1 |
82721174 |
Greywater management system |
41100 |
Construction of Pytriod Horizondal planted filter using GWM at Enjampalli in Keeramadai habitation |
Roof laid |
-
latitude : 11.19891338
Longitude : 77.82872064
file name : Image_10112023085348875.png
|
2023-11-10 08:53:48.96838 |
2 |
82721174 |
Greywater management system |
41100 |
Construction of Pytriod Horizondal planted filter using GWM at Enjampalli in Keeramadai habitation |
Plinth level |
-
latitude : 11.19885465
Longitude : 77.82869617
file name : Image_10112023085236521.png
|
2023-11-10 08:52:36.619045 |
3 |
82721174 |
Greywater management system |
41100 |
Construction of Pytriod Horizondal planted filter using GWM at Enjampalli in Keeramadai habitation |
Completion of work |
-
latitude : 11.19890892
Longitude : 77.8287137
file name : Image_10112023084513064.png
|
2023-11-10 08:45:13.164982 |
4 |
55036513 |
Construction of Cement Concrete road and small Bridge from odakkatu road to Kanniyammal House |
245000 |
Construction of Cement Concrete road and small Bridge from odakkatu road to Kanniyammal House1 |
Roof laid |
-
latitude : 11.20549586,11.20547945
Longitude : 77.81095707,77.8109587
file name : Image_24102021114934573.png
|
2021-10-24 11:49:34.641489 |
5 |
55036513 |
Construction of Cement Concrete road and small Bridge from odakkatu road to Kanniyammal House |
245000 |
Construction of Cement Concrete road and small Bridge from odakkatu road to Kanniyammal House1 |
Roof laid |
-
latitude : 11.20552577,11.205527
Longitude : 77.81092209,77.8109226
file name : Image_24102021112500484.png
|
2021-10-24 11:25:00.547541 |
6 |
55036513 |
Construction of Cement Concrete road and small Bridge from odakkatu road to Kanniyammal House |
245000 |
Construction of Cement Concrete road and small Bridge from odakkatu road to Kanniyammal House1 |
Roof laid |
-
latitude : 11.20548886,11.20548597
Longitude : 77.81090287,77.8109202
file name : Image_24102021112452707.png
|
2021-10-24 11:24:52.771587 |
7 |
55036513 |
Construction of Cement Concrete road and small Bridge from odakkatu road to Kanniyammal House |
245000 |
Construction of Cement Concrete road and small Bridge from odakkatu road to Kanniyammal House1 |
Roof laid |
-
latitude : 11.20551035,11.20551065
Longitude : 77.81091961,77.81092122
file name : Image_24102021111405954.png
|
2021-10-24 11:14:06.018835 |
8 |
55036513 |
Construction of Cement Concrete road and small Bridge from odakkatu road to Kanniyammal House |
245000 |
Construction of Cement Concrete road and small Bridge from odakkatu road to Kanniyammal House1 |
Roof laid |
-
latitude : 11.20551472,11.2055079
Longitude : 77.81098248,77.81096361
file name : Image_25102021091338774.png
|
2021-10-25 09:13:38.831595 |
9 |
55036513 |
Construction of Cement Concrete road and small Bridge from odakkatu road to Kanniyammal House |
245000 |
Construction of Cement Concrete road and small Bridge from odakkatu road to Kanniyammal House1 |
Roof laid |
-
latitude : 11.20548448,11.20548351
Longitude : 77.81091126,77.8109142
file name : Image_24102021112446653.png
|
2021-10-24 11:24:46.740335 |
10 |
61859006 |
Construction community sanitary complex at Thanathampalayam Colony |
256120 |
Construction community sanitary complex at Thanathampalayam Colony1 |
Roof laid |
-
latitude : 11.2137106
Longitude : 77.80188319
file name : Image_16032022075555805.png
|
2022-03-16 07:55:55.878538 |
11 |
55039370 |
Extension of new Pipeline from Therku ponnampalayam Merku thottam borewell to Alamarathu amman koil |
62158 |
Extension of new Pipeline from Therku ponnampalayam Merku thottam borewell to Alamarathu amman koil 1 |
Roof laid |
-
latitude : 11.210441666666668,11.210405
Longitude : 77.81042666666667,77.81044666666666
file name : Image_19042022183437074.png
|
2022-04-19 18:34:37.186284 |
12 |
55039370 |
Extension of new Pipeline from Therku ponnampalayam Merku thottam borewell to Alamarathu amman koil |
62158 |
Extension of new Pipeline from Therku ponnampalayam Merku thottam borewell to Alamarathu amman koil 1 |
Roof laid |
-
latitude : 11.210441666666668,11.210405
Longitude : 77.81042666666667,77.81044666666666
file name : Image_19042022183413701.png
|
2022-04-19 18:34:13.806989 |
13 |
55039283 |
Providing 7.5HP Motor pumpset, Panel Board, and UPVC pipe cable to Muthugoundanpalayam Arisana Colon |
200000 |
Providing 7.5HP Motor pumpset, Panel Board, and UPVC pipe cable to Muthugoundanpalayam Arisana Colon1 |
Roof laid |
-
latitude : 11.217473333333333
Longitude : 77.82455666666667
file name : Image_19042022183430263.png
|
2022-04-19 18:34:30.377324 |
14 |
