1 |
51799798 |
road concreate from erupathirandilchira to munnutinkalam in ward 1 |
200000 |
road concreate from erupathirandilchira to munnutinkalam in ward 11 |
Completion of work |
-
latitude : 9.445711666666666,9.4458481
Longitude : 76.462945,76.4624697
file name : Image_12012022123000313.png
|
2022-01-12 12:30:00.556746 |
2 |
51799798 |
road concreate from erupathirandilchira to munnutinkalam in ward 1 |
200000 |
road concreate from erupathirandilchira to munnutinkalam in ward 11 |
Completion of work |
-
latitude : 9.4458318,9.445835
Longitude : 76.4624925,76.4624864
file name : Image_22122021125524559.png
|
2021-12-22 12:55:24.687052 |
3 |
51795063 |
Pipeline from Chakkitaparambu to Punjapidaram Pradeep house in ward 10 |
150000 |
Pipeline from Chakkitaparambu to Punjapidaram Pradeep house in ward 101 |
Completion of work |
-
latitude : 9.4205609,9.4205609
Longitude : 76.497339,76.497339
file name : Image_14032022151000636.png
|
2022-03-14 15:10:00.741419 |
4 |
51795238 |
Pipeline from Kunnampalli bridge to Libraray in ward 13 |
100000 |
Pipeline from Kunnampalli bridge to Libraray in ward 131 |
Completion of work |
-
latitude : 9.4423361,9.4423361
Longitude : 76.4706917,76.4706917
file name : Image_11032022112530333.png
|
2022-03-11 11:25:30.441148 |
5 |
51795161 |
Pipeline from kannamangalam to shibusadhanam in ward 2 |
150000 |
Pipeline from kannamangalam to shibusadhanam in ward 21 |
Completion of work |
-
latitude : 9.4435518,9.4435518
Longitude : 76.474789,76.474789
file name : Image_14032022152621249.png
|
2022-03-14 15:26:21.362956 |
6 |
51794826 |
Pipeline from Parayil to Panaparambu in ward 5 |
300100 |
Pipeline from Parayil to Panaparambu in ward 51 |
Completion of work |
-
latitude : 9.4436584,9.4436584
Longitude : 76.4823478,76.4823478
file name : Image_14032022103131196.png
|
2022-03-14 10:31:31.299022 |
7 |
51816570 |
road from pwd road to kuzhangaramuttu reach 2 |
125000 |
road from pwd road to kuzhangaramuttu reach 21 |
Plinth level |
-
latitude : 9.4411297,9.4411297
Longitude : 76.4734302,76.4734302
file name : Image_21032022103210398.png
|
2022-03-21 10:32:10.501485 |
8 |
51816570 |
road from pwd road to kuzhangaramuttu reach 2 |
125000 |
road from pwd road to kuzhangaramuttu reach 21 |
Plinth level |
-
latitude : 9.4421426,9.442141
Longitude : 76.4747542,76.4747329
file name : Image_05032022110236253.png
|
2022-03-05 11:02:36.351698 |
9 |
51816570 |
road from pwd road to kuzhangaramuttu reach 2 |
125000 |
road from pwd road to kuzhangaramuttu reach 21 |
Completion of work |
-
latitude : 9.4410709,9.4411118
Longitude : 76.4735999,76.4734472
file name : Image_24022022103331024.png
|
2022-02-24 10:33:31.124751 |
10 |
51816248 |
Road concreate from Kalathil pradeesh home to Kothamana in ward 9 |
100000 |
Road concreate from Kalathil pradeesh home to Kothamana in ward 91 |
Plinth level |
-
latitude : 9.4245544,9.4246135
Longitude : 76.4961223,76.4962287
file name : Image_21012022153036117.png
|
2022-01-21 15:30:36.222749 |
11 |
51816248 |
Road concreate from Kalathil pradeesh home to Kothamana in ward 9 |
100000 |
Road concreate from Kalathil pradeesh home to Kothamana in ward 91 |
Completion of work |
-
latitude : 9.4245895,9.4245051
Longitude : 76.4962495,76.4961519
