1 |
44245926 |
CONST. OF CC DRAIN AT SAGIGARH MUNDA SAHI |
300000 |
CONST. OF CC DRAIN AT SAGIGARH MUNDA SAHI1 |
Completion of work |
-
latitude : 21.902534999999997,21.899206666666668
Longitude : 85.30245500000001,85.30183166666666
file name : Image_19012021121737822.png
|
2021-01-19 12:17:37.924966 |
2 |
44245985 |
CONST. OF CC DRAIN FROM SARGIGARH BGANGADHAR GHANA HOUSE TO MITRABHANU DEHURY HOUSE |
157540 |
CONST. OF CC DRAIN FROM SARGIGARH BGANGADHAR GHANA HOUSE TO MITRABHANU DEHURY HOUSE1 |
Completion of work |
-
latitude : 21.90525757,21.90525933
Longitude : 85.30749547,85.30749718
file name : Image_12042024154212228.png
|
2024-04-12 15:42:12.347336 |
3 |
44245600 |
DIGGING OF NEW TUBEWELL AT SANUA MUNDA SAHI |
248250 |
DIGGING OF NEW TUBEWELL AT SANUA MUNDA SAHI1 |
Completion of work |
-
latitude : 21.885755000000003
Longitude : 85.28770666666667
file name : Image_14032023132941862.png
|
2023-03-14 13:29:41.949381 |
4 |
44245600 |
DIGGING OF NEW TUBEWELL AT SANUA MUNDA SAHI |
248250 |
DIGGING OF NEW TUBEWELL AT SANUA MUNDA SAHI1 |
Completion of work |
-
latitude : 21.88576333333333
Longitude : 85.287705
file name : Image_14032023132938159.png
|
2023-03-14 13:29:38.274892 |
5 |
44245600 |
DIGGING OF NEW TUBEWELL AT SANUA MUNDA SAHI |
248250 |
DIGGING OF NEW TUBEWELL AT SANUA MUNDA SAHI1 |
Completion of work |
-
latitude : 21.88568666666667
Longitude : 85.28771
file name : Image_14032023133017410.png
|
2023-03-14 13:30:17.489486 |
6 |
44245111 |
SINKING OF BORE WELL WITH INSTALLATION OF OVER HEAD TANK AT PATMUNDA KALYAN MANDAP |
450000 |
SINKING OF BORE WELL WITH INSTALLATION OF OVER HEAD TANK AT PATMUNDA KALYAN MANDAP1 |
Completion of work |
-
latitude : 21.874799999999997
Longitude : 85.30893833333333
file name : Image_14032023133000890.png
|
2023-03-14 13:30:00.971024 |
7 |
44245111 |
SINKING OF BORE WELL WITH INSTALLATION OF OVER HEAD TANK AT PATMUNDA KALYAN MANDAP |
450000 |
SINKING OF BORE WELL WITH INSTALLATION OF OVER HEAD TANK AT PATMUNDA KALYAN MANDAP1 |
Completion of work |
-
latitude : 21.87479166666667
Longitude : 85.30896
file name : Image_14032023132957067.png
|
2023-03-14 13:29:57.15676 |
8 |
44245111 |
SINKING OF BORE WELL WITH INSTALLATION OF OVER HEAD TANK AT PATMUNDA KALYAN MANDAP |
450000 |
SINKING OF BORE WELL WITH INSTALLATION OF OVER HEAD TANK AT PATMUNDA KALYAN MANDAP1 |
Completion of work |
-
latitude : 21.874795000000002
Longitude : 85.308955
file name : Image_14032023133004654.png
|
2023-03-14 13:30:04.759891 |
9 |
44245533 |
DIGGING OF NEW TUBEWELL AT BALDIHI GUDA SAHI |
200000 |
DIGGING OF NEW TUBEWELL AT BALDIHI GUDA SAHI1 |
Completion of work |
-
latitude : 21.869921666666663
Longitude : 85.29945833333335
file name : Image_14032023133009983.png
|
2023-03-14 13:30:10.049802 |
10 |
44245533 |
DIGGING OF NEW TUBEWELL AT BALDIHI GUDA SAHI |
200000 |
DIGGING OF NEW TUBEWELL AT BALDIHI GUDA SAHI1 |
Completion of work |
-
latitude : 21.869923333333336
Longitude : 85.29945000000001
file name : Image_14032023133013672.png
|
2023-03-14 13:30:13.745034 |
11 |
44245956 |
REPAIR AND MAINTAINANCE OF PATMUNDA PRY SCHOOL; |
100000 |
REPAIR AND MAINTAINANCE OF PATMUNDA PRY SCHOOL;1 |
Completion of work |
-
