1 |
56192486 |
Construction of side wall on motor floor in mammodu canal ward 6 |
219000 |
Construction of side wall on motor floor in mammodu canal ward 61 |
Roof laid |
-
latitude : 9.3874002,9.3874012
Longitude : 76.3843818,76.3843845
file name : Image_10022022110838677.png
|
2022-02-10 11:08:38.777649 |
2 |
56192486 |
Construction of side wall on motor floor in mammodu canal ward 6 |
219000 |
Construction of side wall on motor floor in mammodu canal ward 61 |
Plinth level |
-
latitude : 9.38697065,9.38720365
Longitude : 76.38440149,76.38440783
file name : Image_09022022115339111.png
|
2022-02-09 11:53:39.247901 |
3 |
56192486 |
Construction of side wall on motor floor in mammodu canal ward 6 |
219000 |
Construction of side wall on motor floor in mammodu canal ward 61 |
Completion of work |
-
latitude : 9.3874011,9.38672691
Longitude : 76.384384,76.38433928
file name : Image_08022022131236695.png
|
2022-02-08 13:12:36.802947 |
4 |
56193418 |
Construction of Side Wall for east canal from Poonthara Bridge ward 5 |
439000 |
Construction of Side Wall for east canal from Poonthara Bridge ward 51 |
Roof laid |
-
latitude : 9.38567147,9.38545027
Longitude : 76.38982783,76.39096244
file name : Image_10022022105447288.png
|
2022-02-10 10:54:47.422415 |
5 |
56193418 |
Construction of Side Wall for east canal from Poonthara Bridge ward 5 |
439000 |
Construction of Side Wall for east canal from Poonthara Bridge ward 51 |
Plinth level |
-
latitude : 9.38557149,9.3849934
Longitude : 76.39013615,76.3902609
file name : Image_09022022114306374.png
|
2022-02-09 11:43:06.4743 |
6 |
56193418 |
Construction of Side Wall for east canal from Poonthara Bridge ward 5 |
439000 |
Construction of Side Wall for east canal from Poonthara Bridge ward 51 |
Completion of work |
-
latitude : 9.38566555,9.3850012
Longitude : 76.38981514,76.3902574
file name : Image_08022022133726735.png
|
2022-02-08 13:37:26.834872 |
7 |
56407857 |
Drainage Construction From Puthupurackal Underpass to Boat jetty Ward-6 |
200000 |
Drainage Construction From Puthupurackal Underpass to Boat jetty Ward-61 |
Roof laid |
-
latitude : 9.385007,9.3850931
Longitude : 76.3730379,76.372962
file name : Image_10022022114929398.png
|
2022-02-10 11:49:29.519575 |
8 |
56407857 |
Drainage Construction From Puthupurackal Underpass to Boat jetty Ward-6 |
200000 |
Drainage Construction From Puthupurackal Underpass to Boat jetty Ward-61 |
Plinth level |
-
latitude : 9.40012332,9.3848464
Longitude : 76.38208827,76.3730558
file name : Image_09022022123529736.png
|
2022-02-09 12:35:29.849712 |
9 |
56407857 |
Drainage Construction From Puthupurackal Underpass to Boat jetty Ward-6 |
200000 |
Drainage Construction From Puthupurackal Underpass to Boat jetty Ward-61 |
Completion of work |
-
latitude : 9.3849147,9.38486915
Longitude : 76.3730397,76.37327064
file name : Image_08022022132433760.png
|
2022-02-08 13:24:33.875681 |
10 |
56217488 |
Concreting of various roads ward 10 |
256000 |
Concreting of various roads ward 101 |
Roof laid |
-
latitude : 9.3834989,9.3835569
Longitude : 76.3648496,76.3649318
file name : Image_10022022115447934.png
|
2022-02-10 11:54:48.055455 |
11 |
56217488 |
Concreting of various roads ward 10 |
256000 |
Concreting of various roads ward 101 |
Plinth level |
-
latitude : 9.3835172,9.38373643
Longitude : 76.3653204,76.36499651
file name : Image_09022022125212001.png
|
2022-02-09 12:52:12.111504 |
12 |
56217488 |
Concreting of various roads ward 10 |
256000 |
Concreting of various roads ward 101 |
Completion of work |
-
latitude : 9.3829064,9.38363188
