1 |
40624168 |
Taka Vasti Concrete Road |
352420 |
Taka Vasti Concrete Road1 |
Completion of work |
-

latitude : 17.62554803,17.62555102
Longitude : 75.26722646,75.26719303
file name : Image_29012022124641813.png
|
2022-01-29 12:46:42.187829 |
2 |
40623978 |
Construction of concrete road under Gaothan |
400000 |
Construction of concrete road under Gaothan1 |
Completion of work |
-

latitude : 17.65511736,17.65510615
Longitude : 75.28839689,75.28841302
file name : Image_19032022113131710.png
|
2022-03-19 11:31:31.782302 |
3 |
40623978 |
Construction of concrete road under Gaothan |
400000 |
Construction of concrete road under Gaothan1 |
Completion of work |
-

latitude : 17.6064709,17.65503173
Longitude : 75.2820335,75.28844628
file name : Image_19032022112906453.png
|
2022-03-19 11:29:06.528539 |
4 |
36012167 |
Purchasing sports equipment |
71250 |
Purchasing sports equipment1 |
Completion of work |
-

latitude : 17.67413963
Longitude : 75.32078102
file name : Image_19032022120014252.png
|
2022-03-19 12:00:14.379036 |
5 |
36012167 |
Purchasing sports equipment |
71250 |
Purchasing sports equipment1 |
Completion of work |
-

latitude : 17.67413963
Longitude : 75.32078102
file name : Image_19032022121345539.png
|
2022-03-19 12:13:45.661042 |
6 |
40611292 |
Repair of hand pumps and purchase of material |
400000 |
Repair of hand pumps and purchase of material1 |
Completion of work |
-

latitude : 17.64476123
Longitude : 75.26626914
file name : Image_01052022120141509.png
|
2022-05-01 12:01:41.614949 |
7 |
40623740 |
Installation of paving blocks on both sides of Baliram Babar Ghar to Anganwadi road |
112330 |
Installation of paving blocks on both sides of Baliram Babar Ghar to Anganwadi road1 |
Completion of work |
-

latitude : 17.64368824,17.64368706
Longitude : 75.2660967,75.26609826
file name : Image_01052022115500322.png
|
2022-05-01 11:55:00.417691 |
8 |
36005741 |
Road to bring agricultural goods |
260000 |
Road to bring agricultural goods1 |
Completion of work |
-

latitude : 17.63056171,17.63056245
Longitude : 75.24896339,75.24896094
file name : Image_01052022122853152.png
|
2022-05-01 12:28:53.258162 |
9 |
50702462 |
constriction at cement concrete road from shankar pawar ghar to dattu pawar ghar |
360000 |
constriction at cement concrete road from shankar pawar ghar to dattu pawar ghar 1 |
Completion of work |
-

latitude : 17.65591898,17.65592236
Longitude : 75.2878778,75.28788348
file name : Image_19052022161817658.png
|
2022-05-19 16:18:17.743178 |
10 |
50702237 |
construction of cement concrete road at taka wasti |
360000 |
construction of cement concrete road at taka wasti 1 |
Completion of work |
-

latitude : 17.62452592,17.62452978
Longitude : 75.26665144,75.26669324
file name : Image_13062022181237500.png
|
2022-06-13 18:12:37.571526 |
11 |
35954699 |
Health materials for primary substations |
100000 |
Health materials for primary substations1 |
Completion of work |
-

latitude : 17.6426636
Longitude : 75.2652053
file name : Image_17062022144446007.png
|
2022-06-17 14:44:46.08975 |
12 |
36017545 |
ZP Primary School Room Coloring |
200000 |
ZP Primary School Room Coloring1 |
Completion of work |
-

latitude : 17.6282543
Longitude : 75.24453203
file name : Image_21062022174515978.png
|
2022-06-21 17:45:16.082877 |
13 |
40612453 |
instruction of dual pump on boar well |
225000 |
instruction of dual pump on boar well1 |
Completion of work |
-

latitude : 17.63756679
Longitude : 75.27821707
file name : Image_14082022143646964.png
|
2022-08-14 14:36:47.058932 |
14 |
36005372 |
Painting Anganwadi buildings |
160000 |
Painting Anganwadi buildings1 |
Completion of work |
-

