1 |
55819690 |
Imp. of Playground at Dablong 15cfc untied |
150000 |
Imp. of Playground at Dablong 15cfc untied1 |
Completion of work |
-
latitude : 20.940173333333338,20.937926666666666
Longitude : 83.65712333333335,83.65152000000002
file name : Image_08022022134651379.png
|
2022-02-08 13:46:51.512002 |
2 |
55819735 |
Construction of CC Road at Balpur 15cfc untied |
250000 |
Construction of CC Road at Balpur 15cfc untied1 |
Completion of work |
-
latitude : 20.96871666666667,20.96871666666667,20.969608333333333
Longitude : 83.63712333333334,83.63712333333334,83.63690666666668
file name : Image_08022022131633206.png
|
2022-02-08 13:16:33.307662 |
3 |
47788896 |
Const. of CC Road At Balpur Ghasiapada (Untied) |
150000 |
Const. of CC Road At Balpur Ghasiapada (Untied)1 |
Completion of work |
-
latitude : 20.968225,20.968238333333336
Longitude : 83.63573,83.63570999999999
file name : Image_08022022131950506.png
|
2022-02-08 13:19:50.624038 |
4 |
55856511 |
Imp. of Missin sakti Building and Const of CC Road Infront ofMission saktu building Chhakormal untie |
200000 |
Imp. of Missin sakti Building and Const of CC Road Infront ofMission saktu building Chhakormal untie1 |
Completion of work |
-
latitude : 20.921719999999997
Longitude : 83.630145
file name : Image_08022022140510433.png
|
2022-02-08 14:05:10.548262 |
5 |
44108981 |
SEM & Pump operator Salary |
312000 |
SEM & Pump operator Salary1 |
Completion of work |
-
latitude : 20.8467032
Longitude : 83.8938949
file name : Image_10052021093317311.png
|
2021-05-10 09:33:17.460557 |
6 |
44109422 |
Reno of Nuamunda |
300000 |
Reno of Nuamunda1 |
Completion of work |
-
latitude : 20.93697982
Longitude : 83.65563405
file name : Image_15062021102907930.png
|
2021-06-15 10:29:08.028381 |
7 |
44109381 |
Reno. of Puthuria kata Baslat |
306851 |
Reno. of Puthuria kata Baslat1 |
Completion of work |
-
latitude : 20.90797714
Longitude : 83.62665592
file name : Image_15062021104932926.png
|
2021-06-15 10:49:33.042967 |
8 |
44181121 |
Const.of Boundary wall and improvement of Matiapali Nodal UP school 15th CFC |
150000 |
Const.of Boundary wall and improvement of Matiapali Nodal UP school 15th CFC 1 |
Completion of work |
-
latitude : 20.94872666666667
Longitude : 83.64424499999998
file name : Image_27102021093627940.png
|
2021-10-27 09:36:28.085515 |
9 |
44182127 |
Dress changing room at Bathing steps of Maheswari Ghat,Dablang 5th SFC |
30000 |
Dress changing room at Bathing steps of Maheswari Ghat,Dablang 5th SFC1 |
Completion of work |
-
latitude : 20.934646666666662
Longitude : 83.66318333333332
file name : Image_27102021142135883.png
|
2021-10-27 14:21:36.050373 |
10 |
44181680 |
Const.of Kalyan Mandap Uparpada,Balpur 15th CFC Untied |
300000 |
Const.of Kalyan Mandap Uparpada,Balpur 15th CFC Untied1 |
Completion of work |
-
latitude : 20.968196666666667
Longitude : 83.63576166666665
file name : Image_03112021112146255.png
|
2021-11-03 11:21:46.392298 |
11 |
47789953 |
Const. of Cc Road at Nuapada, Balpur (untied) |
230851 |
Const. of Cc Road at Nuapada, Balpur (untied)1 |
Completion of work |
-
latitude : 20.966975,20.96701
Longitude : 83.63998000000001,83.64007166666667
file name : Image_03112021113734014.png
|
2021-11-03 11:37:34.13284 |
12 |
47806117 |
Jala Chhatra (5Th SFC) |
140000 |
Jala Chhatra (5Th SFC)1 |
Completion of work |
-
latitude : 20.84660464
Longitude : 83.89384839
file name : Image_23082021162033985.png
|
2021-08-23 16:20:34.16225 |
13 |
44211227 |
Imp.of/Maintenance of road from New Canal Bridge to school Chahatakhol 5th SFC |
100000 |
Imp.of/Maintenance of road from New Canal Bridge to school Chahatakhol 5th SFC1 |
Completion of work |
-
latitude : 20.907775
Longitude : 83.63392333333334
file name : Image_27082021110748232.png
|
2021-08-27 11:07:48.3287 |
14 |
47804409 |
Salary of SEM And Pump Operator (5th SFC) |
312000 |
Salary of SEM And Pump Operator (5th SFC)1 |
Completion of work |
-
latitude : 20.84655077
Longitude : 83.89386191
file name : Image_02092021141055714.png
|
2021-09-02 14:10:55.891419 |
15 |
47805048 |
Mobility and PRIaSoft allowance to GRS (5th SFC) |
