PURCHASE OF LAND FOR MCF |
1996600 |
PURCHASE OF LAND FOR MCF1 |
Completion of work |
-
latitude : 11.657440000000001
Longitude : 75.572685
file name : Image_30032022151514393.png
|
2022-03-30 15:15:14.482123 |
2 |
56815580 |
Purchase of Baling Machine |
530000 |
Purchase of Baling Machine1 |
Plinth level |
-
latitude : 11.650888333333334
Longitude : 75.562585
file name : Image_21022022153521326.png
|
2022-02-21 15:35:21.447412 |
3 |
56815580 |
Purchase of Baling Machine |
530000 |
Purchase of Baling Machine1 |
Completion of work |
-
latitude : 11.650810000000002
Longitude : 75.562425
file name : Image_19022022101524306.png
|
2022-02-19 10:15:24.392764 |
4 |
56832265 |
NH NAVATH KIZHAKKAYIL METHAL ROAD CONSTRUCTION WARD - 2 |
400000 |
NH NAVATH KIZHAKKAYIL METHAL ROAD CONSTRUCTION WARD - 21 |
Plinth level |
-
latitude : 11.65676,11.6567978
Longitude : 75.5610907,75.5610972
file name : Image_02022022121920137.png
|
2022-02-02 12:19:20.243801 |
5 |
56832265 |
NH NAVATH KIZHAKKAYIL METHAL ROAD CONSTRUCTION WARD - 2 |
400000 |
NH NAVATH KIZHAKKAYIL METHAL ROAD CONSTRUCTION WARD - 21 |
Completion of work |
-
latitude : 11.6567045,11.656776666666667
Longitude : 75.561023,75.56114
file name : Image_24012022123905743.png
|
2022-01-24 12:39:05.972751 |
6 |
56830786 |
MUNNOORAM KANDATHIL FOOTPATH CONSTRUCTION WARD - 13 |
300000 |
MUNNOORAM KANDATHIL FOOTPATH CONSTRUCTION WARD - 131 |
Plinth level |
-
latitude : 11.642106,11.642106,11.642106
Longitude : 75.5651342,75.5651342,75.5651342
file name : Image_18032022172132480.png
|
2022-03-18 17:21:32.579142 |
7 |
56830786 |
MUNNOORAM KANDATHIL FOOTPATH CONSTRUCTION WARD - 13 |
300000 |
MUNNOORAM KANDATHIL FOOTPATH CONSTRUCTION WARD - 131 |
Completion of work |
-
latitude : 11.6423287,11.6421367
Longitude : 75.5653063,75.5651647
file name : Image_24012022131128110.png
|
2022-01-24 13:11:28.221115 |
8 |
56832614 |
KANHIRATT MUKKU MAAVILAKKANDI ROAD CONSRTUCTION WARD - 17 |
300000 |
KANHIRATT MUKKU MAAVILAKKANDI ROAD CONSRTUCTION WARD - 171 |
Plinth level |
-
latitude : 11.656468333333331,11.656468333333331,11.656468333333331
Longitude : 75.56011333333332,75.56011333333332,75.56011333333332
file name : Image_17022022170239640.png
|
2022-02-17 17:02:39.739971 |
9 |
56832614 |
KANHIRATT MUKKU MAAVILAKKANDI ROAD CONSRTUCTION WARD - 17 |
300000 |
KANHIRATT MUKKU MAAVILAKKANDI ROAD CONSRTUCTION WARD - 171 |
Completion of work |
-
latitude : 11.656476666666666,11.656506666666667
Longitude : 75.55925333333333,75.55924
file name : Image_24012022125031380.png
|
2022-01-24 12:50:31.496162 |
10 |
57900469 |
BUILDING CONSRTUCTION FOR MCF |
2202600 |
BUILDING CONSRTUCTION FOR MCF1 |
Completion of work |
-
latitude : 11.657583333333331
Longitude : 75.57271833333333
file name : Image_30032023151736339.png
|
2023-03-30 15:17:36.431835 |
11 |
57900469 |
BUILDING CONSRTUCTION FOR MCF |
2202600 |
BUILDING CONSRTUCTION FOR MCF1 |
Completion of work |
-
latitude : 11.657631666666669
Longitude : 75.57261166666667
file name : Image_30112022150023787.png
|
2022-11-30 15:00:23.894829 |
12 |
57809229 |
EDAVANA PUTHIYOTTIL -PILAKKANDYMUKKU ROAD WARD -2 |
435000 |
EDAVANA PUTHIYOTTIL -PILAKKANDYMUKKU ROAD WARD -21 |
