1 |
43775722 |
Const of New Tubewell (Odex Method)-CFC |
200000 |
Const of New Tubewell (Odex Method)-CFC1 |
Completion of work |
-
latitude : 21.91000073
Longitude : 83.9726778
file name : Image_05012021122603630.png
|
2021-01-05 12:26:03.73074 |
2 |
43775746 |
Digging of New Tubewell 3 nos at Sagarpali Harijanpada, Rohidaspada kaju field, turipada-CFC |
300000 |
Digging of New Tubewell 3 nos at Sagarpali Harijanpada, Rohidaspada kaju field, turipada-CFC1 |
Completion of work |
-
latitude : 21.94125394
Longitude : 83.99398315
file name : Image_05012021125134478.png
|
2021-01-05 12:51:34.586774 |
3 |
43775732 |
Const of New Tubewell (Odex Method)-CFC |
200000 |
Const of New Tubewell (Odex Method)-CFC1 |
Completion of work |
-
latitude : 21.92398178
Longitude : 83.99252345
file name : Image_05012021124311597.png
|
2021-01-05 12:43:11.703672 |
4 |
43775700 |
Salary of SEM 2 nos-CFC |
48000 |
Salary of SEM 2 nos-CFC1 |
Completion of work |
-
latitude : 21.93776066,21.9377893,21.93778988
Longitude : 84.00868453,84.0087458,84.00874851
file name : Image_11062021094409017.png
|
2021-06-11 09:44:09.172707 |
5 |
43775704 |
Salary of Pump Driver 2 nos-CFC |
48000 |
Salary of Pump Driver 2 nos-CFC1 |
Completion of work |
-
latitude : 21.93777728,21.93776436
Longitude : 84.00873921,84.00871824
file name : Image_11062021094414737.png
|
2021-06-11 09:44:14.870974 |
6 |
43775883 |
Const of Stage at Football Field Mangaspur-SFC |
100000 |
Const of Stage at Football Field Mangaspur-SFC1 |
Completion of work |
-
latitude : 21.93778826
Longitude : 84.00863905
file name : Image_26102021161536927.png
|
2021-10-26 16:15:36.981229 |
7 |
43775769 |
Repairing and Maintenance of Shock pit, Platform and Tube well-CFC |
80000 |
Repairing and Maintenance of Shock pit, Platform and Tube well-CFC1 |
Completion of work |
-
latitude : 21.93772941
Longitude : 84.00877318
file name : Image_16072021202246243.png
|
2021-07-16 20:22:46.343512 |
8 |
43775769 |
Repairing and Maintenance of Shock pit, Platform and Tube well-CFC |
80000 |
Repairing and Maintenance of Shock pit, Platform and Tube well-CFC2 |
Completion of work |
-
latitude : 21.93763759
Longitude : 84.00867264
file name : Image_19072021100041371.png
|
2021-07-19 10:00:41.489875 |
9 |
43775769 |
Repairing and Maintenance of Shock pit, Platform and Tube well-CFC |
80000 |
Repairing and Maintenance of Shock pit, Platform and Tube well-CFC3 |
Completion of work |
-
latitude : 21.93767396
Longitude : 84.00869682
file name : Image_19072021100225428.png
|
2021-07-19 10:02:25.51117 |
10 |
43775769 |
Repairing and Maintenance of Shock pit, Platform and Tube well-CFC |
80000 |
Repairing and Maintenance of Shock pit, Platform and Tube well-CFC4 |
Completion of work |
-
latitude : 21.93767317
Longitude : 84.00865589
file name : Image_19072021100410203.png
|
2021-07-19 10:04:10.325576 |
11 |
43775769 |
Repairing and Maintenance of Shock pit, Platform and Tube well-CFC |
80000 |
Repairing and Maintenance of Shock pit, Platform and Tube well-CFC5 |
Completion of work |
-
latitude : 21.93768638
Longitude : 84.00866364
file name : Image_19072021100459042.png
|
2021-07-19 10:04:59.167397 |
12 |
43775778 |
Renovation of Renda Tank with Bathing step-CFC |
119643 |
Renovation of Renda Tank with Bathing step-CFC1 |
Completion of work |
-
latitude : 22.08912284
Longitude : 83.93120142