Longitude : 76.3650076,76.36497162
file name : Image_08022022142704991.png
|
2022-02-08 14:27:05.116612 |
13 |
56117133 |
Drainage Construction from Kunnel bridge towards south Ward-4 |
439000 |
Drainage Construction from Kunnel bridge towards south Ward-41 |
Roof laid |
-
latitude : 9.4000176,9.3999169
Longitude : 76.3821522,76.3821755
file name : Image_10022022113356248.png
|
2022-02-10 11:33:56.362649 |
14 |
56117133 |
Drainage Construction from Kunnel bridge towards south Ward-4 |
439000 |
Drainage Construction from Kunnel bridge towards south Ward-41 |
Plinth level |
-
latitude : 9.3998878,9.4005794
Longitude : 76.3822009,76.3827909
file name : Image_09022022121210417.png
|
2022-02-09 12:12:10.517965 |
15 |
56117133 |
Drainage Construction from Kunnel bridge towards south Ward-4 |
439000 |
Drainage Construction from Kunnel bridge towards south Ward-41 |
Completion of work |
-
latitude : 9.3998154,9.3998301
Longitude : 76.3819917,76.3820529
file name : Image_08022022141232468.png
|
2022-02-08 14:12:32.580302 |
16 |
56407890 |
Drain Construction West From Sea Wall road Ward-1 |
400000 |
Drain Construction West From Sea Wall road Ward-11 |
Roof laid |
-
latitude : 9.38823822,9.38849406
Longitude : 76.34852235,76.34918007
file name : Image_24022022103022713.png
|
2022-02-24 10:30:22.826673 |
17 |
56407890 |
Drain Construction West From Sea Wall road Ward-1 |
400000 |
Drain Construction West From Sea Wall road Ward-11 |
Plinth level |
-
latitude : 9.38843839,9.38842482
Longitude : 76.34899855,76.34897497
file name : Image_23022022105510783.png
|
2022-02-23 10:55:10.90037 |
18 |
56407890 |
Drain Construction West From Sea Wall road Ward-1 |
400000 |
Drain Construction West From Sea Wall road Ward-11 |
Completion of work |
-
latitude : 9.38840257,9.38829084
Longitude : 76.34894979,76.34867858
file name : Image_22022022104652315.png
|
2022-02-22 10:46:52.418035 |
19 |
56217503 |
Dwaraka Kochupurackal Road Gravaling Ward 13 |
338000 |
Dwaraka Kochupurackal Road Gravaling Ward 131 |
Roof laid |
-
latitude : 9.3819889,9.3819842
Longitude : 76.3612255,76.3613687
file name : Image_24022022101934428.png
|
2022-02-24 10:19:34.539072 |
20 |
56217503 |
Dwaraka Kochupurackal Road Gravaling Ward 13 |
338000 |
Dwaraka Kochupurackal Road Gravaling Ward 131 |
Plinth level |
-
latitude : 9.3815795,9.3819112
Longitude : 76.3613853,76.3614836
file name : Image_23022022104550079.png
|
2022-02-23 10:45:50.188969 |
21 |
56217503 |
Dwaraka Kochupurackal Road Gravaling Ward 13 |
338000 |
Dwaraka Kochupurackal Road Gravaling Ward 131 |
Completion of work |
-
latitude : 9.381574,9.3818501
Longitude : 76.3614161,76.3613853
file name : Image_22022022151421385.png
|
2022-02-22 15:14:21.481665 |
22 |
56192866 |
Construction of side wall for canal from kannankeri Bridge to Railway Line Ward 7 |
328000 |
Construction of side wall for canal from kannankeri Bridge to Railway Line Ward 71 |
Roof laid |
-
latitude : 9.38163567,9.38208391
Longitude : 76.39192198,76.39200484
file name : Image_09022022113619297.png
|
2022-02-09 11:36:19.399309 |
23 |
56192866 |
Construction of side wall for canal from kannankeri Bridge to Railway Line Ward 7 |
328000 |
Construction of side wall for canal from kannankeri Bridge to Railway Line Ward 71 |
Plinth level |
-
latitude : 9.38166772,9.38186275
Longitude : 76.39194836,76.39190469
file name : Image_08022022125823370.png
|
2022-02-08 12:58:23.479249 |
24 |
56192866 |
Construction of side wall for canal from kannankeri Bridge to Railway Line Ward 7 |
328000 |
