1 |
48090694 |
Const of CC road with Drain at Telitileimal Tali Kisanpada |
165278 |
Const of CC road with Drain at Telitileimal Tali Kisanpada1 |
Completion of work |
-
latitude : 21.7570769,21.75707685
Longitude : 84.40178792,84.40174944
file name : Image_15022021172459323.png
|
2021-02-15 17:24:59.403669 |
2 |
48090694 |
Const of CC road with Drain at Telitileimal Tali Kisanpada |
165278 |
Const of CC road with Drain at Telitileimal Tali Kisanpada1 |
Completion of work |
-
latitude : 21.75706467,21.75708689
Longitude : 84.40176187,84.40168335
file name : Image_15022021172209258.png
|
2021-02-15 17:22:09.322475 |
3 |
48090694 |
Const of CC road with Drain at Telitileimal Tali Kisanpada |
165278 |
Const of CC road with Drain at Telitileimal Tali Kisanpada1 |
Completion of work |
-
latitude : 21.75708943,21.75708822
Longitude : 84.40173694,84.40169459
file name : Image_15022021171920937.png
|
2021-02-15 17:19:21.013452 |
4 |
48087828 |
Installation of Water Supply Pipeline at AWC Building Thelkobudi (Mini) |
62411 |
Installation of Water Supply Pipeline at AWC Building Thelkobudi (Mini)1 |
Plinth level |
-
latitude : 21.77327121,21.77327643
Longitude : 84.38882492,84.38881138
file name : Image_11082021120259001.png
|
2021-08-11 12:02:59.069488 |
5 |
48087828 |
Installation of Water Supply Pipeline at AWC Building Thelkobudi (Mini) |
62411 |
Installation of Water Supply Pipeline at AWC Building Thelkobudi (Mini)1 |
Completion of work |
-
latitude : 21.77324939,21.77324806
Longitude : 84.38879367,84.38880011
file name : Image_02082021121215371.png
|
2021-08-02 12:12:15.449797 |
6 |
48087067 |
Installation of Water Supply Pipeline at AWC Building Telitileimal |
55617 |
Installation of Water Supply Pipeline at AWC Building Telitileimal 1 |
Completion of work |
-
latitude : 21.7536255,21.7536255
Longitude : 84.404681,84.404681
file name : Image_16032021113408262.png
|
2021-03-16 11:34:08.347679 |
7 |
48087067 |
Installation of Water Supply Pipeline at AWC Building Telitileimal |
55617 |
Installation of Water Supply Pipeline at AWC Building Telitileimal 1 |
Completion of work |
-
latitude : 21.7536251,21.7536253
Longitude : 84.4046833,84.4046822
file name : Image_16032021112945971.png
|
2021-03-16 11:29:46.049554 |
8 |
48087067 |
Installation of Water Supply Pipeline at AWC Building Telitileimal |
55617 |
Installation of Water Supply Pipeline at AWC Building Telitileimal 1 |
Completion of work |
-
latitude : 21.7532726,21.75394135
Longitude : 84.40514064,84.40462856
file name : Image_16032021111804618.png
|
2021-03-16 11:18:04.687785 |
9 |
48087067 |
Installation of Water Supply Pipeline at AWC Building Telitileimal |
55617 |
Installation of Water Supply Pipeline at AWC Building Telitileimal 1 |
Completion of work |
-
latitude : 21.75395121,21.7536255
Longitude : 84.40462534,84.404681
file name : Image_16032021112009671.png
|
2021-03-16 11:20:09.763044 |
10 |
48087510 |
Installation of Water Supply Pipeline at AWC Building Ramjhali |
55843 |
Installation of Water Supply Pipeline at AWC Building Ramjhali1 |
Completion of work |
-
latitude : 21.75616345,21.75619538,21.75617991
Longitude : 84.3876918,84.38762189,84.38764012
file name : Image_16032021130041705.png
|
2021-03-16 13:00:41.788977 |
11 |
48087510 |
Installation of Water Supply Pipeline at AWC Building Ramjhali |
55843 |
Installation of Water Supply Pipeline at AWC Building Ramjhali1 |
Completion of work |
-
latitude : 21.75611558,21.75612803
Longitude : 84.38765725,84.38761623
file name : Image_16032021124351960.png
|
2021-03-16 12:43:52.049779 |
12 |
48087510 |
Installation of Water Supply Pipeline at AWC Building Ramjhali |
55843 |
Installation of Water Supply Pipeline at AWC Building Ramjhali1 |
Completion of work |
-
