1 |
51805993 |
VAZHAVILA CANAL SIDE WALL CONSTRUCTION |
200000 |
VAZHAVILA CANAL SIDE WALL CONSTRUCTION1 |
Completion of work |
-
latitude : 8.4407473
Longitude : 76.9985068
file name : Image_03022022103444539.png
|
2022-02-03 10:34:44.650166 |
2 |
51808474 |
KAYALKARA THODU SIDEWALL CONSTRUCTION |
200000 |
KAYALKARA THODU SIDEWALL CONSTRUCTION1 |
Completion of work |
-
latitude : 8.4561528
Longitude : 76.9838617
file name : Image_04022022122345275.png
|
2022-02-04 12:23:45.367268 |
3 |
99013531 |
Connecting septic tanks with soak pits |
107955 |
Connecting septic tanks with soak pits1 |
Completion of work |
-
latitude : 8.4315069
Longitude : 77.0137071
file name : Image_03012025134541526.png
|
2025-01-03 13:45:40.241264 |
4 |
99013531 |
Connecting septic tanks with soak pits |
107955 |
Connecting septic tanks with soak pits1 |
Completion of work |
-
latitude : 8.4315389
Longitude : 77.0136851
file name : Image_03012025134458276.png
|
2025-01-03 13:44:57.020012 |
5 |
56729741 |
235 AKN ROAD PATHWAY CONCREATING WARD 6 |
68366 |
235 AKN ROAD PATHWAY CONCREATING WARD 6 1 |
Completion of work |
-
latitude : 8.450643333333334,8.450601666666667
Longitude : 77.00055333333333,77.000545
file name : Image_07022022110836475.png
|
2022-02-07 11:08:36.571758 |
6 |
56730014 |
NANUKUTTAN NAIR VIPANI ROAD CULVERT CONSTRUCTION |
50000 |
NANUKUTTAN NAIR VIPANI ROAD CULVERT CONSTRUCTION1 |
Completion of work |
-
latitude : 8.43323,8.433225
Longitude : 77.00950333333334,77.00950166666667
file name : Image_07022022111803711.png
|
2022-02-07 11:18:03.80903 |
7 |
51806067 |
MATHAVARA POND SIDEWALL CONSTRUCTION |
200000 |
MATHAVARA POND SIDEWALL CONSTRUCTION1 |
Completion of work |
-
latitude : 8.4428486
Longitude : 76.9936692
file name : Image_20022022160305738.png
|
2022-02-20 16:03:05.82005 |
8 |
55140643 |
REMITTANCE OF WATER CHARGE OF KWA |
1079000 |
REMITTANCE OF WATER CHARGE OF KWA1 |
Completion of work |
-
latitude : 8.4316626,8.4316468
Longitude : 77.0136587,77.0136546
file name : Image_08022022164357017.png
|
2022-02-08 16:43:57.130764 |
9 |
56732133 |
249 PAKALOOR POND MAINTENANCE 2 nd PHASE |
495000 |
249 PAKALOOR POND MAINTENANCE 2 nd PHASE1 |
Completion of work |
-
latitude : 8.4355502
Longitude : 77.0183366
file name : Image_07022022105344465.png
|
2022-02-07 10:53:44.573913 |
10 |
56732133 |
249 PAKALOOR POND MAINTENANCE 2 nd PHASE |
495000 |
249 PAKALOOR POND MAINTENANCE 2 nd PHASE1 |
Completion of work |
-
latitude : 8.431521
Longitude : 77.0136094
file name : Image_08022022170126130.png
|
2022-02-08 17:01:26.231391 |
11 |
56732133 |
249 PAKALOOR POND MAINTENANCE 2 nd PHASE |
495000 |
249 PAKALOOR POND MAINTENANCE 2 nd PHASE1 |
Completion of work |
-
latitude : 8.4315177
Longitude : 77.0136081
file name : Image_08022022171714449.png
|
2022-02-08 17:17:14.537842 |
12 |
51826835 |
HOUSEHOLD BIOGAS PLANT |
244800 |
HOUSEHOLD BIOGAS PLANT1 |
Completion of work |
-
latitude : 8.4315179
Longitude : 77.0136645
file name : Image_23072022112353912.png
|
2022-07-23 11:23:54.006824 |
13 |
51795687 |
KALLUVILA NARANGARATHALA CONCRETING |
100000 |
KALLUVILA NARANGARATHALA CONCRETING 1 |
Completion of work |
-
latitude : 8.424816666666667,8.424821666666666
Longitude : 77.01234166666667,77.01233666666667
file name : Image_21032022113139273.png
|
2022-03-21 11:31:39.388294 |
14 |
51792500 |
ELECTRIC LINE EXTENSION |
1850000 |
ELECTRIC LINE EXTENSION1 |
Completion of work |
-
latitude : 8.4316286
Longitude : 77.0136602
file name : Image_12012022154721256.png
|
2022-01-12 15:47:21.392802 |
15 |
51792500 |
ELECTRIC LINE EXTENSION |
1850000 |
ELECTRIC LINE EXTENSION1 |
Completion of work |
-
latitude : 8.4314166
Longitude : 77.0137289
file name : Image_19012022150716928.png
|
2022-01-19 15:07:17.014798 |
16 |
51808281 |
THENGUMPALLYKKONAM THODU SIDEWALL CONSTRUCTION |
200000 |
THENGUMPALLYKKONAM THODU SIDEWALL CONSTRUCTION1 |
Completion of work |
-
latitude : 8.422733333333333
Longitude : 77.01500333333334
file name : Image_22032022121133304.png
|
2022-03-22 12:11:33.384947 |
17 |
51796337 |
SANTHIVILA MARKET COMPOUND WALL CONSTRUCTION |
206000 |
SANTHIVILA MARKET COMPOUND WALL CONSTRUCTION1 |
Completion of work |
-
latitude : 8.4314764
Longitude : 77.0135934
file name : Image_20012022145927956.png
|
2022-01-20 14:59:28.122647 |
18 |
51795317 |
KALPAKA NAGAR PATH WAY CONCRETING |
100000 |
KALPAKA NAGAR PATH WAY CONCRETING 1 |
Completion of work |
-
latitude : 8.4314895,8.4314895
Longitude : 77.0135941,77.0135941
file name : Image_31012022141432041.png
|
2022-01-31 14:14:32.131144 |
19 |
51795317 |
KALPAKA NAGAR PATH WAY CONCRETING |
100000 |
KALPAKA NAGAR PATH WAY CONCRETING 1 |
Completion of work |
-
latitude : 8.448072,8.448072
Longitude : 77.0097734,77.0097734
file name : Image_25032022154856341.png
|
2022-03-25 15:48:56.440522 |
20 |
51792741 |
CHERUSERIKKAL ROAD KODIVILAKATHU ROAD CONCRETING |
200000 |
CHERUSERIKKAL ROAD KODIVILAKATHU ROAD CONCRETING 1 |
Completion of work |
-
latitude : 8.4314431,8.4314379
Longitude : 77.0136755,77.0136554
file name : Image_31012022141437969.png
|
2022-01-31 14:14:38.068724 |
21 |
51809034 |
NEDINJAL THODU BUND MAINTENANCE |
200000 |
NEDINJAL THODU BUND MAINTENANCE1 |
Completion of work |
-
latitude : 8.4205887
Longitude : 77.0007542
file name : Image_28012022164148954.png
|
2022-01-28 16:41:49.144647 |
22 |
51796198 |
VARUVILA PATHWAY CONCRETING |
100000 |
VARUVILA PATHWAY CONCRETING 1 |
Completion of work |
-
latitude : 8.4259002,8.4259002
Longitude : 76.9999906,76.9999906
