1 |
43671992 |
CONSTRUCTION OF BATHING STEP AT SAMETI KATA |
100000 |
CONSTRUCTION OF BATHING STEP AT SAMETI KATA1 |
Completion of work |
-
latitude : 21.38519308
Longitude : 84.26239208
file name : Image_04082021092546886.png
|
2021-08-04 09:25:47.013553 |
2 |
43671992 |
CONSTRUCTION OF BATHING STEP AT SAMETI KATA |
100000 |
CONSTRUCTION OF BATHING STEP AT SAMETI KATA1 |
Completion of work |
-
latitude : 21.38520287
Longitude : 84.26238149
file name : Image_04082021092747499.png
|
2021-08-04 09:27:47.588964 |
3 |
43672743 |
CONSTRUCTION OF BOUNDARY WALL AT KHAJURIPALI PRIMARY SCHOOL |
140000 |
CONSTRUCTION OF BOUNDARY WALL AT KHAJURIPALI PRIMARY SCHOOL1 |
Plinth level |
-
latitude : 21.38502229
Longitude : 84.26114341
file name : Image_05032021142237064.png
|
2021-03-05 14:22:37.167678 |
4 |
43672743 |
CONSTRUCTION OF BOUNDARY WALL AT KHAJURIPALI PRIMARY SCHOOL |
140000 |
CONSTRUCTION OF BOUNDARY WALL AT KHAJURIPALI PRIMARY SCHOOL1 |
Completion of work |
-
latitude : 21.3851405
Longitude : 84.26119948
file name : Image_05032021141543105.png
|
2021-03-05 14:15:43.198437 |
5 |
43672743 |
CONSTRUCTION OF BOUNDARY WALL AT KHAJURIPALI PRIMARY SCHOOL |
140000 |
CONSTRUCTION OF BOUNDARY WALL AT KHAJURIPALI PRIMARY SCHOOL1 |
Completion of work |
-
latitude : 21.3851332
Longitude : 84.26112336
file name : Image_05032021140414165.png
|
2021-03-05 14:04:14.263955 |
6 |
43670927 |
INSTALLATION OF SOLAR DUEL PUMP AT MATHAPARA |
370000 |
INSTALLATION OF SOLAR DUEL PUMP AT MATHAPARA1 |
Completion of work |
-
latitude : 21.40532872
Longitude : 84.21322496
file name : Image_22012021155202341.png
|
2021-01-22 15:52:02.452344 |
7 |
43670927 |
INSTALLATION OF SOLAR DUEL PUMP AT MATHAPARA |
370000 |
INSTALLATION OF SOLAR DUEL PUMP AT MATHAPARA1 |
Completion of work |
-
latitude : 21.40535655
Longitude : 84.2132986
file name : Image_22012021145716023.png
|
2021-01-22 14:57:16.133767 |
8 |
43672051 |
MAINTENANCE & REPAIRING OF GP BUILDING FOR COVID CARE HOME |
50000 |
MAINTENANCE & REPAIRING OF GP BUILDING FOR COVID CARE HOME1 |
Plinth level |
-
latitude : 21.39397095
Longitude : 84.26822061
file name : Image_22012021143728029.png
|
2021-01-22 14:37:28.135724 |
9 |
43672051 |
MAINTENANCE & REPAIRING OF GP BUILDING FOR COVID CARE HOME |
50000 |
MAINTENANCE & REPAIRING OF GP BUILDING FOR COVID CARE HOME1 |
Completion of work |
-
latitude : 21.39400525
Longitude : 84.26820208
file name : Image_09122020143455808.png
|
2020-12-09 14:34:55.9228 |
10 |
43672051 |
MAINTENANCE & REPAIRING OF GP BUILDING FOR COVID CARE HOME |
50000 |
MAINTENANCE & REPAIRING OF GP BUILDING FOR COVID CARE HOME1 |
Completion of work |
-
latitude : 21.39398567
Longitude : 84.26815794
file name : Image_07122020123211168.png
|
2020-12-07 12:32:11.269188 |
11 |
43670545 |
SINKING OF TUBE WELL AT NABARATNAPUR MUNDAPADA |
92000 |
SINKING OF TUBE WELL AT NABARATNAPUR MUNDAPADA1 |
Plinth level |
-
latitude : 21.41103204
Longitude : 84.24582102
file name : Image_28012021132341659.png
|
2021-01-28 13:23:41.772933 |
12 |
43670545 |
SINKING OF TUBE WELL AT NABARATNAPUR MUNDAPADA |
92000 |
SINKING OF TUBE WELL AT NABARATNAPUR MUNDAPADA1 |
Completion of work |
-
latitude : 21.41102615
Longitude : 84.2456695
file name : Image_28012021110833299.png
|
2021-01-28 11:08:33.377533 |
13 |
43670607 |
SINKING OF TUBE WELL AT DANGAPAL |
92000 |
SINKING OF TUBE WELL AT DANGAPAL1 |
Completion of work |
-
latitude : 21.38458056
Longitude : 84.28640894