12000 |
Mobility and PRIaSoft allowance to GRS (5th SFC)1 |
Completion of work |
-
latitude : 20.8465492
Longitude : 83.89387875
file name : Image_02092021141126103.png
|
2021-09-02 14:11:26.427052 |
16 |
44181229 |
Renov.&Imp.of Badipadia UP school 15th CFC UNtied |
50000 |
Renov.&Imp.of Badipadia UP school 15th CFC UNtied1 |
Completion of work |
-
latitude : 20.933598333333332
Longitude : 83.61539499999999
file name : Image_03092021150050463.png
|
2021-09-03 15:00:50.611266 |
17 |
44109181 |
Sanitation & ODF status maintainance |
150000 |
Sanitation & ODF status maintainance1 |
Completion of work |
-
latitude : 20.935353333333335
Longitude : 83.65979666666665
file name : Image_31122021153844439.png
|
2021-12-31 15:38:44.560911 |
18 |
44109181 |
Sanitation & ODF status maintainance |
150000 |
Sanitation & ODF status maintainance1 |
Completion of work |
-
latitude : 20.909174999999998
Longitude : 83.627785
file name : Image_15092021160619763.png
|
2021-09-15 16:06:19.889444 |
19 |
44116792 |
Renovation and Imp. of Chhakormal UP School |
75000 |
Renovation and Imp. of Chhakormal UP School1 |
Completion of work |
-
latitude : 20.92189
Longitude : 83.63252166666668
file name : Image_21122021131836320.png
|
2021-12-21 13:18:36.435782 |
20 |
47784752 |
Const. of CC Road At UP School, Karmigoth, Dablang (Untied) |
100000 |
Const. of CC Road At UP School, Karmigoth, Dablang (Untied)1 |
Completion of work |
-
latitude : 20.920313333333336,20.920293333333333,20.92030833333333
Longitude : 83.64990000000002,83.64979,83.64984666666666
file name : Image_21122021133727512.png
|
2021-12-21 13:37:27.625227 |
21 |
44109285 |
Const. of rised platform and soakpit of tubewells |
100000 |
Const. of rised platform and soakpit of tubewells1 |
Completion of work |
-
latitude : 20.92175166666667
Longitude : 83.65318333333335
file name : Image_31122021130532331.png
|
2021-12-31 13:05:32.437029 |
22 |
47802068 |
Const. of Drain At Dablang (Tied) |
100000 |
Const. of Drain At Dablang (Tied)1 |
Completion of work |
-
latitude : 20.93616833333333,20.936134999999997
Longitude : 83.66168666666665,83.66165000000001
file name : Image_27042022112800811.png
|
2022-04-27 11:28:00.913209 |
23 |
56053864 |
Const of Kitchen Shed and CC Infront and Backside of Uperpada Kalyan Mandap 14cfc |
300000 |
Const of Kitchen Shed and CC Infront and Backside of Uperpada Kalyan Mandap 14cfc1 |
Completion of work |
-
latitude : 20.96852333333333
Longitude : 83.635645
file name : Image_27042022113515547.png
|
2022-04-27 11:35:15.685264 |
24 |
44116180 |
construction Of Boundary wall of primary School Karmigoth, Dablang |
150000 |
construction Of Boundary wall of primary School Karmigoth, Dablang1 |
Completion of work |
-
latitude : 20.920370000000002
Longitude : 83.64992666666667
file name : Image_21042022181323557.png
|
2022-04-21 18:13:23.687434 |
25 |
55820312 |
Const Raised platform of the tube well in near Chahatakhol Gaonmunda tied |
17000 |
Const Raised platform of the tube well in near Chahatakhol Gaonmunda tied1 |
Completion of work |
-
latitude : 20.897861666666667
Longitude : 83.63815333333332
file name : Image_28052022112452282.png
|
2022-05-28 11:24:52.409931 |
26 |
55820219 |
Const of Raised platform of the tubewell in near chahatakhol HB tied |
17000 |
Const of Raised platform of the tubewell in near chahatakhol HB tied1 |
Completion of work |
-
latitude : 20.899125000000005
Longitude : 83.637315
file name : Image_28052022111708521.png
|
2022-05-28 11:17:08.628851 |
27 |
55820149 |
Const. of Raised Platform of the Tubewell in near Barapahar Gudi, Balpur Tied |
16000 |
Const. of Raised Platform of the Tubewell in near Barapahar Gudi, Balpur Tied1 |
Completion of work |
-
latitude : 20.967311666666667
Longitude : 83.64069833333333
file name : Image_27052022181937657.png
|
2022-05-27 18:19:37.760875 |
28 |
55820066 |
Const. of Raised Platform of the Tubewell in near Nadi Road, Balpur(tied) |
16000 |
Const. of Raised Platform of the Tubewell in near Nadi Road, Balpur(tied)1 |
Completion of work |
-
latitude : 20.96721166666667
Longitude : 83.64063999999999
