1 |
44294784 |
Const.of CC road at Baladi Barapahad chowk 15th CFC Untied |
50000 |
Const.of CC road at Baladi Barapahad chowk 15th CFC Untied1 |
Completion of work |
-
latitude : 20.8065028,20.806836666666662
Longitude : 83.6888712,83.68834999999999
file name : Image_26042021082957188.png
|
2021-04-26 08:29:57.283304 |
2 |
44295073 |
Improvement and maintenance of roads from Makundpur to Fapsi 5th SFC |
200000 |
Improvement and maintenance of roads from Makundpur to Fapsi 5th SFC1 |
Completion of work |
-
latitude : 20.815195000000003,20.815216666666668
Longitude : 83.72771499999999,83.72771333333334
file name : Image_01052021102146638.png
|
2021-05-01 10:21:46.721724 |
3 |
44294579 |
Const.of Bathing steps at Baladi Mahabandh 15th CFC Untied |
200000 |
Const.of Bathing steps at Baladi Mahabandh 15th CFC Untied1 |
Completion of work |
-
latitude : 20.810786666666665
Longitude : 83.71025166666668
file name : Image_30042021143820663.png
|
2021-04-30 14:38:20.741281 |
4 |
44295454 |
imp.of road from salepali to majhifabsi 5th SFC |
100000 |
imp.of road from salepali to majhifabsi 5th SFC1 |
Completion of work |
-
latitude : 20.80958333333333,20.80958333333333,20.80958333333333,20.80958333333333,20.809581666666666,20.809581666666666
Longitude : 83.72249333333333,83.72249333333333,83.72249333333333,83.72249333333333,83.72249500000001,83.72249500000001
file name : Image_30042021143850382.png
|
2021-04-30 14:38:50.476355 |
5 |
44295454 |
imp.of road from salepali to majhifabsi 5th SFC |
100000 |
imp.of road from salepali to majhifabsi 5th SFC1 |
Completion of work |
-
latitude : 20.809618333333333,20.809578333333334
Longitude : 83.72250666666666,83.72251166666668
file name : Image_30042021143909180.png
|
2021-04-30 14:39:09.279293 |
6 |
44294724 |
Const.of CC road from Baladi to Taraikela road 15th CFC Untied |
400000 |
Const.of CC road from Baladi to Taraikela road 15th CFC Untied1 |
Completion of work |
-
latitude : 20.797346666666666,20.797346666666666
Longitude : 83.69138166666669,83.69138166666669
file name : Image_30042021122030428.png
|
2021-04-30 12:20:30.545704 |
7 |
44296674 |
RENOVATION AND IMPROVEMENT OF NAIKENPALI SCHOOL- U |
100000 |
RENOVATION AND IMPROVEMENT OF NAIKENPALI SCHOOL- U1 |
Completion of work |
-
latitude : 20.818705
Longitude : 83.67780833333333
file name : Image_29102021115624482.png
|
2021-10-29 11:56:24.600967 |
8 |
32143021 |
Construction of CC road at Naikenpali Mahakur pada- 14th CFC |
100000 |
Construction of CC road at Naikenpali Mahakur pada- 14th CFC1 |
Commenced |
-
latitude : 20.819206666666666,20.81923
Longitude : 83.67623666666665,83.67625500000001
file name : Image_29102021122025703.png
|
2021-10-29 12:20:25.827425 |
9 |
44294653 |
imp.of Budelbahali road 15th CFC Untied |
50000 |
imp.of Budelbahali road 15th CFC Untied1 |
Completion of work |
-
latitude : 20.81383166666667,20.813836666666663
Longitude : 83.68317499999999,83.683165
file name : Image_03112021120744182.png
|
2021-11-03 12:07:44.30709 |
10 |
44293933 |
Salary of SEM and pump operator 15th CFC Tied |
144000 |
Salary of SEM and pump operator 15th CFC Tied1 |
Completion of work |
-
latitude : 20.846605,20.846610000000002
Longitude : 83.89392666666666,83.89392333333332
file name : Image_19082021150059071.png
|
2021-08-19 15:00:59.189925 |
11 |
44293933 |
Salary of SEM and pump operator 15th CFC Tied |
144000 |
Salary of SEM and pump operator 15th CFC Tied1 |
Completion of work |
-
latitude : 20.846605,20.846610000000002
Longitude : 83.89392666666666,83.89392333333332
file name : Image_19082021150105299.png
|
2021-08-19 15:01:05.420817 |
12 |
44294371 |
Payment of jalachhatra in summer season at not available of drinking water 15th CFC Tied |
90000 |
Payment of jalachhatra in summer season at not available of drinking water 15th CFC Tied1 |
Completion of work |
-
latitude : 20.846529999999998
Longitude : 83.89387666666669
file name : Image_19082021150102132.png
|
2021-08-19 15:01:02.258619 |
13 |
44294371 |
Payment of jalachhatra in summer season at not available of drinking water 15th CFC Tied |
90000 |
Payment of jalachhatra in summer season at not available of drinking water 15th CFC Tied1 |
Completion of work |
-
latitude : 20.846529999999998
Longitude : 83.89387666666669
file name : Image_19082021150108408.png
|
2021-08-19 15:01:08.528357 |
14 |
44294061 |
MOBILITY AND PRIASOFT ALLOWANCE TO GRS - 15th CFC - Tied |
12000 |
MOBILITY AND PRIASOFT ALLOWANCE TO GRS - 15th CFC - Tied1 |
Completion of work |
-
latitude : 20.846173333333333