55039283 |
Providing 7.5HP Motor pumpset, Panel Board, and UPVC pipe cable to Muthugoundanpalayam Arisana Colon |
200000 |
Providing 7.5HP Motor pumpset, Panel Board, and UPVC pipe cable to Muthugoundanpalayam Arisana Colon1 |
Roof laid |
-
latitude : 11.217473333333333
Longitude : 77.82455666666667
file name : Image_19042022183406393.png
|
2022-04-19 18:34:06.505688 |
15 |
55038431 |
Providing 7.5HP Motor pumpset and UPVC Pipe Cables to the new borewell to vadakuponnampalayam merku |
200000 |
Providing 7.5HP Motor pumpset and UPVC Pipe Cables to the new borewell to vadakuponnampalayam merku 1 |
Roof laid |
-
latitude : 11.206603333333332
Longitude : 77.80783333333333
file name : Image_19042022190527785.png
|
2022-04-19 19:05:27.870482 |
16 |
55039171 |
Providing 7.5HP Motor pumpset, Panel Board, and UPVC pipe cable to thanathampalayam colony OHT borew |
200000 |
Providing 7.5HP Motor pumpset, Panel Board, and UPVC pipe cable to thanathampalayam colony OHT borew1 |
Roof laid |
-
latitude : 11.214955000000002
Longitude : 77.802075
file name : Image_19042022190520821.png
|
2022-04-19 19:05:20.930227 |
17 |
55036875 |
Construction of Cement Concrete road from Keeramadai road to Ramanathan House |
200000 |
Construction of Cement Concrete road from Keeramadai road to Ramanathan House1 |
Roof laid |
-
latitude : 11.198265,11.198275
Longitude : 77.82945500000001,77.82944
file name : Image_19042022174410076.png
|
2022-04-19 17:44:10.147166 |
18 |
55037464 |
Construction of Cement Conctere road Keeramadai Ponnammal House Manokaran House |
200000 |
Construction of Cement Conctere road Keeramadai Ponnammal House Manokaran House1 |
Roof laid |
-
latitude : 11.198006666666666,11.197981666666665
Longitude : 77.82937666666666,77.829355
file name : Image_19042022174616377.png
|
2022-04-19 17:46:16.450763 |
19 |
55038523 |
Providing new borewell to Vadakkuponnampalayam merku thottam new Household areas |
150000 |
Providing new borewell to Vadakkuponnampalayam merku thottam new Household areas1 |
Roof laid |
-
latitude : 11.212271666666668
Longitude : 77.808105
file name : Image_19042022183421328.png
|
2022-04-19 18:34:21.437687 |
20 |
55038523 |
Providing new borewell to Vadakkuponnampalayam merku thottam new Household areas |
150000 |
Providing new borewell to Vadakkuponnampalayam merku thottam new Household areas1 |
Roof laid |
-
latitude : 11.212271666666668
Longitude : 77.808105
file name : Image_19042022183446545.png
|
2022-04-19 18:34:46.653058 |
21 |
55039235 |
Providing 5HP Motor pumpset, Panel Board, and UPVC pipe cable to Sengodagoundanpudhur Vaikkalmed b |
200000 |
Providing 5HP Motor pumpset, Panel Board, and UPVC pipe cable to Sengodagoundanpudhur Vaikkalmed b1 |
Roof laid |
-
latitude : 11.204130000000001
Longitude : 77.828995
file name : Image_19042022183357821.png
|
2022-04-19 18:33:57.947287 |
22 |
55037588 |
Construction of CC Road from Vadakkuponnampalayam Road to Primary school near Bridge |
200000 |
Construction of CC Road from Vadakkuponnampalayam Road to Primary school near Bridge1 |
Roof laid |
-
latitude : 11.210093333333335,11.210081666666667
Longitude : 77.81537499999999,77.81534833333333
file name : Image_19042022173603510.png
|
2022-04-19 17:36:03.571187 |
23 |
55038583 |
Providing 7.5 HP Motor pumpset Panel board and UPVC Pipe cable to Poosaripalayam OHT Borewell |
200000 |
Providing 7.5 HP Motor pumpset Panel board and UPVC Pipe cable to Poosaripalayam OHT Borewell1 |
Roof laid |
-
latitude : 11.197805
Longitude : 77.79895333333334
file name : Image_19042022190524174.png
|
2022-04-19 19:05:24.279634 |
24 |
82723212 |
Creation of a new source of drinking water |
442232 |
Pipeline Extension and Providing 30 tap Connections from Muthugoundanpalayam Vaikalmedu OHT to Mukkiya st |
Roof laid |
-
latitude : 11.21289571,11.21289232
Longitude : 77.82331964,77.82331285
file name : Image_27122023173638839.png
|
2023-12-27 17:36:38.944577 |
25 |
82723212 |
Creation of a new source of drinking water |
442232 |
Pipeline Extension and Providing 30 tap Connections from Muthugoundanpalayam Vaikalmedu OHT to Mukkiya st |
Plinth level |
-
latitude : 11.21289481,11.21290043
Longitude : 77.82330367,77.82330335
file name : Image_27122023173247643.png
|
2023-12-27 17:32:47.7425 |
26 |
82723212 |
Creation of a new source of drinking water |
442232 |
Pipeline Extension and Providing 30 tap Connections from Muthugoundanpalayam Vaikalmedu OHT to Mukkiya st |
Completion of work |
-
latitude : 11.21288913,11.21288928
Longitude : 77.82332889,77.82332817
file name : Image_27122023173130525.png
|
2023-12-27 17:31:30.623851 |