latitude : 21.75608325,21.75612516
Longitude : 84.38756795,84.38758764
file name : Image_16032021123747840.png
|
2021-03-16 12:37:47.90879 |
13 |
48087320 |
Installation of Water Supply Pipeline at AWC Building Dhanudihi |
55431 |
Installation of Water Supply Pipeline at AWC Building Dhanudihi1 |
Completion of work |
-
latitude : 21.76085263,21.76086025
Longitude : 84.41080889,84.41081812
file name : Image_16032021120115142.png
|
2021-03-16 12:01:15.221526 |
14 |
48087320 |
Installation of Water Supply Pipeline at AWC Building Dhanudihi |
55431 |
Installation of Water Supply Pipeline at AWC Building Dhanudihi1 |
Completion of work |
-
latitude : 21.76086334,21.76086331,21.76086329
Longitude : 84.41074712,84.41074732,84.41074762
file name : Image_16032021115713290.png
|
2021-03-16 11:57:13.384371 |
15 |
48087320 |
Installation of Water Supply Pipeline at AWC Building Dhanudihi |
55431 |
Installation of Water Supply Pipeline at AWC Building Dhanudihi1 |
Completion of work |
-
latitude : 21.7536255,21.7536255
Longitude : 84.404681,84.404681
file name : Image_16032021114608554.png
|
2021-03-16 11:46:08.64186 |
16 |
47672054 |
Const of Culvert at Dhanudihi Road |
200000 |
Const of Culvert at Dhanudihi Road1 |
Completion of work |
-
latitude : 21.76284759
Longitude : 84.41461873
file name : Image_19102021113935635.png
|
2021-10-19 11:39:35.712082 |
17 |
48090223 |
Const of Drain with CC Road at Ramjhali Agharipada |
200000 |
Const of Drain with CC Road at Ramjhali Agharipada1 |
Roof laid |
-
latitude : 21.74792147,21.74792159
Longitude : 84.38494092,84.38494315
file name : Image_28062021165805910.png
|
2021-06-28 16:58:05.99184 |
18 |
48090223 |
Const of Drain with CC Road at Ramjhali Agharipada |
200000 |
Const of Drain with CC Road at Ramjhali Agharipada1 |
Plinth level |
-
latitude : 21.74785093,21.74784365
Longitude : 84.38496775,84.38494501
file name : Image_28062021165337397.png
|
2021-06-28 16:53:37.473329 |
19 |
48090223 |
Const of Drain with CC Road at Ramjhali Agharipada |
200000 |
Const of Drain with CC Road at Ramjhali Agharipada1 |
Completion of work |
-
latitude : 21.7480873,21.748087
Longitude : 84.3849843,84.3849845
file name : Image_28062021164315924.png
|
2021-06-28 16:43:16.027443 |
20 |
47671627 |
CC drain road at Dihimal Nuapada |
200000 |
CC drain road at Dihimal Nuapada1 |
Roof laid |
-
latitude : 21.76629594,21.76632624,21.76637275
Longitude : 84.44659442,84.44659829,84.44659068
file name : Image_16072021180225445.png
|
2021-07-16 18:02:25.503553 |
21 |
47671627 |
CC drain road at Dihimal Nuapada |
200000 |
CC drain road at Dihimal Nuapada1 |
Roof laid |
-
latitude : 21.76631956,21.76632797,21.76637625
Longitude : 84.44662327,84.44663514,84.44658413
file name : Image_16072021180442795.png
|
2021-07-16 18:04:42.855748 |
22 |
47671627 |
CC drain road at Dihimal Nuapada |
200000 |
CC drain road at Dihimal Nuapada1 |
Plinth level |
-
latitude : 21.76631942,21.76636806
Longitude : 84.44654718,84.44655757
file name : Image_16072021175314425.png
|
2021-07-16 17:53:14.508893 |
23 |
47671627 |
CC drain road at Dihimal Nuapada |
200000 |
CC drain road at Dihimal Nuapada1 |
Plinth level |
-
latitude : 21.76632588,21.76632631
Longitude : 84.44664497,84.44663603
file name : Image_16072021175332461.png
|
2021-07-16 17:53:32.563173 |
24 |
47671627 |
CC drain road at Dihimal Nuapada |
200000 |
CC drain road at Dihimal Nuapada1 |
Completion of work |
-
latitude : 21.76631188,21.76631162
Longitude : 84.44659968,84.44660334
file name : Image_16072021172951322.png
|
2021-07-16 17:29:51.415723 |
25 |
48094434 |
Installation of Water Supply Pipeline at AWC Building Kaputikra MINi |
54190 |
Installation of Water Supply Pipeline at AWC Building Kaputikra MINi1 |
Plinth level |
-
latitude : 21.74476132,21.74476818