file name : Image_01022022104900851.png
|
2022-02-01 10:49:00.966486 |
23 |
51806401 |
MUTHUVAKKODU KOLLAM VILAKAM STREAM SIDE WALL CONSTRUCTION |
200000 |
MUTHUVAKKODU KOLLAM VILAKAM STREAM SIDE WALL CONSTRUCTION1 |
Completion of work |
-
latitude : 8.443276666666666
Longitude : 76.99372333333334
file name : Image_02022022140003273.png
|
2022-02-02 14:00:03.408645 |
24 |
51795226 |
KEERTHI NAGAR KUZHIVILAKAM ROAD KEERTHINAGAR EK NAYANAR LANE CONCRETING |
200000 |
KEERTHI NAGAR KUZHIVILAKAM ROAD KEERTHINAGAR EK NAYANAR LANE CONCRETING 1 |
Completion of work |
-
latitude : 8.4455203,8.4455203
Longitude : 76.9946049,76.9946049
file name : Image_02022022140922791.png
|
2022-02-02 14:09:22.898828 |
25 |
56737390 |
277 KUZHITHALACHAL POND MAINTENANCE |
200000 |
277 KUZHITHALACHAL POND MAINTENANCE 1 |
Completion of work |
-
latitude : 8.4315339
Longitude : 77.0136599
file name : Image_17032022125030987.png
|
2022-03-17 12:50:31.117299 |
26 |
58497567 |
PALOORKONAM PLAKKUZHY PATHWAYS CONCRETING |
131365 |
PALOORKONAM PLAKKUZHY PATHWAYS CONCRETING1 |
Completion of work |
-
latitude : 8.4315483,8.4315483
Longitude : 77.0136604,77.0136604
file name : Image_21032022114521594.png
|
2022-03-21 11:45:21.706137 |
27 |
51795160 |
MUKALOORMOOLA KEEZHAKKARI ROAD CONCRETING |
100000 |
MUKALOORMOOLA KEEZHAKKARI ROAD CONCRETING 1 |
Completion of work |
-
latitude : 8.4315441,8.4315441
Longitude : 77.0136623,77.0136623
file name : Image_17032022131708082.png
|
2022-03-17 13:17:08.174446 |
28 |
56730545 |
238 AARATTUKADAVU THODU SIDEWALL CONSTRUCTION & BUND CONCRETING |
116450 |
238 AARATTUKADAVU THODU SIDEWALL CONSTRUCTION & BUND CONCRETING 1 |
Completion of work |
-
latitude : 8.425913333333334,8.425913333333334
Longitude : 77.00093333333332,77.00093333333332
file name : Image_22032022161830776.png
|
2022-03-22 16:18:30.864038 |
29 |
60102997 |
MAINTENANCE OF LED STREET LIGHTS |
400120 |
MAINTENANCE OF LED STREET LIGHTS1 |
Completion of work |
-
latitude : 8.4316701
Longitude : 77.0137362
file name : Image_26032022103524298.png
|
2022-03-26 10:35:24.455372 |
30 |
51809087 |
POONKULAM KOLIYOOR CHANNEL BUND SIDE WALL CONSTRUCTION |
200000 |
POONKULAM KOLIYOOR CHANNEL BUND SIDE WALL CONSTRUCTION1 |
Completion of work |
-
latitude : 8.4111382
Longitude : 77.0008903
file name : Image_26032022124724322.png
|
2022-03-26 12:47:24.436929 |
31 |
56736226 |
273 KALPANAGAR PATHWAY CONCRETING |
40000 |
273 KALPANAGAR PATHWAY CONCRETING1 |
Completion of work |
-
latitude : 8.444086666666667,8.444086666666667
Longitude : 76.99318333333333,76.99318333333333
file name : Image_06062022140020719.png
|
2022-06-06 14:00:20.809343 |
32 |
51795648 |
NEDIYAVILA PATHWAY CONCRETING |
100000 |
NEDIYAVILA PATHWAY CONCRETING 1 |
Completion of work |
-
latitude : 8.4197595,8.4197595
Longitude : 77.0196922,77.0196922
file name : Image_30032022124340983.png
|
2022-03-30 12:43:41.084776 |
33 |
56731000 |
244 SASTHAMKOVIL THODU AIRAL ROAD SIDEWALL CONSTRUCTION |
400000 |
244 SASTHAMKOVIL THODU AIRAL ROAD SIDEWALL CONSTRUCTION1 |
Completion of work |
-
latitude : 8.4277733
Longitude : 77.0060244
file name : Image_30032022133740494.png
|
2022-03-30 13:37:40.602769 |
34 |
56732502 |
251 NANUKKUTTAN NAIR PULIKKAKULAM SIDE WALL CONSTRUCTION |
400000 |
251 NANUKKUTTAN NAIR PULIKKAKULAM SIDE WALL CONSTRUCTION 1 |
Completion of work |
-
latitude : 8.4338877
Longitude : 77.0116444
file name : Image_30032022124048063.png
|
2022-03-30 12:40:48.16362 |
35 |
51822997 |
PANDARAKKARI FIELD CLEANING |
200000 |
PANDARAKKARI FIELD CLEANING 1 |
Completion of work |
-
latitude : 8.443145
Longitude : 76.993735
file name : Image_31032022115651817.png
|
2022-03-31 11:56:51.936332 |
36 |
51805405 |
VEHICLE PURCHASE FOR HARITHAKARMASENA AND RELATED ACTIVITIES |
260000 |
VEHICLE PURCHASE FOR HARITHAKARMASENA AND RELATED ACTIVITIES 1 |
Completion of work |
-
latitude : 8.4315709
Longitude : 77.0136648
file name : Image_30032022150727000.png
|
2022-03-30 15:07:27.089598 |
37 |
51805405 |
VEHICLE PURCHASE FOR HARITHAKARMASENA AND RELATED ACTIVITIES |
260000 |
VEHICLE PURCHASE FOR HARITHAKARMASENA AND RELATED ACTIVITIES 1 |
Completion of work |
-
latitude : 8.4315425
Longitude : 77.013645
file name : Image_30032022151112738.png
|
2022-03-30 15:11:12.824014 |
38 |
56733527 |
271 PALOORKONAM KODIKKULAM DRAINAGE CULVERT |
150000 |
271 PALOORKONAM KODIKKULAM DRAINAGE CULVERT1 |
Completion of work |
-
latitude : 8.448226666666667,8.44824
Longitude : 77.00804,77.008005
file name : Image_28052022153116451.png
|
2022-05-28 15:31:16.550619 |
39 |
56733781 |
MADATHUVILA PATHWAY CONCRETING |
49000 |
MADATHUVILA PATHWAY CONCRETING 1 |
Completion of work |
-
latitude : 8.4429769,8.4429769
Longitude : 76.9936703,76.9936703
file name : Image_30052022101802986.png
|
2022-05-30 10:18:03.131871 |
40 |
58871465 |
PULIKKAKKULAM POND MAINTENANCE |
95000 |
PULIKKAKKULAM POND MAINTENANCE1 |
Completion of work |
-
latitude : 8.4327707
Longitude : 77.0119328
file name : Image_30052022130801983.png
|
2022-05-30 13:08:02.076434 |
41 |
58871465 |
PULIKKAKKULAM POND MAINTENANCE |
95000 |
PULIKKAKKULAM POND MAINTENANCE1 |
Completion of work |
-
latitude : 8.4327465
Longitude : 77.0119051
file name : Image_30052022130616744.png
|
2022-05-30 13:06:16.835693 |
42 |
57509614 |
VARUVILAKAM NANUKUTTAN NAIR ROAD DRAIN CONSTRUCTION |
150000 |
VARUVILAKAM NANUKUTTAN NAIR ROAD DRAIN CONSTRUCTION1 |
Completion of work |
-
latitude : 8.4315107,8.4315107
Longitude : 77.0136669,77.0136669
