1 |
19443631 |
Construction of urinal shed for panchayat ghar at kwakta gram panchayat |
159753 |
Toilet1 |
Stage 1 |
-
latitude : 24.45187332
Longitude : 93.75759829
file name : Image_05092018143715396.png
|
2018-09-05 14:37:15.539788 |
2 |
41575780 |
Construction of water tanky for Rain Water Harvesting at Ward No 7 |
100000 |
Construction of water tanky for Rain Water Harvesting at Ward No 71 |
Roof laid |
-
latitude : 24.45729455
Longitude : 93.76969214
file name : Image_02072021144539298.png
|
2021-07-02 14:45:39.428113 |
3 |
41575780 |
Construction of water tanky for Rain Water Harvesting at Ward No 7 |
100000 |
Construction of water tanky for Rain Water Harvesting at Ward No 71 |
Completion of work |
-
latitude : 24.45738611
Longitude : 93.76935999
file name : Image_20032021105710896.png
|
2021-03-20 10:57:11.002536 |
4 |
41575225 |
Construction of water tanky for Rain Water Harvesting at Ward No 6 |
100000 |
Construction of water tanky for Rain Water Harvesting at Ward No 61 |
Roof laid |
-
latitude : 24.45347921
Longitude : 93.75521162
file name : Image_05012022124455017.png
|
2022-01-05 12:44:55.140116 |
5 |
41575225 |
Construction of water tanky for Rain Water Harvesting at Ward No 6 |
100000 |
Construction of water tanky for Rain Water Harvesting at Ward No 61 |
Roof laid |
-
latitude : 24.45353154
Longitude : 93.75522052
file name : Image_05012022124450347.png
|
2022-01-05 12:44:50.47498 |
6 |
41575225 |
Construction of water tanky for Rain Water Harvesting at Ward No 6 |
100000 |
Construction of water tanky for Rain Water Harvesting at Ward No 61 |
Completion of work |
-
latitude : 24.45373572
Longitude : 93.75539454
file name : Image_15042021212441964.png
|
2021-04-15 21:24:42.096257 |
7 |
41575225 |
Construction of water tanky for Rain Water Harvesting at Ward No 6 |
100000 |
Construction of water tanky for Rain Water Harvesting at Ward No 61 |
Completion of work |
-
latitude : 24.45375494
Longitude : 93.75539595
file name : Image_15042021212436341.png
|
2021-04-15 21:24:36.483336 |
8 |
42432588 |
Construction of RCC Bridge over Moirang Turel at Kwakta Khuman Ward No 4 |
816717 |
Construction of RCC Bridge over Moirang Turel at Kwakta Khuman Ward No 41 |
Roof laid |
-
latitude : 24.45651857
Longitude : 93.76114957
file name : Image_02072021142056037.png
|
2021-07-02 14:20:56.145654 |
9 |
42432588 |
Construction of RCC Bridge over Moirang Turel at Kwakta Khuman Ward No 4 |
816717 |
Construction of RCC Bridge over Moirang Turel at Kwakta Khuman Ward No 41 |
Completion of work |
-
latitude : 24.45651441
Longitude : 93.76104593
file name : Image_15042021212452908.png
|
2021-04-15 21:24:53.05061 |
10 |
42432588 |
Construction of RCC Bridge over Moirang Turel at Kwakta Khuman Ward No 4 |
816717 |
Construction of RCC Bridge over Moirang Turel at Kwakta Khuman Ward No 41 |
Completion of work |
-
latitude : 24.45653073
Longitude : 93.76109119
file name : Image_20032021105857388.png
|
2021-03-20 10:58:57.518033 |
11 |
40675850 |
Construction of garbage tank near Panchayat Office |
200000 |
Construction of garbage tank near Panchayat Office1 |
Plinth level |
-
latitude : 24.4528071,24.4528071,24.4528071
Longitude : 93.7576189,93.7576189,93.7576189
file name : Image_17042021124451576.png
|
2021-04-17 12:44:51.685634 |
12 |
40675850 |
Construction of garbage tank near Panchayat Office |
200000 |
Construction of garbage tank near Panchayat Office1 |
Roof laid |
