1 |
14754460 |
रंग मंच निर्माण स्कूल चंदगडी |
60000 |
Chaupal1 |
25% |
-
latitude : 21.4197256
Longitude : 80.9770885
file name : Image_12062019144954428.png
|
2019-06-12 14:49:54.536996 |
2 |
14753674 |
बौन्द्रीवाल पंचायत भवन स्कूल |
75000 |
Boundary wall / Side Wall / Retaining Wall1 |
Survey before start of work |
-
latitude : 21.4197258
Longitude : 80.977091
file name : Image_12062019144902219.png
|
2019-06-12 14:49:02.350581 |
3 |
23073759 |
नल जल व्वयसथा |
50000 |
Water supply pipe line1 |
Survey before start of work |
-
latitude : 21.3791022,21.3791022
Longitude : 80.8781092,80.8781092
file name : Image_11092019130203755.png
|
2019-09-11 13:02:03.864916 |
4 |
54218363 |
स्कूल तालाब निस्तारी कार्य |
15000 |
स्कूल तालाब निस्तारी कार्य 1 |
Plinth level |
-
latitude : 21.37903666
Longitude : 80.87615654
file name : Image_07092021145118236.png
|
2021-09-07 14:51:18.350092 |
5 |
55138733 |
वार्ड क्रमांक 09 चाँदगढ़ी गली मरम्मत कार्य |
38727 |
वार्ड क्रमांक 09 चाँदगढ़ी गली मरम्मत कार्य 1 |
Plinth level |
-
latitude : 21.38977483,21.38977547
Longitude : 80.89098783,80.8909883
file name : Image_16112021152047430.png
|
2021-11-16 15:20:47.545138 |
6 |
55138648 |
कच्ची सड़क मरम्मत कार्य अ नवागांव |
43197 |
कच्ची सड़क मरम्मत कार्य अ नवागांव 1 |
Plinth level |
-
latitude : 21.37360652,21.37360425
Longitude : 80.88152224,80.88152432
file name : Image_16112021154905110.png
|
2021-11-16 15:49:05.231584 |
7 |
55138416 |
आंगनबाड़ी केन्द्र अ नवागांव में पेयजल पाइपलाइन विस्तार कार्य |
20070 |
आंगनबाड़ी केन्द्र अ नवागांव में पेयजल पाइपलाइन विस्तार कार्य 1 |
Plinth level |
-
latitude : 21.37811381,21.37811389
Longitude : 80.87808221,80.87808211
file name : Image_16112021154857664.png
|
2021-11-16 15:48:57.795544 |
8 |
59394261 |
गौठान में महिला शेड निर्माण कार्य |
100000 |
गौठान में महिला शेड निर्माण कार्य 1 |
Plinth level |
-
latitude : 21.38288232
Longitude : 80.87872219
file name : Image_01022022130712136.png
|
2022-02-01 13:07:12.206504 |
9 |
59356881 |
नल जल पाइपलाइन मरम्मत कार्य |
10000 |
नल जल पाइपलाइन मरम्मत कार्य 1 |
Plinth level |
-
latitude : 21.37908358,21.37908339
Longitude : 80.87814787,80.87814884
file name : Image_01022022130723179.png
|
2022-02-01 13:07:23.242942 |
10 |
59389396 |
प्राथमिक शाला चाँदगढ़ी में आहाता निर्माण कार्य |
136790 |
प्राथमिक शाला चाँदगढ़ी में आहाता निर्माण कार्य 1 |
Plinth level |
-
latitude : 21.38987788
Longitude : 80.89155456
file name : Image_01022022130656900.png
|
2022-02-01 13:06:56.965976 |
11 |
59388180 |
गली मरम्मत कार्य चाँदगढ़ी |
23560 |
गली मरम्मत कार्य चाँदगढ़ी 1 |
Plinth level |
-
latitude : 21.38918527,21.38918454
Longitude : 80.89103545,80.89103409
file name : Image_01022022130700339.png
|
2022-02-01 13:07:00.397061 |
12 |
65649013 |
खेल मैदान समतलीकरण कार्य चांदगढ़ी हेतु जीरा गिट्टी क्रय |
33000 |
खेल मैदान समतलीकरण कार्य चांदगढ़ी हेतु जीरा गिट्टी क्रय 1 |
Plinth level |
-
latitude : 21.389793333333333,21.389793333333333
Longitude : 80.89103166666668,80.89103166666668
file name : Image_22102022202704802.png
|
2022-10-22 20:27:04.972802 |
13 |
65648987 |
प्रा.शाला व आंगनबाड़ी प्रांगण चाँदगढ़ी हेतु जीरा गिट्टी क्रय |
21000 |
प्रा.शाला व आंगनबाड़ी प्रांगण चाँदगढ़ी हेतु जीरा गिट्टी क्रय 1 |
Plinth level |
-
latitude : 21.389898333333335,21.389901666666667
Longitude : 80.89110666666667,80.89107833333334