Longitude : 83.89409666666667
file name : Image_19082021150055840.png
|
2021-08-19 15:00:55.969116 |
15 |
51124315 |
Improvement of LibraryHall at Baladi |
159754 |
Improvement of LibraryHall at Baladi1 |
Completion of work |
-
latitude : 20.80621833333333
Longitude : 83.68800166666666
file name : Image_30122022144903053.png
|
2022-12-30 14:49:03.157894 |
16 |
51124315 |
Improvement of LibraryHall at Baladi |
159754 |
Improvement of LibraryHall at Baladi1 |
Completion of work |
-
latitude : 20.8066467
Longitude : 83.6883755
file name : Image_10112021112359234.png
|
2021-11-10 11:23:59.414973 |
17 |
44294900 |
Const.of CC road at Matikud 15th CFC Untied |
173312 |
Const.of CC road at Matikud 15th CFC Untied1 |
Completion of work |
-
latitude : 20.80759833333333,20.807601666666663
Longitude : 83.66066166666666,83.66068166666668
file name : Image_10112021125544127.png
|
2021-11-10 12:55:44.268735 |
18 |
44294167 |
Construction of raised platform and soakpit of Tubewell 15th CFC Tied |
82312 |
Construction of raised platform and soakpit of Tubewell 15th CFC Tied1 |
Completion of work |
-
latitude : 20.806753333333337
Longitude : 83.69118166666667
file name : Image_10112021105347191.png
|
2021-11-10 10:53:47.332494 |
19 |
44295135 |
Improvement and maintenance of roads from Dunguripali to Limbapali 5th SFc |
100000 |
Improvement and maintenance of roads from Dunguripali to Limbapali 5th SFc1 |
Completion of work |
-
latitude : 20.817535,20.81753833333333
Longitude : 83.716355,83.71636500000001
file name : Image_07092021105247943.png
|
2021-09-07 10:52:48.049354 |
20 |
51124468 |
Improvement of Nurserymunda at Baladi |
200000 |
Improvement of Nurserymunda at Baladi1 |
Completion of work |
-
latitude : 20.80746333333333
Longitude : 83.70558333333332
file name : Image_07092021110549186.png
|
2021-09-07 11:05:49.250509 |
21 |
51124407 |
Completion of MISSION SHAKTI Gruha at Baladi |
100000 |
Completion of MISSION SHAKTI Gruha at Baladi1 |
Completion of work |
-
latitude : 20.811533333333333
Longitude : 83.68382166666667
file name : Image_07092021111945083.png
|
2021-09-07 11:19:45.149301 |
22 |
51124545 |
Construction of culver at Budelbahali Road |
100000 |
Construction of culver at Budelbahali Road1 |
Completion of work |
-
latitude : 20.804209999999998
Longitude : 83.68075166666668
file name : Image_18092021174627901.png
|
2021-09-18 17:46:27.995604 |
23 |
44293973 |
Electricity bill of PWS 15th CFC Tied |
100000 |
Electricity bill of PWS 15th CFC Tied1 |
Completion of work |
-
latitude : 20.846715000000003,20.846709999999998
Longitude : 83.89391666666667,83.89371000000001
file name : Image_24122021154706388.png
|
2021-12-24 15:47:06.526246 |
24 |
47883659 |
Construction Of CC Road At Naikenpali (5th SFC) |
250080 |
Construction Of CC Road At Naikenpali (5th SFC)1 |
Completion of work |
-
latitude : 20.822085,20.822103333333335
Longitude : 83.67846499999999,83.67852666666667
file name : Image_07032022153638213.png
|
2022-03-07 15:36:38.317363 |
25 |
47694011 |
CONST.OF KITCHEN ROOM AT BABAMATH,DUNGURIPALI UNTIED 15TH CFC |
100000 |
CONST.OF KITCHEN ROOM AT BABAMATH,DUNGURIPALI UNTIED 15TH CFC1 |
Completion of work |
-
latitude : 20.817511666666665
Longitude : 83.71415333333334
file name : Image_07032022150406444.png
|
2022-03-07 15:04:06.543808 |
26 |
56114707 |
Construction of CC Road at Baladi Jhankar goat to Tarekela UNTIED |
273312 |
Construction of CC Road at Baladi Jhankar goat to Tarekela UNTIED1 |
Completion of work |
-
latitude : 20.79669,20.796699999999998
Longitude : 83.69143833333334,83.69147
file name : Image_07032022144600299.png
|
2022-03-07 14:46:00.452161 |
27 |
44294841 |
Improvement of Baladi Bhandari pada community centre 15th CFC Untied |
150000 |
Improvement of Baladi Bhandari pada community centre 15th CFC Untied1 |
Completion of work |
-
latitude : 20.805116666666663
Longitude : 83.68907333333333
file name : Image_08032022134020105.png
|
2022-03-08 13:40:20.199676 |
28 |
52725395 |
Improvement of Baladi Tali Pada Community Centre |
64080 |
Improvement of Baladi Tali Pada Community Centre1 |
Completion of work |
-
latitude : 20.805055
Longitude : 83.68985666666667
file name : Image_08032022135808333.png
|
2022-03-08 13:58:08.451349 |
29 |
52697017 |
Pipe Water Supply near Kalyan Mandap At Baladi 4sfc |
100000 |
Pipe Water Supply near Kalyan Mandap At Baladi 4sfc1 |
Completion of work |
-
latitude : 20.806828333333335,20.806858333333334
Longitude : 83.69114999999998,83.69113166666666
