1 |
41809918 |
Construction of gate of hundu community grave yard at kolar k |
50000 |
Construction of gate of hundu community grave yard at kolar k1 |
Completion of work |
-
latitude : 17.915686666666666,17.915686666666666
Longitude : 77.44878999999999,77.44878999999999
file name : Image_08072021114756171.png
|
2021-07-08 11:47:56.463842 |
2 |
41805136 |
CC drain in General ward at kolar k village |
40000 |
CC drain in General ward at kolar k village1 |
Completion of work |
-
latitude : 17.917481666666667,17.91748833333333
Longitude : 77.44601166666666,77.44602499999999
file name : Image_08072021164826734.png
|
2021-07-08 16:48:26.83941 |
3 |
41805136 |
CC drain in General ward at kolar k village |
40000 |
CC drain in General ward at kolar k village1 |
Completion of work |
-
latitude : 17.914463333333334,17.914463333333334
Longitude : 77.44901333333334,77.44901333333334
file name : Image_08072021114741277.png
|
2021-07-08 11:47:41.483547 |
4 |
41722569 |
water supply Cistern near SC community hall kolar k village |
46000 |
water supply Cistern near SC community hall kolar k village1 |
Completion of work |
-
latitude : 17.90575
Longitude : 77.45029
file name : Image_08072021114731553.png
|
2021-07-08 11:47:31.777667 |
5 |
41502564 |
Bakchowdi village general water supply motor repairs and maintanance |
131000 |
Bakchowdi village general water supply motor repairs and maintanance1 |
Completion of work |
-
latitude : 17.906308333333335
Longitude : 77.45074
file name : Image_08072021114612443.png
|
2021-07-08 11:46:12.63521 |
6 |
41552672 |
Kolar k village General water supply motor repairs and maintanance |
215000 |
Kolar k village General water supply motor repairs and maintanance 1 |
Completion of work |
-
latitude : 17.906308333333335
Longitude : 77.45074
file name : Image_08072021114632362.png
|
2021-07-08 11:46:32.572331 |
7 |
41553587 |
Kamalpur village general water supply motor repairs and maintanance |
46000 |
Kamalpur village general water supply motor repairs and maintanance1 |
Completion of work |
-
latitude : 17.906305
Longitude : 77.4501
file name : Image_08072021114658268.png
|
2021-07-08 11:46:58.444875 |
8 |
41553010 |
Bellur village general water supply motor repairs and maintanance |
131000 |
Bellur village general water supply motor repairs and maintanance1 |
Completion of work |
-
latitude : 17.906415
Longitude : 77.45070000000001
file name : Image_08072021114644285.png
|
2021-07-08 11:46:44.452981 |
9 |
41814577 |
OHT tank maintanance at kolar k vilage |
100000 |
OHT tank maintanance at kolar k vilage1 |
Completion of work |
-
latitude : 17.906353333333335
Longitude : 77.45096833333334
file name : Image_08072021114650255.png
|
2021-07-08 11:46:50.47307 |
10 |
66359181 |
Water Supply to villages |
190000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 17.88923,17.889215
Longitude : 77.46429666666667,77.46428833333333
file name : Image_10032023142357752.png
|
2023-03-10 14:23:57.85925 |
11 |
66359181 |
Water Supply to villages |
190000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 17.88923,17.889215
Longitude : 77.46429666666667,77.46428833333333
file name : Image_10032023142638048.png
|
2023-03-10 14:26:38.15698 |
12 |
66359241 |
Water Supply to villages |
115422 |
Water Supply to villages1 |
Completion of work |
-
latitude : 17.917056666666667,17.91712
Longitude : 77.44787,77.44784166666666
file name : Image_10032023145334177.png
|
2023-03-10 14:53:34.27937 |
13 |
66360868 |
Water Supply to villages |
41957 |
Water Supply to villages1 |
Completion of work |
-
latitude : 17.917089999999998,17.917081666666665
Longitude : 77.44778333333333,77.447815
file name : Image_10032023145356398.png
|
2023-03-10 14:53:56.497615 |
14 |
66360868 |
Water Supply to villages |
41957 |
Water Supply to villages1 |
Completion of work |
-
latitude : 17.917089999999998,17.917081666666665
Longitude : 77.44778333333333,77.447815
file name : Image_10032023145430387.png
|