27 |
82719692 |
Greywater management system |
60000 |
Construction of Pytriod Horizondal planted filter using GWM at Enjampalli in Kalathuminnapalayam habitati |
Roof laid |
-
latitude : 11.19228109
Longitude : 77.81947491
file name : Image_10112023083709978.png
|
2023-11-10 08:37:10.074885 |
28 |
82719692 |
Greywater management system |
60000 |
Construction of Pytriod Horizondal planted filter using GWM at Enjampalli in Kalathuminnapalayam habitati |
Plinth level |
-
latitude : 11.19228431
Longitude : 77.81946079
file name : Image_10112023083554397.png
|
2023-11-10 08:35:54.492409 |
29 |
82719692 |
Greywater management system |
60000 |
Construction of Pytriod Horizondal planted filter using GWM at Enjampalli in Kalathuminnapalayam habitati |
Completion of work |
-
latitude : 11.19226894
Longitude : 77.81943204
file name : Image_10112023083259729.png
|
2023-11-10 08:32:59.826664 |
30 |
67010867 |
Operation & maintenance of drinking water supply system |
200000 |
Fittings of UPVC cable panel board Pumb set in 7 5 HP motor in Madathupalayam AD colony |
Roof laid |
-
latitude : 11.19581061
Longitude : 77.81095218
file name : Image_26042023132859759.png
|
2023-04-26 13:28:59.895604 |
31 |
67010867 |
Operation & maintenance of drinking water supply system |
200000 |
Fittings of UPVC cable panel board Pumb set in 7 5 HP motor in Madathupalayam AD colony |
Roof laid |
-
latitude : 11.19580912
Longitude : 77.81094779
file name : Image_26042023132755763.png
|
2023-04-26 13:27:55.900279 |
32 |
67010886 |
Operation & maintenance of drinking water supply system |
200000 |
Fitting a new 7 5 HP Submersible motor Pump set panel Board and UPVC pipe at Thanathampalayam |
Roof laid |
-
latitude : 11.21754733
Longitude : 77.79871897
file name : Image_26042023140213283.png
|
2023-04-26 14:02:13.407346 |
33 |
67010886 |
Operation & maintenance of drinking water supply system |
200000 |
Fitting a new 7 5 HP Submersible motor Pump set panel Board and UPVC pipe at Thanathampalayam |
Roof laid |
-
latitude : 11.21754679
Longitude : 77.7987641
file name : Image_26042023120741530.png
|
2023-04-26 12:07:41.648429 |
34 |
67010886 |
Operation & maintenance of drinking water supply system |
200000 |
Fitting a new 7 5 HP Submersible motor Pump set panel Board and UPVC pipe at Thanathampalayam |
Roof laid |
-
latitude : 11.21754711
Longitude : 77.79871983
file name : Image_26042023140259854.png
|
2023-04-26 14:02:59.960269 |
35 |
67010809 |
Creation of drainage channel for management of grey water |
200000 |
Construction of drainage from Koothampalayam bridge to Ramasamy Thottam |
Roof laid |
-
latitude : 11.20832131,11.20833394
Longitude : 77.80157036,77.80156722
file name : Image_26042023135311423.png
|
2023-04-26 13:53:11.528439 |
36 |
67010809 |
Creation of drainage channel for management of grey water |
200000 |
Construction of drainage from Koothampalayam bridge to Ramasamy Thottam |
Roof laid |
-
latitude : 11.2083768,11.2083763
Longitude : 77.8012039,77.8012019
file name : Image_26042023135216772.png
|
2023-04-26 13:52:16.87897 |
37 |
67010809 |
Creation of drainage channel for management of grey water |
200000 |
Construction of drainage from Koothampalayam bridge to Ramasamy Thottam |
Roof laid |
-
latitude : 11.20836624,11.20839518
Longitude : 77.8016246,77.8014895
file name : Image_26042023121036360.png
|
2023-04-26 12:10:36.46055 |
38 |
67010809 |
Creation of drainage channel for management of grey water |
200000 |
Construction of drainage from Koothampalayam bridge to Ramasamy Thottam |
Roof laid |
-
latitude : 11.20836624,11.20839518
Longitude : 77.8016246,77.8014895
file name : Image_26042023120802738.png
|
2023-04-26 12:08:02.903837 |
39 |
67010809 |
Creation of drainage channel for management of grey water |
200000 |
Construction of drainage from Koothampalayam bridge to Ramasamy Thottam |
Roof laid |
-
latitude : 11.20858495,11.20856101
Longitude : 77.80129335,77.80132831
file name : Image_26042023101805033.png
|
2023-04-26 10:18:05.125919 |
40 |
67010836 |
Creation of drainage channel for management of grey water |
200000 |
Construction of drainage from Koothampalayam Kulandhaisamy house to bridge |
Roof laid |
-
latitude : 11.20864395,11.20866059
Longitude : 77.8011783,77.80116595
file name : Image_26042023135650340.png
|
2023-04-26 13:56:50.43753 |
41 |
67010836 |
Creation of drainage channel for management of grey water |
200000 |
Construction of drainage from Koothampalayam Kulandhaisamy house to bridge |
Roof laid |
-
latitude : 11.20860521,11.20865605,11.20865513
Longitude : 77.80122538,77.80117478,77.80117352
