1 |
41294078 |
At Gholar upali faliya chosath joganimata temple main road protection wall work. |
100000 |
At Gholar upali faliya chosath joganimata temple main road protection wall work. 1 |
Roof laid |
-
latitude : 20.70528223
Longitude : 73.16152174
file name : Image_09112021165900311.png
|
2021-11-09 16:59:00.424532 |
2 |
41294078 |
At Gholar upali faliya chosath joganimata temple main road protection wall work. |
100000 |
At Gholar upali faliya chosath joganimata temple main road protection wall work. 1 |
Plinth level |
-
latitude : 20.7050956
Longitude : 73.16158615
file name : Image_09112021165550828.png
|
2021-11-09 16:55:50.936431 |
3 |
41294078 |
At Gholar upali faliya chosath joganimata temple main road protection wall work. |
100000 |
At Gholar upali faliya chosath joganimata temple main road protection wall work. 1 |
Completion of work |
-
latitude : 20.7050888
Longitude : 73.1615858
file name : Image_09112021165033139.png
|
2021-11-09 16:50:33.258649 |
4 |
41293590 |
At Gholar mahakalpada main road to suresh shobhan home BT road work. |
200000 |
At Gholar mahakalpada main road to suresh shobhan home BT road work. 1 |
Roof laid |
-
latitude : 20.70200724,20.70208614
Longitude : 73.13925214,73.13932061
file name : Image_19022022143018164.png
|
2022-02-19 14:30:18.307649 |
5 |
41293590 |
At Gholar mahakalpada main road to suresh shobhan home BT road work. |
200000 |
At Gholar mahakalpada main road to suresh shobhan home BT road work. 1 |
Plinth level |
-
latitude : 20.70151482,20.70153206
Longitude : 73.13866247,73.13865551
file name : Image_19022022142838135.png
|
2022-02-19 14:28:38.234147 |
6 |
41293590 |
At Gholar mahakalpada main road to suresh shobhan home BT road work. |
200000 |
At Gholar mahakalpada main road to suresh shobhan home BT road work. 1 |
Completion of work |
-
latitude : 20.70201492,20.7020129
Longitude : 73.13920797,73.13921369
file name : Image_19022022142450873.png
|
2022-02-19 14:24:50.98677 |
7 |
41293590 |
At Gholar mahakalpada main road to suresh shobhan home BT road work. |
200000 |
At Gholar mahakalpada main road to suresh shobhan home BT road work. 1 |
Completion of work |
-
latitude : 20.69966088,20.69963581
Longitude : 73.14239908,73.14238767
file name : Image_19022022141542199.png
|
2022-02-19 14:15:42.29876 |
8 |
41292930 |
At Gholar ranpada main road to bhikhu jamsu home BT road work. |
135280 |
At Gholar ranpada main road to bhikhu jamsu home BT road work. 1 |
Roof laid |
-
latitude : 20.69139571,20.69138397
Longitude : 73.14791564,73.14794103
file name : Image_19022022144254169.png
|
2022-02-19 14:42:54.275707 |
9 |
41292930 |
At Gholar ranpada main road to bhikhu jamsu home BT road work. |
135280 |
At Gholar ranpada main road to bhikhu jamsu home BT road work. 1 |
Plinth level |
-
latitude : 20.691453,20.691424
Longitude : 73.1476318,73.14766322
file name : Image_19022022144049784.png
|
2022-02-19 14:40:49.886089 |
10 |
41292930 |
At Gholar ranpada main road to bhikhu jamsu home BT road work. |
135280 |
At Gholar ranpada main road to bhikhu jamsu home BT road work. 1 |
Completion of work |
-
latitude : 20.69139932,20.6913943
Longitude : 73.1479144,73.14791373
file name : Image_19022022143524261.png
|
2022-02-19 14:35:24.39111 |
11 |
41293173 |
At Gholar ranpada bahadur bhanji home to ranpada main road BT road work. |
438368 |
At Gholar ranpada bahadur bhanji home to ranpada main road BT road work. 1 |
Roof laid |
-
latitude : 20.7064294,20.7064294