Construction of side wall for canal from kannankeri Bridge to Railway Line Ward 71 |
Completion of work |
-
latitude : 9.3813432,9.3813445
Longitude : 76.391983,76.3919857
file name : Image_13012022150344588.png
|
2022-01-13 15:03:44.685649 |
25 |
56407821 |
Drain From Tharakoottil to Kollam thara Road Ward-2 |
400000 |
Drain From Tharakoottil to Kollam thara Road Ward-21 |
Roof laid |
-
latitude : 9.39235841,9.39271632
Longitude : 76.36350364,76.36357777
file name : Image_11032022120052384.png
|
2022-03-11 12:00:52.504944 |
26 |
56407821 |
Drain From Tharakoottil to Kollam thara Road Ward-2 |
400000 |
Drain From Tharakoottil to Kollam thara Road Ward-21 |
Plinth level |
-
latitude : 9.3924106,9.39242861
Longitude : 76.3628919,76.36354915
file name : Image_24022022140554144.png
|
2022-02-24 14:05:54.24872 |
27 |
56407821 |
Drain From Tharakoottil to Kollam thara Road Ward-2 |
400000 |
Drain From Tharakoottil to Kollam thara Road Ward-21 |
Completion of work |
-
latitude : 9.39269665,9.39256193
Longitude : 76.36359402,76.36361969
file name : Image_22022022152835294.png
|
2022-02-22 15:28:35.386599 |
28 |
56217572 |
Sreenivas Road Concreting Ward 10 |
150000 |
Sreenivas Road Concreting Ward 101 |
Roof laid |
-
latitude : 9.3833844,9.3838235
Longitude : 76.3616186,76.3617406
file name : Image_15032022161431100.png
|
2022-03-15 16:14:31.219416 |
29 |
56217572 |
Sreenivas Road Concreting Ward 10 |
150000 |
Sreenivas Road Concreting Ward 101 |
Plinth level |
-
latitude : 9.3837998,9.3838333
Longitude : 76.3617455,76.3617232
file name : Image_14032022160215728.png
|
2022-03-14 16:02:15.82367 |
30 |
56217572 |
Sreenivas Road Concreting Ward 10 |
150000 |
Sreenivas Road Concreting Ward 101 |
Completion of work |
-
latitude : 9.3836193,9.3837617
Longitude : 76.3616977,76.3617034
file name : Image_11032022155021452.png
|
2022-03-11 15:50:21.577054 |
31 |
56217659 |
Land Altitude increasing for the construction of Anganavadi No 130 |
155960 |
Land Altitude increasing for the construction of Anganavadi No 1301 |
Roof laid |
-
latitude : 9.38882133,9.38888544
Longitude : 76.36377509,76.36373119
file name : Image_23032022125157870.png
|
2022-03-23 12:51:58.00645 |
32 |
56217659 |
Land Altitude increasing for the construction of Anganavadi No 130 |
155960 |
Land Altitude increasing for the construction of Anganavadi No 1301 |
Plinth level |
-
latitude : 9.38886352,9.38881192
Longitude : 76.36371614,76.36380004
file name : Image_22032022164953146.png
|
2022-03-22 16:49:53.256273 |
33 |
56217659 |
Land Altitude increasing for the construction of Anganavadi No 130 |
155960 |
Land Altitude increasing for the construction of Anganavadi No 1301 |
Completion of work |
-
latitude : 9.3888611,9.38882444
Longitude : 76.36362984,76.36369281
file name : Image_21032022151159310.png
|
2022-03-21 15:11:59.404226 |
34 |
56217549 |
Construction of Side Wall in Crematorium Road Ward 3 |
400000 |
Construction of Side Wall in Crematorium Road Ward 31 |
Roof laid |
-
latitude : 9.39477599,9.39479065
Longitude : 76.37737917,76.37761342
file name : Image_30032022110126102.png
|
2022-03-30 11:01:26.203256 |
35 |
56217549 |
Construction of Side Wall in Crematorium Road Ward 3 |
400000 |
Construction of Side Wall in Crematorium Road Ward 31 |
Plinth level |
-
latitude : 9.3945815,9.39479196
Longitude : 76.37773826,76.37770355
file name : Image_24032022120833291.png
|
2022-03-24 12:08:33.398376 |
36 |
56217549 |
Construction of Side Wall in Crematorium Road Ward 3 |
400000 |
Construction of Side Wall in Crematorium Road Ward 31 |
Completion of work |
-
latitude : 9.39453109,9.3946387