latitude : 17.64289915
Longitude : 75.26555829
file name : Image_19082022182041299.png
|
2022-08-19 18:20:41.374736 |
15 |
36005372 |
Painting Anganwadi buildings |
160000 |
Painting Anganwadi buildings1 |
Completion of work |
-

latitude : 17.64289841
Longitude : 75.26555769
file name : Image_17082022175241555.png
|
2022-08-17 17:52:41.679077 |
16 |
40604306 |
Gavthan area Cleaning |
100000 |
Gavthan area Cleaning 1 |
Completion of work |
-

latitude : 17.62768958,17.62769503
Longitude : 75.24405435,75.24406198
file name : Image_19082022182244516.png
|
2022-08-19 18:22:44.591595 |
17 |
40604306 |
Gavthan area Cleaning |
100000 |
Gavthan area Cleaning 1 |
Completion of work |
-

latitude : 17.62768186,17.6276784
Longitude : 75.24403809,75.24404316
file name : Image_19082022182155062.png
|
2022-08-19 18:21:55.140508 |
18 |
50700679 |
to supply water to Zilla parishad primary schools |
400000 |
to supply water to Zilla parishad primary schools 1 |
Completion of work |
-

latitude : 17.62828515
Longitude : 75.24455653
file name : Image_13082022190253576.png
|
2022-08-13 19:02:53.631676 |
19 |
50700679 |
to supply water to Zilla parishad primary schools |
400000 |
to supply water to Zilla parishad primary schools 1 |
Completion of work |
-

latitude : 17.62828195
Longitude : 75.24454802
file name : Image_13082022190113831.png
|
2022-08-13 19:01:13.894874 |
20 |
40600900 |
Construction of ZP Primary School and Anganwadi toilets and urinals and repair of defective toilets |
400000 |
Construction of ZP Primary School and Anganwadi toilets and urinals and repair of defective toilets 1 |
Completion of work |
-

latitude : 17.6485525
Longitude : 75.2716499
file name : Image_20082022105550472.png
|
2022-08-20 10:55:50.571109 |
21 |
40613433 |
Construction of water supply tank protective wall and beautification of premises |
200000 |
Construction of water supply tank protective wall and beautification of premises1 |
Completion of work |
-

latitude : 17.6407657
Longitude : 75.26542617
file name : Image_04102022093558070.png
|
2022-10-04 09:35:58.153793 |
22 |
65782949 |
road repair karane |
300000 |
road repair karane 1 |
Completion of work |
-

latitude : 17.6426901,17.6426901
Longitude : 75.2652599,75.2652589
file name : Image_04112022165233161.png
|
2022-11-04 16:52:33.289342 |
23 |
65782949 |
road repair karane |
300000 |
road repair karane 1 |
Completion of work |
-

latitude : 17.64250549,17.6426906
Longitude : 75.26539454,75.265263
file name : Image_04112022165155328.png
|
2022-11-04 16:51:55.45628 |
24 |
50689671 |
to repair ZP school toilets and urinals |
290345 |
to repair ZP school toilets and urinals1 |
Completion of work |
-

latitude : 17.62910423
Longitude : 75.25980782
file name : Image_02122022163509767.png
|
2022-12-02 16:35:09.86847 |
25 |
59996921 |
installing LED lights |
99000 |
installing LED lights 1 |
Completion of work |
-

latitude : 17.64145283
Longitude : 75.26540368
file name : Image_02122022162556582.png
|
2022-12-02 16:25:56.677163 |
26 |
40624437 |
Underground drainage in the village |
300000 |
Underground drainage in the village1 |
Completion of work |
-

latitude : 17.64149133,17.64150006
Longitude : 75.26470227,75.26470392
file name : Image_29122022154558447.png
|
2022-12-29 15:45:58.541079 |
27 |
65783288 |
gutar repair karane |
175000 |
gutar repair karane 1 |
Completion of work |
-

latitude : 17.6437539,17.64376032
Longitude : 75.26547831,75.26546155
file name : Image_29122022160327439.png
|
2022-12-29 16:03:27.531273 |
28 |
65783288 |
gutar repair karane |
175000 |
gutar repair karane 1 |
Completion of work |
-