2023-03-10 14:54:30.490785 |
15 |
66359413 |
Water Supply to villages |
40000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 17.917064999999997,17.917053333333335
Longitude : 77.44781666666667,77.44779833333334
file name : Image_10032023145411396.png
|
2023-03-10 14:54:11.491195 |
16 |
66359413 |
Water Supply to villages |
40000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 17.917064999999997,17.917053333333335
Longitude : 77.44781666666667,77.44779833333334
file name : Image_10032023145451244.png
|
2023-03-10 14:54:51.340583 |
17 |
58686537 |
GP Kolar k all village drinking water kolar k and bakchowdi motor repairs |
100000 |
GP Kolar k all village drinking water kolar k and bakchowdi motor repairs1 |
Completion of work |
-
latitude : 17.889231666666667
Longitude : 77.46432499999999
file name : Image_10032023142352107.png
|
2023-03-10 14:23:52.209244 |
18 |
41572746 |
Kolar k village SC ST water supply motor repairs and maintanance |
92000 |
Kolar k village SC ST water supply motor repairs and maintanance 1 |
Completion of work |
-
latitude : 17.906298333333332
Longitude : 77.44999333333334
file name : Image_08072021114706441.png
|
2021-07-08 11:47:06.608927 |
19 |
41572916 |
Bakchowdi village SC ST water supply motor repairs and maintanance |
77000 |
Bakchowdi village SC ST water supply motor repairs and maintanance 1 |
Completion of work |
-
latitude : 17.906375
Longitude : 77.44994166666667
file name : Image_08072021114714503.png
|
2021-07-08 11:47:14.733102 |
20 |
41573098 |
Bellur village SC ST water supply motor repairs and maintanance |
77000 |
Bellur village SC ST water supply motor repairs and maintanance 1 |
Completion of work |
-
latitude : 17.905798333333333
Longitude : 77.45067999999999
file name : Image_08072021114722385.png
|
2021-07-08 11:47:22.532738 |
21 |
41718327 |
water supply pipe line General ward at Bellur village |
60000 |
water supply pipe line General ward at Bellur village1 |
Completion of work |
-
latitude : 17.91777666666667,17.917773333333333
Longitude : 77.446035,77.44602833333333
file name : Image_08072021164713832.png
|
2021-07-08 16:47:13.926685 |
22 |
41735087 |
Maintanance of all village drainage of kolar k gp |
168434 |
Maintanance of all village drainage of kolar k gp1 |
Completion of work |
-
latitude : 17.917678333333335,17.917678333333335
Longitude : 77.44607166666667,77.44607166666667
file name : Image_08072021164811453.png
|
2021-07-08 16:48:11.638231 |
23 |
41728941 |
Bakchowdi drain cleaning in general ward at Bakchowdi |
95000 |
Bakchowdi drain cleaning in general ward at Bakchowdi1 |
Completion of work |
-
latitude : 17.917891666666666,17.917871666666667
Longitude : 77.44600999999999,77.44597999999999
file name : Image_08072021164741423.png
|
2021-07-08 16:47:41.524517 |
24 |
41722026 |
water supply pipe line in kolar k village |
78000 |
water supply pipe line in kolar k village1 |
Completion of work |
-
latitude : 17.917771666666667,17.917771666666667
Longitude : 77.44603166666667,77.44603166666667
file name : Image_08072021164719415.png
|
2021-07-08 16:47:19.515271 |
25 |
41807518 |
All village SC ST solar light of gp kolar k |
185000 |
All village SC ST solar light of gp kolar k1 |
Completion of work |
-
latitude : 17.91774666666667
Longitude : 77.44604833333332
file name : Image_08072021164833035.png
|
2021-07-08 16:48:33.158735 |
26 |
41728671 |
Drain cleaning in general ward at kolar k village |
165000 |
Drain cleaning in general ward at kolar k village1 |
Completion of work |
-
latitude : 17.917786666666665,17.917871666666667
Longitude : 77.44602666666667,77.44602499999999
file name : Image_08072021164726390.png
|
2021-07-08 16:47:26.498675 |
27 |
41729353 |
Bellur drain cleaning in general ward at bellur |
95000 |
Bellur drain cleaning in general ward at bellur1 |
Completion of work |
-
latitude : 17.917838333333336,17.917838333333336
Longitude : 77.44598833333333,77.44598833333333
file name : Image_08072021164802663.png
