1 |
44282897 |
COMPLETION OF BOUNDARY WALL OF GATISWAR SCHOOL,SAHASPUR |
200000 |
COMPLETION OF BOUNDARY WALL OF GATISWAR SCHOOL,SAHASPUR1 |
Completion of work |
-
latitude : 19.92708653
Longitude : 85.5802275
file name : Image_25112020140603780.png
|
2020-11-25 14:06:03.837337 |
2 |
44282193 |
PLANPLUS AND PRIASOFT ENTRY |
6000 |
PLANPLUS AND PRIASOFT ENTRY1 |
Completion of work |
-
latitude : 19.981582760810852
Longitude : 85.58536291122437
file name : Image_24052021115440576.png
|
2021-05-24 11:54:40.694829 |
3 |
44286197 |
COMPLETION OF DRAIN ,UPPER SAHI,RAMLEELA FIELD,KAUDIKHANI |
50000 |
COMPLETION OF DRAIN ,UPPER SAHI,RAMLEELA FIELD,KAUDIKHANI1 |
Completion of work |
-
latitude : 19.94102505
Longitude : 85.58953902
file name : Image_28052021144228116.png
|
2021-05-28 14:42:28.243143 |
4 |
48145930 |
CONST. OF CC ROAD FORM SANAORA VILLAGE TO BAJARANGI TEMPLE. |
100000 |
CONST. OF CC ROAD FORM SANAORA VILLAGE TO BAJARANGI TEMPLE.1 |
Completion of work |
-
latitude : 20.0032477,20.0032445
Longitude : 85.6537421,85.653743
file name : Image_17112021132730481.png
|
2021-11-17 13:27:30.575587 |
5 |
44282234 |
GEO TAG AND NETPACK |
6000 |
GEO TAG AND NETPACK1 |
Completion of work |
-
latitude : 20.00312089920044
Longitude : 85.65387189388275
file name : Image_08072021164653333.png
|
2021-07-08 16:46:53.430405 |
6 |
48106860 |
CONST. OF CC ROAD FORM KAUDIKHANI UPARSHAHI YOGENDRA PRADHAN HOUSE TO GODABARI PRADHAN HOUSE.TO GODA |
100000 |
CONST. OF CC ROAD FORM KAUDIKHANI UPARSHAHI YOGENDRA PRADHAN HOUSE TO GODABARI PRADHAN HOUSE.TO GODA1 |
Completion of work |
-
latitude : 19.94022846221924,19.940233826637268
Longitude : 85.5907541513443,85.59078633785248
file name : Image_05082021140046680.png
|
2021-08-05 14:00:46.79594 |
7 |
48106860 |
CONST. OF CC ROAD FORM KAUDIKHANI UPARSHAHI YOGENDRA PRADHAN HOUSE TO GODABARI PRADHAN HOUSE.TO GODA |
100000 |
CONST. OF CC ROAD FORM KAUDIKHANI UPARSHAHI YOGENDRA PRADHAN HOUSE TO GODABARI PRADHAN HOUSE.TO GODA1 |
Completion of work |
-
latitude : 19.94022846221924,19.940233826637268
Longitude : 85.5907541513443,85.59078633785248
file name : Image_05082021140107578.png
|
2021-08-05 14:01:07.742183 |
8 |
48147301 |
CONST OF CC ROAD FORM INFRONT OF KADUAGHAT EKADEMI SCHOOL. |
105391 |
CONST OF CC ROAD FORM INFRONT OF KADUAGHAT EKADEMI SCHOOL.1 |
Completion of work |
-
latitude : 19.94393596,19.94393836
Longitude : 85.589785,85.58979143
file name : Image_05082021140039931.png
|
2021-08-05 14:00:40.125088 |
9 |
44286521 |
COMPLETION WORK OF GP OFFICE, KADUA |
500000 |
COMPLETION WORK OF GP OFFICE, KADUA1 |
Completion of work |
-
latitude : 19.942189
Longitude : 85.59096813
file name : Image_05082021140033758.png
|
2021-08-05 14:00:33.937778 |
10 |
44282642 |
WATER DISTRIBUTION |
70000 |
WATER DISTRIBUTION1 |
Completion of work |
-
latitude : 20.003244
Longitude : 85.6537004
file name : Image_03112021152338469.png
