1 |
44457638 |
CONST. OF COMPOUND WALL AT KANIA BHAGABATI ME SCHOOL |
200000 |
CONST. OF COMPOUND WALL AT KANIA BHAGABATI ME SCHOOL1 |
Completion of work |
-
latitude : 19.92518833333333
Longitude : 86.19102833333334
file name : Image_11062021145821359.png
|
2021-06-11 14:58:21.489089 |
2 |
44455346 |
CONST. OF BOUNDARY WALL OF BANIA PRY SCHOOL |
100000 |
CONST. OF BOUNDARY WALL OF BANIA PRY SCHOOL1 |
Completion of work |
-
latitude : 19.926495
Longitude : 86.19831500000001
file name : Image_11062021143527605.png
|
2021-06-11 14:35:27.692928 |
3 |
44455346 |
CONST. OF BOUNDARY WALL OF BANIA PRY SCHOOL |
100000 |
CONST. OF BOUNDARY WALL OF BANIA PRY SCHOOL1 |
Completion of work |
-
latitude : 19.926499999999997
Longitude : 86.19832333333333
file name : Image_11062021143339205.png
|
2021-06-11 14:33:39.306836 |
4 |
44454838 |
SUPPLY OF WATER BY TANKER IN SUMMER |
160000 |
SUPPLY OF WATER BY TANKER IN SUMMER1 |
Completion of work |
-
latitude : 19.920883333333332
Longitude : 86.18972333333335
file name : Image_11112021130943978.png
|
2021-11-11 13:09:44.087033 |
5 |
44454861 |
CLEANING OF GP AREA UNDER SWM |
220000 |
CLEANING OF GP AREA UNDER SWM1 |
Completion of work |
-
latitude : 19.944968333333335
Longitude : 86.189895
file name : Image_11092021123354672.png
|
2021-09-11 12:33:54.777824 |
6 |
44458198 |
KANIA KALYAN MANDAP REPAIR (TMC) |
57000 |
KANIA KALYAN MANDAP REPAIR (TMC)1 |
Completion of work |
-
latitude : 19.924781666666668
Longitude : 86.19119833333335
file name : Image_11092021114501019.png
|
2021-09-11 11:45:01.144924 |
7 |
44458019 |
BIRABHADRA NODAL BIDYAPITH REPAIR (TMC) |
321000 |
BIRABHADRA NODAL BIDYAPITH REPAIR (TMC)1 |
Completion of work |
-
latitude : 19.9423155
Longitude : 86.1915893
file name : Image_11092021115811395.png
|
2021-09-11 11:58:11.48862 |
8 |
44458150 |
BANGURIGAN GIRLS HIGH SCHOOL REPAIR |
94000 |
BANGURIGAN GIRLS HIGH SCHOOL REPAIR1 |
Completion of work |
-
latitude : 19.9423158
Longitude : 86.1915871
file name : Image_11092021122831092.png
|
2021-09-11 12:28:31.19406 |
9 |
44458092 |
BANGURIGAN CPS (TMC) |
170000 |
BANGURIGAN CPS (TMC)1 |
Completion of work |
-
latitude : 19.937369999999998
Longitude : 86.19181666666667
file name : Image_11092021115207944.png
|
2021-09-11 11:52:08.033034 |
10 |
44455052 |
INSTALATION OF 10 NOS OF DUSTBIN IN GP AREA |
100000 |
INSTALATION OF 10 NOS OF DUSTBIN IN GP AREA1 |
Completion of work |
-
latitude : 19.944883333333333
Longitude : 86.19017000000001
file name : Image_11092021123237860.png
|
2021-09-11 12:32:37.972717 |
11 |
44455383 |
CONST. OF CC ROAD FROM KANIA BRAJABANDHU BASTIA HOUSE TO DUBA BASTIA HOUSE |
100000 |
CONST. OF CC ROAD FROM KANIA BRAJABANDHU BASTIA HOUSE TO DUBA BASTIA HOUSE1 |
Completion of work |
-
latitude : 19.920426666666668,19.920423333333336,19.920425,19.92040666666667,19.920413333333332
Longitude : 86.19085166666667,86.19086333333334,86.19086166666666,86.19081,86.19084333333333
file name : Image_11092021111844886.png
|
2021-09-11 11:18:44.97516 |
12 |
47890147 |
Construction of CC road from kiakani nadi tutha to bangurigaon mela baragachhna |
130000 |
Construction of CC road from kiakani nadi tutha to bangurigaon mela baragachhna1 |
Completion of work |
-
latitude : 19.933608333333332,19.933606666666666