Completion of work |
-
latitude : 11.663231666666665,11.663248333333335,11.663291666666664
Longitude : 75.56192333333334,75.56187833333334,75.56181666666666
file name : Image_01122022121738965.png
|
2022-12-01 12:17:39.050456 |
13 |
57895827 |
CHATHYATH FOOTPAATH WARD-9 |
400000 |
CHATHYATH FOOTPAATH WARD-91 |
Completion of work |
-
latitude : 11.6462218,11.6461906
Longitude : 75.5761634,75.5762097
file name : Image_01122022112959991.png
|
2022-12-01 11:30:00.082 |
14 |
57808085 |
N H PUNATHIL PUTHAN PURAYIL ROAD WARD 1 |
400000 |
N H PUNATHIL PUTHAN PURAYIL ROAD WARD 11 |
Completion of work |
-
latitude : 11.6591619,11.6591619
Longitude : 75.5610036,75.5610036
file name : Image_03122022145449455.png
|
2022-12-03 14:54:49.561739 |
15 |
57813120 |
VALIYAPARAMBATH ROAD -WARD 4 |
400000 |
VALIYAPARAMBATH ROAD -WARD 41 |
Completion of work |
-
latitude : 11.6510478,11.655838333333334,11.656041666666665
Longitude : 75.5733371,75.57790666666666,75.57789
file name : Image_06122022143046290.png
|
2022-12-06 14:30:46.405569 |
16 |
56825018 |
PUTHIYOTTUMKANDI COLONY WATER TANK STAIRCASE GRILL CONSTRUCTION WARD -5 |
100000 |
PUTHIYOTTUMKANDI COLONY WATER TANK STAIRCASE GRILL CONSTRUCTION WARD -5 1 |
Plinth level |
-
latitude : 11.6546791
Longitude : 75.5807208
file name : Image_30032023164419812.png
|
2023-03-30 16:44:19.902842 |
17 |
57816160 |
EDAKKANDYKUNNU VALIPPARAMBATH FOOTPATH WARD-6 |
400000 |
EDAKKANDYKUNNU VALIPPARAMBATH FOOTPATH WARD-61 |
Plinth level |
-
latitude : 11.651571666666666,11.651541666666667
Longitude : 75.57562833333333,75.575595
file name : Image_20122022084539444.png
|
2022-12-20 08:45:39.550705 |
18 |
57816160 |
EDAKKANDYKUNNU VALIPPARAMBATH FOOTPATH WARD-6 |
400000 |
EDAKKANDYKUNNU VALIPPARAMBATH FOOTPATH WARD-61 |
Completion of work |
-
latitude : 11.6518705,11.6518705
Longitude : 75.5758838,75.5758838
file name : Image_01122022181620839.png
|
2022-12-01 18:16:20.92954 |
19 |
57818816 |
PANAKKOOL SCHOOL ROAD WARD 8 |
400000 |
PANAKKOOL SCHOOL ROAD WARD 81 |
Completion of work |
-
latitude : 11.6446886,11.6446884
Longitude : 75.5864921,75.5864932
file name : Image_17012023144519858.png
|
2023-01-17 14:45:19.965834 |
20 |
57814267 |
TARING REMAINING PORTION OF KARUVARAKKALTHAZHE ROAD -WARD 5 |
500000 |
TARING REMAINING PORTION OF KARUVARAKKALTHAZHE ROAD -WARD 51 |
Completion of work |
-
latitude : 11.651791666666668,11.651791666666668
Longitude : 75.58413333333333,75.58413333333333
file name : Image_17012023145927819.png
|
2023-01-17 14:59:27.943557 |
21 |
57817817 |
PANCHARAKKANDY MUKKU THAYYIL TEMPLE ROAD WARD 7 |
435800 |
PANCHARAKKANDY MUKKU THAYYIL TEMPLE ROAD WARD 71 |
Plinth level |
-
latitude : 11.653989999999999,11.653989999999999
Longitude : 75.58764666666666,75.58764666666666
file name : Image_17012023145231863.png
|
2023-01-17 14:52:31.964799 |
22 |
57817817 |
PANCHARAKKANDY MUKKU THAYYIL TEMPLE ROAD WARD 7 |
435800 |
PANCHARAKKANDY MUKKU THAYYIL TEMPLE ROAD WARD 71 |
Completion of work |
-
latitude : 11.654096666666666,11.654096666666666,11.654100000000001
Longitude : 75.58763333333333,75.58762666666667,75.58762499999999
file name : Image_20122022085911424.png
|
2022-12-20 08:59:11.524669 |
23 |
57810211 |
