PUNAMBHAI DESAIBHAINA GHARTHI KUNDALA TALAV TARAF CC RASTANU KAM |
100000 |
PUNAMBHAI DESAIBHAINA GHARTHI KUNDALA TALAV TARAF CC RASTANU KAM1 |
Completion of work |
-

latitude : 22.89426576,22.89375565
Longitude : 73.02198339,73.02181208
file name : Image_16112021115920434.png
|
2021-11-16 11:59:20.552413 |
2 |
53849852 |
PUNAMBHAI DESAIBHAINA GHARTHI KUNDALA TALAV TARAF CC RASTANU KAM |
100000 |
PUNAMBHAI DESAIBHAINA GHARTHI KUNDALA TALAV TARAF CC RASTANU KAM1 |
Completion of work |
-

latitude : 22.89428834,22.89377357
Longitude : 73.02197805,73.02183576
file name : Image_23112021121533653.png
|
2021-11-23 12:15:33.770653 |
3 |
53849852 |
PUNAMBHAI DESAIBHAINA GHARTHI KUNDALA TALAV TARAF CC RASTANU KAM |
100000 |
PUNAMBHAI DESAIBHAINA GHARTHI KUNDALA TALAV TARAF CC RASTANU KAM1 |
Plinth level |
-

latitude : 22.89427825,22.89378771
Longitude : 73.02195329,73.02189011
file name : Image_24022022150209417.png
|
2022-02-24 15:02:09.506902 |
4 |
53849852 |
PUNAMBHAI DESAIBHAINA GHARTHI KUNDALA TALAV TARAF CC RASTANU KAM |
100000 |
PUNAMBHAI DESAIBHAINA GHARTHI KUNDALA TALAV TARAF CC RASTANU KAM1 |
Plinth level |
-

latitude : 22.89425482,22.89427405
Longitude : 73.02197399,73.02199251
file name : Image_24022022150150441.png
|
2022-02-24 15:01:50.556155 |
5 |
53849726 |
GAMTALMA MATHURBHAI JIBHABHAINA GHARTHI PUNAMBHAI KANTIBHAINA GHAR SUDHI PEVARBLOCK NU KAM |
181000 |
GAMTALMA MATHURBHAI JIBHABHAINA GHARTHI PUNAMBHAI KANTIBHAINA GHAR SUDHI PEVARBLOCK NU KAM1 |
Completion of work |
-

latitude : 22.89805349,22.89787331,22.8980787
Longitude : 73.01201416,73.01236048,73.0127942
file name : Image_16112021114457676.png
|
2021-11-16 11:44:57.785547 |
6 |
53849726 |
GAMTALMA MATHURBHAI JIBHABHAINA GHARTHI PUNAMBHAI KANTIBHAINA GHAR SUDHI PEVARBLOCK NU KAM |
181000 |
GAMTALMA MATHURBHAI JIBHABHAINA GHARTHI PUNAMBHAI KANTIBHAINA GHAR SUDHI PEVARBLOCK NU KAM1 |
Completion of work |
-

latitude : 22.89770792,22.89774077,22.89790086,22.89793499,22.89803977
Longitude : 73.01234191,73.01240413,73.01241587,73.01256015,73.01208321
file name : Image_23112021121509963.png
|
2021-11-23 12:15:10.058376 |
7 |
53849726 |
GAMTALMA MATHURBHAI JIBHABHAINA GHARTHI PUNAMBHAI KANTIBHAINA GHAR SUDHI PEVARBLOCK NU KAM |
181000 |
GAMTALMA MATHURBHAI JIBHABHAINA GHARTHI PUNAMBHAI KANTIBHAINA GHAR SUDHI PEVARBLOCK NU KAM1 |
Completion of work |
-

