1 |
60818614 |
T WS 1 providing of pipe line arrangement in AD colony at munthal anakaraipatti |
390000 |
T WS 1 providing of pipe line arrangement in AD colony at munthal anakaraipatti1 |
Roof laid |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/33/2020/Image_14022022161804367.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/33/2020/Image_14022022161804367.png)
latitude : 9.978245,10.0494
Longitude : 77.35883,77.31308666666668
file name : Image_14022022161804367.png
|
2022-02-14 16:18:04.464133 |
2 |
60819836 |
T SAN 1 Construction Drainage in main road at anaikaraipatti |
540000 |
T SAN 1 Construction Drainage in main road at anaikaraipatti1 |
Roof laid |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/33/2020/Image_20032022120231700.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/33/2020/Image_20032022120231700.png)
latitude : 10.008735,10.008733333333334,10.008741666666667,10.008738333333334,10.008748333333333
Longitude : 77.37874833333333,77.378755,77.37869166666665,77.37873166666667,77.37873833333333
file name : Image_20032022120231700.png
|
2022-03-20 12:02:31.798768 |
3 |
82922079 |
Water Supply to villages |
200000 |
Water Supply to villages1 |
Roof laid |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/33/2022/Image_21062023095239374.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/33/2022/Image_21062023095239374.png)
latitude : 10.007791666666666,10.007783333333332
Longitude : 77.37852833333334,77.37853166666667
file name : Image_21062023095239374.png
|
2023-06-21 09:52:39.460424 |
4 |
60820387 |
T SAN 4 construction of Drainage in Anaikaraipatty |
261270 |
T SAN 4 construction of Drainage in Anaikaraipatty1 |
Roof laid |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/33/2020/Image_15102022103100478.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/33/2020/Image_15102022103100478.png)
latitude : 10.009611666666666,10.009656666666666
Longitude : 77.37847833333333,77.37847666666667
file name : Image_15102022103100478.png
|
2022-10-15 10:31:00.579227 |
5 |
60825384 |
UT 5 construction of pavament road in Anaikaraipatty panchayat |
500000 |
UT 5 construction of pavament road in Anaikaraipatty panchayat1 |
Roof laid |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/33/2020/Image_15102022103159049.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/33/2020/Image_15102022103159049.png)
latitude : 10.009653333333334,10.009653333333334
Longitude : 77.37841166666666,77.37841166666666
file name : Image_15102022103159049.png
|
2022-10-15 10:31:59.166982 |
6 |
60818799 |
T WS 2 providing of pipe line arrangement in valasai AD colony at Anaikaraipatti |
400000 |
T WS 2 providing of pipe line arrangement in valasai AD colony at Anaikaraipatti1 |
Roof laid |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/33/2020/Image_18102022202409229.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/33/2020/Image_18102022202409229.png)
latitude : 10.0120653,10.0118917
Longitude : 77.3511334,77.3512536
file name : Image_18102022202409229.png
|
2022-10-18 20:24:09.323311 |
7 |
60818799 |
T WS 2 providing of pipe line arrangement in valasai AD colony at Anaikaraipatti |
400000 |
T WS 2 providing of pipe line arrangement in valasai AD colony at Anaikaraipatti1 |
Roof laid |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/33/2020/Image_29122022195528918.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/33/2020/Image_29122022195528918.png)
latitude : 10.0120402,10.0120266
Longitude : 77.3511437,77.3511582
file name : Image_29122022195528918.png
|
2022-12-29 19:55:29.055588 |
8 |
65129843 |
Operation & maintenance of drinking water supply system |
451755 |
Operation & maintenance of drinking water supply system1 |
Roof laid |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/33/2021/Image_20102022174721233.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/33/2021/Image_20102022174721233.png)
latitude : 10.0120828,10.0120828
Longitude : 77.3508636,77.3508636
file name : Image_20102022174721233.png
|
2022-10-20 17:47:21.353246 |
9 |
82926154 |
Creation of drainage channel for management of grey water |
730000 |
Creation of drainage channel for management of grey water1 |
Roof laid |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/33/2022/Image_21062023152544079.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/33/2022/Image_21062023152544079.png)
latitude : 10.0131482
Longitude : 77.3420512
file name : Image_21062023152544079.png
|
2023-06-21 15:25:44.169798 |
10 |
82925558 |
Operation & maintenance of drinking water supply system |
264215 |
Operation & maintenance of drinking water supply system1 |
Roof laid |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/33/2022/Image_21062023095525801.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/33/2022/Image_21062023095525801.png)