file name : Image_09082021162515611.png
|
2021-08-09 16:25:15.705817 |
13 |
48064288 |
Renovation of New Tank at Mangaspur Karmapada-CFC |
262789 |
Renovation of New Tank at Mangaspur Karmapada-CFC1 |
Completion of work |
-
latitude : 21.96750395
Longitude : 83.97381485
file name : Image_17122021113419997.png
|
2021-12-17 11:34:20.207247 |
14 |
48063172 |
Salary of Pump Driver 2 nos-CFC |
48000 |
Salary of Pump Driver 2 nos-CFC1 |
Completion of work |
-
latitude : 22.08921116,22.08919076
Longitude : 83.93103269,83.9312229
file name : Image_25012022154254531.png
|
2022-01-25 15:42:54.688899 |
15 |
43775795 |
Construction of Mangaspur New GP Office Building-CFC |
1000000 |
Construction of Mangaspur New GP Office Building-CFC1 |
Completion of work |
-
latitude : 21.95304335
Longitude : 83.99041469
file name : Image_23122021172028258.png
|
2021-12-23 17:20:28.358607 |
16 |
48067674 |
Const of Bhagbat Tungi at Kurla Agriapada-CFC |
200000 |
Const of Bhagbat Tungi at Kurla Agriapada-CFC1 |
Completion of work |
-
latitude : 21.99308615
Longitude : 83.97399218
file name : Image_16102023135911544.png
|
2023-10-16 13:59:11.643537 |
17 |
61679728 |
Completion of GP Office-SFC |
100000 |
Completion of GP Office-SFC1 |
Completion of work |
-
latitude : 22.08985858
Longitude : 83.94269459
file name : Image_16102023144914727.png
|
2023-10-16 14:49:14.823425 |
18 |
61740206 |
Repair & Maintenance of Polling Booths PRIs Election-2022-cfc |
50000 |
Repair & Maintenance of Polling Booths PRIs Election-2022-cfc1 |
Completion of work |
-
latitude : 22.08922135
Longitude : 83.93085073
file name : Image_16102023155729610.png
|
2023-10-16 15:57:29.703737 |
19 |
48062967 |
Salary of SEM 2 nos-CFC |
48000 |
Salary of SEM 2 nos-CFC1 |
Completion of work |
-
latitude : 22.08919343,22.08919169
Longitude : 83.93122353,83.93122411
file name : Image_25012022153806199.png
|
2022-01-25 15:38:06.359325 |
20 |
48066321 |
Const of Gate and Wear Boundary at Daldali Football Field-CFC |
150000 |
Const of Gate and Wear Boundary at Daldali Football Field-CFC1 |
Completion of work |
-
latitude : 21.93561367
Longitude : 84.00852489
file name : Image_01022022153445535.png
|
2022-02-01 15:34:45.646648 |
21 |
48066321 |
Const of Gate and Wear Boundary at Daldali Football Field-CFC |
150000 |
Const of Gate and Wear Boundary at Daldali Football Field-CFC1 |
Completion of work |
-
latitude : 21.93550491
Longitude : 84.00842936
file name : Image_01022022153922712.png
|
2022-02-01 15:39:22.820706 |
22 |
48065945 |
Const of Drain from CD to Dharsa Road-CFC |
134395 |
Const of Drain from CD to Dharsa Road-CFC1 |
Completion of work |
-
latitude : 21.93778721,21.93775405
Longitude : 84.00869114,84.00868072
file name : Image_01022022113544717.png
|
2022-02-01 11:35:44.829766 |
23 |
48067426 |
Repairing of Football Field-CFC |
100000 |
Repairing of Football Field-CFC1 |
Completion of work |
-
latitude : 21.93546558,21.93549432
Longitude : 84.0083266,84.00837249
file name : Image_01022022115050054.png
|
2022-02-01 11:50:50.207726 |
24 |
48071935 |
Const of New Bhagbat Tungi-SFC |
200000 |
Const of New Bhagbat Tungi-SFC1 |
Completion of work |
-
latitude : 21.95401588
Longitude : 83.99124907
file name : Image_06082022131347546.png
|
2022-08-06 13:13:47.640957 |
25 |
48071935 |
Const of New Bhagbat Tungi-SFC |
200000 |
Const of New Bhagbat Tungi-SFC1 |
Completion of work |
-