|
2021-11-03 15:23:38.574209 |
11 |
48146404 |
REPAIRING OF SUNAKHALA PRAIMERI SCHOOL |
200000 |
REPAIRING OF SUNAKHALA PRAIMERI SCHOOL1 |
Completion of work |
-
latitude : 19.94688122
Longitude : 85.59505726
file name : Image_03092021121147255.png
|
2021-09-03 12:11:47.347647 |
12 |
48114799 |
CONST. OF AWC BOUNDARY WALL AT KAUDIKHUNI |
100000 |
CONST. OF AWC BOUNDARY WALL AT KAUDIKHUNI1 |
Completion of work |
-
latitude : 19.94018988
Longitude : 85.59077398
file name : Image_03092021121911362.png
|
2021-09-03 12:19:11.467649 |
13 |
44282110 |
PAYMENT TO ELECTRICITY BILL |
250000 |
PAYMENT TO ELECTRICITY BILL1 |
Completion of work |
-
latitude : 19.98160731
Longitude : 85.58533356
file name : Image_24092021155213692.png
|
2021-09-24 15:52:13.782571 |
14 |
48107586 |
PAYMENT TO SEM |
168000 |
PAYMENT TO SEM1 |
Completion of work |
-
latitude : 19.981716871261597
Longitude : 85.58542191982269
file name : Image_24092021161803614.png
|
2021-09-24 16:18:03.684057 |
15 |
44276003 |
WATER SUPPLY IN SUMMER |
270000 |
WATER SUPPLY IN SUMMER1 |
Completion of work |
-
latitude : 20.0032023
Longitude : 85.6537414
file name : Image_02122021141459087.png
|
2021-12-02 14:14:59.226586 |
16 |
48105908 |
COMPLETION OF KADUA GP OFFICE |
400000 |
COMPLETION OF KADUA GP OFFICE1 |
Completion of work |
-
latitude : 20.0032888
Longitude : 85.653699
file name : Image_18122021140042883.png
|
2021-12-18 14:00:42.976812 |
17 |
44282691 |
REPAIRING OF PIPELINE |
200000 |
REPAIRING OF PIPELINE1 |
Completion of work |
-
latitude : 20.0032075,20.0032095
Longitude : 85.6536942,85.6536918
file name : Image_20072024133739429.png
|
2024-07-20 13:37:39.543208 |
18 |
44282691 |
REPAIRING OF PIPELINE |
200000 |
REPAIRING OF PIPELINE1 |
Completion of work |
-
latitude : 20.0032903,20.003291
Longitude : 85.6537408,85.6537434
file name : Image_31122021152650557.png
|
2021-12-31 15:26:50.656741 |
19 |
48114471 |
CONST. OF GRAVEYARD BOUNDARY WALL AT BHATAPADA SOUTH SAID. |
100000 |
CONST. OF GRAVEYARD BOUNDARY WALL AT BHATAPADA SOUTH SAID.1 |
Roof laid |
-
latitude : 19.94388676
Longitude : 85.58157598
file name : Image_28012022155610793.png
|
2022-01-28 15:56:10.772778 |
20 |
48114471 |
CONST. OF GRAVEYARD BOUNDARY WALL AT BHATAPADA SOUTH SAID. |
100000 |
CONST. OF GRAVEYARD BOUNDARY WALL AT BHATAPADA SOUTH SAID.1 |
Plinth level |
-
latitude : 19.94388264
Longitude : 85.58153881
file name : Image_28012022155437635.png
|
2022-01-28 15:54:37.632519 |
21 |
48114471 |
CONST. OF GRAVEYARD BOUNDARY WALL AT BHATAPADA SOUTH SAID. |
100000 |
CONST. OF GRAVEYARD BOUNDARY WALL AT BHATAPADA SOUTH SAID.1 |
Completion of work |
-
latitude : 19.94387993
Longitude : 85.58158798
file name : Image_28012022155059951.png
|
2022-01-28 15:51:00.006162 |
22 |
48114627 |
CONST. OF SCHOOL PRANGAN AT BHATAPADA |
100000 |
CONST. OF SCHOOL PRANGAN AT BHATAPADA1 |
Plinth level |
-
latitude : 19.94741339