latitude : 10.009608333333334
Longitude : 77.37856333333335
file name : Image_21062023095525801.png
|
2023-06-21 09:55:25.892484 |
11 |
60820077 |
T SAN 2 construction of community toilet in munthal at anaikaraipatti |
256120 |
T SAN 2 construction of community toilet in munthal at anaikaraipatti1 |
Roof laid |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/33/2020/Image_03122022113835073.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/33/2020/Image_03122022113835073.png)
latitude : 10.054730000000001
Longitude : 77.313805
file name : Image_03122022113835073.png
|
2022-12-03 11:38:35.211319 |
12 |
65129787 |
Operation & maintenance of drinking water supply system |
500000 |
Operation & maintenance of drinking water supply system1 |
Roof laid |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/33/2021/Image_02122022101659588.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/33/2021/Image_02122022101659588.png)
latitude : 10.008331666666667,10.008311666666666
Longitude : 77.37324666666667,77.373225
file name : Image_02122022101659588.png
|
2022-12-02 10:16:59.682597 |
13 |
65130025 |
Repair of drainage channel |
300000 |
Repair of drainage channel1 |
Roof laid |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/33/2021/Image_24012023134524697.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/33/2021/Image_24012023134524697.png)
latitude : 10.011966,10.0119678
Longitude : 77.3424357,77.3424402
file name : Image_24012023134524697.png
|
2023-01-24 13:45:24.840106 |
14 |
65130078 |
Repair of drainage channel |
300000 |
Repair of drainage channel1 |
Roof laid |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/33/2021/Image_24012023135026109.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/33/2021/Image_24012023135026109.png)
latitude : 10.012538333333334,10.0119542
Longitude : 77.34196166666668,77.3424443
file name : Image_24012023135026109.png
|
2023-01-24 13:50:26.235724 |
15 |
60819203 |
T WS 4 construction of street light at Munthal AD colony at anaikaraipatti |
100000 |
T WS 4 construction of street light at Munthal AD colony at anaikaraipatti1 |
Roof laid |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/33/2020/Image_29122022195611345.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/33/2020/Image_29122022195611345.png)
latitude : 10.0120266
Longitude : 77.3511582
file name : Image_29122022195611345.png
|
2022-12-29 19:56:11.482076 |
16 |
60820533 |
U SAN 3 construction of Street light at melaparavu at Anaikaraipatty |
18245 |
U SAN 3 construction of Street light at melaparavu at Anaikaraipatty1 |
Roof laid |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/33/2020/Image_29122022195651029.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/33/2020/Image_29122022195651029.png)
latitude : 10.0120266
Longitude : 77.3511582
file name : Image_29122022195651029.png
|
2022-12-29 19:56:51.174856 |
17 |
60819411 |
TWS 5 construction of Street light at melaparavu at anaikaraipatti |
41755 |
TWS 5 construction of Street light at melaparavu at anaikaraipatti1 |
Roof laid |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/33/2020/Image_29122022201216588.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/33/2020/Image_29122022201216588.png)
latitude : 10.0120266
Longitude : 77.3511582
file name : Image_29122022201216588.png
|
2022-12-29 20:12:16.702963 |
18 |
60819014 |
T WS 3 Construction of Drainage with culvert In munthal AD at anaikaraipatti |
400000 |
T WS 3 Construction of Drainage with culvert In munthal AD at anaikaraipatti1 |
Roof laid |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/33/2020/Image_02022023194921756.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/33/2020/Image_02022023194921756.png)
latitude : 10.016386666666667,10.004998333333333
Longitude : 77.35567333333333,77.34809833333334
file name : Image_02022023194921756.png
|
2023-02-02 19:49:21.862032 |
19 |
60820255 |
T SAN 3 construction of community toilet in anaikaraipatti |
256120 |
T SAN 3 construction of community toilet in anaikaraipatti1 |
Roof laid |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/33/2020/Image_07022023204724031.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/33/2020/Image_07022023204724031.png)
latitude : 10.0118323
Longitude : 77.3513233
file name : Image_07022023204724031.png
|
2023-02-07 20:47:24.13924 |
20 |
65129985 |
Repair of drainage channel |
379000 |
Repair of drainage channel1 |
Roof laid |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/33/2021/Image_13022023173640878.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/33/2021/Image_13022023173640878.png)
latitude : 10.013123333333334,10.013098333333334
Longitude : 77.34213500000001,77.34212833333332
file name : Image_13022023173640878.png
|
2023-02-13 17:36:40.98449 |
21 |
60825564 |
UT 6 construction of pavament road in munthal at Anaikaraipatty |