MARAMVEETIL KODERIMEETHAL ROAD WARD 3 |
400000 |
MARAMVEETIL KODERIMEETHAL ROAD WARD 31 |
Completion of work |
-
latitude : 11.659918333333334,11.659918333333334
Longitude : 75.57080833333333,75.57081
file name : Image_02122022180259478.png
|
2022-12-02 18:02:59.575411 |
24 |
66863923 |
Augmentation of the existing source of drinking water |
2200000 |
Augmentation of the existing source of drinking water1 |
Completion of work |
-
latitude : 11.650211666666667
Longitude : 75.58359666666666
file name : Image_30032023150642329.png
|
2023-03-30 15:06:42.428689 |
25 |
94629439 |
Construction of roads |
600000 |
Crash Road Kunjippura Road |
Roof laid |
-
latitude : 11.647181,11.647181
Longitude : 75.5807186,75.5807186
file name : Image_13032024120749830.png
|
2024-03-13 12:07:49.925057 |
26 |
94629439 |
Construction of roads |
600000 |
Crash Road Kunjippura Road |
Plinth level |
-
latitude : 11.6471517,11.6471517
Longitude : 75.580714,75.580714
file name : Image_06032024134039800.png
|
2024-03-06 13:40:39.895212 |
27 |
94629439 |
Construction of roads |
600000 |
Crash Road Kunjippura Road |
Completion of work |
-
latitude : 11.6471386,11.647105
Longitude : 75.5809034,75.58086499999999
file name : Image_04032024160045785.png
|
2024-03-04 16:00:45.878637 |
28 |
67779282 |
Drinking water facility |
500000 |
Madakkara Thod Samrakshana Bithi |
Completion of work |
-
latitude : 11.653995000000002
Longitude : 75.563215
file name : Image_26032024160525550.png
|
2024-03-26 16:05:25.641352 |
29 |
67779402 |
Drinking water facility |
475500 |
Karuvarakkal Pulayam KunnathThod |
Completion of work |
-
latitude : 11.6530392
Longitude : 75.5865077
file name : Image_06032024131838586.png
|
2024-03-06 13:18:38.68022 |
30 |
57899660 |
KANOOKKARA TO MADAKKARA DRAINAGE |
628100 |
KANOOKKARA TO MADAKKARA DRAINAGE 1 |
Completion of work |
-
latitude : 11.6505748
Longitude : 75.5587564
file name : Image_29012024114721425.png
|
2024-01-29 11:47:21.60433 |
31 |
67770350 |
Drainage Construction |
1000000 |
Naalukandathil Drainage |
Completion of work |
-
latitude : 11.643565
Longitude : 75.5637607
file name : Image_13032024124747616.png
|
2024-03-13 12:47:47.707404 |
32 |
56816306 |
PURCHASE OF WEIGHING MACHINE |
17000 |
PURCHASE OF WEIGHING MACHINE1 |
Plinth level |
-
latitude : 11.650843333333334
Longitude : 75.56261166666667
file name : Image_28022022152906505.png
|
2022-02-28 15:29:06.62198 |
33 |
56816306 |
PURCHASE OF WEIGHING MACHINE |
17000 |
PURCHASE OF WEIGHING MACHINE1 |
Plinth level |
-
latitude : 11.650848333333332
Longitude : 75.56263333333332
file name : Image_21022022153528081.png
|
2022-02-21 15:35:28.200807 |
34 |
67512247 |
Construction of roads |
500000 |
Vellikulangara Pumb to Panakkol Thazhe Road |
Plinth level |
-
latitude : 11.6463208,11.6463208
Longitude : 75.591056,75.591056
file name : Image_13032024114450621.png
|
2024-03-13 11:44:50.834595 |
35 |
67512247 |
Construction of roads |
500000 |
Vellikulangara Pumb to Panakkol Thazhe Road |
Completion of work |
-
latitude : 11.6466463,11.6466463
Longitude : 75.5909507,75.5909507
file name : Image_06032024131832488.png
|
2024-03-06 13:18:32.576286 |
36 |
67512247 |
Construction of roads |