latitude : 21.95254716
Longitude : 83.99051457
file name : Image_10032022114814949.png
|
2022-03-10 11:48:15.053523 |
26 |
48066956 |
Imp of Makar Munda at Renda-CFC |
150000 |
Imp of Makar Munda at Renda-CFC1 |
Completion of work |
-
latitude : 22.0891154
Longitude : 83.9310588
file name : Image_29042022113044834.png
|
2022-04-29 11:30:44.926339 |
27 |
48065127 |
Comp of Drain at Kalopada-CFC |
134394 |
Comp of Drain at Kalopada-CFC1 |
Completion of work |
-
latitude : 22.08915399,22.08914312
Longitude : 83.93106877,83.93110214
file name : Image_20052022122245593.png
|
2022-05-20 12:22:45.71576 |
28 |
61740055 |
Const of Boundary Wall at Kurla UPS-cfc |
170000 |
Const of Boundary Wall at Kurla UPS-cfc1 |
Completion of work |
-
latitude : 21.93781993
Longitude : 84.00862533
file name : Image_03052023075451195.png
|
2023-05-03 07:54:51.304553 |
29 |
61740097 |
Const of Boundary Wall at Sagarpali UPS-cfc |
170000 |
Const of Boundary Wall at Sagarpali UPS-cfc1 |
Completion of work |
-
latitude : 21.93778202
Longitude : 84.00862755
file name : Image_03052023080116351.png
|
2023-05-03 08:01:16.44013 |
30 |
61740140 |
Const of LI Centre at Mangaspur-cfc |
150000 |
Const of LI Centre at Mangaspur-cfc1 |
Completion of work |
-
latitude : 21.93781311
Longitude : 84.00863327
file name : Image_03052023075646191.png
|
2023-05-03 07:56:46.284374 |
31 |
48064056 |
Tap Water Connection at Sagarpali UP School-CFC |
150000 |
Tap Water Connection at Sagarpali UP School-CFC1 |
Completion of work |
-
latitude : 21.93790994,21.93790994
Longitude : 84.00895513,84.00895513
file name : Image_04072022122037251.png
|
2022-07-04 12:20:37.352549 |
32 |
48067924 |
Digging of New Tubewell 2 nos at Sagarpali Pahadtal and Kurla UP School-CFC |
100000 |
Digging of New Tubewell 2 nos at Sagarpali Pahadtal and Kurla UP School-CFC1 |
Completion of work |
-
latitude : 21.93777548
Longitude : 84.0087491
file name : Image_11072022144130945.png
|
2022-07-11 14:41:31.070811 |
33 |
48063471 |
Jala Chhatra for Summer Season-CFC |
50000 |
Jala Chhatra for Summer Season-CFC1 |
Completion of work |
-
latitude : 21.93781144
Longitude : 84.00860317
file name : Image_19072022153128261.png
|
2022-07-19 15:31:28.374824 |
34 |
48063471 |
Jala Chhatra for Summer Season-CFC |
50000 |
Jala Chhatra for Summer Season-CFC1 |
Completion of work |
-
latitude : 21.93782619
Longitude : 84.00872334
file name : Image_11072022144621726.png
|
2022-07-11 14:46:21.841164 |
35 |
48063471 |
Jala Chhatra for Summer Season-CFC |
50000 |
Jala Chhatra for Summer Season-CFC1 |
Completion of work |
-
latitude : 21.93774568
Longitude : 84.00850811
file name : Image_22122021133815252.png
|
2021-12-22 13:38:15.354938 |
36 |
48063471 |
Jala Chhatra for Summer Season-CFC |
50000 |
Jala Chhatra for Summer Season-CFC1 |
Completion of work |
-
latitude : 21.93788423
Longitude : 84.0086256
file name : Image_19072022152722781.png
|
2022-07-19 15:27:22.89368 |
37 |
48063471 |
Jala Chhatra for Summer Season-CFC |
50000 |
Jala Chhatra for Summer Season-CFC1 |
Completion of work |
-
latitude : 21.93790313
Longitude : 84.00863121
file name : Image_19072022152726814.png
|
2022-07-19 15:27:26.916671 |
38 |
48063471 |
Jala Chhatra for Summer Season-CFC |
50000 |
Jala Chhatra for Summer Season-CFC1 |
Completion of work |
-
latitude : 21.93787807
Longitude : 84.00863403
file name : Image_19072022152731219.png