latitude : 17.64376334,17.64377673
Longitude : 75.26547331,75.26546046
file name : Image_29122022160323961.png
|
2022-12-29 16:03:24.039673 |
29 |
50701534 |
road for transport of farm goods karande wasti road to kisan zanje to khandu navale ghar to taka vas |
225000 |
road for transport of farm goods karande wasti road to kisan zanje to khandu navale ghar to taka vas1 |
Completion of work |
-

latitude : 17.62669728,17.62670425
Longitude : 75.26957395,75.26957332
file name : Image_06012023091944072.png
|
2023-01-06 09:19:44.14577 |
30 |
59986872 |
To clean the Anganwadi Permises |
163600 |
To clean the Anganwadi Permises1 |
Completion of work |
-

latitude : 17.63757236
Longitude : 75.27821749
file name : Image_24012023100724206.png
|
2023-01-24 10:07:24.262078 |
31 |
50700845 |
construction of pump house at dhondali water supply well |
160000 |
construction of pump house at dhondali water supply well 1 |
Completion of work |
-

latitude : 17.65570668
Longitude : 75.27076634
file name : Image_17022023101310473.png
|
2023-02-17 10:13:10.543943 |
32 |
50700845 |
construction of pump house at dhondali water supply well |
160000 |
construction of pump house at dhondali water supply well 1 |
Completion of work |
-

latitude : 17.65570662
Longitude : 75.27076626
file name : Image_17022023101221829.png
|
2023-02-17 10:12:21.914929 |
33 |
50702062 |
installation of hymast lamps at garmala hake mane wasti mahadev mandir bhakt nivas dargah parkatta |
670000 |
installation of hymast lamps at garmala hake mane wasti mahadev mandir bhakt nivas dargah parkatta 1 |
Completion of work |
-

latitude : 17.64150708
Longitude : 75.2647494
file name : Image_17022023164636065.png
|
2023-02-17 16:46:36.152873 |
34 |
50702062 |
installation of hymast lamps at garmala hake mane wasti mahadev mandir bhakt nivas dargah parkatta |
670000 |
installation of hymast lamps at garmala hake mane wasti mahadev mandir bhakt nivas dargah parkatta 1 |
Completion of work |
-

latitude : 17.64150655
Longitude : 75.2647491
file name : Image_17022023164558706.png
|
2023-02-17 16:45:58.787912 |
35 |
59995803 |
concereting of roads at neharunagar |
436400 |
concereting of roads at neharunagar 1 |
Completion of work |
-

latitude : 17.65610675,17.65610722
Longitude : 75.28824175,75.28823723
file name : Image_24022023124718138.png
|
2023-02-24 12:47:18.221463 |
36 |
59995803 |
concereting of roads at neharunagar |
436400 |
concereting of roads at neharunagar 1 |
Completion of work |
-

latitude : 17.65611365,17.65611259
Longitude : 75.28823339,75.28823506
file name : Image_24022023124750087.png
|
2023-02-24 12:47:50.171214 |
37 |
93760076 |
Construction/ Maintenance/ Upgradation of repairing of Play Ground/ Child friendly Park etc. |
116069 |
Construction/ Maintenance/ Upgradation of repairing of Play Ground/ Child friendly Park etc.1 |
Completion of work |
-

latitude : 17.639623333333336
Longitude : 75.26345666666666
file name : Image_03012025145705673.png
|
2025-01-03 14:57:04.509785 |
38 |
93760076 |
Construction/ Maintenance/ Upgradation of repairing of Play Ground/ Child friendly Park etc. |
116069 |
Construction/ Maintenance/ Upgradation of repairing of Play Ground/ Child friendly Park etc.1 |
Plinth level |
-

latitude : 17.639625000000002
Longitude : 75.26346666666667
file name : Image_03012025150049245.png
|
2025-01-03 15:00:47.985097 |
39 |
93760076 |
Construction/ Maintenance/ Upgradation of repairing of Play Ground/ Child friendly Park etc. |
116069 |
Construction/ Maintenance/ Upgradation of repairing of Play Ground/ Child friendly Park etc.1 |
Roof laid |
-