file name : Image_26042023135554333.png
|
2023-04-26 13:55:54.451966 |
42 |
67010836 |
Creation of drainage channel for management of grey water |
200000 |
Construction of drainage from Koothampalayam Kulandhaisamy house to bridge |
Roof laid |
-
latitude : 11.20865758,11.20865573
Longitude : 77.80114117,77.80114729
file name : Image_26042023120725947.png
|
2023-04-26 12:07:26.18889 |
43 |
67010820 |
Creation of drainage channel for management of grey water |
200000 |
Construction of Drainage with 2 inch cement pipe from komaraplayam drainage to EB post |
Roof laid |
-
latitude : 11.19481234,11.19478588
Longitude : 77.80660533,77.80660738
file name : Image_26042023134159407.png
|
2023-04-26 13:41:59.526433 |
44 |
67010820 |
Creation of drainage channel for management of grey water |
200000 |
Construction of Drainage with 2 inch cement pipe from komaraplayam drainage to EB post |
Roof laid |
-
latitude : 11.1949292,11.1949297
Longitude : 77.8061726,77.8061682
file name : Image_26042023134042880.png
|
2023-04-26 13:40:43.011538 |
45 |
67010909 |
Creation of drainage channel for management of grey water |
174160 |
Construction of Drainage with 2 inch cement pipe from komarapalayam Arumugam Thottam to Bridge |
Roof laid |
-
latitude : 11.19460168,11.19459429
Longitude : 77.80745166,77.80745664
file name : Image_26042023133720600.png
|
2023-04-26 13:37:20.715302 |
46 |
67010909 |
Creation of drainage channel for management of grey water |
174160 |
Construction of Drainage with 2 inch cement pipe from komarapalayam Arumugam Thottam to Bridge |
Roof laid |
-
latitude : 11.19461322,11.19460103
Longitude : 77.80744584,77.80745976
file name : Image_26042023133621352.png
|
2023-04-26 13:36:21.46816 |
47 |
67010898 |
Operation & maintenance of drinking water supply system |
200000 |
Fitting new 7 5 Hp Submersible motor pump set panel board cable UPVC pipe at Saravanapuram OHT borewell |
Roof laid |
-
latitude : 11.1879053
Longitude : 77.82373878
file name : Image_26042023131945539.png
|
2023-04-26 13:19:45.654029 |
48 |
67010855 |
Operation & maintenance of drinking water supply system |
174160 |
Fittings of UPVC pipe cable panel board in 5HP Motor in Muthugoundenaplayam vaikkalmedu OHT borewell |
Roof laid |
-
latitude : 11.21267485
Longitude : 77.82317648
file name : Image_23072023103033757.png
|
2023-07-23 10:30:33.857423 |
49 |
67010855 |
Operation & maintenance of drinking water supply system |
174160 |
Fittings of UPVC pipe cable panel board in 5HP Motor in Muthugoundenaplayam vaikkalmedu OHT borewell |
Plinth level |
-
latitude : 11.21267506
Longitude : 77.82316625
file name : Image_23072023102806162.png
|
2023-07-23 10:28:06.263524 |
50 |
67010855 |
Operation & maintenance of drinking water supply system |
174160 |
Fittings of UPVC pipe cable panel board in 5HP Motor in Muthugoundenaplayam vaikkalmedu OHT borewell |
Completion of work |
-
latitude : 11.21267884
Longitude : 77.82314552
file name : Image_23072023100231761.png
|
2023-07-23 10:02:31.863736 |
51 |
82718064 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 11.20610781
Longitude : 77.80917458
file name : Image_29062023150003679.png
|
2023-06-29 15:00:03.77054 |
52 |
82718064 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 11.20991323
Longitude : 77.81536129
file name : Image_29062023144726118.png
|
2023-06-29 14:47:26.204179 |
53 |
82718064 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
latitude : 11.21012806
Longitude : 77.81560713
file name : Image_21062023133912582.png
|
2023-06-21 13:39:12.683459 |
54 |
82713654 |
Maintenance of Muthugoundanpalayam Anganwadi Center Building. |
153000 |
Maintenance of Muthugoundanpalayam Anganwadi Center Building. |
Roof laid |
-
latitude : 11.21648398
Longitude : 77.82635946
file name : Image_29062023150745616.png
|
2023-06-29 15:07:45.165204 |
55 |
105017535 |
Creation of drainage channel for management of grey water |
83027 |
Cement Concrete Drainage at Poyyeri Existing Drainage to small bridge |
Roof laid |
-
latitude : 11.207024
Longitude : 77.80812386
file name : Image_10042024084420598.png
|
2024-04-10 08:44:20.69523 |
56 |
105017535 |
Creation of drainage channel for management of grey water |
83027 |
Cement Concrete Drainage at Poyyeri Existing Drainage to small bridge |
Plinth level |
-
latitude : 11.20702878
Longitude : 77.80812141
file name : Image_10042024084222520.png
|
2024-04-10 08:42:22.609626 |
57 |
105017535 |
Creation of drainage channel for management of grey water |
83027 |
Cement Concrete Drainage at Poyyeri Existing Drainage to small bridge |
Completion of work |
-