file name : Image_27052022181730018.png
|
2022-05-27 18:17:30.126594 |
29 |
55820801 |
Const. of Raised Platform of tube well near sashi house biseswarpali |
18000 |
Const. of Raised Platform of tube well near sashi house biseswarpali1 |
Completion of work |
-
latitude : 20.94461833333333
Longitude : 83.66403166666666
file name : Image_27052022183020541.png
|
2022-05-27 18:30:20.678805 |
30 |
55820948 |
Const of rised platform of tubewell near lala house baslat |
18000 |
Const of rised platform of tubewell near lala house baslat1 |
Completion of work |
-
latitude : 20.91061
Longitude : 83.62557999999999
file name : Image_28052022103824740.png
|
2022-05-28 10:38:24.877941 |
31 |
55820748 |
Const. of Raised Platform near Braja House Biseswarpali tied |
18000 |
Const. of Raised Platform near Braja House Biseswarpali tied1 |
Completion of work |
-
latitude : 20.943605
Longitude : 83.66763166666667
file name : Image_28052022100808688.png
|
2022-05-28 10:08:08.797693 |
32 |
55820748 |
Const. of Raised Platform near Braja House Biseswarpali tied |
18000 |
Const. of Raised Platform near Braja House Biseswarpali tied1 |
Completion of work |
-
latitude : 20.943605
Longitude : 83.66763166666667
file name : Image_28052022101153440.png
|
2022-05-28 10:11:53.541041 |
33 |
55821086 |
const of raised platform of tube nearchhakormal gaonmunda |
18000 |
const of raised platform of tube nearchhakormal gaonmunda1 |
Completion of work |
-
latitude : 20.92213166666667
Longitude : 83.63297666666668
file name : Image_30052022095004629.png
|
2022-05-30 09:50:04.753195 |
34 |
55821135 |
const of raised platform of tube near chhakormal gp |
18000 |
const of raised platform of tube near chhakormal gp1 |
Completion of work |
-
latitude : 20.921726666666668
Longitude : 83.62993666666668
file name : Image_30052022095204280.png
|
2022-05-30 09:52:04.403061 |
35 |
55820858 |
Const of raised platform of tubewell near Harijan Basti biseswarpali |
18000 |
Const of raised platform of tubewell near Harijan Basti biseswarpali1 |
Completion of work |
-
latitude : 20.945876666666663
Longitude : 83.66725666666667
file name : Image_28052022100804944.png
|
2022-05-28 10:08:05.049583 |
36 |
55819975 |
Const. of raised platform of the tubewell in near bandha, matiapali |
17000 |
Const. of raised platform of the tubewell in near bandha, matiapali1 |
Completion of work |
-
latitude : 20.948723333333337
Longitude : 83.64476166666667
file name : Image_24062022103752580.png
|
2022-06-24 10:37:52.701187 |
37 |
55819975 |
Const. of raised platform of the tubewell in near bandha, matiapali |
17000 |
Const. of raised platform of the tubewell in near bandha, matiapali1 |
Completion of work |
-
latitude : 20.948643333333333
Longitude : 83.6448
file name : Image_24062022103133651.png
|
2022-06-24 10:31:33.811096 |
38 |
55819868 |
Const. of Raised Platform of the tubewell innear lala house, Matiapali (tied) |
17000 |
Const. of Raised Platform of the tubewell innear lala house, Matiapali (tied)1 |
Completion of work |
-
latitude : 20.945389999999996
Longitude : 83.64464000000001
file name : Image_24062022103144581.png
|
2022-06-24 10:31:44.721499 |
39 |
55819868 |
Const. of Raised Platform of the tubewell innear lala house, Matiapali (tied) |
17000 |
Const. of Raised Platform of the tubewell innear lala house, Matiapali (tied)1 |
Completion of work |
-
latitude : 20.945375
Longitude : 83.64461666666666
file name : Image_24062022103429191.png
|
2022-06-24 10:34:29.326954 |
40 |
55821295 |
const of raised platform of tubwell near behera house Dumerkhol |
18000 |
const of raised platform of tubwell near behera house Dumerkhol1 |
Completion of work |
-
latitude : 20.883615000000002
Longitude : 83.62790333333332
file name : Image_24062022131206035.png
|
2022-06-24 13:12:06.12916 |
41 |
55821295 |
const of raised platform of tubwell near behera house Dumerkhol |
18000 |
const of raised platform of tubwell near behera house Dumerkhol1 |
Completion of work |
-
latitude : 20.883638333333337
Longitude : 83.62794333333335
file name : Image_24062022131118945.png
|
