1 |
44711218 |
CFC/TIED/CONST. OF TUBE WELL PLAT FORM 6 NOS |
90000 |
CFC/TIED/CONST. OF TUBE WELL PLAT FORM 6 NOS1 |
Plinth level |
-
latitude : 19.18845333333333
Longitude : 83.41666833333332
file name : Image_09022022233106230.png
|
2022-02-09 23:31:06.311968 |
2 |
60726112 |
Installation of Solar Street Light at Durukhal and Maligaon SFC |
490000 |
Installation of Solar Street Light at Durukhal and Maligaon SFC1 |
Plinth level |
-
latitude : 19.1683646
Longitude : 83.4201882
file name : Image_04072022215448270.png
|
2022-07-04 21:54:48.397676 |
3 |
51250394 |
VEHICLE CHARGES FOR REPAIR OF TUBE WELL AND SUMMER SEASON WATER SUPPLY CFC TIED 1ST |
150000 |
VEHICLE CHARGES FOR REPAIR OF TUBE WELL AND SUMMER SEASON WATER SUPPLY CFC TIED 1ST1 |
Plinth level |
-
latitude : 19.39157943
Longitude : 82.98322406
file name : Image_09102021195516799.png
|
2021-10-09 19:55:16.900586 |
4 |
51250486 |
MAINTENANCE OF SBWS CFC TIED 1ST |
166821 |
MAINTENANCE OF SBWS CFC TIED 1ST1 |
Plinth level |
-
latitude : 19.34676144
Longitude : 83.02189138
file name : Image_27102021164212360.png
|
2021-10-27 16:42:12.452238 |
5 |
51250036 |
JALA CHATRA CFC TIED 1ST |
100000 |
JALA CHATRA CFC TIED 1ST1 |
Plinth level |
-
latitude : 19.38467036
Longitude : 82.98601287
file name : Image_09102021195513368.png
|
2021-10-09 19:55:13.506879 |
6 |
51249545 |
SEM REMUNARATION CFC TIED 1ST |
50000 |
SEM REMUNARATION CFC TIED 1ST1 |
Plinth level |
-
latitude : 19.1884427
Longitude : 83.4171423
file name : Image_09022022232420278.png
|
2022-02-09 23:24:20.39551 |
7 |
51249545 |
SEM REMUNARATION CFC TIED 1ST |
50000 |
SEM REMUNARATION CFC TIED 1ST1 |
Plinth level |
-
latitude : 19.3604169
Longitude : 83.10941301
file name : Image_09102021195523405.png
|
2021-10-09 19:55:23.470744 |
8 |
44712225 |
CFC/UNTIED/CONST. OF MASANI GHAT STEP AT CHANDRAGIRI HARIJANA SAHI |
150000 |
CFC/UNTIED/CONST. OF MASANI GHAT STEP AT CHANDRAGIRI HARIJANA SAHI1 |
Plinth level |
-
latitude : 19.39006603,19.39006603
Longitude : 82.98650567,82.98650567
file name : Image_30102021041123357.png
|
2021-10-30 04:11:23.470688 |
9 |
44712239 |
CFC/UNTIED/CONST. OF BATHING GHAT AND CHANGING ROOM AT MALIGAON |
150000 |
CFC/UNTIED/CONST. OF BATHING GHAT AND CHANGING ROOM AT MALIGAON1 |
Plinth level |
-
latitude : 19.35748911
Longitude : 82.99934267
file name : Image_11052021191518979.png
|
2021-05-11 19:15:19.024501 |
10 |
44712324 |
CFC/UNTIED/REPAIR OF GP GODOWN AT CHANDRAGIRI |
150000 |
CFC/UNTIED/REPAIR OF GP GODOWN AT CHANDRAGIRI1 |
Plinth level |
-
latitude : 19.38474879
Longitude : 82.98587198
file name : Image_11052021191536087.png
|
2021-05-11 19:15:36.128732 |
11 |
44711059 |
CFC/TIED/ REMUNERATION OF SEM |
80000 |
CFC/TIED/ REMUNERATION OF SEM1 |
Plinth level |
-
latitude : 19.36033233
Longitude : 83.10943081
file name : Image_24082021103612186.png