latitude : 17.639574999999997
Longitude : 75.263345
file name : Image_03012025150720492.png
|
2025-01-03 15:07:19.2389 |
40 |
93755881 |
Installation of Street Lights |
200000 |
Installation of Street Lights1 |
Completion of work |
-

latitude : 17.64256
Longitude : 75.26533166666667
file name : Image_03012025153331746.png
|
2025-01-03 15:33:30.385838 |
41 |
93755881 |
Installation of Street Lights |
200000 |
Installation of Street Lights1 |
Plinth level |
-

latitude : 17.642566666666667
Longitude : 75.265325
file name : Image_03012025153704704.png
|
2025-01-03 15:37:03.33934 |
42 |
93755881 |
Installation of Street Lights |
200000 |
Installation of Street Lights1 |
Roof laid |
-

latitude : 17.642573333333335
Longitude : 75.26533666666666
file name : Image_03012025153908349.png
|
2025-01-03 15:39:06.987554 |
43 |
59994536 |
Underground drainej in korti gavathan area |
404600 |
Underground drainej in korti gavathan area1 |
Completion of work |
-

latitude : 17.643238333333333,17.643253333333334
Longitude : 75.26463166666667,75.26468166666668
file name : Image_04012025140929635.png
|
2025-01-04 14:09:27.740571 |
44 |
85851090 |
Water Supply to villages |
300000 |
Water Supply to villages1 |
Completion of work |
-

latitude : 17.652866666666668
Longitude : 75.28748166666666
file name : Image_04012025142746128.png
|
2025-01-04 14:27:44.139319 |
45 |
85851090 |
Water Supply to villages |
300000 |
Water Supply to villages1 |
Plinth level |
-

latitude : 17.652901666666665
Longitude : 75.28749666666666
file name : Image_04012025143001570.png
|
2025-01-04 14:29:59.570475 |
46 |
85851090 |
Water Supply to villages |
300000 |
Water Supply to villages1 |
Roof laid |
-

latitude : 17.652896666666667
Longitude : 75.28749666666666
file name : Image_04012025143158940.png
|
2025-01-04 14:31:56.939896 |
47 |
93770318 |
Establishment Hygienic Kitchen facilities and Sheds |
100000 |
Establishment Hygienic Kitchen facilities and Sheds1 |
Completion of work |
-

latitude : 17.642774999999997
Longitude : 75.265535
file name : Image_02012025164141974.png
|
2025-01-02 16:41:41.256523 |
48 |
93770318 |
Establishment Hygienic Kitchen facilities and Sheds |
100000 |
Establishment Hygienic Kitchen facilities and Sheds1 |
Plinth level |
-

latitude : 17.6427258
Longitude : 75.2652723
file name : Image_02012025164635753.png
|
2025-01-02 16:46:35.041885 |
49 |
93770318 |
Establishment Hygienic Kitchen facilities and Sheds |
100000 |
Establishment Hygienic Kitchen facilities and Sheds1 |
Roof laid |
-

latitude : 17.6426684
Longitude : 75.2652316
file name : Image_02012025164956153.png
|
2025-01-02 16:49:55.433068 |
50 |
93758927 |
Construction of Paver Block |
200000 |
Construction of Paver Block1 |
Completion of work |
-

latitude : 17.64106333333333,17.641105
Longitude : 75.26429333333334,75.26437333333334
file name : Image_03012025143702080.png
|
2025-01-03 14:37:00.909031 |
51 |
93758927 |
Construction of Paver Block |
200000 |
Construction of Paver Block1 |
Plinth level |
-

latitude : 17.641054999999998,17.641054999999998
Longitude : 75.26427666666667,75.26427666666667
file name : Image_03012025144154917.png
|
2025-01-03 14:41:53.809486 |
52 |
93758927 |
Construction of Paver Block |
200000 |
Construction of Paver Block1 |
Roof laid |
-

latitude : 17.64108,17.641091666666668
Longitude : 75.26426166666667,75.26427
file name : Image_03012025144358314.png
|
2025-01-03 14:43:57.092563 |
53 |
93772393 |
Construction of Paver Block |
150000 |
Construction of Paver Block1 |
Completion of work |
-