500000 |
Vellikulangara Pumb to Panakkol Thazhe Road |
Completion of work |
-
latitude : 11.6462599,11.6462599
Longitude : 75.5910347,75.5910347
file name : Image_04032024153725802.png
|
2024-03-04 15:37:25.897111 |
37 |
67770530 |
Construction of roads |
500000 |
Kakkattmukk Thekke Parambath Road |
Completion of work |
-
latitude : 11.6359484,11.6359484
Longitude : 75.5703835,75.5703835
file name : Image_13032024123007739.png
|
2024-03-13 12:30:07.835153 |
38 |
67770379 |
Drainage Construction |
600000 |
Komath Drainage |
Roof laid |
-
latitude : 11.644554999999999
Longitude : 75.58709333333333
file name : Image_25032024114551714.png
|
2024-03-25 11:45:51.794128 |
39 |
67770379 |
Drainage Construction |
600000 |
Komath Drainage |
Plinth level |
-
latitude : 11.644528333333335
Longitude : 75.58716166666666
file name : Image_13032024121509559.png
|
2024-03-13 12:15:09.666119 |
40 |
67770379 |
Drainage Construction |
600000 |
Komath Drainage |
Completion of work |
-
latitude : 11.644513333333334
Longitude : 75.58724833333333
file name : Image_04032024160913777.png
|
2024-03-04 16:09:13.94873 |
41 |
94657799 |
Drinking water facility |
853300 |
Onchiyam Bank Kalyanimukk |
Completion of work |
-
latitude : 11.6575582
Longitude : 75.5839074
file name : Image_13032024112414975.png
|
2024-03-13 11:24:15.077448 |
42 |
56820045 |
RING COMPOST |
280000 |
RING COMPOST1 |
Plinth level |
-
latitude : 11.6540256
Longitude : 75.5621143
file name : Image_03022022114705257.png
|
2022-02-03 11:47:05.364428 |
43 |
56820045 |
RING COMPOST |
280000 |
RING COMPOST1 |
Completion of work |
-
latitude : 11.6539855
Longitude : 75.5621167
file name : Image_22012022145505768.png
|
2022-01-22 14:55:05.882521 |
44 |
56912541 |
CONSTRUCTION OF ROAD FROM MEYANA ROAD TO CHALL MUKKU - WARD - 15 |
300000 |
CONSTRUCTION OF ROAD FROM MEYANA ROAD TO CHALL MUKKU - WARD - 15 1 |
Plinth level |
-
latitude : 11.651558333333332,11.651556666666666,11.651556666666666
Longitude : 75.56596333333333,75.56596166666667,75.56595999999999
file name : Image_17022022174443969.png
|
2022-02-17 17:44:44.076655 |
45 |
56912541 |
CONSTRUCTION OF ROAD FROM MEYANA ROAD TO CHALL MUKKU - WARD - 15 |
300000 |
CONSTRUCTION OF ROAD FROM MEYANA ROAD TO CHALL MUKKU - WARD - 15 1 |
Completion of work |
-
latitude : 11.651595000000002,11.651606666666664
Longitude : 75.56600666666667,75.56604833333334
file name : Image_24012022132553842.png
|
2022-01-24 13:25:53.994242 |
46 |
56818061 |
CONSTRUCTION OF MINI MCF |
600000 |
CONSTRUCTION OF MINI MCF1 |
Plinth level |
-
latitude : 11.6539532
Longitude : 75.5619786
file name : Image_21022022150843289.png
|
2022-02-21 15:08:43.404735 |
47 |
56818061 |
CONSTRUCTION OF MINI MCF |
600000 |
CONSTRUCTION OF MINI MCF1 |
Completion of work |
-
latitude : 11.653747
Longitude : 75.5616937
file name : Image_19022022101058522.png
|
2022-02-19 10:10:58.613196 |
48 |
67770434 |
Construction of roads |
500000 |
Pilakkandi Keerayikandy Road |
Roof laid |
-
latitude : 11.662815,11.662815
Longitude : 75.56186,75.56186
file name : Image_13032024141908767.png
|
2024-03-13 14:19:08.745504 |
49 |
67770434 |
Construction of roads |
500000 |
Pilakkandi Keerayikandy Road |
Roof laid |