Longitude : 73.1550739,73.1550739
file name : Image_25042022161500347.png
|
2022-04-25 16:15:00.480482 |
12 |
41293173 |
At Gholar ranpada bahadur bhanji home to ranpada main road BT road work. |
438368 |
At Gholar ranpada bahadur bhanji home to ranpada main road BT road work. 1 |
Plinth level |
-
latitude : 20.7064294,20.7064294
Longitude : 73.1550739,73.1550739
file name : Image_25042022160626690.png
|
2022-04-25 16:06:26.785515 |
13 |
41293173 |
At Gholar ranpada bahadur bhanji home to ranpada main road BT road work. |
438368 |
At Gholar ranpada bahadur bhanji home to ranpada main road BT road work. 1 |
Completion of work |
-
latitude : 20.79320614,20.79322302
Longitude : 73.1333042,73.13330831
file name : Image_28032022122526471.png
|
2022-03-28 12:25:26.59455 |
14 |
49936234 |
At Gholar chikar faliya govind chhibu home to dharmesh home Bt road work |
200000 |
At Gholar chikar faliya govind chhibu home to dharmesh home Bt road work1 |
Roof laid |
-
latitude : 20.70136463,20.70132001
Longitude : 73.14708016,73.14706201
file name : Image_03062022132839380.png
|
2022-06-03 13:28:39.479073 |
15 |
49936234 |
At Gholar chikar faliya govind chhibu home to dharmesh home Bt road work |
200000 |
At Gholar chikar faliya govind chhibu home to dharmesh home Bt road work1 |
Plinth level |
-
latitude : 20.70114704,20.70099387
Longitude : 73.15233083,73.15237496
file name : Image_03062022124234292.png
|
2022-06-03 12:42:34.407342 |
16 |
49936234 |
At Gholar chikar faliya govind chhibu home to dharmesh home Bt road work |
200000 |
At Gholar chikar faliya govind chhibu home to dharmesh home Bt road work1 |
Completion of work |
-
latitude : 20.7011777,20.70117766
Longitude : 73.14721887,73.14721899
file name : Image_03062022122224935.png
|
2022-06-03 12:22:25.020789 |
17 |
49943967 |
At gholar hanumanji temple block paving work |
59260 |
At gholar hanumanji temple block paving work1 |
Roof laid |
-
latitude : 20.7597169,20.7597169
Longitude : 73.0486491,73.0486491
file name : Image_08062022123331367.png
|
2022-06-08 12:33:31.46814 |
18 |
49943967 |
At gholar hanumanji temple block paving work |
59260 |
At gholar hanumanji temple block paving work1 |
Plinth level |
-
latitude : 20.7597169,20.7597169
Longitude : 73.0486491,73.0486491
file name : Image_08062022122826659.png
|
2022-06-08 12:28:26.76041 |
19 |
49943967 |
At gholar hanumanji temple block paving work |
59260 |
At gholar hanumanji temple block paving work1 |
Completion of work |
-
latitude : 20.7597169,20.7597169
Longitude : 73.0486491,73.0486491
file name : Image_08062022122357840.png
|
2022-06-08 12:23:57.93117 |
20 |
62674589 |
At Gholar gram panchayat pipe gutter work |
200000 |
At Gholar gram panchayat pipe gutter work1 |
Completion of work |
-
latitude : 20.7591016,20.7591016,20.7591016,20.7591016
Longitude : 73.0658845,73.0658845,73.0658845,73.0658845
file name : Image_06042024115833040.png
|
2024-04-06 11:58:33.178622 |
21 |
62674533 |
At Gholar kharera nadi dhobi ghat work |
200000 |
At Gholar kharera nadi dhobi ghat work1 |
Completion of work |
-
latitude : 20.7591055
Longitude : 73.0659014
file name : Image_06042024115840205.png
|
2024-04-06 11:58:40.38608 |
22 |
49936903 |
At gholar rajesh bhikha home to gaman shamji home BT road work |
259217 |
At gholar rajesh bhikha home to gaman shamji home BT road work1 |
Roof laid |
-
latitude : 20.7521806,20.7521806
Longitude : 73.0682441,73.0682441
file name : Image_19112022141256056.png
|
2022-11-19 14:12:56.166184 |