Longitude : 84.40682895,84.406794
file name : Image_11082021122030235.png
|
2021-08-11 12:20:30.320651 |
26 |
48094434 |
Installation of Water Supply Pipeline at AWC Building Kaputikra MINi |
54190 |
Installation of Water Supply Pipeline at AWC Building Kaputikra MINi1 |
Completion of work |
-
latitude : 21.7447654,21.74474024
Longitude : 84.40682907,84.4068448
file name : Image_02082021111837667.png
|
2021-08-02 11:18:37.770785 |
27 |
47674301 |
Jala Chhatra |
51000 |
Jala Chhatra1 |
Completion of work |
-
latitude : 21.77498219
Longitude : 84.4374117
file name : Image_29102021180242862.png
|
2021-10-29 18:02:42.919446 |
28 |
48095575 |
Water Supply to Oram Niktimal PS |
69859 |
Water Supply to Oram Niktimal PS1 |
Completion of work |
-
latitude : 21.78295257
Longitude : 84.43923819
file name : Image_30062023174903785.png
|
2023-06-30 17:49:03.721773 |
29 |
47675243 |
Water Supply connection at Rural Park Telitileimal |
180000 |
Water Supply connection at Rural Park Telitileimal1 |
Completion of work |
-
latitude : 21.75681509,21.7568145
Longitude : 84.40426469,84.40419425
file name : Image_21052022111128730.png
|
2022-05-21 11:11:28.786306 |
30 |
48102002 |
Completion of Library & GP Office Building at Telitileimal GP |
700000 |
Completion of Library & GP Office Building at Telitileimal GP1 |
Completion of work |
-
latitude : 21.753719304688275
Longitude : 84.40476682037115
file name : Image_08092023171221476.png
|
2023-09-08 17:12:21.517097 |
31 |
48102002 |
Completion of Library & GP Office Building at Telitileimal GP |
700000 |
Completion of Library & GP Office Building at Telitileimal GP1 |
Completion of work |
-
latitude : 21.76659605
Longitude : 84.44658347
file name : Image_07072022173829277.png
|
2022-07-07 17:38:29.409433 |
32 |
48101549 |
Water Supply System at Laidaguna PS |
44659 |
Water Supply System at Laidaguna PS1 |
Completion of work |
-
latitude : 21.74335525,21.74335231
Longitude : 84.44079546,84.44079614
file name : Image_07072022111623668.png
|
2022-07-07 11:16:23.740419 |
33 |
48095472 |
Water Supply to Anandpur PS |
71464 |
Water Supply to Anandpur PS1 |
Completion of work |
-
latitude : 21.73684876
Longitude : 84.41843556
file name : Image_07072022172659917.png
|
2022-07-07 17:27:00.022616 |
34 |
48088529 |
Water Supply to Burodihi PS |
43382 |
Water Supply to Burodihi PS1 |
Completion of work |
-
latitude : 21.73345361
Longitude : 84.46592703
file name : Image_07072022120626701.png
|
2022-07-07 12:06:26.805238 |
35 |
48094288 |
Installation of Water Supply Pipeline at AWC Building Burodihi |
53414 |
Installation of Water Supply Pipeline at AWC Building Burodihi1 |
Completion of work |
-
latitude : 21.73323655,21.73323194
Longitude : 84.46586517,84.46586296
file name : Image_07072022115914480.png
|
2022-07-07 11:59:14.563958 |
36 |
48093948 |
Installation of Water Supply Pipeline at AWC Building Laidaguna |
53016 |
Installation of Water Supply Pipeline at AWC Building Laidaguna1 |
Completion of work |
-
latitude : 21.74531157,21.74530639
Longitude : 84.44366515,84.44367225
file name : Image_07072022110640355.png
|
2022-07-07 11:06:40.417675 |
37 |
83012096 |
Maintenance of Separate toilets for girls and boys in schools |
100000 |
Maintenance of Separate toilets for girls and boys in schools1 |
Plinth level |
-
latitude : 21.75316553
Longitude : 84.4064198
file name : Image_27082024181618967.png
|
2024-08-27 18:16:19.260089 |
38 |
83012096 |
Maintenance of Separate toilets for girls and boys in schools |
100000 |
Maintenance of Separate toilets for girls and boys in schools1 |
Completion of work |
-
latitude : 21.75320158
Longitude : 84.40636978
file name : Image_27082024181015034.png
|
2024-08-27 18:10:15.239619 |
39 |
47656720 |
Completion of Rural Park |
