1 |
53395037 |
OHT TANK AT KALIAPPAGOUNDENPUTHUR |
411000 |
OHT TANK AT KALIAPPAGOUNDENPUTHUR1 |
Completion of work |
-
latitude : 10.866275
Longitude : 77.32509666666667
file name : Image_06102021113057663.png
|
2021-10-06 11:30:57.764781 |
2 |
53395037 |
OHT TANK AT KALIAPPAGOUNDENPUTHUR |
411000 |
OHT TANK AT KALIAPPAGOUNDENPUTHUR1 |
Completion of work |
-
latitude : 10.86643
Longitude : 77.32516333333334
file name : Image_06102021113120211.png
|
2021-10-06 11:31:20.294513 |
3 |
53395037 |
OHT TANK AT KALIAPPAGOUNDENPUTHUR |
411000 |
OHT TANK AT KALIAPPAGOUNDENPUTHUR1 |
Completion of work |
-
latitude : 10.866295
Longitude : 77.32477666666666
file name : Image_04102021170734363.png
|
2021-10-04 17:07:34.455642 |
4 |
53395037 |
OHT TANK AT KALIAPPAGOUNDENPUTHUR |
411000 |
OHT TANK AT KALIAPPAGOUNDENPUTHUR1 |
Completion of work |
-
latitude : 10.866308333333333
Longitude : 77.32504666666667
file name : Image_04102021170802326.png
|
2021-10-04 17:08:02.419494 |
5 |
53394903 |
NEW BORE WELL AT KALIAPPAGOUNDENPUTHUR |
300000 |
NEW BORE WELL AT KALIAPPAGOUNDENPUTHUR 1 |
Completion of work |
-
latitude : 10.866301666666667
Longitude : 77.325075
file name : Image_04102021170934869.png
|
2021-10-04 17:09:34.965295 |
6 |
53394811 |
PIPE LINE EXISTING AT KALIAPPAGOUNDENPUDUR |
177400 |
PIPE LINE EXISTING AT KALIAPPAGOUNDENPUDUR1 |
Completion of work |
-
latitude : 10.866301666666667,10.866303333333333
Longitude : 77.32459,77.32458666666666
file name : Image_04102021170642593.png
|
2021-10-04 17:06:42.695734 |
7 |
53394811 |
PIPE LINE EXISTING AT KALIAPPAGOUNDENPUDUR |
177400 |
PIPE LINE EXISTING AT KALIAPPAGOUNDENPUDUR1 |
Completion of work |
-
latitude : 10.866218333333332,10.866173333333332,10.866173333333332,10.866168333333333,10.866155
Longitude : 77.32514166666667,77.32512666666666,77.32512666666666,77.32512333333334,77.32510333333333
file name : Image_04102021171652035.png
|
2021-10-04 17:16:52.136399 |
8 |
53406315 |
NEW BORE WELL AT KALLIYAPPAGOUNDENPUTHUR |
130000 |
NEW BORE WELL AT KALLIYAPPAGOUNDENPUTHUR1 |
Completion of work |
-
latitude : 10.866435000000001
Longitude : 77.3252
file name : Image_06102021113110579.png
|
2021-10-06 11:31:10.701948 |
9 |
53406315 |
NEW BORE WELL AT KALLIYAPPAGOUNDENPUTHUR |
130000 |
NEW BORE WELL AT KALLIYAPPAGOUNDENPUTHUR1 |
Completion of work |
-
latitude : 10.866489999999999
Longitude : 77.32515333333335
file name : Image_04102021170623655.png
|
2021-10-04 17:06:23.772751 |
10 |
53394741 |
DRINKING WATER SUPPLY WORK |
273600 |
DRINKING WATER SUPPLY WORK1 |
Completion of work |
-
latitude : 10.866366666666666,10.866376666666667
Longitude : 77.32565500000001,77.32563
file name : Image_06102021150555225.png
|
2021-10-06 15:05:55.315977 |
11 |
53408654 |
EXISTING BORE WELL FIIT SUBMERSIBLE MOTOR AND ACCESSORIESFIT |
380000 |
EXISTING BORE WELL FIIT SUBMERSIBLE MOTOR AND ACCESSORIESFIT 1 |
Completion of work |
-
latitude : 10.874240000000002
Longitude : 77.29347666666666
file name : Image_05082022155746880.png
|
2022-08-05 15:57:47.004279 |
12 |
53394675 |
EXISTING BORE WELL FITTING SUBMERSIBLE MOTOR AND OTHER ACCESSORIES AT MUTHUR |
350000 |
EXISTING BORE WELL FITTING SUBMERSIBLE MOTOR AND OTHER ACCESSORIES AT MUTHUR1 |
Completion of work |
-
latitude : 10.880561666666665
Longitude : 77.30971666666666
file name : Image_22112023110017414.png
|
2023-11-22 11:00:17.479155 |
13 |
53394675 |
EXISTING BORE WELL FITTING SUBMERSIBLE MOTOR AND OTHER ACCESSORIES AT MUTHUR |
350000 |