latitude : 11.20702876
Longitude : 77.80812227
file name : Image_10042024083859047.png
|
2024-04-10 08:38:59.159322 |
58 |
82746091 |
Water Supply to villages |
340000 |
Providing water supply Kalathu Minnapalayam FHTCs 20 |
Roof laid |
-
latitude : 11.18725634
Longitude : 77.81953361
file name : Image_10042024090639497.png
|
2024-04-10 09:06:39.589362 |
59 |
82746091 |
Water Supply to villages |
340000 |
Providing water supply Kalathu Minnapalayam FHTCs 20 |
Plinth level |
-
latitude : 11.1872936
Longitude : 77.81952884
file name : Image_10042024090512492.png
|
2024-04-10 09:05:12.581101 |
60 |
82746091 |
Water Supply to villages |
340000 |
Providing water supply Kalathu Minnapalayam FHTCs 20 |
Completion of work |
-
latitude : 11.18728775
Longitude : 77.81951979
file name : Image_10042024090305068.png
|
2024-04-10 09:03:05.158448 |
61 |
86618166 |
Creation of a new source of drinking water |
442835 |
Extenion of Pipeline from Komarampalayam OHTat Enjampalayam Panchayat |
Roof laid |
-
latitude : 11.19470756,11.1947069
Longitude : 77.80644026,77.80644393
file name : Image_25072023181513047.png
|
2023-07-25 18:15:13.159704 |
62 |
86618166 |
Creation of a new source of drinking water |
442835 |
Extenion of Pipeline from Komarampalayam OHTat Enjampalayam Panchayat |
Plinth level |
-
latitude : 11.19469197,11.19468916
Longitude : 77.80641692,77.80642399
file name : Image_25072023181338576.png
|
2023-07-25 18:13:38.674486 |
63 |
86618166 |
Creation of a new source of drinking water |
442835 |
Extenion of Pipeline from Komarampalayam OHTat Enjampalayam Panchayat |
Completion of work |
-
latitude : 11.19468105,11.19471709
Longitude : 77.80644463,77.8064497
file name : Image_25072023181042040.png
|
2023-07-25 18:10:42.161915 |
64 |
79686760 |
Maintenance of school buildings |
73000 |
Maintenance of school buildings1 |
Roof laid |
-
latitude : 11.19262817
Longitude : 77.82052486
file name : Image_30082023154328015.png
|
2023-08-30 15:43:28.122756 |
65 |
79686760 |
Maintenance of school buildings |
73000 |
Maintenance of school buildings1 |
Roof laid |
-
latitude : 11.19260857
Longitude : 77.82047321
file name : Image_30082023130820974.png
|
2023-08-30 13:08:21.075396 |
66 |
79686760 |
Maintenance of school buildings |
73000 |
Maintenance of school buildings1 |
Plinth level |
-
latitude : 11.1925702
Longitude : 77.82048916
file name : Image_30082023130619181.png
|
2023-08-30 13:06:19.268177 |
67 |
79686760 |
Maintenance of school buildings |
73000 |
Maintenance of school buildings1 |
Completion of work |
-
latitude : 11.19261385
Longitude : 77.82050651
file name : Image_30082023130118812.png
|
2023-08-30 13:01:18.891607 |
68 |
59624430 |
Water Supply works |
24000 |
Providing FHTCs to Kalathuminappampalayam AD colony |
Roof laid |
-
latitude : 11.21366272
Longitude : 77.80174179
file name : Image_17042024095124072.png
|
2024-04-17 09:51:24.165202 |
69 |
59624430 |
Water Supply works |
24000 |
Providing FHTCs to Kalathuminappampalayam AD colony |
Roof laid |
-
latitude : 11.18721346
Longitude : 77.81954503
file name : Image_10042024090851135.png
|
2024-04-10 09:08:51.21584 |
70 |
59624430 |
Water Supply works |
24000 |
Providing FHTCs to Kalathuminappampalayam AD colony |
Plinth level |
-
latitude : 11.18731498
Longitude : 77.81953021
file name : Image_10042024090753156.png
|
2024-04-10 09:07:53.247856 |
71 |
59624430 |
Water Supply works |
24000 |
Providing FHTCs to Kalathuminappampalayam AD colony |
Completion of work |
-
latitude : 11.18728971
Longitude : 77.81953274
file name : Image_10042024090005435.png
|
2024-04-10 09:00:05.544791 |
72 |
61858744 |
Construction of drainage from Nathamedu PKP Thottam to Milk society |
170000 |
Construction of drainage from Nathamedu PKP Thottam to Milk society1 |
Roof laid |
-
latitude : 11.20491566,11.20491653
Longitude : 77.82028647,77.820287
file name : Image_20092023081014997.png
|
2023-09-20 08:10:15.087097 |
73 |
61858744 |
Construction of drainage from Nathamedu PKP Thottam to Milk society |
170000 |
Construction of drainage from Nathamedu PKP Thottam to Milk society1 |
Plinth level |
-
latitude : 11.20489919,11.20490159
Longitude : 77.82030605,77.82029287
file name : Image_20092023080856908.png
|
2023-09-20 08:08:57.001262 |
74 |
61858744 |
Construction of drainage from Nathamedu PKP Thottam to Milk society |
170000 |
Construction of drainage from Nathamedu PKP Thottam to Milk society1 |
Completion of work |
-
latitude : 11.20490891,11.20489947
Longitude : 77.82028941,77.82031984
file name : Image_20092023080637011.png
|
2023-09-20 08:06:37.100395 |
75 |
61858793 |