|
2022-07-19 15:27:31.322404 |
39 |
48063471 |
Jala Chhatra for Summer Season-CFC |
50000 |
Jala Chhatra for Summer Season-CFC1 |
Completion of work |
-
latitude : 21.93772325
Longitude : 84.00863608
file name : Image_19072022153501794.png
|
2022-07-19 15:35:01.91472 |
40 |
48063471 |
Jala Chhatra for Summer Season-CFC |
50000 |
Jala Chhatra for Summer Season-CFC1 |
Completion of work |
-
latitude : 21.9378727
Longitude : 84.00863367
file name : Image_19072022152735303.png
|
2022-07-19 15:27:35.416062 |
41 |
48063471 |
Jala Chhatra for Summer Season-CFC |
50000 |
Jala Chhatra for Summer Season-CFC1 |
Completion of work |
-
latitude : 21.93773885
Longitude : 84.00862953
file name : Image_19072022161337405.png
|
2022-07-19 16:13:37.502855 |
42 |
48072145 |
Repairing of GP Office and Const of New Toilet and Gate-SFC |
217540 |
Repairing of GP Office and Const of New Toilet and Gate-SFC1 |
Completion of work |
-
latitude : 21.93782649
Longitude : 84.00886796
file name : Image_19072022161716751.png
|
2022-07-19 16:17:16.856206 |
43 |
43775715 |
Jala Chhatra for Summer Season-CFC |
50000 |
Jala Chhatra for Summer Season-CFC1 |
Completion of work |
-
latitude : 21.9379169
Longitude : 84.00867526
file name : Image_06082022131057682.png
|
2022-08-06 13:10:57.781336 |
44 |
43775715 |
Jala Chhatra for Summer Season-CFC |
50000 |
Jala Chhatra for Summer Season-CFC1 |
Completion of work |
-
latitude : 21.93795019
Longitude : 84.00857204
file name : Image_06082022131113484.png
|
2022-08-06 13:11:13.568593 |
45 |
43775940 |
Management of Covid Care Home (CCH)-SFC |
50000 |
Management of Covid Care Home (CCH)-SFC1 |
Completion of work |
-
latitude : 22.12217921
Longitude : 84.01702803
file name : Image_07102022153154433.png
|
2022-10-07 15:31:54.532121 |
46 |
48064616 |
Const of Sockpit of Tubewell All Village-CFC |
50000 |
Const of Sockpit of Tubewell All Village-CFC1 |
Completion of work |
-
latitude : 22.12227495
Longitude : 84.01706286
file name : Image_07102022153701730.png
|
2022-10-07 15:37:01.836848 |
47 |
64891346 |
Creation of a new source of drinking water |
220000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 21.96245808
Longitude : 84.02098546
file name : Image_07112022155914348.png
|
2022-11-07 15:59:14.455025 |
48 |
64891677 |
Weighing machine for use in Solid Waste Management |
25000 |
Weighing machine for use in Solid Waste Management1 |
Completion of work |
-
latitude : 22.1174608
Longitude : 84.0398757
file name : Image_19122022142515887.png
|
2022-12-19 14:25:16.034838 |
49 |
48065413 |
Const of Bathing Step at Ghusurimunda-CFC |
150000 |
Const of Bathing Step at Ghusurimunda-CFC1 |
Completion of work |
-
latitude : 21.9378057
Longitude : 84.00871985
file name : Image_30122022114407076.png
|
2022-12-30 11:44:07.176777 |
50 |
61739702 |
Purchase of Try Cycle and Cleaning equipments at Mangaspur GP-cfc |
9000 |
Purchase of Try Cycle and Cleaning equipments at Mangaspur GP-cfc1 |
Completion of work |
-
latitude : 22.11755184
Longitude : 84.03988761
file name : Image_29122022165849951.png
|
2022-12-29 16:58:50.089027 |
51 |
64980545 |
Operation & maintenance of community compost pits |
37500 |
Operation & maintenance of community compost pits1 |
Completion of work |
-
latitude : 22.11760293
Longitude : 84.03984868
file name : Image_30122022114010530.png
|
2022-12-30 11:40:10.635572 |
52 |
64980545 |