|
2021-08-24 10:36:12.278036 |
12 |
44711059 |
CFC/TIED/ REMUNERATION OF SEM |
80000 |
CFC/TIED/ REMUNERATION OF SEM1 |
Plinth level |
-
latitude : 19.36034642
Longitude : 83.10938818
file name : Image_20052021084719928.png
|
2021-05-20 08:47:20.031902 |
13 |
44712438 |
SFC/CONST. OF PROTECTION WALL AT SIRIGUNJA LITI SAHI |
100000 |
SFC/CONST. OF PROTECTION WALL AT SIRIGUNJA LITI SAHI1 |
Plinth level |
-
latitude : 19.3876057
Longitude : 83.00778326
file name : Image_20052021125901036.png
|
2021-05-20 12:59:01.129143 |
14 |
44712503 |
SFC/CONST. OF PROTECTION WALL AT DANGESKHAL HARIJAN SAHI |
100000 |
SFC/CONST. OF PROTECTION WALL AT DANGESKHAL HARIJAN SAHI1 |
Plinth level |
-
latitude : 19.39156396
Longitude : 82.96730368
file name : Image_20052021125906017.png
|
2021-05-20 12:59:06.129581 |
15 |
44711116 |
CFC/TIED/MAINTENANCE OF SWAJALADHARA PIPE LINE |
100000 |
CFC/TIED/MAINTENANCE OF SWAJALADHARA PIPE LINE1 |
Plinth level |
-
latitude : 19.37604405,19.37604262,19.3760434,19.37604394
Longitude : 82.963492,82.96354149,82.96353866,82.96353768
file name : Image_20052021125913867.png
|
2021-05-20 12:59:13.958055 |
16 |
44712234 |
CFC/UNTIED/CONST. OF BATHING GHAT AND CHANGING ROOM AT DHUTURAPAS |
150000 |
CFC/UNTIED/CONST. OF BATHING GHAT AND CHANGING ROOM AT DHUTURAPAS1 |
Plinth level |
-
latitude : 19.1689426
Longitude : 83.4201598
file name : Image_04072022215647164.png
|
2022-07-04 21:56:47.311811 |
17 |
44712272 |
CFC/UNTIED/CONST. OF RIVER STEPS AT KASANDARA |
150000 |
CFC/UNTIED/CONST. OF RIVER STEPS AT KASANDARA1 |
Plinth level |
-
latitude : 19.3541573
Longitude : 83.03832614
file name : Image_18122021221506061.png
|
2021-12-18 22:15:06.128488 |
18 |
44712272 |
CFC/UNTIED/CONST. OF RIVER STEPS AT KASANDARA |
150000 |
CFC/UNTIED/CONST. OF RIVER STEPS AT KASANDARA1 |
Plinth level |
-
latitude : 19.37377605
Longitude : 83.04422473
file name : Image_03092021114331531.png
|
2021-09-03 11:43:31.612707 |
19 |
44712316 |
CFC/UNTIED/CONST. OF RIVER STEPS AT TIKARPADA |
100000 |
CFC/UNTIED/CONST. OF RIVER STEPS AT TIKARPADA1 |
Plinth level |
-
latitude : 19.40755385
Longitude : 83.0161284
file name : Image_09092021101549230.png
|
2021-09-09 10:15:49.299176 |
20 |
44711245 |
CFC/TIED/JALACHATRA |
100000 |
CFC/TIED/JALACHATRA1 |
Plinth level |
-
latitude : 19.39265306
Longitude : 83.05347474
file name : Image_09102021195506755.png
|
2021-10-09 19:55:06.833396 |
21 |
44711096 |
CFC/TIED/VEHICLE CHARGES IN SUMMER SEASON OF WATER SUPPLY |
34643 |
CFC/TIED/VEHICLE CHARGES IN SUMMER SEASON OF WATER SUPPLY1 |
Plinth level |
-
latitude : 19.39159057,19.39159057
Longitude : 82.98322295,82.98322295
file name : Image_09102021195520112.png
|
2021-10-09 19:55:20.218663 |
22 |
44712335 |
CFC/UNTIED/CONST. OF BATHING GHAT STEPS AT CHANDRAGIRI |
90000 |
CFC/UNTIED/CONST. OF BATHING GHAT STEPS AT CHANDRAGIRI1 |