latitude : 22.89797653,22.89797681
Longitude : 73.01256441,73.01256368
file name : Image_23112021121544189.png
|
2021-11-23 12:15:44.305509 |
8 |
53849726 |
GAMTALMA MATHURBHAI JIBHABHAINA GHARTHI PUNAMBHAI KANTIBHAINA GHAR SUDHI PEVARBLOCK NU KAM |
181000 |
GAMTALMA MATHURBHAI JIBHABHAINA GHARTHI PUNAMBHAI KANTIBHAINA GHAR SUDHI PEVARBLOCK NU KAM1 |
Completion of work |
-

latitude : 22.8981813,22.8981697,22.89805295,22.89792094,22.89777269,22.89771842
Longitude : 73.0127656,73.0128014,73.01208462,73.01236775,73.0123828,73.01230475
file name : Image_23112021121459633.png
|
2021-11-23 12:14:59.734207 |
9 |
56932954 |
BHOINA VAD FARIYAMA SUKHABHAINA GHARTHI DESABHAI FAKRIBHAINA GHAR SUDHI GATARLINE NU KAM |
140000 |
BHOINA VAD FARIYAMA SUKHABHAINA GHARTHI DESABHAI FAKRIBHAINA GHAR SUDHI GATARLINE NU KAM1 |
Completion of work |
-

latitude : 22.90118173,22.90176656,22.90186867
Longitude : 73.02939719,73.02964657,73.02957133
file name : Image_21022022133657015.png
|
2022-02-21 13:36:57.133222 |
10 |
56932954 |
BHOINA VAD FARIYAMA SUKHABHAINA GHARTHI DESABHAI FAKRIBHAINA GHAR SUDHI GATARLINE NU KAM |
140000 |
BHOINA VAD FARIYAMA SUKHABHAINA GHARTHI DESABHAI FAKRIBHAINA GHAR SUDHI GATARLINE NU KAM1 |
Completion of work |
-

latitude : 22.90201245,22.90188802,22.90183736,22.90177768
Longitude : 73.03005837,73.03001817,73.03001022,73.03003338
file name : Image_07072022170530688.png
|
2022-07-07 17:05:30.788672 |
11 |
56932954 |
BHOINA VAD FARIYAMA SUKHABHAINA GHARTHI DESABHAI FAKRIBHAINA GHAR SUDHI GATARLINE NU KAM |
140000 |
BHOINA VAD FARIYAMA SUKHABHAINA GHARTHI DESABHAI FAKRIBHAINA GHAR SUDHI GATARLINE NU KAM1 |
Completion of work |
-

latitude : 22.90194493,22.90190548,22.90189721
Longitude : 73.03009584,73.03006519,73.03005743
file name : Image_07072022170545652.png
|
2022-07-07 17:05:45.760289 |
12 |
56932954 |
BHOINA VAD FARIYAMA SUKHABHAINA GHARTHI DESABHAI FAKRIBHAINA GHAR SUDHI GATARLINE NU KAM |
140000 |
BHOINA VAD FARIYAMA SUKHABHAINA GHARTHI DESABHAI FAKRIBHAINA GHAR SUDHI GATARLINE NU KAM1 |
Completion of work |
-

latitude : 22.90190138,22.90190122
Longitude : 73.03006219,73.03006214
file name : Image_07072022170549082.png
|
2022-07-07 17:05:49.178639 |
13 |
53850218 |
SHAHPUR GAME BALABHAI NAAGARBHAINA GHARO TARAF PEVARBLOK NU KAM |
100000 |
SHAHPUR GAME BALABHAI NAAGARBHAINA GHARO TARAF PEVARBLOK NU KAM1 |
Completion of work |
-

latitude : 22.8911228,22.8911228,22.8911228
Longitude : 72.9870166,72.9870166,72.9870166
file name : Image_21022022133700836.png
|
2022-02-21 13:37:00.953673 |
14 |
53850218 |
SHAHPUR GAME BALABHAI NAAGARBHAINA GHARO TARAF PEVARBLOK NU KAM |
100000 |
SHAHPUR GAME BALABHAI NAAGARBHAINA GHARO TARAF PEVARBLOK NU KAM1 |
Completion of work |
-