file name : Image_22102022202648541.png
|
2022-10-22 20:26:48.721452 |
14 |
65649037 |
गौठान सड़क मरम्मत कार्य अ. नवागांव हेतु जीरा गिट्टी क्रय |
32210 |
गौठान सड़क मरम्मत कार्य अ. नवागांव हेतु जीरा गिट्टी क्रय 1 |
Plinth level |
-
latitude : 21.389766666666667,21.389781666666668
Longitude : 80.89102666666666,80.891035
file name : Image_22102022202659139.png
|
2022-10-22 20:26:59.314155 |
15 |
65648957 |
Operation & maintenance of drinking water supply system |
12734 |
Operation & maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 21.38872666666667
Longitude : 80.89007
file name : Image_22102022202642827.png
|
2022-10-22 20:26:43.001015 |
16 |
65648935 |
Operation & maintenance of community sanitary complex |
12860 |
Operation & maintenance of community sanitary complex1 |
Plinth level |
-
latitude : 21.3781528
Longitude : 80.8784899
file name : Image_22102022155505672.png
|
2022-10-22 15:55:05.916738 |
17 |
67478434 |
राजीव गांधी सेवा केन्द्र रंग रोहन कार्य अ. नवागांव |
18300 |
राजीव गांधी सेवा केन्द्र रंग रोहन कार्य अ. नवागांव 1 |
Plinth level |
-
latitude : 21.37944931
Longitude : 80.87639755
file name : Image_25032023161457905.png
|
2023-03-25 16:14:58.011936 |
18 |
67478145 |
सतनाम भवन रंगरोहन कार्य चाँदगढ़ी |
18200 |
सतनाम भवन रंगरोहन कार्य चाँदगढ़ी 1 |
Plinth level |
-
latitude : 21.39003417
Longitude : 80.89136694
file name : Image_25032023154650654.png
|
2023-03-25 15:46:50.751414 |
19 |
67478095 |
Any other operation and maintenance needs related to solid waste management |
50000 |
Any other operation and maintenance needs related to solid waste management1 |
Plinth level |
-
latitude : 21.38282666
Longitude : 80.8786575
file name : Image_25032023160341393.png
|
2023-03-25 16:03:41.497785 |
20 |
67477939 |
गौठान में तार फेंसिंग कार्य अ.नवागांव |
41900 |
गौठान में तार फेंसिंग कार्य अ.नवागांव 1 |
Plinth level |
-
latitude : 21.38282529
Longitude : 80.87864635
file name : Image_25032023160400046.png
|
2023-03-25 16:04:00.142199 |
21 |
67477880 |
गौठान में गेट निर्माण कार्य अ.नवागांव |
22871 |
गौठान में गेट निर्माण कार्य अ.नवागांव 1 |
Plinth level |
-
latitude : 21.38302076
Longitude : 80.87870889
file name : Image_25032023160323670.png
|
2023-03-25 16:03:23.763951 |
22 |
67477813 |
रंग मंच में स्टील रेलिंग कार्य अ. नवागांव |
35200 |
रंग मंच में स्टील रेलिंग कार्य अ. नवागांव 1 |
Plinth level |
-
latitude : 21.37928425
Longitude : 80.87812474
file name : Image_25032023161451162.png
|
2023-03-25 16:14:51.25891 |
23 |
67477763 |
महिला वर्क शेड पेन्टिंग कार्य अ.नवागांव |
10604 |
महिला वर्क शेड पेन्टिंग कार्य अ.नवागांव 1 |
Plinth level |
-
latitude : 21.38304141
Longitude : 80.87866664
file name : Image_25032023160305425.png
|
2023-03-25 16:03:05.516575 |
24 |
67477685 |
प्रा. स्वास्थ्य केन्द्र के पास मैदान समतलीकरण कार्य अ. नवागांव |
38535 |
प्रा. स्वास्थ्य केन्द्र के पास मैदान समतलीकरण कार्य अ. नवागांव 1 |
Plinth level |
-
latitude : 21.378937,21.37893645
Longitude : 80.87810192,80.87810168
file name : Image_25032023161442822.png
|
2023-03-25 16:14:42.924835 |
25 |
67477634 |
अ.नवागांव वार्ड न. 06 में गली मरम्मत कार्य |
41200 |
अ.नवागांव वार्ड न. 06 में गली मरम्मत कार्य 1 |
Plinth level |
-
latitude : 21.37816499,21.37812562
Longitude : 80.87798885,80.87800728
file name : Image_25032023161432956.png
|
2023-03-25 16:14:33.060202 |