file name : Image_23072022180431970.png
|
2022-07-23 18:04:32.04921 |
43 |
58862002 |
KAROTTUKONAM POND SIDEWALL CONSTRUCTION & CONCRETING |
400000 |
KAROTTUKONAM POND SIDEWALL CONSTRUCTION & CONCRETING1 |
Completion of work |
-
latitude : 8.4263917
Longitude : 76.9767251
file name : Image_01082022150955978.png
|
2022-08-01 15:09:56.070578 |
44 |
58534915 |
POONKULAM KOLIYOOR CHANNEL BUND SIDE WALL CONSTRUCTION |
300000 |
POONKULAM KOLIYOOR CHANNEL BUND SIDE WALL CONSTRUCTION1 |
Completion of work |
-
latitude : 8.4315274
Longitude : 77.0136842
file name : Image_22082022144805356.png
|
2022-08-22 14:48:05.474096 |
45 |
56737074 |
ANGANWADI BUILDING RENNOVATION |
900539 |
ANGANWADI BUILDING RENNOVATION1 |
Completion of work |
-
latitude : 8.434473333333333
Longitude : 76.97505333333334
file name : Image_25082022144415834.png
|
2022-08-25 14:44:15.938899 |
46 |
56737074 |
ANGANWADI BUILDING RENNOVATION |
900539 |
ANGANWADI BUILDING RENNOVATION1 |
Completion of work |
-
latitude : 8.434433333333335
Longitude : 76.97504333333333
file name : Image_25082022144214479.png
|
2022-08-25 14:42:14.606792 |
47 |
56737074 |
ANGANWADI BUILDING RENNOVATION |
900539 |
ANGANWADI BUILDING RENNOVATION1 |
Completion of work |
-
latitude : 8.434498333333332
Longitude : 76.97513666666667
file name : Image_25082022144116463.png
|
2022-08-25 14:41:16.571386 |
48 |
58896442 |
CONSTRUCTION OF TOILETS IN MCF |
1000000 |
CONSTRUCTION OF TOILETS IN MCF1 |
Completion of work |
-
latitude : 8.427998333333333
Longitude : 77.02030666666666
file name : Image_28102022111446598.png
|
2022-10-28 11:14:46.713056 |
49 |
58896442 |
CONSTRUCTION OF TOILETS IN MCF |
1000000 |
CONSTRUCTION OF TOILETS IN MCF1 |
Completion of work |
-
latitude : 8.427983333333334
Longitude : 77.02029333333333
file name : Image_28102022111354007.png
|
2022-10-28 11:13:54.124849 |
50 |
56737867 |
278 PALAPPOORU CHANNEL MAINTENANCE |
228771 |
278 PALAPPOORU CHANNEL MAINTENANCE1 |
Completion of work |
-
latitude : 8.4355992,8.4355992
Longitude : 76.9765851,76.9765851
file name : Image_08112022145455238.png
|
2022-11-08 14:54:55.343086 |
51 |
56737867 |
278 PALAPPOORU CHANNEL MAINTENANCE |
228771 |
278 PALAPPOORU CHANNEL MAINTENANCE1 |
Completion of work |
-
latitude : 8.4356893,8.4356893
Longitude : 76.9765881,76.9765881
file name : Image_08112022145557206.png
|
2022-11-08 14:55:57.313274 |
52 |
65966637 |
291 - HARITHA NAGAR ROAD CONCRETING WARD -13 |
230000 |
291 - HARITHA NAGAR ROAD CONCRETING WARD -131 |
Completion of work |
-
latitude : 8.4318089,8.4318089
Longitude : 77.0128925,77.0128925
file name : Image_04012023153033228.png
|
2023-01-04 15:30:33.346315 |
53 |
65966637 |
291 - HARITHA NAGAR ROAD CONCRETING WARD -13 |
230000 |
291 - HARITHA NAGAR ROAD CONCRETING WARD -131 |
Completion of work |
-
latitude : 8.4314409,8.4314409
Longitude : 77.0129192,77.0129192
file name : Image_04012023153138518.png
|
2023-01-04 15:31:38.634331 |
54 |
58122338 |
POONKULAM OLIPPUVILA ROAD CONCRETING IN WARD 19 |
230000 |
POONKULAM OLIPPUVILA ROAD CONCRETING IN WARD 191 |
Completion of work |
-
latitude : 8.4212343,8.4212343
Longitude : 76.9817964,76.9817964
file name : Image_04012023151251951.png
|
2023-01-04 15:12:52.057732 |
55 |
58134462 |
WELL MAINTENANCE FOR INDIVIDUALS |
378000 |
WELL MAINTENANCE FOR INDIVIDUALS1 |
Completion of work |
-
latitude : 8.4314665
Longitude : 77.0136477
file name : Image_05012023141001103.png
|
2023-01-05 14:10:01.201414 |
56 |
58134462 |
WELL MAINTENANCE FOR INDIVIDUALS |
378000 |
WELL MAINTENANCE FOR INDIVIDUALS1 |
Completion of work |
-
latitude : 8.4314624
Longitude : 77.0136483
file name : Image_05012023141125596.png
|
2023-01-05 14:11:25.707639 |
57 |
58134462 |
WELL MAINTENANCE FOR INDIVIDUALS |
378000 |
WELL MAINTENANCE FOR INDIVIDUALS1 |
Completion of work |
-
latitude : 8.431468
Longitude : 77.0136532
file name : Image_05012023141253724.png
|
2023-01-05 14:12:53.81186 |
58 |
58134234 |
PIPELINE EXTENSION |
600000 |
PIPELINE EXTENSION1 |
Completion of work |
-
latitude : 8.4315438,8.4315438
Longitude : 77.0136909,77.0136909
file name : Image_05012023135254771.png
|
2023-01-05 13:52:54.881832 |
59 |
58122007 |
KANNANKUZHI AIRAL PATHWAY CONCRETING IN WARD 17 PATHWAYS CONCRETING IN WARD 18 |
360000 |
KANNANKUZHI AIRAL PATHWAY CONCRETING IN WARD 17 PATHWAYS CONCRETING IN WARD 181 |
Completion of work |
-
latitude : 8.421818333333333,8.421816666666667,8.421816666666667,8.421816666666667,8.421815
Longitude : 77.00220166666666,77.00219833333334,77.00219833333334,77.00219333333332,77.00219166666668
file name : Image_23012023123849254.png
|
2023-01-23 12:38:49.398229 |
60 |
58122007 |
KANNANKUZHI AIRAL PATHWAY CONCRETING IN WARD 17 PATHWAYS CONCRETING IN WARD 18 |
360000 |
KANNANKUZHI AIRAL PATHWAY CONCRETING IN WARD 17 PATHWAYS CONCRETING IN WARD 181 |
Completion of work |
-
latitude : 8.424095,8.424095
Longitude : 77.00703666666666,77.00703666666666
file name : Image_23012023124548658.png
|
2023-01-23 12:45:48.766746 |
61 |
58122007 |
KANNANKUZHI AIRAL PATHWAY CONCRETING IN WARD 17 PATHWAYS CONCRETING IN WARD 18 |
360000 |
KANNANKUZHI AIRAL PATHWAY CONCRETING IN WARD 17 PATHWAYS CONCRETING IN WARD 181 |
Completion of work |
-
latitude : 8.424898333333335,8.424898333333335
Longitude : 77.002505,77.002505
file name : Image_23012023124457295.png
|
2023-01-23 12:44:57.40455 |
62 |
58122007 |
KANNANKUZHI AIRAL PATHWAY CONCRETING IN WARD 17 PATHWAYS CONCRETING IN WARD 18 |
360000 |
KANNANKUZHI AIRAL PATHWAY CONCRETING IN WARD 17 PATHWAYS CONCRETING IN WARD 181 |
