1 |
51802914 |
Elamballoor Grama Panchayat 2021 22 Manalivila Veedu to Charuvila Thekkathil Road Concrete |
300000 |
Elamballoor Grama Panchayat 2021 22 Manalivila Veedu to Charuvila Thekkathil Road Concrete1 |
Completion of work |
-
latitude : 8.9517118,8.9517799
Longitude : 76.6799468,76.6799154
file name : Image_16102021161110928.png
|
2021-10-16 16:11:11.019062 |
2 |
54663563 |
Road concreting from Kavungara jn to jayanthi colony jn |
300000 |
Road concreting from Kavungara jn to jayanthi colony jn1 |
Completion of work |
-
latitude : 8.9361723,8.936601666666666
Longitude : 76.6856147,76.68662666666667
file name : Image_09022022152518999.png
|
2022-02-09 15:25:19.103963 |
3 |
51803310 |
Elamballoor Grama Panchayat 2021 22 Aswathy Bhavan to Keezhekaippalliyil Road Concrete |
300000 |
Elamballoor Grama Panchayat 2021 22 Aswathy Bhavan to Keezhekaippalliyil Road Concrete1 |
Completion of work |
-
latitude : 8.9326512,8.9326519
Longitude : 76.6837691,76.6837718
file name : Image_08122021132120466.png
|
2021-12-08 13:21:20.590232 |
4 |
51803140 |
Elamablloor Grama Panchayat 2021 22 Meloottu Road Concreting |
300000 |
Elamablloor Grama Panchayat 2021 22 Meloottu Road Concreting1 |
Completion of work |
-
latitude : 8.933986666666668,8.933816666666667
Longitude : 76.68797666666666,76.68854833333333
file name : Image_08122021130945220.png
|
2021-12-08 13:09:45.318534 |
5 |
51803433 |
Elamballoor Grama Panchayat 2021 22 Pazhavila to Kuttiyil Veedu Road Concrete |
300000 |
Elamballoor Grama Panchayat 2021 22 Pazhavila to Kuttiyil Veedu Road Concrete1 |
Completion of work |
-
latitude : 8.922396666666666,8.9225053
Longitude : 76.66938666666667,76.669497
file name : Image_08122021133437216.png
|
2021-12-08 13:34:37.325223 |
6 |
51802549 |
Elamballoor Grama Panchayat 2021 22 Naduvilappura Nadappatha Concreting |
300000 |
Elamballoor Grama Panchayat 2021 22 Naduvilappura Nadappatha Concreting1 |
Completion of work |
-
latitude : 8.9565392,8.957716666666666
Longitude : 76.6966854,76.697105
file name : Image_07012022120332685.png
|
2022-01-07 12:03:32.7722 |
7 |
51802982 |
Elamballoor Grama Panchayat 2021 22 Chandran Pillas House to Kurissady Through Cashew factory Road |
300000 |
Elamballoor Grama Panchayat 2021 22 Chandran Pillas House to Kurissady Through Cashew factory Road 1 |
Completion of work |
-
latitude : 8.942728333333333,8.942701666666666
Longitude : 76.69090166666666,76.69019499999999
file name : Image_07012022120346699.png
|
2022-01-07 12:03:46.800802 |
8 |
51803391 |
Elamaballoor Grama Panchayat 2021 22 Chamavila Veedu to KIP Canal East Side Road Concrete |
300000 |
Elamaballoor Grama Panchayat 2021 22 Chamavila Veedu to KIP Canal East Side Road Concrete1 |
Completion of work |
-
latitude : 8.924883333333334,8.924919999999998
Longitude : 76.67699999999999,76.67698666666666
file name : Image_05022022160306607.png
|
2022-02-05 16:03:06.704306 |
9 |
51803391 |
Elamaballoor Grama Panchayat 2021 22 Chamavila Veedu to KIP Canal East Side Road Concrete |
300000 |
Elamaballoor Grama Panchayat 2021 22 Chamavila Veedu to KIP Canal East Side Road Concrete1 |
Completion of work |
-
latitude : 8.925228333333333,8.924913333333334
Longitude : 76.67650666666667,76.67698333333333
file name : Image_19012022134452817.png
|
2022-01-19 13:44:52.919373 |
10 |
51802320 |
Elamballoor Grama Panchayat 2021 22 Madathivila Jn to Kailas Bhavan Road Concrete |
300000 |
Elamballoor Grama Panchayat 2021 22 Madathivila Jn to Kailas Bhavan Road Concrete1 |
Completion of work |
-
latitude : 8.9448478,8.9449383
Longitude : 76.6631768,76.6632252
file name : Image_05022022160302308.png
|
2022-02-05 16:03:02.405149 |
11 |
51802320 |
Elamballoor Grama Panchayat 2021 22 Madathivila Jn to Kailas Bhavan Road Concrete |
300000 |
Elamballoor Grama Panchayat 2021 22 Madathivila Jn to Kailas Bhavan Road Concrete1 |
Completion of work |
-
latitude : 8.945151666666668,8.944768333333334
Longitude : 76.66370833333333,76.66381166666666
file name : Image_19012022134432151.png
|
2022-01-19 13:44:32.264663 |
12 |
51802724 |
Elamballoor Grama Panchayat 2021 22 Lijosh Bhavan to Kottackakathu Melethil Road Concrete |
300000 |
Elamballoor Grama Panchayat 2021 22 Lijosh Bhavan to Kottackakathu Melethil Road Concrete1 |
Completion of work |
-
latitude : 8.9595771,8.9589385
Longitude : 76.6848975,76.684659
file name : Image_05022022160310409.png
|
2022-02-05 16:03:10.527461 |
13 |
51802791 |
Elamballoor Grama Panchayat 2021 22 Ambipoika Jayanthy Colony Kalari Kshethram Road Concrete |
300000 |
Elamballoor Grama Panchayat 2021 22 Ambipoika Jayanthy Colony Kalari Kshethram Road Concrete1 |
Completion of work |
-
latitude : 8.9557303,8.955608333333334