latitude : 22.89719065,22.89714304,22.89714966
Longitude : 73.01260612,73.01256206,73.01237089
file name : Image_21032022171045617.png
|
2022-03-21 17:10:45.721764 |
15 |
53850218 |
SHAHPUR GAME BALABHAI NAAGARBHAINA GHARO TARAF PEVARBLOK NU KAM |
100000 |
SHAHPUR GAME BALABHAI NAAGARBHAINA GHARO TARAF PEVARBLOK NU KAM1 |
Roof laid |
-

latitude : 22.89713712,22.89712
Longitude : 73.01256208,73.01254127
file name : Image_23032022120848677.png
|
2022-03-23 12:08:48.76977 |
16 |
53850218 |
SHAHPUR GAME BALABHAI NAAGARBHAINA GHARO TARAF PEVARBLOK NU KAM |
100000 |
SHAHPUR GAME BALABHAI NAAGARBHAINA GHARO TARAF PEVARBLOK NU KAM1 |
Roof laid |
-

latitude : 22.8971093,22.89710651,22.89726234
Longitude : 73.01227271,73.01226536,73.01254108
file name : Image_23032022120845011.png
|
2022-03-23 12:08:45.103652 |
17 |
53849928 |
SIM VISTARMA BABUBHAI BHUDARBHAINA GHARTHI BHAYJIBHAI SOMABHAINA GHARO SUDHI PIPELINE NU KAM |
50000 |
SIM VISTARMA BABUBHAI BHUDARBHAINA GHARTHI BHAYJIBHAI SOMABHAINA GHARO SUDHI PIPELINE NU KAM1 |
Completion of work |
-

latitude : 22.89999578,22.89898292
Longitude : 73.01477927,73.01492248
file name : Image_16112021123224154.png
|
2021-11-16 12:32:24.271638 |
18 |
53849928 |
SIM VISTARMA BABUBHAI BHUDARBHAINA GHARTHI BHAYJIBHAI SOMABHAINA GHARO SUDHI PIPELINE NU KAM |
50000 |
SIM VISTARMA BABUBHAI BHUDARBHAINA GHARTHI BHAYJIBHAI SOMABHAINA GHARO SUDHI PIPELINE NU KAM1 |
Completion of work |
-

latitude : 22.89853881,22.89798656,22.89796778
Longitude : 73.01535774,73.01594289,73.01596857
file name : Image_21032022171042165.png
|
2022-03-21 17:10:42.270083 |
19 |
53849928 |
SIM VISTARMA BABUBHAI BHUDARBHAINA GHARTHI BHAYJIBHAI SOMABHAINA GHARO SUDHI PIPELINE NU KAM |
50000 |
SIM VISTARMA BABUBHAI BHUDARBHAINA GHARTHI BHAYJIBHAI SOMABHAINA GHARO SUDHI PIPELINE NU KAM1 |
Roof laid |
-

latitude : 22.89853771,22.89852453,22.89831213,22.89805356,22.89797255,22.89780441,22.8977369,22.89775315,22.89750129,22.89738857,22.89714984,22.89707043
Longitude : 73.01543998,73.01545004,73.01556556,73.01588359,73.0158852,73.01608898,73.01622182,73.01621744,73.0163434,73.01639458,73.01640051,73.01640681
file name : Image_23032022120838140.png
|
2022-03-23 12:08:38.247937 |
20 |
53849928 |
SIM VISTARMA BABUBHAI BHUDARBHAINA GHARTHI BHAYJIBHAI SOMABHAINA GHARO SUDHI PIPELINE NU KAM |
50000 |
SIM VISTARMA BABUBHAI BHUDARBHAINA GHARTHI BHAYJIBHAI SOMABHAINA GHARO SUDHI PIPELINE NU KAM1 |
Roof laid |
-