file name : Image_28012021144603232.png
|
2021-01-28 14:46:03.338873 |
14 |
43670607 |
SINKING OF TUBE WELL AT DANGAPAL |
92000 |
SINKING OF TUBE WELL AT DANGAPAL1 |
Completion of work |
-
latitude : 21.38459125
Longitude : 84.2864006
file name : Image_28012021144438312.png
|
2021-01-28 14:44:38.418558 |
15 |
43670607 |
SINKING OF TUBE WELL AT DANGAPAL |
92000 |
SINKING OF TUBE WELL AT DANGAPAL1 |
Completion of work |
-
latitude : 21.38459343
Longitude : 84.28646135
file name : Image_28012021144100552.png
|
2021-01-28 14:41:00.652005 |
16 |
43671849 |
IMPROVEMENT OF RURAL LIBRARY AT TAMPERGARH |
200000 |
IMPROVEMENT OF RURAL LIBRARY AT TAMPERGARH1 |
Plinth level |
-
latitude : 21.39397327
Longitude : 84.26797182
file name : Image_01032021171929166.png
|
2021-03-01 17:19:29.263526 |
17 |
43671849 |
IMPROVEMENT OF RURAL LIBRARY AT TAMPERGARH |
200000 |
IMPROVEMENT OF RURAL LIBRARY AT TAMPERGARH1 |
Completion of work |
-
latitude : 21.3938986
Longitude : 84.26804227
file name : Image_01032021170708405.png
|
2021-03-01 17:07:08.509955 |
18 |
43672661 |
CONSTRUCTION OF CULVERT AT TALIMAL PURUNA BASTI |
200000 |
CONSTRUCTION OF CULVERT AT TALIMAL PURUNA BASTI1 |
Plinth level |
-
latitude : 21.3998212,21.39980336
Longitude : 84.22246554,84.22243625
file name : Image_12032021173324252.png
|
2021-03-12 17:33:24.384692 |
19 |
43672661 |
CONSTRUCTION OF CULVERT AT TALIMAL PURUNA BASTI |
200000 |
CONSTRUCTION OF CULVERT AT TALIMAL PURUNA BASTI1 |
Completion of work |
-
latitude : 21.39982603,21.39982601
Longitude : 84.22246506,84.22246521
file name : Image_12032021172923917.png
|
2021-03-12 17:29:24.018691 |
20 |
43671612 |
IMPROVEMENT OF RURAL PARK AT TAMPERGARH |
300000 |
IMPROVEMENT OF RURAL PARK AT TAMPERGARH1 |
Plinth level |
-
latitude : 21.38434682,21.38435443
Longitude : 84.25977826,84.2597881
file name : Image_13032021162044483.png
|
2021-03-13 16:20:44.579763 |
21 |
43671612 |
IMPROVEMENT OF RURAL PARK AT TAMPERGARH |
300000 |
IMPROVEMENT OF RURAL PARK AT TAMPERGARH1 |
Completion of work |
-
latitude : 21.3302265,21.38434879
Longitude : 84.3344963,84.26013635
file name : Image_13032021161153206.png
|
2021-03-13 16:11:53.301576 |
22 |
43671410 |
EXTENSION OF PIPE LINE AT BEHERAMAL |
100000 |
EXTENSION OF PIPE LINE AT BEHERAMAL1 |
Plinth level |
-
latitude : 21.41407621,21.41407625
Longitude : 84.23090439,84.23090439
file name : Image_26042021141200041.png
|
2021-04-26 14:12:00.13065 |
23 |
43672088 |
CONSTRUCTION OF DRAIN AT TRIPATKANI AWC PADA |
175000 |
CONSTRUCTION OF DRAIN AT TRIPATKANI AWC PADA1 |
Completion of work |
-
latitude : 21.42112085,21.42105817
Longitude : 84.24467535,84.24461567
file name : Image_06052021174821914.png
|
2021-05-06 17:48:21.775331 |
24 |
43672088 |
CONSTRUCTION OF DRAIN AT TRIPATKANI AWC PADA |
175000 |
CONSTRUCTION OF DRAIN AT TRIPATKANI AWC PADA1 |
Completion of work |
-
latitude : 21.42112085,21.42105817
Longitude : 84.24467535,84.24461567
file name : Image_06052021173056126.png
|
2021-05-06 17:30:56.021844 |
25 |
43672088 |
CONSTRUCTION OF DRAIN AT TRIPATKANI AWC PADA |
175000 |
CONSTRUCTION OF DRAIN AT TRIPATKANI AWC PADA1 |
Completion of work |
-
latitude : 21.42112179,21.42109595
Longitude : 84.24477791,84.24456815
file name : Image_06052021172749586.png
|
2021-05-06 17:27:49.440946 |
26 |
48101670 |
Pipe Water Supply at Mathapara Primary School under implementation of 100 days Campaign. |
58772 |
Pipe Water Supply at Mathapara Primary School under implementation of 100 days Campaign.1 |