23 |
49936903 |
At gholar rajesh bhikha home to gaman shamji home BT road work |
259217 |
At gholar rajesh bhikha home to gaman shamji home BT road work1 |
Plinth level |
-
latitude : 20.7521806,20.7521806
Longitude : 73.0682441,73.0682441
file name : Image_19112022140938716.png
|
2022-11-19 14:09:38.825234 |
24 |
49936903 |
At gholar rajesh bhikha home to gaman shamji home BT road work |
259217 |
At gholar rajesh bhikha home to gaman shamji home BT road work1 |
Completion of work |
-
latitude : 20.7521806,20.7521806
Longitude : 73.0682441,73.0682441
file name : Image_19112022140159325.png
|
2022-11-19 14:01:59.437956 |
25 |
41296589 |
At Gholar mahakalpada cremation bore work. |
60766 |
At Gholar mahakalpada cremation bore work. 1 |
Completion of work |
-
latitude : 20.64164077
Longitude : 72.93135182
file name : Image_01032023100011132.png
|
2023-03-01 10:00:11.242113 |
26 |
41296749 |
At Gholar mahakalpada primary school bore work. |
51830 |
At Gholar mahakalpada primary school bore work. 1 |
Completion of work |
-
latitude : 20.64164077
Longitude : 72.93135182
file name : Image_01032023095936756.png
|
2023-03-01 09:59:36.841114 |
27 |
41294537 |
At Gholar dungari faliya arvind rama home nala work. |
435280 |
At Gholar dungari faliya arvind rama home nala work. 1 |
Roof laid |
-
latitude : 20.70223478
Longitude : 73.15438219
file name : Image_14022023155418673.png
|
2023-02-14 15:54:18.80858 |
28 |
41294537 |
At Gholar dungari faliya arvind rama home nala work. |
435280 |
At Gholar dungari faliya arvind rama home nala work. 1 |
Plinth level |
-
latitude : 20.70225282
Longitude : 73.15425999
file name : Image_14022023155220445.png
|
2023-02-14 15:52:20.59488 |
29 |
41294537 |
At Gholar dungari faliya arvind rama home nala work. |
435280 |
At Gholar dungari faliya arvind rama home nala work. 1 |
Completion of work |
-
latitude : 20.70222292
Longitude : 73.15437546
file name : Image_14022023154946410.png
|
2023-02-14 15:49:46.525803 |
30 |
66749614 |
Construction of Community Sanitary Complex |
383342 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 20.70228554,20.70228554
Longitude : 73.15426116,73.15426116
file name : Image_14022023154935830.png
|
2023-02-14 15:49:35.942866 |
31 |
66749614 |
Construction of Community Sanitary Complex |
383342 |
Construction of Community Sanitary Complex1 |
Plinth level |
-
latitude : 20.70655651,20.70655446
Longitude : 73.1599871,73.15998697
file name : Image_14022023153647181.png
|
2023-02-14 15:36:47.377025 |
32 |
66749614 |
Construction of Community Sanitary Complex |
383342 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 20.75388764,20.75388764
Longitude : 73.06815257,73.06815257
file name : Image_14022023153357989.png
|
2023-02-14 15:33:58.094319 |
33 |
41295211 |
At Gholar ranpada aanganwadi bore work. |
59850 |
At Gholar ranpada aanganwadi bore work. 1 |
Roof laid |
-
latitude : 20.64192872
Longitude : 72.9314749
file name : Image_02032023095051489.png
|
2023-03-02 09:50:51.587715 |
34 |
41295211 |
At Gholar ranpada aanganwadi bore work. |
59850 |
At Gholar ranpada aanganwadi bore work. 1 |
Completion of work |
-
latitude : 20.75560991
Longitude : 73.04918518
file name : Image_22022023174155020.png
|
2023-02-22 17:41:55.110602 |
35 |
41295417 |
At Gholar dungari faliya aanganwadi subcenter bore work. |
59850 |
At Gholar dungari faliya aanganwadi subcenter bore work. 1 |
Roof laid |
-
latitude : 20.7582528
Longitude : 73.04807402
file name : Image_02032023094938989.png