latitude : 21.873368333333328
Longitude : 85.30767166666668
file name : Image_23112021110135759.png
|
2021-11-23 11:01:35.88304 |
12 |
44245956 |
REPAIR AND MAINTAINANCE OF PATMUNDA PRY SCHOOL; |
100000 |
REPAIR AND MAINTAINANCE OF PATMUNDA PRY SCHOOL;1 |
Completion of work |
-
latitude : 21.87337
Longitude : 85.30766166666666
file name : Image_23112021110145276.png
|
2021-11-23 11:01:45.382938 |
13 |
47709929 |
SEM REMUNERATION |
72000 |
SEM REMUNERATION1 |
Completion of work |
-
latitude : 21.908496666666665
Longitude : 85.25345166666666
file name : Image_07052022071817587.png
|
2022-05-07 07:18:17.700962 |
14 |
47708177 |
CONST.,OF . DRAIN WITH CC ROAD FROM SARGIGARH MAIN ROAD TO KILTU GHANA HOUSE |
150000 |
CONST.,OF . DRAIN WITH CC ROAD FROM SARGIGARH MAIN ROAD TO KILTU GHANA HOUSE1 |
Completion of work |
-
latitude : 21.905086666666662,21.905045000000005
Longitude : 85.30796166666666,85.30796333333335
file name : Image_04072022091348918.png
|
2022-07-04 09:13:49.018782 |
15 |
44245993 |
IMPV. OF PATMUNDA GP WEEKLY MARKET |
423893 |
IMPV. OF PATMUNDA GP WEEKLY MARKET 1 |
Completion of work |
-
latitude : 21.872455
Longitude : 85.31611666666667
file name : Image_04072022091433760.png
|
2022-07-04 09:14:33.872589 |
16 |
47708842 |
CONST OF DRAIN WITH CC ROAD FROM SARGIGARH SHYAMSUNDAR BARIK HOUSE TO DEHURI SAHI |
80000 |
CONST OF DRAIN WITH CC ROAD FROM SARGIGARH SHYAMSUNDAR BARIK HOUSE TO DEHURI SAHI1 |
Completion of work |
-
latitude : 21.905730000000002,21.905731666666664
Longitude : 85.30923666666668,85.30925666666666
file name : Image_04072022091419854.png
|
2022-07-04 09:14:19.942045 |
17 |
44245774 |
REPAIR AND MAINTAINANCE OF GP OFFICE |
170000 |
REPAIR AND MAINTAINANCE OF GP OFFICE1 |
Completion of work |
-
latitude : 21.8746
Longitude : 85.30898166666665
file name : Image_22022023175128235.png
|
2023-02-22 17:51:28.408554 |
18 |
44245774 |
REPAIR AND MAINTAINANCE OF GP OFFICE |
170000 |
REPAIR AND MAINTAINANCE OF GP OFFICE1 |
Completion of work |
-
latitude : 21.874721666666666
Longitude : 85.30901999999999
file name : Image_22022023175109301.png
|
2023-02-22 17:51:09.376492 |
19 |
47720773 |
CONST OF TOILET AND BATHING ROOM IN MISSION SHAKTI GRUHA AT PATMUNDA |
300000 |
CONST OF TOILET AND BATHING ROOM IN MISSION SHAKTI GRUHA AT PATMUNDA1 |
Completion of work |
-
latitude : 21.874751666666665
Longitude : 85.30853
file name : Image_22022023175131807.png
|
2023-02-22 17:51:31.866602 |
20 |
47707131 |
REPAIR & MAINTANCE OF SOLAR PIPE WATER SUPPLY AT SARGIGARH & BASARDA |
220821 |
REPAIR & MAINTANCE OF SOLAR PIPE WATER SUPPLY AT SARGIGARH & BASARDA1 |
Completion of work |
-
latitude : 21.9087393
Longitude : 85.2531914
file name : Image_15042024165723317.png
|
2024-04-15 16:57:23.413425 |
21 |
82447210 |
Grey water management- treatment and reuse infrastructure |
100000 |
Grey water management- treatment and reuse infrastructure1 |
Roof laid |
-
latitude : 21.90950874
Longitude : 85.253437
file name : Image_03052024205336271.png
|
2024-05-03 20:53:36.364112 |
22 |
82447210 |
Grey water management- treatment and reuse infrastructure |
100000 |
Grey water management- treatment and reuse infrastructure1 |
Plinth level |
-