file name : Image_13012022164550213.png
|
2022-01-13 16:45:50.348385 |
12 |
51816464 |
road from puthenparambu to manaluvackal motorthara |
125000 |
road from puthenparambu to manaluvackal motorthara1 |
Roof laid |
-
latitude : 9.4278592,9.434391666666667
Longitude : 76.4834824,76.47557
file name : Image_23022022103951220.png
|
2022-02-23 10:39:51.320372 |
13 |
51816464 |
road from puthenparambu to manaluvackal motorthara |
125000 |
road from puthenparambu to manaluvackal motorthara1 |
Roof laid |
-
latitude : 9.4278592,9.434391666666667
Longitude : 76.4834824,76.47557
file name : Image_23022022104002406.png
|
2022-02-23 10:40:02.513504 |
14 |
51816464 |
road from puthenparambu to manaluvackal motorthara |
125000 |
road from puthenparambu to manaluvackal motorthara1 |
Plinth level |
-
latitude : 9.4279205,9.429808333333334
Longitude : 76.4834309,76.48484499999999
file name : Image_09022022102545009.png
|
2022-02-09 10:25:45.105342 |
15 |
51816464 |
road from puthenparambu to manaluvackal motorthara |
125000 |
road from puthenparambu to manaluvackal motorthara1 |
Completion of work |
-
latitude : 9.4278927,9.4278881
Longitude : 76.4833451,76.4833724
file name : Image_12012022142828737.png
|
2022-01-12 14:28:28.835937 |
16 |
51799497 |
Pipeline from Kizhakepurackal to tharayilmuttu in ward 11 |
100000 |
Pipeline from Kizhakepurackal to tharayilmuttu in ward 111 |
Completion of work |
-
latitude : 9.4338089,9.4332308
Longitude : 76.4726802,76.4742251
file name : Image_11032022142347622.png
|
2022-03-11 14:23:47.7215 |
17 |
51799526 |
Pipeline from Karukaparambu jetty to Attuchirakulikadavu in ward 11 |
100000 |
Pipeline from Karukaparambu jetty to Attuchirakulikadavu in ward 111 |
Completion of work |
-
latitude : 9.431765,9.431776666666668
Longitude : 76.47345166666668,76.47342499999999
file name : Image_11032022142354932.png
|
2022-03-11 14:23:55.04094 |
18 |
51799580 |
Pipeline from Appachantechira vadakeyattam to ennackapalli in ward 7 |
150000 |
Pipeline from Appachantechira vadakeyattam to ennackapalli in ward 71 |
Completion of work |
-
latitude : 9.431586666666668,9.431586666666668
Longitude : 76.50394833333333,76.50395333333333
file name : Image_18032022125554710.png
|
2022-03-18 12:55:54.826496 |
19 |
51816305 |
Maintanance of lane and construction of retaining wall from Pulivelil to cheruvallikavu |
200000 |
Maintanance of lane and construction of retaining wall from Pulivelil to cheruvallikavu1 |
Roof laid |
-
latitude : 9.4197897,9.4197897
Longitude : 76.4979682,76.4979682
file name : Image_18032022151501891.png
|
2022-03-18 15:15:01.977472 |
20 |
51816305 |
Maintanance of lane and construction of retaining wall from Pulivelil to cheruvallikavu |
200000 |
Maintanance of lane and construction of retaining wall from Pulivelil to cheruvallikavu1 |
Plinth level |
-
latitude : 9.4193518,9.4196434
Longitude : 76.4978309,76.4978657
file name : Image_16022022121604492.png
|
2022-02-16 12:16:04.591864 |
21 |
51816305 |
Maintanance of lane and construction of retaining wall from Pulivelil to cheruvallikavu |
200000 |
Maintanance of lane and construction of retaining wall from Pulivelil to cheruvallikavu1 |
Completion of work |
-
latitude : 9.4194837,9.4192976