Longitude : 76.6916543,76.69115333333333
file name : Image_11032022135212177.png
|
2022-03-11 13:52:12.316934 |
14 |
51802426 |
Elamballoor Grama Panchayat 2021 22 Edayilapura Thulasiyude Veeduvare Road Concrete |
300000 |
Elamballoor Grama Panchayat 2021 22 Edayilapura Thulasiyude Veeduvare Road Concrete1 |
Completion of work |
-
latitude : 8.9521932,8.9521977
Longitude : 76.6714999,76.6714972
file name : Image_11032022141033359.png
|
2022-03-11 14:10:33.449802 |
15 |
51802401 |
Elamballoor Grama Panchayat 2021 22 Construction of Drain at Poikayil Nadapatha |
300000 |
Elamballoor Grama Panchayat 2021 22 Construction of Drain at Poikayil Nadapatha1 |
Completion of work |
-
latitude : 8.9473499,8.948166666666667
Longitude : 76.6667573,76.66592333333332
file name : Image_11032022132914175.png
|
2022-03-11 13:29:14.3009 |
16 |
66128992 |
Elampalloor GP2022-23-Back Side of the FCI Godown Road Concreting |
400456 |
Elampalloor GP2022-23-Back Side of the FCI Godown Road Concreting1 |
Completion of work |
-
latitude : 8.9435,8.943796666666666
Longitude : 76.6779,76.67798666666665
file name : Image_24052023105458766.png
|
2023-05-24 10:54:58.890438 |
17 |
51802486 |
Elamballoor Grama Panchayat 2021 22 Construction of Drain at Sundharan Pilla House to Canal Road |
300000 |
Elamballoor Grama Panchayat 2021 22 Construction of Drain at Sundharan Pilla House to Canal Road 1 |
Completion of work |
-
latitude : 8.957891666666665,8.959403333333334,8.959368333333334
Longitude : 76.68943833333333,76.68979333333333,76.689785
file name : Image_10112022155817950.png
|
2022-11-10 15:58:18.074987 |
18 |
58201414 |
Ward 1 - Anchumukku Kottavila road concreting |
200328 |
Ward 1 - Anchumukku Kottavila road concreting1 |
Completion of work |
-
latitude : 8.9436494,8.9436494
Longitude : 76.6628595,76.6628595
file name : Image_15022023154801677.png
|
2023-02-15 15:48:01.783008 |
19 |
58208386 |
Ward 13- Nisha bhavan to Kuthiramoottil veedu road concreting |
200228 |
Ward 13- Nisha bhavan to Kuthiramoottil veedu road concreting1 |
Completion of work |
-
latitude : 8.9222943,8.922716666666668
Longitude : 76.6830037,76.68392
file name : Image_15022023162736980.png
|
2023-02-15 16:27:37.147325 |
20 |
66128791 |
Elampalloor GP2022-23-Sheeja Bhavan Combiyil Road Concreting |
200228 |
Elampalloor GP2022-23-Sheeja Bhavan Combiyil Road Concreting1 |
Completion of work |
-
latitude : 8.929271666666667,8.9292778
Longitude : 76.68039333333333,76.6809028
file name : Image_15022023161544928.png
|
2023-02-15 16:15:45.032194 |
21 |
66128188 |
ElampalloorGP 2022-23-Revathy Bhavanam to Achu Bhavanam Road Concreting |
200228 |
ElampalloorGP 2022-23-Revathy Bhavanam to Achu Bhavanam Road Concreting1 |
Completion of work |
-
latitude : 8.955426666666666,8.955421
Longitude : 76.68472333333334,76.6851729
file name : Image_15022023165224757.png
|
2023-02-15 16:52:24.877333 |
22 |
66127695 |
Elampalloor GP 2022-23- Cheppally thachonathu Ela Road Concreting |
200228 |
Elampalloor GP 2022-23- Cheppally thachonathu Ela Road Concreting1 |
Completion of work |
-
latitude : 8.958786666666667,8.958708333333334
Longitude : 76.69304000000001,76.69356166666667
file name : Image_15022023170618529.png
|
2023-02-15 17:06:18.636816 |
23 |
66128595 |
ElampalloorGP 2022-23 Jayanthi Junction to North side Road Concreting |
200228 |
ElampalloorGP 2022-23 Jayanthi Junction to North side Road Concreting1 |
Completion of work |
-
latitude : 8.9407512,8.9407024
Longitude : 76.683124,76.6832259
file name : Image_15022023164046229.png
|
2023-02-15 16:40:46.352873 |
24 |
66129209 |
Elampalloor GP2022-23-BhadrakaliMadam Rice Mill to Thalaparamb Poyikayil Puthanveedu Road Concreting |
200228 |
Elampalloor GP2022-23-BhadrakaliMadam Rice Mill to Thalaparamb Poyikayil Puthanveedu Road Concreting1 |
Plinth level |
-
latitude : 8.936903333333333,8.936903333333333
Longitude : 76.67649333333334,76.67649333333334
file name : Image_16022023103003931.png
|
2023-02-16 10:30:04.030594 |
25 |
66129209 |
Elampalloor GP2022-23-BhadrakaliMadam Rice Mill to Thalaparamb Poyikayil Puthanveedu Road Concreting |
200228 |
Elampalloor GP2022-23-BhadrakaliMadam Rice Mill to Thalaparamb Poyikayil Puthanveedu Road Concreting1 |
Completion of work |
-
latitude : 8.936286666666666,8.936495
Longitude : 76.67637166666667,76.67636999999999
file name : Image_15022023160639705.png
|
2023-02-15 16:06:39.804039 |
26 |
66129042 |
Elampalloor GP2022-23- Vaidyarmukku to PVC Company Road Concreting |
200228 |
Elampalloor GP2022-23- Vaidyarmukku to PVC Company Road Concreting1 |
Plinth level |
-
latitude : 8.920008333333334,8.920043333333332
Longitude : 76.659975,76.65988333333333