file name : Image_08032022140532954.png
|
2022-03-08 14:05:33.043249 |
30 |
52725171 |
improvement of Jana Kalyan Community Center at Baladi Uparpada 15CFC tied |
100000 |
improvement of Jana Kalyan Community Center at Baladi Uparpada 15CFC tied1 |
Completion of work |
-
latitude : 20.805977
Longitude : 83.6892928
file name : Image_08032022134443894.png
|
2022-03-08 13:44:44.01741 |
31 |
47694480 |
RENOVATION OF KHALIAMUNDA MAKUNDPUR UNTIED 15TH CFC |
100000 |
RENOVATION OF KHALIAMUNDA MAKUNDPUR UNTIED 15TH CFC1 |
Completion of work |
-
latitude : 20.81262
Longitude : 83.72445166666667
file name : Image_06072022111936299.png
|
2022-07-06 11:19:36.387929 |
32 |
52696749 |
Improvement Of Nursarymunda at Bladi 14cfc |
174000 |
Improvement Of Nursarymunda at Bladi 14cfc1 |
Completion of work |
-
latitude : 20.80747
Longitude : 83.70565333333334
file name : Image_06072022113342691.png
|
2022-07-06 11:33:42.807641 |
33 |
63791304 |
Construction of Steps At Khaliamunda at Budelbahali |
100000 |
Construction of Steps At Khaliamunda at Budelbahali1 |
Completion of work |
-
latitude : 20.806783333333335
Longitude : 83.68234166666667
file name : Image_26072022124308900.png
|
2022-07-26 12:43:09.003756 |
34 |
47695569 |
IMP. OF ROAD FROM MATIKOD TO BUDELBAHALI UNTIED 15TH CFC |
150000 |
IMP. OF ROAD FROM MATIKOD TO BUDELBAHALI UNTIED 15TH CFC1 |
Completion of work |
-
latitude : 20.80889833333333,20.80891166666667
Longitude : 83.67762166666668,83.67765
file name : Image_26072022123821920.png
|
2022-07-26 12:38:22.023223 |
35 |
47694802 |
CONST.OF CC ROAD AT SALEPALI UNTIED 15TH CFC |
100000 |
CONST.OF CC ROAD AT SALEPALI UNTIED 15TH CFC 1 |
Completion of work |
-
latitude : 20.811091666666666,20.811125
Longitude : 83.71595666666666,83.71597500000001
file name : Image_26072022125739420.png
|
2022-07-26 12:57:39.547343 |
36 |
47879906 |
Const. of Drain And CC Road At Salepali ( Tied) |
150000 |
Const. of Drain And CC Road At Salepali ( Tied)1 |
Completion of work |
-
latitude : 20.81103333333333,20.811100000000003
Longitude : 83.71596833333334,83.71599166666668
file name : Image_26072022125944693.png
|
2022-07-26 12:59:44.796295 |
37 |
47704435 |
CONST.OF RAISED PLATFORM AND SOAK PIT OF TUBE WELLS TIED 15TH CFC |
160000 |
CONST.OF RAISED PLATFORM AND SOAK PIT OF TUBE WELLS TIED 15TH CFC1 |
Completion of work |
-
latitude : 20.799466666666667
Longitude : 83.68793499999998
file name : Image_04062023174818964.png
|
2023-06-04 17:48:19.085912 |
38 |
47704435 |
CONST.OF RAISED PLATFORM AND SOAK PIT OF TUBE WELLS TIED 15TH CFC |
160000 |
CONST.OF RAISED PLATFORM AND SOAK PIT OF TUBE WELLS TIED 15TH CFC1 |
Completion of work |
-
latitude : 20.8065232
Longitude : 83.6886412
file name : Image_04062023175658452.png
|
2023-06-04 17:56:58.573494 |
39 |
47704435 |
CONST.OF RAISED PLATFORM AND SOAK PIT OF TUBE WELLS TIED 15TH CFC |
160000 |
CONST.OF RAISED PLATFORM AND SOAK PIT OF TUBE WELLS TIED 15TH CFC1 |
Completion of work |
-
latitude : 20.81731333333333
Longitude : 83.71696166666668
file name : Image_05082022120243854.png
|
2022-08-05 12:02:43.943829 |
40 |
47704435 |
CONST.OF RAISED PLATFORM AND SOAK PIT OF TUBE WELLS TIED 15TH CFC |
160000 |
CONST.OF RAISED PLATFORM AND SOAK PIT OF TUBE WELLS TIED 15TH CFC1 |
Completion of work |
-
latitude : 20.817575
Longitude : 83.71656
file name : Image_05082022120256518.png
|
2022-08-05 12:02:56.602571 |
41 |
47704435 |
CONST.OF RAISED PLATFORM AND SOAK PIT OF TUBE WELLS TIED 15TH CFC |
160000 |
CONST.OF RAISED PLATFORM AND SOAK PIT OF TUBE WELLS TIED 15TH CFC1 |
Completion of work |
-
latitude : 20.811058333333335
Longitude : 83.71643333333334
file name : Image_05082022121846101.png
|
2022-08-05 12:18:46.19636 |
42 |
47704435 |
CONST.OF RAISED PLATFORM AND SOAK PIT OF TUBE WELLS TIED 15TH CFC |
160000 |
CONST.OF RAISED PLATFORM AND SOAK PIT OF TUBE WELLS TIED 15TH CFC1 |
Completion of work |
-
latitude : 20.816
Longitude : 83.72618166666668
file name : Image_05082022123320746.png
|
2022-08-05 12:33:20.85913 |
43 |
47704435 |
CONST.OF RAISED PLATFORM AND SOAK PIT OF TUBE WELLS TIED 15TH CFC |
160000 |
CONST.OF RAISED PLATFORM AND SOAK PIT OF TUBE WELLS TIED 15TH CFC1 |
Completion of work |
-
latitude : 20.816616666666665
Longitude : 83.72733666666666
file name : Image_05082022123911995.png
|
2022-08-05 12:39:12.097795 |
44 |
63904850 |
Renovation of Nuamunda at Naikenpali 15cfc t |
200000 |
Renovation of Nuamunda at Naikenpali 15cfc t1 |
Completion of work |
-
latitude : 20.824526666666664
Longitude : 83.67841833333333
