1 |
57890566 |
ASHTAVAR PAYRI RASTA KARNE |
100000 |
ASHTAVAR PAYRI RASTA KARNE1 |
Completion of work |
-
latitude : 18.0496535,18.0496535
Longitude : 73.020205,73.020205
file name : Image_24082024200405717.png
|
2024-08-24 20:04:05.807624 |
2 |
57806764 |
DIGHI TALAV VA SARV VIHIRITIL GAL KADHANE |
50000 |
DIGHI TALAV VA SARV VIHIRITIL GAL KADHANE1 |
Completion of work |
-
latitude : 18.0496543
Longitude : 73.0202053
file name : Image_24082024200548379.png
|
2024-08-24 20:05:48.47866 |
3 |
67867719 |
Drainage Construction |
200000 |
Drainage Construction1 |
Completion of work |
-
latitude : 18.0496553
Longitude : 73.0202055
file name : Image_24082024200638459.png
|
2024-08-24 20:06:38.547394 |
4 |
42557586 |
DAMU NIGUDKAR TE JANARJAN VASKAR YETHE CEMENT RASTA |
100000 |
DAMU NIGUDKAR TE JANARJAN VASKAR YETHE CEMENT RASTA1 |
Completion of work |
-
latitude : 18.0496698
Longitude : 73.0201894
file name : Image_29082022125649310.png
|
2022-08-29 12:56:49.423126 |
5 |
42557197 |
KRUSHNA CHIKATI TE DAMU NIGUDKAR YETHE CEMENT RASTA V BHINT |
238374 |
KRUSHNA CHIKATI TE DAMU NIGUDKAR YETHE CEMENT RASTA V BHINT1 |
Completion of work |
-
latitude : 18.0496639
Longitude : 73.0201944
file name : Image_29082022125538847.png
|
2022-08-29 12:55:38.958705 |
6 |
50463000 |
DIGHI KOLIWADA GRAMPANCHAYATICHI PANI PURAVTHA YOJANE KARITA PANYACHI SATHAVN TAKI RCC HOLIVARTI BAN |
299000 |
DIGHI KOLIWADA GRAMPANCHAYATICHI PANI PURAVTHA YOJANE KARITA PANYACHI SATHAVN TAKI RCC HOLIVARTI BAN1 |
Completion of work |
-
latitude : 18.0496688
Longitude : 73.0201747
file name : Image_20092022154311572.png
|
2022-09-20 15:43:11.694012 |
7 |
50463000 |
DIGHI KOLIWADA GRAMPANCHAYATICHI PANI PURAVTHA YOJANE KARITA PANYACHI SATHAVN TAKI RCC HOLIVARTI BAN |
299000 |
DIGHI KOLIWADA GRAMPANCHAYATICHI PANI PURAVTHA YOJANE KARITA PANYACHI SATHAVN TAKI RCC HOLIVARTI BAN1 |
Completion of work |
-
latitude : 18.0496679
Longitude : 73.0201771
file name : Image_20092022154314311.png
|
2022-09-20 15:43:14.437363 |
8 |
42554522 |
TCL KHAREDI |
100000 |
TCL KHAREDI1 |
Completion of work |
-
latitude : 18.049663
Longitude : 73.0202146
file name : Image_24102024170145840.png
|
2024-10-24 17:01:45.998295 |
9 |
42554522 |
TCL KHAREDI |
100000 |
TCL KHAREDI1 |
Completion of work |
-
latitude : 18.0496607
Longitude : 73.0201659
file name : Image_21102022170819952.png
|
2022-10-21 17:08:20.04357 |
10 |
57795987 |
HIGHSCHOOL JAVAL SARVJANIK SAUCHALAY BANDHANE |
300000 |
HIGHSCHOOL JAVAL SARVJANIK SAUCHALAY BANDHANE1 |
Completion of work |
-
latitude : 18.0496454
Longitude : 73.0201791
file name : Image_21122022183326795.png
|
2022-12-21 18:33:26.890596 |
11 |
35806577 |
DIGHI KOLIWADA YETHIL MOTHI VIHIR TE VARCHI VIHIR CEMENT RASTA |
100000 |
DIGHI KOLIWADA YETHIL MOTHI VIHIR TE VARCHI VIHIR CEMENT RASTA1 |
Completion of work |
-
latitude : 18.0496456
Longitude : 73.0201805
file name : Image_02012023174611400.png
|
2023-01-02 17:46:11.518088 |
12 |
50459762 |
PANCHKROSHI GAROGAR MAHILANA POSHTIK AHAR |
50000 |
PANCHKROSHI GAROGAR MAHILANA POSHTIK AHAR1 |
Completion of work |
-
latitude : 18.0496458
Longitude : 73.0201768
file name : Image_28122022130515993.png
|
2022-12-28 13:05:16.060919 |
13 |
50459762 |
PANCHKROSHI GAROGAR MAHILANA POSHTIK AHAR |
50000 |
PANCHKROSHI GAROGAR MAHILANA POSHTIK AHAR1 |
Completion of work |
-
latitude : 18.0496458
Longitude : 73.0201768
file name : Image_28122022130547482.png
|
2022-12-28 13:05:47.549826 |
14 |
57817951 |
MAHILANSATHI SANIORY PAD PURVINE |
50000 |
MAHILANSATHI SANIORY PAD PURVINE1 |