latitude : 22.89854439,22.89853366
Longitude : 73.01543354,73.0154402
file name : Image_23032022120841541.png
|
2022-03-23 12:08:41.625069 |
21 |
53851036 |
SHAHPUR GAME BHOINA VAD VISTARMA PANINO BOR ANE PAMPING MASINARI NU KAM |
140000 |
SHAHPUR GAME BHOINA VAD VISTARMA PANINO BOR ANE PAMPING MASINARI NU KAM1 |
Completion of work |
-

latitude : 22.90120718
Longitude : 73.02954529
file name : Image_21022022133652527.png
|
2022-02-21 13:36:52.644998 |
22 |
53851036 |
SHAHPUR GAME BHOINA VAD VISTARMA PANINO BOR ANE PAMPING MASINARI NU KAM |
140000 |
SHAHPUR GAME BHOINA VAD VISTARMA PANINO BOR ANE PAMPING MASINARI NU KAM1 |
Completion of work |
-

latitude : 22.90178807
Longitude : 73.02977182
file name : Image_18052022123736785.png
|
2022-05-18 12:37:36.904447 |
23 |
53849988 |
GANGAPURAMA TORUBHAI BADARBHAINA GHAROTHI MELABHAI GANTABHAINA GHARO SUDHI PIPELINE NU KAM |
90000 |
GANGAPURAMA TORUBHAI BADARBHAINA GHAROTHI MELABHAI GANTABHAINA GHARO SUDHI PIPELINE NU KAM1 |
Completion of work |
-

latitude : 22.90727047,22.90731504,22.90723257,22.90745634,22.90756116
Longitude : 73.02403834,73.02377914,73.02318851,73.02258378,73.0224055
file name : Image_16112021123229106.png
|
2021-11-16 12:32:29.213154 |
24 |
53849988 |
GANGAPURAMA TORUBHAI BADARBHAINA GHAROTHI MELABHAI GANTABHAINA GHARO SUDHI PIPELINE NU KAM |
90000 |
GANGAPURAMA TORUBHAI BADARBHAINA GHAROTHI MELABHAI GANTABHAINA GHARO SUDHI PIPELINE NU KAM1 |
Roof laid |
-

latitude : 22.90682289,22.9068232,22.90682383,22.90683925
Longitude : 73.02432673,73.02432673,73.02432667,73.02432482
file name : Image_06062022120634212.png
|
2022-06-06 12:06:34.311237 |
25 |
53849988 |
GANGAPURAMA TORUBHAI BADARBHAINA GHAROTHI MELABHAI GANTABHAINA GHARO SUDHI PIPELINE NU KAM |
90000 |
GANGAPURAMA TORUBHAI BADARBHAINA GHAROTHI MELABHAI GANTABHAINA GHARO SUDHI PIPELINE NU KAM1 |
Completion of work |
-

latitude : 22.90690679,22.90686149,22.90684662,22.90682414
Longitude : 73.02473719,73.02455775,73.02450817,73.0243425
file name : Image_18052022123740204.png
|
2022-05-18 12:37:40.326103 |
26 |
53849988 |
GANGAPURAMA TORUBHAI BADARBHAINA GHAROTHI MELABHAI GANTABHAINA GHARO SUDHI PIPELINE NU KAM |
90000 |
GANGAPURAMA TORUBHAI BADARBHAINA GHAROTHI MELABHAI GANTABHAINA GHARO SUDHI PIPELINE NU KAM1 |
Roof laid |
-

latitude : 22.9067958,22.90682138
Longitude : 73.02430975,73.02431012
file name : Image_06062022120630666.png
|
2022-06-06 12:06:30.763846 |
27 |
65306832 |
GANGAPURA PERA VISTARMA PUJABHAI PUNABHAI NA GHARO THI BHATHIJI MANDEAR TARAF CC RASTANU KAM |
244000 |
GANGAPURA PERA VISTARMA PUJABHAI PUNABHAI NA GHARO THI BHATHIJI MANDEAR TARAF CC RASTANU KAM1 |
Completion of work |
-