Plinth level |
-
latitude : 19.40000099
Longitude : 83.00177047
file name : Image_09102021195510135.png
|
2021-10-09 19:55:10.200177 |
23 |
44712311 |
CFC/UNTIED/CONST. OF RIVER STEPS AT TALAPATRI |
100000 |
CFC/UNTIED/CONST. OF RIVER STEPS AT TALAPATRI1 |
Plinth level |
-
latitude : 19.354156666666665
Longitude : 83.03847333333333
file name : Image_12012022170428745.png
|
2022-01-12 17:04:28.852461 |
24 |
51249920 |
ELECTRIC BILL PAYMENT CFC TIED 1ST |
100000 |
ELECTRIC BILL PAYMENT CFC TIED 1ST1 |
Plinth level |
-
latitude : 19.36033762
Longitude : 83.1094228
file name : Image_16122021191026606.png
|
2021-12-16 19:10:26.761369 |
25 |
51247499 |
INSTALLATION OF SOLAR STREET LIGHT AT DURUKHAL CFC UNTIED 1ST |
200000 |
INSTALLATION OF SOLAR STREET LIGHT AT DURUKHAL CFC UNTIED 1ST1 |
Plinth level |
-
latitude : 19.34635597
Longitude : 83.02196197
file name : Image_20112021190231172.png
|
2021-11-20 19:02:31.231441 |
26 |
44712345 |
SFC/CONST. OF PROTECTION WALL AT GUDI SAHI CHANDRAGIRI |
100000 |
SFC/CONST. OF PROTECTION WALL AT GUDI SAHI CHANDRAGIRI1 |
Plinth level |
-
latitude : 19.188480000000002
Longitude : 83.41680999999998
file name : Image_16082022170100785.png
|
2022-08-16 17:01:00.898779 |
27 |
44712345 |
SFC/CONST. OF PROTECTION WALL AT GUDI SAHI CHANDRAGIRI |
100000 |
SFC/CONST. OF PROTECTION WALL AT GUDI SAHI CHANDRAGIRI1 |
Plinth level |
-
latitude : 19.382755
Longitude : 82.98683333333332
file name : Image_18012022190351591.png
|
2022-01-18 19:03:51.720055 |
28 |
44712389 |
SFC/CONST. OF PROTECTION WALL AT DURUKHAL |
127000 |
SFC/CONST. OF PROTECTION WALL AT DURUKHAL1 |
Plinth level |
-
latitude : 19.346701666666668
Longitude : 83.02226999999999
file name : Image_19012022190314625.png
|
2022-01-19 19:03:14.705242 |
29 |
44712260 |
CFC/UNTIED/CONST. OF STEPS AT DURUKHAL SCHOOL |
101000 |
CFC/UNTIED/CONST. OF STEPS AT DURUKHAL SCHOOL1 |
Plinth level |
-
latitude : 19.348856666666666
Longitude : 83.01916166666666
file name : Image_19012022190301397.png
|
2022-01-19 19:03:01.480567 |
30 |
51250207 |
PRIASOFT ENTRY CFC TIED 1ST |
6000 |
PRIASOFT ENTRY CFC TIED 1ST1 |
Plinth level |
-
latitude : 19.188454999999998
Longitude : 83.41662833333334
file name : Image_11092022075235718.png
|
2022-09-11 07:52:35.820864 |
31 |
60725907 |
Installation of Solar Street Light at Chandragiri CFC(U) |
315000 |
Installation of Solar Street Light at Chandragiri CFC(U)1 |
Plinth level |
-
latitude : 19.1682234
Longitude : 83.4201746
file name : Image_13072022072509563.png
|
2022-07-13 07:25:09.65511 |
32 |
51250608 |
SOLID WASTE MANAGEMENT CFC TIED 2ND |
50000 |
SOLID WASTE MANAGEMENT CFC TIED 2ND1 |
Plinth level |
-
latitude : 19.1884717
Longitude : 83.4166282
file name : Image_25072022092952969.png
|
2022-07-25 09:29:53.073281 |
33 |
60724762 |