2022-06-24 13:11:19.04311 |
42 |
55821295 |
const of raised platform of tubwell near behera house Dumerkhol |
18000 |
const of raised platform of tubwell near behera house Dumerkhol1 |
Completion of work |
-
latitude : 20.883616666666665
Longitude : 83.627915
file name : Image_24062022131136075.png
|
2022-06-24 13:11:36.191892 |
43 |
55821295 |
const of raised platform of tubwell near behera house Dumerkhol |
18000 |
const of raised platform of tubwell near behera house Dumerkhol1 |
Completion of work |
-
latitude : 20.883608333333335
Longitude : 83.62781833333332
file name : Image_24062022131421922.png
|
2022-06-24 13:14:22.019695 |
44 |
55821295 |
const of raised platform of tubwell near behera house Dumerkhol |
18000 |
const of raised platform of tubwell near behera house Dumerkhol1 |
Completion of work |
-
latitude : 20.883558333333333
Longitude : 83.62784333333333
file name : Image_24062022131353817.png
|
2022-06-24 13:13:53.92335 |
45 |
55821038 |
const. of raised platform of tubewell nearHB Baslat |
18000 |
const. of raised platform of tubewell nearHB Baslat1 |
Completion of work |
-
latitude : 20.911585
Longitude : 83.62702833333333
file name : Image_24062022133047508.png
|
2022-06-24 13:30:47.617287 |
46 |
55821347 |
const of raised platform of tubewell near upendra house dumerkhol |
18000 |
const of raised platform of tubewell near upendra house dumerkhol1 |
Completion of work |
-
latitude : 20.88134
Longitude : 83.62693499999999
file name : Image_24062022122129972.png
|
2022-06-24 12:21:30.080652 |
47 |
55821419 |
30% GP Share For Construction of Tubewell Leachpit |
440467 |
30% GP Share For Construction of Tubewell Leachpit 1 |
Completion of work |
-
latitude : 20.943568333333328
Longitude : 83.66749166666665
file name : Image_14122023073757195.png
|
2023-12-14 07:37:57.283317 |
48 |
55821419 |
30% GP Share For Construction of Tubewell Leachpit |
440467 |
30% GP Share For Construction of Tubewell Leachpit 1 |
Completion of work |
-
latitude : 20.96899166666667
Longitude : 83.63717999999999
file name : Image_13072022090627676.png
|
2022-07-13 09:06:27.756194 |
49 |
44181280 |
Renov.& Imp.of Dumerkhol UP school 15th CFC Untied |
50000 |
Renov.& Imp.of Dumerkhol UP school 15th CFC Untied1 |
Completion of work |
-
latitude : 20.881106666666664
Longitude : 83.62705833333332
file name : Image_02082022133126689.png
|
2022-08-02 13:31:26.785411 |
50 |
47789597 |
Const. of CC Road at Dumerkhol (untied) |
100000 |
Const. of CC Road at Dumerkhol (untied)1 |
Completion of work |
-
latitude : 20.881496666666667,20.881513333333334
Longitude : 83.627015,83.62696166666667
file name : Image_02082022132818422.png
|
2022-08-02 13:28:18.562966 |
51 |
60381025 |
Renovation of Khajurikata Tank At Matiapali Untied |
500000 |
Renovation of Khajurikata Tank At Matiapali Untied1 |
Completion of work |
-
latitude : 20.948375000000002
Longitude : 83.64468666666669
file name : Image_04082022181928060.png
|
2022-08-04 18:19:28.164407 |
52 |
60384327 |
Salary of SEM And Pump Operator 5SFC |
312000 |
Salary of SEM And Pump Operator 5SFC1 |
Completion of work |
-
latitude : 20.8467488
Longitude : 83.8939102
file name : Image_05082022113100875.png
|
2022-08-05 11:31:01.026369 |
53 |
60385024 |
Jalachhatra 5SFC |
150000 |
Jalachhatra 5SFC1 |
Completion of work |
-
latitude : 20.94242166666667
Longitude : 83.66438000000001
file name : Image_04082022180852944.png
|
2022-08-04 18:08:53.053551 |
54 |
60383439 |
Provision For Compost Pit S Tied |
100000 |
Provision For Compost Pit S Tied1 |
Completion of work |
-
latitude : 20.943573333333333
Longitude : 83.66799
file name : Image_14122023074409847.png
|
2023-12-14 07:44:09.940086 |
55 |
60383439 |
Provision For Compost Pit S Tied |
100000 |
Provision For Compost Pit S Tied1 |
Completion of work |
-
latitude : 20.921695
Longitude : 83.63003166666667
file name : Image_24082022122848113.png
|
2022-08-24 12:28:48.230469 |
56 |
104635535 |
Electric connection |
400000 |
Electric connection1 |
Roof laid |
-
latitude : 20.8468499
Longitude : 83.8942199
file name : Image_27082024133531011.png
|