latitude : 22.90742917,22.90742917,22.90742472
Longitude : 73.02671575,73.02671579,73.02667271
file name : Image_04102022102556882.png
|
2022-10-04 10:25:56.970478 |
28 |
65306832 |
GANGAPURA PERA VISTARMA PUJABHAI PUNABHAI NA GHARO THI BHATHIJI MANDEAR TARAF CC RASTANU KAM |
244000 |
GANGAPURA PERA VISTARMA PUJABHAI PUNABHAI NA GHARO THI BHATHIJI MANDEAR TARAF CC RASTANU KAM1 |
Completion of work |
-

latitude : 22.90734416,22.90733868
Longitude : 73.02605518,73.02605436
file name : Image_04102022161913763.png
|
2022-10-04 16:19:13.875487 |
29 |
65306832 |
GANGAPURA PERA VISTARMA PUJABHAI PUNABHAI NA GHARO THI BHATHIJI MANDEAR TARAF CC RASTANU KAM |
244000 |
GANGAPURA PERA VISTARMA PUJABHAI PUNABHAI NA GHARO THI BHATHIJI MANDEAR TARAF CC RASTANU KAM1 |
Completion of work |
-

latitude : 22.90741431,22.90742763
Longitude : 73.02657277,73.02655732
file name : Image_04102022161900046.png
|
2022-10-04 16:19:00.14234 |
30 |
65306832 |
GANGAPURA PERA VISTARMA PUJABHAI PUNABHAI NA GHARO THI BHATHIJI MANDEAR TARAF CC RASTANU KAM |
244000 |
GANGAPURA PERA VISTARMA PUJABHAI PUNABHAI NA GHARO THI BHATHIJI MANDEAR TARAF CC RASTANU KAM1 |
Completion of work |
-

latitude : 22.9074295,22.90743047
Longitude : 73.02656547,73.02680008
file name : Image_04102022102605563.png
|
2022-10-04 10:26:05.656948 |
31 |
65306940 |
Construction of Community Sanitary Complex |
168000 |
SHAHPUR TABE GANGAPURA GAME CHIMANBHAI AMARBHAI NA GHAR THI NADHI TARAF AUDHARI GATAR LINE NU KAM |
Completion of work |
-

latitude : 22.90908578,22.90912406,22.90946488
Longitude : 73.02668274,73.02665357,73.02664283
file name : Image_04102022102618894.png
|
2022-10-04 10:26:18.99043 |
32 |
65306940 |
Construction of Community Sanitary Complex |
168000 |
SHAHPUR TABE GANGAPURA GAME CHIMANBHAI AMARBHAI NA GHAR THI NADHI TARAF AUDHARI GATAR LINE NU KAM |
Completion of work |
-

latitude : 22.90926592,22.90952697,22.90959934,22.90975088,22.90976938
Longitude : 73.02672526,73.02666817,73.026682,73.02668499,73.02668712
file name : Image_04102022162023934.png
|
2022-10-04 16:20:24.037773 |
33 |
65306940 |
Construction of Community Sanitary Complex |
168000 |
SHAHPUR TABE GANGAPURA GAME CHIMANBHAI AMARBHAI NA GHAR THI NADHI TARAF AUDHARI GATAR LINE NU KAM |
Completion of work |
-

latitude : 22.91011077,22.91039517,22.91053869,22.91056869
Longitude : 73.02674567,73.02673736,73.02677634,73.02677981
file name : Image_04102022102623207.png
|
2022-10-04 10:26:23.297511 |
34 |
65306893 |
Creation of a new source of drinking water |
168000 |
SHAHPUR TABE GAGAPURA PERA VISTARMA BOAR NU KAM |
Completion of work |
-