Operation & maintenance of community compost pits |
37500 |
Operation & maintenance of community compost pits1 |
Completion of work |
-
latitude : 21.95157131
Longitude : 83.99093001
file name : Image_30122022154125937.png
|
2022-12-30 15:41:26.06291 |
53 |
61739884 |
Const of Tube well sockpit at Revenue village of Mangaspur GP-cfc |
150000 |
Const of Tube well sockpit at Revenue village of Mangaspur GP-cfc1 |
Completion of work |
-
latitude : 21.93674522
Longitude : 83.99475591
file name : Image_27012023142324503.png
|
2023-01-27 14:23:24.609885 |
54 |
61739746 |
Const of waste segregation shed at Mangaspur GP head quarter-cfc |
90000 |
Const of waste segregation shed at Mangaspur GP head quarter-cfc1 |
Completion of work |
-
latitude : 21.94325105
Longitude : 83.99383234
file name : Image_27012023142002269.png
|
2023-01-27 14:20:02.377948 |
55 |
64891796 |
Const of Boundary wall at AWC Malipada |
150000 |
Const of Boundary wall at AWC Malipada1 |
Completion of work |
-
latitude : 21.95321777
Longitude : 83.9905524
file name : Image_20022023105434836.png
|
2023-02-20 10:54:34.936922 |
56 |
64891796 |
Const of Boundary wall at AWC Malipada |
150000 |
Const of Boundary wall at AWC Malipada1 |
Completion of work |
-
latitude : 21.93781037
Longitude : 84.00863414
file name : Image_03052023075858660.png
|
2023-05-03 07:58:58.745045 |
57 |
64891619 |
Creation of Shed for segregation and processing of wet and dry waste |
109440 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 21.95312732
Longitude : 83.9904368
file name : Image_09032023123930318.png
|
2023-03-09 12:39:30.404576 |
58 |
64891539 |
Any other operation and maintenance needs related to solid waste management |
150102 |
Any other operation and maintenance needs related to solid waste management1 |
Completion of work |
-
latitude : 21.95312708
Longitude : 83.99044057
file name : Image_09032023124117402.png
|
2023-03-09 12:41:17.501444 |
59 |
64891861 |
Repair and Maintenance of Mangaspur Kalyan Mandap |
200000 |
Repair and Maintenance of Mangaspur Kalyan Mandap1 |
Completion of work |
-
latitude : 21.93769294
Longitude : 84.0086244
file name : Image_15052023120903545.png
|
2023-05-15 12:09:03.640339 |
60 |
61740020 |
Reparing of Football Field at Renda-cfc |
171388 |
Reparing of Football Field at Renda-cfc1 |
Completion of work |
-
latitude : 21.93774022
Longitude : 84.00866742
file name : Image_15072023163918168.png
|
2023-07-15 16:39:18.255902 |
61 |
64891913 |
Const of Restshed at Renda Football Field |
230040 |
Const of Restshed at Renda Football Field1 |
Completion of work |
-
latitude : 21.93786142
Longitude : 84.00860806
file name : Image_15072023163405872.png
|
2023-07-15 16:34:05.957698 |
62 |
48064894 |
Const of New Bathing Step at Renda Bnadh-CFC |
120000 |
Const of New Bathing Step at Renda Bnadh-CFC1 |
Completion of work |
-
latitude : 21.93778636
Longitude : 84.00886454
file name : Image_20072023120211184.png
|
2023-07-20 12:02:11.307092 |
63 |
61739588 |
Repair and Maintenance of Pipe Water Supply at Mangaspur GP-cfc |
100000 |
Repair and Maintenance of Pipe Water Supply at Mangaspur GP-cfc1 |
Completion of work |
-
latitude : 21.9530419
Longitude : 83.990425
file name : Image_06102023135257028.png
|
2023-10-06 13:52:57.134267 |
64 |
61739516 |
Jalachhatra for Summer Season-cfc |
32542 |
Jalachhatra for Summer Season-cfc1 |