2024-08-27 13:35:31.679557 |
57 |
104635535 |
Electric connection |
400000 |
Electric connection1 |
Plinth level |
-
latitude : 20.8468495
Longitude : 83.8942211
file name : Image_27082024133304071.png
|
2024-08-27 13:33:04.752389 |
58 |
104635535 |
Electric connection |
400000 |
Electric connection1 |
Completion of work |
-
latitude : 20.8468441
Longitude : 83.894221
file name : Image_27082024131851114.png
|
2024-08-27 13:18:51.568221 |
59 |
104635535 |
Electric connection |
400000 |
Electric connection1 |
Completion of work |
-
latitude : 20.8468486
Longitude : 83.8942217
file name : Image_27082024131906483.png
|
2024-08-27 13:19:06.952026 |
60 |
44210519 |
Renov.of AWC Dablang (C) & (D) 5th SFC |
40000 |
Renov.of AWC Dablang (C) & (D) 5th SFC1 |
Completion of work |
-
latitude : 20.93549833333333
Longitude : 83.65709666666667
file name : Image_19122022132410196.png
|
2022-12-19 13:24:10.309117 |
61 |
44183090 |
Renov.of AWC Balpur (B) & (C) 5th SFC |
40000 |
Renov.of AWC Balpur (B) & (C) 5th SFC1 |
Completion of work |
-
latitude : 20.967536666666668
Longitude : 83.63948833333333
file name : Image_19122022165720683.png
|
2022-12-19 16:57:20.841123 |
62 |
44210794 |
Renov.of AWC Chahatakhol(Mini) 5th SFC |
20000 |
Renov.of AWC Chahatakhol(Mini) 5th SFC1 |
Completion of work |
-
latitude : 20.901324999999996
Longitude : 83.63540333333334
file name : Image_19122022134859613.png
|
2022-12-19 13:48:59.72161 |
63 |
44210736 |
Renov.of AWC Badipadia 5th SFC |
20000 |
Renov.of AWC Badipadia 5th SFC1 |
Completion of work |
-
latitude : 20.931303333333336
Longitude : 83.61909499999999
file name : Image_19122022162930087.png
|
2022-12-19 16:29:30.264586 |
64 |
44210973 |
Revnov.of AWC Baslat (A) 5th SFC |
20000 |
Revnov.of AWC Baslat (A) 5th SFC1 |
Completion of work |
-
latitude : 20.91234833333333
Longitude : 83.62704000000001
file name : Image_19122022145324764.png
|
2022-12-19 14:53:24.898379 |
65 |
44211064 |
Renov.of AWC Dumerkhol 5th SFC |
20000 |
Renov.of AWC Dumerkhol 5th SFC1 |
Completion of work |
-
latitude : 20.881688333333333
Longitude : 83.62678666666667
file name : Image_19122022142058494.png
|
2022-12-19 14:20:58.608333 |
66 |
44183415 |
Renov.of AWC Matiapali(B) 5th SFC |
20000 |
Renov.of AWC Matiapali(B) 5th SFC1 |
Completion of work |
-
latitude : 20.9488
Longitude : 83.64191333333335
file name : Image_19122022164758935.png
|
2022-12-19 16:47:59.144772 |
67 |
44183491 |
Renov.of AWC Matiapali(c) 5th SFC |
20000 |
Renov.of AWC Matiapali(c) 5th SFC1 |
Completion of work |
-
latitude : 20.947300000000002
Longitude : 83.64528833333334
file name : Image_20122022133957169.png
|
2022-12-20 13:39:57.294071 |
68 |
44183999 |
Renov.of AWC Biswswaripali 5th SFC |
20000 |
Renov.of AWC Biswswaripali 5th SFC1 |
Completion of work |
-
latitude : 20.943123333333332
Longitude : 83.66630166666667
file name : Image_19122022131020720.png
|
2022-12-19 13:10:20.819172 |
69 |
44182995 |
Renov.of AWC Balpur(A) 5th SFC |
20000 |
Renov.of AWC Balpur(A) 5th SFC1 |
Completion of work |
-
latitude : 20.96818
Longitude : 83.63881
file name : Image_19122022170204684.png
|
2022-12-19 17:02:04.806995 |
70 |
44183320 |
Renov.of AWC Matiapali(A) 5th SFC |
20000 |
Renov.of AWC Matiapali(A) 5th SFC1 |
Completion of work |
-
latitude : 20.948735000000003
Longitude : 83.643175
file name : Image_19122022164402634.png
|
2022-12-19 16:44:02.787135 |
71 |
44210688 |
Renov.of AWC Dablang(E) 5th SFC |
20000 |
Renov.of AWC Dablang(E) 5th SFC1 |
Completion of work |
-
latitude : 20.920251666666665
Longitude : 83.649705
file name : Image_19122022133809124.png
|
2022-12-19 13:38:09.257447 |
72 |
44216687 |
Renov.of AWC Chhakormal 5th SFC |
20000 |
Renov.of AWC Chhakormal 5th SFC1 |
Completion of work |
-
latitude : 20.921899999999997
Longitude : 83.63237333333333
file name : Image_19122022153135624.png
|
2022-12-19 15:31:35.740385 |
73 |
44181919 |
Repair and Maintenance of Health Sub centre at Baslat 5th SFC |
100000 |
Repair and Maintenance of Health Sub centre at Baslat 5th SFC1 |
Completion of work |
-
latitude : 20.82676497
Longitude : 83.68721074