file name : Image_20022023151427617.png
|
2023-02-20 15:14:27.722784 |
27 |
66129042 |
Elampalloor GP2022-23- Vaidyarmukku to PVC Company Road Concreting |
200228 |
Elampalloor GP2022-23- Vaidyarmukku to PVC Company Road Concreting1 |
Completion of work |
-
latitude : 8.9209096,8.919986666666667
Longitude : 76.6605829,76.65997666666667
file name : Image_20022023150046236.png
|
2023-02-20 15:00:46.322754 |
28 |
66128721 |
Elampalloor GP 2022-23- Ambadi Hollow Bricks Company vazhavila Road Concreting |
200228 |
Elampalloor GP 2022-23- Ambadi Hollow Bricks Company vazhavila Road Concreting1 |
Completion of work |
-
latitude : 8.9223825,8.9223858
Longitude : 76.6853797,76.6854016
file name : Image_25032023174644970.png
|
2023-03-25 17:46:45.068159 |
29 |
66128309 |
Elampalloor GP 2022-23-Chamavila Jayanthi Colony Road Concreting |
200228 |
Elampalloor GP 2022-23-Chamavila Jayanthi Colony Road Concreting1 |
Completion of work |
-
latitude : 8.94895,8.948873333333333
Longitude : 76.68507833333334,76.68496499999999
file name : Image_25032023174648744.png
|
2023-03-25 17:46:48.830233 |
30 |
66128425 |
Elampalloor GP2022-23-Forest Chandranpillai House to Cashew Factory Kurisadi Road Concreting |
200228 |
Elampalloor GP2022-23-Forest Chandranpillai House to Cashew Factory Kurisadi Road Concreting1 |
Completion of work |
-
latitude : 8.942688333333333,8.942641666666667
Longitude : 76.69045333333334,76.68990166666667
file name : Image_21032023160441225.png
|
2023-03-21 16:04:41.347244 |
31 |
66127880 |
Elampalloor GP2022-23-Alummoodu Veluthambi Nagar Road Concreting |
200240 |
Elampalloor GP2022-23-Alummoodu Veluthambi Nagar Road Concreting1 |
Completion of work |
-
latitude : 8.9517229,8.9519436
Longitude : 76.6694975,76.669182
file name : Image_25022023155143890.png
|
2023-02-25 15:51:43.985036 |
32 |
66139133 |
Creation of drainage channel for management of grey water |
450514 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 8.9362279,8.936229
Longitude : 76.6856654,76.6856688
file name : Image_21032023155803729.png
|
2023-03-21 15:58:03.824018 |
33 |
66139319 |
Creation of drainage channel for management of grey water |
450514 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 8.9588316,8.9589213
Longitude : 76.6758422,76.6758928
file name : Image_21032023153445055.png
|
2023-03-21 15:34:45.17375 |
34 |
66129159 |
Elampalloor GP2022-23-Puthiya junction Moolavaram Side Valum Road Concreting |
600684 |
Elampalloor GP2022-23-Puthiya junction Moolavaram Side Valum Road Concreting1 |
Plinth level |
-
latitude : 8.935068,8.9350638,8.93517,8.935161666666666
Longitude : 76.6693805,76.669382,76.66864333333334,76.66857833333333
file name : Image_25032023171215841.png
|
2023-03-25 17:12:15.931813 |
35 |
66129159 |
Elampalloor GP2022-23-Puthiya junction Moolavaram Side Valum Road Concreting |
600684 |
Elampalloor GP2022-23-Puthiya junction Moolavaram Side Valum Road Concreting1 |
Completion of work |
-
latitude : 8.935228333333333,8.935016666666666
Longitude : 76.668465,76.66820833333333
file name : Image_21032023154741900.png
|
2023-03-21 15:47:42.0112 |
36 |
66141213 |
Augmentation of the existing source of drinking water |
1400460 |
Augmentation of the existing source of drinking water1 |
Completion of work |
-
latitude : 8.9391731
Longitude : 76.6684226
file name : Image_30032023145129466.png
|
2023-03-30 14:51:29.550201 |
37 |
66129106 |
Elampalloor GP2022-23-Cherukaramoola Junction to Pangajam Radiomukku Road Concreting |
400456 |
Elampalloor GP2022-23-Cherukaramoola Junction to Pangajam Radiomukku Road Concreting1 |
Plinth level |
-
latitude : 8.928271666666665,8.928268333333333
Longitude : 76.66697333333333,76.66698333333333
file name : Image_24052023104131406.png
|
2023-05-24 10:41:31.516297 |
38 |
66129106 |
Elampalloor GP2022-23-Cherukaramoola Junction to Pangajam Radiomukku Road Concreting |
400456 |
Elampalloor GP2022-23-Cherukaramoola Junction to Pangajam Radiomukku Road Concreting1 |
Completion of work |
-
latitude : 8.928065,8.928065
Longitude : 76.667895,76.667895
file name : Image_25032023174537496.png
|
2023-03-25 17:45:37.598822 |
39 |
66139653 |
Creation of drainage channel for management of grey water |
1002572 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 8.9235195,8.92392
Longitude : 76.6809303,76.68057166666668
file name : Image_07072023130335261.png
|
2023-07-07 13:03:35.358189 |
40 |
66139653 |
Creation of drainage channel for management of grey water |
1002572 |
Creation of drainage channel for management of grey water1 |
Plinth level |
-
latitude : 8.9237167,8.9235394
Longitude : 76.6807361,76.6809646
file name : Image_06072023145935229.png
|
2023-07-06 14:59:35.330572 |