26 |
55138136 |
आंगनबाड़ी केन्द्र चाँदगढ़ी में पेयजल पाइपलाइन विस्तार कार्य |
8723 |
आंगनबाड़ी केन्द्र चाँदगढ़ी में पेयजल पाइपलाइन विस्तार कार्य 1 |
Plinth level |
-
latitude : 21.38978111,21.38978072
Longitude : 80.89112019,80.89111732
file name : Image_16112021151848360.png
|
2021-11-16 15:18:48.504234 |
27 |
55138355 |
प्राथमिक शाला भवन चाँदगढ़ी में पेयजल पाइपलाइन विस्तार कार्य |
12110 |
प्राथमिक शाला भवन चाँदगढ़ी में पेयजल पाइपलाइन विस्तार कार्य 1 |
Plinth level |
-
latitude : 21.38998177,21.38998349
Longitude : 80.89116799,80.89117367
file name : Image_16112021150618639.png
|
2021-11-16 15:06:18.737781 |
28 |
59387535 |
नाली सफाई एवं मलबा ढुलाई कार्य |
27720 |
नाली सफाई एवं मलबा ढुलाई कार्य 1 |
Plinth level |
-
latitude : 21.37931674,21.37929344
Longitude : 80.87838508,80.87839525
file name : Image_01022022130715757.png
|
2022-02-01 13:07:15.819744 |
29 |
55138284 |
प्राथमिक शाला भवन अ नवागांव में पेयजल पाइपलाइन विस्तार कार्य |
7835 |
प्राथमिक शाला भवन अ नवागांव में पेयजल पाइपलाइन विस्तार कार्य 1 |
Plinth level |
-
latitude : 21.37971543,21.37971873,21.3797191
Longitude : 80.876006,80.87600265,80.87600196
file name : Image_16112021153647804.png
|
2021-11-16 15:36:47.921588 |
30 |
55138035 |
उप स्वास्थ्य केन्द्र भवन अ नवागांव में पेयजल पाइपलाइन विस्तार कार्य |
44261 |
उप स्वास्थ्य केन्द्र भवन अ नवागांव में पेयजल पाइपलाइन विस्तार कार्य 1 |
Plinth level |
-
latitude : 21.3461353,21.3461353
Longitude : 80.979689,80.979689
file name : Image_27102021123828294.png
|
2021-10-27 12:38:28.400842 |
31 |
54218428 |
प्राथमिक शाला चांदगढ़ी में मैदान समतलीकरण कार्य |
45150 |
प्राथमिक शाला चांदगढ़ी में मैदान समतलीकरण कार्य 1 |
Plinth level |
-
latitude : 21.39017129,21.39016953,21.3901692
Longitude : 80.89163546,80.89164061,80.89164103
file name : Image_07092021142234577.png
|
2021-09-07 14:22:34.676506 |
32 |
59385073 |
गौठान में सोलर पम्प स्थापना कार्य |
24800 |
गौठान में सोलर पम्प स्थापना कार्य 1 |
Plinth level |
-
latitude : 21.3825393
Longitude : 80.87850378
file name : Image_01022022130708340.png
|
2022-02-01 13:07:08.417075 |
33 |
59396515 |
अ. नवागांव में बोर खनन कार्य |
47575 |
अ. नवागांव में बोर खनन कार्य 1 |
Plinth level |
-
latitude : 21.37686443
Longitude : 80.87758865
file name : Image_01022022130719457.png
|
2022-02-01 13:07:19.527769 |
34 |
59395319 |
बोर खनन कार्य चाँदगढ़ी |
48355 |
बोर खनन कार्य चाँदगढ़ी 1 |
Plinth level |
-
latitude : 21.38906779
Longitude : 80.89396937
file name : Image_01022022130704499.png
|
2022-02-01 13:07:04.567291 |
35 |
55138184 |
ग्राम पंचायत भवन अ नवागांव में पेयजल पाइपलाइन विस्तार कार्य |
8318 |
ग्राम पंचायत भवन अ नवागांव में पेयजल पाइपलाइन विस्तार कार्य 1 |
Plinth level |
-
latitude : 21.37921739,21.37921464
Longitude : 80.87577545,80.87579038
file name : Image_16112021154120547.png
|
2021-11-16 15:41:20.6915 |
36 |
83547559 |
Solar Street Lighting Installation |
250000 |
Solar Street Lighting Installation1 |
Plinth level |
-
latitude : 21.38979846
Longitude : 80.8910799
file name : Image_30032024073100128.png
|
2024-03-30 07:31:00.223129 |
37 |
83547559 |
Solar Street Lighting Installation |
250000 |
Solar Street Lighting Installation1 |
Completion of work |
-
latitude : 21.37952032
Longitude : 80.87924704
file name : Image_30032024071214439.png
|
2024-03-30 07:12:14.536203 |
38 |