Payment of Previous Due Electric Bill of Pump House CFC(T) |
100000 |
Payment of Previous Due Electric Bill of Pump House CFC(T)1 |
Plinth level |
-
latitude : 19.188241666666666
Longitude : 83.41682833333334
file name : Image_30032023130419821.png
|
2023-03-30 13:04:19.910338 |
34 |
60724762 |
Payment of Previous Due Electric Bill of Pump House CFC(T) |
100000 |
Payment of Previous Due Electric Bill of Pump House CFC(T)1 |
Plinth level |
-
latitude : 19.188248333333334
Longitude : 83.41659666666668
file name : Image_30032023130416045.png
|
2023-03-30 13:04:16.158427 |
35 |
60724762 |
Payment of Previous Due Electric Bill of Pump House CFC(T) |
100000 |
Payment of Previous Due Electric Bill of Pump House CFC(T)1 |
Plinth level |
-
latitude : 19.188503333333333
Longitude : 83.416715
file name : Image_17082022105053865.png
|
2022-08-17 10:50:54.01581 |
36 |
60724688 |
Remuneration of SEM and PUMP Driver CFC(T) |
72000 |
Remuneration of SEM and PUMP Driver CFC(T)1 |
Plinth level |
-
latitude : 19.1884901
Longitude : 83.4165809
file name : Image_17082022105050873.png
|
2022-08-17 10:50:51.006854 |
37 |
60724817 |
Distribution of Jalachatra CFC(T) |
91200 |
Distribution of Jalachatra CFC(T)1 |
Plinth level |
-
latitude : 19.1681867
Longitude : 83.4201378
file name : Image_11092022192652330.png
|
2022-09-11 19:26:52.423948 |
38 |
60726209 |
Installation of Solar street Light in Different villages SFC |
490000 |
Installation of Solar street Light in Different villages SFC1 |
Plinth level |
-
latitude : 19.1884481
Longitude : 83.4171741
file name : Image_04062023100507030.png
|
2023-06-04 10:05:07.137785 |
39 |
60726010 |
Installation of Solar Street Light at Dangeskhal CFC(U) |
210000 |
Installation of Solar Street Light at Dangeskhal CFC(U)1 |
Plinth level |
-
latitude : 19.1884404
Longitude : 83.4171687
file name : Image_04062023100503360.png
|
2023-06-04 10:05:03.466981 |
40 |
51249216 |
REPAIR OF DRAIN AT BRAMORJODI CFC UNTIED 2ND |
100000 |
REPAIR OF DRAIN AT BRAMORJODI CFC UNTIED 2ND1 |
Completion of work |
-
latitude : 19.177871033333336,19.17785555
Longitude : 83.09182111666665,83.09180648333334
file name : Image_02082023110952164.png
|
2023-08-02 11:09:52.25893 |
41 |
51248910 |
REPAIR OF DRAIN AT DURUKHAL CFC UNTIED 2ND |
98822 |
REPAIR OF DRAIN AT DURUKHAL CFC UNTIED 2ND1 |
Completion of work |
-
latitude : 19.17779051666667,19.177790366666667
Longitude : 83.09179623333333,83.09185113333334
file name : Image_02082023110814407.png
|
2023-08-02 11:08:14.506141 |
42 |
51248359 |
CONST OF AMOGAN CHANDINI AT LITI SAHI SURUGUNJA CFC UNTIED 2ND |
150000 |
CONST OF AMOGAN CHANDINI AT LITI SAHI SURUGUNJA CFC UNTIED 2ND1 |
Completion of work |
-
latitude : 19.177912483333333
Longitude : 83.09177963333335
file name : Image_02082023110020492.png
|
2023-08-02 11:00:20.636202 |
43 |
51252256 |