563510 |
UT 6 construction of pavament road in munthal at Anaikaraipatty1 |
Roof laid |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/33/2020/Image_24022023155953935.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/33/2020/Image_24022023155953935.png)
latitude : 10.0119199,10.012112
Longitude : 77.3512198,77.3508249
file name : Image_24022023155953935.png
|
2023-02-24 15:59:54.042411 |
22 |
82930386 |
UT 2 construction of drainage at sannasipuram mmariyamman kovil street |
820000 |
UT 2 construction of drainage at sannasipuram mmariyamman kovil street1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/33/2022/Image_07072023190305670.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/33/2022/Image_07072023190305670.png)
latitude : 10.0117219,10.011888
Longitude : 77.3510997,77.351234
file name : Image_07072023190305670.png
|
2023-07-07 19:03:05.759498 |
23 |
60820728 |
UT 1 construction of pavament road in Munthal AD colony at Anaikaraipatty |
990000 |
UT 1 construction of pavament road in Munthal AD colony at Anaikaraipatty1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/33/2020/Image_12072023194525287.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/33/2020/Image_12072023194525287.png)
latitude : 10.0118863,10.0118863
Longitude : 77.3512454,77.3512454
file name : Image_12072023194525287.png
|
2023-07-12 19:45:25.397861 |
24 |
82923904 |
Water Supply to villages |
613000 |
Water Supply to villages1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/33/2022/Image_24082023094417986.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/33/2022/Image_24082023094417986.png)
latitude : 10.0118876,10.0119113
Longitude : 77.3512368,77.3512282
file name : Image_24082023094417986.png
|
2023-08-24 09:44:18.123658 |
25 |
65130241 |
UT 2 providing of pipe line arrangement in 18th vaikal to OHT in jeyamnagar at anaimalaiyanpatti |
560000 |
UT 2 providing of pipe line arrangement in 18th vaikal to OHT in jeyamnagar at anaimalaiyanpatti1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/33/2021/Image_26092023202429108.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/33/2021/Image_26092023202429108.png)
latitude : 10.0119101,10.011961
Longitude : 77.3512298,77.3511959
file name : Image_26092023202429108.png
|
2023-09-26 20:24:29.200914 |
26 |
82928018 |
Creation of drainage channel for management of grey water |
200000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/33/2022/Image_27092023201427024.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/33/2022/Image_27092023201427024.png)
latitude : 10.0119417
Longitude : 77.3512342
file name : Image_27092023201427024.png
|
2023-09-27 20:14:27.141675 |
27 |
82930492 |
UT 1 constructiion Of Drainage at Periyakaruppan House Street |
170000 |
UT 1 constructiion Of Drainage at Periyakaruppan House Street1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/33/2022/Image_27092023201324764.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/33/2022/Image_27092023201324764.png)
latitude : 10.0118792,10.0118792
Longitude : 77.3512571,77.3512571
file name : Image_27092023201324764.png
|
2023-09-27 20:13:24.846776 |
28 |
82931477 |
UT 3 construction of drainage at iwsc near munthal |
200000 |
UT 3 construction of drainage at iwsc near munthal1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/33/2022/Image_27092023201154728.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/33/2022/Image_27092023201154728.png)
latitude : 10.009576666666668,10.009576666666668
Longitude : 77.37839166666666,77.37839166666666
file name : Image_27092023201154728.png
|
2023-09-27 20:11:54.814576 |
29 |
82932389 |
UT 4 Construction of pavement road at iwsc near at munthal |
200000 |
UT 4 Construction of pavement road at iwsc near at munthal1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/33/2022/Image_27092023201013929.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/33/2022/Image_27092023201013929.png)
latitude : 10.0119248,10.0118107
Longitude : 77.3512183,77.3513144
file name : Image_27092023201013929.png
|
2023-09-27 20:10:14.00973 |
30 |
65129901 |
Operation & maintenance of drinking water supply system |
380000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/33/2021/Image_26102023190822942.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/33/2021/Image_26102023190822942.png)
latitude : 10.0135453
Longitude : 77.3512857
file name : Image_26102023190822942.png
|
2023-10-26 19:08:23.028724 |
31 |
65130394 |
UT 5 construction of drainage with pavement road in north street at Anaikaraipatti |
533434 |
UT 5 construction of drainage with pavement road in north street at Anaikaraipatti1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/33/2021/Image_20122023100710099.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/33/2021/Image_20122023100710099.png)