|
2021-07-08 16:48:02.758714 |
28 |
41502463 |
Nizampur village general water supply motor repairs and maintanance |
92000 |
Nizampur village general water supply motor repairs and maintanance1 |
Completion of work |
-
latitude : 17.917825
Longitude : 77.446005
file name : Image_08072021164703422.png
|
2021-07-08 16:47:03.525366 |
29 |
54890109 |
Vijaykumar mechanic water supply motor repairs charge wage payment |
100000 |
Vijaykumar mechanic water supply motor repairs charge wage payment1 |
Completion of work |
-
latitude : 17.914628333333333
Longitude : 77.44901333333334
file name : Image_01112021104650165.png
|
2021-11-01 10:46:50.285755 |
30 |
54890089 |
Basavanna mechanic water supply motor repairs charge wage payment |
150000 |
Basavanna mechanic water supply motor repairs charge wage payment1 |
Completion of work |
-
latitude : 17.914391666666667
Longitude : 77.44903500000001
file name : Image_01112021104645110.png
|
2021-11-01 10:46:45.257374 |
31 |
54891060 |
High mass street light repairs and purchases |
100000 |
High mass street light repairs and purchases 1 |
Completion of work |
-
latitude : 17.917745
Longitude : 77.44682333333334
file name : Image_01112021104705469.png
|
2021-11-01 10:47:05.598098 |
32 |
54890165 |
Purchase of Drinking water supply repair materials for general ward all village |
150000 |
Purchase of Drinking water supply repair materials for general ward all village1 |
Completion of work |
-
latitude : 17.916024999999998
Longitude : 77.44836166666667
file name : Image_01112021104655515.png
|
2021-11-01 10:46:55.638262 |
33 |
54890212 |
Purchase of Drinking water supply repair materials for SC/ST ward all village |
150000 |
Purchase of Drinking water supply repair materials for SC/ST ward all village1 |
Completion of work |
-
latitude : 17.918805000000003
Longitude : 77.447205
file name : Image_01112021104700964.png
|
2021-11-01 10:47:01.085337 |
34 |
54890595 |
Construction of Cistern and pipeline near Jaganath Jamadar house ST galli at kamalpur village |
60000 |
Construction of Cistern and pipeline near Jaganath Jamadar house ST galli at kamalpur village1 |
Completion of work |
-
latitude : 17.909418333333335
Longitude : 77.45007000000001
file name : Image_13022022143625585.png
|
2022-02-13 14:36:25.700865 |
35 |
54890456 |
Construction of CC drain from Ganpati chidri house to Main road at Kolar K village |
100000 |
Construction of CC drain from Ganpati chidri house to Main road at Kolar K village1 |
Completion of work |
-
latitude : 17.915211666666668,17.915206666666666
Longitude : 77.44896999999999,77.44902333333333
file name : Image_25022022114346168.png
|
2022-02-25 11:43:46.270344 |
36 |
54890524 |
Construction of culvert near water tank, government school, Anil house, swami house near Laxmi mndr |
60000 |
Construction of culvert near water tank, government school, Anil house, swami house near Laxmi mndr 1 |
Completion of work |
-
latitude : 17.90806,17.907998333333335,17.907998333333335
Longitude : 77.44693333333333,77.44689666666666,77.44689666666666
file name : Image_21022022150713857.png
|
2022-02-21 15:07:13.961112 |
37 |
54890253 |
Construction of Culvert near Faruk house at kolar k |
60000 |
Construction of Culvert near Faruk house at kolar k1 |
Completion of work |
-
latitude : 17.915891666666667
Longitude : 77.44725833333334
file name : Image_29122021160618732.png
|
2021-12-29 16:06:18.869818 |
38 |
54890860 |
Construction of CC drain and culvert from Rajkumar Aurade house to Baburao Aurade house at Bakchowdi |
180000 |
Construction of CC drain and culvert from Rajkumar Aurade house to Baburao Aurade house at Bakchowdi1 |
Completion of work |
-
latitude : 17.892753333333335,17.89271
Longitude : 77.43919666666667,77.43923333333333
file name : Image_29122021180338017.png
|
2021-12-29 18:03:38.146454 |
39 |
54890909 |
Construction of drain from Shankar SC Bhavikatti house to shettepa navar house at bakchowdi village |
120000 |