Completion of work |
-
latitude : 8.42179,8.42179
Longitude : 77.00217833333333,77.00217833333333
file name : Image_23012023124011388.png
|
2023-01-23 12:40:11.494064 |
63 |
58127784 |
PAPPANCHANI POND MAINTENANCE IN WARD 1 |
150000 |
PAPPANCHANI POND MAINTENANCE IN WARD 11 |
Completion of work |
-
latitude : 8.437618333333335
Longitude : 76.97449833333333
file name : Image_23012023130220718.png
|
2023-01-23 13:02:20.847438 |
64 |
58133925 |
MAINTENANCE OF KAROTTUKONAM , KAMUKINKUZHI POND IN WARD 20 |
150000 |
MAINTENANCE OF KAROTTUKONAM , KAMUKINKUZHI POND IN WARD 201 |
Completion of work |
-
latitude : 8.426421666666666
Longitude : 76.97665666666667
file name : Image_28012023175656578.png
|
2023-01-28 17:56:56.679851 |
65 |
58118942 |
PALOORKONAM POOVANVILA ROAD CON (WARD 6) NSS ROAD PLAVOORKONAM PATHWAY SIDEWALL & CONCRETING WARD 7 |
460000 |
PALOORKONAM POOVANVILA ROAD CON (WARD 6) NSS ROAD PLAVOORKONAM PATHWAY SIDEWALL & CONCRETING WARD 71 |
Completion of work |
-
latitude : 8.44583,8.44583,8.44583
Longitude : 77.0065817,77.0065817,77.0065817
file name : Image_10022023122547219.png
|
2023-02-10 12:25:47.319399 |
66 |
58133394 |
MANGALATHUKONAM POND MAINTENANCE IN WARD 17 |
300000 |
MANGALATHUKONAM POND MAINTENANCE IN WARD 171 |
Completion of work |
-
latitude : 8.4289178
Longitude : 77.0039199
file name : Image_13022023161444623.png
|
2023-02-13 16:14:44.79 |
67 |
58133394 |
MANGALATHUKONAM POND MAINTENANCE IN WARD 17 |
300000 |
MANGALATHUKONAM POND MAINTENANCE IN WARD 171 |
Completion of work |
-
latitude : 8.428401666666668
Longitude : 77.00313
file name : Image_13022023161246405.png
|
2023-02-13 16:12:46.507784 |
68 |
58132939 |
MAINTENANCE OF KUZHITHALACHAL POND IN WARD 15 |
150000 |
MAINTENANCE OF KUZHITHALACHAL POND IN WARD 151 |
Completion of work |
-
latitude : 8.423221666666667
Longitude : 77.01035833333334
file name : Image_13022023162237231.png
|
2023-02-13 16:22:37.320218 |
69 |
58132939 |
MAINTENANCE OF KUZHITHALACHAL POND IN WARD 15 |
150000 |
MAINTENANCE OF KUZHITHALACHAL POND IN WARD 151 |
Completion of work |
-
latitude : 8.425946666666666
Longitude : 77.01106333333334
file name : Image_13022023162129060.png
|
2023-02-13 16:21:29.15338 |
70 |
66009860 |
Grey water management — collection infrastructure |
204900 |
Grey water management — collection infrastructure1 |
Completion of work |
-
latitude : 8.4314584
Longitude : 77.0136562
file name : Image_15022023162556744.png
|
2023-02-15 16:25:56.84932 |
71 |
58116856 |
THANNIVILA TEMPLE PATHWAY CONCRETING IN WARD 4 |
230000 |
THANNIVILA TEMPLE PATHWAY CONCRETING IN WARD 41 |
Completion of work |
-
latitude : 8.4497432,8.4497432,8.4497432
Longitude : 77.0002705,77.0002705,77.0002705
file name : Image_16022023115031502.png
|
2023-02-16 11:50:31.61506 |
72 |
58116514 |
THENNOR MULAVILAKAM ROAD ,VIVEKANANDA ROAD MUKALOORMOOLA ADALJI ROAD INTERLOCKING IN WARD 2,3 |
460000 |
THENNOR MULAVILAKAM ROAD ,VIVEKANANDA ROAD MUKALOORMOOLA ADALJI ROAD INTERLOCKING IN WARD 2,31 |
Completion of work |
-
latitude : 8.449694,8.449694
Longitude : 76.9903458,76.9903458
file name : Image_16022023143018442.png
|
2023-02-16 14:30:18.547995 |
73 |
58116514 |
THENNOR MULAVILAKAM ROAD ,VIVEKANANDA ROAD MUKALOORMOOLA ADALJI ROAD INTERLOCKING IN WARD 2,3 |
460000 |
THENNOR MULAVILAKAM ROAD ,VIVEKANANDA ROAD MUKALOORMOOLA ADALJI ROAD INTERLOCKING IN WARD 2,31 |
Completion of work |
-
latitude : 8.4496567,8.4496567
Longitude : 76.9902931,76.9902931
file name : Image_16022023143101673.png
|
2023-02-16 14:31:01.774524 |
74 |
58121586 |
KARIYARATHALA BRIDGE EXTN THENGUVILA PATHWAY INTERLOCKING IN WARD 15 KALLUTHATTU ROAD CON IN WARD 16 |
460000 |
KARIYARATHALA BRIDGE EXTN THENGUVILA PATHWAY INTERLOCKING IN WARD 15 KALLUTHATTU ROAD CON IN WARD 161 |
Completion of work |
-
latitude : 8.423968333333333,8.423961666666665
Longitude : 77.00993666666666,77.00991
file name : Image_21022023143619197.png
|
2023-02-21 14:36:19.292317 |
75 |
58121586 |
KARIYARATHALA BRIDGE EXTN THENGUVILA PATHWAY INTERLOCKING IN WARD 15 KALLUTHATTU ROAD CON IN WARD 16 |
460000 |
KARIYARATHALA BRIDGE EXTN THENGUVILA PATHWAY INTERLOCKING IN WARD 15 KALLUTHATTU ROAD CON IN WARD 161 |
Completion of work |
-
latitude : 8.425976666666665,8.425975
Longitude : 77.01106666666666,77.01105833333332
file name : Image_21022023141541528.png
|
2023-02-21 14:15:41.63345 |
76 |
66863861 |
Operation & maintenance of drinking water supply system |
80000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 8.423361666666667
Longitude : 77.00893166666667
file name : Image_20022023144827925.png
|
2023-02-20 14:48:28.025312 |
77 |
66863861 |
Operation & maintenance of drinking water supply system |
80000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 8.427706666666667
Longitude : 77.01117833333333
file name : Image_20022023144744834.png
|
2023-02-20 14:47:44.937754 |
78 |
66851611 |
Providing piped water supply to public institutions |
870000 |
Providing piped water supply to public institutions1 |
Completion of work |
-
latitude : 8.4534715
Longitude : 76.995134
file name : Image_23022023170322175.png
|
2023-02-23 17:03:22.255358 |
79 |
58115057 |
POTTAVILA KOVIL VILA ROAD CONCRETING WARD 1 |
230000 |
POTTAVILA KOVIL VILA ROAD CONCRETING WARD 11 |
Completion of work |
-
latitude : 8.4341246,8.4341246
Longitude : 76.9724599,76.9724599
file name : Image_16032023163610199.png
|
2023-03-16 16:36:10.314112 |
80 |
58115057 |
POTTAVILA KOVIL VILA ROAD CONCRETING WARD 1 |