|
2023-03-02 09:49:39.086689 |
36 |
41295417 |
At Gholar dungari faliya aanganwadi subcenter bore work. |
59850 |
At Gholar dungari faliya aanganwadi subcenter bore work. 1 |
Completion of work |
-
latitude : 20.75560991
Longitude : 73.04918518
file name : Image_22022023174225955.png
|
2023-02-22 17:42:26.044434 |
37 |
66749687 |
Creation of a new source of drinking water |
63057 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 20.64164077
Longitude : 72.93135182
file name : Image_01032023095624779.png
|
2023-03-01 09:56:24.885884 |
38 |
66749687 |
Creation of a new source of drinking water |
63057 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 20.75560991
Longitude : 73.04918518
file name : Image_22022023174325769.png
|
2023-02-22 17:43:25.865324 |
39 |
49940221 |
At gholar ishavar dhediya home bore work |
63057 |
At gholar ishavar dhediya home bore work1 |
Roof laid |
-
latitude : 20.64164077
Longitude : 72.93135182
file name : Image_01032023095628683.png
|
2023-03-01 09:56:28.769017 |
40 |
49940221 |
At gholar ishavar dhediya home bore work |
63057 |
At gholar ishavar dhediya home bore work1 |
Completion of work |
-
latitude : 20.64168057
Longitude : 72.93136513
file name : Image_26022023175928966.png
|
2023-02-26 17:59:29.070324 |
41 |
41295675 |
At Gholar pir faliya bipin ghandhi home bore work. |
59850 |
At Gholar pir faliya bipin ghandhi home bore work. 1 |
Roof laid |
-
latitude : 20.7582528
Longitude : 73.04807402
file name : Image_02032023094819069.png
|
2023-03-02 09:48:19.147753 |
42 |
41295899 |
At Gholar near cremation khareda river bore work. |
86479 |
At Gholar near cremation khareda river bore work. 1 |
Roof laid |
-
latitude : 20.7582528
Longitude : 73.04807402
file name : Image_02032023094707520.png
|
2023-03-02 09:47:07.642488 |
43 |
41296368 |
At Gholar mahakalpada dhiru lallu home bore work. |
59850 |
At Gholar mahakalpada dhiru lallu home bore work. 1 |
Roof laid |
-
latitude : 20.64128452
Longitude : 72.93142925
file name : Image_01032023100014838.png
|
2023-03-01 10:00:14.932991 |
44 |
69831846 |
Construction of Community Sanitary Complex |
262711 |
Construction of Community Sanitary Complex1 |
Roof laid |
-
latitude : 20.64666788
Longitude : 72.93273302
file name : Image_26042023212337893.png
|
2023-04-26 21:23:37.976927 |
45 |
62673932 |
At gholar chikari faliya main road to navin pavar to govind magan thorat house BT |
118500 |
At gholar chikari faliya main road to navin pavar to govind magan thorat house BT 1 |
Roof laid |
-
latitude : 20.6423708,20.6423708,20.6423708
Longitude : 72.931524,72.931524,72.931524
file name : Image_27062023085541143.png
|
2023-06-27 08:55:41.233737 |
46 |
86325035 |
At gholar navanagar main road to arvind janu house BT road work |
268500 |
At gholar navanagar main road to arvind janu house BT road work1 |
Completion of work |
-
latitude : 20.7591767,20.7591767,20.7591767
Longitude : 73.0658024,73.0658024,73.0658024
file name : Image_12072023171313097.png
|
2023-07-12 17:13:13.15217 |
47 |
62674219 |
At Gholar nava nagar sangita ashok house bor/handpump work |
80567 |
At Gholar nava nagar sangita ashok house bor/handpump work1 |
Completion of work |
-
latitude : 20.7591765
Longitude : 73.0658023
file name : Image_12072023171304318.png
|
2023-07-12 17:13:04.388923 |
48 |
62674416 |
At Gholar hanuman faliya raman bhusra house bor/handpump work |
63057 |
At Gholar hanuman faliya raman bhusra house bor/handpump work1 |