Construction of drain from Shankar SC Bhavikatti house to shettepa navar house at bakchowdi village1 |
Completion of work |
-
latitude : 17.891978333333334,17.891978333333334
Longitude : 77.44062833333334,77.44062833333334
file name : Image_29122021180344465.png
|
2021-12-29 18:03:44.562564 |
40 |
58687508 |
Hand pump repairs |
50000 |
Hand pump repairs1 |
Completion of work |
-
latitude : 17.906893333333336
Longitude : 77.448275
file name : Image_02022022174750490.png
|
2022-02-02 17:47:50.626464 |
41 |
59202280 |
Dust bin purchases for all village beneficiary |
53693 |
Dust bin purchases for all village beneficiary1 |
Completion of work |
-
latitude : 17.917761666666667
Longitude : 77.44682833333333
file name : Image_02022022172703712.png
|
2022-02-02 17:27:03.823154 |
42 |
58970832 |
Installation of Insulator at Govertnement HRPS |
26000 |
Installation of Insulator at Govertnement HRPS 1 |
Completion of work |
-
latitude : 17.893996666666666
Longitude : 77.43899666666667
file name : Image_04022022104630415.png
|
2022-02-04 10:46:30.527078 |
43 |
54890342 |
Construction of drain and culvert near Ghudusab house at bellur village |
150000 |
Construction of drain and culvert near Ghudusab house at bellur village1 |
Completion of work |
-
latitude : 17.888863333333333,17.888841666666668
Longitude : 77.45859999999999,77.458565
file name : Image_15092022093540901.png
|
2022-09-15 09:35:41.009147 |
44 |
58964123 |
Kolar k culvert construction near Gurudas christian house at kolar k |
30000 |
Kolar k culvert construction near Gurudas christian house at kolar k1 |
Completion of work |
-
latitude : 17.91719,17.91719
Longitude : 77.44771833333333,77.44771833333333
file name : Image_26042022152802435.png
|
2022-04-26 15:28:02.5667 |
45 |
58961349 |
Bakchowdi Basappa jigalmadi house to kandak CC drain and culvert construction |
90000 |
Bakchowdi Basappa jigalmadi house to kandak CC drain and culvert construction1 |
Completion of work |
-
latitude : 17.894108333333335,17.894203333333333
Longitude : 77.44104833333334,77.441
file name : Image_26042022122207898.png
|
2022-04-26 12:22:08.010513 |
46 |
58964705 |
Bellur Culvert construction near Ramabai ST house at bellur village |
40000 |
Bellur Culvert construction near Ramabai ST house at bellur village1 |
Completion of work |
-
latitude : 17.890853333333332,17.890863333333336
Longitude : 77.45981499999999,77.45991666666667
file name : Image_26042022114633512.png
|
2022-04-26 11:46:33.654563 |
47 |
58966638 |
Bellur water tank to grave yard kacha road formation |
60000 |
Bellur water tank to grave yard kacha road formation1 |
Completion of work |
-
latitude : 17.892296666666667,17.892331666666667,17.892305
Longitude : 77.460835,77.46080833333333,77.46077666666666
file name : Image_11052022105405528.png
|
2022-05-11 10:54:05.677449 |
48 |
54890991 |
Construction of CC compound near government school at kolar k village |
60000 |
Construction of CC compound near government school at kolar k village1 |
Completion of work |
-
latitude : 17.917036666666668
Longitude : 77.44844333333334
file name : Image_11052022112955884.png
|
2022-05-11 11:29:55.995982 |
49 |
41816213 |
Water filter maintantance all village |
40000 |
Water filter maintantance all village1 |
Completion of work |
-
latitude : 17.917705
Longitude : 77.44660166666667
file name : Image_11052022133835937.png
|
2022-05-11 13:38:36.058657 |
50 |
58691846 |
Hajjargi water supply pipeline from majid to khanapur hanmanth house at hajjargi |
30000 |
Hajjargi water supply pipeline from majid to khanapur hanmanth house at hajjargi1 |
Completion of work |
-
latitude : 17.908293333333333
Longitude : 77.44682166666666
file name : Image_16062022092929593.png
|
2022-06-16 09:29:29.697817 |
51 |
59624446 |
san dmm |
924951 |
san dmm1 |
Completion of work |
-
latitude : 17.89149666666667
Longitude : 77.46073
file name : Image_26062022161218147.png
|
2022-06-26 16:12:18.238121 |
52 |
59624446 |
san dmm |
924951 |