41 |
66139653 |
Creation of drainage channel for management of grey water |
1002572 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 8.9235357,8.9236462
Longitude : 76.6809278,76.6808372
file name : Image_05072023153037983.png
|
2023-07-05 15:30:38.071217 |
42 |
67617024 |
Construction of roads |
200000 |
Elampalloor GP 2023-24 canal junction to jalaja vasathi Road Concreting work |
Roof laid |
-
latitude : 8.952893333333332,8.95295
Longitude : 76.67673166666667,76.67648166666666
file name : Image_25102023145744931.png
|
2023-10-25 14:57:45.023831 |
43 |
67617024 |
Construction of roads |
200000 |
Elampalloor GP 2023-24 canal junction to jalaja vasathi Road Concreting work |
Plinth level |
-
latitude : 8.9557312,8.952873333333335
Longitude : 76.6715188,76.67669166666666
file name : Image_09102023130358466.png
|
2023-10-09 13:03:58.578317 |
44 |
67617024 |
Construction of roads |
200000 |
Elampalloor GP 2023-24 canal junction to jalaja vasathi Road Concreting work |
Completion of work |
-
latitude : 8.952850000000002,8.952873333333335
Longitude : 76.67672833333333,76.67667499999999
file name : Image_07102023160254262.png
|
2023-10-07 16:02:54.392411 |
45 |
67612720 |
Construction of roads |
200000 |
KIP Canal Bridge to Road Concreting work Elampalloor GP 2023-24 |
Roof laid |
-
latitude : 8.9469247,8.9469235
Longitude : 76.6810722,76.6810719
file name : Image_11032024164755282.png
|
2024-03-11 16:47:55.38547 |
46 |
67612720 |
Construction of roads |
200000 |
KIP Canal Bridge to Road Concreting work Elampalloor GP 2023-24 |
Plinth level |
-
latitude : 8.9464281,8.946403333333334
Longitude : 76.6805288,76.68099666666667
file name : Image_28112023131550672.png
|
2023-11-28 13:15:50.788551 |
47 |
67612720 |
Construction of roads |
200000 |
KIP Canal Bridge to Road Concreting work Elampalloor GP 2023-24 |
Completion of work |
-
latitude : 8.9463072,8.9468412
Longitude : 76.6820864,76.681217
file name : Image_07102023154109729.png
|
2023-10-07 15:41:09.822055 |
48 |
67610198 |
Construction of roads |
200100 |
Elampalloor GP-2023-24 Meloottu Junction to Habeebulla house Road Concreating |
Roof laid |
-
latitude : 8.945093333333334,8.9447948
Longitude : 76.66693833333333,76.6661844
file name : Image_30102023152633313.png
|
2023-10-30 15:26:33.408388 |
49 |
67610198 |
Construction of roads |
200100 |
Elampalloor GP-2023-24 Meloottu Junction to Habeebulla house Road Concreating |
Plinth level |
-
latitude : 8.9446946,8.9447131
Longitude : 76.6666848,76.666732
file name : Image_11102023114809019.png
|
2023-10-11 11:48:09.119765 |
50 |
67610198 |
Construction of roads |
200100 |
Elampalloor GP-2023-24 Meloottu Junction to Habeebulla house Road Concreating |
Completion of work |
-
latitude : 8.9447044,8.9449503
Longitude : 76.6667494,76.6669465
file name : Image_07102023154043226.png
|
2023-10-07 15:40:43.32496 |
51 |
67610711 |
Construction of roads |
200000 |
Elampalloor GP-2023-24 Sakhav dampdharan house to North side of Keshavan Pillas House Road Concreting |
Roof laid |
-
latitude : 8.949113333333335,8.949406666666667
Longitude : 76.66609666666666,76.66701833333333
file name : Image_30102023151816746.png
|
2023-10-30 15:18:16.85332 |
52 |
67610711 |
Construction of roads |
200000 |
Elampalloor GP-2023-24 Sakhav dampdharan house to North side of Keshavan Pillas House Road Concreting |
Plinth level |
-
latitude : 8.953125,8.949085
Longitude : 76.67680333333332,76.666945
file name : Image_10102023102703154.png
|
2023-10-10 10:27:03.254547 |
53 |
67610711 |
Construction of roads |
200000 |
Elampalloor GP-2023-24 Sakhav dampdharan house to North side of Keshavan Pillas House Road Concreting |
Completion of work |
-
latitude : 8.9491628,8.949325
Longitude : 76.6659159,76.6673027
file name : Image_07102023154058774.png
|
2023-10-07 15:40:58.978263 |
54 |
67610451 |
Construction of roads |
200000 |
Elampalloor GP 2023-24 Near canal payattuvila ju to pampalil Junction road concreting |
Roof laid |
-
latitude : 8.962816666666667,8.962891666666668
Longitude : 76.68751333333333,76.68737
file name : Image_05042024111712348.png
|
2024-04-05 11:17:12.305836 |
55 |
67610451 |
Construction of roads |
200000 |
Elampalloor GP 2023-24 Near canal payattuvila ju to pampalil Junction road concreting |
Plinth level |
-
latitude : 8.9628141,8.962946666666666
Longitude : 76.6877121,76.68728166666666
file name : Image_26032024121610320.png
|
2024-03-26 12:16:10.403968 |
56 |
67610451 |
Construction of roads |
200000 |
Elampalloor GP 2023-24 Near canal payattuvila ju to pampalil Junction road concreting |
Completion of work |
-
latitude : 8.9628902,8.9628902
Longitude : 76.6874603,76.6874603
file name : Image_07102023154937866.png