Completion of work |
-
latitude : 22.08918388
Longitude : 83.93128564
file name : Image_11102023163840900.png
|
2023-10-11 16:38:41.059426 |
65 |
82766611 |
Operation and Maintenance of drinking water supply system |
96000 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 22.08891061
Longitude : 83.9307435
file name : Image_02072024171346714.png
|
2024-07-02 17:13:46.816986 |
66 |
82766611 |
Operation and Maintenance of drinking water supply system |
96000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 21.9532743
Longitude : 83.990473
file name : Image_19032024121225332.png
|
2024-03-19 12:12:25.432027 |
67 |
82766611 |
Operation and Maintenance of drinking water supply system |
96000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 22.08916623
Longitude : 83.93119235
file name : Image_28022024161331478.png
|
2024-02-28 16:13:31.601174 |
68 |
82766611 |
Operation and Maintenance of drinking water supply system |
96000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 21.93633087
Longitude : 84.00053032
file name : Image_18122023111034697.png
|
2023-12-18 11:10:34.798738 |
69 |
82766611 |
Operation and Maintenance of drinking water supply system |
96000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.93784211
Longitude : 84.00860959
file name : Image_15122023141242843.png
|
2023-12-15 14:12:42.927721 |
70 |
82482629 |
Construction of Sheds |
261540 |
Construction of Sheds1 |
Roof laid |
-
latitude : 22.0891846
Longitude : 83.9311276
file name : Image_28032024164457217.png
|
2024-03-28 16:44:57.305312 |
71 |
82482629 |
Construction of Sheds |
261540 |
Construction of Sheds1 |
Plinth level |
-
latitude : 21.9532733
Longitude : 83.9904696
file name : Image_19032024121108844.png
|
2024-03-19 12:11:08.946613 |
72 |
82482629 |
Construction of Sheds |
261540 |
Construction of Sheds1 |
Completion of work |
-
latitude : 22.03133197
Longitude : 83.88797087
file name : Image_27022024115225398.png
|
2024-02-27 11:52:25.510189 |
73 |
61739668 |
Reparing and Maintenance of Mangaspur Kalyan Mandap Water Supply-cfc |
50000 |
Reparing and Maintenance of Mangaspur Kalyan Mandap Water Supply-cfc1 |
Completion of work |
-
latitude : 22.03133935
Longitude : 83.88795178
file name : Image_27022024120016567.png
|
2024-02-27 12:00:16.670618 |
74 |
61739918 |
Transpotation of Waste from Mangaspur GP to Block-cfc |
40000 |
Transpotation of Waste from Mangaspur GP to Block-cfc1 |
Completion of work |
-
latitude : 21.9532529
Longitude : 83.9905147
file name : Image_11072024114520416.png
|
2024-07-11 11:45:20.507312 |
75 |
82944823 |
Operation & maintenance of community compost pits |
148660 |
Operation & maintenance of community compost pits1 |
Completion of work |
-
latitude : 21.9532516
Longitude : 83.9905108
file name : Image_11072024115051507.png
|
2024-07-11 11:50:51.596567 |
76 |
72472030 |
Operation and Maintenance of drinking water supply system |
40000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 22.3588511
Longitude : 84.9021605
file name : Image_09102024100948962.png
|
2024-10-09 10:09:49.047188 |
77 |
72472030 |
Operation and Maintenance of drinking water supply system |
40000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.9532532
Longitude : 83.990515
file name : Image_11072024114857493.png
|
2024-07-11 11:48:57.574731 |
78 |
82942157 |
Purchase of Tricycles/other battery -operated vehicles for door to door collection of waste |