san dmm1 |
Completion of work |
-
latitude : 17.91774
Longitude : 77.44690999999999
file name : Image_02022022140622527.png
|
2022-02-02 14:06:22.654954 |
53 |
58694888 |
Kolar k CC drain from gundayya chowk to PKPS society at at kolar k |
60000 |
Kolar k CC drain from gundayya chowk to PKPS society at at kolar k1 |
Completion of work |
-
latitude : 17.92002666666667,17.91999666666667,17.91999666666667
Longitude : 77.44866999999999,77.44860666666666,77.44860666666666
file name : Image_04082022163838221.png
|
2022-08-04 16:38:38.335379 |
54 |
58965147 |
Kamalpur culvert construction near Prabhushetty house at kamalpur |
30000 |
Kamalpur culvert construction near Prabhushetty house at kamalpur1 |
Completion of work |
-
latitude : 17.891425,17.891516666666668
Longitude : 77.460815,77.4607
file name : Image_22092022184132200.png
|
2022-09-22 18:41:32.296046 |
55 |
41730270 |
Kamalpur drain cleaning in general ward at kamalpur |
19000 |
Kamalpur drain cleaning in general ward at kamalpur1 |
Completion of work |
-
latitude : 17.891501666666667,17.891478333333335
Longitude : 77.460695,77.46084166666667
file name : Image_22092022184136775.png
|
2022-09-22 18:41:36.877497 |
56 |
58963032 |
Nizampur village CC drain from nagamma house to rajkumar house |
60000 |
Nizampur village CC drain from nagamma house to rajkumar house1 |
Completion of work |
-
latitude : 17.891489999999997,17.891579999999998
Longitude : 77.46067333333333,77.46027833333332
file name : Image_20122022121919085.png
|
2022-12-20 12:19:19.226602 |
57 |
58696277 |
Bakchowdi Bhimanna chatnalli house to Hanmanth mirkale house CC drain construction |
60000 |
Bakchowdi Bhimanna chatnalli house to Hanmanth mirkale house CC drain construction1 |
Completion of work |
-
latitude : 17.891506666666665,17.891540000000003
Longitude : 77.460695,77.46052666666667
file name : Image_20122022121925335.png
|
2022-12-20 12:19:25.426837 |
58 |
58696277 |
Bakchowdi Bhimanna chatnalli house to Hanmanth mirkale house CC drain construction |
60000 |
Bakchowdi Bhimanna chatnalli house to Hanmanth mirkale house CC drain construction1 |
Completion of work |
-
latitude : 17.891506666666665,17.891540000000003
Longitude : 77.460695,77.46052666666667
file name : Image_20122022121936045.png
|
2022-12-20 12:19:36.143859 |
59 |
58969320 |
Bellur pochamma temple repairs |
90000 |
Bellur pochamma temple repairs1 |
Completion of work |
-
latitude : 17.89153333333333
Longitude : 77.460505
file name : Image_20122022121914280.png
|
2022-12-20 12:19:14.376907 |
60 |
58969790 |
Kolar K Margemma temple zink sheet roof construction in ST galli at kolar K village |
30000 |
Kolar K Margemma temple zink sheet roof construction in ST galli at kolar K village1 |
Completion of work |
-
latitude : 17.891653333333334
Longitude : 77.46035666666667
file name : Image_20122022121930651.png
|
2022-12-20 12:19:30.743061 |
61 |
58969790 |
Kolar K Margemma temple zink sheet roof construction in ST galli at kolar K village |
30000 |
Kolar K Margemma temple zink sheet roof construction in ST galli at kolar K village1 |
Completion of work |
-
latitude : 17.891653333333334
Longitude : 77.46035666666667
file name : Image_20122022121941900.png
|
2022-12-20 12:19:42.004554 |
62 |
66369107 |
All village street light purchases |
182741 |
All village street light purchases1 |
Completion of work |
-
latitude : 17.91771333333333
Longitude : 77.446785
file name : Image_04032023151927917.png
|
2023-03-04 15:19:28.023975 |
63 |
66359026 |
Water Supply to villages |
346000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 17.9193948,17.919595
Longitude : 77.4466545,77.44678833333334
file name : Image_04032023151932109.png
|
2023-03-04 15:19:32.22053 |
64 |
66369091 |
Assets manual survey hologram form purchses |
161212 |
Assets manual survey hologram form purchses1 |
Completion of work |
-
latitude : 17.9176898
Longitude : 77.4466316
file name : Image_04032023151923949.png
|
2023-03-04 15:19:24.053216 |