Completion of work |
-
latitude : 18.049646
Longitude : 73.020181
file name : Image_28122022124850925.png
|
2022-12-28 12:48:51.048109 |
15 |
57867776 |
GARODAR MAHILANA POSHAN AHAR PURVINE |
62986 |
GARODAR MAHILANA POSHAN AHAR PURVINE1 |
Completion of work |
-
latitude : 18.0496535
Longitude : 73.0201706
file name : Image_28122022130522323.png
|
2022-12-28 13:05:22.381868 |
16 |
57867776 |
GARODAR MAHILANA POSHAN AHAR PURVINE |
62986 |
GARODAR MAHILANA POSHAN AHAR PURVINE1 |
Completion of work |
-
latitude : 18.0496535
Longitude : 73.0201706
file name : Image_28122022130552849.png
|
2022-12-28 13:05:52.904359 |
17 |
57821693 |
KUPOSHIT BALKANSATHI AHAR PURVINE |
85000 |
KUPOSHIT BALKANSATHI AHAR PURVINE1 |
Completion of work |
-
latitude : 18.0496454
Longitude : 73.0201791
file name : Image_28122022130508004.png
|
2022-12-28 13:05:08.066051 |
18 |
57821693 |
KUPOSHIT BALKANSATHI AHAR PURVINE |
85000 |
KUPOSHIT BALKANSATHI AHAR PURVINE1 |
Completion of work |
-
latitude : 18.0496567
Longitude : 73.0201687
file name : Image_28122022130535222.png
|
2022-12-28 13:05:35.278148 |
19 |
57821693 |
KUPOSHIT BALKANSATHI AHAR PURVINE |
85000 |
KUPOSHIT BALKANSATHI AHAR PURVINE1 |
Completion of work |
-
latitude : 18.0496454
Longitude : 73.0201791
file name : Image_28122022130540247.png
|
2022-12-28 13:05:40.307202 |
20 |
57821693 |
KUPOSHIT BALKANSATHI AHAR PURVINE |
85000 |
KUPOSHIT BALKANSATHI AHAR PURVINE1 |
Completion of work |
-
latitude : 18.0496567
Longitude : 73.0201687
file name : Image_28122022130559442.png
|
2022-12-28 13:05:59.500525 |
21 |
50459504 |
PANCHKROSHI MAHILANA SANITORY PAD DENE |
21549 |
PANCHKROSHI MAHILANA SANITORY PAD DENE1 |
Completion of work |
-
latitude : 18.0496475
Longitude : 73.0201727
file name : Image_28122022124846889.png
|
2022-12-28 12:48:47.011146 |
22 |
42556719 |
SARV AANGANWADI SATHI BENCH KHAREDI |
100000 |
SARV AANGANWADI SATHI BENCH KHAREDI1 |
Completion of work |
-
latitude : 18.0496455
Longitude : 73.0201776
file name : Image_28122022130850821.png
|
2022-12-28 13:08:50.874937 |
23 |
42556486 |
SARV AANGANWADI LAHAN MULA MULINA KAPDE |
100000 |
SARV AANGANWADI LAHAN MULA MULINA KAPDE1 |
Completion of work |
-
latitude : 18.0496454
Longitude : 73.0201783
file name : Image_28122022130500812.png
|
2022-12-28 13:05:00.890723 |
24 |
42555339 |
SANITORY NAPKIN KHAREDI |
70000 |
SANITORY NAPKIN KHAREDI1 |
Completion of work |
-
latitude : 18.0496455
Longitude : 73.0201798
file name : Image_28122022124842238.png
|
2022-12-28 12:48:42.357679 |
25 |
42555958 |
MAHILA SAHITYA VATAP |
275284 |
MAHILA SAHITYA VATAP1 |
Completion of work |
-
latitude : 18.0496558
Longitude : 73.0201695
file name : Image_28122022125234479.png
|
2022-12-28 12:52:34.60069 |
26 |
50461065 |
DIGHI RZP SHALA KARITA LIGHT FITTING VA INVERTER VA PANI FILTER |
50000 |
DIGHI RZP SHALA KARITA LIGHT FITTING VA INVERTER VA PANI FILTER1 |
Completion of work |
-
latitude : 18.0496455
Longitude : 73.0201776
file name : Image_28122022130856022.png
|
2022-12-28 13:08:56.088221 |
27 |
50461065 |
DIGHI RZP SHALA KARITA LIGHT FITTING VA INVERTER VA PANI FILTER |
50000 |
DIGHI RZP SHALA KARITA LIGHT FITTING VA INVERTER VA PANI FILTER1 |
Completion of work |
-
latitude : 18.0496455
Longitude : 73.0201776
file name : Image_28122022130900971.png
|
2022-12-28 13:09:01.046922 |
28 |
57815860 |
VYAVSAYASATHI SAHITYA PURVINE |
120000 |
VYAVSAYASATHI SAHITYA PURVINE1 |
Completion of work |
-
latitude : 18.0496536
Longitude : 73.0201705
file name : Image_28122022165559079.png
|
2022-12-28 16:55:59.214538 |