-
latitude : 24.45193505,24.45209848
Longitude : 93.75753717,93.75738484
file name : Image_02072021140238534.png
|
2021-07-02 14:02:38.644648 |
13 |
40675850 |
Construction of garbage tank near Panchayat Office |
200000 |
Construction of garbage tank near Panchayat Office1 |
Plinth level |
-
latitude : 24.4528071,24.452811
Longitude : 93.7576189,93.7576218
file name : Image_17042021123756853.png
|
2021-04-17 12:37:56.977347 |
14 |
40675850 |
Construction of garbage tank near Panchayat Office |
200000 |
Construction of garbage tank near Panchayat Office1 |
Plinth level |
-
latitude : 24.45192489,24.45191513,24.45191955
Longitude : 93.75757303,93.75761276,93.75763123
file name : Image_17042021123612929.png
|
2021-04-17 12:36:13.013332 |
15 |
41576193 |
Construction of water tanky for Rain Water Harvesting at Ward No 1 |
100000 |
Construction of water tanky for Rain Water Harvesting at Ward No 11 |
Plinth level |
-
latitude : 24.44768947
Longitude : 93.7549678
file name : Image_02072021115033082.png
|
2021-07-02 11:50:33.225615 |
16 |
41576193 |
Construction of water tanky for Rain Water Harvesting at Ward No 1 |
100000 |
Construction of water tanky for Rain Water Harvesting at Ward No 11 |
Completion of work |
-
latitude : 24.44768923
Longitude : 93.75492575
file name : Image_15042021212431061.png
|
2021-04-15 21:24:31.194427 |
17 |
41576193 |
Construction of water tanky for Rain Water Harvesting at Ward No 1 |
100000 |
Construction of water tanky for Rain Water Harvesting at Ward No 11 |
Roof laid |
-
latitude : 24.44769611
Longitude : 93.75493964
file name : Image_02072021120312056.png
|
2021-07-02 12:03:12.176734 |
18 |
41576193 |
Construction of water tanky for Rain Water Harvesting at Ward No 1 |
100000 |
Construction of water tanky for Rain Water Harvesting at Ward No 11 |
Plinth level |
-
latitude : 24.44770142
Longitude : 93.75493395
file name : Image_02072021115028389.png
|
2021-07-02 11:50:28.541379 |
19 |
41576193 |
Construction of water tanky for Rain Water Harvesting at Ward No 1 |
100000 |
Construction of water tanky for Rain Water Harvesting at Ward No 11 |
Completion of work |
-
latitude : 24.44768962
Longitude : 93.75495206
file name : Image_15042021212425932.png
|
2021-04-15 21:24:26.069551 |
20 |
42523764 |
Construction of water reservior with Handpump near Pradhan Sevla W/1. |
207463 |
Construction of water reservior with Handpump near Pradhan Sevla W/1.1 |
Plinth level |
-
latitude : 24.4512327
Longitude : 93.757317
file name : Image_05012022124432381.png
|
2022-01-05 12:44:32.519658 |
21 |
42523764 |
Construction of water reservior with Handpump near Pradhan Sevla W/1. |
207463 |
Construction of water reservior with Handpump near Pradhan Sevla W/1.1 |
Completion of work |
-
latitude : 24.45098956
Longitude : 93.75480524
file name : Image_15042021152848537.png
|
2021-04-15 15:28:48.733073 |
22 |
42523764 |
Construction of water reservior with Handpump near Pradhan Sevla W/1. |
207463 |
Construction of water reservior with Handpump near Pradhan Sevla W/1.1 |
Completion of work |
-
latitude : 24.45096725
Longitude : 93.75474453
file name : Image_15042021152841952.png
|
2021-04-15 15:28:42.143834 |
23 |
42413417 |
Extension of Panchayat Ghar ( Varanda ) at Kwakta Khuman ward No 8 |
116717 |
Extension of Panchayat Ghar ( Varanda ) at Kwakta Khuman ward No 81 |
Plinth level |
-
latitude : 24.45198039
Longitude : 93.75756196
file name : Image_08112021120333493.png