230000 |
POTTAVILA KOVIL VILA ROAD CONCRETING WARD 11 |
Completion of work |
-
latitude : 8.434224,8.434224
Longitude : 76.9725088,76.9725088
file name : Image_16032023163730742.png
|
2023-03-16 16:37:30.856889 |
81 |
58119850 |
PALLICHAL POND, THAKIDIYIL POND SIDE ROAD CON IN WARD 10 KUZHIYAMVILA PATHWAYS CONCRETING IN WARD 11 |
460000 |
PALLICHAL POND, THAKIDIYIL POND SIDE ROAD CON IN WARD 10 KUZHIYAMVILA PATHWAYS CONCRETING IN WARD 111 |
Completion of work |
-
latitude : 8.443606666666666,8.443606666666666
Longitude : 77.01594833333334,77.01594833333334
file name : Image_16032023170137254.png
|
2023-03-16 17:01:37.350871 |
82 |
58119850 |
PALLICHAL POND, THAKIDIYIL POND SIDE ROAD CON IN WARD 10 KUZHIYAMVILA PATHWAYS CONCRETING IN WARD 11 |
460000 |
PALLICHAL POND, THAKIDIYIL POND SIDE ROAD CON IN WARD 10 KUZHIYAMVILA PATHWAYS CONCRETING IN WARD 111 |
Completion of work |
-
latitude : 8.443668333333333,8.443668333333333
Longitude : 77.01589333333332,77.01589333333332
file name : Image_16032023170229847.png
|
2023-03-16 17:02:30.007762 |
83 |
58119850 |
PALLICHAL POND, THAKIDIYIL POND SIDE ROAD CON IN WARD 10 KUZHIYAMVILA PATHWAYS CONCRETING IN WARD 11 |
460000 |
PALLICHAL POND, THAKIDIYIL POND SIDE ROAD CON IN WARD 10 KUZHIYAMVILA PATHWAYS CONCRETING IN WARD 111 |
Completion of work |
-
latitude : 8.4383962,8.4383962
Longitude : 77.0104392,77.0104392
file name : Image_16032023170930944.png
|
2023-03-16 17:09:31.039389 |
84 |
58120932 |
KARAKKATTUVILA PATHWAY INTERLOCKING IN WARD 14 |
180000 |
KARAKKATTUVILA PATHWAY INTERLOCKING IN WARD 141 |
Completion of work |
-
latitude : 8.419791,8.419791
Longitude : 77.0195322,77.0195322
file name : Image_16032023165502904.png
|
2023-03-16 16:55:03.000056 |
85 |
58120932 |
KARAKKATTUVILA PATHWAY INTERLOCKING IN WARD 14 |
180000 |
KARAKKATTUVILA PATHWAY INTERLOCKING IN WARD 141 |
Completion of work |
-
latitude : 8.4196204,8.4196204
Longitude : 77.0207782,77.0207782
file name : Image_16032023165406054.png
|
2023-03-16 16:54:06.155792 |
86 |
58119370 |
VALLOMCODE PUTHUVAL ROADSIDE CON IN WARD 8 VALLATHUVILAKAM VEVILA PUNNAVILA OOKKODE ROAD CON WARD 9 |
460000 |
VALLOMCODE PUTHUVAL ROADSIDE CON IN WARD 8 VALLATHUVILAKAM VEVILA PUNNAVILA OOKKODE ROAD CON WARD 91 |
Completion of work |
-
latitude : 8.4395526,8.4395526
Longitude : 77.0089064,77.0089064
file name : Image_27032023121912649.png
|
2023-03-27 12:19:12.758236 |
87 |
58119370 |
VALLOMCODE PUTHUVAL ROADSIDE CON IN WARD 8 VALLATHUVILAKAM VEVILA PUNNAVILA OOKKODE ROAD CON WARD 9 |
460000 |
VALLOMCODE PUTHUVAL ROADSIDE CON IN WARD 8 VALLATHUVILAKAM VEVILA PUNNAVILA OOKKODE ROAD CON WARD 91 |
Completion of work |
-
latitude : 8.4398646,8.4399025
Longitude : 77.0090291,77.0090341
file name : Image_27032023122005182.png
|
2023-03-27 12:20:05.957879 |
88 |
58119370 |
VALLOMCODE PUTHUVAL ROADSIDE CON IN WARD 8 VALLATHUVILAKAM VEVILA PUNNAVILA OOKKODE ROAD CON WARD 9 |
460000 |
VALLOMCODE PUTHUVAL ROADSIDE CON IN WARD 8 VALLATHUVILAKAM VEVILA PUNNAVILA OOKKODE ROAD CON WARD 91 |
Completion of work |
-
latitude : 8.4396987,8.4396987
Longitude : 77.0089244,77.0089244
file name : Image_27032023122148797.png
|
2023-03-27 12:21:49.141363 |
89 |
65966527 |
232- KONNAVILA THENNOOR OOTTUKUZHI KAITHAKONAM ROAD RETARRING INTERLOCKING -WARD 5 |
230000 |
232- KONNAVILA THENNOOR OOTTUKUZHI KAITHAKONAM ROAD RETARRING INTERLOCKING -WARD 51 |
Completion of work |
-
latitude : 8.442936666666666,8.442936666666666
Longitude : 76.99369833333334,76.99369833333334
file name : Image_11102023112257310.png
|
2023-10-11 11:22:57.380896 |
90 |
65966527 |
232- KONNAVILA THENNOOR OOTTUKUZHI KAITHAKONAM ROAD RETARRING INTERLOCKING -WARD 5 |
230000 |
232- KONNAVILA THENNOOR OOTTUKUZHI KAITHAKONAM ROAD RETARRING INTERLOCKING -WARD 51 |
Completion of work |
-
latitude : 8.451915000000001,8.451915000000001
Longitude : 76.99416,76.99415833333335
file name : Image_11102023112336464.png
|
2023-10-11 11:23:36.520834 |
91 |
65966527 |
232- KONNAVILA THENNOOR OOTTUKUZHI KAITHAKONAM ROAD RETARRING INTERLOCKING -WARD 5 |
230000 |
232- KONNAVILA THENNOOR OOTTUKUZHI KAITHAKONAM ROAD RETARRING INTERLOCKING -WARD 51 |
Completion of work |
-
latitude : 8.451901666666666,8.451901666666666
Longitude : 76.99413833333332,76.994135
file name : Image_09012024151409490.png
|
2024-01-09 15:14:09.566758 |
92 |
58120321 |
MAVUVILA PATHWAY INTERLOCKING IN WARD 12 |
100000 |
MAVUVILA PATHWAY INTERLOCKING IN WARD 12 1 |
Completion of work |
-
latitude : 8.429973333333333,8.4303193
Longitude : 77.02351833333334,77.023404
file name : Image_26092023151616812.png
|
2023-09-26 15:16:16.89974 |
93 |
58120321 |
MAVUVILA PATHWAY INTERLOCKING IN WARD 12 |
100000 |
MAVUVILA PATHWAY INTERLOCKING IN WARD 12 1 |
Completion of work |
-
latitude : 8.430305,8.430305
Longitude : 77.0234071,77.0234071
file name : Image_26092023151658089.png
|
2023-09-26 15:16:58.155225 |
94 |
66009924 |
Grey water management — collection infrastructure |
77700 |
Grey water management — collection infrastructure1 |
Completion of work |
-
latitude : 8.4314726
Longitude : 77.0136589
file name : Image_04102023111924949.png
|
2023-10-04 11:19:25.013443 |
95 |
66097026 |
CHANNALKARA KAVUVILA ROAD CONCRETING KAYALKARA PAPPARIKKARA ROAD INTERLOCKING |
460000 |
CHANNALKARA KAVUVILA ROAD CONCRETING KAYALKARA PAPPARIKKARA ROAD INTERLOCKING 1 |
Completion of work |
-
latitude : 8.434186666666667,8.434176666666668
Longitude : 76.98114666666667,76.98114666666667
file name : Image_09012024151414110.png