CONST OF DRAIN AT TALAPATRI 5TH SFC 2ND |
100000 |
CONST OF DRAIN AT TALAPATRI 5TH SFC 2ND1 |
Completion of work |
-
latitude : 19.177840783333334,19.177855233333332
Longitude : 83.09179225000001,83.09180701666668
file name : Image_02082023111429137.png
|
2023-08-02 11:14:29.227207 |
44 |
51251943 |
CONST OF DRAIN AT HARIJAN SAHI DANESKHAL 5TH SFC 1ST |
100000 |
CONST OF DRAIN AT HARIJAN SAHI DANESKHAL 5TH SFC 1ST1 |
Completion of work |
-
latitude : 19.17783066666667,19.177802733333333
Longitude : 83.09183761666667,83.09184846666668
file name : Image_02082023111131628.png
|
2023-08-02 11:11:31.72031 |
45 |
51251752 |
CONST OF GUARD WALL AT DURUKHAL KHAJURGACH 5TH SFC 1ST |
241230 |
CONST OF GUARD WALL AT DURUKHAL KHAJURGACH 5TH SFC 1ST1 |
Completion of work |
-
latitude : 19.1777938,19.1778625
Longitude : 83.09181538333333,83.09175896666666
file name : Image_02082023111303349.png
|
2023-08-02 11:13:03.438655 |
46 |
51252304 |
CONST OF GUARD WALL AT CHANDRAGIRI 5TH SFC 2ND |
200000 |
CONST OF GUARD WALL AT CHANDRAGIRI 5TH SFC 2ND1 |
Completion of work |
-
latitude : 19.1783603,19.1783603
Longitude : 83.0923346,83.0923346
file name : Image_09102023100729032.png
|
2023-10-09 10:07:29.123363 |
47 |
51252304 |
CONST OF GUARD WALL AT CHANDRAGIRI 5TH SFC 2ND |
200000 |
CONST OF GUARD WALL AT CHANDRAGIRI 5TH SFC 2ND1 |
Completion of work |
-
latitude : 19.1782973,19.1782973
Longitude : 83.0906578,83.0906578
file name : Image_09102023100612977.png
|
2023-10-09 10:06:13.069212 |
48 |
51250883 |
HELTH CAMP AT GUMUNDISUPEL CFC TIED 2ND |
50000 |
HELTH CAMP AT GUMUNDISUPEL CFC TIED 2ND1 |
Completion of work |
-
latitude : 19.181376211345196
Longitude : 83.09365091845393
file name : Image_03032024200727183.png
|
2024-03-03 20:07:27.3121 |
49 |
51252348 |
CONST OF DRAIN AT CHANDRAGIRI 5TH SFC 2ND |
108770 |
CONST OF DRAIN AT CHANDRAGIRI 5TH SFC 2ND1 |
Plinth level |
-
latitude : 19.18167930096388,19.1816995
Longitude : 83.09327197261155,83.09267
file name : Image_20012024093812026.png
|
2024-01-20 09:38:12.110011 |
50 |
51252348 |
CONST OF DRAIN AT CHANDRAGIRI 5TH SFC 2ND |
108770 |
CONST OF DRAIN AT CHANDRAGIRI 5TH SFC 2ND1 |
Completion of work |
-
latitude : 19.177855983333334,19.17785363333333
Longitude : 83.09183694999999,83.09182771666669
file name : Image_02082023111600753.png
|
2023-08-02 11:16:00.863923 |
51 |
83229051 |
Construction of new Piped Water Supply schemes |
91200 |
Construction of new Piped Water Supply schemes1 |
Completion of work |
-
latitude : 19.181646737270057
Longitude : 83.09324498288333
file name : Image_20012024101434660.png
|
2024-01-20 10:14:34.749402 |
52 |
51247342 |
REPAIR OF ANGANWADI CENTER AT PADAMPUR CFC UNTIDE 1ST |
172821 |
REPAIR OF ANGANWADI CENTER AT PADAMPUR CFC UNTIDE 1ST1 |
Completion of work |
-
latitude : 19.181460491381586
Longitude : 83.09325101785362