29 |
57815860 |
VYAVSAYASATHI SAHITYA PURVINE |
120000 |
VYAVSAYASATHI SAHITYA PURVINE1 |
Completion of work |
-
latitude : 18.0496545
Longitude : 73.0201701
file name : Image_28122022125244538.png
|
2022-12-28 12:52:44.660933 |
30 |
57815860 |
VYAVSAYASATHI SAHITYA PURVINE |
120000 |
VYAVSAYASATHI SAHITYA PURVINE1 |
Completion of work |
-
latitude : 18.0496545
Longitude : 73.0201701
file name : Image_28122022125254599.png
|
2022-12-28 12:52:54.719532 |
31 |
50459178 |
MAHILANAKARITA HALDI KUNKU SAHITYA VATAP |
100000 |
MAHILANAKARITA HALDI KUNKU SAHITYA VATAP1 |
Completion of work |
-
latitude : 18.0496553
Longitude : 73.0201697
file name : Image_28122022125239645.png
|
2022-12-28 12:52:39.775516 |
32 |
50459178 |
MAHILANAKARITA HALDI KUNKU SAHITYA VATAP |
100000 |
MAHILANAKARITA HALDI KUNKU SAHITYA VATAP1 |
Completion of work |
-
latitude : 18.0496553
Longitude : 73.0201697
file name : Image_28122022125249361.png
|
2022-12-28 12:52:49.484643 |
33 |
57868897 |
MAHILANA VYAVSAY SAHITYA PURVINE |
40000 |
MAHILANA VYAVSAY SAHITYA PURVINE1 |
Completion of work |
-
latitude : 18.0496535
Longitude : 73.0201706
file name : Image_28122022172354083.png
|
2022-12-28 17:23:54.176998 |
34 |
50455487 |
DIGHI KOLIWADA YETHIL KAMAL MADHUKAR BHALDAR TE ANUSAYA JANARADAN NIGUDKAR GHARA PARYANT GATARALA SA |
251526 |
DIGHI KOLIWADA YETHIL KAMAL MADHUKAR BHALDAR TE ANUSAYA JANARADAN NIGUDKAR GHARA PARYANT GATARALA SA1 |
Completion of work |
-
latitude : 18.04957654
Longitude : 73.02009875
file name : Image_02012023174436303.png
|
2023-01-02 17:44:36.416647 |
35 |
50455487 |
DIGHI KOLIWADA YETHIL KAMAL MADHUKAR BHALDAR TE ANUSAYA JANARADAN NIGUDKAR GHARA PARYANT GATARALA SA |
251526 |
DIGHI KOLIWADA YETHIL KAMAL MADHUKAR BHALDAR TE ANUSAYA JANARADAN NIGUDKAR GHARA PARYANT GATARALA SA1 |
Completion of work |
-
latitude : 18.0496543
Longitude : 73.0201702
file name : Image_02012023174440417.png
|
2023-01-02 17:44:40.541814 |
36 |
50455487 |
DIGHI KOLIWADA YETHIL KAMAL MADHUKAR BHALDAR TE ANUSAYA JANARADAN NIGUDKAR GHARA PARYANT GATARALA SA |
251526 |
DIGHI KOLIWADA YETHIL KAMAL MADHUKAR BHALDAR TE ANUSAYA JANARADAN NIGUDKAR GHARA PARYANT GATARALA SA1 |
Completion of work |
-
latitude : 18.0496543
Longitude : 73.0201702
file name : Image_02012023174445068.png
|
2023-01-02 17:44:45.1931 |
37 |
35804860 |
Road repair from Hari Zengar to old cemetery(juni smashan bhumi) at Dighi Koliwada |
100000 |
Road repair from Hari Zengar to old cemetery(juni smashan bhumi) at Dighi Koliwada1 |
Completion of work |
-
latitude : 18.0496454
Longitude : 73.0201783
file name : Image_02012023175341916.png
|
2023-01-02 17:53:42.039435 |
38 |
35802997 |
GANRAJ NAGAR YETHE PANI SATHVAN TAKI RCC |
200000 |
GANRAJ NAGAR YETHE PANI SATHVAN TAKI RCC1 |
Completion of work |
-
latitude : 18.0496571
Longitude : 73.0201777
file name : Image_18012023163556326.png
|
2023-01-18 16:35:56.475137 |
39 |
50462560 |
DIGHI KOLIWADA HIRKHAR SAMARTH NAGAR RCC CEMENT SAHVAN TAKI BANDHANE |
246663 |
DIGHI KOLIWADA HIRKHAR SAMARTH NAGAR RCC CEMENT SAHVAN TAKI BANDHANE1 |
Completion of work |
-
latitude : 18.0496678
Longitude : 73.0201709
file name : Image_18012023163601391.png
|
2023-01-18 16:36:01.531177 |
40 |
50462560 |
DIGHI KOLIWADA HIRKHAR SAMARTH NAGAR RCC CEMENT SAHVAN TAKI BANDHANE |
246663 |
DIGHI KOLIWADA HIRKHAR SAMARTH NAGAR RCC CEMENT SAHVAN TAKI BANDHANE1 |
Completion of work |
-
latitude : 18.0496678
Longitude : 73.0201709
file name : Image_18012023163605335.png
|
2023-01-18 16:36:05.471551 |
41 |
50464110 |
SARV GAV GATAR SAFAI |