Construction of drainage from Nathamedu PKP Thottam to Milk society |
160000 |
Construction of drainage from Nathamedu PKP Thottam to Milk society1 |
Roof laid |
-
latitude : 11.20476387,11.20471649
Longitude : 77.82016955,77.82024437
file name : Image_20092023082225933.png
|
2023-09-20 08:22:26.015574 |
76 |
61858793 |
Construction of drainage from Nathamedu PKP Thottam to Milk society |
160000 |
Construction of drainage from Nathamedu PKP Thottam to Milk society1 |
Plinth level |
-
latitude : 11.2047499,11.20475052
Longitude : 77.82016409,77.82016443
file name : Image_20092023081546283.png
|
2023-09-20 08:15:46.370141 |
77 |
61858793 |
Construction of drainage from Nathamedu PKP Thottam to Milk society |
160000 |
Construction of drainage from Nathamedu PKP Thottam to Milk society1 |
Completion of work |
-
latitude : 11.20474447,11.20475526
Longitude : 77.82016407,77.82016299
file name : Image_20092023081403882.png
|
2023-09-20 08:14:03.967434 |
78 |
67011410 |
Creation of drainage channel for management of grey water |
182210 |
Construction of Drainage from Motor Room to Kalyanipuram PKP Arun Thottam Gate |
Roof laid |
-
latitude : 11.20405717,11.20405282
Longitude : 77.81991659,77.81990937
file name : Image_20092023084614962.png
|
2023-09-20 08:46:15.043048 |
79 |
67011410 |
Creation of drainage channel for management of grey water |
182210 |
Construction of Drainage from Motor Room to Kalyanipuram PKP Arun Thottam Gate |
Plinth level |
-
latitude : 11.20407792,11.20406824
Longitude : 77.8198673,77.81986473
file name : Image_20092023084346032.png
|
2023-09-20 08:43:46.115363 |
80 |
67011410 |
Creation of drainage channel for management of grey water |
182210 |
Construction of Drainage from Motor Room to Kalyanipuram PKP Arun Thottam Gate |
Completion of work |
-
latitude : 11.20416089,11.20407129
Longitude : 77.8199046,77.81990592
file name : Image_20092023084003223.png
|
2023-09-20 08:40:03.30911 |
81 |
67010795 |
Creation of drainage channel for management of grey water |
200000 |
Construction of Drainage from Kalyanipuram PKP Arun Thottam Gate to burial Ground |
Roof laid |
-
latitude : 11.20364459,11.20364417
Longitude : 77.81964605,77.81964618
file name : Image_20092023085133214.png
|
2023-09-20 08:51:33.294221 |
82 |
67010795 |
Creation of drainage channel for management of grey water |
200000 |
Construction of Drainage from Kalyanipuram PKP Arun Thottam Gate to burial Ground |
Plinth level |
-
latitude : 11.20365926,11.20365908
Longitude : 77.81967192,77.81967223
file name : Image_20092023084937007.png
|
2023-09-20 08:49:37.08717 |
83 |
67010795 |
Creation of drainage channel for management of grey water |
200000 |
Construction of Drainage from Kalyanipuram PKP Arun Thottam Gate to burial Ground |
Completion of work |
-
latitude : 11.20370677,11.20371805
Longitude : 77.81971262,77.81970076
file name : Image_20092023084731301.png
|
2023-09-20 08:47:31.38643 |
84 |
61858838 |
Construction of drainage from Kalyanipuram Lamp post to Bridge |
150000 |
Construction of drainage from Kalyanipuram Lamp post to Bridge1 |
Roof laid |
-
latitude : 11.20444975,11.20445158
Longitude : 77.82002282,77.82003009
file name : Image_20092023083208683.png
|
2023-09-20 08:32:08.781337 |
85 |
61858838 |
Construction of drainage from Kalyanipuram Lamp post to Bridge |
150000 |
Construction of drainage from Kalyanipuram Lamp post to Bridge1 |
Plinth level |
-
latitude : 11.20460196,11.2045554
Longitude : 77.82005683,77.82004735
file name : Image_20092023082655928.png
|
2023-09-20 08:26:56.006295 |
86 |
61858838 |
Construction of drainage from Kalyanipuram Lamp post to Bridge |
150000 |
Construction of drainage from Kalyanipuram Lamp post to Bridge1 |
Completion of work |
-
latitude : 11.20463936,11.20464815
Longitude : 77.82010237,77.82004733
file name : Image_20092023082451577.png
|
2023-09-20 08:24:51.657554 |
87 |
61858946 |
Construction of drainage from Kalyanipuram road to VPRC Building |
136714 |
Construction of drainage from Kalyanipuram road to VPRC Building1 |
Roof laid |
-
latitude : 11.2043268,11.20432868
Longitude : 77.82001752,77.82001835
file name : Image_20092023083834160.png
|
2023-09-20 08:38:34.239565 |
88 |
61858946 |
Construction of drainage from Kalyanipuram road to VPRC Building |
136714 |
Construction of drainage from Kalyanipuram road to VPRC Building1 |
Plinth level |
-
latitude : 11.20434147,11.20432817
Longitude : 77.82001317,77.82001708
file name : Image_20092023083520217.png
|
2023-09-20 08:35:20.300072 |
89 |
61858946 |
Construction of drainage from Kalyanipuram road to VPRC Building |