Completion of work |
-
latitude : 21.40527287,21.4052738
Longitude : 84.21171128,84.2117731
file name : Image_02082021145642690.png
|
2021-08-02 14:56:42.806433 |
27 |
48101670 |
Pipe Water Supply at Mathapara Primary School under implementation of 100 days Campaign. |
58772 |
Pipe Water Supply at Mathapara Primary School under implementation of 100 days Campaign.1 |
Completion of work |
-
latitude : 21.40531528,21.40533256
Longitude : 84.21181427,84.21177722
file name : Image_02082021142543667.png
|
2021-08-02 14:25:43.760525 |
28 |
48100763 |
Pipe Water Supply at Dhalapal Primary School under implementation of 100 days Campaign. |
50000 |
Pipe Water Supply at Dhalapal Primary School under implementation of 100 days Campaign.1 |
Completion of work |
-
latitude : 21.3890388,21.38901829
Longitude : 84.23966342,84.23935632
file name : Image_02082021151541620.png
|
2021-08-02 15:15:41.708951 |
29 |
48100763 |
Pipe Water Supply at Dhalapal Primary School under implementation of 100 days Campaign. |
50000 |
Pipe Water Supply at Dhalapal Primary School under implementation of 100 days Campaign.1 |
Completion of work |
-
latitude : 21.4020456,21.38928601,21.38908452
Longitude : 84.2385815,84.2394999,84.23933926
file name : Image_02082021140249497.png
|
2021-08-02 14:02:49.576929 |
30 |
48101013 |
Pipe Water Supplt at Beheramal AWC under implementation of 100 days Campaign. |
30000 |
Pipe Water Supplt at Beheramal AWC under implementation of 100 days Campaign.1 |
Completion of work |
-
latitude : 21.40128346,21.40129249
Longitude : 84.24393454,84.24376091
file name : Image_02082021152924023.png
|
2021-08-02 15:29:24.117413 |
31 |
48101013 |
Pipe Water Supplt at Beheramal AWC under implementation of 100 days Campaign. |
30000 |
Pipe Water Supplt at Beheramal AWC under implementation of 100 days Campaign.1 |
Completion of work |
-
latitude : 21.40127659,21.40127803
Longitude : 84.24393823,84.24393768
file name : Image_02082021152605020.png
|
2021-08-02 15:26:05.117796 |
32 |
43671373 |
PAYMENT OF JALACHATRA |
68772 |
PAYMENT OF JALACHATRA1 |
Completion of work |
-
latitude : 21.41376616,21.41376614
Longitude : 84.23105049,84.2310505
file name : Image_25072021115651434.png
|
2021-07-25 11:56:51.565888 |
33 |
43671208 |
SALARY FOR SEM & PUMP DRIVER |
48000 |
SALARY FOR SEM & PUMP DRIVER1 |
Completion of work |
-
latitude : 21.41379657,21.41377367
Longitude : 84.23111591,84.23105818
file name : Image_25072021115224117.png
|
2021-07-25 11:52:24.260372 |
34 |
48100513 |
Pipe Water Supply at Dhalapal AWC under implementation of 100 days Campaign. |
50000 |
Pipe Water Supply at Dhalapal AWC under implementation of 100 days Campaign.1 |
Completion of work |
-
latitude : 21.38901239,21.3889534
Longitude : 84.2396643,84.23967782
file name : Image_02082021151335822.png
|
2021-08-02 15:13:35.912427 |
35 |
48100513 |
Pipe Water Supply at Dhalapal AWC under implementation of 100 days Campaign. |
50000 |
Pipe Water Supply at Dhalapal AWC under implementation of 100 days Campaign.1 |
Completion of work |
-
latitude : 21.38889343,21.38888207
Longitude : 84.23971319,84.23966628
file name : Image_02082021142537642.png
|
2021-08-02 14:25:37.758986 |
36 |
48101415 |
Pipe Water Supply at Tripitkani AWC under implementation of 100 days Campaign. |
30000 |
Pipe Water Supply at Tripitkani AWC under implementation of 100 days Campaign.1 |
Completion of work |
-