500000 |
Completion of Rural Park1 |
Completion of work |
-
latitude : 21.75703658,21.75702669,21.75702352
Longitude : 84.40381129,84.40380757,84.40380141
file name : Image_19082022120757126.png
|
2022-08-19 12:07:57.197507 |
40 |
47678147 |
Completion of Telitileimal Kalyan mandap at Harijanpada |
200000 |
Completion of Telitileimal Kalyan mandap at Harijanpada1 |
Completion of work |
-
latitude : 21.75343299
Longitude : 84.40462889
file name : Image_19082022114425112.png
|
2022-08-19 11:44:25.207874 |
41 |
48093643 |
Electric Bill of Water Supply System |
90000 |
Electric Bill of Water Supply System1 |
Completion of work |
-
latitude : 21.7461932,21.7461932,21.7461932
Longitude : 84.3493495,84.3493495,84.3493495
file name : Image_24082022170040450.png
|
2022-08-24 17:00:40.545727 |
42 |
47674747 |
Electric bill And Maintenance of Cool Drinking System |
85421 |
Electric bill And Maintenance of Cool Drinking System1 |
Completion of work |
-
latitude : 21.7461849
Longitude : 84.349333
file name : Image_24082022170541243.png
|
2022-08-24 17:05:41.345881 |
43 |
83017555 |
Drainage Construction |
100000 |
Drainage Construction1 |
Roof laid |
-
latitude : 21.77087279
Longitude : 84.44654503
file name : Image_27082024172224276.png
|
2024-08-27 17:22:24.676459 |
44 |
83017555 |
Drainage Construction |
100000 |
Drainage Construction1 |
Plinth level |
-
latitude : 21.77082598
Longitude : 84.44652246
file name : Image_27082024171740344.png
|
2024-08-27 17:17:40.670042 |
45 |
83017555 |
Drainage Construction |
100000 |
Drainage Construction1 |
Completion of work |
-
latitude : 21.77084137
Longitude : 84.44650839
file name : Image_27082024170927974.png
|
2024-08-27 17:09:28.220661 |
46 |
59781642 |
Salary of SEM and Pump Driver |
96000 |
Salary of SEM and Pump Driver1 |
Completion of work |
-
latitude : 21.74629327
Longitude : 84.34938728
file name : Image_10112022163759215.png
|
2022-11-10 16:37:59.317151 |
47 |
59793525 |
Jala Chhatra |
70000 |
Jala Chhatra1 |
Completion of work |
-
latitude : 21.7462533
Longitude : 84.34938209
file name : Image_10112022164030889.png
|
2022-11-10 16:40:30.992337 |
48 |
59783132 |
Const. of Community Sanitary Complex at Telitileimal |
90000 |
Const. of Community Sanitary Complex at Telitileimal1 |
Completion of work |
-
latitude : 21.75364401
Longitude : 84.40486708
file name : Image_11112022111954729.png
|
2022-11-11 11:19:54.807412 |
49 |
48094624 |
Installation of Water Supply Pipeline at AWC Building Dansanadihi |
54995 |
Installation of Water Supply Pipeline at AWC Building Dansanadihi1 |
Completion of work |
-
latitude : 21.76645889,21.76648914
Longitude : 84.43487362,84.43490189
file name : Image_30062023175913055.png
|
2023-06-30 17:59:13.13189 |
50 |
48094782 |
Installation of Water Supply Pipeline at AWC Building Oram Niktimal |
53601 |
Installation of Water Supply Pipeline at AWC Building Oram Niktimal1 |
Completion of work |
-
latitude : 21.7829145,21.78291368,21.78290265
Longitude : 84.43902648,84.43902254,84.43902684
file name : Image_03072023100035724.png
|
2023-07-03 10:00:35.673128 |
51 |
48094945 |
Installation of Water Supply Pipeline at AWC Building Arjundihi |
53317 |
Installation of Water Supply Pipeline at AWC Building Arjundihi1 |
Completion of work |
-
latitude : 21.7562224,21.75632357
Longitude : 84.45087204,84.45078212
file name : Image_30062023173831244.png
|
2023-06-30 17:38:31.165112 |
52 |
59799871 |
Waste Segregation shed |
91982 |
Waste Segregation shed1 |
Completion of work |
-
latitude : 21.75746335
Longitude : 84.40444946
file name : Image_30062023181213913.png
|
2023-06-30 18:12:13.783148 |
53 |
65678266 |
Imp. of Market Complex at Telitileimal & Rural Hat |
250000 |
Imp. of Market Complex at Telitileimal & Rural Hat1 |