74944632 |
Construction of new Piped Water Supply schemes |
200000 |
Construction of new Piped Water Supply schemes1 |
Plinth level |
-
latitude : 21.37280227,21.37280874
Longitude : 80.86762844,80.86761041
file name : Image_31032024111203643.png
|
2024-03-31 11:12:03.738206 |
39 |
74944632 |
Construction of new Piped Water Supply schemes |
200000 |
Construction of new Piped Water Supply schemes1 |
Completion of work |
-
latitude : 21.38909754,21.38908637
Longitude : 80.89405297,80.89402018
file name : Image_31032024071349563.png
|
2024-03-31 07:13:49.653246 |
40 |
74972235 |
Connecting septic tanks with soak pits |
50000 |
Connecting septic tanks with soak pits1 |
Plinth level |
-
latitude : 21.3781762
Longitude : 80.87723254
file name : Image_31032024123352759.png
|
2024-03-31 12:33:52.848458 |
41 |
74972235 |
Connecting septic tanks with soak pits |
50000 |
Connecting septic tanks with soak pits1 |
Completion of work |
-
latitude : 21.3781452
Longitude : 80.87723911
file name : Image_31032024085335991.png
|
2024-03-31 08:53:36.103346 |
42 |
74974093 |
Construction of Community Sanitary Complex |
120000 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 21.39008754
Longitude : 80.89101402
file name : Image_31032024125401722.png
|
2024-03-31 12:54:01.813651 |
43 |
74974093 |
Construction of Community Sanitary Complex |
120000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 21.39006685
Longitude : 80.89107234
file name : Image_31032024073336751.png
|
2024-03-31 07:33:36.847511 |
44 |
74972640 |
Creation of drainage channel for management of grey water |
20000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 21.37952572
Longitude : 80.87640164
file name : Image_31032024112236150.png
|
2024-03-31 11:22:36.238681 |
45 |
74972640 |
Creation of drainage channel for management of grey water |
20000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 21.3794235
Longitude : 80.8784716
file name : Image_31032024091927885.png
|
2024-03-31 09:19:27.964163 |
46 |
74973381 |
Drainage Construction |
150000 |
Drainage Construction1 |
Plinth level |
-
latitude : 21.37828643
Longitude : 80.87785682
file name : Image_31032024124008397.png
|
2024-03-31 12:40:08.485851 |
47 |
74973381 |
Drainage Construction |
150000 |
Drainage Construction1 |
Completion of work |
-
latitude : 21.37836158
Longitude : 80.87763422
file name : Image_31032024085327983.png
|
2024-03-31 08:53:28.072545 |
48 |
74973381 |
Drainage Construction |
150000 |
Drainage Construction1 |
Completion of work |
-
latitude : 21.378317
Longitude : 80.87761775
file name : Image_31032024085253406.png
|
2024-03-31 08:52:53.491182 |
49 |
74973810 |
Construction of Segregation Unit |
50000 |
Construction of Segregation Unit1 |
Plinth level |
-
latitude : 21.39015064
Longitude : 80.89100468
file name : Image_31032024125421200.png
|
2024-03-31 12:54:21.301809 |
50 |
74973810 |
Construction of Segregation Unit |
50000 |
Construction of Segregation Unit1 |
Completion of work |
-
latitude : 21.39008378
Longitude : 80.89104916
file name : Image_31032024075735114.png
|
2024-03-31 07:57:35.199736 |
51 |
96169288 |
Creation of drainage channel for management of grey water |
70000 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 21.38991606
Longitude : 80.89120152
file name : Image_26102024114852551.png