file name : Image_20012024093558608.png
|
2024-01-20 09:35:58.690788 |
53 |
44712416 |
SFC/PURCHASE OF COMPUTER AND PRINTER FOR GP OFFICE |
50546 |
SFC/PURCHASE OF COMPUTER AND PRINTER FOR GP OFFICE1 |
|
-
latitude : 19.18157414998859
Longitude : 83.09321673586965
file name : Image_19012024184750556.png
|
2024-01-19 18:47:50.667083 |
54 |
44712431 |
SFC/PURCHASE OF MOBILE FOR GEO TAGGING |
20000 |
SFC/PURCHASE OF MOBILE FOR GEO TAGGING1 |
|
-
latitude : 19.2603430012241
Longitude : 83.95191145129502
file name : Image_14012024074618560.png
|
2024-01-14 07:46:18.652716 |
55 |
83234787 |
Purchase of water testing kit |
90000 |
Purchase of water testing kit1 |
Completion of work |
-
latitude : 19.181621172465384
Longitude : 83.09329594485462
file name : Image_26022024230004371.png
|
2024-02-26 23:00:04.334353 |
56 |
83359949 |
Functional Electricity Connection |
12980 |
Functional Electricity Connection1 |
Completion of work |
-
latitude : 19.18160533066839
Longitude : 83.09309746138752
file name : Image_26022024225806561.png
|
2024-02-26 22:58:06.538099 |
57 |
83222294 |
Creation of a new rainwater harvesting structure |
72000 |
Creation of a new rainwater harvesting structure1 |
Completion of work |
-
latitude : 19.357860451564193
Longitude : 83.10944007709622
file name : Image_22042024082645180.png
|
2024-04-22 08:26:45.256824 |
58 |
51252086 |
CONST OF DRAIN AT PODAPADAR 5TH SFC 1ST |
100000 |
CONST OF DRAIN AT PODAPADAR 5TH SFC 1ST1 |
Completion of work |
-
latitude : 19.410590333864093,19.410572103224695
Longitude : 83.01178461872041,83.01179056987166
file name : Image_24062024152525413.png
|
2024-06-24 15:25:25.550634 |
59 |
83233946 |
Installation of Tubewell |
50000 |
Installation of Tubewell1 |
Completion of work |
-
latitude : 19.386720517650247
Longitude : 82.96600861474872
file name : Image_24062024152549729.png
|
2024-06-24 15:25:49.821216 |
60 |
83233946 |
Installation of Tubewell |
50000 |
Installation of Tubewell1 |
Completion of work |
-
latitude : 19.386720517650247
Longitude : 82.96600861474872
file name : Image_24062024152536770.png
|
2024-06-24 15:25:36.86477 |
61 |
83222292 |
Installation of Solar lights |
490000 |
Installation of Solar lights1 |
Completion of work |
-
latitude : 19.358332
Longitude : 83.1103598
file name : Image_21052024103053227.png
|
2024-05-21 10:30:53.330602 |
62 |
79154614 |
Purchase of Tricycles/other battery -operated vehicles for door to door collection of waste |
8900 |
Purchase of Tricycles/other battery -operated vehicles for door to door collection of waste1 |
Completion of work |
-
latitude : 19.3579755
Longitude : 83.1101952
file name : Image_12092024140755336.png
|
2024-09-12 14:07:55.465725 |
63 |
44711227 |
CFC/TIED/SOLID WASTE MANAGEMENT AT G.SUPEL |
50000 |
CFC/TIED/SOLID WASTE MANAGEMENT AT G.SUPEL1 |
Completion of work |
-