latitude : 10.008158333333334,10.008185
Longitude : 77.37858333333334,77.37858
file name : Image_20122023100710099.png
|
2023-12-20 10:07:10.193765 |
32 |
65130394 |
UT 5 construction of drainage with pavement road in north street at Anaikaraipatti |
533434 |
UT 5 construction of drainage with pavement road in north street at Anaikaraipatti1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/33/2021/Image_09112023161402232.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/33/2021/Image_09112023161402232.png)
latitude : 10.0118061,10.0118737
Longitude : 77.3513145,77.3512689
file name : Image_09112023161402232.png
|
2023-11-09 16:14:02.346815 |
33 |
90347816 |
Creation of a new source of drinking water |
450000 |
Creation of a new source of drinking water1 |
Roof laid |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/33/2023/Image_28022024152640068.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/33/2023/Image_28022024152640068.png)
latitude : 9.994371666666666,9.994371666666666
Longitude : 77.37053166666666,77.37053166666666
file name : Image_28022024152640068.png
|
2024-02-28 15:26:40.188302 |
34 |
90347816 |
Creation of a new source of drinking water |
450000 |
Creation of a new source of drinking water1 |
Plinth level |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/33/2023/Image_28022024152426616.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/33/2023/Image_28022024152426616.png)
latitude : 9.994371666666666,9.994371666666666
Longitude : 77.37053166666666,77.37053166666666
file name : Image_28022024152426616.png
|
2024-02-28 15:24:26.722246 |
35 |
90347816 |
Creation of a new source of drinking water |
450000 |
Creation of a new source of drinking water1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/33/2023/Image_28022024151847367.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/33/2023/Image_28022024151847367.png)
latitude : 9.994371666666666,9.994371666666666
Longitude : 77.37053166666666,77.37053166666666
file name : Image_28022024151847367.png
|
2024-02-28 15:18:47.452921 |
36 |
90349926 |
Drainage Construction |
550000 |
Drainage Construction1 |
Roof laid |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/33/2023/Image_28022024154719072.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/33/2023/Image_28022024154719072.png)
latitude : 9.994371666666666
Longitude : 77.37053166666666
file name : Image_28022024154719072.png
|
2024-02-28 15:47:19.229535 |
37 |
90349926 |
Drainage Construction |
550000 |
Drainage Construction1 |
Plinth level |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/33/2023/Image_28022024153840329.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/33/2023/Image_28022024153840329.png)
latitude : 9.994371666666666
Longitude : 77.37053166666666
file name : Image_28022024153840329.png
|
2024-02-28 15:38:40.441098 |
38 |
90349926 |
Drainage Construction |
550000 |
Drainage Construction1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/33/2023/Image_28022024153337792.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/33/2023/Image_28022024153337792.png)
latitude : 9.994371666666666
Longitude : 77.37053166666666
file name : Image_28022024153337792.png
|
2024-02-28 15:33:37.920399 |
39 |
60824841 |
UT 2 providing of pipe line arrangement in pinchakarai at Anaikaraipatty |
550000 |
UT 2 providing of pipe line arrangement in pinchakarai at Anaikaraipatty1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/33/2020/Image_25012024111246298.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/33/2020/Image_25012024111246298.png)
latitude : 10.008856666666667,10.008781666666666
Longitude : 77.37613666666667,77.37603166666666
file name : Image_25012024111246298.png
|
2024-01-25 11:12:46.39929 |
40 |
90347569 |
Creation of a new source of drinking water |
350000 |
Creation of a new source of drinking water1 |
Roof laid |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/33/2023/Image_07022024194442240.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/33/2023/Image_07022024194442240.png)
latitude : 10.0121539,10.0121547
Longitude : 77.3510544,77.3510469
file name : Image_07022024194442240.png
|
2024-02-07 19:44:42.329972 |
41 |
90347569 |
Creation of a new source of drinking water |
350000 |
Creation of a new source of drinking water1 |
Roof laid |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/33/2023/Image_26012024124339433.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/33/2023/Image_26012024124339433.png)
latitude : 10.008938333333333,10.008956666666668
Longitude : 77.37569333333333,77.375705
file name : Image_26012024124339433.png
|
2024-01-26 12:43:39.524 |
42 |
90347569 |
Creation of a new source of drinking water |
350000 |
Creation of a new source of drinking water1 |
Plinth level |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/33/2023/Image_26012024124137426.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/33/2023/Image_26012024124137426.png)