EXISTING BORE WELL FITTING SUBMERSIBLE MOTOR AND OTHER ACCESSORIES AT MUTHUR1 |
Completion of work |
-
latitude : 10.889448333333332
Longitude : 77.30144833333334
file name : Image_05082022154900746.png
|
2022-08-05 15:49:00.855207 |
14 |
61979399 |
PROVIDING CEMENT CONCRETE PAVEMENT FROM KITTUSAMY HOUSE TO PUE SCHOOL AT KOTTAPALAYAM |
389000 |
PROVIDING CEMENT CONCRETE PAVEMENT FROM KITTUSAMY HOUSE TO PUE SCHOOL AT KOTTAPALAYAM1 |
Completion of work |
-
latitude : 10.890254999999998,10.890254999999998
Longitude : 77.30506,77.30506
file name : Image_05082022154342941.png
|
2022-08-05 15:43:43.055923 |
15 |
53410849 |
CC ROAD WORK AT KOTTAPALAYAM |
390000 |
CC ROAD WORK AT KOTTAPALAYAM1 |
Completion of work |
-
latitude : 10.890291666666666,10.890288333333334
Longitude : 77.30571333333334,77.30572000000001
file name : Image_05082022154349988.png
|
2022-08-05 15:43:50.094961 |
16 |
61951979 |
Extension of Pipeline from AD Colony to 10000 Litre OHT at Mandhiripalayam |
108000 |
Extension of Pipeline from AD Colony to 10000 Litre OHT at Mandhiripalayam 1 |
Completion of work |
-
latitude : 10.901443333333335,10.901443333333335
Longitude : 77.274635,77.27462833333334
file name : Image_15092022183654085.png
|
2022-09-15 18:36:54.168905 |
17 |
61951246 |
Construction of Vertical Filter at Kaluveripalayam Near Vinayagar Kovil Temple |
125000 |
Construction of Vertical Filter at Kaluveripalayam Near Vinayagar Kovil Temple 1 |
Completion of work |
-
latitude : 10.878391666666667,10.878391666666667
Longitude : 77.30934666666667,77.30934666666667
file name : Image_17092022134751153.png
|
2022-09-17 13:47:51.269571 |
18 |
61952140 |
Providing Cement Concrete Pavement From Jaya House to Nagamani House at West Kullampalayam |
160000 |
Providing Cement Concrete Pavement From Jaya House to Nagamani House at West Kullampalayam1 |
Completion of work |
-
latitude : 10.884505,10.884505
Longitude : 77.27387666666667,77.27387666666667
file name : Image_16092022120523907.png
|
2022-09-16 12:05:24.003843 |
19 |
61979473 |
SUPPLY AND FIXING OF STEEL COVER FOR OPEN WELL AT EAST KULLAMPALAYAM |
58000 |
SUPPLY AND FIXING OF STEEL COVER FOR OPEN WELL AT EAST KULLAMPALAYAM 1 |
Completion of work |
-
latitude : 10.859546666666665
Longitude : 77.31579666666667
file name : Image_09062023161357902.png
|
2023-06-09 16:13:57.990669 |
20 |
61979473 |
SUPPLY AND FIXING OF STEEL COVER FOR OPEN WELL AT EAST KULLAMPALAYAM |
58000 |
SUPPLY AND FIXING OF STEEL COVER FOR OPEN WELL AT EAST KULLAMPALAYAM 1 |
Completion of work |
-
latitude : 10.890239999999999
Longitude : 77.284045
file name : Image_16092022115604727.png
|
2022-09-16 11:56:04.845858 |
21 |
61932065 |
PROVIDING 51 FHTC AND PIPE LINE EXTENSION AT KOTTAPALAYAM |
1173981 |
PROVIDING 51 FHTC AND PIPE LINE EXTENSION AT KOTTAPALAYAM1 |
Completion of work |
-
latitude : 10.890431666666666,10.890431666666666
Longitude : 77.30505166666667,77.30505166666667
file name : Image_16092022114238765.png
|
2022-09-16 11:42:38.886763 |
22 |
61953712 |
Supply and Fixing of Steel Cover for Open Well and Raising of Wall at Mandhiripalayam |
73000 |
Supply and Fixing of Steel Cover for Open Well and Raising of Wall at Mandhiripalayam1 |
Completion of work |
-
latitude : 10.899198333333334
Longitude : 77.27222666666667
file name : Image_17092022160900439.png
|
2022-09-17 16:09:00.525124 |
23 |
61953712 |
Supply and Fixing of Steel Cover for Open Well and Raising of Wall at Mandhiripalayam |
73000 |
