1 |
40190110 |
ANGANVADI YANA RANGRANGOTI |
40000 |
ANGANVADI YANA RANGRANGOTI1 |
Roof laid |
-
latitude : 18.3468541
Longitude : 72.9422941
file name : Image_20082021115451312.png
|
2021-08-20 11:54:51.399702 |
2 |
40190110 |
ANGANVADI YANA RANGRANGOTI |
40000 |
ANGANVADI YANA RANGRANGOTI3 |
Completion of work |
-
latitude : 18.346827
Longitude : 72.9422876
file name : Image_20082021114456597.png
|
2021-08-20 11:44:56.678955 |
3 |
40174299 |
SRVAJANIK TOILET MORE YETHE SARVAJANIK TOILET LA PANYACHI TAKI AND NAL CANECTION |
40000 |
SRVAJANIK TOILET MORE YETHE SARVAJANIK TOILET LA PANYACHI TAKI AND NAL CANECTION1 |
Roof laid |
-
latitude : 18.3468604
Longitude : 72.9423005
file name : Image_20082021115230520.png
|
2021-08-20 11:52:30.612274 |
4 |
40174299 |
SRVAJANIK TOILET MORE YETHE SARVAJANIK TOILET LA PANYACHI TAKI AND NAL CANECTION |
40000 |
SRVAJANIK TOILET MORE YETHE SARVAJANIK TOILET LA PANYACHI TAKI AND NAL CANECTION1 |
Completion of work |
-
latitude : 18.346884
Longitude : 72.9423114
file name : Image_20082021114104029.png
|
2021-08-20 11:41:04.108454 |
5 |
40177266 |
VIHOOR MARATHA ALI YETHE ANTARGAT PAIPE LINE TAKNE |
200000 |
VIHOOR MARATHA ALI YETHE ANTARGAT PAIPE LINE TAKNE1 |
Roof laid |
-
latitude : 18.3468548,18.3468548,18.3468548,18.3468548,18.3468548
Longitude : 72.9422902,72.9422902,72.9422902,72.9422902,72.9422902
file name : Image_17092021121850300.png
|
2021-09-17 12:18:50.383795 |
6 |
40177266 |
VIHOOR MARATHA ALI YETHE ANTARGAT PAIPE LINE TAKNE |
200000 |
VIHOOR MARATHA ALI YETHE ANTARGAT PAIPE LINE TAKNE1 |
Plinth level |
-
latitude : 18.3468435,18.3468402,18.3468402,18.3468402,18.3468402
Longitude : 72.9422835,72.9422834,72.9422834,72.9422834,72.9422834
file name : Image_17092021121256445.png
|
2021-09-17 12:12:56.508931 |
7 |
40177266 |
VIHOOR MARATHA ALI YETHE ANTARGAT PAIPE LINE TAKNE |
200000 |
VIHOOR MARATHA ALI YETHE ANTARGAT PAIPE LINE TAKNE1 |
Completion of work |
-
latitude : 18.3468423,18.3468423,18.3468423,18.3468423,18.3468423,18.3468423,18.3468423
Longitude : 72.9422761,72.9422761,72.9422761,72.9422761,72.9422761,72.9422761,72.9422761
file name : Image_17092021120510572.png
|
2021-09-17 12:05:10.629076 |
8 |
40191240 |
VIHOOR BAUDHVADI YETHE JALIT SHEAD BANDHNE |
150000 |
VIHOOR BAUDHVADI YETHE JALIT SHEAD BANDHNE1 |
Roof laid |
-
latitude : 18.3468448
Longitude : 72.9422725
file name : Image_29092021125435558.png
|
2021-09-29 12:54:35.668404 |
9 |
40191240 |
VIHOOR BAUDHVADI YETHE JALIT SHEAD BANDHNE |
150000 |
VIHOOR BAUDHVADI YETHE JALIT SHEAD BANDHNE1 |
Completion of work |
-
latitude : 18.3468365
Longitude : 72.9422759
file name : Image_29092021124448092.png
|
2021-09-29 12:44:48.208651 |
10 |
53661966 |
VIHOOR MOHALLA YETHE VAIYAKTIK NAL CONNECTION DENE 2 |
50000 |
VIHOOR MOHALLA YETHE VAIYAKTIK NAL CONNECTION DENE 21 |
Completion of work |
-
latitude : 18.3305062,18.3305062
Longitude : 72.9546778,72.9546778
file name : Image_28022024185216178.png
|
2024-02-28 18:52:16.23781 |
11 |
40172670 |
VIHOOR RUKSANA PATEL YANCHA GHARASAMORIL GATAR DURUSTI KARUN BANDISTA KARNE |
150000 |
VIHOOR RUKSANA PATEL YANCHA GHARASAMORIL GATAR DURUSTI KARUN BANDISTA KARNE1 |