|
2023-10-07 15:49:37.961487 |
57 |
67611050 |
Construction of roads |
200000 |
Elampalloor GP-2023-24 Madthil Near Vincent House to South Side of Aswathy Bhavanam |
Roof laid |
-
latitude : 8.9537135,8.9534964
Longitude : 76.6699987,76.6705011
file name : Image_25102023145730628.png
|
2023-10-25 14:57:30.733213 |
58 |
67611050 |
Construction of roads |
200000 |
Elampalloor GP-2023-24 Madthil Near Vincent House to South Side of Aswathy Bhavanam |
Plinth level |
-
latitude : 8.9535915,8.9535963
Longitude : 76.6705388,76.6705646
file name : Image_10102023133145878.png
|
2023-10-10 13:31:45.981325 |
59 |
67611050 |
Construction of roads |
200000 |
Elampalloor GP-2023-24 Madthil Near Vincent House to South Side of Aswathy Bhavanam |
Completion of work |
-
latitude : 8.9535422,8.9535238
Longitude : 76.6704132,76.6704279
file name : Image_10102023122540824.png
|
2023-10-10 12:25:40.931758 |
60 |
67612272 |
Construction of roads |
20000 |
2023-24 canal to chekkala side road concreting |
Roof laid |
-
latitude : 8.9426001,8.9426278
Longitude : 76.6954293,76.6954022
file name : Image_14032024151045356.png
|
2024-03-14 15:10:45.464739 |
61 |
67612272 |
Construction of roads |
20000 |
2023-24 canal to chekkala side road concreting |
Plinth level |
-
latitude : 8.9426189,8.942813333333334
Longitude : 76.6954427,76.695225
file name : Image_11102023154514853.png
|
2023-10-11 15:45:14.964839 |
62 |
67612272 |
Construction of roads |
20000 |
2023-24 canal to chekkala side road concreting |
Completion of work |
-
latitude : 8.9425977,8.9432238
Longitude : 76.6954255,76.6941852
file name : Image_11102023125231731.png
|
2023-10-11 12:52:31.821104 |
63 |
96412377 |
Creation of compost pits for individual Households |
405000 |
Creation of compost pits for individual Households |
Roof laid |
-
latitude : 8.95495
Longitude : 76.672585
file name : Image_11092024114456210.png
|
2024-09-11 11:45:00.319317 |
64 |
96412377 |
Creation of compost pits for individual Households |
405000 |
Creation of compost pits for individual Households |
Plinth level |
-
latitude : 8.95496
Longitude : 76.67261666666667
file name : Image_10092024152949797.png
|
2024-09-10 15:31:54.179969 |
65 |
96412377 |
Creation of compost pits for individual Households |
405000 |
Creation of compost pits for individual Households |
Completion of work |
-
latitude : 8.9553058
Longitude : 76.6727616
file name : Image_04092024200033020.png
|
2024-09-04 20:00:33.104438 |
66 |
96414025 |
Household Sanitation - Construction of IHHL for eligible HHs |
280000 |
Financial Assistance for Toilets Of Life Houses |
Roof laid |
-
latitude : 8.9558499
Longitude : 76.6715029
file name : Image_12062024115924003.png
|
2024-06-12 11:59:24.089234 |
67 |
96414025 |
Household Sanitation - Construction of IHHL for eligible HHs |
280000 |
Financial Assistance for Toilets Of Life Houses |
Plinth level |
-
latitude : 8.946841666666668
Longitude : 76.68985833333333
file name : Image_18052024123355520.png
|
2024-05-18 12:33:55.611798 |
68 |
96414025 |
Household Sanitation - Construction of IHHL for eligible HHs |
280000 |
Financial Assistance for Toilets Of Life Houses |
Completion of work |
-
latitude : 8.9469
Longitude : 76.68986833333334
file name : Image_16042024122107118.png
|
2024-04-16 12:21:07.201352 |
69 |
96394970 |
Retrofitting of single pit toilets to twin pit toilets |
505440 |
Retrofitting toilet Maintenance 2023-24 |
Roof laid |
-
latitude : 8.930805
Longitude : 76.6738341
file name : Image_26032024125848761.png
|
2024-03-26 12:58:48.887881 |
70 |
96394970 |
Retrofitting of single pit toilets to twin pit toilets |
505440 |
Retrofitting toilet Maintenance 2023-24 |
Plinth level |
-
latitude : 8.9308865
Longitude : 76.6713468
file name : Image_18032024134355803.png
|
2024-03-18 13:43:55.91007 |
71 |
96394970 |
Retrofitting of single pit toilets to twin pit toilets |
505440 |
Retrofitting toilet Maintenance 2023-24 |
Completion of work |
-
latitude : 8.9308775
Longitude : 76.6713502
file name : Image_02032024145521987.png
|
2024-03-02 14:55:22.079854 |
72 |
67611875 |
Construction of roads |
380000 |
2023-24 kalluvilakkada aarogyakendram punnavila bhagom raod concreting |
Roof laid |
-
latitude : 8.957446666666668,8.952073333333335
Longitude : 76.68834,76.69287166666666
file name : Image_18032024130608772.png
|
2024-03-18 13:06:08.749665 |
73 |
67611875 |
Construction of roads |
380000 |
2023-24 kalluvilakkada aarogyakendram punnavila bhagom raod concreting |
Plinth level |
-
latitude : 8.9535326,8.952018333333333
Longitude : 76.6933357,76.69286333333334
file name : Image_14032024145901726.png
|
2024-03-14 14:59:01.812977 |
74 |
67611875 |