latitude : 17.64300666666667
Longitude : 75.26589166666666
file name : Image_03012025151607845.png
|
2025-01-03 15:16:06.539465 |
54 |
93772393 |
Construction of Paver Block |
150000 |
Construction of Paver Block1 |
Plinth level |
-

latitude : 17.642986666666665
Longitude : 75.26594833333334
file name : Image_03012025151758185.png
|
2025-01-03 15:17:56.862973 |
55 |
93772393 |
Construction of Paver Block |
150000 |
Construction of Paver Block1 |
Roof laid |
-

latitude : 17.642986666666665
Longitude : 75.26594333333334
file name : Image_03012025151948962.png
|
2025-01-03 15:19:47.628924 |
56 |
36002909 |
Furniture for Anganwadi |
92500 |
Furniture for Anganwadi1 |
|
-

latitude : 17.642831666666666
Longitude : 75.26573666666667
file name : Image_23092024162113392.png
|
2024-09-23 16:21:13.498882 |
57 |
85881960 |
Construction of Store Room in GP Bhawan |
150371 |
Construction of Store Room in GP Bhawan1 |
Completion of work |
-

latitude : 17.642695
Longitude : 75.26630166666668
file name : Image_26092024172909243.png
|
2024-09-26 17:29:09.326284 |
58 |
85081514 |
Construction of toilets in public institutions |
300000 |
Construction of toilets in public institutions1 |
|
-

latitude : 17.641226666666668
Longitude : 75.26421666666667
file name : Image_10102024132832932.png
|
2024-10-10 13:28:33.025813 |
59 |
85085878 |
Purchase of Tricycles/other battery -operated vehicles for door to door collection of waste |
315000 |
Purchase of Tricycles/other battery -operated vehicles for door to door collection of waste1 |
Completion of work |
-

latitude : 17.652428333333333
Longitude : 75.29034166666666
file name : Image_11102024152124695.png
|
2024-10-11 15:21:24.779635 |
60 |
85085202 |
Purchase of litter bins to be fixed at public places |
250000 |
Purchase of litter bins to be fixed at public places1 |
Completion of work |
-

latitude : 17.642703333333333
Longitude : 75.26557666666666
file name : Image_11102024150026831.png
|
2024-10-11 15:00:26.981823 |
61 |
85084572 |
Purchase of litter bins to be fixed at public places |
200000 |
Purchase of litter bins to be fixed at public places1 |
Completion of work |
-

latitude : 17.642665
Longitude : 75.26567833333334
file name : Image_11102024145651589.png
|
2024-10-11 14:56:51.670875 |
62 |
93771580 |
Purchase/ installtion of various Equipments |
118160 |
Purchase/ installtion of various Equipments1 |
Completion of work |
-

latitude : 17.649156666666666
Longitude : 75.27277833333332
file name : Image_03012025152421850.png
|
2025-01-03 15:24:20.507442 |
63 |
93771580 |
Purchase/ installtion of various Equipments |
118160 |
Purchase/ installtion of various Equipments1 |
Plinth level |
-

latitude : 17.649136666666667
Longitude : 75.27277666666667
file name : Image_03012025152722969.png
|
2025-01-03 15:27:21.615126 |
64 |
93771580 |
Purchase/ installtion of various Equipments |
118160 |
Purchase/ installtion of various Equipments1 |
Roof laid |
-

latitude : 17.649165
Longitude : 75.27286000000001
file name : Image_03012025152909334.png
|
2025-01-03 15:29:07.97153 |
65 |
93758060 |
Purchase/ installtion of various Equipments |
100000 |
Purchase/ installtion of various Equipments1 |
Completion of work |
-

latitude : 17.640945
Longitude : 75.26431666666667
file name : Image_03012025144449035.png
|
2025-01-03 14:44:47.764814 |
66 |
93758060 |
Purchase/ installtion of various Equipments |
100000 |
Purchase/ installtion of various Equipments1 |
Plinth level |
-

latitude : 17.64093
Longitude : 75.26430666666667
file name : Image_03012025144700910.png
|
2025-01-03 14:46:59.673165 |
67 |
93758060 |
Purchase/ installtion of various Equipments |
100000 |
Purchase/ installtion of various Equipments1 |
Roof laid |
-