latitude : 21.90950175
Longitude : 85.25337806
file name : Image_03052024203803481.png
|
2024-05-03 20:38:03.57663 |
23 |
82447210 |
Grey water management- treatment and reuse infrastructure |
100000 |
Grey water management- treatment and reuse infrastructure1 |
Completion of work |
-
latitude : 21.89033968
Longitude : 85.32511981
file name : Image_15042024135642970.png
|
2024-04-15 13:56:43.057459 |
24 |
44245755 |
ELECTRIC BILL OF HIGH MAS LIGHT |
240000 |
ELECTRIC BILL OF HIGH MAS LIGHT 1 |
Completion of work |
-
latitude : 21.908728
Longitude : 85.2526533
file name : Image_28102022183445750.png
|
2022-10-28 18:34:45.858329 |
25 |
61884048 |
SEM REMUNERATION |
72000 |
SEM REMUNERATION1 |
Completion of work |
-
latitude : 21.9087209
Longitude : 85.2532327
file name : Image_13092023144228874.png
|
2023-09-13 14:42:28.964712 |
26 |
61884048 |
SEM REMUNERATION |
72000 |
SEM REMUNERATION1 |
Completion of work |
-
latitude : 21.87998267
Longitude : 85.30092826
file name : Image_01122022141725957.png
|
2022-12-01 14:17:26.042851 |
27 |
61884048 |
SEM REMUNERATION |
72000 |
SEM REMUNERATION1 |
Completion of work |
-
latitude : 21.88002564
Longitude : 85.30096008
file name : Image_01122022141721123.png
|
2022-12-01 14:17:21.215413 |
28 |
61884382 |
ELECTRICITY CHARGES FOR GP OFFICE AND WATER SUPPLY |
100000 |
ELECTRICITY CHARGES FOR GP OFFICE AND WATER SUPPLY1 |
Completion of work |
-
latitude : 21.9086514
Longitude : 85.2528478
file name : Image_28102022182505323.png
|
2022-10-28 18:25:05.419409 |
29 |
104048952 |
Electricity Connection/ Electricity bill payment in Gram Panchayat Bhawan |
266600 |
Electricity Connection/ Electricity bill payment in Gram Panchayat Bhawan1 |
Roof laid |
-
latitude : 21.9086297
Longitude : 85.2526676
file name : Image_29082024160435471.png
|
2024-08-29 16:04:35.591112 |
30 |
104048952 |
Electricity Connection/ Electricity bill payment in Gram Panchayat Bhawan |
266600 |
Electricity Connection/ Electricity bill payment in Gram Panchayat Bhawan1 |
Plinth level |
-
latitude : 21.908838333333332
Longitude : 85.25273999999999
file name : Image_29082024160224492.png
|
2024-08-29 16:02:24.576522 |
31 |
104048952 |
Electricity Connection/ Electricity bill payment in Gram Panchayat Bhawan |
266600 |
Electricity Connection/ Electricity bill payment in Gram Panchayat Bhawan1 |
Completion of work |
-
latitude : 21.989073333333334
Longitude : 85.11315833333335
file name : Image_29082024103718006.png
|
2024-08-29 10:37:18.538568 |
32 |
65260794 |
CONST OF MARKET PINDI SHED AT PATMUNDA WEEKLY MARKET |
975600 |
CONST OF MARKET PINDI SHED AT PATMUNDA WEEKLY MARKET1 |
Completion of work |
-
latitude : 21.87232333333333
Longitude : 85.31611166666669
file name : Image_28022023171935821.png
|
2023-02-28 17:19:35.884176 |
33 |
65260794 |
CONST OF MARKET PINDI SHED AT PATMUNDA WEEKLY MARKET |
975600 |
CONST OF MARKET PINDI SHED AT PATMUNDA WEEKLY MARKET1 |
Completion of work |
-
latitude : 21.872271666666666
Longitude : 85.31603166666667
file name : Image_28022023172054183.png
|
2023-02-28 17:20:54.249025 |
34 |
47706411 |
DIGGING OF NEW TUBE WELL AT PATMUNDA THAKURANI KOTHI |
200000 |
DIGGING OF NEW TUBE WELL AT PATMUNDA THAKURANI KOTHI1 |