65 |
54890776 |
Construction of Culvert near Parmeshwar hindoddi house at nizampur village |
30000 |
Construction of Culvert near Parmeshwar hindoddi house at nizampur village1 |
Completion of work |
-
latitude : 17.905134999999998
Longitude : 77.44762166666666
file name : Image_13022023152834628.png
|
2023-02-13 15:28:34.726954 |
66 |
54890776 |
Construction of Culvert near Parmeshwar hindoddi house at nizampur village |
30000 |
Construction of Culvert near Parmeshwar hindoddi house at nizampur village1 |
Completion of work |
-
latitude : 17.905134999999998
Longitude : 77.44762166666666
file name : Image_13022023152853270.png
|
2023-02-13 15:28:53.363744 |
67 |
66368974 |
Kolar k CC bed construction near basava mantap |
150000 |
Kolar k CC bed construction near basava mantap 1 |
Completion of work |
-
latitude : 17.914440000000003,17.91435166666667
Longitude : 77.44905,77.44902666666667
file name : Image_13022023152845409.png
|
2023-02-13 15:28:45.507825 |
68 |
66368974 |
Kolar k CC bed construction near basava mantap |
150000 |
Kolar k CC bed construction near basava mantap 1 |
Completion of work |
-
latitude : 17.914440000000003,17.91435166666667
Longitude : 77.44905,77.44902666666667
file name : Image_13022023152859270.png
|
2023-02-13 15:28:59.37454 |
69 |
66368591 |
Water Supply to villages |
70000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 17.891385,17.891348333333333
Longitude : 77.44044833333334,77.44053666666667
file name : Image_13022023152818241.png
|
2023-02-13 15:28:18.336117 |
70 |
66368988 |
Hajjargi grave yard fencing work |
75000 |
Hajjargi grave yard fencing work1 |
Completion of work |
-
latitude : 17.911915,17.912003333333335
Longitude : 77.44714666666667,77.44717166666666
file name : Image_05062023113818960.png
|
2023-06-05 11:38:19.089128 |
71 |
66368909 |
Bellur Dr Babu jagjeevan ram bhavan fencing and gate construction |
75000 |
Bellur Dr Babu jagjeevan ram bhavan fencing and gate construction1 |
Completion of work |
-
latitude : 17.89213
Longitude : 77.46224166666666
file name : Image_18032023101428166.png
|
2023-03-18 10:14:28.283097 |
72 |
66368948 |
Kolar k community hall flooring near pastor house |
225000 |
Kolar k community hall flooring near pastor house 1 |
Completion of work |
-
latitude : 17.91710833333333
Longitude : 77.44774000000001
file name : Image_18032023111048430.png
|
2023-03-18 11:10:48.529254 |
73 |
66369049 |
Physical challenged 5 percent reserved |
231063 |
Physical challenged 5 percent reserved 1 |
Completion of work |
-
latitude : 17.9177
Longitude : 77.44667
file name : Image_05062023113934584.png
|
2023-06-05 11:39:34.684562 |
74 |
66369049 |
Physical challenged 5 percent reserved |
231063 |
Physical challenged 5 percent reserved 1 |
Completion of work |
-
latitude : 17.917606666666664
Longitude : 77.44665499999999
file name : Image_30032023140009602.png
|
2023-03-30 14:00:09.696312 |
75 |
66368832 |
Water Supply to villages |
281379 |
Water Supply to villages1 |
Completion of work |
-
latitude : 17.917728333333333
Longitude : 77.44679333333333
file name : Image_05042023155027702.png
|
2023-04-05 15:50:27.808169 |
76 |
66368805 |
Water Supply to villages |
80000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 17.884888333333333,17.9176925
Longitude : 77.453445,77.4467508
file name : Image_21092023122349388.png
|
2023-09-21 12:23:49.498455 |
77 |
66368805 |
Water Supply to villages |
80000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 17.9176926,17.9176943
Longitude : 77.4466799,77.4466795
file name : Image_06062023114233137.png
|
2023-06-06 11:42:33.238585 |
78 |
66360993 |
Water Supply to villages |
288000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 17.9176942,17.9176959
Longitude : 77.4466794,77.4466703
file name : Image_06062023114350287.png
|
2023-06-06 11:43:50.383307 |
79 |
66360993 |
Water Supply to villages |
288000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 17.9176942,17.9176959
