1 |
46834343 |
Construction of water tank at water tank at jatrapur gp feild |
241775 |
Construction of water tank at water tank at jatrapur gp feild1 |
Completion of work |
-

latitude : 23.38718178
Longitude : 91.29196649
file name : Image_15072021121450233.png
|
2021-07-15 12:14:50.330183 |
2 |
53603344 |
creation a hand pump ohp at nainder par jb school at jatrapur gp |
14226 |
creation a hand pump ohp at nainder par jb school at jatrapur gp1 |
Completion of work |
-

latitude : 23.39019633
Longitude : 91.2838037
file name : Image_26082021135815902.png
|
2021-08-26 13:58:16.009679 |
3 |
53602988 |
creation a hand pump ohp at jatrapur high school |
14226 |
creation a hand pump ohp at jatrapur high school1 |
Completion of work |
-

latitude : 23.37906942
Longitude : 91.28384048
file name : Image_26082021134849548.png
|
2021-08-26 13:48:49.647644 |
4 |
53603469 |
const of toilet block 3 unit at jatrapur high school |
328575 |
const of toilet block 3 unit at jatrapur high school1 |
Completion of work |
-

latitude : 23.37908472
Longitude : 91.28384327
file name : Image_26082021134912552.png
|
2021-08-26 13:49:12.642101 |
5 |
53603469 |
const of toilet block 3 unit at jatrapur high school |
328575 |
const of toilet block 3 unit at jatrapur high school1 |
Completion of work |
-

latitude : 23.37908472
Longitude : 91.28384327
file name : Image_26082021135154181.png
|
2021-08-26 13:51:54.274797 |
6 |
47013403 |
Construction a community toilet at jatrapur gp area |
19118 |
Construction a community toilet at jatrapur gp area 1 |
Completion of work |
-

latitude : 23.38751624
Longitude : 91.29198219
file name : Image_24122021140632636.png
|
2021-12-24 14:06:32.722605 |
7 |
58569338 |
const of community compost pit at jatrapur gp area |
35402 |
const of community compost pit at jatrapur gp area1 |
Completion of work |
-

latitude : 23.387014999999998
Longitude : 91.29197500000001
file name : Image_04042022131331088.png
|
2022-04-04 13:13:31.195448 |
8 |
58569338 |
const of community compost pit at jatrapur gp area |
35402 |
const of community compost pit at jatrapur gp area1 |
Completion of work |
-

latitude : 23.392924999999998
Longitude : 91.28608833333334
file name : Image_23082022122756692.png
|
2022-08-23 12:27:56.823014 |
9 |
58570411 |
const of community compost pit at public places under jatrapur gp area |
35402 |
const of community compost pit at public places under jatrapur gp area1 |
Completion of work |
-

latitude : 23.38404166666667
Longitude : 91.28685500000002
file name : Image_06042022153222015.png
|
2022-04-06 15:32:22.150156 |
10 |
58566208 |
const of individual compost pit for 5 nos household |
75366 |
const of individual compost pit for 5 nos household1 |
Completion of work |
-

latitude : 23.391205
Longitude : 91.28226000000001
file name : Image_23082022122745422.png
|
2022-08-23 12:27:45.544806 |
11 |
34639686 |
Construction of toilet at Birampur Anganwadi Center -2 |
59653 |
Construction of toilet at Birampur Anganwadi Center -2 1 |
Completion of work |
-

latitude : 23.384138333333333
Longitude : 91.28533
file name : Image_12012023121337926.png
|
2023-01-12 12:13:38.059727 |
12 |
56685100 |
mtc of jatrapur high school kitchen room |
92675 |
mtc of jatrapur high school kitchen room1 |
Completion of work |
-

latitude : 23.379206666666665
Longitude : 91.28366
file name : Image_12012023115825529.png
|
2023-01-12 11:58:25.678032 |
13 |
46928546 |
mtc of computer,printer and other electric components at jatrapur gp |
60000 |
mtc of computer,printer and other electric components at jatrapur gp1 |
Completion of work |
-

latitude : 23.387161666666664
Longitude : 91.29176000000001
file name : Image_15052023132320673.png
|
2023-05-15 13:23:20.771497 |
14 |
74778859 |
Construction of Segregation Unit |
23230 |
Construction of Segregation Unit1 |
Completion of work |
-