Completion of work |
-
latitude : 21.87392333333333
Longitude : 85.31023666666667
file name : Image_14032023132953131.png
|
2023-03-14 13:29:53.197011 |
35 |
47706411 |
DIGGING OF NEW TUBE WELL AT PATMUNDA THAKURANI KOTHI |
200000 |
DIGGING OF NEW TUBE WELL AT PATMUNDA THAKURANI KOTHI1 |
Completion of work |
-
latitude : 21.873961666666666
Longitude : 85.31022
file name : Image_14032023132949123.png
|
2023-03-14 13:29:49.183239 |
36 |
47706411 |
DIGGING OF NEW TUBE WELL AT PATMUNDA THAKURANI KOTHI |
200000 |
DIGGING OF NEW TUBE WELL AT PATMUNDA THAKURANI KOTHI1 |
Completion of work |
-
latitude : 21.873973333333332
Longitude : 85.31024166666666
file name : Image_14032023132945399.png
|
2023-03-14 13:29:45.477588 |
37 |
47713400 |
CONST OF DRAIN WITH CC ROAD FROM PANPOSIA CHOWK TO RADHAKRUSNA MANDAP |
300000 |
CONST OF DRAIN WITH CC ROAD FROM PANPOSIA CHOWK TO RADHAKRUSNA MANDAP1 |
Completion of work |
-
latitude : 21.896571666666667,21.896613333333335
Longitude : 85.31344333333332,85.31349
file name : Image_03062023120438987.png
|
2023-06-03 12:04:39.046678 |
38 |
65260332 |
Creation of community compost pits for a group of Households |
84000 |
Creation of community compost pits for a group of Households1 |
Completion of work |
-
latitude : 21.876446666666666
Longitude : 85.29706666666668
file name : Image_03062023123034950.png
|
2023-06-03 12:30:35.018349 |
39 |
65260346 |
Creation of community soak pits for group of Households |
264000 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 21.901785000000004
Longitude : 85.25732166666667
file name : Image_03062023123447098.png
|
2023-06-03 12:34:47.167497 |
40 |
47709472 |
CONST OF DRAIN WITH CC ROAD FROM NEAR GP BOREWELL TO KALYAN MANDAP |
442822 |
CONST OF DRAIN WITH CC ROAD FROM NEAR GP BOREWELL TO KALYAN MANDAP1 |
Completion of work |
-
latitude : 21.874354999999998,21.87437333333333,21.874376666666663
Longitude : 85.30863833333333,85.30864333333332,85.30864666666666
file name : Image_03062023121200500.png
|
2023-06-03 12:12:00.570366 |
41 |
47709472 |
CONST OF DRAIN WITH CC ROAD FROM NEAR GP BOREWELL TO KALYAN MANDAP |
442822 |
CONST OF DRAIN WITH CC ROAD FROM NEAR GP BOREWELL TO KALYAN MANDAP1 |
Completion of work |
-
latitude : 21.87435833333333,21.874383333333338,21.874381666666668
Longitude : 85.30860833333332,85.30862833333335,85.30862333333334
file name : Image_03062023121907319.png
|
2023-06-03 12:19:07.385593 |
42 |
44245915 |
CONST. OF CC DRAIN AT SANPATULI AWC TO GOBIND NAIK HOUSE |
200000 |
CONST. OF CC DRAIN AT SANPATULI AWC TO GOBIND NAIK HOUSE1 |
Completion of work |
-
latitude : 21.88014034,21.8801371,21.88013662
Longitude : 85.31296674,85.31296661,85.31296601
file name : Image_21062023112021873.png
|
2023-06-21 11:20:21.976182 |
43 |
65260309 |
Creation of plastic waste storage unit |
96000 |
Creation of plastic waste storage unit 1 |
Completion of work |
-
latitude : 21.86965566
Longitude : 85.31356782
file name : Image_21062023112018573.png
|
2023-06-21 11:20:18.672041 |
44 |
65260408 |
Weighing machine for use in Solid Waste Management |
25000 |
Weighing machine for use in Solid Waste Management1 |
Completion of work |
-
latitude : 21.97906196