Longitude : 77.4466794,77.4466703
file name : Image_06062023114504739.png
|
2023-06-06 11:45:04.844649 |
80 |
66368515 |
Water Supply to villages |
75000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 17.889436666666665,17.889421666666667
Longitude : 77.45943833333334,77.459445
file name : Image_05062023113807748.png
|
2023-06-05 11:38:07.844216 |
81 |
58685867 |
all village drinking water material purchase gp kolar k |
100000 |
all village drinking water material purchase gp kolar k1 |
Completion of work |
-
latitude : 17.892895
Longitude : 77.43869166666667
file name : Image_05062023113813335.png
|
2023-06-05 11:38:13.448538 |
82 |
58685867 |
all village drinking water material purchase gp kolar k |
100000 |
all village drinking water material purchase gp kolar k1 |
Completion of work |
-
latitude : 17.892063333333333
Longitude : 77.46093833333333
file name : Image_26062022160505358.png
|
2022-06-26 16:05:05.456786 |
83 |
58685867 |
all village drinking water material purchase gp kolar k |
100000 |
all village drinking water material purchase gp kolar k1 |
Completion of work |
-
latitude : 17.91731
Longitude : 77.448595
file name : Image_11052022141549453.png
|
2022-05-11 14:15:49.564651 |
84 |
66368795 |
Water Supply to villages |
75000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 17.915773333333334,17.915746666666667
Longitude : 77.44746833333333,77.44733166666667
file name : Image_10072023120814457.png
|
2023-07-10 12:08:14.565347 |
85 |
58963688 |
Kolar k Kacha nali from basappa house to baswaraj shargar house at kolar k |
80000 |
Kolar k Kacha nali from basappa house to baswaraj shargar house at kolar k1 |
Completion of work |
-
latitude : 17.916138333333333,17.916138333333333
Longitude : 77.44932166666668,77.44932166666668
file name : Image_10072023120819503.png
|
2023-07-10 12:08:19.611369 |
86 |
66368931 |
Bakchowdi SC community hall repairs and color work |
75000 |
Bakchowdi SC community hall repairs and color work1 |
Completion of work |
-
latitude : 17.9177039
Longitude : 77.4467609
file name : Image_16092023124726957.png
|
2023-09-16 12:47:27.051086 |
87 |
66368919 |
Bakchowdi Anganwadi 2 repairs and color work |
50000 |
Bakchowdi Anganwadi 2 repairs and color work 1 |
Completion of work |
-
latitude : 17.9175142
Longitude : 77.4481001
file name : Image_16092023124713122.png
|
2023-09-16 12:47:12.067442 |
88 |
66368859 |
Water Supply to villages |
75000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 17.9175104,17.9177139
Longitude : 77.4480818,77.4467511
file name : Image_16092023124703694.png
|
2023-09-16 12:47:03.775254 |
89 |
66361065 |
Water Supply to villages |
75000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 17.9175127
Longitude : 77.4480865
file name : Image_16092023124733211.png
|
2023-09-16 12:47:33.458925 |
90 |
66368559 |
Water Supply to villages |
150000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 17.892848333333333,17.892848333333333,17.892848333333333
Longitude : 77.43922833333333,77.43922833333333,77.43922833333333
file name : Image_04042023172040221.png
|
2023-04-04 17:20:40.310106 |
91 |
66368538 |
Water Supply to villages |
75000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 17.9175188,17.9175166
Longitude : 77.4480976,77.4480956
file name : Image_16092023124742077.png
|
2023-09-16 12:47:42.173104 |
92 |
66368538 |
Water Supply to villages |
75000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 17.9176869,17.9177054
Longitude : 77.4466682,77.446675
file name : Image_06062023114312342.png
|
2023-06-06 11:43:12.451618 |
93 |
66368538 |
Water Supply to villages |
75000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 17.9176869,17.9177054
Longitude : 77.4466682,77.446675
file name : Image_06062023114431725.png
|
2023-06-06 11:44:31.830162 |
94 |
55322543 |
drinking water expenditures 2021 22 |
1321362 |
drinking water expenditures 2021 221 |
Completion of work |
-
latitude : 17.91772166666667