|
2024-01-09 15:14:14.205809 |
96 |
66097026 |
CHANNALKARA KAVUVILA ROAD CONCRETING KAYALKARA PAPPARIKKARA ROAD INTERLOCKING |
460000 |
CHANNALKARA KAVUVILA ROAD CONCRETING KAYALKARA PAPPARIKKARA ROAD INTERLOCKING 1 |
Completion of work |
-
latitude : 8.434173333333332,8.434171666666666
Longitude : 76.98116499999999,76.98116666666667
file name : Image_09012024151418098.png
|
2024-01-09 15:14:18.170424 |
97 |
66097026 |
CHANNALKARA KAVUVILA ROAD CONCRETING KAYALKARA PAPPARIKKARA ROAD INTERLOCKING |
460000 |
CHANNALKARA KAVUVILA ROAD CONCRETING KAYALKARA PAPPARIKKARA ROAD INTERLOCKING 1 |
Completion of work |
-
latitude : 8.434186666666667,8.434176666666668
Longitude : 76.98114666666667,76.98114666666667
file name : Image_09012024151422812.png
|
2024-01-09 15:14:22.902411 |
98 |
66097026 |
CHANNALKARA KAVUVILA ROAD CONCRETING KAYALKARA PAPPARIKKARA ROAD INTERLOCKING |
460000 |
CHANNALKARA KAVUVILA ROAD CONCRETING KAYALKARA PAPPARIKKARA ROAD INTERLOCKING 1 |
Completion of work |
-
latitude : 8.434173333333332,8.434171666666666
Longitude : 76.98116499999999,76.98116666666667
file name : Image_09012024151426373.png
|
2024-01-09 15:14:26.45192 |
99 |
67777793 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 8.447598333333334,8.447598333333334
Longitude : 77.00463833333333,77.00463833333333
file name : Image_27012024143255068.png
|
2024-01-27 14:32:55.129204 |
100 |
67777793 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 8.452210000000001,8.452253333333335
Longitude : 77.00668833333334,77.00663
file name : Image_27012024143307315.png
|
2024-01-27 14:33:07.384342 |
101 |
67777793 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 8.4458335,8.4458335
Longitude : 77.0068763,77.0068763
file name : Image_11032024170924906.png
|
2024-03-11 17:09:24.973001 |
102 |
67754872 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 8.431765,8.431765
Longitude : 77.01385666666667,77.01385666666667
file name : Image_13022024103837097.png
|
2024-02-13 10:38:37.16618 |
103 |
67754872 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 8.431616666666667,8.431616666666667
Longitude : 77.013685,77.013685
file name : Image_13022024103937917.png
|
2024-02-13 10:39:37.983497 |
104 |
58135819 |
CONSTRUCTION OF BABY FRIENDLY TOILET IN ANGANWADIS |
900000 |
CONSTRUCTION OF BABY FRIENDLY TOILET IN ANGANWADIS1 |
Completion of work |
-
latitude : 8.4347634
Longitude : 77.0125515
file name : Image_20022024151047652.png
|
2024-02-20 15:10:47.718065 |
105 |
58135819 |
CONSTRUCTION OF BABY FRIENDLY TOILET IN ANGANWADIS |
900000 |
CONSTRUCTION OF BABY FRIENDLY TOILET IN ANGANWADIS2 |
Completion of work |
-
latitude : 8.437305
Longitude : 77.00208500000001
file name : Image_20022024151358358.png
|
2024-02-20 15:13:58.447322 |
106 |
58135819 |
CONSTRUCTION OF BABY FRIENDLY TOILET IN ANGANWADIS |
900000 |
CONSTRUCTION OF BABY FRIENDLY TOILET IN ANGANWADIS3 |
Completion of work |
-
latitude : 8.4265901
Longitude : 76.9956669
file name : Image_20022024152428769.png
|
2024-02-20 15:24:28.826047 |
107 |
58135819 |
CONSTRUCTION OF BABY FRIENDLY TOILET IN ANGANWADIS |
900000 |
CONSTRUCTION OF BABY FRIENDLY TOILET IN ANGANWADIS3 |
Completion of work |
-
latitude : 8.4267914
Longitude : 76.9960248
file name : Image_20022024152546995.png
|
2024-02-20 15:25:47.068328 |
108 |
67782903 |
Household Sanitation - Construction of IHHL for eligible HHs |
1000000 |
Household Sanitation - Construction of IHHL for eligible HHs1 |
Completion of work |
-
latitude : 8.4315043
Longitude : 77.0136906
file name : Image_21022024152757103.png
|
2024-02-21 15:27:57.17366 |
109 |
67782903 |
Household Sanitation - Construction of IHHL for eligible HHs |
1000000 |
Household Sanitation - Construction of IHHL for eligible HHs1 |
Completion of work |
-
latitude : 8.4315041
Longitude : 77.0136939
file name : Image_21022024153018039.png
|
2024-02-21 15:30:18.117855 |
110 |
67397091 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 8.42495,8.42495
Longitude : 76.9791738,76.9791738
file name : Image_26022024125053567.png
|
2024-02-26 12:50:53.65789 |
111 |
67775600 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 8.4453256,8.4453256
Longitude : 76.9919458,76.9919458
file name : Image_26022024141208080.png
|
2024-02-26 14:12:08.162608 |
112 |
67775600 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 8.4467204,8.4467204
Longitude : 76.993792,76.993792
file name : Image_26022024141402803.png
|
2024-02-26 14:14:02.879514 |
113 |
58129762 |
MAINTENANCE OF PALOORKONAM CHUDUKADU POND IN WARD 6 PLAKKUZHI POND IN WARD 7 |
300000 |
MAINTENANCE OF PALOORKONAM CHUDUKADU POND IN WARD 6 PLAKKUZHI POND IN WARD 71 |
Completion of work |
-
latitude : 8.4501096
Longitude : 77.0061403
file name : Image_11032024155753285.png
|
2024-03-11 15:57:53.355613 |
114 |
58129762 |
MAINTENANCE OF PALOORKONAM CHUDUKADU POND IN WARD 6 PLAKKUZHI POND IN WARD 7 |
300000 |
MAINTENANCE OF PALOORKONAM CHUDUKADU POND IN WARD 6 PLAKKUZHI POND IN WARD 71 |
Completion of work |
-
latitude : 8.450296
Longitude : 77.0070965
file name : Image_11032024155904358.png
|
2024-03-11 15:59:04.422458 |
115 |
67754634 |
Construction of roads |
120000 |
Construction of roads1 |
Completion of work |
-
latitude : 8.4404526,8.4404526
Longitude : 76.9933784,76.9933784
file name : Image_11032024143915418.png
|
2024-03-11 14:39:15.483723 |
116 |
67754634 |
Construction of roads |
120000 |
Construction of roads1 |
Completion of work |
-
latitude : 8.4402545,8.4402545