latitude : 22.90758695
Longitude : 73.02686966
file name : Image_04102022102610120.png
|
2022-10-04 10:26:10.202954 |
35 |
65287343 |
Construction of Community Sanitary Complex |
140000 |
SHAHPUR GAME GANGAPURA PERA VISTARMA VAJESINH PUJABHAI NA GHAR THI CHIMANBHAI AMARABHAI NA GHARO SUDHI GA |
Completion of work |
-

latitude : 22.90861052,22.90860577,22.90879781,22.90893789,22.90901994
Longitude : 73.02675957,73.02676188,73.02671962,73.02670104,73.02669462
file name : Image_04102022102614441.png
|
2022-10-04 10:26:14.530422 |
36 |
65287343 |
Construction of Community Sanitary Complex |
140000 |
SHAHPUR GAME GANGAPURA PERA VISTARMA VAJESINH PUJABHAI NA GHAR THI CHIMANBHAI AMARABHAI NA GHARO SUDHI GA |
Completion of work |
-

latitude : 22.9086189,22.90872812,22.90902667,22.90912822,22.90920046
Longitude : 73.02677944,73.02674282,73.02674741,73.02674062,73.0267248
file name : Image_04102022162015915.png
|
2022-10-04 16:20:16.021843 |
37 |
65287343 |
Construction of Community Sanitary Complex |
140000 |
SHAHPUR GAME GANGAPURA PERA VISTARMA VAJESINH PUJABHAI NA GHAR THI CHIMANBHAI AMARABHAI NA GHARO SUDHI GA |
Completion of work |
-

latitude : 22.90976391,22.90955457,22.90931031,22.90930719
Longitude : 73.02664102,73.02664293,73.02670889,73.02672307
file name : Image_04102022102627478.png
|
2022-10-04 10:26:27.564421 |
38 |
65287343 |
Construction of Community Sanitary Complex |
140000 |
SHAHPUR GAME GANGAPURA PERA VISTARMA VAJESINH PUJABHAI NA GHAR THI CHIMANBHAI AMARABHAI NA GHARO SUDHI GA |
Completion of work |
-

latitude : 22.90855369,22.90855383
Longitude : 73.02681293,73.02681248
file name : Image_04102022162033003.png
|
2022-10-04 16:20:33.1031 |
39 |
65287291 |
GANGAPURA VISTARMA PRI SCHOOL THI PUJABHAI PUNABHAI NA GHARO SUDHI CC RASTANU KAM |
180000 |
GANGAPURA VISTARMA PRI SCHOOL THI PUJABHAI PUNABHAI NA GHARO SUDHI CC RASTANU KAM1 |
Completion of work |
-

latitude : 22.90748957,22.90747696,22.90742707
Longitude : 73.02685825,73.02684095,73.02672448
file name : Image_04102022102552322.png
|
2022-10-04 10:25:52.418301 |
40 |
65287291 |
GANGAPURA VISTARMA PRI SCHOOL THI PUJABHAI PUNABHAI NA GHARO SUDHI CC RASTANU KAM |
180000 |
GANGAPURA VISTARMA PRI SCHOOL THI PUJABHAI PUNABHAI NA GHARO SUDHI CC RASTANU KAM1 |
Completion of work |
-

latitude : 22.90740807,22.90741322
Longitude : 73.02690399,73.02690737
file name : Image_04102022161942514.png
|
2022-10-04 16:19:42.633167 |
41 |
65287291 |
GANGAPURA VISTARMA PRI SCHOOL THI PUJABHAI PUNABHAI NA GHARO SUDHI CC RASTANU KAM |
180000 |
GANGAPURA VISTARMA PRI SCHOOL THI PUJABHAI PUNABHAI NA GHARO SUDHI CC RASTANU KAM1 |
Completion of work |
-