Completion of work |
-
latitude : 18.3304683
Longitude : 72.954725
file name : Image_24082024184143670.png
|
2024-08-24 18:41:41.566183 |
12 |
49492773 |
PAIL MOHALLA KABRASTAN LAGAT GATAR BANDHNE |
221523 |
PAIL MOHALLA KABRASTAN LAGAT GATAR BANDHNE1 |
Completion of work |
-
latitude : 18.330469
Longitude : 72.9547245
file name : Image_24082024184023696.png
|
2024-08-24 18:40:23.750841 |
13 |
60578997 |
vihur masjid yethe bandist gatar durusti karane |
50000 |
vihur masjid yethe bandist gatar durusti karane1 |
Completion of work |
-
latitude : 18.3304699,18.3304699
Longitude : 72.9547238,72.9547238
file name : Image_24082024183913166.png
|
2024-08-24 18:39:13.233234 |
14 |
60580639 |
aarogya vishayak sarv upay yojana karane |
50000 |
aarogya vishayak sarv upay yojana karane1 |
Completion of work |
-
latitude : 18.3304697
Longitude : 72.9547243
file name : Image_25082024122402590.png
|
2024-08-25 12:24:02.649009 |
15 |
60585068 |
vihur maratha samaj takichi vihirila shed bandhane |
70000 |
vihur maratha samaj takichi vihirila shed bandhane1 |
Completion of work |
-
latitude : 18.3305023
Longitude : 72.9546893
file name : Image_29022024092323745.png
|
2024-02-29 09:23:23.823104 |
16 |
60577471 |
prathmik shala vihur shalechi panyachi sathavan taki durusti karane |
60000 |
prathmik shala vihur shalechi panyachi sathavan taki durusti karane1 |
Completion of work |
-
latitude : 18.3305023
Longitude : 72.9546893
file name : Image_29022024092451343.png
|
2024-02-29 09:24:51.399741 |
17 |
60583748 |
vihur urdu aganvadi durusti karane |
30000 |
vihur urdu aganvadi durusti karane1 |
Completion of work |
-
latitude : 18.3305015
Longitude : 72.9546903
file name : Image_28022024185150586.png
|
2024-02-28 18:51:50.641485 |
18 |
40304951 |
SHAKIL CHOGALE YANCHYA GHARASAMORIL RASTA CONCRETE KARAN KARNE |
150000 |
SHAKIL CHOGALE YANCHYA GHARASAMORIL RASTA CONCRETE KARAN KARNE1 |
Completion of work |
-
latitude : 18.3305171,18.3305238
Longitude : 72.9547676,72.954752
file name : Image_09052022155407378.png
|
2022-05-09 15:54:07.48902 |
19 |
53661994 |
VIHOOR V MORE GAVAT VAIYAKTIK NAL CONNECTION DENE |
185531 |
VIHOOR V MORE GAVAT VAIYAKTIK NAL CONNECTION DENE1 |
Completion of work |
-
latitude : 18.3305519,18.330516
Longitude : 72.9547561,72.9547641
file name : Image_09052022155458839.png
|
2022-05-09 15:54:58.977653 |
20 |
67956902 |
Construction of Sheds |
121048 |
Construction of Sheds1 |
Completion of work |
-
latitude : 18.330464
Longitude : 72.9547074
file name : Image_27082024130207890.png
|
2024-08-27 13:02:07.975784 |
21 |
67945800 |
Extension of existing pipeline |
215500 |
Extension of existing pipeline1 |
Completion of work |
-
latitude : 18.330469,18.330469
Longitude : 72.9547092,72.9547092
file name : Image_27082024130308281.png
|
2024-08-27 13:03:08.436378 |
22 |
67944918 |
Extension of existing pipeline |
200000 |
Extension of existing pipeline1 |
Completion of work |
-
latitude : 18.3304691
Longitude : 72.9547094
file name : Image_27082024130334526.png
|
2024-08-27 13:03:34.639523 |
23 |
40305329 |
PAIL MOHALLA RASTA CONCRETE KARAN KARNE |
151096 |
PAIL MOHALLA RASTA CONCRETE KARAN KARNE1 |