latitude : 17.640938333333334
Longitude : 75.26425166666667
file name : Image_03012025144908487.png
|
2025-01-03 14:49:07.222678 |
68 |
93768091 |
Maintenance of school buildings |
200000 |
Maintenance of school buildings1 |
Completion of work |
-

latitude : 17.64277
Longitude : 75.2655
file name : Image_16012025134453503.png
|
2025-01-16 13:44:43.252359 |
69 |
93768091 |
Maintenance of school buildings |
200000 |
Maintenance of school buildings1 |
Plinth level |
-

latitude : 17.642788333333332
Longitude : 75.265545
file name : Image_16012025140045877.png
|
2025-01-16 14:00:35.658808 |
70 |
93768091 |
Maintenance of school buildings |
200000 |
Maintenance of school buildings1 |
Plinth level |
-

latitude : 17.6426614
Longitude : 75.2652366
file name : Image_16012025140018532.png
|
2025-01-16 14:00:08.367599 |
71 |
93777953 |
Maintenance/ Upgradation of Gram Panchayat Bhawan |
200000 |
Maintenance/ Upgradation of Gram Panchayat Bhawan1 |
Completion of work |
-

latitude : 17.642763333333335
Longitude : 75.26555166666667
file name : Image_16012025131107379.png
|
2025-01-16 13:10:57.409079 |
72 |
93777953 |
Maintenance/ Upgradation of Gram Panchayat Bhawan |
200000 |
Maintenance/ Upgradation of Gram Panchayat Bhawan1 |
Plinth level |
-

latitude : 17.6426682
Longitude : 75.2652366
file name : Image_16012025133910242.png
|
2025-01-16 13:39:00.088328 |
73 |
93777953 |
Maintenance/ Upgradation of Gram Panchayat Bhawan |
200000 |
Maintenance/ Upgradation of Gram Panchayat Bhawan1 |
Roof laid |
-

latitude : 17.642813333333333
Longitude : 75.26555499999999
file name : Image_16012025134236623.png
|
2025-01-16 13:42:26.415064 |
74 |
93769654 |
Purchase/ installtion of various Equipments |
95400 |
Purchase/ installtion of various Equipments1 |
Completion of work |
-

latitude : 17.64276
Longitude : 75.26546833333333
file name : Image_16012025142956032.png
|
2025-01-16 14:29:45.759774 |
75 |
93769654 |
Purchase/ installtion of various Equipments |
95400 |
Purchase/ installtion of various Equipments1 |
Plinth level |
-

latitude : 17.642521666666667
Longitude : 75.26541833333334
file name : Image_16012025143223637.png
|
2025-01-16 14:32:13.345804 |
76 |
93769654 |
Purchase/ installtion of various Equipments |
95400 |
Purchase/ installtion of various Equipments1 |
Plinth level |
-

latitude : 17.642606666666666
Longitude : 75.26550166666667
file name : Image_16012025143458970.png
|
2025-01-16 14:34:48.68198 |
77 |
93769654 |
Purchase/ installtion of various Equipments |
95400 |
Purchase/ installtion of various Equipments1 |
Roof laid |
-

latitude : 17.642603333333334
Longitude : 75.26555833333333
file name : Image_16012025143751133.png
|
2025-01-16 14:37:40.93118 |
78 |
85851129 |
Water Supply to villages |
300000 |
Water Supply to villages1 |
Completion of work |
-

latitude : 17.640836666666665
Longitude : 75.26422
file name : Image_03012025145016605.png
|
2025-01-03 14:50:15.37584 |
79 |
85851129 |
Water Supply to villages |
300000 |
Water Supply to villages1 |
Plinth level |
-

latitude : 17.640881666666665
Longitude : 75.26423333333334
file name : Image_03012025145246886.png
|
2025-01-03 14:52:45.681774 |
80 |
85851129 |
Water Supply to villages |
300000 |
Water Supply to villages1 |
Roof laid |
-

latitude : 17.640856666666664
Longitude : 75.26424
file name : Image_03012025145434692.png
|
2025-01-03 14:54:33.465569 |