|
2021-11-08 12:03:33.579679 |
24 |
42413417 |
Extension of Panchayat Ghar ( Varanda ) at Kwakta Khuman ward No 8 |
116717 |
Extension of Panchayat Ghar ( Varanda ) at Kwakta Khuman ward No 81 |
Completion of work |
-
latitude : 24.45195141
Longitude : 93.75755629
file name : Image_02072021140233839.png
|
2021-07-02 14:02:33.930325 |
25 |
41575982 |
Construction of water tanky for Rain Water Harvesting at Ward No 9 |
100000 |
Construction of water tanky for Rain Water Harvesting at Ward No 91 |
Plinth level |
-
latitude : 24.44823053
Longitude : 93.76001692
file name : Image_02072021131533456.png
|
2021-07-02 13:15:33.630416 |
26 |
41575982 |
Construction of water tanky for Rain Water Harvesting at Ward No 9 |
100000 |
Construction of water tanky for Rain Water Harvesting at Ward No 91 |
Plinth level |
-
latitude : 24.44834675
Longitude : 93.75985509
file name : Image_02072021132305228.png
|
2021-07-02 13:23:05.366398 |
27 |
41575982 |
Construction of water tanky for Rain Water Harvesting at Ward No 9 |
100000 |
Construction of water tanky for Rain Water Harvesting at Ward No 91 |
Roof laid |
-
latitude : 24.44829917
Longitude : 93.75988553
file name : Image_02072021133019801.png
|
2021-07-02 13:30:19.997157 |
28 |
41576420 |
Construction of water tanky for Rain Water Harvesting at Ward No 5 |
100000 |
Construction of water tanky for Rain Water Harvesting at Ward No 51 |
Plinth level |
-
latitude : 24.45193374
Longitude : 93.75750278
file name : Image_21112021103739459.png
|
2021-11-21 10:37:39.553432 |
29 |
41576420 |
Construction of water tanky for Rain Water Harvesting at Ward No 5 |
100000 |
Construction of water tanky for Rain Water Harvesting at Ward No 51 |
Completion of work |
-
latitude : 24.46136217
Longitude : 93.76266014
file name : Image_20032021105850884.png
|
2021-03-20 10:58:50.988503 |
30 |
37908239 |
Construction of RCC Bridge over Moirang Turel at Kwakta Khuman Ward No 5 |
700000 |
Construction of RCC Bridge over Moirang Turel at Kwakta Khuman Ward No 51 |
Plinth level |
-
latitude : 24.45362343
Longitude : 93.7554492
file name : Image_05012022124445023.png
|
2022-01-05 12:44:45.133415 |
31 |
37908239 |
Construction of RCC Bridge over Moirang Turel at Kwakta Khuman Ward No 5 |
700000 |
Construction of RCC Bridge over Moirang Turel at Kwakta Khuman Ward No 51 |
Plinth level |
-
latitude : 24.45362343
Longitude : 93.7554492
file name : Image_05012022124439324.png
|
2022-01-05 12:44:39.454331 |
32 |
37908239 |
Construction of RCC Bridge over Moirang Turel at Kwakta Khuman Ward No 5 |
700000 |
Construction of RCC Bridge over Moirang Turel at Kwakta Khuman Ward No 51 |
Completion of work |
-
latitude : 24.45193374
Longitude : 93.75750278
file name : Image_21112021103743359.png
|
2021-11-21 10:37:43.443918 |
33 |
37908239 |
Construction of RCC Bridge over Moirang Turel at Kwakta Khuman Ward No 5 |
700000 |
Construction of RCC Bridge over Moirang Turel at Kwakta Khuman Ward No 51 |
Completion of work |
-
latitude : 24.46126716
Longitude : 93.7630882
file name : Image_02072021142204266.png
|
2021-07-02 14:22:04.388306 |
34 |
41578198 |
Construction of water tanky for Rain Water Harvesting at Ward No 8 |
100000 |
Construction of water tanky for Rain Water Harvesting at Ward No 81 |
Roof laid |
-
latitude : 24.45098767
Longitude : 93.7569474
file name : Image_06062022115738980.png
|
2022-06-06 11:57:39.100806 |
35 |
41578198 |