Longitude : 86.18986000000001,86.18985666666667
file name : Image_14112021112704555.png
|
2021-11-14 11:27:04.682398 |
13 |
47882558 |
Construction of CC road from bangurigaon mela baragachhat to banamali Jena house |
80000 |
Construction of CC road from bangurigaon mela baragachhat to banamali Jena house1 |
Completion of work |
-
latitude : 19.933506666666666,19.93349
Longitude : 86.19061000000002,86.19062333333335
file name : Image_14112021111726270.png
|
2021-11-14 11:17:26.397392 |
14 |
47890640 |
Construction of CC road from matiapada babu Nayak house to kania chhka |
100000 |
Construction of CC road from matiapada babu Nayak house to kania chhka1 |
Completion of work |
-
latitude : 19.924223333333334,19.924221666666664
Longitude : 86.19238833333333,86.192395
file name : Image_29112021153433062.png
|
2021-11-29 15:34:33.212054 |
15 |
44454992 |
CONST. OF TUBEWELL WITH PLATFORM AT DHARAM PUR KELASAHI |
35000 |
CONST. OF TUBEWELL WITH PLATFORM AT DHARAM PUR KELASAHI1 |
Completion of work |
-
latitude : 19.930165
Longitude : 86.202225
file name : Image_30122021133216773.png
|
2021-12-30 13:32:16.919226 |
16 |
44457720 |
CONST. OF CC ROAD FROM KOLATHAKANTA MADHU DALUA HOUSE TO NARENDRA DASH HOUSE |
150000 |
CONST. OF CC ROAD FROM KOLATHAKANTA MADHU DALUA HOUSE TO NARENDRA DASH HOUSE1 |
Completion of work |
-
latitude : 19.942296666666667,19.942308333333337,19.942285000000002
Longitude : 86.18396666666668,86.18399333333333,86.18397666666667
file name : Image_29112021152008297.png
|
2021-11-29 15:20:08.430015 |
17 |
44455023 |
CONST. OF COMMON LATRINE AT ANANDA BAJAR |
251500 |
CONST. OF COMMON LATRINE AT ANANDA BAJAR1 |
Completion of work |
-
latitude : 19.953308333333332
Longitude : 86.18567499999999
file name : Image_30122021143701666.png
|
2021-12-30 14:37:01.818522 |
18 |
44454805 |
CONST. OF COMMON LATRINE AT KANIA MAHAVIR |
251500 |
CONST. OF COMMON LATRINE AT KANIA MAHAVIR1 |
Completion of work |
-
latitude : 19.9246
Longitude : 86.19102833333334
file name : Image_30122021134708065.png
|
2021-12-30 13:47:08.252486 |
19 |
47862364 |
Construction of new TUBEWELL and platform at sahadev kania |
25000 |
Construction of new TUBEWELL and platform at sahadev kania1 |
Completion of work |
-
latitude : 19.91188833333333
Longitude : 86.19978166666667
file name : Image_07012022122555841.png
|
2022-01-07 12:25:55.955451 |
20 |
44455445 |
CONST. OF CC ROAD FROM GANIPUR BEHERASAHI RANJIT NAYAK HOUSE TO PABITRA BEHERA HOUSE |
150000 |
CONST. OF CC ROAD FROM GANIPUR BEHERASAHI RANJIT NAYAK HOUSE TO PABITRA BEHERA HOUSE1 |
Completion of work |
-
latitude : 19.9393,19.93929166666667
Longitude : 86.18526666666666,86.18526500000002
file name : Image_07012022125008484.png
|
2022-01-07 12:50:08.607185 |
21 |
74431092 |
KEDAR SAHOO HOUSE TO ADHURA ROAD REPAIRING |
50000 |
KEDAR SAHOO HOUSE TO ADHURA ROAD REPAIRING1 |
Completion of work |
-
latitude : 21.856768333333335,21.856761666666664
Longitude : 83.96474833333332,83.96476
file name : Image_19052023115502985.png
|
2023-05-19 11:55:03.11784 |
22 |
74430576 |
GADANARAYANCHADA GOTHA NEW TUBWELL AND PLATFORM |
35000 |
GADANARAYANCHADA GOTHA NEW TUBWELL AND PLATFORM1 |
Completion of work |
-
latitude : 21.856675000000003
Longitude : 83.96468333333333