latitude : 21.42100373,21.42104672
Longitude : 84.24497156,84.24511456
file name : Image_02082021155753111.png
|
2021-08-02 15:57:53.227934 |
37 |
48101415 |
Pipe Water Supply at Tripitkani AWC under implementation of 100 days Campaign. |
30000 |
Pipe Water Supply at Tripitkani AWC under implementation of 100 days Campaign.1 |
Completion of work |
-
latitude : 21.42098567,21.42098035
Longitude : 84.24510577,84.24509121
file name : Image_02082021154002786.png
|
2021-08-02 15:40:02.888736 |
38 |
47416704 |
Installation of Solar Duel Pump at Jharbandha.. |
365000 |
Installation of Solar Duel Pump at Jharbandha..1 |
Completion of work |
-
latitude : 21.39843113
Longitude : 84.27008185
file name : Image_03022022133239796.png
|
2022-02-03 13:32:39.924138 |
39 |
47424360 |
SINKING OF TUBE WELL NEAR GUDAPAL TEMPLE. |
92000 |
SINKING OF TUBE WELL NEAR GUDAPAL TEMPLE.1 |
Completion of work |
-
latitude : 21.38953188
Longitude : 84.21843449
file name : Image_03022022121629083.png
|
2022-02-03 12:16:29.177439 |
40 |
47424360 |
SINKING OF TUBE WELL NEAR GUDAPAL TEMPLE. |
92000 |
SINKING OF TUBE WELL NEAR GUDAPAL TEMPLE.1 |
Completion of work |
-
latitude : 21.38952989
Longitude : 84.21843227
file name : Image_03022022121624538.png
|
2022-02-03 12:16:24.651655 |
41 |
47424360 |
SINKING OF TUBE WELL NEAR GUDAPAL TEMPLE. |
92000 |
SINKING OF TUBE WELL NEAR GUDAPAL TEMPLE.1 |
Completion of work |
-
latitude : 21.38952917
Longitude : 84.2184062
file name : Image_03022022121633322.png
|
2022-02-03 12:16:33.418477 |
42 |
47549834 |
SINKING OF TUBE WELL AT RENGALKANI AWC |
92000 |
SINKING OF TUBE WELL AT RENGALKANI AWC1 |
Completion of work |
-
latitude : 21.38853808
Longitude : 84.21177408
file name : Image_03022022120053704.png
|
2022-02-03 12:00:53.790155 |
43 |
47548280 |
CONST OF RING WELL AT JHARBANDH & EXTENSION OF PIPE LINE TO KANDHAPAR AND GANDHAPARA |
175000 |
CONST OF RING WELL AT JHARBANDH & EXTENSION OF PIPE LINE TO KANDHAPAR AND GANDHAPARA1 |
Completion of work |
-
latitude : 21.398796
Longitude : 84.27006216
file name : Image_03022022133850606.png
|
2022-02-03 13:38:50.732266 |
44 |
47421144 |
Sinking of Tube Well near Hanuman Temple. |
92000 |
Sinking of Tube Well near Hanuman Temple.1 |
Completion of work |
-
latitude : 21.39081574
Longitude : 84.24937274
file name : Image_03022022123335790.png
|
2022-02-03 12:33:35.901429 |
45 |
47421018 |
CONST OF DRAIN AT DHALAPALA |
150000 |
CONST OF DRAIN AT DHALAPALA1 |
Completion of work |
-
latitude : 21.38984654,21.38984665
Longitude : 84.23724138,84.23724139
file name : Image_10052022135213011.png
|
2022-05-10 13:52:13.144198 |
46 |
47421018 |
CONST OF DRAIN AT DHALAPALA |
150000 |
CONST OF DRAIN AT DHALAPALA1 |
Completion of work |
-
latitude : 21.38974088,21.38987147
Longitude : 84.23738186,84.23724193
file name : Image_10052022123746937.png
|
2022-05-10 12:37:48.59405 |
47 |
47420458 |
Const. of Drain at Khajurpali. |
100000 |
Const. of Drain at Khajurpali.1 |
Completion of work |
-
latitude : 21.38351893,21.38351881
Longitude : 84.26523015,84.26522986
file name : Image_10052022103007740.png
|
2022-05-10 10:30:07.83857 |
48 |
47547347 |
CONST OF DRAIN AT BASUPALI |
100000 |
CONST OF DRAIN AT BASUPALI1 |
Completion of work |
-
latitude : 21.38687357,21.38687471
Longitude : 84.25996513,84.25996113
file name : Image_10052022102035233.png
|
2022-05-10 10:20:35.33352 |
49 |
47549398 |
CONST OF CC AND HPC ROAD AT NABARATNAPUR MUNDAPARA |
200000 |