latitude : 19.38468534965068
Longitude : 82.98602879047394
file name : Image_15092024120102281.png
|
2024-09-15 12:01:02.266057 |
64 |
44711227 |
CFC/TIED/SOLID WASTE MANAGEMENT AT G.SUPEL |
50000 |
CFC/TIED/SOLID WASTE MANAGEMENT AT G.SUPEL1 |
Completion of work |
-
latitude : 19.38468534965068
Longitude : 82.98602879047394
file name : Image_15092024120053793.png
|
2024-09-15 12:00:53.891267 |
65 |
83231696 |
Household Sanitation - Construction of IHHL for eligible HHs |
114000 |
Household Sanitation - Construction of IHHL for eligible HHs1 |
Completion of work |
-
latitude : 19.38461909070611
Longitude : 82.98592301085591
file name : Image_15092024120000551.png
|
2024-09-15 12:00:00.537085 |
66 |
79152049 |
Operation and Maintenance of drinking water supply system |
50000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 19.38683824148029
Longitude : 82.96602755784988
file name : Image_24062024152542731.png
|
2024-06-24 15:25:42.824008 |
67 |
79152049 |
Operation and Maintenance of drinking water supply system |
50000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 19.38683824148029
Longitude : 82.96602755784988
file name : Image_24062024152531884.png
|
2024-06-24 15:25:31.975823 |
68 |
83238127 |
Providing piped water supply to public institutions |
89052 |
Providing piped water supply to public institutions1 |
Completion of work |
-
latitude : 19.36091980431229
Longitude : 83.00243368372321
file name : Image_26092024150020938.png
|
2024-09-26 15:00:21.027741 |
69 |
83238127 |
Providing piped water supply to public institutions |
89052 |
Providing piped water supply to public institutions1 |
Completion of work |
-
latitude : 19.36091980431229
Longitude : 83.00243368372321
file name : Image_26092024150011385.png
|
2024-09-26 15:00:11.470289 |
70 |
102314999 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets |
150000 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets1 |
Completion of work |
-
latitude : 19.38470659777522
Longitude : 82.98589300364256
file name : Image_26092024150006662.png
|
2024-09-26 15:00:06.743654 |
71 |
102267934 |
Piped/tap water supply to HH |
117000 |
Piped/tap water supply to HH1 |
Completion of work |
-
latitude : 19.181651095859706
Longitude : 83.09323919937015
file name : Image_28092024125256680.png
|
2024-09-28 12:52:57.85468 |
72 |
83363109 |
Fencing of Ponds |
100000 |
Fencing of Ponds1 |
Completion of work |
-
latitude : 19.181647282093763
Longitude : 83.09324213303626
file name : Image_17102024141043591.png
|
2024-10-17 14:10:43.715572 |
73 |
51251420 |
SUPPLY OF PIPE LINE WATER LINE BRAMORJODI CFC TIED 2ND |
150000 |
SUPPLY OF PIPE LINE WATER LINE BRAMORJODI CFC TIED 2ND 1 |
Completion of work |
-
latitude : 19.1815926739946
Longitude : 83.09337481856346
file name : Image_18102024155357290.png
|
2024-10-18 15:53:57.40486 |