Construction of water tanky for Rain Water Harvesting at Ward No 8 |
100000 |
Construction of water tanky for Rain Water Harvesting at Ward No 81 |
Plinth level |
-
latitude : 24.45096747
Longitude : 93.75694855
file name : Image_16052022121751645.png
|
2022-05-16 12:17:51.728971 |
36 |
41578198 |
Construction of water tanky for Rain Water Harvesting at Ward No 8 |
100000 |
Construction of water tanky for Rain Water Harvesting at Ward No 81 |
Completion of work |
-
latitude : 24.45103031
Longitude : 93.75696293
file name : Image_24042022122338355.png
|
2022-04-24 12:23:38.429857 |
37 |
41578198 |
Construction of water tanky for Rain Water Harvesting at Ward No 8 |
100000 |
Construction of water tanky for Rain Water Harvesting at Ward No 81 |
Completion of work |
-
latitude : 24.45096141
Longitude : 93.7569254
file name : Image_24042022122334264.png
|
2022-04-24 12:23:34.366132 |
38 |
41578198 |
Construction of water tanky for Rain Water Harvesting at Ward No 8 |
100000 |
Construction of water tanky for Rain Water Harvesting at Ward No 81 |
Roof laid |
-
latitude : 24.45090818
Longitude : 93.75695433
file name : Image_06062022115743661.png
|
2022-06-06 11:57:43.74519 |
39 |
41577245 |
Cleaning of 16Nos. of Septic tank within Kwakta Gram Panchayat |
400000 |
Cleaning of 16Nos. of Septic tank within Kwakta Gram Panchayat2 |
Plinth level |
-
latitude : 24.45089019
Longitude : 93.75697421
file name : Image_06062022121629281.png
|
2022-06-06 12:16:29.381418 |
40 |
41577245 |
Cleaning of 16Nos. of Septic tank within Kwakta Gram Panchayat |
400000 |
Cleaning of 16Nos. of Septic tank within Kwakta Gram Panchayat2 |
Completion of work |
-
latitude : 24.45098162
Longitude : 93.75711461
file name : Image_24042022122329544.png
|
2022-04-24 12:23:29.768131 |
41 |
41577715 |
Construction of water tanky for Rain Water Harvesting at Ward No 2 |
100000 |
Construction of water tanky for Rain Water Harvesting at Ward No 21 |
Plinth level |
-
latitude : 24.45228
Longitude : 93.7449372
file name : Image_16052022120220008.png
|
2022-05-16 12:02:20.102278 |
42 |
41577715 |
Construction of water tanky for Rain Water Harvesting at Ward No 2 |
100000 |
Construction of water tanky for Rain Water Harvesting at Ward No 21 |
Completion of work |
-
latitude : 24.44759923
Longitude : 93.74938862
file name : Image_24042022124011944.png
|
2022-04-24 12:40:12.050554 |
43 |
41577715 |
Construction of water tanky for Rain Water Harvesting at Ward No 2 |
100000 |
Construction of water tanky for Rain Water Harvesting at Ward No 21 |
Roof laid |
-
latitude : 24.44761152
Longitude : 93.74938102
file name : Image_10062022114038957.png
|
2022-06-10 11:40:39.044141 |
44 |
41577958 |
Construction of water tank for Rain Water Harvesting at Ward No 3 |
100000 |
Construction of water tank for Rain Water Harvesting at Ward No 31 |
Roof laid |
-
latitude : 24.45231228
Longitude : 93.75296362
file name : Image_14062022114234941.png
|
2022-06-14 11:42:35.090708 |
45 |
41577958 |
Construction of water tank for Rain Water Harvesting at Ward No 3 |
100000 |
Construction of water tank for Rain Water Harvesting at Ward No 31 |
Completion of work |
-
latitude : 24.45228365
Longitude : 93.75291244
file name : Image_24042022124008091.png
|
2022-04-24 12:40:08.216487 |
46 |
41577958 |
Construction of water tank for Rain Water Harvesting at Ward No 3 |
100000 |
Construction of water tank for Rain Water Harvesting at Ward No 31 |