Completion of work |
-
latitude : 21.75447723
Longitude : 84.4505281
file name : Image_30062023173519994.png
|
2023-06-30 17:35:20.071295 |
54 |
59784138 |
Purchase of e Trolly Rickshaw and Cleaning Equipments |
90000 |
Purchase of e Trolly Rickshaw and Cleaning Equipments1 |
Completion of work |
-
latitude : 21.75472793
Longitude : 84.40199459
file name : Image_17072023105503730.png
|
2023-07-17 10:55:03.84065 |
55 |
59789517 |
Comp. of Telitileimal Field |
117540 |
Comp. of Telitileimal Field1 |
Completion of work |
-
latitude : 21.756816962733865
Longitude : 84.40282942727208
file name : Image_08092023171929775.png
|
2023-09-08 17:19:29.821955 |
56 |
59789517 |
Comp. of Telitileimal Field |
117540 |
Comp. of Telitileimal Field1 |
Completion of work |
-
latitude : 21.756910462863743
Longitude : 84.4027850870043
file name : Image_08092023172101553.png
|
2023-09-08 17:21:01.600701 |
57 |
65678237 |
Comp. of Boundary and Suface |
200000 |
Comp. of Boundary and Suface1 |
Completion of work |
-
latitude : 21.73321310430765
Longitude : 84.46579813957214
file name : Image_08092023174144366.png
|
2023-09-08 17:41:44.423689 |
58 |
83013066 |
Water Supply to villages |
80000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 21.7462305
Longitude : 84.3493787
file name : Image_06112023173148581.png
|
2023-11-06 17:31:48.674243 |
59 |
83013066 |
Water Supply to villages |
80000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 21.76654734648764
Longitude : 84.5230284333229
file name : Image_20102023124126994.png
|
2023-10-20 12:41:27.15631 |
60 |
88291097 |
Repair and maintenace of street light |
108821 |
Repair and maintenace of street light1 |
Completion of work |
-
latitude : 21.76660958211869
Longitude : 84.52332347631454
file name : Image_10112023201911631.png
|
2023-11-10 20:19:11.69649 |
61 |
88290970 |
Water Supply to villages |
72094 |
Water Supply to villages1 |
Completion of work |
-
latitude : 21.748762791976333
Longitude : 84.3998789973557
file name : Image_12112023142925889.png
|
2023-11-12 14:29:25.968313 |
62 |
59785048 |
Institutional Compost Pit at School 6 @ Rs. 15000 |
90000 |
Institutional Compost Pit at School 6 @ Rs. 150001 |
Completion of work |
-
latitude : 21.733467997983098
Longitude : 84.46590232662857
file name : Image_14112023081938791.png
|
2023-11-14 08:19:38.855129 |
63 |
59784591 |
Institutional Compost Pit at AWC 11 @ Rs. 10000 |
110000 |
Institutional Compost Pit at AWC 11 @ Rs. 100001 |
Completion of work |
-
latitude : 21.7562641762197
Longitude : 84.38763538375497
file name : Image_14112023155626467.png
|
2023-11-14 15:56:26.536269 |
64 |
83019505 |
Maintenance of Sports Equipments |
20000 |
Maintenance of Sports Equipments1 |
Roof laid |
-
latitude : 21.7462367
Longitude : 84.3493385
file name : Image_03022024130401096.png
|
2024-02-03 13:04:01.168521 |
65 |
83019505 |
Maintenance of Sports Equipments |
20000 |
Maintenance of Sports Equipments1 |
Plinth level |
-
latitude : 21.7462196
Longitude : 84.3493828
file name : Image_06012024164948309.png
|
2024-01-06 16:49:48.374406 |
66 |
83019505 |
Maintenance of Sports Equipments |
20000 |
Maintenance of Sports Equipments1 |
Completion of work |
-
latitude : 21.764734466560185
Longitude : 84.52384432777762
file name : Image_21122023151605366.png
|
2023-12-21 15:16:05.443738 |
67 |
65678136 |
Comp. of Rural Park |
278392 |
Comp. of Rural Park1 |
Roof laid |
-
latitude : 21.757060000000003,21.757031666666663
Longitude : 84.40387166666666,84.40386500000001
file name : Image_28022024143518961.png
|
2024-02-28 14:35:19.059157 |
68 |
65678136 |
Comp. of Rural Park |
278392 |
Comp. of Rural Park1 |
Plinth level |
-
latitude : 21.757011666666667,21.757006666666665
Longitude : 84.40387833333334,84.40394666666667