Longitude : 77.44676333333334
file name : Image_03102023112418301.png
|
2023-10-03 11:24:18.408786 |
95 |
55322543 |
drinking water expenditures 2021 22 |
1321362 |
drinking water expenditures 2021 221 |
Completion of work |
-
latitude : 17.917208333333335
Longitude : 77.44530833333333
file name : Image_10102022124255516.png
|
2022-10-10 12:42:55.63824 |
96 |
58696643 |
Nizampur water filter repairs and fencing |
30000 |
Nizampur water filter repairs and fencing1 |
Completion of work |
-
latitude : 17.9176987
Longitude : 77.4467364
file name : Image_03102023112350982.png
|
2023-10-03 11:23:51.09068 |
97 |
55322600 |
road work maintanance 2021 |
1761815 |
road work maintanance 20211 |
Completion of work |
-
latitude : 17.91772166666667,17.9176983,17.9176994
Longitude : 77.44676333333334,77.4467403,77.4467348
file name : Image_03102023112707593.png
|
2023-10-03 11:27:07.6911 |
98 |
55322600 |
road work maintanance 2021 |
1761815 |
road work maintanance 20211 |
Completion of work |
-
latitude : 17.905036666666668,17.905036666666668,17.905036666666668
Longitude : 77.44928333333334,77.44928333333334,77.44928333333334
file name : Image_10102022124300377.png
|
2022-10-10 12:43:00.489984 |
99 |
55322600 |
road work maintanance 2021 |
1761815 |
road work maintanance 20211 |
Completion of work |
-
latitude : 17.905036666666668,17.905036666666668,17.905036666666668
Longitude : 77.44928333333334,77.44928333333334,77.44928333333334
file name : Image_10102022124306546.png
|
2022-10-10 12:43:06.651146 |
100 |
66368648 |
Water Supply to villages |
75000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 17.9176997,17.9176997
Longitude : 77.4467332,77.4467332
file name : Image_03102023112434468.png
|
2023-10-03 11:24:34.765698 |
101 |
66368648 |
Water Supply to villages |
75000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 17.9176997,17.9176997
Longitude : 77.4467332,77.4467332
file name : Image_03102023112412922.png
|
2023-10-03 11:24:13.018471 |
102 |
66358595 |
Water Supply to villages |
50000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 17.91772166666667
Longitude : 77.44676333333334
file name : Image_03102023112428005.png
|
2023-10-03 11:24:28.139098 |
103 |
66358595 |
Water Supply to villages |
50000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 17.91772166666667
Longitude : 77.44676333333334
file name : Image_03102023112408063.png
|
2023-10-03 11:24:08.199178 |
104 |
66368689 |
Water Supply to villages |
225000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 17.91772166666667,17.9176997
Longitude : 77.44676333333334,77.4467332
file name : Image_03102023112422966.png
|
2023-10-03 11:24:23.095156 |
105 |
66368689 |
Water Supply to villages |
225000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 17.91772166666667,17.9176997
Longitude : 77.44676333333334,77.4467332
file name : Image_03102023112358139.png
|
2023-10-03 11:23:58.297195 |
106 |
66369023 |
ESCROW bill 2022 reserved |
323488 |
ESCROW bill 2022 reserved1 |
Completion of work |
-
latitude : 17.91772166666667
Longitude : 77.44676333333334
file name : Image_03102023135620125.png
|
2023-10-03 13:56:20.265999 |
107 |
87661617 |
Operation and Maintenance of drinking water supply system |
1402911 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 17.9177225
Longitude : 77.4466838
file name : Image_17012024123755512.png
|
2024-01-17 12:37:55.601482 |
108 |
54890671 |
construction of culvert near SC saraswati house and CC drain upto Bhimanna halli land at nizampur |
150000 |
construction of culvert near SC saraswati house and CC drain upto Bhimanna halli land at nizampur 1 |
Completion of work |
-
latitude : 17.9047679,17.9047676
Longitude : 77.4496422,77.4496423
file name : Image_10022024144032469.png
|
2024-02-10 14:40:32.591755 |
109 |
59592546 |
dummy |
2520000 |
dummy1 |
Completion of work |
-
latitude : 17.8676315
Longitude : 77.3607349
file name : Image_11082024223959339.png
|
2024-08-11 22:39:59.459901 |