Plinth level |
-
latitude : 24.45231109
Longitude : 93.75264988
file name : Image_06062022125940461.png
|
2022-06-06 12:59:40.557673 |
47 |
41577460 |
Construction of water tanky for Rain Water Harvesting at Ward No 4 |
100000 |
Construction of water tanky for Rain Water Harvesting at Ward No 41 |
Plinth level |
-
latitude : 24.45610096
Longitude : 93.76112056
file name : Image_10062022114043915.png
|
2022-06-10 11:40:44.000889 |
48 |
41577460 |
Construction of water tanky for Rain Water Harvesting at Ward No 4 |
100000 |
Construction of water tanky for Rain Water Harvesting at Ward No 41 |
Completion of work |
-
latitude : 24.45614153
Longitude : 93.76120942
file name : Image_24042022122342297.png
|
2022-04-24 12:23:42.381619 |
49 |
41578514 |
Cleaning of both side sanitary drain from Maronglou to KwaktaThongkhong |
107463 |
Cleaning of both side sanitary drain from Maronglou to KwaktaThongkhong1 |
Plinth level |
-
latitude : 24.45319455,24.45319423
Longitude : 93.75565995,93.75566006
file name : Image_06062022125932726.png
|
2022-06-06 12:59:32.82381 |
50 |
41578514 |
Cleaning of both side sanitary drain from Maronglou to KwaktaThongkhong |
107463 |
Cleaning of both side sanitary drain from Maronglou to KwaktaThongkhong1 |
Completion of work |
-
latitude : 24.45325059,24.453179
Longitude : 93.75597986,93.75595391
file name : Image_24042022122346847.png
|
2022-04-24 12:23:46.951834 |
51 |
48952507 |
Construction of water tank at Kwakta Sevla Ward No 3 |
200000 |
Construction of water tank at Kwakta Sevla Ward No 31 |
Plinth level |
-
latitude : 24.4481722
Longitude : 93.74998245
file name : Image_29102022143955740.png
|
2022-10-29 14:39:55.858528 |
52 |
48952507 |
Construction of water tank at Kwakta Sevla Ward No 3 |
200000 |
Construction of water tank at Kwakta Sevla Ward No 31 |
Plinth level |
-
latitude : 24.45016395
Longitude : 93.75965869
file name : Image_23102022142037837.png
|
2022-10-23 14:20:38.496154 |
53 |
48952507 |
Construction of water tank at Kwakta Sevla Ward No 3 |
200000 |
Construction of water tank at Kwakta Sevla Ward No 31 |
Completion of work |
-
latitude : 24.44812035
Longitude : 93.74994187
file name : Image_23102022124132123.png
|
2022-10-23 12:41:32.746769 |
54 |
48952432 |
Construction of Reservoir tank at Khonghampat Loukon ward 9 |
200000 |
Construction of Reservoir tank at Khonghampat Loukon ward 91 |
Plinth level |
-
latitude : 24.45023723
Longitude : 93.75979057
file name : Image_29102022143959980.png
|
2022-10-29 14:40:00.108443 |
55 |
48952432 |
Construction of Reservoir tank at Khonghampat Loukon ward 9 |
200000 |
Construction of Reservoir tank at Khonghampat Loukon ward 91 |
Plinth level |
-
latitude : 24.4499251
Longitude : 93.75955844
file name : Image_23102022140705247.png
|
2022-10-23 14:07:05.884874 |
56 |
48952432 |
Construction of Reservoir tank at Khonghampat Loukon ward 9 |
200000 |
Construction of Reservoir tank at Khonghampat Loukon ward 91 |
Completion of work |
-
latitude : 24.4499655
Longitude : 93.75949763
file name : Image_23102022133311818.png
|
2022-10-23 13:33:12.199672 |
57 |
48952174 |
Continuation of market building (two rooms) at madrassa/Medina Thongkhong bazar ward No 6 |
495759 |
Continuation of market building (two rooms) at madrassa/Medina Thongkhong bazar ward No 61 |
Completion of work |
-
latitude : 24.4528351
Longitude : 93.7575796
file name : Image_23102022124136567.png
|
2022-10-23 12:41:37.19356 |