file name : Image_19052023141131039.png
|
2023-05-19 14:11:31.140786 |
23 |
47881885 |
Construction of CC road from Konark KAKATPUR main road to siba kandi house GADA NAYAR CHHADA Bhati r |
100000 |
Construction of CC road from Konark KAKATPUR main road to siba kandi house GADA NAYAR CHHADA Bhati r1 |
Completion of work |
-
latitude : 19.958219999999997,19.958219999999997,19.958223333333333
Longitude : 86.189755,86.189755,86.18978
file name : Image_31012022102946054.png
|
2022-01-31 10:29:46.171526 |
24 |
44457817 |
CONST. OF CC ROAD FROM GADANAYARCHHADA SANKHIAPADA PRADUMNYA JENA HOUSE TO MAIN ROADA |
119448 |
CONST. OF CC ROAD FROM GADANAYARCHHADA SANKHIAPADA PRADUMNYA JENA HOUSE TO MAIN ROADA1 |
Completion of work |
-
latitude : 19.955718333333333,19.955703333333336
Longitude : 86.18922333333333,86.18921833333334
file name : Image_31012022102159476.png
|
2022-01-31 10:21:59.671297 |
25 |
74430375 |
TENTULIA GADHI NEW TUBWELL AND PLATFORM |
30000 |
TENTULIA GADHI NEW TUBWELL AND PLATFORM1 |
Completion of work |
-
latitude : 21.856675000000003
Longitude : 83.964665
file name : Image_19052023140337366.png
|
2023-05-19 14:03:37.458011 |
26 |
47883321 |
Construction of CC road from dharamapur bansidhar muduli house to maa dharemeswari thakurani, bangur |
229948 |
Construction of CC road from dharamapur bansidhar muduli house to maa dharemeswari thakurani, bangur1 |
Completion of work |
-
latitude : 19.929836666666667,19.929896666666664
Longitude : 86.20232666666668,86.20230166666667
file name : Image_02022022111030490.png
|
2022-02-02 11:10:30.610831 |
27 |
47877618 |
Energy charges of pump house, street light,and gp office |
450000 |
Energy charges of pump house, street light,and gp office1 |
Completion of work |
-
latitude : 19.964836666666667
Longitude : 86.18404000000001
file name : Image_31032022065148532.png
|
2022-03-31 06:51:48.648766 |
28 |
47876460 |
DATA ENTRY |
6000 |
DATA ENTRY1 |
Completion of work |
-
latitude : 19.987475
Longitude : 86.11599999999999
file name : Image_26042022084949421.png
|
2022-04-26 08:49:49.559729 |
29 |
74430781 |
KANIA LOKANATH TEMPLE NEW TUBWELL AND PLATFORM |
35000 |
KANIA LOKANATH TEMPLE NEW TUBWELL AND PLATFORM1 |
Completion of work |
-
latitude : 21.856661666666664
Longitude : 83.96472833333334
file name : Image_19052023135615964.png
|
2023-05-19 13:56:16.093757 |
30 |
44454954 |
CONST. OF TUBEWELL WITH PLATFORM AT BANGURIGAN BAJAR |
35000 |
CONST. OF TUBEWELL WITH PLATFORM AT BANGURIGAN BAJAR1 |
Completion of work |
-
latitude : 19.9419242
Longitude : 86.1915519
file name : Image_25082022170933103.png
|
2022-08-25 17:09:33.217354 |
31 |
47862645 |
Construction of bathing ghat dharsa pokhari bania sasamal sahi |
130000 |
Construction of bathing ghat dharsa pokhari bania sasamal sahi1 |
Completion of work |
-
latitude : 19.92519
Longitude : 86.19817833333333
file name : Image_25082022171933313.png
|
2022-08-25 17:19:33.410962 |
32 |
44457566 |
CONST. OF CC ROAD FROM SRICHANDANPUR GUNDICHA MANDIR TO SIBA SETHI HOUSE |
80000 |
CONST. OF CC ROAD FROM SRICHANDANPUR GUNDICHA MANDIR TO SIBA SETHI HOUSE1 |
Completion of work |
-
latitude : 19.947003333333335,19.946990000000003
Longitude : 86.19355833333333,86.19353666666666
file name : Image_25082022170227718.png
|
2022-08-25 17:02:27.808647 |