Longitude : 85.58373034
file name : Image_28012022155935558.png
|
2022-01-28 15:59:35.568907 |
23 |
48114627 |
CONST. OF SCHOOL PRANGAN AT BHATAPADA |
100000 |
CONST. OF SCHOOL PRANGAN AT BHATAPADA1 |
Completion of work |
-
latitude : 19.94735493
Longitude : 85.58365555
file name : Image_28012022154137861.png
|
2022-01-28 15:41:37.930769 |
24 |
48114144 |
PAYMENT TO ELECTRICITY BILL |
200000 |
PAYMENT TO ELECTRICITY BILL1 |
Completion of work |
-
latitude : 19.98828658
Longitude : 85.57037395
file name : Image_10062022181524045.png
|
2022-06-10 18:15:24.1377 |
25 |
44282068 |
PURCHASING OF TUBEWELL SPAREPARTS |
100000 |
PURCHASING OF TUBEWELL SPAREPARTS1 |
Completion of work |
-
latitude : 19.988203
Longitude : 85.57016617
file name : Image_21062022111735496.png
|
2022-06-21 11:17:35.645754 |
26 |
44275901 |
PURCHSING OF BLEACHING AND ALUM |
70000 |
PURCHSING OF BLEACHING AND ALUM1 |
Completion of work |
-
latitude : 19.98849809
Longitude : 85.57037404
file name : Image_10062022183045258.png
|
2022-06-10 18:30:45.393404 |
27 |
44282591 |
REPAIRING OF COMPUTER |
6000 |
REPAIRING OF COMPUTER1 |
Completion of work |
-
latitude : 19.98849796
Longitude : 85.57037415
file name : Image_10062022183152902.png
|
2022-06-10 18:31:53.024339 |
28 |
48111701 |
PRIASOFT ENTRY |
6000 |
PRIASOFT ENTRY1 |
Completion of work |
-
latitude : 19.98849677
Longitude : 85.57037595
file name : Image_10062022183243459.png
|
2022-06-10 18:32:43.577753 |
29 |
60863905 |
SEM SALARY U |
159000 |
SEM SALARY U1 |
Completion of work |
-
latitude : 20.0032424
Longitude : 85.6537049
file name : Image_08022023140238877.png
|
2023-02-08 14:02:38.955022 |
30 |
60863905 |
SEM SALARY U |
159000 |
SEM SALARY U1 |
Completion of work |
-
latitude : 19.98849926
Longitude : 85.57037333
file name : Image_10062022182858024.png
|
2022-06-10 18:28:58.133402 |
31 |
48111896 |
GEO TAG AND NETPACK |
6000 |
GEO TAG AND NETPACK1 |
Completion of work |
-
latitude : 19.98820844
Longitude : 85.57038822
file name : Image_16062022182815713.png
|
2022-06-16 18:28:15.820528 |
32 |
48111896 |
GEO TAG AND NETPACK |
6000 |
GEO TAG AND NETPACK1 |
Completion of work |
-
latitude : 19.98162433
Longitude : 85.58553955
file name : Image_03092021114954491.png
|
2021-09-03 11:49:54.608361 |
33 |
60864417 |
SUPPLY OF DRINKING WATER THROUGH TANKER D |
280000 |
SUPPLY OF DRINKING WATER THROUGH TANKER D1 |
Completion of work |
-
latitude : 20.003186
Longitude : 85.6537114
file name : Image_27092022155948563.png
|
2022-09-27 15:59:48.628082 |
34 |
48113221 |
WATER SUPPLY IN SUMMER |
260000 |
WATER SUPPLY IN SUMMER1 |
Completion of work |
-
latitude : 20.0031881
Longitude : 85.6537104
file name : Image_27092022155729000.png
|
2022-09-27 15:57:29.07686 |
35 |
60864232 |
PAYMENT OF ELECTRICITY BILL,PWS CENTER,SAHASPUR D |
250000 |
PAYMENT OF ELECTRICITY BILL,PWS CENTER,SAHASPUR D1 |
Completion of work |
-
latitude : 20.0031969