Completion of work |
-
latitude : 20.759177
Longitude : 73.0658028
file name : Image_12072023171321613.png
|
2023-07-12 17:13:21.673904 |
49 |
75552560 |
Drainage Construction |
155972 |
Drainage Construction1 |
Plinth level |
-
latitude : 20.642252
Longitude : 72.9308041
file name : Image_09032024090318404.png
|
2024-03-09 09:03:18.499055 |
50 |
75552560 |
Drainage Construction |
155972 |
Drainage Construction1 |
Completion of work |
-
latitude : 20.6416653
Longitude : 72.9309485
file name : Image_08032024101201522.png
|
2024-03-08 10:12:01.601398 |
51 |
86328687 |
Construction of Community Sanitary Complex |
122896 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 20.6416653
Longitude : 72.9309485
file name : Image_08032024101020922.png
|
2024-03-08 10:10:21.012209 |
52 |
75552373 |
Drainage Construction |
155972 |
Drainage Construction1 |
Plinth level |
-
latitude : 20.6418421
Longitude : 72.9308976
file name : Image_09032024090314544.png
|
2024-03-09 09:03:14.641495 |
53 |
75552373 |
Drainage Construction |
155972 |
Drainage Construction1 |
Completion of work |
-
latitude : 20.6416653
Longitude : 72.9309485
file name : Image_08032024101157706.png
|
2024-03-08 10:11:57.790596 |
54 |
62673876 |
At Gholar dungari faliya dhiru khandu mahala house PT wall work |
150000 |
At Gholar dungari faliya dhiru khandu mahala house PT wall work1 |
Completion of work |
-
latitude : 20.7591471,20.7591471,20.7591471,20.7591471
Longitude : 73.0659355,73.0659355,73.0659355,73.0659355
file name : Image_06052024152139916.png
|
2024-05-06 15:21:39.982494 |
55 |
75516296 |
Construction of roads |
78948 |
Construction of roads1 |
Plinth level |
-
latitude : 20.7591496,20.7591496,20.7591496,20.7591496
Longitude : 73.0659509,73.0659509,73.0659509,73.0659509
file name : Image_18052024172149815.png
|
2024-05-18 17:21:49.897529 |
56 |
75516296 |
Construction of roads |
78948 |
Construction of roads1 |
Completion of work |
-
latitude : 20.7591526,20.7591526,20.7591526,20.7591526
Longitude : 73.0659527,73.0659527,73.0659527,73.0659527
file name : Image_18052024171348411.png
|
2024-05-18 17:13:48.491435 |
57 |
106534322 |
Construction of roads |
20000 |
Construction of roads1 |
Completion of work |
-
latitude : 20.7591515,20.7591515,20.7591515
Longitude : 73.0659468,73.0659468,73.0659468
file name : Image_12062024155000228.png
|
2024-06-12 15:50:00.318529 |
58 |
106535293 |
Drainage Construction |
197391 |
Drainage Construction1 |
Plinth level |
-
latitude : 20.7591366
Longitude : 73.0659384
file name : Image_27062024182400987.png
|
2024-06-27 18:24:01.086458 |
59 |
106535293 |
Drainage Construction |
197391 |
Drainage Construction1 |
Completion of work |
-
latitude : 20.7591688
Longitude : 73.0659461
file name : Image_27062024182228745.png
|
2024-06-27 18:22:28.832759 |
60 |
86328951 |
Creation of a new source of drinking water |
79749 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 20.7591681
Longitude : 73.0659417
file name : Image_01072024180437508.png
|
2024-07-01 18:04:37.586116 |
61 |
75516586 |
Creation of a new source of drinking water |
79763 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 20.7591679
Longitude : 73.0659452
file name : Image_01072024180815045.png
|
2024-07-01 18:08:15.134326 |
62 |
75516586 |
Creation of a new source of drinking water |
79763 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 20.7591487
Longitude : 73.0659073
file name : Image_01072024180340944.png
|
2024-07-01 18:03:41.027064 |