file name : Image_15032023133423015.png
|
2023-03-15 13:34:23.170623 |
45 |
63904850 |
Renovation of Nuamunda at Naikenpali 15cfc t |
200000 |
Renovation of Nuamunda at Naikenpali 15cfc t1 |
Completion of work |
-
latitude : 20.822433333333333
Longitude : 83.678755
file name : Image_02082022122514684.png
|
2022-08-02 12:25:14.787999 |
46 |
47695206 |
IMP.OF ROAD FROM BUDELBAHALI TO KUTSIRA ROAD UNTIED 15TH CFC |
150000 |
IMP.OF ROAD FROM BUDELBAHALI TO KUTSIRA ROAD UNTIED 15TH CFC1 |
Completion of work |
-
latitude : 20.81169,20.813566666666663
Longitude : 83.68373000000001,83.68321666666667
file name : Image_30082022105433606.png
|
2022-08-30 10:54:33.730264 |
47 |
65084382 |
Creation of Shed for segregation and processing of wet and dry waste |
75000 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 20.804818333333333
Longitude : 83.69391666666667
file name : Image_15092022132310488.png
|
2022-09-15 13:23:10.594846 |
48 |
32143181 |
Extension and Renovation of Piped line at Baladi PWS- 14th CFC |
400000 |
Extension and Renovation of Piped line at Baladi PWS- 14th CFC1 |
Commenced |
-
latitude : 20.8060207,20.8060207
Longitude : 83.6895207,83.6895207
file name : Image_19122022121543224.png
|
2022-12-19 12:15:43.3302 |
49 |
32143181 |
Extension and Renovation of Piped line at Baladi PWS- 14th CFC |
400000 |
Extension and Renovation of Piped line at Baladi PWS- 14th CFC1 |
Commenced |
-
latitude : 20.8059306,20.8059306
Longitude : 83.6895638,83.6895638
file name : Image_30092022124000312.png
|
2022-09-30 12:40:00.431478 |
50 |
65082863 |
Construction of CC Road From Baladi to Taraikela |
271392 |
Construction of CC Road From Baladi to Taraikela 1 |
Completion of work |
-
latitude : 20.796086666666667,20.796106666666667
Longitude : 83.69269166666666,83.69267333333333
file name : Image_30092022122654005.png
|
2022-09-30 12:26:54.10865 |
51 |
65084322 |
Creation of community soak pits for group of Households |
199474 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 20.81224666666667
Longitude : 83.661785
file name : Image_07102023104846895.png
|
2023-10-07 10:48:46.988679 |
52 |
65084322 |
Creation of community soak pits for group of Households |
199474 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 20.81276666666667
Longitude : 83.6619
file name : Image_07102023104425974.png
|
2023-10-07 10:44:26.069299 |
53 |
65084322 |
Creation of community soak pits for group of Households |
199474 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 20.8062032
Longitude : 83.689239
file name : Image_22062023154237874.png
|
2023-06-22 15:42:37.97957 |
54 |
47883316 |
Completion of PEO Quarter At Baladi (5th SFC) |
168000 |
Completion of PEO Quarter At Baladi (5th SFC)1 |
Completion of work |
-
latitude : 20.811791666666668
Longitude : 83.68372333333333
file name : Image_19122022114618865.png
|
2022-12-19 11:46:18.984027 |
55 |
47883316 |
Completion of PEO Quarter At Baladi (5th SFC) |
168000 |
Completion of PEO Quarter At Baladi (5th SFC)1 |
Completion of work |
-
latitude : 20.81183
Longitude : 83.68384833333333
file name : Image_01112022150716328.png
|
2022-11-01 15:07:16.416189 |
56 |
44295332 |
Beutification of BNRGSK 5th SFC- |
50000 |
Beutification of BNRGSK 5th SFC-1 |
Completion of work |
-
latitude : 20.811735
Longitude : 83.68390666666667
file name : Image_01112022150554798.png
|
2022-11-01 15:05:54.903291 |
57 |
51124246 |
Improvement of Playground at Dunguripali |
100000 |
Improvement of Playground at Dunguripali1 |
Completion of work |
-
latitude : 20.81743666666667,20.817363333333333
Longitude : 83.71433999999999,83.71424666666665
file name : Image_19122022123142292.png
|
2022-12-19 12:31:42.401642 |
58 |
32142984 |
Renovation of Dunguripali Gaonkata- 14th CFC |
100000 |
Renovation of Dunguripali Gaonkata- 14th CFC1 |
Commenced |
-
latitude : 20.817518333333336
Longitude : 83.71463
file name : Image_06072022105423464.png
|
2022-07-06 10:54:23.59059 |
59 |
65082784 |
Infrastructure and Development work of Baladi Hiigh School |
500000 |
Infrastructure and Development work of Baladi Hiigh School 1 |
Completion of work |
-
latitude : 20.80847833333333
Longitude : 83.68584833333334
file name : Image_15032023133525383.png
|
2023-03-15 13:35:25.506725 |
60 |
65082784 |
Infrastructure and Development work of Baladi Hiigh School |
500000 |
Infrastructure and Development work of Baladi Hiigh School 1 |
Completion of work |
-
latitude : 20.808473333333335
Longitude : 83.685775
file name : Image_27012023124522333.png
|