Longitude : 85.6537027
file name : Image_27092022155816554.png
|
2022-09-27 15:58:16.638691 |
36 |
63511892 |
REPAIRING OF BATHINGSTEP MALIBIL POND AT BHATAPADA.(SFC) |
50000 |
REPAIRING OF BATHINGSTEP MALIBIL POND AT BHATAPADA.(SFC)1 |
Completion of work |
-
latitude : 20.0031824
Longitude : 85.6537281
file name : Image_02112022142928901.png
|
2022-11-02 14:29:28.938395 |
37 |
60864551 |
BHATAPADA MAIN ROAD TO BRAHMAN SAHI C C SFC |
150000 |
BHATAPADA MAIN ROAD TO BRAHMAN SAHI C C SFC1 |
Completion of work |
-
latitude : 19.94661166666667
Longitude : 85.58455333333335
file name : Image_09122022145407396.png
|
2022-12-09 14:54:07.472267 |
38 |
60864551 |
BHATAPADA MAIN ROAD TO BRAHMAN SAHI C C SFC |
150000 |
BHATAPADA MAIN ROAD TO BRAHMAN SAHI C C SFC1 |
Completion of work |
-
latitude : 19.946651666666664
Longitude : 85.58451166666667
file name : Image_09122022150443099.png
|
2022-12-09 15:04:43.167087 |
39 |
60868009 |
CONSTRUCTION OF DRAIN FROM KAUDIKHANI MATHA SAHI TO SUDAM BEHERA HOME (UT) |
200000 |
CONSTRUCTION OF DRAIN FROM KAUDIKHANI MATHA SAHI TO SUDAM BEHERA HOME (UT)1 |
Completion of work |
-
latitude : 20.003198
Longitude : 85.6537432
file name : Image_12122022140119231.png
|
2022-12-12 14:01:19.291875 |
40 |
44286594 |
CONST.OF CC ROAD FROM WESTERN SIDE TARINI TEMPLE TO AMA GAON AMA VIKAS HOUSE,SAHASPUR |
100000 |
CONST.OF CC ROAD FROM WESTERN SIDE TARINI TEMPLE TO AMA GAON AMA VIKAS HOUSE,SAHASPUR1 |
Completion of work |
-
latitude : 20.0032389,20.0032405
Longitude : 85.6537038,85.6537046
file name : Image_08022023141410569.png
|
2023-02-08 14:14:10.642937 |
41 |
44286377 |
REPAIRING OF CC ROAD FROM HOUSE OF BRAJA BALIYARSINGH, TO HOUSE OF KEDAR SUNDARAY;SUNAK |
90000 |
REPAIRING OF CC ROAD FROM HOUSE OF BRAJA BALIYARSINGH, TO HOUSE OF KEDAR SUNDARAY;SUNAK1 |
Completion of work |
-
latitude : 20.0032433
Longitude : 85.6537043
file name : Image_08022023141108449.png
|
2023-02-08 14:11:08.520496 |
42 |
48113554 |
REPAIRING OF PIPLINE |
280000 |
REPAIRING OF PIPLINE1 |
Completion of work |
-
latitude : 20.0031469
Longitude : 85.6537717
file name : Image_30052023160805372.png
|
2023-05-30 16:08:05.434851 |
43 |
44286258 |
CONST.OF CC WALL AT BADA POKHARI,KADUA GP |
150000 |
CONST.OF CC WALL AT BADA POKHARI,KADUA GP1 |
Completion of work |
-
latitude : 20.0031079
Longitude : 85.6537092
file name : Image_10082023153658171.png
|
2023-08-10 15:36:58.253332 |
44 |
60867725 |
REPAIRING OF SANORA AWC AND CONNECTION OF PIPE AND TAP (UT) |
100000 |
REPAIRING OF SANORA AWC AND CONNECTION OF PIPE AND TAP (UT)1 |
Completion of work |
-
latitude : 20.0030986
Longitude : 85.6537031
file name : Image_10082023153415126.png
|
2023-08-10 15:34:15.200755 |
45 |
60865290 |
PRIYA SOFT AND PLAN PLUS ENTRY D |
6000 |
PRIYA SOFT AND PLAN PLUS ENTRY D1 |
Completion of work |
-
latitude : 20.0030604
Longitude : 85.6536804
file name : Image_10082023152151344.png