file name : Image_29032023191246431.png
|
2023-03-29 19:12:46.501406 |
74 |
44181919 |
Repair and Maintenance of Health Sub centre at Baslat 5th SFC |
100000 |
Repair and Maintenance of Health Sub centre at Baslat 5th SFC1 |
Completion of work |
-
latitude : 20.83867341
Longitude : 83.90323387
file name : Image_19012023132052211.png
|
2023-01-19 13:20:52.296932 |
75 |
44181989 |
Repair and Maintenance of Health Sub centre at Dablang 5th SFC |
75000 |
Repair and Maintenance of Health Sub centre at Dablang 5th SFC1 |
Completion of work |
-
latitude : 20.83867435
Longitude : 83.90320812
file name : Image_19012023132048314.png
|
2023-01-19 13:20:48.3964 |
76 |
65085188 |
Imp of MGP High School Mahimapuram for 5T Achool Transformation |
393800 |
Imp of MGP High School Mahimapuram for 5T Achool Transformation1 |
Completion of work |
-
latitude : 20.951306666666664
Longitude : 83.63449999999999
file name : Image_19022023083931783.png
|
2023-02-19 08:39:31.89388 |
77 |
65110674 |
Imp od MGP High School Mahimapuram for 5T School Trasformation |
662000 |
Imp od MGP High School Mahimapuram for 5T School Trasformation1 |
Completion of work |
-
latitude : 20.951363333333333
Longitude : 83.63444499999999
file name : Image_19022023083355111.png
|
2023-02-19 08:33:55.229517 |
78 |
65085908 |
Providing piped water supply to public institutions |
500000 |
Providing piped water supply to public institutions1 |
Completion of work |
-
latitude : 20.951713333333334
Longitude : 83.63471833333332
file name : Image_25032023124423514.png
|
2023-03-25 12:44:23.625991 |
79 |
60381741 |
Repair and Maintenance of PWS D Tied |
100347 |
Repair and Maintenance of PWS D Tied1 |
Completion of work |
-
latitude : 20.8467284
Longitude : 83.893832
file name : Image_29032023191412919.png
|
2023-03-29 19:14:13.041823 |
80 |
65111711 |
Construction of toilets in public institutions |
200000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 20.951946666666664
Longitude : 83.63503666666665
file name : Image_05062023180454472.png
|
2023-06-05 18:04:54.577907 |
81 |
77392613 |
Purchase of Tricycles/other battery -operated vehicles for door to door collection of waste |
75000 |
Purchase of Tricycles/other battery -operated vehicles for door to door collection of waste1 |
|
-
latitude : 20.9210488
Longitude : 83.63019049
file name : Image_14032024151526954.png
|
2024-03-14 15:15:27.044988 |
82 |
77857257 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 20.942551666666667
Longitude : 83.66439166666666
file name : Image_12092023160730970.png
|
2023-09-12 16:07:31.061699 |
83 |
44183230 |
Renov.of AWC Balpur(D) 5th SFC |
25000 |
Renov.of AWC Balpur(D) 5th SFC1 |
Completion of work |
-
latitude : 20.967320000000004
Longitude : 83.63999
file name : Image_03102023075038487.png
|
2023-10-03 07:50:38.593596 |
84 |
47788521 |
Const. of CC Road At Biseswarpali (untied) |
100000 |
Const. of CC Road At Biseswarpali (untied)1 |
Completion of work |
-
latitude : 20.9443,20.942621666666664
Longitude : 83.66567166666667,83.66490999999999
file name : Image_13122023173228745.png
|
2023-12-13 17:32:28.843437 |
85 |
47789272 |
Const. of CC Road at UP School, Baslat (Untied) |
100000 |
Const. of CC Road at UP School, Baslat (Untied)1 |
Completion of work |
-
latitude : 20.912430000000004,20.912476666666667,20.91247333333333
Longitude : 83.62698833333334,83.62697333333332,83.62697166666666
file name : Image_21122021124932640.png
|
2021-12-21 12:49:32.755055 |
86 |
65085239 |
Ext. of Bathing Steps of Maheswari Ghat Dablong |
25000 |
Ext. of Bathing Steps of Maheswari Ghat Dablong1 |
Completion of work |
-
latitude : 20.936878333333333
Longitude : 83.68016666666666
file name : Image_05102023101657471.png
|
2023-10-05 10:16:57.566279 |
87 |
44210476 |
Renov.of AWC Dablang(B) 5th SFC |
30000 |
Renov.of AWC Dablang(B) 5th SFC1 |
Completion of work |
-
latitude : 20.93563
Longitude : 83.65613166666665
file name : Image_04102023114448473.png
|
2023-10-04 11:44:48.615002 |
88 |
65085304 |
Ext. Bathing Steps at Harijan Pada Ghat at Balpur Bandha |
15000 |
Ext. Bathing Steps at Harijan Pada Ghat at Balpur Bandha1 |