Longitude : 76.4978773,76.4978313
file name : Image_13012022145016748.png
|
2022-01-13 14:50:16.871184 |
22 |
51799600 |
Pipeline from Kochuparambu to Kappilchra reach2 |
165000 |
Pipeline from Kochuparambu to Kappilchra reach21 |
Plinth level |
-
latitude : 9.4525799,9.4525799
Longitude : 76.4725935,76.4725935
file name : Image_18032022140546361.png
|
2022-03-18 14:05:46.468828 |
23 |
51799510 |
Pipeline from SNDP to Chonithra in ward 12 |
200000 |
Pipeline from SNDP to Chonithra in ward 121 |
Completion of work |
-
latitude : 9.4358787,9.4358839
Longitude : 76.4697721,76.4697693
file name : Image_15032022082110755.png
|
2022-03-15 08:21:10.852461 |
24 |
51799705 |
improve the infrastructure of MCF |
300000 |
improve the infrastructure of MCF1 |
Completion of work |
-
latitude : 9.430493
Longitude : 76.4810964
file name : Image_19032022122546092.png
|
2022-03-19 12:25:46.241477 |
25 |
51799705 |
improve the infrastructure of MCF |
300000 |
improve the infrastructure of MCF1 |
Completion of work |
-
latitude : 9.430076666666668
Longitude : 76.48106666666666
file name : Image_07012022160241325.png
|
2022-01-07 16:02:41.423572 |
26 |
60942015 |
road concrete from alakattuparambu to vazhaparambu coclony |
69000 |
road concrete from alakattuparambu to vazhaparambu coclony1 |
Roof laid |
-
latitude : 9.43351,9.433503333333334
Longitude : 76.47596333333333,76.47600333333334
file name : Image_23032022154344530.png
|
2022-03-23 15:43:44.640039 |
27 |
60942015 |
road concrete from alakattuparambu to vazhaparambu coclony |
69000 |
road concrete from alakattuparambu to vazhaparambu coclony1 |
Completion of work |
-
latitude : 9.427465000000002,9.433551666666666
Longitude : 76.48351833333332,76.47592333333334
file name : Image_21032022092558165.png
|
2022-03-21 09:25:58.257691 |
28 |
51799823 |
road concreate from manishnivas to block bridge |
100000 |
road concreate from manishnivas to block bridge1 |
Plinth level |
-
latitude : 9.459485,9.459481666666667
Longitude : 76.49755833333333,76.49756166666666
file name : Image_25032022103721646.png
|
2022-03-25 10:37:21.748577 |
29 |
51799823 |
road concreate from manishnivas to block bridge |
100000 |
road concreate from manishnivas to block bridge1 |
Roof laid |
-
latitude : 9.4594575,9.4594575
Longitude : 76.4976574,76.4976574
file name : Image_25032022104710584.png
|
2022-03-25 10:47:10.695258 |
30 |
51799823 |
road concreate from manishnivas to block bridge |
100000 |
road concreate from manishnivas to block bridge1 |
Completion of work |
-
latitude : 9.424841,9.424841
Longitude : 76.4887915,76.4887915
file name : Image_23022022103931370.png
|
2022-02-23 10:39:31.477483 |
31 |
51816591 |
road from thattasery to vrindavanam |
150000 |
road from thattasery to vrindavanam1 |
Plinth level |
-
latitude : 9.4274015,9.4274077
Longitude : 76.4931313,76.49313
file name : Image_21032022091112600.png
|
2022-03-21 09:11:12.679724 |
32 |
51816591 |
road from thattasery to vrindavanam |
150000 |
road from thattasery to vrindavanam1 |
Completion of work |
-
latitude : 9.4274035,9.4274079
Longitude : 76.4931303,76.4931281
file name : Image_13012022122543721.png
|
2022-01-13 12:25:43.813151 |
33 |
51816343 |
Construction of road from Ettupara to Nelloor |
125000 |