|
2023-08-10 15:21:51.433417 |
46 |
44275058 |
PAYMENT TO SEM |
115200 |
PAYMENT TO SEM1 |
Completion of work |
-
latitude : 20.0032436
Longitude : 85.6537032
file name : Image_17112023130450857.png
|
2023-11-17 13:04:50.992279 |
47 |
60868264 |
CONSTRUCTION OF DRAIN FROM HOUSE OF BIRANCHI MAHARATHY TO GHERI BANDHA THROUGH TARINI TEMPLE WEST (U |
178710 |
CONSTRUCTION OF DRAIN FROM HOUSE OF BIRANCHI MAHARATHY TO GHERI BANDHA THROUGH TARINI TEMPLE WEST (U1 |
Completion of work |
-
latitude : 20.0031947
Longitude : 85.6537849
file name : Image_09102023135656187.png
|
2023-10-09 13:56:56.253668 |
48 |
60865460 |
EMERGENCY CONTIGENCY U |
38060 |
EMERGENCY CONTIGENCY U1 |
Completion of work |
-
latitude : 19.98849819
Longitude : 85.57037408
file name : Image_10062022182958265.png
|
2022-06-10 18:29:58.392191 |
49 |
63512068 |
SOLID AND QUIDE WASTE MANAGEMENT. S |
600980 |
SOLID AND QUIDE WASTE MANAGEMENT. S1 |
Completion of work |
-
latitude : 20.0031606
Longitude : 85.6536821
file name : Image_07102024132535182.png
|
2024-10-07 13:25:35.275415 |
50 |
63512068 |
SOLID AND QUIDE WASTE MANAGEMENT. S |
600980 |
SOLID AND QUIDE WASTE MANAGEMENT. S1 |
Completion of work |
-
latitude : 20.003242
Longitude : 85.6537046
file name : Image_08022023140731550.png
|
2023-02-08 14:07:31.638799 |
51 |
60864035 |
REPAIRING OF PIPELINE D |
90020 |
REPAIRING OF PIPELINE D1 |
Completion of work |
-
latitude : 20.0031932
Longitude : 85.6537049
file name : Image_30092022164831187.png
|
2022-09-30 16:48:31.269791 |
52 |
81181508 |
Water Supply to villages |
190903 |
Water Supply to villages1 |
Roof laid |
-
latitude : 20.0031975
Longitude : 85.6537361
file name : Image_03102023123225161.png
|
2023-10-03 12:32:25.229061 |
53 |
81181508 |
Water Supply to villages |
190903 |
Water Supply to villages1 |
Plinth level |
-
latitude : 20.0031963
Longitude : 85.6537395
file name : Image_03102023122948857.png
|
2023-10-03 12:29:48.928259 |
54 |
81181508 |
Water Supply to villages |
190903 |
Water Supply to villages1 |
Completion of work |
-
latitude : 20.0031959
Longitude : 85.6537352
file name : Image_03102023115644038.png
|
2023-10-03 11:56:44.119397 |
55 |
60867852 |
REPAIRING OF BHATAPADA AWC AND CONNECTION OF PIPE AND TAP (ut) |
100000 |
REPAIRING OF BHATAPADA AWC AND CONNECTION OF PIPE AND TAP (ut)1 |
Completion of work |
-
latitude : 20.1698461
Longitude : 85.7126482
file name : Image_08112023112844472.png
|
2023-11-08 11:28:44.661431 |
56 |
60866319 |
WATER SUPPLY TO BHATAPADA SCHOOL S |
100000 |
WATER SUPPLY TO BHATAPADA SCHOOL S1 |
Completion of work |
-
latitude : 20.00349333333333
Longitude : 85.65276166666666
file name : Image_07112023113036692.png
|
2023-11-07 11:30:36.775739 |
57 |
82706134 |
Water Supply to villages |
67876 |
Water Supply to villages1 |
Completion of work |
-
latitude : 20.169896666666666
Longitude : 85.71234666666666