2023-01-27 12:45:22.4353 |
61 |
47880274 |
Const. of Toilet At Baladi High School ( Tied) |
100000 |
Const. of Toilet At Baladi High School ( Tied)1 |
Completion of work |
-
latitude : 20.807963333333337
Longitude : 83.68588666666668
file name : Image_27012023124939796.png
|
2023-01-27 12:49:39.891089 |
62 |
65084112 |
Amrit Sarovar — Construction of new water body |
250000 |
Amrit Sarovar — Construction of new water body1 |
Completion of work |
-
latitude : 20.819403333333337
Longitude : 83.715655
file name : Image_15032023135606551.png
|
2023-03-15 13:56:06.669003 |
63 |
65084153 |
Rejuvenation and Desilting of tank/waterbody |
220000 |
Rejuvenation and Desilting of tank/waterbody1 |
Completion of work |
-
latitude : 20.80768833333333
Longitude : 83.70553833333334
file name : Image_11052023083943076.png
|
2023-05-11 08:39:43.196461 |
64 |
65082610 |
Improvement of Khaliamunda Tank at Budelbahali |
300000 |
Improvement of Khaliamunda Tank at Budelbahali1 |
Completion of work |
-
latitude : 20.807965
Longitude : 83.682415
file name : Image_14072023164226332.png
|
2023-07-14 16:42:26.449853 |
65 |
47692558 |
CONST.OF BATHING STEPS AT GAONKATA OF VILLAGE DUNGURIPALI UNTIED 15TH CFC |
100000 |
CONST.OF BATHING STEPS AT GAONKATA OF VILLAGE DUNGURIPALI UNTIED 15TH CFC1 |
Completion of work |
-
latitude : 20.817908333333335
Longitude : 83.71631166666666
file name : Image_14072023162102874.png
|
2023-07-14 16:21:02.970223 |
66 |
65084238 |
Operation & maintenance of drinking water supply system |
52044 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 20.805461666666663
Longitude : 83.68817833333333
file name : Image_24072023174202576.png
|
2023-07-24 17:42:02.685681 |
67 |
86828625 |
Rejuvenation and Desilting of tank/waterbody |
100000 |
Rejuvenation and Desilting of tank/waterbody1 |
Completion of work |
-
latitude : 20.817855
Longitude : 83.71638833333333
file name : Image_04082023170528143.png
|
2023-08-04 17:05:28.244004 |
68 |
49697661 |
PIPE WATER SUPPLY TO BALADI BARAPAHA CHHOWK AWC BALADI AWC MAKUNDPUR AWC5TH SFC |
150000 |
PIPE WATER SUPPLY TO BALADI BARAPAHA CHHOWK AWC BALADI AWC MAKUNDPUR AWC5TH SFC1 |
Completion of work |
-
latitude : 20.8066922,20.8066286
Longitude : 83.6884748,83.6884424
file name : Image_22112023142444015.png
|
2023-11-22 14:24:44.111511 |
69 |
49697661 |
PIPE WATER SUPPLY TO BALADI BARAPAHA CHHOWK AWC BALADI AWC MAKUNDPUR AWC5TH SFC |
150000 |
PIPE WATER SUPPLY TO BALADI BARAPAHA CHHOWK AWC BALADI AWC MAKUNDPUR AWC5TH SFC1 |
Completion of work |
-
latitude : 20.806609,20.8067111
Longitude : 83.6884559,83.6884883
file name : Image_07102023121737341.png
|
2023-10-07 12:17:37.434131 |
70 |
65084788 |
Creation of drainage channel for management of grey water |
85570 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 20.811194999999998,20.811178333333334
Longitude : 83.71609833333332,83.71611999999999
file name : Image_07102023122950445.png
|
2023-10-07 12:29:50.53799 |
71 |
65084184 |
Augmentation of the existing source of drinking water |
50000 |
Augmentation of the existing source of drinking water1 |
Completion of work |
-
latitude : 20.810645
Longitude : 83.71753833333332
file name : Image_07102023123453889.png
|
2023-10-07 12:34:54.034531 |
72 |
65084184 |
Augmentation of the existing source of drinking water |
50000 |
Augmentation of the existing source of drinking water1 |
Completion of work |
-
latitude : 20.806196666666665
Longitude : 83.68047833333334
file name : Image_07102023102930044.png
|
2023-10-07 10:29:30.142647 |
73 |
65084184 |
Augmentation of the existing source of drinking water |
50000 |
Augmentation of the existing source of drinking water1 |
Completion of work |
-
latitude : 20.81281166666667
Longitude : 83.66190166666665
file name : Image_28092023104203590.png
|
2023-09-28 10:42:03.684406 |
74 |
82350406 |
Electricity |
224532 |
Electricity1 |
Roof laid |
-
latitude : 20.8467047
Longitude : 83.8938634
file name : Image_19102023154506212.png
|
2023-10-19 15:45:06.346474 |
75 |
82350406 |
Electricity |
224532 |
Electricity1 |
Plinth level |
-
latitude : 20.732826666666664
Longitude : 83.67372833333333
file name : Image_19102023154342034.png
|
2023-10-19 15:43:42.175837 |
76 |
82350406 |
Electricity |
224532 |
Electricity1 |
Completion of work |
-
latitude : 20.8467052
Longitude : 83.8938649
file name : Image_19102023154207544.png
|
2023-10-19 15:42:07.665996 |
77 |
47880799 |
Const. of Toilet And Bathroom At Baladi (Tied) |
101656 |
Const. of Toilet And Bathroom At Baladi (Tied)1 |