250000 |
SARV GAV GATAR SAFAI1 |
Completion of work |
-
latitude : 18.0496515
Longitude : 73.0201777
file name : Image_23022023154008716.png
|
2023-02-23 15:40:08.810047 |
42 |
50464110 |
SARV GAV GATAR SAFAI |
250000 |
SARV GAV GATAR SAFAI1 |
Completion of work |
-
latitude : 18.0496515
Longitude : 73.0201777
file name : Image_23022023154015830.png
|
2023-02-23 15:40:15.925364 |
43 |
50457219 |
DIGHI KOLIWADA YETHIL PANDHURANG DHARMA TANDEL TE GOPAL LAMLYA CHIKATI GHARA PARYANT RCC BANDIST GAT |
299000 |
DIGHI KOLIWADA YETHIL PANDHURANG DHARMA TANDEL TE GOPAL LAMLYA CHIKATI GHARA PARYANT RCC BANDIST GAT1 |
Completion of work |
-
latitude : 18.0496512,18.0496515
Longitude : 73.0201792,73.0201777
file name : Image_23022023154006084.png
|
2023-02-23 15:40:06.177961 |
44 |
42559393 |
JAYTARA HOTEL YETHE SATHVAN TAKI RCC |
200000 |
JAYTARA HOTEL YETHE SATHVAN TAKI RCC1 |
Completion of work |
-
latitude : 18.0497568
Longitude : 73.0201774
file name : Image_21032023164930302.png
|
2023-03-21 16:49:30.376245 |
45 |
42559393 |
JAYTARA HOTEL YETHE SATHVAN TAKI RCC |
200000 |
JAYTARA HOTEL YETHE SATHVAN TAKI RCC1 |
Completion of work |
-
latitude : 18.0497568
Longitude : 73.0201762
file name : Image_21032023164934831.png
|
2023-03-21 16:49:34.920664 |
46 |
42559393 |
JAYTARA HOTEL YETHE SATHVAN TAKI RCC |
200000 |
JAYTARA HOTEL YETHE SATHVAN TAKI RCC1 |
Completion of work |
-
latitude : 18.0497568
Longitude : 73.0201762
file name : Image_21032023164938772.png
|
2023-03-21 16:49:38.860092 |
47 |
57790682 |
BHANDARI SAMAJ BOREWELL SOLAR PUMP BASVINE |
100000 |
BHANDARI SAMAJ BOREWELL SOLAR PUMP BASVINE1 |
Completion of work |
-
latitude : 18.0496577
Longitude : 73.020191
file name : Image_24042023175251264.png
|
2023-04-24 17:52:51.369467 |
48 |
57790682 |
BHANDARI SAMAJ BOREWELL SOLAR PUMP BASVINE |
100000 |
BHANDARI SAMAJ BOREWELL SOLAR PUMP BASVINE1 |
Completion of work |
-
latitude : 18.0496577
Longitude : 73.020191
file name : Image_24042023175253837.png
|
2023-04-24 17:52:53.930194 |
49 |
42557732 |
DIGHI AADIWASIDI YETHE SMASHAN SHED |
50000 |
DIGHI AADIWASIDI YETHE SMASHAN SHED1 |
Completion of work |
-
latitude : 18.0496668
Longitude : 73.0201988
file name : Image_19052023114141176.png
|
2023-05-19 11:41:41.277835 |
50 |
50462758 |
KARLAS SAVARDE VAIYAKTIK NAL CONNECTION DENE |
299000 |
KARLAS SAVARDE VAIYAKTIK NAL CONNECTION DENE1 |
Completion of work |
-
latitude : 18.0496666,18.0496667
Longitude : 73.0202013,73.0201988
file name : Image_19052023114143742.png
|
2023-05-19 11:41:43.839157 |
51 |
57866363 |
ANGANWADI RANGRANGOTI KARNE(CHITRA REKHATNE) |
80000 |
ANGANWADI RANGRANGOTI KARNE(CHITRA REKHATNE)1 |
Completion of work |
-
latitude : 18.0496667
Longitude : 73.0201988
file name : Image_19052023114146372.png
|
2023-05-19 11:41:46.486346 |
52 |
57793701 |
BAUDHWADI NAVGHARI YETHE VIHIR KHODANE |
300000 |
BAUDHWADI NAVGHARI YETHE VIHIR KHODANE1 |
Completion of work |
-
latitude : 18.049658
Longitude : 73.0201887
file name : Image_24042023175420430.png
|
2023-04-24 17:54:20.521981 |
53 |
35783150 |
DIGHI BAUDHWADI SATHI NAVGHARI YETHE SATHVAN TAKI BANDHNE |
143265 |
DIGHI BAUDHWADI SATHI NAVGHARI YETHE SATHVAN TAKI BANDHNE1 |
Completion of work |
-
latitude : 18.0496577
Longitude : 73.0201917
file name : Image_24042023174322769.png
|
2023-04-24 17:43:22.877045 |
54 |
42556281 |
IRKHAR AANGANWADI LADI V KHIDKYA BASAVINE V 1 DARVAJA |
100000 |
IRKHAR AANGANWADI LADI V KHIDKYA BASAVINE V 1 DARVAJA1 |
Completion of work |
-
latitude : 18.0496589
Longitude : 73.0201985