Supply and Fixing of Steel Cover for Open Well and Raising of Wall at Mandhiripalayam1 |
Completion of work |
-
latitude : 10.899246666666667
Longitude : 77.27228
file name : Image_17092022161409327.png
|
2022-09-17 16:14:09.424266 |
24 |
53410692 |
PIPELINE EXTENSION AT KOSAVAMPALAYAM |
83626 |
PIPELINE EXTENSION AT KOSAVAMPALAYAM1 |
Completion of work |
-
latitude : 10.857474999999999,10.857474999999999
Longitude : 77.29928,77.29927833333333
file name : Image_26092022181326163.png
|
2022-09-26 18:13:26.25146 |
25 |
61951139 |
Construction of Drainage With Vatical Soak Pit at Mandhiripalayam |
431000 |
Construction of Drainage With Vatical Soak Pit at Mandhiripalayam1 |
Completion of work |
-
latitude : 10.898446666666667,10.898446666666667
Longitude : 77.27165,77.27165
file name : Image_26092022172617535.png
|
2022-09-26 17:26:17.629845 |
26 |
61950986 |
Construction of Drainage With Vertical Soak Pit at Kaluveripalayam |
617980 |
Construction of Drainage With Vertical Soak Pit at Kaluveripalayam1 |
Completion of work |
-
latitude : 10.879486666666667,10.879465000000001
Longitude : 77.30866999999999,77.30869
file name : Image_19102022122302947.png
|
2022-10-19 12:23:03.090494 |
27 |
61950986 |
Construction of Drainage With Vertical Soak Pit at Kaluveripalayam |
617980 |
Construction of Drainage With Vertical Soak Pit at Kaluveripalayam1 |
Completion of work |
-
latitude : 10.879480000000001,10.880381666666665
Longitude : 77.30868166666667,77.30955166666666
file name : Image_19102022121848634.png
|
2022-10-19 12:18:48.786714 |
28 |
61954145 |
NEW STREET LIGHT AND ONE NO OF POLE AT VAVIPALAYAM |
120000 |
NEW STREET LIGHT AND ONE NO OF POLE AT VAVIPALAYAM 1 |
Completion of work |
-
latitude : 10.874566666666665
Longitude : 77.28110333333333
file name : Image_31102022131554793.png
|
2022-10-31 13:15:54.881177 |
29 |
61954145 |
NEW STREET LIGHT AND ONE NO OF POLE AT VAVIPALAYAM |
120000 |
NEW STREET LIGHT AND ONE NO OF POLE AT VAVIPALAYAM 6 |
Completion of work |
-
latitude : 10.874203333333332
Longitude : 77.280375
file name : Image_29052023132215287.png
|
2023-05-29 13:22:15.411332 |
30 |
61978412 |
NEW STREET LIGHT AT VAVIPALAYAM |
159307 |
NEW STREET LIGHT AT VAVIPALAYAM 2 |
Completion of work |
-
latitude : 10.870416
Longitude : 77.2737565
file name : Image_31102022132059450.png
|
2022-10-31 13:20:59.533516 |
31 |
61979018 |
NEW STREET LIGHT AT KOSAVAMPALAYAM |
100000 |
NEW STREET LIGHT AT KOSAVAMPALAYAM 1 |
Completion of work |
-
latitude : 10.854648333333333
Longitude : 77.29343333333333
file name : Image_27052023124519429.png
|
2023-05-27 12:45:19.53177 |
32 |
61979018 |
NEW STREET LIGHT AT KOSAVAMPALAYAM |
100000 |
NEW STREET LIGHT AT KOSAVAMPALAYAM 1 |
Completion of work |
-
latitude : 10.85424
Longitude : 77.28881666666666
file name : Image_31102022133511709.png
|
2022-10-31 13:35:11.813015 |
33 |
61979171 |
TWO NEW STREET LIGHT AND TWO POLE AT KOTTAPALAYAM |
28000 |
TWO NEW STREET LIGHT AND TWO POLE AT KOTTAPALAYAM1 |
Completion of work |
-
latitude : 10.889208333333332
Longitude : 77.305345
file name : Image_31102022170819700.png
|
2022-10-31 17:08:19.784042 |
34 |
61980046 |
TWO NEW STREET LIGHT AND THREE POLE AT KOTTAPALAYAM |
42000 |
TWO NEW STREET LIGHT AND THREE POLE AT KOTTAPALAYAM2 |
Completion of work |
-
latitude : 10.891738333333334
Longitude : 77.307315
file name : Image_31102022171218494.png
|
2022-10-31 17:12:18.582356 |
35 |
61979289 |
ONE STREET LIGHT AND ONE POLE AT KALUVERIPALAYAM AD COLONY BURIYAL GROUND |