Longitude : 76.9933917,76.9933917
file name : Image_11032024143954617.png
|
2024-03-11 14:39:54.683341 |
117 |
67777389 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 8.4344748,8.4344748
Longitude : 76.9772786,76.9772786
file name : Image_13032024145505643.png
|
2024-03-13 14:55:05.346351 |
118 |
67817136 |
Creation of plastic waste storage unit |
100000 |
Creation of plastic waste storage unit1 |
Completion of work |
-
latitude : 8.4314659
Longitude : 77.0137021
file name : Image_15032024103716231.png
|
2024-03-15 10:37:16.296129 |
119 |
96299931 |
Construction of roads |
219136 |
Construction of roads1 |
Completion of work |
-
latitude : 8.4429373,8.4429373
Longitude : 76.9936493,76.9936493
file name : Image_20032024153605808.png
|
2024-03-20 15:36:05.926048 |
120 |
96299931 |
Construction of roads |
219136 |
Construction of roads1 |
Completion of work |
-
latitude : 8.4413643,8.4413643
Longitude : 76.9958931,76.9958931
file name : Image_20032024153645023.png
|
2024-03-20 15:36:45.13442 |
121 |
99019557 |
Drainage Construction |
1191701 |
Drainage Construction1 |
Completion of work |
-
latitude : 8.431473
Longitude : 77.0136824
file name : Image_22032024104418766.png
|
2024-03-22 10:44:18.838423 |
122 |
88056322 |
Wall Painting |
50000 |
Wall Painting1 |
Completion of work |
-
latitude : 8.4314705
Longitude : 77.0136848
file name : Image_21032024121824388.png
|
2024-03-21 12:18:24.463453 |
123 |
88056322 |
Wall Painting |
50000 |
Wall Painting1 |
Completion of work |
-
latitude : 8.4314646
Longitude : 77.0136898
file name : Image_21032024122003597.png
|
2024-03-21 12:20:03.669758 |
124 |
87076464 |
Construction of roads |
483730 |
Construction of roads1 |
Completion of work |
-
latitude : 8.43517,8.43517
Longitude : 76.9790276,76.9790276
file name : Image_21032024121254763.png
|
2024-03-21 12:12:54.870822 |
125 |
99460440 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 8.430313,8.430313
Longitude : 77.0088303,77.0088303
file name : Image_22032024114910225.png
|
2024-03-22 11:49:10.297925 |
126 |
99460440 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 8.4298854,8.4298854
Longitude : 77.0095155,77.0095155
file name : Image_22032024114832293.png
|
2024-03-22 11:48:32.355653 |
127 |
58130524 |
OOKKODU DRINKING WATER PLANT CONSTRUCTION IN WARD 8 |
150000 |
OOKKODU DRINKING WATER PLANT CONSTRUCTION IN WARD 81 |
Completion of work |
-
latitude : 8.4398231
Longitude : 77.0044125
file name : Image_22032024112058580.png
|
2024-03-22 11:20:58.648473 |
128 |
58130524 |
OOKKODU DRINKING WATER PLANT CONSTRUCTION IN WARD 8 |
150000 |
OOKKODU DRINKING WATER PLANT CONSTRUCTION IN WARD 81 |
Completion of work |
-
latitude : 8.4398147
Longitude : 77.004397
file name : Image_22032024112204307.png
|
2024-03-22 11:22:04.386296 |
129 |
95982218 |
Construction of roads |
152435 |
Construction of roads1 |
Completion of work |
-
latitude : 8.4319564,8.4319564
Longitude : 77.0187919,77.0187919
file name : Image_22032024114120155.png
|
2024-03-22 11:41:20.214546 |
130 |
95982218 |
Construction of roads |
152435 |
Construction of roads1 |
Completion of work |
-
latitude : 8.4320682,8.4320682
Longitude : 77.0188174,77.0188174
file name : Image_22032024114223612.png
|
2024-03-22 11:42:23.798756 |
131 |
67764764 |
Water Supply to villages |
200000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 8.438868333333334
Longitude : 76.97724
file name : Image_23032024135808058.png
|
2024-03-23 13:58:08.112388 |
132 |
87104128 |
Construction of roads |
34858 |
Construction of roads1 |
Completion of work |
-
latitude : 8.44333,8.443336666666665
Longitude : 76.98784500000001,76.98786
file name : Image_23032024151147656.png
|
2024-03-23 15:11:47.718454 |
133 |
87104128 |
Construction of roads |
34858 |
Construction of roads1 |
Completion of work |
-
latitude : 8.443318333333334,8.443318333333334
Longitude : 76.98777166666667,76.98777166666667
file name : Image_23032024151306503.png
|
2024-03-23 15:13:06.569735 |
134 |
98909540 |
Creation of soak pits for individual Household for onsite Grey Water Management |
33488 |
Creation of soak pits for individual Household for onsite Grey Water Management1 |
Completion of work |
-
latitude : 8.4315282
Longitude : 77.0135786
file name : Image_27032024093928281.png
|
2024-03-27 09:39:28.346677 |
135 |
88051662 |
Construction of Building |
164000 |
Construction of Building1 |
Completion of work |
-
latitude : 8.4178299
Longitude : 77.0148339
file name : Image_23032024170347696.png
|
2024-03-23 17:03:47.766791 |
136 |
88051662 |
Construction of Building |
164000 |
Construction of Building1 |
Completion of work |
-
latitude : 8.417835
Longitude : 77.01483
file name : Image_23032024170306622.png
|
2024-03-23 17:03:06.702904 |
137 |
98910856 |
Construction of Segregation Unit |
90804 |
Construction of Segregation Unit1 |
Completion of work |
-
latitude : 8.4314567
Longitude : 77.0136749
file name : Image_27032024120637548.png
|
2024-03-27 12:06:37.612377 |
138 |
67778034 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 8.4314644,8.4314644
Longitude : 77.0136773,77.0136773
file name : Image_26032024145310059.png
|
2024-03-26 14:53:10.121115 |
139 |
67778034 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 8.4314686,8.4314686
Longitude : 77.0136745,77.0136745
file name : Image_26032024145353989.png
|
2024-03-26 14:53:54.07706 |
140 |
67755595 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 8.4314677,8.4314677
Longitude : 77.0136791,77.0136791