file name : Image_11052023114902713.png
|
2023-05-11 11:49:02.826804 |
55 |
35775781 |
DIGHI AANGANWADI KRAMANK-2 NAVIN KHIDKYA BASAVINE |
50000 |
DIGHI AANGANWADI KRAMANK-2 NAVIN KHIDKYA BASAVINE1 |
Completion of work |
-
latitude : 18.0496584
Longitude : 73.0201981
file name : Image_11052023114741444.png
|
2023-05-11 11:47:41.543735 |
56 |
50458217 |
ERKHAR ANGANWADI SAUCHALAY VA KITCHEN SHED |
100000 |
ERKHAR ANGANWADI SAUCHALAY VA KITCHEN SHED 1 |
Completion of work |
-
latitude : 18.0496584
Longitude : 73.0201946
file name : Image_11052023115031585.png
|
2023-05-11 11:50:31.692631 |
57 |
50458441 |
KARLAS ANGANWADI DURUSTI |
50000 |
KARLAS ANGANWADI DURUSTI 1 |
Completion of work |
-
latitude : 18.0496581
Longitude : 73.0201968
file name : Image_11052023115034102.png
|
2023-05-11 11:50:34.190961 |
58 |
50458441 |
KARLAS ANGANWADI DURUSTI |
50000 |
KARLAS ANGANWADI DURUSTI 1 |
Completion of work |
-
latitude : 18.0496581
Longitude : 73.0201968
file name : Image_11052023115041518.png
|
2023-05-11 11:50:41.609859 |
59 |
35804359 |
Construction of cement road and protection wall at dighi Adivashivadi |
101385 |
Construction of cement road and protection wall at dighi Adivashivadi1 |
Completion of work |
-
latitude : 18.0496584
Longitude : 73.0201981
file name : Image_11052023114746837.png
|
2023-05-11 11:47:46.943571 |
60 |
35804359 |
Construction of cement road and protection wall at dighi Adivashivadi |
101385 |
Construction of cement road and protection wall at dighi Adivashivadi1 |
Completion of work |
-
latitude : 18.0496584
Longitude : 73.0201981
file name : Image_11052023114754251.png
|
2023-05-11 11:47:54.35611 |
61 |
42557397 |
DIGHI AANGANWADI YETHE RASTA V GATAR BANDHNE |
77627 |
DIGHI AANGANWADI YETHE RASTA V GATAR BANDHNE1 |
Completion of work |
-
latitude : 18.0496587
Longitude : 73.0202033
file name : Image_19052023114138588.png
|
2023-05-19 11:41:38.68836 |
62 |
35803569 |
SHIVSHANBHU YETHE VIHIRIVAR PAYTING V THALACHA KHALI RCC KAM KARNE |
100000 |
SHIVSHANBHU YETHE VIHIRIVAR PAYTING V THALACHA KHALI RCC KAM KARNE1 |
Completion of work |
-
latitude : 18.0496472
Longitude : 73.0201981
file name : Image_31052023174024913.png
|
2023-05-31 17:40:25.012254 |
63 |
57808023 |
APURN GATARACHE KAME PURN KARNE |
172398 |
APURN GATARACHE KAME PURN KARNE1 |
Completion of work |
-
latitude : 18.0496487
Longitude : 73.0201989
file name : Image_31052023174216026.png
|
2023-05-31 17:42:16.118835 |
64 |
57795550 |
ANUSAYA NIGUDKAR TE MANGESH GUNAJI RCC GATAR BANDHANE |
200000 |
ANUSAYA NIGUDKAR TE MANGESH GUNAJI RCC GATAR BANDHANE1 |
Completion of work |
-
latitude : 18.0496473
Longitude : 73.0201945
file name : Image_31052023174147181.png
|
2023-05-31 17:41:47.273687 |
65 |
57797115 |
HIGHSCHOOL SAMOR RCC GATAR BANDHANE |
100000 |
HIGHSCHOOL SAMOR RCC GATAR BANDHANE1 |
Completion of work |
-
latitude : 18.0496533
Longitude : 73.0202003
file name : Image_12062023181406320.png
|
2023-06-12 18:14:06.420827 |
66 |
57890776 |
VARCHI BAUDHAVADI PAYRI RASTA CONCRETIKARAN KARNE |
100000 |
VARCHI BAUDHAVADI PAYRI RASTA CONCRETIKARAN KARNE1 |
Completion of work |
-
latitude : 18.0496531,18.0496533
Longitude : 73.0202011,73.0202003
file name : Image_12062023181317582.png
|
2023-06-12 18:13:17.67869 |
67 |
42554903 |
MEDICLORE KHAREDI |
50000 |
MEDICLORE KHAREDI1 |
Completion of work |
-
latitude : 18.0496612
Longitude : 73.0201846
file name : Image_11082023172337821.png
|
2023-08-11 17:23:37.913374 |
68 |
57793122 |
NANVALI MANERI PANI SATHVAN TAKI BANDHANE |
172398 |
NANVALI MANERI PANI SATHVAN TAKI BANDHANE1 |