latitude : 23.37061491
Longitude : 91.32021144
file name : Image_31082023161332885.png
|
2023-08-31 16:13:32.941697 |
15 |
46845177 |
Construction of box culvert near the land of aman ulla |
155677 |
Construction of box culvert near the land of aman ulla1 |
Completion of work |
-

latitude : 23.38251693,23.38251739
Longitude : 91.28771495,91.28770621
file name : Image_30072021134736765.png
|
2021-07-30 13:47:36.847607 |
16 |
46845177 |
Construction of box culvert near the land of aman ulla |
155677 |
Construction of box culvert near the land of aman ulla1 |
Completion of work |
-

latitude : 23.38251693,23.38251739
Longitude : 91.28771495,91.28770621
file name : Image_30072021134715046.png
|
2021-07-30 13:47:15.111399 |
17 |
46845177 |
Construction of box culvert near the land of aman ulla |
155677 |
Construction of box culvert near the land of aman ulla1 |
Plinth level |
-

latitude : 23.38716399,23.387489318847656
Longitude : 91.29184742,91.29101157188416
file name : Image_14092023135325331.png
|
2023-09-14 13:53:25.406852 |
18 |
46845177 |
Construction of box culvert near the land of aman ulla |
155677 |
Construction of box culvert near the land of aman ulla1 |
Roof laid |
-

latitude : 23.38722033,23.38722033
Longitude : 91.29165891,91.29165891
file name : Image_14092023142339870.png
|
2023-09-14 14:23:39.938217 |
19 |
46845393 |
Construction of box culvert near the land of abdul mamin |
155677 |
Construction of box culvert near the land of abdul mamin1 |
Completion of work |
-

latitude : 23.38295472,23.38294434
Longitude : 91.28773539,91.28774161
file name : Image_30072021134652198.png
|
2021-07-30 13:46:52.279933 |
20 |
46845393 |
Construction of box culvert near the land of abdul mamin |
155677 |
Construction of box culvert near the land of abdul mamin1 |
Plinth level |
-

latitude : 23.38748867,23.38748768
Longitude : 91.29098841,91.29098799
file name : Image_14092023135329501.png
|
2023-09-14 13:53:29.579866 |
21 |
46845393 |
Construction of box culvert near the land of abdul mamin |
155677 |
Construction of box culvert near the land of abdul mamin1 |
Plinth level |
-

latitude : 23.38748867,23.38748768
Longitude : 91.29098841,91.29098799
file name : Image_14092023135349146.png
|
2023-09-14 13:53:49.224723 |
22 |
46845393 |
Construction of box culvert near the land of abdul mamin |
155677 |
Construction of box culvert near the land of abdul mamin1 |
Roof laid |
-

latitude : 23.53540452,23.53552812
Longitude : 91.06494171,91.06503492
file name : Image_14092023142348998.png
|
2023-09-14 14:23:49.063057 |
23 |
46845393 |
Construction of box culvert near the land of abdul mamin |
155677 |
Construction of box culvert near the land of abdul mamin1 |
Roof laid |
-

latitude : 23.53540452,23.53552812
Longitude : 91.06494171,91.06503492
file name : Image_14092023142344209.png
|
2023-09-14 14:23:44.270532 |
24 |
46837370 |
Construction of brick soiling road from babul shil house to bashpukur madhya para awc |
141031 |
Construction of brick soiling road from babul shil house to bashpukur madhya para awc1 |
Completion of work |
-

latitude : 23.39059735,23.39060031
Longitude : 91.29761832,91.29758878
file name : Image_20072021141047267.png
|
2021-07-20 14:10:47.351535 |
25 |
46837370 |
Construction of brick soiling road from babul shil house to bashpukur madhya para awc |
141031 |
Construction of brick soiling road from babul shil house to bashpukur madhya para awc1 |
Completion of work |
-

latitude : 23.39059684,23.39059945
Longitude : 91.29762771,91.29762538
file name : Image_20072021141041748.png
|
2021-07-20 14:10:41.843055 |
26 |
46837370 |
Construction of brick soiling road from babul shil house to bashpukur madhya para awc |
141031 |
Construction of brick soiling road from babul shil house to bashpukur madhya para awc1 |
Plinth level |
-