file name : Image_28022024140007346.png
|
2024-02-28 14:00:07.531746 |
69 |
65678136 |
Comp. of Rural Park |
278392 |
Comp. of Rural Park1 |
Completion of work |
-
latitude : 21.75694,21.756919999999997
Longitude : 84.40384833333334,84.40386666666667
file name : Image_28022024121925832.png
|
2024-02-28 12:19:25.954084 |
70 |
83029479 |
Construction of toilets in public institutions |
150000 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 21.75447166666667
Longitude : 84.45051166666666
file name : Image_19032024163909797.png
|
2024-03-19 16:39:09.879556 |
71 |
83029479 |
Construction of toilets in public institutions |
150000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 21.754565000000003
Longitude : 84.45050166666667
file name : Image_19032024152109450.png
|
2024-03-19 15:21:09.540999 |
72 |
83029479 |
Construction of toilets in public institutions |
150000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 21.754554999999996
Longitude : 84.45054166666665
file name : Image_16032024165136233.png
|
2024-03-16 16:51:36.327371 |
73 |
83012716 |
Water Supply to villages |
96000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 21.74626951
Longitude : 84.34935636
file name : Image_21052024113918444.png
|
2024-05-21 11:39:18.548294 |
74 |
83012716 |
Water Supply to villages |
96000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 21.7461927
Longitude : 84.3494861
file name : Image_21052024113216893.png
|
2024-05-21 11:32:16.986684 |
75 |
83012716 |
Water Supply to villages |
96000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 21.7462195
Longitude : 84.3493844
file name : Image_16102023120608976.png
|
2023-10-16 12:06:09.112838 |
76 |
83013164 |
Water Supply to villages |
299279 |
Water Supply to villages1 |
Roof laid |
-
latitude : 21.7462393
Longitude : 84.3494585
file name : Image_20032024174315579.png
|
2024-03-20 17:43:15.663819 |
77 |
83013164 |
Water Supply to villages |
299279 |
Water Supply to villages1 |
Plinth level |
-
latitude : 21.7462428
Longitude : 84.3495007
file name : Image_20032024173203073.png
|
2024-03-20 17:32:03.189768 |
78 |
83013164 |
Water Supply to villages |
299279 |
Water Supply to villages1 |
Completion of work |
-
latitude : 21.7462293
Longitude : 84.3493782
file name : Image_30102023172736904.png
|
2023-10-30 17:27:37.016482 |
79 |
83019035 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.767336666666665,21.767336666666665
Longitude : 84.44635333333332,84.44640499999998
file name : Image_30032024153603606.png
|
2024-03-30 15:36:03.740453 |
80 |
83019035 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.76732833333333,21.76734333333333
Longitude : 84.446305,84.44632500000002
file name : Image_30032024152738994.png
|
2024-03-30 15:27:39.105386 |
81 |
83019035 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.76731666666667,21.767311666666668
Longitude : 84.44629333333333,84.44632000000001
file name : Image_30032024152146927.png
|
2024-03-30 15:21:47.03138 |
82 |
59780066 |
Pipe Water Supply System at Arjundihi School |
80000 |
Pipe Water Supply System at Arjundihi School1 |
Roof laid |
-
latitude : 21.758106666666663
Longitude : 84.450395
file name : Image_30032024155444305.png
|
2024-03-30 15:54:44.437326 |
83 |
59780066 |
Pipe Water Supply System at Arjundihi School |
80000 |
Pipe Water Supply System at Arjundihi School1 |
Plinth level |
-
latitude : 21.758129999999998
Longitude : 84.45032666666665
file name : Image_30032024155113486.png
|
2024-03-30 15:51:13.585418 |
84 |
59780066 |
Pipe Water Supply System at Arjundihi School |
80000 |
Pipe Water Supply System at Arjundihi School1 |
Completion of work |
-
latitude : 21.758105
Longitude : 84.45029166666667
file name : Image_30032024154710305.png
|
2024-03-30 15:47:10.42129 |
85 |