CONST OF CC AND HPC ROAD AT NABARATNAPUR MUNDAPARA1 |
Completion of work |
-
latitude : 21.41100314,21.41099992
Longitude : 84.24586232,84.24585739
file name : Image_03072022132641525.png
|
2022-07-03 13:26:41.631843 |
50 |
47549398 |
CONST OF CC AND HPC ROAD AT NABARATNAPUR MUNDAPARA |
200000 |
CONST OF CC AND HPC ROAD AT NABARATNAPUR MUNDAPARA1 |
Completion of work |
-
latitude : 21.41098707,21.41098623,21.41098874
Longitude : 84.24587093,84.2458617,84.24586045
file name : Image_03072022130613544.png
|
2022-07-03 13:06:13.629751 |
51 |
47549398 |
CONST OF CC AND HPC ROAD AT NABARATNAPUR MUNDAPARA |
200000 |
CONST OF CC AND HPC ROAD AT NABARATNAPUR MUNDAPARA1 |
Completion of work |
-
latitude : 21.41101399,21.41100963
Longitude : 84.24587862,84.2458782
file name : Image_15052022084739812.png
|
2022-05-15 08:47:39.945646 |
52 |
47548909 |
CONST OF BOUNDARY WALL AT MATHAPARA PS |
100000 |
CONST OF BOUNDARY WALL AT MATHAPARA PS1 |
Completion of work |
-
latitude : 21.40542299
Longitude : 84.21165463
file name : Image_03072022142655652.png
|
2022-07-03 14:26:55.746991 |
53 |
47548909 |
CONST OF BOUNDARY WALL AT MATHAPARA PS |
100000 |
CONST OF BOUNDARY WALL AT MATHAPARA PS1 |
Completion of work |
-
latitude : 21.40548522
Longitude : 84.21176109
file name : Image_10052022135217493.png
|
2022-05-10 13:52:17.615767 |
54 |
47548909 |
CONST OF BOUNDARY WALL AT MATHAPARA PS |
100000 |
CONST OF BOUNDARY WALL AT MATHAPARA PS1 |
Completion of work |
-
latitude : 21.40548401
Longitude : 84.2117405
file name : Image_10052022135221434.png
|
2022-05-10 13:52:21.545699 |
55 |
47420510 |
Const. of Drain at Tripitkani. |
132886 |
Const. of Drain at Tripitkani.1 |
Completion of work |
-
latitude : 21.42798635,21.42799391
Longitude : 84.2449429,84.24493969
file name : Image_03072022133638391.png
|
2022-07-03 13:36:38.524062 |
56 |
47420842 |
Const. of Culvert at Talimal to Badabandh road. |
200000 |
Const. of Culvert at Talimal to Badabandh road.1 |
Completion of work |
-
latitude : 21.40245229,21.40202331
Longitude : 84.22319552,84.22333732
file name : Image_03072022140210008.png
|
2022-07-03 14:02:10.097774 |
57 |
47420842 |
Const. of Culvert at Talimal to Badabandh road. |
200000 |
Const. of Culvert at Talimal to Badabandh road.1 |
Completion of work |
-
latitude : 21.40241896,21.40241995
Longitude : 84.22318081,84.2231958
file name : Image_10052022140420766.png
|
2022-05-10 14:04:20.92099 |
58 |
58781921 |
Cost of Energy Charges for PWS |
208990 |
Cost of Energy Charges for PWS1 |
Completion of work |
-
latitude : 21.41394559
Longitude : 84.2310815
file name : Image_11082022220143755.png
|
2022-08-11 22:01:43.840546 |
59 |
58781921 |
Cost of Energy Charges for PWS |
208990 |
Cost of Energy Charges for PWS1 |
Completion of work |
-
latitude : 21.44759327
Longitude : 84.00211011
file name : Image_10082022171959222.png
|
2022-08-10 17:19:59.313345 |
60 |
58773536 |
Jalachhatra in Summer Season |
119700 |
Jalachhatra in Summer Season1 |
Completion of work |
-
latitude : 21.44753953
Longitude : 84.00213651
file name : Image_10082022170812003.png
|
2022-08-10 17:08:12.08536 |
61 |
58773536 |
Jalachhatra in Summer Season |
119700 |
Jalachhatra in Summer Season1 |
Completion of work |
-
latitude : 21.41394922
Longitude : 84.23111842
file name : Image_10082022075342491.png
|
2022-08-10 07:53:42.59693 |
62 |
58773536 |
Jalachhatra in Summer Season |
119700 |
Jalachhatra in Summer Season1 |
Completion of work |
-