Construction of roads |
380000 |
2023-24 kalluvilakkada aarogyakendram punnavila bhagom raod concreting |
Completion of work |
-
latitude : 8.9512984,8.951556666666667
Longitude : 76.692283,76.69262499999999
file name : Image_11032024170003453.png
|
2024-03-11 17:00:03.571273 |
75 |
67611597 |
Construction of roads |
200000 |
Elampalloor GP 2023-24 Muraleesadhanam to Narayanapilla road concreting |
Roof laid |
-
latitude : 8.9576667,8.9576735
Longitude : 76.6884139,76.6884166
file name : Image_26032024115802203.png
|
2024-03-26 11:58:02.299863 |
76 |
67611597 |
Construction of roads |
200000 |
Elampalloor GP 2023-24 Muraleesadhanam to Narayanapilla road concreting |
Plinth level |
-
latitude : 8.9576323,8.9576308
Longitude : 76.6884567,76.6884291
file name : Image_18032024125116378.png
|
2024-03-18 12:51:16.478295 |
77 |
67611597 |
Construction of roads |
200000 |
Elampalloor GP 2023-24 Muraleesadhanam to Narayanapilla road concreting |
Completion of work |
-
latitude : 8.957228333333335,8.9570971
Longitude : 76.68840833333334,76.6883881
file name : Image_14032024145221202.png
|
2024-03-14 14:52:21.285326 |
78 |
67615811 |
Construction of roads |
400000 |
Elampalloor GP 2023-24 Thalaparamp puthalazhikath road concreating |
Roof laid |
-
latitude : 8.930805,8.930805
Longitude : 76.6738341,76.6738341
file name : Image_26032024125548905.png
|
2024-03-26 12:55:48.998409 |
79 |
67615811 |
Construction of roads |
400000 |
Elampalloor GP 2023-24 Thalaparamp puthalazhikath road concreating |
Plinth level |
-
latitude : 8.9307505,8.9307505
Longitude : 76.6739246,76.6739246
file name : Image_18032024132521085.png
|
2024-03-18 13:25:21.197368 |
80 |
67615811 |
Construction of roads |
400000 |
Elampalloor GP 2023-24 Thalaparamp puthalazhikath road concreating |
Completion of work |
-
latitude : 8.9307714,8.9307714
Longitude : 76.6738628,76.6738628
file name : Image_14032024152240644.png
|
2024-03-14 15:22:40.72983 |
81 |
96403763 |
Purchase of Sanitary Pad Incinerator |
55000 |
Purchase of Sanitary Pad Incinerator1 |
Roof laid |
-
latitude : 8.955744
Longitude : 76.671416
file name : Image_16032024113836071.png
|
2024-03-16 11:38:36.151999 |
82 |
96403763 |
Purchase of Sanitary Pad Incinerator |
55000 |
Purchase of Sanitary Pad Incinerator1 |
Plinth level |
-
latitude : 8.9556479
Longitude : 76.67145
file name : Image_16032024112726445.png
|
2024-03-16 11:27:26.528581 |
83 |
96403763 |
Purchase of Sanitary Pad Incinerator |
55000 |
Purchase of Sanitary Pad Incinerator1 |
Completion of work |
-
latitude : 8.955661
Longitude : 76.6715035
file name : Image_16032024112203183.png
|
2024-03-16 11:22:03.276265 |
84 |
96399476 |
Purchase of equipment (including safety equipment) for waste management |
309000 |
Purchase of equipment (including safety equipment) for waste management1 |
|
-
latitude : 8.9557761
Longitude : 76.6714376
file name : Image_06062024153154991.png
|
2024-06-06 15:31:55.106503 |
85 |
67625689 |
Drinking water facilities |
2526500 |
Njettayil ela thodu drinking water project |
Roof laid |
-
latitude : 8.932279999999999
Longitude : 76.66781666666667
file name : Image_27032024144718869.png
|
2024-03-27 14:47:18.960431 |
86 |
67625689 |
Drinking water facilities |
2526500 |
Njettayil ela thodu drinking water project |
Plinth level |
-
latitude : 8.9325689
Longitude : 76.6674373
file name : Image_27032024144348720.png
|
2024-03-27 14:43:48.806578 |
87 |
67625689 |
Drinking water facilities |
2526500 |
Njettayil ela thodu drinking water project |
Completion of work |
-
latitude : 8.9326174
Longitude : 76.6674838
file name : Image_27032024143641407.png
|
2024-03-27 14:36:41.508149 |
88 |
66128090 |
ElampalloorGP 2022-23- Sundharan Pillayude Veedu to Ela Vazhy Canal Road Concreting |
200228 |
ElampalloorGP 2022-23- Sundharan Pillayude Veedu to Ela Vazhy Canal Road Concreting1 |
Roof laid |
-
latitude : 8.9597255,8.9597269
Longitude : 76.6898183,76.6898115
file name : Image_05042024143757294.png
|
2024-04-05 14:37:57.408157 |
89 |
66128090 |
ElampalloorGP 2022-23- Sundharan Pillayude Veedu to Ela Vazhy Canal Road Concreting |
200228 |
ElampalloorGP 2022-23- Sundharan Pillayude Veedu to Ela Vazhy Canal Road Concreting1 |
Plinth level |
-
latitude : 8.9597266,8.9597323
Longitude : 76.6898196,76.6898173
file name : Image_05042024112721956.png
|
2024-04-05 11:27:22.038022 |
90 |
66128090 |
ElampalloorGP 2022-23- Sundharan Pillayude Veedu to Ela Vazhy Canal Road Concreting |
200228 |
ElampalloorGP 2022-23- Sundharan Pillayude Veedu to Ela Vazhy Canal Road Concreting1 |
Completion of work |
-
latitude : 8.9597374,8.9597374
Longitude : 76.6898311,76.6898311
file name : Image_26032024120305511.png
|