Completion of work |
-
latitude : 18.3303914,18.3303914
Longitude : 72.9547699,72.9547699
file name : Image_22112022184823524.png
|
2022-11-22 18:48:23.622365 |
24 |
40186628 |
VIHOOR PAIL MOHALA ANTARGAT PAIPE LINE TAKNE |
100000 |
VIHOOR PAIL MOHALA ANTARGAT PAIPE LINE TAKNE1 |
Completion of work |
-
latitude : 18.3303917,18.3303917
Longitude : 72.9547716,72.9547716
file name : Image_22112022184826764.png
|
2022-11-22 18:48:26.852007 |
25 |
66014501 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 18.3303935,18.3303935
Longitude : 72.9547682,72.9547682
file name : Image_22112022204612877.png
|
2022-11-22 20:46:12.975087 |
26 |
66236826 |
Water Supply to villages |
50000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 18.3304332
Longitude : 72.9547513
file name : Image_15122022175450480.png
|
2022-12-15 17:54:50.582703 |
27 |
66236855 |
Water Supply to villages |
250000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 18.3304383
Longitude : 72.9547509
file name : Image_15122022175447355.png
|
2022-12-15 17:54:47.45072 |
28 |
53661946 |
VIHOOR MOHALLA YETHE VAIYAKTIK NAL CONNECTION DENE |
50000 |
VIHOOR MOHALLA YETHE VAIYAKTIK NAL CONNECTION DENE1 |
Completion of work |
-
latitude : 18.3304382,18.3304382,18.3304382,18.3304382,18.3304382,18.3304382
Longitude : 72.9547517,72.9547517,72.9547517,72.9547517,72.9547517,72.9547517
file name : Image_15122022170308402.png
|
2022-12-15 17:03:08.498827 |
29 |
53661946 |
VIHOOR MOHALLA YETHE VAIYAKTIK NAL CONNECTION DENE |
50000 |
VIHOOR MOHALLA YETHE VAIYAKTIK NAL CONNECTION DENE1 |
Completion of work |
-
latitude : 18.330433,18.330433,18.330433,18.330433
Longitude : 72.954757,72.954757,72.954757,72.954757
file name : Image_15122022170312103.png
|
2022-12-15 17:03:12.18245 |
30 |
53661926 |
ADIWASI WADI V BAUDDHWADI YETHE KUTUMBANA VAIYAKTIK NAL KANECTION DENE |
250000 |
ADIWASI WADI V BAUDDHWADI YETHE KUTUMBANA VAIYAKTIK NAL KANECTION DENE1 |
Completion of work |
-
latitude : 18.3304334,18.3304334,18.3304334,18.3304334,18.3304334
Longitude : 72.9547501,72.9547501,72.9547501,72.9547501,72.9547501
file name : Image_15122022170532197.png
|
2022-12-15 17:05:32.279555 |
31 |
53661926 |
ADIWASI WADI V BAUDDHWADI YETHE KUTUMBANA VAIYAKTIK NAL KANECTION DENE |
250000 |
ADIWASI WADI V BAUDDHWADI YETHE KUTUMBANA VAIYAKTIK NAL KANECTION DENE1 |
Completion of work |
-
latitude : 18.3304351,18.3304351
Longitude : 72.9547522,72.9547522
file name : Image_15122022170536200.png
|
2022-12-15 17:05:36.276721 |
32 |
49494956 |
MORE GANPATI VISARJAN RASTA CONCRETE KARNE |
100000 |
MORE GANPATI VISARJAN RASTA CONCRETE KARNE1 |
Completion of work |
-
latitude : 18.3304392,18.3304392,18.3304392
Longitude : 72.9548057,72.9548057,72.9548057
file name : Image_13042023141927324.png
|
2023-04-13 14:19:27.419833 |
33 |
40175855 |
SRVAJANIK TOILET VIHOOR ADHIWASHI WADI YETHE SARVAJANIK TOILET LA PANYACHI TAKI AND NAL CANECTION |
40000 |
SRVAJANIK TOILET VIHOOR ADHIWASHI WADI YETHE SARVAJANIK TOILET LA PANYACHI TAKI AND NAL CANECTION1 |
Completion of work |
-
latitude : 18.330551
Longitude : 72.9547495
file name : Image_18042023215348789.png
|