Longitude : 84.99772719
file name : Image_15072023151113540.png
|
2023-07-15 15:11:13.643498 |
45 |
82580776 |
Electricity |
176000 |
Electricity1 |
|
-
latitude : 21.9525629
Longitude : 85.3205366
file name : Image_22032024120458477.png
|
2024-03-22 12:04:58.601517 |
46 |
82580776 |
Electricity |
176000 |
Electricity1 |
|
-
latitude : 21.9087424
Longitude : 85.2531991
file name : Image_30102023165846791.png
|
2023-10-30 16:58:46.876173 |
47 |
65260751 |
Providing piped water supply to public institutions |
210392 |
Providing piped water supply to public institutions1 |
Completion of work |
-
latitude : 21.87002213
Longitude : 85.29951398
file name : Image_03112023172359514.png
|
2023-11-03 17:23:59.603677 |
48 |
65260732 |
Providing piped water supply to public institutions |
210000 |
Providing piped water supply to public institutions1 |
Completion of work |
-
latitude : 21.88594683
Longitude : 85.28770565
file name : Image_03112023164715982.png
|
2023-11-03 16:47:16.188748 |
49 |
61884438 |
PIPE WATER SUPPLY AT PATMUNDAVILLAGE |
236544 |
PIPE WATER SUPPLY AT PATMUNDAVILLAGE1 |
Completion of work |
-
latitude : 21.87448134,21.8744817,21.87448171
Longitude : 85.308751,85.30875142,85.30875146
file name : Image_03112023181456970.png
|
2023-11-03 18:14:57.061972 |
50 |
61884246 |
JALA CHHATRA |
40000 |
JALA CHHATRA1 |
Completion of work |
-
latitude : 21.90872
Longitude : 85.2532374
file name : Image_13092023144232098.png
|
2023-09-13 14:42:32.202536 |
51 |
47698053 |
RENOVATION OF RANISAL TANK |
252000 |
RENOVATION OF RANISAL TANK1 |
Completion of work |
-
latitude : 21.8853507
Longitude : 85.30489456
file name : Image_27092023122016372.png
|
2023-09-27 12:20:16.525754 |
52 |
82582409 |
Construction of new Piped Water Supply schemes |
145600 |
Construction of new Piped Water Supply schemes1 |
Roof laid |
-
latitude : 21.90950991
Longitude : 85.25343928
file name : Image_03052024205211047.png
|
2024-05-03 20:52:11.1397 |
53 |
82582409 |
Construction of new Piped Water Supply schemes |
145600 |
Construction of new Piped Water Supply schemes1 |
Plinth level |
-
latitude : 21.90950176
Longitude : 85.25337597
file name : Image_03052024203450198.png
|
2024-05-03 20:34:50.298118 |
54 |
82582409 |
Construction of new Piped Water Supply schemes |
145600 |
Construction of new Piped Water Supply schemes1 |
Completion of work |
-
latitude : 21.9082659
Longitude : 85.253628
file name : Image_19042024171727372.png
|
2024-04-19 17:17:27.475003 |
55 |
82582409 |
Construction of new Piped Water Supply schemes |
145600 |
Construction of new Piped Water Supply schemes1 |
Completion of work |
-
latitude : 21.9082659
Longitude : 85.253628
file name : Image_19042024171720626.png
|
2024-04-19 17:17:20.722199 |
56 |
82582409 |
Construction of new Piped Water Supply schemes |
145600 |
Construction of new Piped Water Supply schemes1 |
Completion of work |
-
latitude : 21.9082659
Longitude : 85.253628
file name : Image_19042024171714770.png
|
2024-04-19 17:17:14.861633 |
57 |
82446253 |
Piped drinking water to public institutions |
200000 |
Piped drinking water to public institutions1 |
Roof laid |
-
latitude : 21.9095074
Longitude : 85.25343783