latitude : 21.41393818
Longitude : 84.23115588
file name : Image_10082022075316373.png
|
2022-08-10 07:53:16.474967 |
63 |
58773536 |
Jalachhatra in Summer Season |
119700 |
Jalachhatra in Summer Season1 |
Completion of work |
-
latitude : 21.3904138
Longitude : 84.2566882
file name : Image_10082022075359997.png
|
2022-08-10 07:54:00.099121 |
64 |
58770974 |
Salary of SEM and Pump Driver |
48000 |
Salary of SEM and Pump Driver1 |
Completion of work |
-
latitude : 21.4139499
Longitude : 84.2310798
file name : Image_10082022170758872.png
|
2022-08-10 17:07:58.95566 |
65 |
58770974 |
Salary of SEM and Pump Driver |
48000 |
Salary of SEM and Pump Driver1 |
Completion of work |
-
latitude : 21.41394999
Longitude : 84.23108022
file name : Image_10082022170753222.png
|
2022-08-10 17:07:53.299639 |
66 |
58770974 |
Salary of SEM and Pump Driver |
48000 |
Salary of SEM and Pump Driver1 |
Completion of work |
-
latitude : 21.41393553
Longitude : 84.23106335
file name : Image_10082022170748743.png
|
2022-08-10 17:07:48.827173 |
67 |
58772408 |
Sinking of Tubewell at Tampergarh Jharbandh |
92000 |
Sinking of Tubewell at Tampergarh Jharbandh1 |
Completion of work |
-
latitude : 21.44746689
Longitude : 84.00206441
file name : Image_10082022174113186.png
|
2022-08-10 17:41:13.283031 |
68 |
58771804 |
Sinking of Tube well at Tirpitkani Chowk |
92000 |
Sinking of Tube well at Tirpitkani Chowk1 |
Completion of work |
-
latitude : 21.41486567
Longitude : 84.2453012
file name : Image_10082022170806315.png
|
2022-08-10 17:08:06.400373 |
69 |
58776870 |
Construction of Drain at Khejurpali Mirdhapada |
150000 |
Construction of Drain at Khejurpali Mirdhapada1 |
Completion of work |
-
latitude : 21.38481691,21.38483015
Longitude : 84.26303292,84.2630367
file name : Image_14032023173628946.png
|
2023-03-14 17:36:29.038602 |
70 |
58777443 |
Construction of Drain at Guguapada |
100000 |
Construction of Drain at Guguapada1 |
Completion of work |
-
latitude : 21.40952666666667,21.409546666666664
Longitude : 84.242455,84.242465
file name : Image_05042023181540028.png
|
2023-04-05 18:15:40.12286 |
71 |
58777443 |
Construction of Drain at Guguapada |
100000 |
Construction of Drain at Guguapada1 |
Completion of work |
-
latitude : 21.409528333333334,21.40952333333333
Longitude : 84.24249166666665,84.24239833333334
file name : Image_05042023180736488.png
|
2023-04-05 18:07:36.586212 |
72 |
58777995 |
Construction of Drain at Basupali |
106744 |
Construction of Drain at Basupali1 |
Completion of work |
-
latitude : 21.389791666666664,21.389726666666668
Longitude : 84.25804666666666,84.25806333333334
file name : Image_05042023155337008.png
|
2023-04-05 15:53:37.122224 |
73 |
74154543 |
Water Supply to villages |
126084 |
Water Supply to villages1 |
Roof laid |
-
latitude : 21.39378
Longitude : 84.26801166666668
file name : Image_11072023134206152.png
|
2023-07-11 13:42:06.239316 |
74 |
74154543 |
Water Supply to villages |
126084 |
Water Supply to villages1 |
Plinth level |
-
latitude : 21.39379666666667
Longitude : 84.26809666666668
file name : Image_11072023115437143.png
|
2023-07-11 11:54:37.234344 |
75 |
74154543 |
Water Supply to villages |
126084 |
Water Supply to villages1 |
Completion of work |
-
latitude : 21.39376333333333
Longitude : 84.26815333333334
file name : Image_08072023152617669.png
|
2023-07-08 15:26:17.767537 |
76 |
58774361 |
Maintainance of PWS and Solar Dual Pump |
105044 |