file name : Image_30112023152610070.png
|
2023-11-30 15:26:10.166017 |
58 |
81214378 |
Installation of Electricity/Solar Energy system |
226723 |
Installation of Electricity/Solar Energy system1 |
Roof laid |
-
latitude : 20.0031949
Longitude : 85.653754
file name : Image_01122023120623153.png
|
2023-12-01 12:06:23.308526 |
59 |
81214378 |
Installation of Electricity/Solar Energy system |
226723 |
Installation of Electricity/Solar Energy system1 |
Roof laid |
-
latitude : 20.0031969
Longitude : 85.6537443
file name : Image_01122023115952228.png
|
2023-12-01 11:59:52.344882 |
60 |
81214378 |
Installation of Electricity/Solar Energy system |
226723 |
Installation of Electricity/Solar Energy system1 |
Plinth level |
-
latitude : 20.0031943
Longitude : 85.6537509
file name : Image_01122023115631780.png
|
2023-12-01 11:56:31.904262 |
61 |
81214378 |
Installation of Electricity/Solar Energy system |
226723 |
Installation of Electricity/Solar Energy system1 |
Completion of work |
-
latitude : 20.0031884
Longitude : 85.6537507
file name : Image_01122023115056454.png
|
2023-12-01 11:50:56.578737 |
62 |
81214378 |
Installation of Electricity/Solar Energy system |
226723 |
Installation of Electricity/Solar Energy system1 |
Completion of work |
-
latitude : 20.0031675
Longitude : 85.653752
file name : Image_01122023115046049.png
|
2023-12-01 11:50:46.167531 |
63 |
81182262 |
Water Supply to villages |
320000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 20.030393333333333
Longitude : 85.69069166666668
file name : Image_22122023115347771.png
|
2023-12-22 11:53:47.87256 |
64 |
60868157 |
CONNECTION OF PIPE AND TAP FOR BOTH AWC OF KAUDIKHANI AWC,FISHERMEN LANE (UT) |
100000 |
CONNECTION OF PIPE AND TAP FOR BOTH AWC OF KAUDIKHANI AWC,FISHERMEN LANE (UT)1 |
Completion of work |
-
latitude : 20.030393333333333
Longitude : 85.69069166666668
file name : Image_22122023115748892.png
|
2023-12-22 11:57:48.983882 |
65 |
81202378 |
Repair and Maintenance of Hostels and Schools |
200000 |
Repair and Maintenance of Hostels and Schools1 |
Completion of work |
-
latitude : 20.0031696
Longitude : 85.6536743
file name : Image_12062024131650295.png
|
2024-06-12 13:16:50.395174 |
66 |
81226697 |
Providing piped water supply to public institutions |
35000 |
Providing piped water supply to public institutions1 |
Completion of work |
-
latitude : 20.00323
Longitude : 85.6537067
file name : Image_14052024161803492.png
|
2024-05-14 16:18:03.586222 |
67 |
82707970 |
Electricity |
75502 |
Electricity1 |
Completion of work |
-
latitude : 20.0032287
Longitude : 85.6536918
file name : Image_28032024162146562.png
|
2024-03-28 16:21:46.713819 |
68 |
81216931 |
Emergency breakdown and up-gradation post disasters/ exigencies |
18591 |
Emergency breakdown and up-gradation post disasters/ exigencies1 |
Completion of work |
-
latitude : 20.0032311
Longitude : 85.6536916
file name : Image_29032024175628424.png