latitude : 23.38729248,23.38724085
Longitude : 91.29152963,91.29147129
file name : Image_14092023135344814.png
|
2023-09-14 13:53:44.882922 |
27 |
46837370 |
Construction of brick soiling road from babul shil house to bashpukur madhya para awc |
141031 |
Construction of brick soiling road from babul shil house to bashpukur madhya para awc1 |
Plinth level |
-

latitude : 23.38729248,23.38724085
Longitude : 91.29152963,91.29147129
file name : Image_14092023135407466.png
|
2023-09-14 13:54:07.53087 |
28 |
46837370 |
Construction of brick soiling road from babul shil house to bashpukur madhya para awc |
141031 |
Construction of brick soiling road from babul shil house to bashpukur madhya para awc1 |
Roof laid |
-

latitude : 23.38704892,23.38709556
Longitude : 91.2918648,91.29183844
file name : Image_14092023143452156.png
|
2023-09-14 14:34:52.228877 |
29 |
47012477 |
Extension of pipe line from harun rasid house to habibulla house |
55965 |
Extension of pipe line from harun rasid house to habibulla house1 |
Completion of work |
-

latitude : 23.38443111,23.38430854
Longitude : 91.28212655,91.28210865
file name : Image_26082021135233669.png
|
2021-08-26 13:52:33.77531 |
30 |
47012477 |
Extension of pipe line from harun rasid house to habibulla house |
55965 |
Extension of pipe line from harun rasid house to habibulla house1 |
Completion of work |
-

latitude : 23.38443111,23.38430854
Longitude : 91.28212655,91.28210865
file name : Image_26082021135101851.png
|
2021-08-26 13:51:01.975664 |
31 |
47012477 |
Extension of pipe line from harun rasid house to habibulla house |
55965 |
Extension of pipe line from harun rasid house to habibulla house1 |
Completion of work |
-

latitude : 23.38747904,23.38747119
Longitude : 91.29115235,91.291209
file name : Image_14092023135339248.png
|
2023-09-14 13:53:39.325725 |
32 |
47012477 |
Extension of pipe line from harun rasid house to habibulla house |
55965 |
Extension of pipe line from harun rasid house to habibulla house1 |
Completion of work |
-

latitude : 23.38747904,23.38747119
Longitude : 91.29115235,91.291209
file name : Image_14092023135359846.png
|
2023-09-14 13:53:59.911173 |
33 |
47012477 |
Extension of pipe line from harun rasid house to habibulla house |
55965 |
Extension of pipe line from harun rasid house to habibulla house1 |
Plinth level |
-

latitude : 23.38722248,23.387226462364197
Longitude : 91.29193968,91.29192888736725
file name : Image_14092023144957122.png
|
2023-09-14 14:49:57.19478 |
34 |
46846687 |
Construction of toilet at jatrapur para awc |
58587 |
Construction of toilet at jatrapur para awc 1 |
Completion of work |
-

latitude : 23.382751666666664
Longitude : 91.30030166666666
file name : Image_23052022164455789.png
|
2022-05-23 16:44:55.910164 |
35 |
47012011 |
Extension of pipe line from swapan debnath house to bankumari kali mandir |
13909 |
Extension of pipe line from swapan debnath house to bankumari kali mandir1 |
Completion of work |
-

latitude : 23.386588333333332,23.386591666666664
Longitude : 91.30588166666666,91.30578333333332
file name : Image_22062022131521931.png
|
2022-06-22 13:15:22.069193 |
36 |
47012011 |
Extension of pipe line from swapan debnath house to bankumari kali mandir |
13909 |
Extension of pipe line from swapan debnath house to bankumari kali mandir1 |
Completion of work |
-

latitude : 23.38748267,23.38748232
Longitude : 91.29098882,91.29098934
file name : Image_14092023135334172.png
|
2023-09-14 13:53:34.235137 |
37 |
47012011 |
Extension of pipe line from swapan debnath house to bankumari kali mandir |
13909 |
Extension of pipe line from swapan debnath house to bankumari kali mandir1 |
Completion of work |
-

latitude : 23.38748267,23.38748232
Longitude : 91.29098882,91.29098934
file name : Image_14092023135354332.png
|
2023-09-14 13:53:54.399807 |
38 |
47012011 |
Extension of pipe line from swapan debnath house to bankumari kali mandir |
13909 |
Extension of pipe line from swapan debnath house to bankumari kali mandir1 |
Plinth level |
-