Completion of work |
-
latitude : 18.049607735819123
Longitude : 73.02017256916815
file name : Image_08082023205908778.png
|
2023-08-08 20:59:08.869267 |
69 |
42555128 |
FAVARNI MACHINE GHENE |
50000 |
FAVARNI MACHINE GHENE1 |
Completion of work |
-
latitude : 18.0496537
Longitude : 73.020193
file name : Image_11082023172234738.png
|
2023-08-11 17:22:34.822781 |
70 |
57796688 |
MUJAHID KALOKHE TE SHADAB HADADI BANDIST GATAR BANDHANE |
100000 |
MUJAHID KALOKHE TE SHADAB HADADI BANDIST GATAR BANDHANE1 |
Completion of work |
-
latitude : 18.0496554
Longitude : 73.0201903
file name : Image_12092023182621962.png
|
2023-09-12 18:26:22.122707 |
71 |
57886877 |
MOHOLLA YETHE SIRAJ KADIRI TE UNUS VELASKAR SAVRAKSHAN BHINT BANDHANE |
100000 |
MOHOLLA YETHE SIRAJ KADIRI TE UNUS VELASKAR SAVRAKSHAN BHINT BANDHANE1 |
Completion of work |
-
latitude : 18.0496474
Longitude : 73.020195
file name : Image_12092023182655479.png
|
2023-09-12 18:26:55.561143 |
72 |
57788752 |
NARAYAN MENDADKAR YANCHYA GHARAJAVAL SATHAVAN TAKI BANDHANE |
350000 |
NARAYAN MENDADKAR YANCHYA GHARAJAVAL SATHAVAN TAKI BANDHANE1 |
Completion of work |
-
latitude : 18.049705269216716
Longitude : 73.02019131299441
file name : Image_17102023171102009.png
|
2023-10-17 17:11:02.07945 |
73 |
57794047 |
SAVARDE YETHE PANIDATHVAN TAKI BSANDHANE |
50000 |
SAVARDE YETHE PANIDATHVAN TAKI BSANDHANE1 |
Completion of work |
-
latitude : 18.049662174158637
Longitude : 73.02021161319168
file name : Image_17102023171133882.png
|
2023-10-17 17:11:33.968907 |
74 |
57885716 |
DIGHI KOLIWADA SARV BANDAR RASTE TAYAR KARNE |
196632 |
DIGHI KOLIWADA SARV BANDAR RASTE TAYAR KARNE1 |
Completion of work |
-
latitude : 18.049637,18.049637
Longitude : 73.0202,73.0202
file name : Image_20102023151814507.png
|
2023-10-20 15:18:14.572015 |
75 |
88068295 |
Water Supply to villages |
320000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 18.0496487
Longitude : 73.0202044
file name : Image_26102023155434010.png
|
2023-10-26 15:54:34.080464 |
76 |
88058794 |
Water Supply to villages |
200000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 18.0496478
Longitude : 73.0202037
file name : Image_26102023155412245.png
|
2023-10-26 15:54:12.311586 |
77 |
57888010 |
SAVRADE YETHE VIJAY KASARE TE LAXMAN SAKPAL RASTA CONCRETIKARAN KARNE |
100000 |
SAVRADE YETHE VIJAY KASARE TE LAXMAN SAKPAL RASTA CONCRETIKARAN KARNE1 |
Completion of work |
-
latitude : 18.049652,18.0496539
Longitude : 73.0201971,73.0201981
file name : Image_10012024121258146.png
|
2024-01-10 12:12:58.214476 |
78 |
50462278 |
DIGHI KOLIWADA GRAMPANCHAYAT MALAKICHI PANIPURAVTHA DURUSTI VA CONNECTON DENE |
299000 |
DIGHI KOLIWADA GRAMPANCHAYAT MALAKICHI PANIPURAVTHA DURUSTI VA CONNECTON DENE1 |
Completion of work |
-
latitude : 18.147953033447266
Longitude : 73.00713348388672
file name : Image_08022024131902606.png
|
2024-02-08 13:19:02.683017 |
79 |
88669617 |
Creation of a new source of drinking water |
500000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 18.0496509
Longitude : 73.0202131
file name : Image_14122023113203634.png
|
2023-12-14 11:32:03.702139 |
80 |
35802123 |
Dighi Kolivada yethil Navin Smashan bhumi yethe mayat jalanycha chauthara va chhappar durusti |
100000 |
Dighi Kolivada yethil Navin Smashan bhumi yethe mayat jalanycha chauthara va chhappar durusti1 |
Completion of work |
-
latitude : 18.0496697
Longitude : 73.0201896
file name : Image_07032024155308524.png
|
2024-03-07 15:53:08.601081 |
81 |
35805730 |
Construction of a new well for karalas Mohalla |