latitude : 10.008965,10.00896
Longitude : 77.37578333333333,77.375775
file name : Image_26012024124137426.png
|
2024-01-26 12:41:37.520542 |
43 |
90347569 |
Creation of a new source of drinking water |
350000 |
Creation of a new source of drinking water1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/33/2023/Image_26012024123730678.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/33/2023/Image_26012024123730678.png)
latitude : 10.008968333333334,10.008968333333334
Longitude : 77.375665,77.375665
file name : Image_26012024123730678.png
|
2024-01-26 12:37:30.768143 |
44 |
82927453 |
Creation of drainage channel for management of grey water |
330000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/33/2022/Image_07022024194312408.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/33/2022/Image_07022024194312408.png)
latitude : 10.0121442
Longitude : 77.3510689
file name : Image_07022024194312408.png
|
2024-02-07 19:43:12.503033 |
45 |
90326488 |
Creation of a new source of drinking water |
900000 |
Creation of a new source of drinking water1 |
Roof laid |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/33/2023/Image_07022024195544186.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/33/2023/Image_07022024195544186.png)
latitude : 10.0121529,10.0121523
Longitude : 77.3510545,77.3510664
file name : Image_07022024195544186.png
|
2024-02-07 19:55:44.283922 |
46 |
90326488 |
Creation of a new source of drinking water |
900000 |
Creation of a new source of drinking water1 |
Plinth level |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/33/2023/Image_07022024195327826.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/33/2023/Image_07022024195327826.png)
latitude : 10.0121523,10.0121523
Longitude : 77.3510664,77.3510664
file name : Image_07022024195327826.png
|
2024-02-07 19:53:27.913916 |
47 |
90326488 |
Creation of a new source of drinking water |
900000 |
Creation of a new source of drinking water1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/33/2023/Image_07022024195124741.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/33/2023/Image_07022024195124741.png)
latitude : 10.0121523,10.0121523
Longitude : 77.3510664,77.3510664
file name : Image_07022024195124741.png
|
2024-02-07 19:51:24.824881 |
48 |
60825220 |
UT 5 construction of pipe line arrangement in solaiyar at Anaikaraipatty |
60000 |
UT 5 construction of pipe line arrangement in solaiyar at Anaikaraipatty1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/33/2020/Image_19122023163437353.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/33/2020/Image_19122023163437353.png)
latitude : 10.0118817,10.0118817
Longitude : 77.3512509,77.3512509
file name : Image_19122023163437353.png
|
2023-12-19 16:34:37.447101 |
49 |
65130173 |
UT 1 construction of drainage with pavement road in east 2nd street at Anaikaraipatti |
950000 |
UT 1 construction of drainage with pavement road in east 2nd street at Anaikaraipatti1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/33/2021/Image_20122023100808440.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/33/2021/Image_20122023100808440.png)
latitude : 10.009003333333334,10.009003333333334
Longitude : 77.37881166666666,77.37880666666666
file name : Image_20122023100808440.png
|
2023-12-20 10:08:08.532975 |
50 |
90347205 |
Creation of a new source of drinking water |
300000 |
Creation of a new source of drinking water1 |
Roof laid |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/33/2023/Image_02052024201000254.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/33/2023/Image_02052024201000254.png)
latitude : 9.993066666666666,9.993066666666666
Longitude : 77.37633000000001,77.37633000000001
file name : Image_02052024201000254.png
|
2024-05-02 20:10:00.331381 |
51 |
90347205 |
Creation of a new source of drinking water |
300000 |
Creation of a new source of drinking water1 |
Plinth level |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/33/2023/Image_02052024200651295.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/33/2023/Image_02052024200651295.png)
latitude : 9.993066666666666,9.993066666666666
Longitude : 77.37633000000001,77.37633000000001
file name : Image_02052024200651295.png
|
2024-05-02 20:06:51.375609 |
52 |
90347205 |
Creation of a new source of drinking water |
300000 |
Creation of a new source of drinking water1 |
Completion of work |
-
![/opt/actionsoft/attachment/mActionSoft/photoupload/33/2023/Image_02052024195956330.png](getMactionPhoto.do?imgId=/opt/actionsoft/attachment/mActionSoft/photoupload/33/2023/Image_02052024195956330.png)
latitude : 9.993066666666666,9.993066666666666
Longitude : 77.37633000000001,77.37633000000001
file name : Image_02052024195956330.png
|
2024-05-02 19:59:56.404515 |