latitude : 23.38713971,23.38713971
Longitude : 91.29189213,91.29189213
file name : Image_14092023145513406.png
|
2023-09-14 14:55:13.577381 |
39 |
47012011 |
Extension of pipe line from swapan debnath house to bankumari kali mandir |
13909 |
Extension of pipe line from swapan debnath house to bankumari kali mandir1 |
Roof laid |
-

latitude : 23.387086987495422,23.387086987495422
Longitude : 91.29151582717896,91.29151582717896
file name : Image_14092023145656256.png
|
2023-09-14 14:56:56.348563 |
40 |
46842148 |
Construction of kitchen shed at bshpukur madhya para awc |
171173 |
Construction of kitchen shed at bshpukur madhya para awc1 |
Completion of work |
-

latitude : 23.389313333333334
Longitude : 91.29766666666667
file name : Image_06042022134954930.png
|
2022-04-06 13:49:55.038198 |
41 |
46842148 |
Construction of kitchen shed at bshpukur madhya para awc |
171173 |
Construction of kitchen shed at bshpukur madhya para awc1 |
Plinth level |
-

latitude : 23.38718891143799
Longitude : 91.29207909107208
file name : Image_14092023143412354.png
|
2023-09-14 14:34:12.429553 |
42 |
46842148 |
Construction of kitchen shed at bshpukur madhya para awc |
171173 |
Construction of kitchen shed at bshpukur madhya para awc1 |
Roof laid |
-

latitude : 23.38743031024933
Longitude : 91.29191279411316
file name : Image_14092023144322908.png
|
2023-09-14 14:43:22.968582 |
43 |
56676432 |
extension of water pipeline from alek hossen house to jahanara bibi house |
14683 |
extension of water pipeline from alek hossen house to jahanara bibi house1 |
Completion of work |
-

latitude : 23.391350000000003,23.391353333333335,23.391320000000004,23.391308333333335
Longitude : 91.29361833333333,91.29361666666667,91.29357999999999,91.29357999999999
file name : Image_10112022135603410.png
|
2022-11-10 13:56:03.54522 |
44 |
56676432 |
extension of water pipeline from alek hossen house to jahanara bibi house |
14683 |
extension of water pipeline from alek hossen house to jahanara bibi house1 |
Plinth level |
-

latitude : 23.38713688,23.38713828
Longitude : 91.29195541,91.29195625
file name : Image_14092023150839572.png
|
2023-09-14 15:08:39.628696 |
45 |
56676432 |
extension of water pipeline from alek hossen house to jahanara bibi house |
14683 |
extension of water pipeline from alek hossen house to jahanara bibi house1 |
Plinth level |
-

latitude : 23.38713688,23.38713828
Longitude : 91.29195541,91.29195625
file name : Image_14092023150847302.png
|
2023-09-14 15:08:47.358525 |
46 |
56676432 |
extension of water pipeline from alek hossen house to jahanara bibi house |
14683 |
extension of water pipeline from alek hossen house to jahanara bibi house1 |
Roof laid |
-

latitude : 23.3871316,23.3871316
Longitude : 91.29185073,91.2918507
file name : Image_14092023151432451.png
|
2023-09-14 15:14:32.544978 |
47 |
56676432 |
extension of water pipeline from alek hossen house to jahanara bibi house |
14683 |
extension of water pipeline from alek hossen house to jahanara bibi house1 |
Roof laid |
-

latitude : 23.3871316,23.3871316
Longitude : 91.29185073,91.2918507
file name : Image_14092023151440575.png
|
2023-09-14 15:14:40.733733 |
48 |
56675617 |
extension of water pipeline from snm belonia road to jamal hossen house |
14683 |
extension of water pipeline from snm belonia road to jamal hossen house1 |
Completion of work |
-

latitude : 23.382423333333335,23.382369999999998
Longitude : 91.283045,91.28325666666666
file name : Image_28112022111639471.png
|
2022-11-28 11:16:39.599872 |
49 |
56675617 |
extension of water pipeline from snm belonia road to jamal hossen house |
14683 |
extension of water pipeline from snm belonia road to jamal hossen house1 |
Plinth level |
-

latitude : 23.38715672492981,23.38715672492981
Longitude : 91.29222393035889,91.29222393035889
file name : Image_14092023150831664.png
|
2023-09-14 15:08:31.728466 |
50 |
56675617 |
extension of water pipeline from snm belonia road to jamal hossen house |
14683 |
extension of water pipeline from snm belonia road to jamal hossen house1 |
Roof laid |
-