Maintainance of PWS and Solar Dual Pump1 |
Completion of work |
-
latitude : 21.42107
Longitude : 84.24499666666667
file name : Image_08052023101736315.png
|
2023-05-08 10:17:36.420607 |
77 |
58774361 |
Maintainance of PWS and Solar Dual Pump |
105044 |
Maintainance of PWS and Solar Dual Pump1 |
Completion of work |
-
latitude : 21.421121666666668
Longitude : 84.24495833333334
file name : Image_08052023100327229.png
|
2023-05-08 10:03:27.338878 |
78 |
58775988 |
Construction of Drain at Tampergarh |
100000 |
Construction of Drain at Tampergarh1 |
Completion of work |
-
latitude : 21.396721666666668,21.396760000000004
Longitude : 84.26971666666668,84.26965999999999
file name : Image_09052023114510749.png
|
2023-05-09 11:45:10.851035 |
79 |
75101299 |
Construction of Building |
200000 |
Construction of Building1 |
Roof laid |
-
latitude : 21.39389119
Longitude : 84.26807357
file name : Image_03012024153315136.png
|
2024-01-03 15:33:15.21782 |
80 |
75101299 |
Construction of Building |
200000 |
Construction of Building1 |
Plinth level |
-
latitude : 21.3943085
Longitude : 84.2681461
file name : Image_03012024153012342.png
|
2024-01-03 15:30:12.431962 |
81 |
75101299 |
Construction of Building |
200000 |
Construction of Building1 |
Completion of work |
-
latitude : 21.3943075
Longitude : 84.268138
file name : Image_03012024150204599.png
|
2024-01-03 15:02:04.689421 |
82 |
80322620 |
Water Supply to villages |
103976 |
Water Supply to villages1 |
Roof laid |
-
latitude : 21.33790205
Longitude : 84.18315218
file name : Image_28032024103045389.png
|
2024-03-28 10:30:45.54172 |
83 |
80322620 |
Water Supply to villages |
103976 |
Water Supply to villages1 |
Plinth level |
-
latitude : 21.48783129
Longitude : 83.99601536
file name : Image_20112023213312530.png
|
2023-11-20 21:33:12.670141 |
84 |
80322620 |
Water Supply to villages |
103976 |
Water Supply to villages1 |
Completion of work |
-
latitude : 21.48778444
Longitude : 83.99604979
file name : Image_20112023202502723.png
|
2023-11-20 20:25:02.921078 |
85 |
80324118 |
Water Supply to villages |
48000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 21.48774383
Longitude : 83.99606604
file name : Image_24122023085422769.png
|
2023-12-24 08:54:22.865031 |
86 |
80324118 |
Water Supply to villages |
48000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 21.393803333333334
Longitude : 84.26804500000001
file name : Image_11072023121325937.png
|
2023-07-11 12:13:26.022242 |
87 |
80324118 |
Water Supply to villages |
48000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 21.393938333333335
Longitude : 84.26822666666666
file name : Image_08072023162044242.png
|
2023-07-08 16:20:44.351027 |
88 |
75096259 |
Any other operation and maintenance needs related to solid waste management |
84920 |
Any other operation and maintenance needs related to solid waste management1 |
Completion of work |
-
latitude : 21.3368708
Longitude : 84.20707393
file name : Image_06092024225814389.png
|
2024-09-06 22:59:08.038523 |
89 |
98245193 |
Water Supply to villages |
78000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 21.33696045
Longitude : 84.20707019
file name : Image_07092024094153835.png
|
2024-09-07 09:42:55.999163 |
90 |
75093645 |
Operation & maintenance of community compost pits |
155000 |
Operation & maintenance of community compost pits1 |
Completion of work |
-
latitude : 21.3368523
Longitude : 84.20702965
file name : Image_20102024093450329.png
|