Longitude : 76.37772571,76.37774176
file name : Image_23032022130827906.png
|
2022-03-23 13:08:28.004896 |
37 |
56217691 |
Purchase of Pump set for Borewell installed in Tsunami Colony |
56000 |
Purchase of Pump set for Borewell installed in Tsunami Colony1 |
Roof laid |
-
latitude : 9.3777545
Longitude : 76.354814
file name : Image_31032022101740126.png
|
2022-03-31 10:17:40.216534 |
38 |
56217691 |
Purchase of Pump set for Borewell installed in Tsunami Colony |
56000 |
Purchase of Pump set for Borewell installed in Tsunami Colony1 |
Plinth level |
-
latitude : 9.3777484
Longitude : 76.3551554
file name : Image_31032022101242730.png
|
2022-03-31 10:12:42.815893 |
39 |
56217691 |
Purchase of Pump set for Borewell installed in Tsunami Colony |
56000 |
Purchase of Pump set for Borewell installed in Tsunami Colony1 |
Completion of work |
-
latitude : 9.3776747
Longitude : 76.3550512
file name : Image_24032022113319110.png
|
2022-03-24 11:33:19.212698 |
40 |
56217523 |
Construction of Drainage in UHTC - Thaiparambu Road Ward 12 |
404720 |
Construction of Drainage in UHTC - Thaiparambu Road Ward 121 |
Roof laid |
-
latitude : 9.3842069,9.3841867
Longitude : 76.3529711,76.3529499
file name : Image_22082022171355139.png
|
2022-08-22 17:13:55.232198 |
41 |
56217523 |
Construction of Drainage in UHTC - Thaiparambu Road Ward 12 |
404720 |
Construction of Drainage in UHTC - Thaiparambu Road Ward 121 |
Plinth level |
-
latitude : 9.3841875,9.3841828
Longitude : 76.3529394,76.3529256
file name : Image_30032022132406586.png
|
2022-03-30 13:24:06.672016 |
42 |
56217523 |
Construction of Drainage in UHTC - Thaiparambu Road Ward 12 |
404720 |
Construction of Drainage in UHTC - Thaiparambu Road Ward 121 |
Completion of work |
-
latitude : 9.3842043,9.3841869
Longitude : 76.352968,76.352936
file name : Image_30032022123652967.png
|
2022-03-30 12:36:53.07064 |
43 |
56194215 |
Drainage construction from plaparambu to nellur parambu ward 9 |
400000 |
Drainage construction from plaparambu to nellur parambu ward 91 |
Roof laid |
-
latitude : 9.3797882,9.3799644
Longitude : 76.3726168,76.37368
file name : Image_22032023183802676.png
|
2023-03-22 18:38:02.772623 |
44 |
56194215 |
Drainage construction from plaparambu to nellur parambu ward 9 |
400000 |
Drainage construction from plaparambu to nellur parambu ward 91 |
Plinth level |
-
latitude : 9.3798156,9.3798147
Longitude : 76.372618,76.3726104
file name : Image_20032023182900953.png
|
2023-03-20 18:29:01.035019 |
45 |
56194215 |
Drainage construction from plaparambu to nellur parambu ward 9 |
400000 |
Drainage construction from plaparambu to nellur parambu ward 91 |
Completion of work |
-
latitude : 9.3798076,9.3798225
Longitude : 76.3726221,76.3726256
file name : Image_15032023152330092.png
|
2023-03-15 15:23:30.185191 |
46 |
56217611 |
Renovation of Motor Floor in Vadakkemelathumkari |
600000 |
Renovation of Motor Floor in Vadakkemelathumkari1 |
Roof laid |
-
latitude : 9.3938722
Longitude : 76.3854033
file name : Image_23032023165116963.png
|
2023-03-23 16:51:17.054501 |
47 |
56217611 |
Renovation of Motor Floor in Vadakkemelathumkari |
600000 |
Renovation of Motor Floor in Vadakkemelathumkari1 |
Plinth level |
-
latitude : 9.3945041
Longitude : 76.3847553
file name : Image_15032023160920947.png
|
2023-03-15 16:09:21.043815 |
48 |
56217611 |
Renovation of Motor Floor in Vadakkemelathumkari |
600000 |
Renovation of Motor Floor in Vadakkemelathumkari1 |
Completion of work |
-
latitude : 9.3939307
Longitude : 76.3853997
file name : Image_10032023160043575.png