2024-03-26 12:03:05.595375 |
91 |
96373131 |
Construction of roads |
200000 |
thrikkoikal Mahavishnu Temple to prasanthi veedu vere road maintanence work |
Roof laid |
-
latitude : 8.9399406,8.939648333333334
Longitude : 76.6875129,76.68773833333333
file name : Image_11092024112122450.png
|
2024-09-11 11:23:42.694614 |
92 |
96373131 |
Construction of roads |
200000 |
thrikkoikal Mahavishnu Temple to prasanthi veedu vere road maintanence work |
Plinth level |
-
latitude : 8.9390084,8.9390085,8.939296666666667
Longitude : 76.6878446,76.6878473,76.687645
file name : Image_10092024145317392.png
|
2024-09-10 14:53:20.880851 |
93 |
96373131 |
Construction of roads |
200000 |
thrikkoikal Mahavishnu Temple to prasanthi veedu vere road maintanence work |
Completion of work |
-
latitude : 8.9398797,8.939605
Longitude : 76.6873404,76.68772166666666
file name : Image_09092024150427620.png
|
2024-09-09 15:06:12.482764 |
94 |
67615465 |
Construction of roads |
200000 |
Mangalath to nadanoor ela vere road concreting 23-24 |
Roof laid |
-
latitude : 8.9464388,8.946181666666666
Longitude : 76.6866675,76.687105
file name : Image_11092024113038881.png
|
2024-09-11 11:32:59.267046 |
95 |
67615465 |
Construction of roads |
200000 |
Mangalath to nadanoor ela vere road concreting 23-24 |
Plinth level |
-
latitude : 8.9465146,8.946206666666665
Longitude : 76.6866608,76.68675666666667
file name : Image_10092024144059962.png
|
2024-09-10 14:43:03.699774 |
96 |
67615465 |
Construction of roads |
200000 |
Mangalath to nadanoor ela vere road concreting 23-24 |
Completion of work |
-
latitude : 8.9464543,8.9464543
Longitude : 76.686662,76.686662
file name : Image_09092024152406483.png
|
2024-09-09 15:24:06.57619 |
97 |
67611319 |
Construction of roads |
200000 |
Pallimukku Aalummoodu junction chirayil colony road Concreting 2023-24 |
Roof laid |
-
latitude : 8.9672515,8.967313333333333
Longitude : 76.6902,76.69056333333333
file name : Image_14102024102659230.png
|
2024-10-14 10:26:59.335438 |
98 |
67611319 |
Construction of roads |
200000 |
Pallimukku Aalummoodu junction chirayil colony road Concreting 2023-24 |
Plinth level |
-
latitude : 8.967316666666667,8.967291666666666
Longitude : 76.69047333333333,76.69047166666665
file name : Image_13102024121015011.png
|
2024-10-13 12:10:15.099015 |
99 |
67611319 |
Construction of roads |
200000 |
Pallimukku Aalummoodu junction chirayil colony road Concreting 2023-24 |
Completion of work |
-
latitude : 8.9590952,8.967291666666666
Longitude : 76.6766953,76.69070666666667
file name : Image_25092024111403701.png
|
2024-09-25 11:14:03.80574 |
100 |
67613917 |
Construction of roads |
200000 |
Elampalloor GP2023-24 thadathil kshethram road concreting |
Roof laid |
-
latitude : 8.9336594,8.933649
Longitude : 76.6812799,76.6812852
file name : Image_01102024145300859.png
|
2024-10-01 14:53:00.958301 |
101 |
67613917 |
Construction of roads |
200000 |
Elampalloor GP2023-24 thadathil kshethram road concreting |
Plinth level |
-
latitude : 8.933228333333334,8.9333394
Longitude : 76.68095666666666,76.6806909
file name : Image_26092024203223259.png
|
2024-09-26 20:32:23.364749 |
102 |
67613917 |
Construction of roads |
200000 |
Elampalloor GP2023-24 thadathil kshethram road concreting |
Completion of work |
-
latitude : 8.9336525,8.9336104
Longitude : 76.6812829,76.6813095
file name : Image_25092024112736215.png
|
2024-09-25 11:27:36.322528 |
103 |
67613465 |
Construction of roads |
200000 |
Kolapoika Thundil Road Concreting Elampalloor GP- 2023-24 |
Roof laid |
-
latitude : 8.93212,8.932096666666666
Longitude : 76.68468666666666,76.68474666666665
file name : Image_03102024133344188.png
|
2024-10-03 13:33:44.281945 |
104 |
67613465 |
Construction of roads |
200000 |
Kolapoika Thundil Road Concreting Elampalloor GP- 2023-24 |
Plinth level |
-
latitude : 8.9338219,8.9338219
Longitude : 76.6812287,76.6812287
file name : Image_01102024150013836.png
|
2024-10-01 15:00:13.935245 |
105 |
67613465 |
Construction of roads |
200000 |
Kolapoika Thundil Road Concreting Elampalloor GP- 2023-24 |
Completion of work |
-
latitude : 8.9347196,8.9347196
Longitude : 76.6826133,76.6826133
file name : Image_25092024113559356.png
|
2024-09-25 11:35:59.458887 |
106 |
67616575 |
Construction of roads |
200000 |
Leelamani junction to north side of Kunjumon House Road Concreting 2023-24 |
Plinth level |
-
latitude : 8.9412509,8.941721666666666
Longitude : 76.6721095,76.67223333333332
file name : Image_04112024143746031.png
|
2024-11-04 14:37:46.13419 |
107 |
67616575 |
Construction of roads |
200000 |
Leelamani junction to north side of Kunjumon House Road Concreting 2023-24 |
Completion of work |
-