Construction of road from Ettupara to Nelloor1 |
Roof laid |
-
latitude : 9.4611538,9.4611538
Longitude : 76.497651,76.497651
file name : Image_31032022160458283.png
|
2022-03-31 16:04:58.38165 |
34 |
51816343 |
Construction of road from Ettupara to Nelloor |
125000 |
Construction of road from Ettupara to Nelloor1 |
Plinth level |
-
latitude : 9.4616523,9.4616523
Longitude : 76.4974466,76.4974466
file name : Image_30032022104737633.png
|
2022-03-30 10:47:37.80331 |
35 |
51816343 |
Construction of road from Ettupara to Nelloor |
125000 |
Construction of road from Ettupara to Nelloor1 |
Completion of work |
-
latitude : 9.4611193,9.4608378
Longitude : 76.497436,76.4972588
file name : Image_22012022144500514.png
|
2022-01-22 14:45:00.641536 |
36 |
51820120 |
road from kalathilmuttu to puthuparambu motorthara |
125000 |
road from kalathilmuttu to puthuparambu motorthara1 |
Plinth level |
-
latitude : 9.444305000000002,9.444303333333332
Longitude : 76.48284333333332,76.48284166666667
file name : Image_31032022161508931.png
|
2022-03-31 16:15:09.028534 |
37 |
51820120 |
road from kalathilmuttu to puthuparambu motorthara |
125000 |
road from kalathilmuttu to puthuparambu motorthara1 |
Roof laid |
-
latitude : 9.444293333333333,9.444293333333333
Longitude : 76.482825,76.482825
file name : Image_31032022162328554.png
|
2022-03-31 16:23:28.667439 |
38 |
51820120 |
road from kalathilmuttu to puthuparambu motorthara |
125000 |
road from kalathilmuttu to puthuparambu motorthara1 |
Completion of work |
-
latitude : 9.4438552,9.4439305
Longitude : 76.4826542,76.4827333
file name : Image_13012022115350032.png
|
2022-01-13 11:53:50.137819 |
39 |
60940667 |
maintenance from kalarithara to puthenpura |
85000 |
maintenance from kalarithara to puthenpura1 |
Roof laid |
-
latitude : 9.431360000000002,9.431366666666666
Longitude : 76.48355333333333,76.48356
file name : Image_06062022123026140.png
|
2022-06-06 12:30:26.256882 |
40 |
60940667 |
maintenance from kalarithara to puthenpura |
85000 |
maintenance from kalarithara to puthenpura1 |
Plinth level |
-
latitude : 9.4335938,9.4335938
Longitude : 76.4838512,76.4838512
file name : Image_04062022105005256.png
|
2022-06-04 10:50:05.384254 |
41 |
60940667 |
maintenance from kalarithara to puthenpura |
85000 |
maintenance from kalarithara to puthenpura1 |
Completion of work |
-
latitude : 9.43154,9.43154
Longitude : 76.48359,76.48359
file name : Image_04062022103301574.png
|
2022-06-04 10:33:01.689558 |
42 |
60952570 |
maintenance from smasanam to kadathukadavu |
40000 |
maintenance from smasanam to kadathukadavu1 |
Roof laid |
-
latitude : 9.4358623,9.4358623
Longitude : 76.4697839,76.4697839
file name : Image_19102022120353809.png
|
2022-10-19 12:03:54.097473 |
43 |
60952570 |
maintenance from smasanam to kadathukadavu |
40000 |
maintenance from smasanam to kadathukadavu1 |
Plinth level |
-
latitude : 9.436119999999999,9.436119999999999
Longitude : 76.46932333333332,76.46932333333332
file name : Image_30072022110350306.png
|
2022-07-30 11:03:50.423027 |
44 |
60952570 |
maintenance from smasanam to kadathukadavu |
40000 |
maintenance from smasanam to kadathukadavu1 |
Completion of work |
-
latitude : 9.435875,9.435875
Longitude : 76.4696859,76.4696859