-
latitude : 11.662815,11.662815
Longitude : 75.56186,75.56186
file name : Image_13032024141851185.png
|
2024-03-13 14:18:51.290356 |
50 |
67770434 |
Construction of roads |
500000 |
Pilakkandi Keerayikandy Road |
Plinth level |
-
latitude : 11.640806666666666,11.640806666666666
Longitude : 75.571855,75.571855
file name : Image_02032024154455764.png
|
2024-03-02 15:44:55.8531 |
51 |
67770434 |
Construction of roads |
500000 |
Pilakkandi Keerayikandy Road |
Completion of work |
-
latitude : 11.662796666666669,11.66286
Longitude : 75.56184166666667,75.56182166666667
file name : Image_01032024131912836.png
|
2024-03-01 13:19:12.945999 |
52 |
94625707 |
Construction of roads |
500000 |
Pachilacheri Chamakkunn Concrete Road |
Roof laid |
-
latitude : 11.656671666666666,11.656671666666666
Longitude : 75.57421833333333,75.57421833333333
file name : Image_04032024162422329.png
|
2024-03-04 16:24:22.4249 |
53 |
94625707 |
Construction of roads |
500000 |
Pachilacheri Chamakkunn Concrete Road |
Plinth level |
-
latitude : 11.657005,11.657005
Longitude : 75.57394333333333,75.57394333333333
file name : Image_02032024153505939.png
|
2024-03-02 15:35:06.027985 |
54 |
94625707 |
Construction of roads |
500000 |
Pachilacheri Chamakkunn Concrete Road |
Completion of work |
-
latitude : 11.657051666666666,11.657051666666666,11.657051666666666,11.657051666666666
Longitude : 75.57394833333333,75.57394833333333,75.57394833333333,75.57394833333333
file name : Image_01032024125404553.png
|
2024-03-01 12:54:04.651287 |
55 |
94624518 |
Construction of roads |
780000 |
Kizhakkayil Varaprath thazha road concrete |
Roof laid |
-
latitude : 11.657543333333335,11.657543333333335
Longitude : 75.58608166666666,75.58608166666666
file name : Image_04032024161952865.png
|
2024-03-04 16:19:52.965728 |
56 |
94624518 |
Construction of roads |
780000 |
Kizhakkayil Varaprath thazha road concrete |
Plinth level |
-
latitude : 11.6575792,11.6575326
Longitude : 75.5856976,75.5858805
file name : Image_02032024150809511.png
|
2024-03-02 15:08:09.618957 |
57 |
94624518 |
Construction of roads |
780000 |
Kizhakkayil Varaprath thazha road concrete |
Completion of work |
-
latitude : 11.65756,11.657561666666668
Longitude : 75.58608,75.58606166666667
file name : Image_01032024124921471.png
|
2024-03-01 12:49:21.580062 |
58 |
94633754 |
Construction of roads |
400000 |
National Highway To Kandoth Footpath |
Roof laid |
-
latitude : 11.640859,11.640859
Longitude : 75.5721904,75.5721904
file name : Image_04032024163702173.png
|
2024-03-04 16:37:02.265595 |
59 |
94633754 |
Construction of roads |
400000 |
National Highway To Kandoth Footpath |
Plinth level |
-
latitude : 11.640925,11.640925
Longitude : 75.5721786,75.5721786
file name : Image_02032024153709591.png
|
2024-03-02 15:37:09.681354 |
60 |
94633754 |
Construction of roads |
400000 |
National Highway To Kandoth Footpath |
Completion of work |
-
latitude : 11.6409044,11.6409044
Longitude : 75.5721685,75.5721685
file name : Image_01032024131012007.png
|
2024-03-01 13:10:12.149611 |
61 |
94628233 |
Construction of roads |
500000 |
Kazhakappurayil Moyiloth Kulam |
Roof laid |
-
latitude : 11.6512074,11.6512074
