3 |
Plinth level |
-
latitude : 20.143494999999998
Longitude : 85.73563
file name : Image_31012024171608203.png
|
2024-01-31 17:16:08.261803 |
127 |
63489480 |
IMPLEMENTATION OF SOLID WASTE MAGEMENT IN HARIRAJPUR GP |
442200 |
IMPLEMENTATION OF SOLID WASTE MAGEMENT IN HARIRAJPUR GP3 |
Completion of work |
-
latitude : 20.143533333333334
Longitude : 85.73565500000001
file name : Image_31012024161012526.png
|
2024-01-31 16:10:12.583775 |
128 |
63489480 |
IMPLEMENTATION OF SOLID WASTE MAGEMENT IN HARIRAJPUR GP |
442200 |
IMPLEMENTATION OF SOLID WASTE MAGEMENT IN HARIRAJPUR GP4 |
Completion of work |
-
latitude : 20.143528333333332
Longitude : 85.73566000000001
file name : Image_31012024161015999.png
|
2024-01-31 16:10:16.065266 |
129 |
63489480 |
IMPLEMENTATION OF SOLID WASTE MAGEMENT IN HARIRAJPUR GP |
442200 |
IMPLEMENTATION OF SOLID WASTE MAGEMENT IN HARIRAJPUR GP5 |
Completion of work |
-
latitude : 20.143528333333332
Longitude : 85.73566000000001
file name : Image_31012024161020174.png
|
2024-01-31 16:10:20.238886 |
130 |
82849018 |
Construction and Maintenance of Community Centre |
108207 |
Construction and Maintenance of Community Centre1 |
Completion of work |
-
latitude : 20.14515
Longitude : 85.73558833333333
file name : Image_01112024124048601.png
|
2024-11-01 12:40:48.65944 |
131 |
47606717 |
IMPLEMENTATION OF VASUDHA |
814080 |
IMPLEMENTATION OF VASUDHA1 |
Completion of work |
-
latitude : 20.145603333333334
Longitude : 85.73774833333333
file name : Image_28022022102313178.png
|
2022-02-28 10:23:13.280422 |