file name : Image_03052024205521035.png
|
2024-05-03 20:55:21.120042 |
58 |
82446253 |
Piped drinking water to public institutions |
200000 |
Piped drinking water to public institutions1 |
Plinth level |
-
latitude : 21.90950172
Longitude : 85.25338038
file name : Image_03052024204113188.png
|
2024-05-03 20:41:13.275449 |
59 |
82446253 |
Piped drinking water to public institutions |
200000 |
Piped drinking water to public institutions1 |
Completion of work |
-
latitude : 21.88512572
Longitude : 85.3235638
file name : Image_15042024131419500.png
|
2024-04-15 13:14:19.600404 |
60 |
82445496 |
Piped drinking water to public institutions |
200000 |
Piped drinking water to public institutions1 |
Roof laid |
-
latitude : 21.90950244
Longitude : 85.25343855
file name : Image_03052024205734734.png
|
2024-05-03 20:57:34.827339 |
61 |
82445496 |
Piped drinking water to public institutions |
200000 |
Piped drinking water to public institutions1 |
Plinth level |
-
latitude : 21.90949834
Longitude : 85.25338266
file name : Image_03052024204327065.png
|
2024-05-03 20:43:27.167136 |
62 |
82445496 |
Piped drinking water to public institutions |
200000 |
Piped drinking water to public institutions1 |
Completion of work |
-
latitude : 21.88315461
Longitude : 85.27925305
file name : Image_15042024153324879.png
|
2024-04-15 15:33:24.973084 |
63 |
44245844 |
CONST. OF BOUNDARY WALL AT HEALTH SUB CENTRE |
244000 |
CONST. OF BOUNDARY WALL AT HEALTH SUB CENTRE1 |
Completion of work |
-
latitude : 21.9086716
Longitude : 85.2526594
file name : Image_04052024125626535.png
|
2024-05-04 12:56:26.626222 |
64 |
100052877 |
Procurement of Sanitation Kits |
400000 |
Procurement of Sanitation Kits1 |
Plinth level |
-
latitude : 21.9086781
Longitude : 85.2526671
file name : Image_30032024200244717.png
|
2024-03-30 20:02:44.85355 |
65 |
100052877 |
Procurement of Sanitation Kits |
400000 |
Procurement of Sanitation Kits1 |
Completion of work |
-
latitude : 21.9086776
Longitude : 85.2526644
file name : Image_30032024195132908.png
|
2024-03-30 19:51:32.99648 |
66 |
100053127 |
Procurement of Sanitation Kits |
55079 |
Procurement of Sanitation Kits1 |
Completion of work |
-
latitude : 21.9086777
Longitude : 85.2526596
file name : Image_30032024195322668.png
|
2024-03-30 19:53:22.758599 |
67 |
82446501 |
Creation of a new source of drinking water |
60000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 21.9086822
Longitude : 85.2526642
file name : Image_16082024112005277.png
|
2024-08-16 11:20:05.335221 |
68 |
82446501 |
Creation of a new source of drinking water |
60000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 21.90873
Longitude : 85.25270166666665
file name : Image_16082024111437936.png
|
2024-08-16 11:14:37.990395 |
69 |
82446501 |
Creation of a new source of drinking water |
60000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 21.90873221
Longitude : 85.25279718
file name : Image_25072024185857268.png
|
2024-07-25 18:58:57.35751 |
70 |
82446501 |
Creation of a new source of drinking water |
60000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 21.9086934
Longitude : 85.2526609
file name : Image_25072024183001141.png
|
2024-07-25 18:30:01.222985 |