Longitude : 75.5844419,75.5844419
file name : Image_13032024113938719.png
|
2024-03-13 11:39:38.820981 |
62 |
94628233 |
Construction of roads |
500000 |
Kazhakappurayil Moyiloth Kulam |
Plinth level |
-
latitude : 11.651319,11.651319
Longitude : 75.5845831,75.5845831
file name : Image_06032024132736891.png
|
2024-03-06 13:27:36.988542 |
63 |
94628233 |
Construction of roads |
500000 |
Kazhakappurayil Moyiloth Kulam |
Plinth level |
-
latitude : 11.651319,11.651319
Longitude : 75.5845831,75.5845831
file name : Image_06032024132651095.png
|
2024-03-06 13:26:51.186329 |
64 |
94628233 |
Construction of roads |
500000 |
Kazhakappurayil Moyiloth Kulam |
Completion of work |
-
latitude : 11.6512584,11.6512584
Longitude : 75.5845023,75.5845023
file name : Image_04032024155647468.png
|
2024-03-04 15:56:47.559932 |
65 |
67770448 |
Construction of roads |
500000 |
Eerayi Meethal elangot Thazha Road |
Plinth level |
-
latitude : 11.662270000000001,11.662270000000001
Longitude : 75.56873833333334,75.56873833333334
file name : Image_13032024141913733.png
|
2024-03-13 14:19:13.384101 |
66 |
67770448 |
Construction of roads |
500000 |
Eerayi Meethal elangot Thazha Road |
Plinth level |
-
latitude : 11.662270000000001,11.662270000000001
Longitude : 75.56873833333334,75.56873833333334
file name : Image_13032024141856410.png
|
2024-03-13 14:18:56.283335 |
67 |
67770448 |
Construction of roads |
500000 |
Eerayi Meethal elangot Thazha Road |
Completion of work |
-
latitude : 11.662341666666668,11.662341666666668
Longitude : 75.56872333333334,75.56872333333334
file name : Image_06032024131816054.png
|
2024-03-06 13:18:16.142659 |
68 |
67512388 |
Construction of roads |
500000 |
Punneri Thazhe Kappoyil Chorod Athirthi Vare |
Plinth level |
-
latitude : 11.640148333333332,11.640148333333332
Longitude : 75.58240500000001,75.58240500000001
file name : Image_13032024121504050.png
|
2024-03-13 12:15:04.023392 |
69 |
67512388 |
Construction of roads |
500000 |
Punneri Thazhe Kappoyil Chorod Athirthi Vare |
Completion of work |
-
latitude : 11.675905,11.640048333333334
Longitude : 75.71909666666667,75.58257
file name : Image_04032024152213531.png
|
2024-03-04 15:22:13.620877 |
70 |
94610339 |
Creation of compost pits for individual Households |
1225300 |
Creation of compost pits for individual Households1 |
Plinth level |
-
latitude : 11.6548386
Longitude : 75.5628991
file name : Image_26032024160950683.png
|
2024-03-26 16:09:50.780027 |
71 |
94610339 |
Creation of compost pits for individual Households |
1225300 |
Creation of compost pits for individual Households1 |
Completion of work |
-
latitude : 11.6548577
Longitude : 75.562929
file name : Image_25032024160500588.png
|
2024-03-25 16:05:00.672127 |
72 |
94644102 |
Drinking water facility |
596700 |
Manoli Karuvarakkal Thod Samrakshana Bithi |
Plinth level |
-
latitude : 11.6520244
Longitude : 75.5845799
file name : Image_13032024113824897.png
|
2024-03-13 11:38:24.998132 |
73 |
94644102 |
Drinking water facility |
596700 |
Manoli Karuvarakkal Thod Samrakshana Bithi |
Completion of work |
-
latitude : 11.651769999999999
Longitude : 75.58415166666667
file name : Image_06032024132157825.png
|
2024-03-06 13:21:57.9342 |