Completion of work |
-
latitude : 20.808035000000004
Longitude : 83.68594333333334
file name : Image_28092023102152299.png
|
2023-09-28 10:21:52.38544 |
78 |
47703912 |
CONST.OF WATER RESERVATION TANK AT LALTIKRAPADA ,BALADI TIED 15TH CFC |
150000 |
CONST.OF WATER RESERVATION TANK AT LALTIKRAPADA ,BALADI TIED 15TH CFC1 |
Roof laid |
-
latitude : 20.80608898
Longitude : 83.68713855
file name : Image_03092024141643615.png
|
2024-09-03 14:16:43.914376 |
79 |
47703912 |
CONST.OF WATER RESERVATION TANK AT LALTIKRAPADA ,BALADI TIED 15TH CFC |
150000 |
CONST.OF WATER RESERVATION TANK AT LALTIKRAPADA ,BALADI TIED 15TH CFC1 |
Plinth level |
-
latitude : 20.80599969
Longitude : 83.68712142
file name : Image_03092024140047063.png
|
2024-09-03 14:00:47.939258 |
80 |
47703912 |
CONST.OF WATER RESERVATION TANK AT LALTIKRAPADA ,BALADI TIED 15TH CFC |
150000 |
CONST.OF WATER RESERVATION TANK AT LALTIKRAPADA ,BALADI TIED 15TH CFC1 |
Completion of work |
-
latitude : 20.80604067
Longitude : 83.68711659
file name : Image_03092024135108141.png
|
2024-09-03 13:51:08.896442 |
81 |
82290441 |
Construction of Boundary Wall |
200000 |
Construction of Boundary Wall1 |
Roof laid |
-
latitude : 20.81254333333333
Longitude : 83.72353999999999
file name : Image_25102023105639267.png
|
2023-10-25 10:56:39.362657 |
82 |
82290441 |
Construction of Boundary Wall |
200000 |
Construction of Boundary Wall1 |
Plinth level |
-
latitude : 20.812481666666667
Longitude : 83.72349833333334
file name : Image_25102023105025089.png
|
2023-10-25 10:50:25.218607 |
83 |
82290441 |
Construction of Boundary Wall |
200000 |
Construction of Boundary Wall1 |
Completion of work |
-
latitude : 20.81258833333333
Longitude : 83.72347166666665
file name : Image_25102023104247748.png
|
2023-10-25 10:42:47.847697 |
84 |
82320477 |
Drainage Construction |
300000 |
Drainage Construction1 |
Plinth level |
-
latitude : 20.80624833333333
Longitude : 83.68802666666667
file name : Image_09042024123725087.png
|
2024-04-09 12:37:25.189306 |
85 |
82320477 |
Drainage Construction |
300000 |
Drainage Construction1 |
Completion of work |
-
latitude : 20.794318333333333
Longitude : 83.71103999999998
file name : Image_09042024123125249.png
|
2024-04-09 12:31:25.342941 |
86 |
82353484 |
Maintenance of traditional Ponds / Tanks |
200000 |
Maintenance of traditional Ponds / Tanks1 |
Roof laid |
-
latitude : 20.811705
Longitude : 83.68389833333335
file name : Image_20012024133701056.png
|
2024-01-20 13:37:01.147181 |
87 |
82353484 |
Maintenance of traditional Ponds / Tanks |
200000 |
Maintenance of traditional Ponds / Tanks1 |
Plinth level |
-
latitude : 20.81970833333333
Longitude : 83.67025
file name : Image_20012024113810889.png
|
2024-01-20 11:38:11.001549 |
88 |
82353484 |
Maintenance of traditional Ponds / Tanks |
200000 |
Maintenance of traditional Ponds / Tanks1 |
Completion of work |
-
latitude : 20.819683333333334
Longitude : 83.67029
file name : Image_20012024112559303.png
|
2024-01-20 11:25:59.420003 |
89 |
82290281 |
Repairing and maintenance of roads |
100000 |
Repairing and maintenance of roads1 |
Roof laid |
-
latitude : 20.810068333333334,20.810058333333338
Longitude : 83.71663166666667,83.71664333333335
file name : Image_15112023142503629.png
|
2023-11-15 14:25:02.570776 |
90 |
82290281 |
Repairing and maintenance of roads |
100000 |
Repairing and maintenance of roads1 |
Roof laid |
-
latitude : 20.810068333333334,20.810058333333338
Longitude : 83.71663166666667,83.71664333333335
file name : Image_15112023140125938.png
|
2023-11-15 14:01:26.058186 |
91 |
82290281 |
Repairing and maintenance of roads |
100000 |
Repairing and maintenance of roads1 |
Plinth level |
-
latitude : 20.81004666666667,20.810045
Longitude : 83.71661166666667,83.716625
file name : Image_15112023135749485.png
|
2023-11-15 13:57:49.58437 |
92 |
82290281 |
Repairing and maintenance of roads |
100000 |
Repairing and maintenance of roads1 |
Completion of work |
-
latitude : 20.81007833333333,20.810021666666664
Longitude : 83.71661166666667,83.71659666666667
file name : Image_15112023135531174.png
|
2023-11-15 13:55:31.287737 |
93 |
44295230 |
Renovation of Matikud AWC 5th SFC |
50000 |
Renovation of Matikud AWC 5th SFC1 |
Completion of work |
-
latitude : 20.812846666666662
Longitude : 83.66238833333334
file name : Image_22112023134135684.png
|
2023-11-22 13:41:35.785774 |
94 |
82337404 |
Drainage Construction |
96959 |
Drainage Construction1 |
Roof laid |
-
latitude : 20.814030000000002
Longitude : 83.66198666666666