136714 |
Construction of drainage from Kalyanipuram road to VPRC Building1 |
Completion of work |
-
latitude : 11.20434661,11.20434747
Longitude : 77.82001702,77.82001528
file name : Image_20092023083343704.png
|
2023-09-20 08:33:43.827282 |
90 |
82727909 |
Purchase of Tricycles/other battery-operated vehicles for door to door collection of waste |
164400 |
Purchase of Tricycles/other battery-operated vehicles for door to door collection of waste1 |
|
-
latitude : 11.20624839
Longitude : 77.80830035
file name : Image_08112023182915175.png
|
2023-11-08 18:29:15.282911 |
91 |
82725602 |
Creation of drainage channel for management of grey water |
200000 |
Construction of Drainage from Chettikuttaivalasu Bridge to Moganasundaram House |
Completion of work |
-
latitude : 11.1900453
Longitude : 77.82577001
file name : Image_31012024131323865.png
|
2024-01-31 13:13:23.953101 |
92 |
82722205 |
Creation of drainage channel for management of grey water |
105172 |
Providing Drainage from South Ponnampalayam Mokanmani House to Jaganathan House |
Completion of work |
-
latitude : 11.20936805
Longitude : 77.81539618
file name : Image_31012024172632105.png
|
2024-01-31 17:26:32.187413 |
93 |
82717750 |
Construction of Paver Block from North PonnamapalayamBridge to Gopalakrishnan House. |
481048 |
Construction of Paver Block from North PonnamapalayamBridge to Gopalakrishnan House.1 |
Roof laid |
-
latitude : 11.21081748,11.21081754
Longitude : 77.81517626,77.81517617
file name : Image_13112023082601041.png
|
2023-11-13 08:26:01.134674 |
94 |
82717750 |
Construction of Paver Block from North PonnamapalayamBridge to Gopalakrishnan House. |
481048 |
Construction of Paver Block from North PonnamapalayamBridge to Gopalakrishnan House.1 |
Plinth level |
-
latitude : 11.21082163,11.21082159
Longitude : 77.81517172,77.81517179
file name : Image_13112023082400145.png
|
2023-11-13 08:24:00.241603 |
95 |
82717750 |
Construction of Paver Block from North PonnamapalayamBridge to Gopalakrishnan House. |
481048 |
Construction of Paver Block from North PonnamapalayamBridge to Gopalakrishnan House.1 |
Plinth level |
-
latitude : 11.21082163,11.21082159
Longitude : 77.81517172,77.81517179
file name : Image_13112023082356301.png
|
2023-11-13 08:23:56.398683 |
96 |
82717750 |
Construction of Paver Block from North PonnamapalayamBridge to Gopalakrishnan House. |
481048 |
Construction of Paver Block from North PonnamapalayamBridge to Gopalakrishnan House.1 |
Plinth level |
-
latitude : 11.21082958,11.21082921
Longitude : 77.81516551,77.81516897
file name : Image_13112023082352082.png
|
2023-11-13 08:23:52.167025 |
97 |
82717750 |
Construction of Paver Block from North PonnamapalayamBridge to Gopalakrishnan House. |
481048 |
Construction of Paver Block from North PonnamapalayamBridge to Gopalakrishnan House.1 |
Completion of work |
-
latitude : 11.21071358,11.21080449
Longitude : 77.81510872,77.81519463
file name : Image_13112023081023239.png
|
2023-11-13 08:10:23.324301 |
98 |
82725156 |
Creation of drainage channel for management of grey water |
91360 |
Construction of Cement Pipe Drainage from Enjampalli Poiyeri Bridge to Anganwadi |
Roof laid |
-
latitude : 11.20694193
Longitude : 77.80800573
file name : Image_24112023082819706.png
|
2023-11-24 08:28:19.806848 |
99 |
82725156 |
Creation of drainage channel for management of grey water |
91360 |
Construction of Cement Pipe Drainage from Enjampalli Poiyeri Bridge to Anganwadi |
Plinth level |
-
latitude : 11.20693835
Longitude : 77.80799614
file name : Image_24112023082719678.png
|
2023-11-24 08:27:19.772969 |
100 |
82725156 |
Creation of drainage channel for management of grey water |
91360 |
Construction of Cement Pipe Drainage from Enjampalli Poiyeri Bridge to Anganwadi |
Completion of work |
-
latitude : 11.20694804
Longitude : 77.80799293
file name : Image_24112023082359036.png
|
2023-11-24 08:23:59.134206 |
101 |
82716226 |
Creation of drainage channel for management of grey water |
112927 |
Construction of 1 Cement Pipe Drainage from Chinnavethipalayam Periyasamy House to Bridge |
Completion of work |
-
latitude : 11.22066936
Longitude : 77.82161099
file name : Image_20122023172910945.png
|
2023-12-20 17:29:11.122324 |
102 |
106410108 |
Creation of a new source of drinking water |
24000 |
Providing FHTCs to Kalathuminappampalayam AD colony |
Completion of work |
-
latitude : 11.198756229132414
Longitude : 77.8101610019803
file name : Image_13062024144740099.png
|
2024-06-13 14:47:40.205444 |
103 |
105013943 |
Creation of drainage channel for management of grey water |
60000 |