299000 |
Construction of a new well for karalas Mohalla1 |
Completion of work |
-
latitude : 18.0496489
Longitude : 73.0201879
file name : Image_30042024160647056.png
|
2024-04-30 16:06:47.127592 |
82 |
67866899 |
Tap water connections to households |
909510 |
Tap water connections to households1 |
Completion of work |
-
latitude : 18.0433527
Longitude : 73.0146019
file name : Image_26042024212746235.png
|
2024-04-26 21:27:46.307519 |
83 |
50457544 |
DIGHI BAUDHWADI DR BABASAHEB AMBEDKAR URVARIT PEVER BLOCK LADI BASVINE |
44581 |
DIGHI BAUDHWADI DR BABASAHEB AMBEDKAR URVARIT PEVER BLOCK LADI BASVINE1 |
Completion of work |
-
latitude : 18.0496398
Longitude : 73.020197
file name : Image_25042024183631914.png
|
2024-04-25 18:36:31.986183 |
84 |
35802543 |
Karbhari yethil Sathavan taki durusti |
200000 |
Karbhari yethil Sathavan taki durusti1 |
Completion of work |
-
latitude : 18.0496676
Longitude : 73.0201984
file name : Image_07032024155510326.png
|
2024-03-07 15:55:10.401175 |
85 |
35660302 |
SARV GATAR SAFAI |
95722 |
SARV GATAR SAFAI1 |
Completion of work |
-
latitude : 18.0496656
Longitude : 73.0202153
file name : Image_24062024174309946.png
|
2024-06-24 17:43:10.033176 |
86 |
50455819 |
DIGHI KOLIWADA YETHIL RAMA BENDUK TE RAMCHANDRA PADMA NIGUDKAR GHARA PARYANT RCC BANDIST GATAR BANDH |
250000 |
DIGHI KOLIWADA YETHIL RAMA BENDUK TE RAMCHANDRA PADMA NIGUDKAR GHARA PARYANT RCC BANDIST GATAR BANDH1 |
Completion of work |
-
latitude : 18.0496607,18.049672
Longitude : 73.020207,73.0202075
file name : Image_06062024163238238.png
|
2024-06-06 16:32:38.338594 |
87 |
57870793 |
ADIVASIWADI YETHE DAMODAR PAVAR TE UPKENDRA PAYRYA RASTA CONCRETIKARAN KARNE |
109792 |
ADIVASIWADI YETHE DAMODAR PAVAR TE UPKENDRA PAYRYA RASTA CONCRETIKARAN KARNE1 |
Completion of work |
-
latitude : 18.0496461
Longitude : 73.020197
file name : Image_28032024233401814.png
|
2024-03-28 23:34:01.889617 |
88 |
57889024 |
BHANDARI SAMAJ RAJENDRA SHELAR E MAHESH BHUNE SIR RASTA CONCRETIKARAN KARNE |
100000 |
BHANDARI SAMAJ RAJENDRA SHELAR E MAHESH BHUNE SIR RASTA CONCRETIKARAN KARNE1 |
Completion of work |
-
latitude : 18.0496457,18.0496457
Longitude : 73.0201966,73.0201966
file name : Image_28032024233435248.png
|
2024-03-28 23:34:35.308858 |
89 |
35805350 |
The roof over the Dighei Mohalla Water storage tank |
187720 |
The roof over the Dighei Mohalla Water storage tank1 |
Completion of work |
-
latitude : 18.0496461
Longitude : 73.020197
file name : Image_28032024232444521.png
|
2024-03-28 23:24:44.594255 |
90 |
67887341 |
Construction Toilet |
119959 |
Construction Toilet1 |
Completion of work |
-
latitude : 18.0496664
Longitude : 73.0202022
file name : Image_29092024162833288.png
|
2024-09-29 16:28:33.383649 |
91 |
57812399 |
SHALESATHI KAPATE PURVINE |
55000 |
SHALESATHI KAPATE PURVINE1 |
Completion of work |
-
latitude : 18.0496733
Longitude : 73.020201
file name : Image_29092024162310261.png
|
2024-09-29 16:23:10.382868 |
92 |
67895497 |
Construction of Building |
152001 |
Construction of Building1 |
Completion of work |
-
latitude : 18.0496657,18.0496657
Longitude : 73.0202037,73.0202037
file name : Image_29092024162937547.png
|
2024-09-29 16:29:37.635374 |
93 |
67878940 |
Piped water supply to HH |
100000 |
Piped water supply to HH1 |
Completion of work |
-
latitude : 18.0496651
Longitude : 73.0202033
file name : Image_29092024162516942.png
|
2024-09-29 16:25:17.04237 |
94 |
67879611 |
Construction of Building |
45475 |
Construction of Building1 |
Completion of work |
-
latitude : 18.049685,18.0496651