33 |
74433180 |
BIRABHADRAPUR NODAL HIGH SCHOOL REPAIRING |
50000 |
BIRABHADRAPUR NODAL HIGH SCHOOL REPAIRING1 |
Completion of work |
-
latitude : 21.856598333333334
Longitude : 83.96463666666665
file name : Image_19052023135859556.png
|
2023-05-19 13:58:59.649241 |
34 |
60664969 |
INSTALATION OF NEW TUBEWELL AND PLATFORM |
119877 |
INSTALATION OF NEW TUBEWELL AND PLATFORM1 |
Completion of work |
-
latitude : 19.939766666666667
Longitude : 86.19034166666667
file name : Image_19102022110818226.png
|
2022-10-19 11:08:18.331518 |
35 |
60665508 |
INSTALATION OF NEW TUBEWELL AT MAHAVIR MANDIR KANIA |
25000 |
INSTALATION OF NEW TUBEWELL AT MAHAVIR MANDIR KANIA1 |
Completion of work |
-
latitude : 19.924809999999997
Longitude : 86.19060666666668
file name : Image_19102022105403321.png
|
2022-10-19 10:54:03.434699 |
36 |
74433667 |
BANGURIGAON GP OFFICE REPAIRING |
100000 |
BANGURIGAON GP OFFICE REPAIRING1 |
Completion of work |
-
latitude : 21.856693333333336
Longitude : 83.96467166666667
file name : Image_19052023141712951.png
|
2023-05-19 14:17:13.064056 |
37 |
74433938 |
GANIPUR UP SCHOOL NEW TUBEWELL AND PLATFORM |
32000 |
GANIPUR UP SCHOOL NEW TUBEWELL AND PLATFORM1 |
Completion of work |
-
latitude : 21.856600000000004
Longitude : 83.96468666666667
file name : Image_19052023140128740.png
|
2023-05-19 14:01:28.845422 |
38 |
74434470 |
GP AREA 2 NOS OF NEW TUBEWELL AND PLATFORM |
64000 |
GP AREA 2 NOS OF NEW TUBEWELL AND PLATFORM1 |
Completion of work |
-
latitude : 21.8567
Longitude : 83.964665
file name : Image_19052023140831704.png
|
2023-05-19 14:08:31.818717 |
39 |
74434187 |
TARAPADA BARIK SAHI NEW TUBEWELL AND PLATFORM |
32000 |
TARAPADA BARIK SAHI NEW TUBEWELL AND PLATFORM1 |
Completion of work |
-
latitude : 21.856730000000002
Longitude : 83.96473166666668
file name : Image_19052023141428495.png
|
2023-05-19 14:14:28.596192 |
40 |
74433417 |
BANGURIGAON UP SCHOOL REPAIRING AND COLOURING |
100000 |
BANGURIGAON UP SCHOOL REPAIRING AND COLOURING1 |
Completion of work |
-
latitude : 21.85666833333333
Longitude : 83.964725
file name : Image_19052023120631871.png
|
2023-05-19 12:06:31.969636 |
41 |
66864345 |
CONSTRUCTION OF CC ROAD FROM RI OFFICE TO NETRANANDA KANDI HOUSE |
100000 |
CONSTRUCTION OF CC ROAD FROM RI OFFICE TO NETRANANDA KANDI HOUSE 1 |
Completion of work |
-
latitude : 19.93917,19.939151666666664
Longitude : 86.189445,86.18945333333335
file name : Image_15022023165410601.png
|
2023-02-15 16:54:10.714322 |
42 |
66869974 |
CONSTRUCTION AND MAINTENANCE OF CC ROAD FROM RI OFFICE TO NETRANANDA KANDI HOUSE |
300000 |
CONSTRUCTION AND MAINTENANCE OF CC ROAD FROM RI OFFICE TO NETRANANDA KANDI HOUSE1 |
Completion of work |
-
latitude : 19.939851666666666,19.93985,19.93985
Longitude : 86.19036166666667,86.19037000000002,86.19037166666666
file name : Image_15022023165639123.png
|
2023-02-15 16:56:39.241665 |
43 |
47860389 |
PURCHASE OF TUBEWELL SPARE PARTS |
80474 |
PURCHASE OF TUBEWELL SPARE PARTS1 |
Completion of work |
-
latitude : 20.049601666666668
Longitude : 86.18877333333333
file name : Image_25022023104857535.png
|
2023-02-25 10:48:57.616488 |
44 |
60666413 |
CONSTRUCTION OF BOUNDARY WALL AT CHHOTIPADA UP SCHOOL |
121796 |
CONSTRUCTION OF BOUNDARY WALL AT CHHOTIPADA UP SCHOOL1 |