file name : Image_24072022163057804.png
|
2022-07-24 16:30:57.92394 |
45 |
60916140 |
ROAD CONCRETE FROM SANDHYALAYAM TO PUTHENPURA WARD 6 |
98000 |
ROAD CONCRETE FROM SANDHYALAYAM TO PUTHENPURA WARD 61 |
Roof laid |
-
latitude : 9.4382961,9.4382961
Longitude : 76.4819735,76.4819735
file name : Image_31102022140511908.png
|
2022-10-31 14:05:11.998182 |
46 |
60916140 |
ROAD CONCRETE FROM SANDHYALAYAM TO PUTHENPURA WARD 6 |
98000 |
ROAD CONCRETE FROM SANDHYALAYAM TO PUTHENPURA WARD 61 |
Plinth level |
-
latitude : 9.4248661,9.4248661
Longitude : 76.4888106,76.4888106
file name : Image_26092022112932938.png
|
2022-09-26 11:29:33.0414 |
47 |
60916140 |
ROAD CONCRETE FROM SANDHYALAYAM TO PUTHENPURA WARD 6 |
98000 |
ROAD CONCRETE FROM SANDHYALAYAM TO PUTHENPURA WARD 61 |
Completion of work |
-
latitude : 9.4383138,9.4382971
Longitude : 76.4820119,76.4820068
file name : Image_21032022091010967.png
|
2022-03-21 09:10:11.049148 |
48 |
66213799 |
ROAD FROM PWD ROAD TO NSS HIGH SCHOOL |
342154 |
ROAD FROM PWD ROAD TO NSS HIGH SCHOOL1 |
Roof laid |
-
latitude : 9.4427948,9.4428072
Longitude : 76.4690499,76.469018
file name : Image_23012023134422395.png
|
2023-01-23 13:44:22.498769 |
49 |
66213799 |
ROAD FROM PWD ROAD TO NSS HIGH SCHOOL |
342154 |
ROAD FROM PWD ROAD TO NSS HIGH SCHOOL1 |
Plinth level |
-
latitude : 9.4439839,9.4439839
Longitude : 76.4682294,76.4682294
file name : Image_29122022142542074.png
|
2022-12-29 14:25:42.174376 |
50 |
66213799 |
ROAD FROM PWD ROAD TO NSS HIGH SCHOOL |
342154 |
ROAD FROM PWD ROAD TO NSS HIGH SCHOOL1 |
Completion of work |
-
latitude : 9.443943333333333,9.443858333333333
Longitude : 76.46804666666667,76.46817333333334
file name : Image_19122022142740166.png
|
2022-12-19 14:27:40.288632 |
51 |
66212522 |
ROAD CONCREETING FROM CHAKKIVEEDU TO MUNNOOTTNKALAM WARD 1 |
200000 |
ROAD CONCREETING FROM CHAKKIVEEDU TO MUNNOOTTNKALAM WARD 11 |
Plinth level |
-
latitude : 9.446308333333333,9.446293333333333
Longitude : 76.462215,76.46220666666666
file name : Image_01022023105508489.png
|
2023-02-01 10:55:08.603716 |
52 |
66212522 |
ROAD CONCREETING FROM CHAKKIVEEDU TO MUNNOOTTNKALAM WARD 1 |
200000 |
ROAD CONCREETING FROM CHAKKIVEEDU TO MUNNOOTTNKALAM WARD 11 |
Completion of work |
-
latitude : 9.4248423,9.4248423
Longitude : 76.4888656,76.4888656
file name : Image_23012023140852967.png
|
2023-01-23 14:08:53.067771 |
53 |
66214048 |
ROAD FROM NALLUTHRAKAVU TEMPLE TO CHEMPAKASERRY |
200000 |
ROAD FROM NALLUTHRAKAVU TEMPLE TO CHEMPAKASERRY1 |
Roof laid |
-
latitude : 9.4463892,9.4463892
Longitude : 76.4664632,76.4664632
file name : Image_04032023075342050.png
|
2023-03-04 07:53:42.141016 |
54 |
66214048 |
ROAD FROM NALLUTHRAKAVU TEMPLE TO CHEMPAKASERRY |
200000 |
ROAD FROM NALLUTHRAKAVU TEMPLE TO CHEMPAKASERRY1 |
Plinth level |
-
latitude : 9.44606,9.446043333333334
Longitude : 76.466465,76.46646166666666
file name : Image_28022023090430782.png
|
2023-02-28 09:04:30.898625 |
55 |
66214048 |
ROAD FROM NALLUTHRAKAVU TEMPLE TO CHEMPAKASERRY |
200000 |
ROAD FROM NALLUTHRAKAVU TEMPLE TO CHEMPAKASERRY1 |
Completion of work |
-
latitude : 9.4464056,9.4464056
Longitude : 76.4664757,76.4664757
file name : Image_23012023141843337.png
|
2023-01-23 14:18:43.435906 |
56 |
66213508 |