109440 |
Purchase of Tricycles/other battery -operated vehicles for door to door collection of waste1 |
Completion of work |
-
latitude : 21.9532534
Longitude : 83.9905154
file name : Image_11072024115450547.png
|
2024-07-11 11:54:50.637743 |
79 |
64891446 |
Operation & maintenance of drinking water supply system |
30000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 22.3588497
Longitude : 84.9021618
file name : Image_09102024100735302.png
|
2024-10-09 10:07:35.402788 |
80 |
98468119 |
Operation and Maintenance of drinking/piped water supply system |
171000 |
Operation and Maintenance of drinking/piped water supply system1 |
Plinth level |
-
latitude : 22.0891666
Longitude : 83.9311361
file name : Image_18112024153411818.png
|
2024-11-18 15:34:11.936213 |
81 |
98468119 |
Operation and Maintenance of drinking/piped water supply system |
171000 |
Operation and Maintenance of drinking/piped water supply system1 |
Completion of work |
-
latitude : 21.9531021
Longitude : 83.9906207
file name : Image_18112024125734461.png
|
2024-11-18 12:57:34.548362 |
82 |
82813714 |
Repairing/Construction of Building |
100000 |
Repairing/Construction of Building1 |
Plinth level |
-
latitude : 21.953553333333335
Longitude : 83.990865
file name : Image_28112024121515721.png
|
2024-11-28 12:15:15.812116 |
83 |
82813714 |
Repairing/Construction of Building |
100000 |
Repairing/Construction of Building1 |
Plinth level |
-
latitude : 21.95340666666667
Longitude : 83.99090333333334
file name : Image_28112024121648211.png
|
2024-11-28 12:16:48.290061 |
84 |
82813714 |
Repairing/Construction of Building |
100000 |
Repairing/Construction of Building1 |
Completion of work |
-
latitude : 21.95341
Longitude : 83.991045
file name : Image_26112024110439383.png
|
2024-11-26 11:04:39.472693 |
85 |
82471159 |
Drainage Construction |
100000 |
Drainage Construction1 |
Roof laid |
-
latitude : 21.92874
Longitude : 83.97252166666667
file name : Image_26112024124503843.png
|
2024-11-26 12:45:03.931624 |
86 |
82471159 |
Drainage Construction |
100000 |
Drainage Construction1 |
Plinth level |
-
latitude : 21.92872333333333
Longitude : 83.97240500000001
file name : Image_26112024124227820.png
|
2024-11-26 12:42:27.940786 |
87 |
82471159 |
Drainage Construction |
100000 |
Drainage Construction1 |
Completion of work |
-
latitude : 21.928835000000003
Longitude : 83.97249666666667
file name : Image_26112024123655109.png
|
2024-11-26 12:36:55.235207 |
88 |
82472097 |
Construction of Building |
100000 |
Construction of Building1 |
Roof laid |
-
latitude : 21.952516666666664
Longitude : 83.99104666666666
file name : Image_12122024140447064.png
|
2024-12-12 14:04:47.155578 |
89 |
82472097 |
Construction of Building |
100000 |
Construction of Building1 |
Plinth level |
-
latitude : 21.95249833333333
Longitude : 83.99100333333332
file name : Image_12122024135848656.png
|
2024-12-12 13:58:48.765551 |
90 |
82472097 |
Construction of Building |
100000 |
Construction of Building1 |
Plinth level |
-
latitude : 21.9524612
Longitude : 83.9908059
file name : Image_12122024135758610.png
|
2024-12-12 13:57:58.707185 |
91 |
82472097 |
Construction of Building |
100000 |
Construction of Building1 |
Completion of work |
-
latitude : 21.9524948
Longitude : 83.9908041
file name : Image_12122024134739169.png
|
2024-12-12 13:47:39.251559 |