Plinth level |
-
latitude : 19.928488333333334
Longitude : 86.19176333333334
file name : Image_27032023175254414.png
|
2023-03-27 17:52:54.494824 |
45 |
60666413 |
CONSTRUCTION OF BOUNDARY WALL AT CHHOTIPADA UP SCHOOL |
121796 |
CONSTRUCTION OF BOUNDARY WALL AT CHHOTIPADA UP SCHOOL1 |
Completion of work |
-
latitude : 19.910263333333333
Longitude : 86.20791
file name : Image_27032023172213295.png
|
2023-03-27 17:22:13.385961 |
46 |
60665053 |
REPAIR OF WATER SUPPLY PIPE LINE |
105000 |
REPAIR OF WATER SUPPLY PIPE LINE1 |
Completion of work |
-
latitude : 20.048825,20.048778333333335
Longitude : 86.18789166666666,86.18787666666667
file name : Image_31032023161505887.png
|
2023-03-31 16:15:05.968945 |
47 |
60665834 |
CONSTRUCTION OF CC ROAD FROM LAXMIDHAR SAHOO HOUSE TO MAIN ROAD TENTULIA |
150000 |
CONSTRUCTION OF CC ROAD FROM LAXMIDHAR SAHOO HOUSE TO MAIN ROAD TENTULIA1 |
Completion of work |
-
latitude : 19.928510000000003,19.928508333333333
Longitude : 86.20448333333334,86.20448166666665
file name : Image_26042023101016937.png
|
2023-04-26 10:10:17.03743 |
48 |
47861138 |
JALACHHATRA |
45474 |
JALACHHATRA1 |
Completion of work |
-
latitude : 20.04958333333333
Longitude : 86.18882333333335
file name : Image_25042023080759811.png
|
2023-04-25 08:07:59.900586 |
49 |
60665930 |
CONSTRUCTION OF CC ROAD FROM DHOBA BEHERA HOUSE TO RD ROAD TENTULIA |
50000 |
CONSTRUCTION OF CC ROAD FROM DHOBA BEHERA HOUSE TO RD ROAD TENTULIA1 |
Completion of work |
-
latitude : 19.925633333333334,19.925635
Longitude : 86.20454166666666,86.20454
file name : Image_26042023100231808.png
|
2023-04-26 10:02:31.895704 |
50 |
47883867 |
Construction of CC road from bula dalei House to babaji sahoo House |
100000 |
Construction of CC road from bula dalei House to babaji sahoo House1 |
Completion of work |
-
latitude : 19.929555,19.92955166666667
Longitude : 86.20648166666666,86.20649499999999
file name : Image_26042023100654778.png
|
2023-04-26 10:06:54.866452 |
51 |
74426285 |
BANGURIGAON GIRLS H SCHOOL REPAIRING AND COLOURING |
200000 |
BANGURIGAON GIRLS H SCHOOL REPAIRING AND COLOURING1 |
Completion of work |
-
latitude : 18.36227166666667
Longitude : 81.91060999999999
file name : Image_01062023155929428.png
|
2023-06-01 15:59:29.520966 |
52 |
74431328 |
GP OFFICE ELECTRIC REPAIRING |
40000 |
GP OFFICE ELECTRIC REPAIRING1 |
Completion of work |
-
latitude : 18.36245166666667
Longitude : 81.90736333333332
file name : Image_01062023160107590.png
|
2023-06-01 16:01:07.69331 |
53 |
60665184 |
SUPPLY OF SAFE DRINKING WATER BY TANKER |
240000 |
SUPPLY OF SAFE DRINKING WATER BY TANKER1 |
Completion of work |
-
latitude : 19.926903333333332
Longitude : 86.20544999999998
file name : Image_25082022171552346.png
|
2022-08-25 17:15:52.461482 |
54 |
60664763 |
SOLID AND LIQUID WASTE MANAGEMENT UNDER SBM |
700347 |
SOLID AND LIQUID WASTE MANAGEMENT UNDER SBM1 |
|
-
latitude : 21.856701666666662
Longitude : 83.96497666666667
file name : Image_01082023174409586.png
|
2023-08-01 17:44:09.671289 |
55 |
60667099 |
SRICHANDANPUR PUPS COMPOUND WALL |
100000 |
SRICHANDANPUR PUPS COMPOUND WALL1 |
Completion of work |
-
latitude : 21.874166666666664
Longitude : 84.01378666666666
file name : Image_15092023080450696.png
|
2023-09-15 08:04:50.785268 |
56 |