Longitude : 73.0201995,73.0202033
file name : Image_29092024162607960.png
|
2024-09-29 16:26:08.035998 |
95 |
67879888 |
Construction of RAMPS |
45476 |
Construction of RAMPS1 |
Completion of work |
-
latitude : 18.043367374659336
Longitude : 73.0146073040814
file name : Image_29092024162712028.png
|
2024-09-29 16:27:12.098384 |
96 |
67880444 |
Construction of Health Sub-Centres |
50000 |
Construction of Health Sub-Centres1 |
Completion of work |
-
latitude : 18.0496637,18.0496637
Longitude : 73.0202119,73.0202119
file name : Image_22072024172849050.png
|
2024-07-22 17:28:49.133085 |
97 |
67887854 |
Construction of Boundary Wall |
152146 |
Construction of Boundary Wall1 |
Completion of work |
-
latitude : 18.0496649,18.0496649
Longitude : 73.0202088,73.0202088
file name : Image_16102024145425727.png
|
2024-10-16 14:54:25.823788 |
98 |
67867053 |
Drainage Construction |
250000 |
Drainage Construction1 |
Completion of work |
-
latitude : 18.0496619
Longitude : 73.020212
file name : Image_21102024144749975.png
|
2024-10-21 14:47:50.069374 |
99 |
89870107 |
Construction of Community Sanitary Complex |
100000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 18.0496766
Longitude : 73.0202053
file name : Image_11112024113123560.png
|
2024-11-11 11:31:23.65947 |
100 |
89870107 |
Construction of Community Sanitary Complex |
100000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 18.0496485
Longitude : 73.0202133
file name : Image_21102024144432069.png
|
2024-10-21 14:44:32.156366 |
101 |
67888265 |
Construction of Building |
100000 |
Construction of Building1 |
Completion of work |
-
latitude : 18.0496546,18.0496546
Longitude : 73.0202133,73.0202133
file name : Image_21102024151801498.png
|
2024-10-21 15:18:01.654765 |
102 |
50460368 |
TCL POWDER KHAREDI |
100000 |
TCL POWDER KHAREDI1 |
Completion of work |
-
latitude : 18.0496636
Longitude : 73.020213
file name : Image_24102024170244435.png
|
2024-10-24 17:02:44.536052 |
103 |
67867967 |
Drainage Construction |
209510 |
Drainage Construction1 |
Completion of work |
-
latitude : 18.0496597
Longitude : 73.0202052
file name : Image_13082024183127514.png
|
2024-08-13 18:31:27.601627 |
104 |
67888705 |
Construction of Building |
100000 |
Construction of Building1 |
Completion of work |
-
latitude : 18.0496592
Longitude : 73.0202057
file name : Image_13082024183018044.png
|
2024-08-13 18:30:18.128536 |
105 |
50454137 |
KARLAS DHANBAI MATA MANDIRALA CEMENT COMPOUND WALL |
122445 |
KARLAS DHANBAI MATA MANDIRALA CEMENT COMPOUND WALL1 |
Completion of work |
-
latitude : 18.27313804626465
Longitude : 72.95000457763672
file name : Image_11112024114245969.png
|
2024-11-11 11:42:46.048846 |
106 |
57886221 |
NANVALI SHALELA SAVRAKSHAN BHINT BANDHANE |
100000 |
NANVALI SHALELA SAVRAKSHAN BHINT BANDHANE1 |
Completion of work |
-
latitude : 18.27313804626465
Longitude : 72.95000457763672
file name : Image_11112024114007482.png
|
2024-11-11 11:40:07.580217 |
107 |
57887420 |
KARLAS YETHE DHYANBAIMATA MANDIR SAVRAKSHAN BHIN BANDHANE |
100000 |
KARLAS YETHE DHYANBAIMATA MANDIR SAVRAKSHAN BHIN BANDHANE1 |
Completion of work |
-
latitude : 18.27313804626465
Longitude : 72.95000457763672
file name : Image_11112024114140393.png
|
2024-11-11 11:41:40.481607 |
108 |
57887420 |
KARLAS YETHE DHYANBAIMATA MANDIR SAVRAKSHAN BHIN BANDHANE |
100000 |
KARLAS YETHE DHYANBAIMATA MANDIR SAVRAKSHAN BHIN BANDHANE1 |
Completion of work |
-
latitude : 18.27313804626465
Longitude : 72.95000457763672
file name : Image_11112024114102893.png
|
2024-11-11 11:41:02.975565 |