latitude : 22.90743963,22.90747374,22.90742289
Longitude : 73.02685968,73.02687906,73.02664598
file name : Image_04102022161848519.png
|
2022-10-04 16:18:48.629712 |
42 |
65287291 |
GANGAPURA VISTARMA PRI SCHOOL THI PUJABHAI PUNABHAI NA GHARO SUDHI CC RASTANU KAM |
180000 |
GANGAPURA VISTARMA PRI SCHOOL THI PUJABHAI PUNABHAI NA GHARO SUDHI CC RASTANU KAM1 |
Completion of work |
-

latitude : 22.90741005,22.90741042
Longitude : 73.02659833,73.0265628
file name : Image_04102022102601177.png
|
2022-10-04 10:26:01.265121 |
43 |
104736095 |
Construction of new Piped Water Supply schemes |
117500 |
SHAHPUR TABE NANI SHAHPUR PRITHMIK SCHOOLMA PIVANA PANINU BOAR NU KAM |
Completion of work |
-

latitude : 22.89516846
Longitude : 73.02204433
file name : Image_29042024124546021.png
|
2024-04-29 12:45:46.122929 |
44 |
104736095 |
Construction of new Piped Water Supply schemes |
117500 |
SHAHPUR TABE NANI SHAHPUR PRITHMIK SCHOOLMA PIVANA PANINU BOAR NU KAM |
Plinth level |
-

latitude : 22.895203994861387
Longitude : 73.02225563675165
file name : Image_01052024115035552.png
|
2024-05-01 11:50:35.637749 |
45 |
104736095 |
Construction of new Piped Water Supply schemes |
117500 |
SHAHPUR TABE NANI SHAHPUR PRITHMIK SCHOOLMA PIVANA PANINU BOAR NU KAM |
Roof laid |
-

latitude : 22.895203994861387
Longitude : 73.02225563675165
file name : Image_01052024115251915.png
|
2024-05-01 11:52:52.014649 |
46 |
104736371 |
Creation of drainage channel for management of grey water |
117500 |
SHAHPUR GAME AAGANVADINI BAJUMA BADAKO MATE TOILEAT BLOCK NU KAM |
Completion of work |
-

latitude : 22.89844865
Longitude : 73.01294717
file name : Image_29042024124548687.png
|
2024-04-29 12:45:48.785308 |
47 |
104736371 |
Creation of drainage channel for management of grey water |
117500 |
SHAHPUR GAME AAGANVADINI BAJUMA BADAKO MATE TOILEAT BLOCK NU KAM |
Plinth level |
-

latitude : 22.898314512376164
Longitude : 73.01255576312542
file name : Image_01052024115831864.png
|
2024-05-01 11:58:31.945714 |
48 |
104734830 |
Construction of roads |
150000 |
SHAHPUR TABE NANI SHAHPUR CHUHAN FARIYAMA PEVAR BLOCK NU KAM |
Completion of work |
-

latitude : 22.89632761,22.89633645
Longitude : 73.02187408,73.02188576
file name : Image_29042024124543218.png
|
2024-04-29 12:45:43.384326 |
49 |
104734830 |
Construction of roads |
150000 |
SHAHPUR TABE NANI SHAHPUR CHUHAN FARIYAMA PEVAR BLOCK NU KAM |
Plinth level |
-

latitude : 22.89629520131253,22.89629520131253
Longitude : 73.02198305726051,73.02198305726051
file name : Image_01052024114537003.png
|
2024-05-01 11:45:37.0873 |
50 |
104734830 |
Construction of roads |
150000 |
SHAHPUR TABE NANI SHAHPUR CHUHAN FARIYAMA PEVAR BLOCK NU KAM |
Roof laid |
-