83948151 |
Construction of roads |
400000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.872551666666663,21.872551666666663
Longitude : 83.97093166666667,83.970855
file name : Image_28072023171738805.png
|
2023-07-28 17:17:38.94999 |
57 |
83948151 |
Construction of roads |
400000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.87257833333333,21.872580000000003
Longitude : 83.970905,83.97090333333333
file name : Image_28072023165345973.png
|
2023-07-28 16:53:46.12106 |
58 |
83948151 |
Construction of roads |
400000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.872630000000004,21.87263666666667
Longitude : 83.97079333333335,83.97078666666667
file name : Image_28072023162634266.png
|
2023-07-28 16:26:34.349007 |
59 |
83948151 |
Construction of roads |
400000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.872525000000003,21.872525000000003
Longitude : 83.97089833333332,83.97089833333332
file name : Image_28072023160909569.png
|
2023-07-28 16:09:09.653366 |
60 |
83948371 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.87256,21.87256166666667
Longitude : 83.97090833333331,83.97091
file name : Image_28072023171859082.png
|
2023-07-28 17:18:59.202056 |
61 |
83948371 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.87259166666667,21.872603333333338
Longitude : 83.97088000000001,83.97086499999999
file name : Image_28072023165438270.png
|
2023-07-28 16:54:38.389202 |
62 |
83948371 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.872525000000003,21.872525000000003
Longitude : 83.97092666666667,83.97092666666667
file name : Image_28072023161023409.png
|
2023-07-28 16:10:23.499811 |
63 |
83943420 |
Creation of a new source of drinking water |
165000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 21.87428166666667
Longitude : 84.013705
file name : Image_27092023115112672.png
|
2023-09-27 11:51:12.759354 |
64 |
83943420 |
Creation of a new source of drinking water |
165000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 21.87423666666667
Longitude : 84.01368166666667
file name : Image_27092023112654730.png
|
2023-09-27 11:26:54.871035 |
65 |
83943420 |
Creation of a new source of drinking water |
165000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 21.8744379
Longitude : 84.0132722
file name : Image_27092023110918421.png
|
2023-09-27 11:09:18.536291 |
66 |
78430052 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.874356666666667,21.874356666666667,21.874351666666666
Longitude : 84.01363166666667,84.01361999999999,84.01361166666666
file name : Image_27092023114939601.png
|
2023-09-27 11:49:39.683372 |
67 |
78430052 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.874266666666667,21.874266666666667
Longitude : 84.01376833333333,84.01376833333333
file name : Image_27092023112546640.png
|
2023-09-27 11:25:46.746928 |
68 |
78430052 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.874411666666667,21.874411666666667
Longitude : 84.01387166666667,84.01387166666667
file name : Image_27092023110756724.png
|
2023-09-27 11:07:56.819043 |
69 |
60664853 |
ENERGY CHARGES OF PUMP HOUSE |
190470 |
ENERGY CHARGES OF PUMP HOUSE1 |
Roof laid |
-
latitude : 21.874315000000003
Longitude : 84.01367833333333
file name : Image_30092023145117250.png
|
2023-09-30 14:51:17.34004 |