file name : Image_22112023140322455.png
|
2023-11-22 14:03:22.549419 |
95 |
82337404 |
Drainage Construction |
96959 |
Drainage Construction1 |
Plinth level |
-
latitude : 20.814343333333333
Longitude : 83.66253
file name : Image_22112023135656575.png
|
2023-11-22 13:56:56.664359 |
96 |
82337404 |
Drainage Construction |
96959 |
Drainage Construction1 |
Completion of work |
-
latitude : 20.814163333333333
Longitude : 83.66274333333334
file name : Image_22112023135259769.png
|
2023-11-22 13:52:59.881029 |
97 |
75775434 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 20.807183333333334,20.807203333333337
Longitude : 83.68864666666666,83.68861666666665
file name : Image_22032024114231456.png
|
2024-03-22 11:42:31.551738 |
98 |
75775434 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 20.8066941,20.8066941
Longitude : 83.6887165,83.6887165
file name : Image_22032024113635258.png
|
2024-03-22 11:36:35.349803 |
99 |
75775434 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 20.8068279,20.8067193
Longitude : 83.6886695,83.6887197
file name : Image_21032024154329392.png
|
2024-03-21 15:43:30.184527 |
100 |
75775434 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 20.8068279,20.8067193
Longitude : 83.6886695,83.6887197
file name : Image_21032024154258256.png
|
2024-03-21 15:43:00.177369 |
101 |
75775434 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 20.8066693,20.8066693
Longitude : 83.6887588,83.6887588
file name : Image_21032024154250189.png
|
2024-03-21 15:42:51.292373 |
102 |
75691023 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 20.812211666666666,20.812250000000002
Longitude : 83.66187166666666,83.66186166666667
file name : Image_21032024144124849.png
|
2024-03-21 14:41:24.970559 |
103 |
75691023 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 20.812301666666666,20.81230833333333
Longitude : 83.66177833333334,83.66178833333333
file name : Image_21032024143827316.png
|
2024-03-21 14:38:27.386881 |
104 |
75691023 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 20.81227666666667,20.812271666666668
Longitude : 83.66183333333332,83.66181333333334
file name : Image_21032024142824495.png
|
2024-03-21 14:28:24.587203 |
105 |
75779261 |
Computer in GP Bhawan |
17000 |
Computer in GP Bhawan1 |
Roof laid |
-
latitude : 20.8468985
Longitude : 83.8941987
file name : Image_30032024152004910.png
|
2024-03-30 15:20:05.235791 |
106 |
75779261 |
Computer in GP Bhawan |
17000 |
Computer in GP Bhawan1 |
Plinth level |
-
latitude : 20.8467706
Longitude : 83.894232
file name : Image_30032024151823695.png
|
2024-03-30 15:18:23.974654 |
107 |
75779261 |
Computer in GP Bhawan |
17000 |
Computer in GP Bhawan1 |
Completion of work |
-
latitude : 20.846767
Longitude : 83.8942325
file name : Image_30032024151420357.png
|
2024-03-30 15:14:20.552599 |
108 |
82290610 |
Construction of roads |
80372 |
Construction of roads1 |
Roof laid |
-
latitude : 20.80627833333333,20.80625166666667
Longitude : 83.68044166666665,83.68041333333333
file name : Image_15112023132801407.png
|
2023-11-15 13:28:01.509416 |
109 |
82290610 |
Construction of roads |
80372 |
Construction of roads1 |
Plinth level |
-
latitude : 20.806255000000004,20.806283333333333
Longitude : 83.68047333333334,83.68044833333333
file name : Image_15112023132440509.png
|
2023-11-15 13:24:40.610997 |
110 |
82290610 |
Construction of roads |
80372 |
Construction of roads1 |
Completion of work |
-
latitude : 20.8066262,20.80627
Longitude : 83.688458,83.68045666666667
file name : Image_15112023131935537.png
|
2023-11-15 13:19:35.639561 |
111 |
106378126 |
Purchase of Tricycles/other battery -operated vehicles for door to door collection of waste or any other services |
75000 |
Purchase of Tricycles/other battery -operated vehicles for door to door collection of waste or any other services1 |
Completion of work |
-
latitude : 20.81178084
Longitude : 83.68373569
file name : Image_29062024174128008.png
|
2024-06-29 17:41:28.104919 |
112 |
106378126 |
Purchase of Tricycles/other battery -operated vehicles for door to door collection of waste or any other services |
75000 |
Purchase of Tricycles/other battery -operated vehicles for door to door collection of waste or any other services1 |
Completion of work |
-
latitude : 20.81179939
Longitude : 83.6837112
file name : Image_29062024174028687.png
|
2024-06-29 17:40:28.780481 |
113 |
82291588 |
Rejuvenation and desilting of tank/ water body |
185279 |
Rejuvenation and desilting of tank/ water body1 |
Roof laid |
-