59780066 |
Pipe Water Supply System at Arjundihi School |
80000 |
Pipe Water Supply System at Arjundihi School1 |
Completion of work |
-
latitude : 21.758008333333336
Longitude : 84.450245
file name : Image_30032024151528905.png
|
2024-03-30 15:15:29.000745 |
86 |
47676826 |
Cleaning of Laidaguna Village |
48000 |
Cleaning of Laidaguna Village1 |
Roof laid |
-
latitude : 21.74632831
Longitude : 84.34938122
file name : Image_18092024174354054.png
|
2024-09-18 17:43:54.300312 |
87 |
47676826 |
Cleaning of Laidaguna Village |
48000 |
Cleaning of Laidaguna Village1 |
Plinth level |
-
latitude : 21.7462421
Longitude : 84.3493697
file name : Image_18092024174048097.png
|
2024-09-18 17:40:48.306723 |
88 |
47676826 |
Cleaning of Laidaguna Village |
48000 |
Cleaning of Laidaguna Village1 |
Completion of work |
-
latitude : 21.7462467
Longitude : 84.3493629
file name : Image_18092024173718444.png
|
2024-09-18 17:37:18.631955 |
89 |
83012569 |
Construction of roads |
80372 |
Construction of roads1 |
Plinth level |
-
latitude : 21.74733558,21.74733558
Longitude : 84.44745756,84.44745756
file name : Image_18092024120218001.png
|
2024-09-18 12:02:18.080109 |
90 |
83012569 |
Construction of roads |
80372 |
Construction of roads1 |
Completion of work |
-
latitude : 21.74732667,21.74733445
Longitude : 84.44751172,84.44750278
file name : Image_18092024115726602.png
|
2024-09-18 11:57:26.687462 |
91 |
83012569 |
Construction of roads |
80372 |
Construction of roads1 |
Completion of work |
-
latitude : 21.74733791,21.74736781,21.74736503
Longitude : 84.44744738,84.44744964,84.44746554
file name : Image_18092024115732029.png
|
2024-09-18 11:57:32.11891 |
92 |
83012569 |
Construction of roads |
80372 |
Construction of roads1 |
Completion of work |
-
latitude : 21.74733667,21.74732952
Longitude : 84.44748964,84.44748185
file name : Image_18092024115736458.png
|
2024-09-18 11:57:36.538183 |
93 |
47676528 |
Cleaning of Telitileimal Village |
48000 |
Cleaning of Telitileimal Village1 |
Plinth level |
-
latitude : 21.7462395
Longitude : 84.3493664
file name : Image_18092024175943769.png
|
2024-09-18 17:59:43.947456 |
94 |
47676528 |
Cleaning of Telitileimal Village |
48000 |
Cleaning of Telitileimal Village1 |
Completion of work |
-
latitude : 21.7462418
Longitude : 84.3493683
file name : Image_18092024175602323.png
|
2024-09-18 17:56:02.476234 |
95 |
83020131 |
Installation of Web Cam |
120000 |
Installation of Web Cam1 |
Plinth level |
-
latitude : 21.74619243
Longitude : 84.34933104
file name : Image_18092024181424387.png
|
2024-09-18 18:14:24.578215 |
96 |
83020131 |
Installation of Web Cam |
120000 |
Installation of Web Cam1 |
Completion of work |
-
latitude : 21.7462339
Longitude : 84.3493773
file name : Image_18092024181154257.png
|
2024-09-18 18:11:54.439235 |
97 |
48095377 |
Water Supply to Barghat PS |
67125 |
Water Supply to Barghat PS1 |
Completion of work |
-
latitude : 21.7461847,21.7461847
Longitude : 84.34938343,84.34938343
file name : Image_10072024194756750.png
|
2024-07-10 19:47:56.897603 |
98 |
48095251 |
Water Supply to Madanmohanpur PS |
20751 |
Water Supply to Madanmohanpur PS1 |
Completion of work |
-
latitude : 21.7462402,21.7462402
Longitude : 84.3493677,84.3493677
file name : Image_10072024194857116.png
|
2024-07-10 19:48:57.264973 |
99 |
48095123 |
Installation of Water Supply Pipeline at AWC Building Barghat |
54756 |
Installation of Water Supply Pipeline at AWC Building Barghat1 |
Completion of work |
-
latitude : 21.7462414,21.7462414
Longitude : 84.3493683,84.3493683
file name : Image_10072024194647760.png
|
2024-07-10 19:46:47.907932 |
100 |
83067444 |
Extension of existing pipeline |
50000 |
Extension of existing pipeline1 |
Roof laid |
-
latitude : 21.7462417,21.7462417