|
2024-10-26 11:48:52.644443 |
52 |
96169288 |
Creation of drainage channel for management of grey water |
70000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 21.38986731
Longitude : 80.89097933
file name : Image_25102024170312751.png
|
2024-10-25 17:03:12.845858 |
53 |
96169288 |
Creation of drainage channel for management of grey water |
70000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 21.38985318
Longitude : 80.89095471
file name : Image_25102024111110929.png
|
2024-10-25 11:11:10.9127 |
54 |
96169288 |
Creation of drainage channel for management of grey water |
70000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 21.38984889
Longitude : 80.8909302
file name : Image_25102024110837481.png
|
2024-10-25 11:08:37.567305 |
55 |
96169288 |
Creation of drainage channel for management of grey water |
70000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 21.38983455
Longitude : 80.89154111
file name : Image_25102024075819094.png
|
2024-10-25 07:58:19.176375 |
56 |
74974742 |
Drainage Construction |
59000 |
Drainage Construction1 |
Plinth level |
-
latitude : 21.39034576
Longitude : 80.89098825
file name : Image_26102024113911382.png
|
2024-10-26 11:39:11.340631 |
57 |
74974742 |
Drainage Construction |
59000 |
Drainage Construction1 |
Plinth level |
-
latitude : 21.38978074
Longitude : 80.89116719
file name : Image_25102024170954658.png
|
2024-10-25 17:09:54.744103 |
58 |
74974742 |
Drainage Construction |
59000 |
Drainage Construction1 |
Completion of work |
-
latitude : 21.38978097
Longitude : 80.891084
file name : Image_25102024104519257.png
|
2024-10-25 10:45:19.387193 |
59 |
74974742 |
Drainage Construction |
59000 |
Drainage Construction1 |
Completion of work |
-
latitude : 21.38976174
Longitude : 80.89114886
file name : Image_25102024091150011.png
|
2024-10-25 09:11:50.205177 |
60 |
74974742 |
Drainage Construction |
59000 |
Drainage Construction1 |
Completion of work |
-
latitude : 21.38992579
Longitude : 80.89116425
file name : Image_25102024094330669.png
|
2024-10-25 09:43:30.787173 |
61 |
74976567 |
Construction of Boundary Wall |
100000 |
Construction of Boundary Wall1 |
Plinth level |
-
latitude : 21.38987506
Longitude : 80.89149914
file name : Image_25102024084733535.png
|
2024-10-25 08:47:33.648456 |
62 |
74976567 |
Construction of Boundary Wall |
100000 |
Construction of Boundary Wall1 |
Completion of work |
-
latitude : 21.3898525
Longitude : 80.89148436
file name : Image_25102024082821036.png
|
2024-10-25 08:28:21.212277 |
63 |
96151400 |
Water Supply to villages |
50000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 21.37913295
Longitude : 80.87570523
file name : Image_26102024122129609.png
|
2024-10-26 12:21:29.710698 |
64 |
96151400 |
Water Supply to villages |
50000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 21.37915533
Longitude : 80.87578995
file name : Image_25102024100901213.png
|
2024-10-25 10:09:01.293658 |
65 |
96151400 |
Water Supply to villages |
50000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 21.37913532
Longitude : 80.87580667
file name : Image_25102024100716118.png
|
2024-10-25 10:07:16.204241 |
66 |
58655457 |
बोर खनन कार्य |
200000 |
बोर खनन कार्य 1 |
Completion of work |
-
latitude : 21.38254791
Longitude : 80.87837891