2023-04-18 21:53:48.894812 |
34 |
60582787 |
more gavat ghankachara v sandpani vyavsthapan urvrit kam 30% bilapoti |
70000 |
more gavat ghankachara v sandpani vyavsthapan urvrit kam 30% bilapoti1 |
Completion of work |
-
latitude : 18.3304359
Longitude : 72.9547615
file name : Image_06092023164055120.png
|
2023-09-06 16:40:55.194111 |
35 |
49494854 |
VIHOOR GP HADDIT VIDYUT KHAMB TAKUN VIDYUT PURAVATHA KARNE |
100000 |
VIHOOR GP HADDIT VIDYUT KHAMB TAKUN VIDYUT PURAVATHA KARNE1 |
Completion of work |
-
latitude : 18.5458515
Longitude : 73.82293
file name : Image_15092023002533127.png
|
2023-09-15 00:25:33.178803 |
36 |
60579792 |
vihur gavat ghankachara sandpani vyavsthapan karane urvrit kam bilapoti 30% |
208429 |
vihur gavat ghankachara sandpani vyavsthapan karane urvrit kam bilapoti 30%1 |
Completion of work |
-
latitude : 18.3304891
Longitude : 72.9546923
file name : Image_09012024120530278.png
|
2024-01-09 12:05:30.335283 |
37 |
40171944 |
PRATHAMIK SCHOOL VIHOOR TOILET DURUSTI |
50000 |
PRATHAMIK SCHOOL VIHOOR TOILET DURUSTI1 |
Plinth level |
-
latitude : 18.3304722
Longitude : 72.9547303
file name : Image_08012024163620084.png
|
2024-01-08 16:36:20.135186 |
38 |
40171944 |
PRATHAMIK SCHOOL VIHOOR TOILET DURUSTI |
50000 |
PRATHAMIK SCHOOL VIHOOR TOILET DURUSTI1 |
Completion of work |
-
latitude : 18.3304892
Longitude : 72.9546921
file name : Image_08012024163338543.png
|
2024-01-08 16:33:38.601007 |
39 |
49493391 |
PRATHAMIK SHALA URDU SHALECHE DIGITAL ROOM LA GRIL BASAVINE |
70761 |
PRATHAMIK SHALA URDU SHALECHE DIGITAL ROOM LA GRIL BASAVINE1 |
Completion of work |
-
latitude : 18.332708557136357
Longitude : 72.95463161543012
file name : Image_09022024163657997.png
|
2024-02-09 16:36:58.073993 |
40 |
60576672 |
vihur gavamdhye nal pipe line takane |
199825 |
vihur gavamdhye nal pipe line takane1 |
Completion of work |
-
latitude : 18.332708557136357,18.332708557136357
Longitude : 72.95463161543012,72.95463161543012
file name : Image_09022024165334054.png
|
2024-02-09 16:53:34.126661 |
41 |
60585428 |
vihur kabrasthan nivara shed durusti karane |
70000 |
vihur kabrasthan nivara shed durusti karane1 |
Completion of work |
-
latitude : 18.332708557136357
Longitude : 72.95463161543012
file name : Image_09022024165330331.png
|
2024-02-09 16:53:30.384182 |
42 |
49494432 |
ANGANWADYANNA RANGRANGOTI KARNE |
68305 |
ANGANWADYANNA RANGRANGOTI KARNE1 |
Completion of work |
-
latitude : 18.3304909
Longitude : 72.9546729
file name : Image_22022024171915741.png
|
2024-02-22 17:19:15.799066 |
43 |
60583529 |
maratha aali aganvadi durusti karane |
30000 |
maratha aali aganvadi durusti karane 1 |
Completion of work |
-
latitude : 18.3304909
Longitude : 72.9546729
file name : Image_22022024172022869.png
|
2024-02-22 17:20:22.942936 |
44 |
60584682 |
vihur men road aadivasivadi te aadhikari gharakade pipe line takane |
60643 |
vihur men road aadivasivadi te aadhikari gharakade pipe line takane1 |
Completion of work |
-
latitude : 18.3305023,18.3305023
Longitude : 72.9546893,72.9546893
file name : Image_29022024092420958.png
|
2024-02-29 09:24:21.015918 |
45 |
49494591 |
VIHOOR ADIWASIWADI SMASHANBHUMILA JALIT SHED BANDHNE |