Longitude : 84.3493683,84.3493683
file name : Image_11072024180021399.png
|
2024-07-11 18:00:21.525227 |
101 |
83067444 |
Extension of existing pipeline |
50000 |
Extension of existing pipeline1 |
Plinth level |
-
latitude : 21.7462404,21.7462406
Longitude : 84.3493678,84.349368
file name : Image_11072024175651608.png
|
2024-07-11 17:56:51.746433 |
102 |
83067444 |
Extension of existing pipeline |
50000 |
Extension of existing pipeline1 |
Completion of work |
-
latitude : 21.7462401,21.7462401
Longitude : 84.3493674,84.3493674
file name : Image_11072024174730341.png
|
2024-07-11 17:47:30.473485 |
103 |
98286931 |
Water Supply to villages |
264118 |
Water Supply to villages1 |
Plinth level |
-
latitude : 21.746233
Longitude : 84.3494135
file name : Image_04102024134632667.png
|
2024-10-04 13:46:32.929992 |
104 |
98286931 |
Water Supply to villages |
264118 |
Water Supply to villages1 |
Completion of work |
-
latitude : 21.7462468
Longitude : 84.3493697
file name : Image_04102024133454854.png
|
2024-10-04 13:34:55.091189 |
105 |
98287225 |
Water Supply to villages |
156000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 21.7462441
Longitude : 84.3493843
file name : Image_04102024141132698.png
|
2024-10-04 14:11:32.86074 |
106 |
98287225 |
Water Supply to villages |
156000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 21.746244
Longitude : 84.3493711
file name : Image_04102024140155467.png
|
2024-10-04 14:01:55.594973 |
107 |
98287225 |
Water Supply to villages |
156000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 21.74624216
Longitude : 84.34938025
file name : Image_04102024135430856.png
|
2024-10-04 13:54:30.981996 |
108 |
98261997 |
Construction of toilets in public institutions |
150000 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 21.75794543
Longitude : 84.4502791
file name : Image_21112024171615145.png
|
2024-11-21 17:16:15.257647 |
109 |
98261997 |
Construction of toilets in public institutions |
150000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 21.75807136
Longitude : 84.45015377
file name : Image_20112024130809159.png
|
2024-11-20 13:08:09.284067 |
110 |
83020419 |
Maintenance of Panchayat Bhawan |
26844 |
Maintenance of Panchayat Bhawan1 |
Plinth level |
-
latitude : 21.7462346
Longitude : 84.3493595
file name : Image_17122024173634009.png
|
2024-12-17 17:36:34.16334 |
111 |
83020419 |
Maintenance of Panchayat Bhawan |
26844 |
Maintenance of Panchayat Bhawan1 |
Completion of work |
-
latitude : 21.7462313
Longitude : 84.3493618
file name : Image_17122024165935282.png
|
2024-12-17 16:59:35.421695 |
112 |
47676240 |
Const of Compost Pit at Kaputikra Market |
5200 |
Const of Compost Pit at Kaputikra Market1 |
Completion of work |
-
latitude : 21.7462352
Longitude : 84.3493528
file name : Image_17122024174654536.png
|
2024-12-17 17:46:54.684117 |
113 |
83013522 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 21.7462738
Longitude : 84.3493229
file name : Image_17122024182226335.png
|
2024-12-17 18:22:26.45937 |
114 |
83013522 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 21.74626405
Longitude : 84.34936823
file name : Image_17122024182022988.png
|
2024-12-17 18:20:23.119337 |
115 |
83014076 |
Creation of community compost pits for a group of Households |
100000 |
Creation of community compost pits for a group of Households1 |
Plinth level |
-
latitude : 21.74628099
Longitude : 84.34935885
file name : Image_17122024183433736.png
|
2024-12-17 18:34:33.861857 |
116 |
83014076 |
Creation of community compost pits for a group of Households |
100000 |
Creation of community compost pits for a group of Households1 |
Completion of work |
-
latitude : 21.74631291
Longitude : 84.34937322
file name : Image_17122024183050221.png
|
2024-12-17 18:30:50.344326 |