14000 |
ONE STREET LIGHT AND ONE POLE AT KALUVERIPALAYAM AD COLONY BURIYAL GROUND 1 |
Completion of work |
-
latitude : 10.968528333333332
Longitude : 77.397055
file name : Image_31102022181751813.png
|
2022-10-31 18:17:51.911339 |
36 |
61979614 |
PROVIDING CEMENT CONCRETE FLOORING INFRONT OF PANCHAYAT OFFICE AT VAVIPALAYAM |
150000 |
PROVIDING CEMENT CONCRETE FLOORING INFRONT OF PANCHAYAT OFFICE AT VAVIPALAYAM 1 |
Completion of work |
-
latitude : 10.8728781,10.8728825
Longitude : 77.2826006,77.2825999
file name : Image_23112022135828974.png
|
2022-11-23 13:58:29.100648 |
37 |
64952192 |
PROVIDING CEMENT CONCRETE PAVEMENT NEAR WOMEN SANITARY COMPLEX AT VAVIPALAYAM |
125289 |
PROVIDING CEMENT CONCRETE PAVEMENT NEAR WOMEN SANITARY COMPLEX AT VAVIPALAYAM1 |
Completion of work |
-
latitude : 10.874185,10.874426666666666
Longitude : 77.28217666666666,77.282045
file name : Image_06122022170618620.png
|
2022-12-06 17:06:18.722872 |
38 |
53394415 |
PIPE LINE EXISTING AT MANDHIRIPALAYAM |
80000 |
PIPE LINE EXISTING AT MANDHIRIPALAYAM1 |
Completion of work |
-
latitude : 10.900461666666668,10.900444999999998
Longitude : 77.27364666666668,77.27364333333334
file name : Image_04022023161018885.png
|
2023-02-04 16:10:18.982313 |
39 |
64977473 |
Operation & maintenance of community sanitary complex |
453511 |
Operation & maintenance of community sanitary complex1 |
Completion of work |
-
latitude : 10.859725,10.859725,10.859726666666665
Longitude : 77.31634333333334,77.31634333333334,77.316335
file name : Image_13062023153914848.png
|
2023-06-13 15:39:14.945332 |
40 |
66695605 |
Water Supply to villages |
501816 |
Water Supply to villages1 |
Completion of work |
-
latitude : 10.902528333333331
Longitude : 77.27601166666666
file name : Image_13062023140622727.png
|
2023-06-13 14:06:22.826277 |
41 |
66696131 |
Purchase of Tricycles/other battery-operated vehicles for door to door collection of waste |
25800 |
Purchase of Tricycles/other battery-operated vehicles for door to door collection of waste1 |
|
-
latitude : 10.936201666666667
Longitude : 77.335995
file name : Image_13062023162314016.png
|
2023-06-13 16:23:14.114154 |
42 |
64976741 |
Operation & maintenance of community sanitary complex |
295818 |
Operation & maintenance of community sanitary complex1 |
Completion of work |
-
latitude : 10.890045000000002,10.89013
Longitude : 77.28388833333334,77.28397666666666
file name : Image_13062023152356571.png
|
2023-06-13 15:23:56.675598 |
43 |
66695949 |
Operation & maintenance of community sanitary complex |
775416 |
Operation & maintenance of community sanitary complex1 |
Completion of work |
-
latitude : 10.876053333333335,10.876071666666666
Longitude : 77.29448166666666,77.29445833333332
file name : Image_13062023151921091.png
|
2023-06-13 15:19:21.189925 |
44 |
66696266 |
Water Supply to villages |
565088 |
Water Supply to villages1 |
Completion of work |
-
latitude : 10.873470000000001
Longitude : 77.28268166666666
file name : Image_08072023173254564.png
|
2023-07-08 17:32:54.656114 |
45 |
66696298 |
Water Supply to villages |
856000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 10.903046666666667,10.903039999999999,10.903036666666667
Longitude : 77.27694666666666,77.27693833333333,77.27694166666667
file name : Image_08072023175518314.png
|
2023-07-08 17:55:18.40733 |
46 |
66695851 |
Construction of Community Sanitary Complex |
45000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 10.868898333333334