2024-10-20 09:34:50.443999 |
91 |
80899497 |
Providing piped water supply to public institutions |
155000 |
Providing piped water supply to public institutions1 |
Plinth level |
-
latitude : 21.33678041
Longitude : 84.20709556
file name : Image_09082024232903946.png
|
2024-08-09 23:29:04.046277 |
92 |
80899497 |
Providing piped water supply to public institutions |
155000 |
Providing piped water supply to public institutions1 |
Completion of work |
-
latitude : 21.33678966
Longitude : 84.20711155
file name : Image_09082024221458762.png
|
2024-08-09 22:14:58.877681 |
93 |
80899497 |
Providing piped water supply to public institutions |
155000 |
Providing piped water supply to public institutions1 |
Completion of work |
-
latitude : 21.33687471
Longitude : 84.20690049
file name : Image_03072024000007742.png
|
2024-07-03 00:00:07.883659 |
94 |
74447084 |
Repair and Maintenance of Hostels and Schools |
200000 |
Repair and Maintenance of Hostels and Schools1 |
Roof laid |
-
latitude : 21.33689679
Longitude : 84.20707492
file name : Image_07102024190217159.png
|
2024-10-07 19:02:17.240193 |
95 |
74447084 |
Repair and Maintenance of Hostels and Schools |
200000 |
Repair and Maintenance of Hostels and Schools1 |
Roof laid |
-
latitude : 21.3939794
Longitude : 84.2681432
file name : Image_01102024124430481.png
|
2024-10-01 12:44:30.568244 |
96 |
74447084 |
Repair and Maintenance of Hostels and Schools |
200000 |
Repair and Maintenance of Hostels and Schools1 |
Plinth level |
-
latitude : 21.3939793
Longitude : 84.268147
file name : Image_01102024123931470.png
|
2024-10-01 12:39:31.578434 |
97 |
74447084 |
Repair and Maintenance of Hostels and Schools |
200000 |
Repair and Maintenance of Hostels and Schools1 |
Completion of work |
-
latitude : 21.38462867
Longitude : 84.26115625
file name : Image_27092024111123054.png
|
2024-09-27 11:11:23.137509 |
98 |
74153629 |
Construction of toilets in public institutions |
62140 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 21.39397749
Longitude : 84.26809094
file name : Image_15102024143313109.png
|
2024-10-15 14:33:13.210373 |
99 |
74153629 |
Construction of toilets in public institutions |
62140 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 21.39399872
Longitude : 84.26809594
file name : Image_15102024142902221.png
|
2024-10-15 14:29:02.309881 |
100 |
74153629 |
Construction of toilets in public institutions |
62140 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 21.3939829
Longitude : 84.2681456
file name : Image_15102024142420445.png
|
2024-10-15 14:24:20.532589 |
101 |
98245583 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 21.33682187
Longitude : 84.20710243
file name : Image_09082024234508577.png
|
2024-08-09 23:45:08.680066 |
102 |
98245583 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 21.33687349
Longitude : 84.20706607
file name : Image_06092024225913017.png
|
2024-09-06 23:00:06.671413 |
103 |
98245583 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 21.33687919
Longitude : 84.2070657
file name : Image_06092024225821716.png
|
2024-09-06 22:59:15.354101 |
104 |
98245583 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 21.33673685
Longitude : 84.20708731
file name : Image_09082024232638397.png
|
2024-08-09 23:26:38.543337 |
105 |
98245583 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 21.33678769
Longitude : 84.20710173
file name : Image_09082024230915164.png
|
2024-08-09 23:09:15.265368 |