Completion of work |
-
latitude : 20.96871666666667
Longitude : 83.63567166666665
file name : Image_01102023085254246.png
|
2023-10-01 08:52:54.33695 |
89 |
65087180 |
Providing piped water supply to public institutions |
90000 |
Providing piped water supply to public institutions1 |
Completion of work |
-
latitude : 20.95201833333333
Longitude : 83.634975
file name : Image_01102023135204974.png
|
2023-10-01 13:52:05.07961 |
90 |
60385446 |
Construction of Culvert At Chahatakhol 5SFC |
211952 |
Construction of Culvert At Chahatakhol 5SFC1 |
Completion of work |
-
latitude : 20.904328333333336,20.900185000000004,20.90019
Longitude : 83.63437,83.63441499999999,83.63441333333334
file name : Image_04102023110107317.png
|
2023-10-04 11:01:07.430813 |
91 |
55821183 |
const. of raised platform of tubewell near badipadia school |
18000 |
const. of raised platform of tubewell near badipadia school1 |
Completion of work |
-
latitude : 20.934453333333334
Longitude : 83.61549166666667
file name : Image_04102023100628987.png
|
2023-10-04 10:06:29.113169 |
92 |
44116535 |
Renovation of BiseswarpaliUP School |
25000 |
Renovation of BiseswarpaliUP School1 |
Completion of work |
-
latitude : 20.943156666666663
Longitude : 83.66628999999999
file name : Image_05102023101702418.png
|
2023-10-05 10:17:02.539746 |
93 |
65087770 |
Reno of Buildings Inside GP Campus and Imp of Gate of GP Office at Chhakormal |
306000 |
Reno of Buildings Inside GP Campus and Imp of Gate of GP Office at Chhakormal1 |
Completion of work |
-
latitude : 20.92123333333333
Longitude : 83.62984499999999
file name : Image_13122023170107080.png
|
2023-12-13 17:01:07.212505 |
94 |
60382361 |
Const of Community Toilet in GP Area S Tied |
100000 |
Const of Community Toilet in GP Area S Tied1 |
Completion of work |
-
latitude : 20.968655
Longitude : 83.63561166666665
file name : Image_13122023163932767.png
|
2023-12-13 16:39:32.961197 |
95 |
77915297 |
Repairing and maintenance of roads |
100000 |
Repairing and maintenance of roads1 |
Roof laid |
-
latitude : 20.91533908,20.91533909
Longitude : 83.65770827,83.65770826
file name : Image_07052024113819788.png
|
2024-05-07 11:38:19.87891 |
96 |
77915297 |
Repairing and maintenance of roads |
100000 |
Repairing and maintenance of roads1 |
Plinth level |
-
latitude : 20.9159356,20.9159356
Longitude : 83.65782341,83.65782341
file name : Image_07052024113554830.png
|
2024-05-07 11:35:54.91635 |
97 |
77915297 |
Repairing and maintenance of roads |
100000 |
Repairing and maintenance of roads1 |
Completion of work |
-
latitude : 20.91846875,20.91843667
Longitude : 83.65772968,83.65774262
file name : Image_07052024113015601.png
|
2024-05-07 11:30:15.691465 |
98 |
81247353 |
Water Supply to villages |
280498 |
Water Supply to villages1 |
Plinth level |
-
latitude : 20.8466899
Longitude : 83.8939736
file name : Image_18032024164829154.png
|
2024-03-18 16:48:29.819441 |
99 |
81247353 |
Water Supply to villages |
280498 |
Water Supply to villages1 |
Completion of work |
-
latitude : 20.8466909
Longitude : 83.8939758
file name : Image_18032024164657610.png
|
2024-03-18 16:46:58.725835 |
100 |
77431592 |
Rejuvenation and desilting of tank/ water body |
320000 |
Rejuvenation and desilting of tank/ water body1 |
Roof laid |
-
latitude : 20.92190168
Longitude : 83.63051443
file name : Image_04072024120050145.png
|
2024-07-04 12:00:50.24213 |
101 |
77431592 |
Rejuvenation and desilting of tank/ water body |
320000 |
Rejuvenation and desilting of tank/ water body1 |
Plinth level |
-
latitude : 20.92194379
Longitude : 83.63045999
file name : Image_04072024115859782.png
|
2024-07-04 11:58:59.883195 |
102 |
77431592 |
Rejuvenation and desilting of tank/ water body |
320000 |
Rejuvenation and desilting of tank/ water body1 |
Completion of work |
-
latitude : 20.92176571
Longitude : 83.63029974
file name : Image_04072024115333854.png
|
2024-07-04 11:53:33.952547 |
103 |
104541273 |
Piped/tap water supply to HH |
570750 |
Piped/tap water supply to HH1 |
Roof laid |
-
latitude : 20.8468643
Longitude : 83.8942235