ATTUCHIRA ROAD MAINTANCE |
34426 |
ATTUCHIRA ROAD MAINTANCE1 |
Completion of work |
-
latitude : 9.4340324,9.4340324
Longitude : 76.4760004,76.4760004
file name : Image_08032023173311031.png
|
2023-03-08 17:33:11.124749 |
57 |
66213508 |
ATTUCHIRA ROAD MAINTANCE |
34426 |
ATTUCHIRA ROAD MAINTANCE1 |
Completion of work |
-
latitude : 9.4340324,9.4340324
Longitude : 76.4760004,76.4760004
file name : Image_08032023173423348.png
|
2023-03-08 17:34:23.434821 |
58 |
67642474 |
ATTUCHIRA ROAD MAINTANANCE |
34426 |
ATTUCHIRA ROAD MAINTANANCE1 |
Roof laid |
-
latitude : 9.449293333333333,9.449291666666666
Longitude : 76.47216166666666,76.47216
file name : Image_30032023093418542.png
|
2023-03-30 09:34:18.632606 |
59 |
67642474 |
ATTUCHIRA ROAD MAINTANANCE |
34426 |
ATTUCHIRA ROAD MAINTANANCE1 |
Plinth level |
-
latitude : 9.44928,9.44929
Longitude : 76.47214833333334,76.47215833333333
file name : Image_30032023093217866.png
|
2023-03-30 09:32:17.963243 |
60 |
67642474 |
ATTUCHIRA ROAD MAINTANANCE |
34426 |
ATTUCHIRA ROAD MAINTANANCE1 |
Completion of work |
-
latitude : 9.449298333333333,9.449278333333332
Longitude : 76.47221166666667,76.47219666666666
file name : Image_30032023092741094.png
|
2023-03-30 09:27:41.192516 |
61 |
99099059 |
Piped water supply to HH |
885000 |
Piped water supply to HH1 |
Completion of work |
-
latitude : 9.4246898
Longitude : 76.4888547
file name : Image_26032024152325567.png
|
2024-03-26 15:23:25.670078 |
62 |
99099059 |
Piped water supply to HH |
885000 |
Piped water supply to HH1 |
Completion of work |
-
latitude : 9.4248933
Longitude : 76.4887866
file name : Image_26032024152330687.png
|
2024-03-26 15:23:30.790202 |
63 |
67733694 |
Electricity/Solar Power Installation |
200000 |
Electricity/Solar Power Installation1 |
Roof laid |
-
latitude : 9.4248745
Longitude : 76.4888121
file name : Image_26032024152822774.png
|
2024-03-26 15:28:22.935807 |
64 |
67733694 |
Electricity/Solar Power Installation |
200000 |
Electricity/Solar Power Installation1 |
Plinth level |
-
latitude : 9.4248648
Longitude : 76.4888261
file name : Image_26032024152558317.png
|
2024-03-26 15:25:58.416316 |
65 |
67733694 |
Electricity/Solar Power Installation |
200000 |
Electricity/Solar Power Installation1 |
Plinth level |
-
latitude : 9.4248783
Longitude : 76.4888357
file name : Image_25032024152920765.png
|
2024-03-25 15:29:20.854986 |
66 |
67733694 |
Electricity/Solar Power Installation |
200000 |
Electricity/Solar Power Installation1 |
Completion of work |
-
latitude : 9.4248918
Longitude : 76.4888188
file name : Image_25032024152254427.png
|
2024-03-25 15:22:54.511114 |
67 |
99108259 |
Purchase of equipment (including safety equipment) for waste management |
286260 |
Purchase of equipment (including safety equipment) for waste management1 |
|
-
latitude : 9.4301794
Longitude : 76.4805666
file name : Image_27032024145227019.png
|
2024-03-27 14:52:27.14417 |
68 |
99071788 |
Purchase of Tricycles/other battery -operated vehicles for door to door collection of waste |
530000 |
Purchase of Tricycles/other battery -operated vehicles for door to door collection of waste1 |
|
-
latitude : 9.429684
Longitude : 76.4813291
file name : Image_28032024193226552.png
|
2024-03-28 19:32:26.727593 |