file name : Image_26102024120229425.png
|
2024-10-26 12:02:29.514075 |
67 |
58655457 |
बोर खनन कार्य |
200000 |
बोर खनन कार्य 1 |
Completion of work |
-
latitude : 21.38985537
Longitude : 80.89091088
file name : Image_25102024164449342.png
|
2024-10-25 16:44:49.473705 |
68 |
58655457 |
बोर खनन कार्य |
200000 |
बोर खनन कार्य 1 |
Completion of work |
-
latitude : 21.38251328
Longitude : 80.87835649
file name : Image_25102024095058092.png
|
2024-10-25 09:50:58.190103 |
69 |
58655457 |
बोर खनन कार्य |
200000 |
बोर खनन कार्य 1 |
Completion of work |
-
latitude : 21.38251627
Longitude : 80.87835929
file name : Image_25102024094713358.png
|
2024-10-25 09:47:13.451547 |
70 |
58697307 |
आहाता निर्माण कार्य |
48000 |
आहाता निर्माण कार्य 1 |
Roof laid |
-
latitude : 21.3898586
Longitude : 80.89142798
file name : Image_25102024172646941.png
|
2024-10-25 17:26:47.035 |
71 |
58697307 |
आहाता निर्माण कार्य |
48000 |
आहाता निर्माण कार्य 1 |
Plinth level |
-
latitude : 21.38982289
Longitude : 80.89146094
file name : Image_25102024085526049.png
|
2024-10-25 08:55:25.895885 |
72 |
58697307 |
आहाता निर्माण कार्य |
48000 |
आहाता निर्माण कार्य 1 |
Completion of work |
-
latitude : 21.38986669
Longitude : 80.89151
file name : Image_25102024083711189.png
|
2024-10-25 08:37:11.357625 |
73 |
96151579 |
Construction of new Piped Water Supply schemes |
50000 |
Construction of new Piped Water Supply schemes1 |
Plinth level |
-
latitude : 21.39009742
Longitude : 80.89122645
file name : Image_26102024115124962.png
|
2024-10-26 11:51:25.056179 |
74 |
96151579 |
Construction of new Piped Water Supply schemes |
50000 |
Construction of new Piped Water Supply schemes1 |
Plinth level |
-
latitude : 21.39000222
Longitude : 80.8913033
file name : Image_25102024175722241.png
|
2024-10-25 17:57:22.338723 |
75 |
96151579 |
Construction of new Piped Water Supply schemes |
50000 |
Construction of new Piped Water Supply schemes1 |
Completion of work |
-
latitude : 21.37949195
Longitude : 80.87649836
file name : Image_25102024102637777.png
|
2024-10-25 10:26:37.858073 |
76 |
96151579 |
Construction of new Piped Water Supply schemes |
50000 |
Construction of new Piped Water Supply schemes1 |
Completion of work |
-
latitude : 21.37949323
Longitude : 80.8764886
file name : Image_25102024102502841.png
|
2024-10-25 10:25:02.920957 |
77 |
74973019 |
Creation of soak pits for individual Household for onsite Grey Water Management |
40000 |
Creation of soak pits for individual Household for onsite Grey Water Management1 |
Plinth level |
-
latitude : 21.39031282
Longitude : 80.89106482
file name : Image_25102024171619559.png
|
2024-10-25 17:16:19.667274 |
78 |
74973019 |
Creation of soak pits for individual Household for onsite Grey Water Management |
40000 |
Creation of soak pits for individual Household for onsite Grey Water Management1 |
Completion of work |
-
latitude : 21.39028895
Longitude : 80.89101496
file name : Image_25102024110102560.png
|
2024-10-25 11:01:02.649266 |
79 |
74973019 |
Creation of soak pits for individual Household for onsite Grey Water Management |
40000 |
Creation of soak pits for individual Household for onsite Grey Water Management1 |
Completion of work |
-
latitude : 21.39011922
Longitude : 80.89100677
file name : Image_25102024104850168.png
|
2024-10-25 10:48:50.260341 |