Longitude : 77.273765
file name : Image_08072023173412682.png
|
2023-07-08 17:34:12.77542 |
47 |
66695829 |
Construction of Community Sanitary Complex |
45000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 10.879399999999999
Longitude : 77.30874666666666
file name : Image_08072023183200063.png
|
2023-07-08 18:32:00.16423 |
48 |
66695803 |
Construction of Community Sanitary Complex |
45000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 10.891131666666668
Longitude : 77.283775
file name : Image_08072023180626528.png
|
2023-07-08 18:06:26.608261 |
49 |
66695783 |
Construction of Community Sanitary Complex |
45000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 10.903263333333333
Longitude : 77.27718499999999
file name : Image_08072023175513845.png
|
2023-07-08 17:55:13.926834 |
50 |
61979512 |
TNEB PENDING PAYEMENT |
150000 |
TNEB PENDING PAYEMENT 1 |
Completion of work |
-
latitude : 10.8728468
Longitude : 77.282619
file name : Image_22092023134315744.png
|
2023-09-22 13:43:15.853812 |
51 |
53436901 |
TNEB PENDING PAYMENT |
978914 |
TNEB PENDING PAYMENT 2 |
Completion of work |
-
latitude : 10.8728503
Longitude : 77.2826221
file name : Image_28102023153501582.png
|
2023-10-28 15:35:01.654689 |
52 |
53394587 |
EXISTING BORE WELL DEEPENING AT KALUVERIPALAYAM |
150000 |
EXISTING BORE WELL DEEPENING AT KALUVERIPALAYAM1 |
Completion of work |
-
latitude : 10.880603333333333
Longitude : 77.30975333333335
file name : Image_22112023153112213.png
|
2023-11-22 15:31:12.276359 |
53 |
66695754 |
Operation & maintenance of community sanitary complex |
42300 |
Operation & maintenance of community sanitary complex1 |
Completion of work |
-
latitude : 10.877425
Longitude : 77.31029333333332
file name : Image_22112023153312723.png
|
2023-11-22 15:33:12.786501 |
54 |
66695687 |
Operation & maintenance of community sanitary complex |
42300 |
Operation & maintenance of community sanitary complex1 |
Completion of work |
-
latitude : 10.901755
Longitude : 77.27195499999999
file name : Image_22112023155335399.png
|
2023-11-22 15:53:35.457838 |
55 |
66695583 |
Water Supply to villages |
714000 |
Water Supply to villages5 |
Completion of work |
-
latitude : 10.901516666666664
Longitude : 77.27267666666667
file name : Image_14022024172513460.png
|
2024-02-14 17:25:13.537611 |
56 |
100561056 |
Water Supply to villages |
211088 |
Water Supply to villages1 |
Completion of work |
-
latitude : 10.873506666666666
Longitude : 77.28272
file name : Image_28032024130755710.png
|
2024-03-28 13:07:55.79821 |
57 |
100560752 |
Water Supply to villages |
550000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 10.874463333333331
Longitude : 77.28100833333333
file name : Image_28032024130759906.png
|
2024-03-28 13:07:59.99527 |
58 |
100208708 |
Construction of new Piped Water Supply schemes |
200000 |
Construction of new Piped Water Supply schemes1 |
Completion of work |
-
latitude : 10.8687919
Longitude : 77.2718924
file name : Image_28032024130804426.png
|
2024-03-28 13:08:04.518239 |
59 |
99827222 |
Water Supply to villages |
632816 |
Water Supply to villages1 |
Completion of work |
-
latitude : 10.876928333333334
Longitude : 77.30663166666666
file name : Image_28032024130808044.png
|
2024-03-28 13:08:08.148897 |
60 |
99816625 |
Water Supply to villages |
610282 |
Water Supply to villages1 |
Completion of work |
-
latitude : 10.874223333333335
Longitude : 77.31688833333332
file name : Image_28032024130811408.png
|
2024-03-28 13:08:11.496346 |