132456 |
VIHOOR ADIWASIWADI SMASHANBHUMILA JALIT SHED BANDHNE1 |
Completion of work |
-
latitude : 18.3305236
Longitude : 72.9547122
file name : Image_06032024121620187.png
|
2024-03-06 12:16:20.243176 |
46 |
60577962 |
vihur maratha aali sahadev mohite te juna rasta parynt bandist gatar bandhane |
100000 |
vihur maratha aali sahadev mohite te juna rasta parynt bandist gatar bandhane1 |
Completion of work |
-
latitude : 18.3305282,18.3305282
Longitude : 72.9547147,72.9547147
file name : Image_06032024121735331.png
|
2024-03-06 12:17:35.391491 |
47 |
60586317 |
vihur pail mohalla nasuruddin halade te parisarat pipe line takane |
90000 |
vihur pail mohalla nasuruddin halade te parisarat pipe line takane1 |
Completion of work |
-
latitude : 18.3305199,18.3305199
Longitude : 72.9547135,72.9547135
file name : Image_07032024160445915.png
|
2024-03-07 16:04:45.993138 |
48 |
49493039 |
VIHOOR RAOUND MOHALLA YETHE PIPE LINE TAKNE |
200000 |
VIHOOR RAOUND MOHALLA YETHE PIPE LINE TAKNE1 |
Completion of work |
-
latitude : 18.3305187,18.3305187
Longitude : 72.9547199,72.9547199
file name : Image_07032024160629789.png
|
2024-03-07 16:06:29.849672 |
49 |
49492958 |
VIHOOR NAVIN MOHALLA YETHE PIPE LINE TAKNE |
100000 |
VIHOOR NAVIN MOHALLA YETHE PIPE LINE TAKNE1 |
Completion of work |
-
latitude : 18.3305212,18.3305212
Longitude : 72.9547212,72.9547212
file name : Image_07032024160633998.png
|
2024-03-07 16:06:34.065105 |
50 |
60578258 |
govind divekar te vitha bhanage juna gatar bandist karane |
50000 |
govind divekar te vitha bhanage juna gatar bandist karane1 |
Completion of work |
-
latitude : 18.3305261,18.3305261
Longitude : 72.9547135,72.9547135
file name : Image_07032024191046541.png
|
2024-03-07 19:10:46.605689 |
51 |
49493208 |
VIHOOR GRAMPANCHAYAT HADDITIL VAIYAKTIK NAL KANECTION NASALELYA KUTUMBANA NAL KANECTION PURAVINE |
141523 |
VIHOOR GRAMPANCHAYAT HADDITIL VAIYAKTIK NAL KANECTION NASALELYA KUTUMBANA NAL KANECTION PURAVINE1 |
Completion of work |
-
latitude : 18.3304605,18.3304605
Longitude : 72.9546958,72.9546958
file name : Image_03052024154525153.png
|
2024-05-03 15:45:25.204707 |
52 |
60576310 |
more anganvadi te gavamdhye antargat pipe line takane |
170000 |
more anganvadi te gavamdhye antargat pipe line takane1 |
Completion of work |
-
latitude : 18.3304544,18.3304544
Longitude : 72.9546553,72.9546553
file name : Image_03052024154623537.png
|
2024-05-03 15:46:23.588421 |
53 |
40189616 |
ANGANVADITIL MULANA GANVESH PURAVINE |
50000 |
ANGANVADITIL MULANA GANVESH PURAVINE1 |
Completion of work |
-
latitude : 18.3304715
Longitude : 72.9546965
file name : Image_17052024120150067.png
|
2024-05-17 12:01:50.137177 |
54 |
40183480 |
CLORIVAT V TCL KHAREDI |
50000 |
CLORIVAT V TCL KHAREDI1 |
Completion of work |
-
latitude : 18.3304628
Longitude : 72.9547185
file name : Image_20062024152435440.png
|
2024-06-20 15:24:35.501773 |
55 |
60581724 |
vihur haddit sarvjanik thikani bakade ghene |
56606 |
vihur haddit sarvjanik thikani bakade ghene1 |
Completion of work |
-
latitude : 18.3304571
Longitude : 72.9547011
file name : Image_20062024152520365.png
|
2024-06-20 15:25:20.421858 |