latitude : 20.81439776
Longitude : 83.66100975
file name : Image_29062024180640573.png
|
2024-06-29 18:06:40.666545 |
114 |
82291588 |
Rejuvenation and desilting of tank/ water body |
185279 |
Rejuvenation and desilting of tank/ water body1 |
Plinth level |
-
latitude : 20.81439319
Longitude : 83.6610055
file name : Image_29062024180536684.png
|
2024-06-29 18:05:36.773334 |
115 |
82291588 |
Rejuvenation and desilting of tank/ water body |
185279 |
Rejuvenation and desilting of tank/ water body1 |
Completion of work |
-
latitude : 20.81438229
Longitude : 83.66102033
file name : Image_29062024180350160.png
|
2024-06-29 18:03:50.246052 |
116 |
82291284 |
Rejuvenation and desilting of tank/ water body |
200000 |
Rejuvenation and desilting of tank/ water body1 |
Roof laid |
-
latitude : 20.81763826
Longitude : 83.71620399
file name : Image_29062024171259098.png
|
2024-06-29 17:12:59.194004 |
117 |
82291284 |
Rejuvenation and desilting of tank/ water body |
200000 |
Rejuvenation and desilting of tank/ water body1 |
Plinth level |
-
latitude : 20.81768524
Longitude : 83.71623478
file name : Image_29062024171129654.png
|
2024-06-29 17:11:29.740087 |
118 |
82291284 |
Rejuvenation and desilting of tank/ water body |
200000 |
Rejuvenation and desilting of tank/ water body1 |
Completion of work |
-
latitude : 20.81763943
Longitude : 83.71638203
file name : Image_29062024170936341.png
|
2024-06-29 17:09:36.434867 |
119 |
82291032 |
Rejuvenation and desilting of tank/ water body |
200000 |
Rejuvenation and desilting of tank/ water body1 |
Roof laid |
-
latitude : 20.80310651
Longitude : 83.6882031
file name : Image_29062024173200421.png
|
2024-06-29 17:32:00.513969 |
120 |
82291032 |
Rejuvenation and desilting of tank/ water body |
200000 |
Rejuvenation and desilting of tank/ water body1 |
Plinth level |
-
latitude : 20.80306059
Longitude : 83.6881853
file name : Image_29062024173036085.png
|
2024-06-29 17:30:36.183582 |
121 |
82291032 |
Rejuvenation and desilting of tank/ water body |
200000 |
Rejuvenation and desilting of tank/ water body1 |
Completion of work |
-
latitude : 20.8058809
Longitude : 83.6888563
file name : Image_29062024172903534.png
|
2024-06-29 17:29:02.105541 |
122 |
82354537 |
Drinking water facility |
80000 |
Drinking water facility1 |
Roof laid |
-
latitude : 20.80684645
Longitude : 83.69749025
file name : Image_08082024161418928.png
|
2024-08-08 16:14:19.026632 |
123 |
82354537 |
Drinking water facility |
80000 |
Drinking water facility1 |
Plinth level |
-
latitude : 20.80684456
Longitude : 83.69747595
file name : Image_08082024161126700.png
|
2024-08-08 16:11:26.805195 |
124 |
82354537 |
Drinking water facility |
80000 |
Drinking water facility1 |
Completion of work |
-
latitude : 20.80686261
Longitude : 83.69746815
file name : Image_08082024160931648.png
|
2024-08-08 16:09:31.749218 |
125 |
82354108 |
Construction of Building |
100000 |
Construction of Building1 |
Roof laid |
-
latitude : 20.81187375
Longitude : 83.68370641
file name : Image_30102024100718200.png
|
2024-10-30 10:07:18.282439 |
126 |
82354108 |
Construction of Building |
100000 |
Construction of Building1 |
Plinth level |
-
latitude : 20.81186172
Longitude : 83.6837294
file name : Image_30102024100543500.png
|
2024-10-30 10:05:43.577566 |
127 |
82354108 |
Construction of Building |
100000 |
Construction of Building1 |
Completion of work |
-
latitude : 20.81188188
Longitude : 83.68367769
file name : Image_30102024100130376.png
|
2024-10-30 10:01:30.464125 |
128 |
101026325 |
VPRP Resource Development -Farm forestry tree plantation under MGNREGA |
300000 |
VPRP Resource Development -Farm forestry tree plantation under MGNREGA1 |
Roof laid |
-
latitude : 20.81147744,20.8114819,20.8114747
Longitude : 83.66068339,83.66069359,83.6607025
file name : Image_30102024103347507.png
|
2024-10-30 10:33:47.602022 |
129 |
101026325 |
VPRP Resource Development -Farm forestry tree plantation under MGNREGA |
300000 |
VPRP Resource Development -Farm forestry tree plantation under MGNREGA1 |
Plinth level |
-
latitude : 20.81141881,20.81142203
Longitude : 83.66063293,83.66063519
file name : Image_30102024103204573.png
|
2024-10-30 10:32:04.651274 |
130 |
101026325 |
VPRP Resource Development -Farm forestry tree plantation under MGNREGA |
300000 |
VPRP Resource Development -Farm forestry tree plantation under MGNREGA1 |
Completion of work |
-
latitude : 20.81135175,20.81135968
Longitude : 83.66062544,83.66063419
file name : Image_30102024103030734.png
|
2024-10-30 10:30:30.824626 |