Providing Madadhuppalayam Maariamman kovil behind drainage end Horrizontal Planted Filter |
Completion of work |
-
latitude : 11.198626644909382
Longitude : 77.80980435200036
file name : Image_13062024144924768.png
|
2024-06-13 14:49:24.85266 |
104 |
105013847 |
Creation of drainage channel for management of grey water |
60000 |
Providing Chettikuttai valasu mayanam behind drainage end Horrizontal Planted Filter |
Completion of work |
-
latitude : 11.192279867827892
Longitude : 77.82891442067921
file name : Image_13062024143457188.png
|
2024-06-13 14:34:57.276966 |
105 |
105013769 |
Creation of drainage channel for management of grey water |
60000 |
Providing Keeramadai floor behind drainage end Horizontal Planted Filter |
Completion of work |
-
latitude : 11.198336337693036
Longitude : 77.82982251606882
file name : Image_13062024142834501.png
|
2024-06-13 14:28:34.589267 |
106 |
105013651 |
Creation of drainage channel for management of grey water |
60000 |
Providing Muthugoundenpalayam behind drainage end Horrizontal Planted Filter |
Completion of work |
-
latitude : 11.217213934287429
Longitude : 77.82643815502524
file name : Image_13062024135628984.png
|
2024-06-13 13:56:29.069244 |
107 |
82715203 |
Maintenance of North Ponnampalayam Anganwadi Center Building. |
328000 |
Maintenance of North Ponnampalayam Anganwadi Center Building.1 |
Roof laid |
-
latitude : 11.2095597
Longitude : 77.8151603
file name : Image_29062024123837595.png
|
2024-06-29 12:38:37.682588 |
108 |
82715203 |
Maintenance of North Ponnampalayam Anganwadi Center Building. |
328000 |
Maintenance of North Ponnampalayam Anganwadi Center Building.1 |
Plinth level |
-
latitude : 11.21008051559329
Longitude : 77.81507296487689
file name : Image_29062024123707061.png
|
2024-06-29 12:37:07.151068 |
109 |
82715203 |
Maintenance of North Ponnampalayam Anganwadi Center Building. |
328000 |
Maintenance of North Ponnampalayam Anganwadi Center Building.1 |
Completion of work |
-
latitude : 11.2095607
Longitude : 77.8151595
file name : Image_29062024123412164.png
|
2024-06-29 12:34:12.248552 |
110 |
105013536 |
Creation of a new source of drinking water |
274615 |
Installation of Automatic control Device for 30000 Litre Capacity OHT tank at North Ponnampalayam |
Completion of work |
-
latitude : 11.21459693647921
Longitude : 77.81884255819023
file name : Image_13072024102746162.png
|
2024-07-13 10:27:46.247043 |
111 |
105013314 |
Construction of new Piped Water Supply schemes |
188074 |
Installation of Automatic control Device for 30000 Litre Capacity OHT tank at South Ponnampalayam |
Completion of work |
-
latitude : 11.209569093771279
Longitude : 77.8153364919126
file name : Image_13072024103554402.png
|
2024-07-13 10:35:54.488901 |
112 |
105013445 |
Creation of a new source of drinking water |
162179 |
Installation of Automatic control Device for 10000 Litre Capacity OHT tank at Nathamedu |
Plinth level |
-
latitude : 11.204784116707742
Longitude : 77.81977185979486
file name : Image_13072024102614229.png
|
2024-07-13 10:26:14.316925 |
113 |
105013445 |
Creation of a new source of drinking water |
162179 |
Installation of Automatic control Device for 10000 Litre Capacity OHT tank at Nathamedu |
Completion of work |
-
latitude : 11.204764670692384
Longitude : 77.81980874016881
file name : Image_11072024135558626.png
|
2024-07-11 13:55:58.707237 |
114 |
105017934 |
Creation of a new source of drinking water |
192706 |
Installation of Automatic control Device for 30000 Litre Capacity OHT tank at North Ponnampalayam |
Completion of work |
-
latitude : 11.21066297404468
Longitude : 77.81541243195534
file name : Image_13072024103121040.png
|
2024-07-13 10:31:21.123534 |
115 |
105014464 |
Construction of Community Sanitary Complex |
60000 |
Construct Mini CSC for Enjampalli Panchayat VAO Office |
Completion of work |
-
latitude : 11.204260289669037
Longitude : 77.81987562775612
file name : Image_13072024104056179.png
|
2024-07-13 10:40:56.259598 |
116 |
105014383 |
Construction of roads |
830432 |
BT Road Poosaripalayam Manickasundaram house to Komarapalayam Pirivu |
Plinth level |
-
latitude : 11.19724199641496,11.197240697219968
Longitude : 77.80247010290623,77.80246675014496
file name : Image_08082024124155612.png
|
2024-08-08 12:41:55.696834 |
117 |
105014383 |
Construction of roads |
830432 |
BT Road Poosaripalayam Manickasundaram house to Komarapalayam Pirivu |
Completion of work |
-
latitude : 11.197219616733491,11.197254275903106
Longitude : 77.80253154225647,77.80265919864178
file name : Image_08082024123856020.png
|
2024-08-08 12:38:56.114297 |