|
2024-03-29 17:56:28.542326 |
69 |
60866931 |
REPAIRING OF SUNAKHALA AWC CENTER AND CONNECTION OF PIPE D |
60000 |
REPAIRING OF SUNAKHALA AWC CENTER AND CONNECTION OF PIPE D1 |
Completion of work |
-
latitude : 20.0032273
Longitude : 85.6536904
file name : Image_29032024180041599.png
|
2024-03-29 18:00:41.752079 |
70 |
81224161 |
Operation and Maintenance of piped water supply system |
100000 |
Operation and Maintenance of piped water supply system1 |
Completion of work |
-
latitude : 20.0032291
Longitude : 85.6536921
file name : Image_29032024175509510.png
|
2024-03-29 17:55:09.608049 |
71 |
104646405 |
Procurement of Computer Printer, UPS, etc. |
50000 |
Procurement of Computer Printer, UPS, etc.1 |
Completion of work |
-
latitude : 20.00302213
Longitude : 85.65377974
file name : Image_07102024132237651.png
|
2024-10-07 13:22:37.82886 |
72 |
81209907 |
Construction of Child Friendly Corner in AWC |
100000 |
Construction of Child Friendly Corner in AWC1 |
Completion of work |
-
latitude : 20.003207
Longitude : 85.6536866
file name : Image_16072024170656150.png
|
2024-07-16 17:06:56.267283 |
73 |
105273327 |
Piped/tap water supply to HH |
261000 |
Piped/tap water supply to HH1 |
Completion of work |
-
latitude : 20.00299042
Longitude : 85.65392933
file name : Image_07102024132149538.png
|
2024-10-07 13:21:49.756968 |
74 |
105273327 |
Piped/tap water supply to HH |
261000 |
Piped/tap water supply to HH1 |
Completion of work |
-
latitude : 20.0031752
Longitude : 85.6536983
file name : Image_07102024132109596.png
|
2024-10-07 13:21:09.71232 |
75 |
105273327 |
Piped/tap water supply to HH |
261000 |
Piped/tap water supply to HH1 |
Completion of work |
-
latitude : 20.00405422
Longitude : 85.64466761
file name : Image_07102024132113169.png
|
2024-10-07 13:21:13.290466 |
76 |
81201193 |
Construction of Child Friendly Corner in AWC |
100000 |
Construction of Child Friendly Corner in AWC1 |
Completion of work |
-
latitude : 20.0032068
Longitude : 85.6536903
file name : Image_20072024133846845.png
|
2024-07-20 13:38:46.92842 |
77 |
104963937 |
Construction of overhead Tank |
60780 |
Construction of overhead Tank1 |
Completion of work |
-
latitude : 20.0031841
Longitude : 85.6536928
file name : Image_17102024164359939.png
|
2024-10-17 16:44:00.063621 |
78 |
104791398 |
Construction of Child Friendly Corner in AWC/ School/ GP/ Public Building |
100000 |
Construction of Child Friendly Corner in AWC/ School/ GP/ Public Building1 |
Completion of work |
-
latitude : 20.0031776
Longitude : 85.6536762
file name : Image_17102024164631631.png
|
2024-10-17 16:46:32.894018 |
79 |
81220505 |
Construction of community washing & bathing complex |
122000 |
Construction of community washing & bathing complex1 |
Completion of work |
-
latitude : 20.0032274
Longitude : 85.6537093
file name : Image_08082024151201245.png
|
2024-08-08 15:12:01.344025 |