latitude : 22.89629520131253,22.89629520131253
Longitude : 73.02198305726051,73.02198305726051
file name : Image_01052024114822274.png
|
2024-05-01 11:48:22.372902 |
51 |
106625071 |
Construction of roads |
160000 |
SHAHPUR TABE GANGAPURA VISTARMA KESHIKBHAI RIYBHANBHAI PARMARNA GHARA PASENA FARIYA PER RSTAMA PEVAR BLOC |
Completion of work |
-

latitude : 22.907444276985636,22.907444276985636
Longitude : 73.0250370875001,73.0250370875001
file name : Image_05072024113208071.png
|
2024-07-05 11:32:08.172939 |
52 |
106625071 |
Construction of roads |
160000 |
SHAHPUR TABE GANGAPURA VISTARMA KESHIKBHAI RIYBHANBHAI PARMARNA GHARA PASENA FARIYA PER RSTAMA PEVAR BLOC |
Plinth level |
-

latitude : 22.907444276985636,22.907444276985636
Longitude : 73.0250370875001,73.0250370875001
file name : Image_05072024113419506.png
|
2024-07-05 11:34:19.589753 |
53 |
106641756 |
Creation of drainage channel for management of grey water |
125000 |
SHAHPUR TABE NANI SHAHPUR BALIYADEVNA MINDEAR THI TAAV TARAF ADHURI GATAR LINE NU KAM |
Completion of work |
-

latitude : 22.893646392865172
Longitude : 73.02161425352097
file name : Image_05072024111048756.png
|
2024-07-05 11:10:48.852961 |
54 |
106641756 |
Creation of drainage channel for management of grey water |
125000 |
SHAHPUR TABE NANI SHAHPUR BALIYADEVNA MINDEAR THI TAAV TARAF ADHURI GATAR LINE NU KAM |
Plinth level |
-

latitude : 22.893646392865172
Longitude : 73.02161425352097
file name : Image_05072024111332193.png
|
2024-07-05 11:13:32.446658 |
55 |
106625139 |
Construction of new Piped Water Supply schemes |
45000 |
SHAHPUR TABE NANI SHAHPUR PRITHMIK SCHOOL MA HAYEAT BOAR UPER PUMPINGEG MSHINARI NU KAM |
Completion of work |
-

latitude : 22.89521078983389
Longitude : 73.0222338438034
file name : Image_02072024123936762.png
|
2024-07-02 12:39:37.100706 |
56 |
106625139 |
Construction of new Piped Water Supply schemes |
45000 |
SHAHPUR TABE NANI SHAHPUR PRITHMIK SCHOOL MA HAYEAT BOAR UPER PUMPINGEG MSHINARI NU KAM |
Plinth level |
-

latitude : 22.89521078983389
Longitude : 73.0222338438034
file name : Image_02072024124530426.png
|
2024-07-02 12:45:30.504413 |
57 |
106625227 |
Construction of new Piped Water Supply schemes |
80000 |
SHAHPUR TABE GANGAPURA LAAT VISTARMA BHOI BHLABHAI KODARBHAINA GHARO MA HEAND PUMP NU KAM |
Completion of work |
-

latitude : 22.908931307052068
Longitude : 73.01788363605738
file name : Image_08072024113136145.png
|
2024-07-08 11:31:36.226995 |
58 |
106625227 |
Construction of new Piped Water Supply schemes |
80000 |
SHAHPUR TABE GANGAPURA LAAT VISTARMA BHOI BHLABHAI KODARBHAINA GHARO MA HEAND PUMP NU KAM |
Plinth level |
-

latitude : 22.908931307052068
Longitude : 73.01788363605738
file name : Image_08072024113349272.png
|
2024-07-08 11:33:49.352751 |
59 |
106625227 |
Construction of new Piped Water Supply schemes |
80000 |
SHAHPUR TABE GANGAPURA LAAT VISTARMA BHOI BHLABHAI KODARBHAINA GHARO MA HEAND PUMP NU KAM |
Roof laid |
-

latitude : 22.908931307052068
Longitude : 73.01788363605738
file name : Image_08072024113541058.png
|