|
2023-03-10 16:00:43.675489 |
49 |
57943760 |
Aanamudi to Kaippally Illom Drainage Construction -Ward-13 (project No 09/22) |
600000 |
Aanamudi to Kaippally Illom Drainage Construction -Ward-13 (project No 09/22)1 |
Roof laid |
-
latitude : 9.3817173,9.3819364
Longitude : 76.3618664,76.3614161
file name : Image_24032023165500779.png
|
2023-03-24 16:55:00.915927 |
50 |
57943760 |
Aanamudi to Kaippally Illom Drainage Construction -Ward-13 (project No 09/22) |
600000 |
Aanamudi to Kaippally Illom Drainage Construction -Ward-13 (project No 09/22)1 |
Plinth level |
-
latitude : 9.3818517,9.3819216
Longitude : 76.3617252,76.3616733
file name : Image_15032023164731892.png
|
2023-03-15 16:47:31.999918 |
51 |
57943760 |
Aanamudi to Kaippally Illom Drainage Construction -Ward-13 (project No 09/22) |
600000 |
Aanamudi to Kaippally Illom Drainage Construction -Ward-13 (project No 09/22)1 |
Completion of work |
-
latitude : 9.3818095,9.3818771
Longitude : 76.3617664,76.3616941
file name : Image_10032023171406891.png
|
2023-03-10 17:14:06.981649 |
52 |
57945274 |
Renovation Of Padaharam Madathil road (Project No 06/23) |
1200000 |
Renovation Of Padaharam Madathil road (Project No 06/23)1 |
Roof laid |
-
latitude : 9.3823397,9.3834779
Longitude : 76.3887541,76.3893374
file name : Image_29032023174519966.png
|
2023-03-29 17:45:20.06731 |
53 |
57945274 |
Renovation Of Padaharam Madathil road (Project No 06/23) |
1200000 |
Renovation Of Padaharam Madathil road (Project No 06/23)1 |
Plinth level |
-
latitude : 9.3832698,9.3841514
Longitude : 76.3895231,76.3895212
file name : Image_15032023164506562.png
|
2023-03-15 16:45:06.654891 |
54 |
57945274 |
Renovation Of Padaharam Madathil road (Project No 06/23) |
1200000 |
Renovation Of Padaharam Madathil road (Project No 06/23)1 |
Completion of work |
-
latitude : 9.3824207,9.3831974
Longitude : 76.3893238,76.3893331
file name : Image_10032023162013010.png
|
2023-03-10 16:20:13.107171 |
55 |
87453704 |
Construction of roads |
500000 |
Construction of roads1 |
Plinth level |
-
latitude : 9.3797335,9.3797531
Longitude : 76.3726968,76.3727723
file name : Image_30032024105500167.png
|
2024-03-30 10:55:00.263301 |
56 |
87453704 |
Construction of roads |
500000 |
Construction of roads1 |
Completion of work |
-
latitude : 9.3832521,9.3832521
Longitude : 76.3559628,76.3559628
file name : Image_27032024145353492.png
|
2024-03-27 14:53:53.607267 |
57 |
87453704 |
Construction of roads |
500000 |
Construction of roads1 |
Completion of work |
-
latitude : 9.3798095,9.3798137
Longitude : 76.3729533,76.3728794
file name : Image_22032024161414062.png
|
2024-03-22 16:14:14.148886 |
58 |
87174744 |
Purchase of equipment (including safety equipment) for waste management |
1100000 |
Purchase of equipment (including safety equipment) for waste management1 |
Roof laid |
-
latitude : 9.3832518
Longitude : 76.3559454
file name : Image_30032024112753338.png
|
2024-03-30 11:27:53.442997 |
59 |
87174744 |
Purchase of equipment (including safety equipment) for waste management |
1100000 |
Purchase of equipment (including safety equipment) for waste management1 |
Plinth level |
-
latitude : 9.3832722
Longitude : 76.3559485
file name : Image_27032024152306435.png
|
2024-03-27 15:23:06.539037 |
60 |
87174744 |
Purchase of equipment (including safety equipment) for waste management |
1100000 |
Purchase of equipment (including safety equipment) for waste management1 |
Completion of work |
-
latitude : 9.3832674
Longitude : 76.3559576
file name : Image_27032024150104024.png
|
2024-03-27 15:01:04.118997 |