70 |
60664853 |
ENERGY CHARGES OF PUMP HOUSE |
190470 |
ENERGY CHARGES OF PUMP HOUSE1 |
Plinth level |
-
latitude : 21.874319999999997
Longitude : 84.01381666666666
file name : Image_30092023144644942.png
|
2023-09-30 14:46:45.032891 |
71 |
60664853 |
ENERGY CHARGES OF PUMP HOUSE |
190470 |
ENERGY CHARGES OF PUMP HOUSE1 |
Completion of work |
-
latitude : 21.874244999999995
Longitude : 84.01397833333334
file name : Image_30092023144128009.png
|
2023-09-30 14:41:28.100025 |
72 |
60666265 |
DEVELOPMENT OF BANIA TANDA PADIA PLAY GROUND |
200000 |
DEVELOPMENT OF BANIA TANDA PADIA PLAY GROUND1 |
Completion of work |
-
latitude : 21.875135,21.875135,21.875135,21.875135
Longitude : 84.01395833333332,84.01395833333332,84.01395833333332,84.01395833333332
file name : Image_24112023160853882.png
|
2023-11-24 16:08:53.989305 |
73 |
83944287 |
Construction of new Piped Water Supply schemes |
87455 |
Construction of new Piped Water Supply schemes1 |
Roof laid |
-
latitude : 21.8735666,21.8735666
Longitude : 83.9987765,83.9987765
file name : Image_02122023180054260.png
|
2023-12-02 18:00:54.356592 |
74 |
83944287 |
Construction of new Piped Water Supply schemes |
87455 |
Construction of new Piped Water Supply schemes1 |
Plinth level |
-
latitude : 21.8735549,21.8735549
Longitude : 83.9988019,83.9988019
file name : Image_02122023175525778.png
|
2023-12-02 17:55:25.880699 |
75 |
83944287 |
Construction of new Piped Water Supply schemes |
87455 |
Construction of new Piped Water Supply schemes1 |
Completion of work |
-
latitude : 21.8735708,21.8735708,21.8735708,21.8735657
Longitude : 83.9987842,83.9987842,83.9987842,83.9987761
file name : Image_02122023174722480.png
|
2023-12-02 17:47:22.57518 |
76 |
74426929 |
EXTRA PROJECTS OUT OF 15TH CFC UNTIED |
596180 |
EXTRA PROJECTS OUT OF 15TH CFC UNTIED1 |
Completion of work |
-
latitude : 21.8735469
Longitude : 83.9988075
file name : Image_02122023174314012.png
|
2023-12-02 17:43:14.09933 |
77 |
78410712 |
Electricity in GP Bhawan |
250000 |
Electricity in GP Bhawan1 |
Roof laid |
-
latitude : 21.8597396
Longitude : 83.9639306
file name : Image_22022024212949747.png
|
2024-02-22 21:29:49.828862 |
78 |
78410712 |
Electricity in GP Bhawan |
250000 |
Electricity in GP Bhawan1 |
Plinth level |
-
latitude : 21.859789999999997
Longitude : 83.96390000000001
file name : Image_22022024212111964.png
|
2024-02-22 21:21:12.047275 |
79 |
78410712 |
Electricity in GP Bhawan |
250000 |
Electricity in GP Bhawan1 |
Completion of work |
-
latitude : 21.85798333333333
Longitude : 83.97103166666666
file name : Image_22022024210431899.png
|
2024-02-22 21:04:31.990807 |
80 |
47861479 |
CONSTRUCTION OF BOUNDARY WALLOF GADA NAYAR CHHADA PROJECT PRIMARY SCHOOL |
100000 |
CONSTRUCTION OF BOUNDARY WALLOF GADA NAYAR CHHADA PROJECT PRIMARY SCHOOL1 |
Completion of work |
-
latitude : 21.858005000000002
Longitude : 83.97115333333335
file name : Image_27022024180049914.png
|
2024-02-27 18:00:49.898186 |
81 |
47861737 |
CONSTRUCTION OF GATE AND BOUNDARY WALLOF ANGANBADI CENTER ASIJANGA |
150000 |
CONSTRUCTION OF GATE AND BOUNDARY WALLOF ANGANBADI CENTER ASIJANGA1 |
Completion of work |
-
latitude : 21.857955
Longitude : 83.97107833333332
file name : Image_27022024175859814.png
|
2024-02-27 17:58:59.905152 |