latitude : 23.38713065,23.38713035
Longitude : 91.29184709,91.29184846
file name : Image_14092023151425448.png
|
2023-09-14 15:14:25.514261 |
51 |
57090647 |
purchase segregation bin |
3000 |
purchase segregation bin1 |
Completion of work |
-

latitude : 23.370305
Longitude : 91.31985000000002
file name : Image_07112023170923139.png
|
2023-11-07 17:09:23.232403 |
52 |
57090647 |
purchase segregation bin |
3000 |
purchase segregation bin2 |
Completion of work |
-

latitude : 23.370314999999998
Longitude : 91.319805
file name : Image_07112023170944929.png
|
2023-11-07 17:09:45.037329 |
53 |
57090647 |
purchase segregation bin |
3000 |
purchase segregation bin2 |
Completion of work |
-

latitude : 23.370314999999998
Longitude : 91.319805
file name : Image_07112023170932604.png
|
2023-11-07 17:09:32.687724 |
54 |
57090647 |
purchase segregation bin |
3000 |
purchase segregation bin3 |
Completion of work |
-

latitude : 23.37025833333333
Longitude : 91.31962
file name : Image_07112023171014049.png
|
2023-11-07 17:10:14.132256 |
55 |
57090647 |
purchase segregation bin |
3000 |
purchase segregation bin4 |
Completion of work |
-

latitude : 23.370208333333334
Longitude : 91.31970166666666
file name : Image_11012024164114311.png
|
2024-01-11 16:41:14.38735 |
56 |
57090647 |
purchase segregation bin |
3000 |
purchase segregation bin5 |
Completion of work |
-

latitude : 23.370208333333334
Longitude : 91.31970166666666
file name : Image_11012024164119306.png
|
2024-01-11 16:41:19.378958 |
57 |
57090647 |
purchase segregation bin |
3000 |
purchase segregation bin6 |
Completion of work |
-

latitude : 23.3699284
Longitude : 91.3198067
file name : Image_11012024164122590.png
|
2024-01-11 16:41:22.907162 |
58 |
89290554 |
Construction of IHHL for eligible HHs |
148500 |
Construction of IHHL for eligible HHs1 |
Completion of work |
-

latitude : 23.363881666666664
Longitude : 91.32504333333333
file name : Image_11012024164244470.png
|
2024-01-11 16:42:44.586185 |
59 |
89289811 |
Water Supply to villages |
293941 |
Water Supply to villages1 |
Completion of work |
-

latitude : 23.38714
Longitude : 91.29173333333334
file name : Image_19012024161012017.png
|
2024-01-19 16:10:12.110805 |
60 |
89289678 |
const of kitchen shed at awc under jatrapur gp |
193882 |
const of kitchen shed at awc under jatrapur gp1 |
Completion of work |
-

latitude : 23.38712666666667
Longitude : 91.291805
file name : Image_19012024161102609.png
|
2024-01-19 16:11:02.705695 |
61 |
89290375 |
mtc of awc under jatrapur gp |
135969 |
mtc of awc under jatrapur gp1 |
Completion of work |
-

latitude : 23.384068333333335
Longitude : 91.28544166666667
file name : Image_02022024143543370.png
|
2024-02-02 14:35:43.467117 |
62 |
94983437 |
Water Supply to villages |
243171 |
Water Supply to villages1 |
Completion of work |
-

latitude : 23.370494
Longitude : 91.3198872
file name : Image_14022025120651491.png
|
2025-02-14 12:06:51.605391 |
63 |
94991420 |
Construction of toilets in public institutions |
129781 |
Construction of toilets in public institutions1 |
Completion of work |
-

latitude : 23.370496
Longitude : 91.3198858
file name : Image_14022025120737073.png
|
2025-02-14 12:07:37.204161 |
64 |
75359433 |
Drinking water facilities |
267088 |
Drinking water facilities1 |
Completion of work |
-

latitude : 23.3704972
Longitude : 91.3198915
file name : Image_14022025140140254.png
|
2025-02-14 14:01:40.443855 |
65 |
74812200 |
Construction of Boundary Wall |
267797 |
Construction of Boundary Wall1 |
Completion of work |
-

latitude : 23.370447
Longitude : 91.3198936
file name : Image_12032025153915842.png
|
2025-03-12 15:39:15.939161 |