latitude : 8.9412456,8.941721666666666
Longitude : 76.6720908,76.67217666666667
file name : Image_28102024153315403.png
|
2024-10-28 15:33:15.559534 |
108 |
96400591 |
Creation of Shed for segregation and processing of wet and dry waste |
126000 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 8.954813333333334
Longitude : 76.6739
file name : Image_12062024121448321.png
|
2024-06-12 12:14:48.445363 |
109 |
96400591 |
Creation of Shed for segregation and processing of wet and dry waste |
126000 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 8.954831666666667
Longitude : 76.67389
file name : Image_18052024123358943.png
|
2024-05-18 12:33:59.052251 |
110 |
96400591 |
Creation of Shed for segregation and processing of wet and dry waste |
126000 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 8.9552583
Longitude : 76.6749984
file name : Image_11032024171126146.png
|
2024-03-11 17:11:26.224523 |
111 |
94125504 |
Services of Collection & transportation of waste from household to treatment site |
300200 |
Charges for legacy waste disposal |
Roof laid |
-
latitude : 8.9681641
Longitude : 76.6913838
file name : Image_20082024105216639.png
|
2024-08-20 10:52:16.760758 |
112 |
94125504 |
Services of Collection & transportation of waste from household to treatment site |
300200 |
Charges for legacy waste disposal |
Plinth level |
-
latitude : 8.9681637
Longitude : 76.691378
file name : Image_20082024102036208.png
|
2024-08-20 10:20:36.328212 |
113 |
94125504 |
Services of Collection & transportation of waste from household to treatment site |
300200 |
Charges for legacy waste disposal |
Completion of work |
-
latitude : 8.968338333333332
Longitude : 76.69149833333333
file name : Image_25072024153052409.png
|
2024-07-25 15:30:52.505922 |
114 |
67615099 |
Construction of roads |
200000 |
kattuvila mukku to madathil mukku road concreting 2023-24 |
Roof laid |
-
latitude : 8.9142968,8.914328
Longitude : 76.6594962,76.6595512
file name : Image_04112024145218663.png
|
2024-11-04 14:52:18.760607 |
115 |
67615099 |
Construction of roads |
200000 |
kattuvila mukku to madathil mukku road concreting 2023-24 |
Plinth level |
-
latitude : 8.914328,8.914476666666667
Longitude : 76.6595516,76.65948333333334
file name : Image_28102024150407755.png
|
2024-10-28 15:04:07.987324 |
116 |
67615099 |
Construction of roads |
200000 |
kattuvila mukku to madathil mukku road concreting 2023-24 |
Completion of work |
-
latitude : 8.9142148,8.9142274
Longitude : 76.6594886,76.6594934
file name : Image_25092024122142067.png
|
2024-09-25 12:21:42.155611 |
117 |
67614709 |
Construction of roads |
200000 |
Elampalloor GP2023-24 Kalluvila veedu to kunnumpurathu road concreting |
Roof laid |
-
latitude : 8.9214271,8.9214248
Longitude : 76.6815769,76.6815682
file name : Image_07092024130118039.png
|
2024-09-07 13:02:22.860192 |
118 |
67614709 |
Construction of roads |
200000 |
Elampalloor GP2023-24 Kalluvila veedu to kunnumpurathu road concreting |
Plinth level |
-
latitude : 8.9214242,8.9214244
Longitude : 76.6815677,76.6815677
file name : Image_05092024145959934.png
|
2024-09-05 15:00:00.026759 |
119 |
67614709 |
Construction of roads |
200000 |
Elampalloor GP2023-24 Kalluvila veedu to kunnumpurathu road concreting |
Completion of work |
-
latitude : 8.9214173,8.9213973
Longitude : 76.6815906,76.6815929
file name : Image_16082024112418506.png
|
2024-08-16 11:24:18.599946 |
120 |
67614308 |
Construction of roads |
200000 |
2023-24 Mundapally kshethram Ela Road Concreting |
Roof laid |
-
latitude : 8.9303614,8.92699
Longitude : 76.6824418,76.68709
file name : Image_25092024114340394.png
|
2024-09-25 11:43:40.494128 |
121 |
67614308 |
Construction of roads |
200000 |
2023-24 Mundapally kshethram Ela Road Concreting |
Plinth level |
-
latitude : 8.926695,8.9267569
Longitude : 76.68700666666668,76.6884839
file name : Image_06092024163930702.png
|
2024-09-06 16:39:30.786924 |
122 |
67614308 |
Construction of roads |
200000 |
2023-24 Mundapally kshethram Ela Road Concreting |
Completion of work |
-
latitude : 8.9558971,8.9267534
Longitude : 76.6714869,76.6884853
file name : Image_16082024111521562.png
|
2024-08-16 11:15:21.67046 |
123 |
67620517 |
Creation of a new rainwater harvesting structure |
1000000 |
2023-24 Rainwater Harvesting for school |
Plinth level |
-
latitude : 8.954376
Longitude : 76.6701259
file name : Image_09092024161142505.png
|
2024-09-09 16:11:42.637503 |
124 |
67620517 |
Creation of a new rainwater harvesting structure |
1000000 |
2023-24 Rainwater Harvesting for school |
Completion of work |
-
latitude : 8.9543022
Longitude : 76.6701371
file name : Image_06092024155843142.png
|
2024-09-06 15:58:43.240904 |