file name : Image_26032024164209695.png
|
2024-03-26 16:42:09.76967 |
141 |
67755595 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 8.4314636,8.4314636
Longitude : 77.013682,77.013682
file name : Image_27032024114041387.png
|
2024-03-27 11:40:41.454042 |
142 |
95947540 |
Construction of roads |
189510 |
Construction of roads1 |
Completion of work |
-
latitude : 8.4314671,8.4314671
Longitude : 77.0136795,77.0136795
file name : Image_27032024114437771.png
|
2024-03-27 11:44:37.882674 |
143 |
67396536 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 8.4314648,8.4314648
Longitude : 77.0136809,77.0136809
file name : Image_26032024153821929.png
|
2024-03-26 15:38:21.981993 |
144 |
98902960 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 8.4533957,8.4533957
Longitude : 76.9951835,76.9951835
file name : Image_26032024154225737.png
|
2024-03-26 15:42:25.791501 |
145 |
98902960 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 8.4534451,8.4534451
Longitude : 76.9953176,76.9953176
file name : Image_26032024154322660.png
|
2024-03-26 15:43:22.718197 |
146 |
98821949 |
Construction of roads |
148000 |
Construction of roads1 |
Completion of work |
-
latitude : 8.4314635,8.4314635
Longitude : 77.0136788,77.0136788
file name : Image_27032024103932550.png
|
2024-03-27 10:39:32.613299 |
147 |
58133212 |
MAINTENANCE OF PANCHAYAT WELL IN THETTIVILA IN WARD 16 |
100000 |
MAINTENANCE OF PANCHAYAT WELL IN THETTIVILA IN WARD 161 |
Completion of work |
-
latitude : 8.4216468
Longitude : 77.0079435
file name : Image_27032024130056528.png
|
2024-03-27 13:00:56.82936 |
148 |
58133212 |
MAINTENANCE OF PANCHAYAT WELL IN THETTIVILA IN WARD 16 |
100000 |
MAINTENANCE OF PANCHAYAT WELL IN THETTIVILA IN WARD 161 |
Completion of work |
-
latitude : 8.4216621
Longitude : 77.0079372
file name : Image_27032024130201118.png
|
2024-03-27 13:02:01.194794 |
149 |
58133691 |
POONKULAM WELL & KULAVARAMBU POND MAINTENANCE IN WARD 19 |
150000 |
POONKULAM WELL & KULAVARAMBU POND MAINTENANCE IN WARD 191 |
Completion of work |
-
latitude : 8.4226235
Longitude : 76.9769308
file name : Image_27032024125232519.png
|
2024-03-27 12:52:32.605982 |
150 |
58133691 |
POONKULAM WELL & KULAVARAMBU POND MAINTENANCE IN WARD 19 |
150000 |
POONKULAM WELL & KULAVARAMBU POND MAINTENANCE IN WARD 191 |
Completion of work |
-
latitude : 8.4226648
Longitude : 76.9766266
file name : Image_27032024125353313.png
|
2024-03-27 12:53:53.394274 |
151 |
95500813 |
Electricity connection /Installation of Solar Energy |
100000 |
Electricity connection /Installation of Solar Energy1 |
Completion of work |
-
latitude : 8.4314655
Longitude : 77.0136756
file name : Image_30032024175608560.png
|
2024-03-30 17:56:08.626064 |
152 |
67777242 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 8.4314677,8.4314677
Longitude : 77.0136777,77.0136777
file name : Image_30032024174629282.png
|
2024-03-30 17:46:29.376614 |
153 |
67777242 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 8.4314677,8.4314677
Longitude : 77.0136777,77.0136777
file name : Image_30032024174632210.png
|
2024-03-30 17:46:32.282291 |
154 |
67777242 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 8.4314677,8.4314677
Longitude : 77.0136777,77.0136777
file name : Image_30032024174635330.png
|
2024-03-30 17:46:35.400222 |
155 |
95955008 |
Construction of Community Sanitary Complex |
202741 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 8.4513385
Longitude : 76.997636
file name : Image_13092024122641973.png
|
2024-09-13 12:26:42.032517 |
156 |
95955008 |
Construction of Community Sanitary Complex |
202741 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 8.4513247
Longitude : 76.9976989
file name : Image_13092024122823456.png
|
2024-09-13 12:28:23.545203 |
157 |
107382695 |
Creation of plastic waste storage unit |
40000 |
Creation of plastic waste storage unit1 |
Completion of work |
-
latitude : 8.4315334
Longitude : 77.0137095
file name : Image_19092024155631832.png
|
2024-09-19 15:56:31.907298 |
158 |
93494379 |
Electric connection |
465000 |
Electric connection1 |
Completion of work |
-
latitude : 8.392856666666667
Longitude : 77.00302666666667
file name : Image_17012025095729004.png
|
2025-01-17 09:57:18.122548 |
159 |
93494379 |
Electric connection |
465000 |
Electric connection1 |
Completion of work |
-
latitude : 8.4316033
Longitude : 77.0136849
file name : Image_17012025095807101.png
|
2025-01-17 09:57:56.230031 |
160 |
67390509 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 8.426095,8.426095
Longitude : 77.01597,77.01596833333333
file name : Image_07102024152913637.png
|
2024-10-07 15:29:13.726131 |
161 |
67390509 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 8.431873333333334,8.431873333333334
Longitude : 77.01623500000001,77.01623500000001
file name : Image_07102024152650099.png
|
2024-10-07 15:26:50.153415 |
162 |
60097021 |
TAKE A BREAK |
1028866 |
TAKE A BREAK1 |
Completion of work |
-
latitude : 8.436526666666667
Longitude : 76.97910499999999
file name : Image_18112024125055224.png
|
2024-11-18 12:50:55.275035 |
163 |
60097021 |
TAKE A BREAK |
1028866 |
TAKE A BREAK1 |
Completion of work |
-
latitude : 8.436621666666667
Longitude : 76.97912166666667
file name : Image_18112024124950749.png
|
2024-11-18 12:49:50.802455 |
164 |
67817649 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 8.4215499,8.421351666666668,8.421351666666668
Longitude : 77.0128416,77.01208,77.01208
file name : Image_04112024114914611.png
|
2024-11-04 11:49:14.678349 |