file name : Image_06102024174702906.png
|
2024-10-06 17:47:03.09558 |
104 |
104541273 |
Piped/tap water supply to HH |
570750 |
Piped/tap water supply to HH1 |
Plinth level |
-
latitude : 20.8468728
Longitude : 83.894223
file name : Image_06102024174235401.png
|
2024-10-06 17:42:35.573564 |
105 |
104541273 |
Piped/tap water supply to HH |
570750 |
Piped/tap water supply to HH1 |
Completion of work |
-
latitude : 20.8468729
Longitude : 83.8942223
file name : Image_06102024173938990.png
|
2024-10-06 17:39:39.153366 |
106 |
104541672 |
Water Supply to villages |
150304 |
Water Supply to villages1 |
Roof laid |
-
latitude : 20.8468651
Longitude : 83.894223
file name : Image_06102024174618124.png
|
2024-10-06 17:46:18.252037 |
107 |
104541672 |
Water Supply to villages |
150304 |
Water Supply to villages1 |
Plinth level |
-
latitude : 20.8468719
Longitude : 83.8942239
file name : Image_06102024174316478.png
|
2024-10-06 17:43:16.64522 |
108 |
104541672 |
Water Supply to villages |
150304 |
Water Supply to villages1 |
Completion of work |
-
latitude : 20.8468647
Longitude : 83.8942227
file name : Image_06102024173854816.png
|
2024-10-06 17:38:54.972833 |
109 |
65087215 |
Creation of drainage channel for management of grey water |
100000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 20.96837446
Longitude : 83.6357748
file name : Image_05122024164559944.png
|
2024-12-05 16:46:00.048032 |
110 |
65087215 |
Creation of drainage channel for management of grey water |
100000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 20.9685112
Longitude : 83.63575638
file name : Image_05122024164445196.png
|
2024-12-05 16:44:45.332504 |
111 |
65087215 |
Creation of drainage channel for management of grey water |
100000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 20.96861106
Longitude : 83.63574508
file name : Image_05122024164143522.png
|
2024-12-05 16:41:43.617563 |
112 |
77918251 |
Repairing and maintenance of roads |
104664 |
Repairing and maintenance of roads1 |
Roof laid |
-
latitude : 20.9433719,20.9433719
Longitude : 83.6659271,83.6659271
file name : Image_05122024171611571.png
|
2024-12-05 17:16:11.661652 |
113 |
77918251 |
Repairing and maintenance of roads |
104664 |
Repairing and maintenance of roads1 |
Plinth level |
-
latitude : 20.94436629,20.94436629
Longitude : 83.66585977,83.6658597
file name : Image_05122024171438552.png
|
2024-12-05 17:14:38.642985 |
114 |
77918251 |
Repairing and maintenance of roads |
104664 |
Repairing and maintenance of roads1 |
Plinth level |
-
latitude : 20.94422287,20.94422287
Longitude : 83.66421893,83.66421893
file name : Image_05122024171056556.png
|
2024-12-05 17:10:56.754713 |
115 |
77918251 |
Repairing and maintenance of roads |
104664 |
Repairing and maintenance of roads1 |
Completion of work |
-
latitude : 20.9442057,20.94420462
Longitude : 83.66443217,83.66443212
file name : Image_05122024170752819.png
|
2024-12-05 17:07:52.915567 |
116 |
77480545 |
Maintenance of school buildings |
120000 |
Maintenance of school buildings1 |
Roof laid |
-
latitude : 20.94864427
Longitude : 83.64413368
file name : Image_05122024163257610.png
|
2024-12-05 16:32:57.70634 |
117 |
77480545 |
Maintenance of school buildings |
120000 |
Maintenance of school buildings1 |
Plinth level |
-
latitude : 20.94865992
Longitude : 83.64412458
file name : Image_05122024163125372.png
|
2024-12-05 16:31:25.512472 |
118 |
77480545 |
Maintenance of school buildings |
120000 |
Maintenance of school buildings1 |
Completion of work |
-
latitude : 20.94867101
Longitude : 83.64413422
file name : Image_05122024162938588.png
|
2024-12-05 16:29:38.756536 |
119 |
77480545 |
Maintenance of school buildings |
120000 |
Maintenance of school buildings1 |
Completion of work |
-
latitude : 20.94867101
Longitude : 83.64413422
file name : Image_05122024162927955.png
|
2024-12-05 16:29:28.040435 |
120 |
77480545 |
Maintenance of school buildings |
120000 |
Maintenance of school buildings1 |
Completion of work |
-
latitude : 20.94857778
Longitude : 83.64414616
file name : Image_05122024162924651.png
|
2024-12-05 16:29:24.830977 |