1 |
48044169 |
WATER SUPPLY ON U.P SCHOOL AT LASTALA - CFC |
80000 |
WATER SUPPLY ON U.P SCHOOL AT LASTALA - CFC1 |
Completion of work |
-
latitude : 20.9664221,20.96642317,20.96642319,20.96642322
Longitude : 83.90528623,83.90528726,83.90528726,83.90528727
file name : Image_23022021150531593.png
|
2021-02-23 15:05:31.68086 |
2 |
48044260 |
WATER SUPPLY ON U.P SCHOOL AT ANTAPALI -CFC |
80000 |
WATER SUPPLY ON U.P SCHOOL AT ANTAPALI -CFC1 |
Completion of work |
-
latitude : 20.96224309,20.96224312
Longitude : 83.91140396,83.911404
file name : Image_23022021150536910.png
|
2021-02-23 15:05:37.013008 |
3 |
48044329 |
WATER SUPPLY ON AWC BUILDING AT LASTALA -CFC |
40000 |
WATER SUPPLY ON AWC BUILDING AT LASTALA -CFC1 |
Completion of work |
-
latitude : 20.96665941,20.96665938
Longitude : 83.90475937,83.90475934
file name : Image_23022021150526318.png
|
2021-02-23 15:05:26.42684 |
4 |
48044840 |
CONSTN., OF BATHING STEP WITH DRESS CHANGING ROOM AT LASTALA KHALIAGHAT -SFC |
150000 |
CONSTN., OF BATHING STEP WITH DRESS CHANGING ROOM AT LASTALA KHALIAGHAT -SFC1 |
Completion of work |
-
latitude : 20.9646235
Longitude : 83.89180364
file name : Image_12042021104821990.png
|
2021-04-12 10:48:22.101108 |
5 |
48044569 |
CONSTN. OF DRAIN WITH CULVERT AT KALLAMAL ON LASTALA TO ULLUNDA ROAD -CFC |
100000 |
CONSTN. OF DRAIN WITH CULVERT AT KALLAMAL ON LASTALA TO ULLUNDA ROAD -CFC1 |
Completion of work |
-
latitude : 20.96286879,20.96286887
Longitude : 83.89263748,83.89263744
file name : Image_12042021104347640.png
|
2021-04-12 10:43:47.780901 |
6 |
44115678 |
IMPRV. OF RURAL PARK AT PODHATIKIRA - CFC |
200000 |
IMPRV. OF RURAL PARK AT PODHATIKIRA - CFC1 |
Completion of work |
-
latitude : 20.94691124,20.94691127
Longitude : 83.90372059,83.90372042
file name : Image_12042021091454112.png
|
2021-04-12 09:14:54.219116 |
7 |
44115678 |
IMPRV. OF RURAL PARK AT PODHATIKIRA - CFC |
200000 |
IMPRV. OF RURAL PARK AT PODHATIKIRA - CFC1 |
Completion of work |
-
latitude : 20.9469211,20.94691811
Longitude : 83.90372627,83.90372195
file name : Image_12042021091459031.png
|
2021-04-12 09:14:59.130539 |
8 |
44115659 |
CONSTN. OF COMMUNITY CENTRE FOR COMPLETION AT ANTAPALI - CFC |
200000 |
CONSTN. OF COMMUNITY CENTRE FOR COMPLETION AT ANTAPALI - CFC1 |
Completion of work |
-
latitude : 20.96350989
Longitude : 83.91290934
file name : Image_12042021093539859.png
|
2021-04-12 09:35:39.988899 |
9 |
44116611 |
IMPR. OF NUABANDHA AT PODHATIKIRA - CFC |
150000 |
IMPR. OF NUABANDHA AT PODHATIKIRA - CFC1 |
Completion of work |
-
latitude : 20.94743908
Longitude : 83.90262705
file name : Image_12042021091950205.png
|
2021-04-12 09:19:50.326954 |
10 |
48044379 |
RENOV. OF NUABANDHA OF PODHATIKIRA, UDEPADAR -CFC |
165772 |
RENOV. OF NUABANDHA OF PODHATIKIRA, UDEPADAR -CFC1 |
Completion of work |
-
latitude : 20.94750189
Longitude : 83.90269731
file name : Image_14042021094332425.png
|
2021-04-14 09:43:32.569897 |
11 |
48044379 |
RENOV. OF NUABANDHA OF PODHATIKIRA, UDEPADAR -CFC |
165772 |
RENOV. OF NUABANDHA OF PODHATIKIRA, UDEPADAR -CFC1 |
Completion of work |
-
latitude : 20.94746114
Longitude : 83.90264141
file name : Image_04032021120030456.png
|
2021-03-04 12:00:30.57759 |
12 |
48044455 |
CONSTN. OF DRAIN WITH CC ROAD AT LASTALA JAGADALAKATA TO SMASAN GHAT -CFC |
200000 |
CONSTN. OF DRAIN WITH CC ROAD AT LASTALA JAGADALAKATA TO SMASAN GHAT -CFC1 |
Completion of work |
-
latitude : 20.96798235,20.96798147
Longitude : 83.90778493,83.90778639
file name : Image_14042021092843605.png
|
2021-04-14 09:28:43.696965 |
13 |
44116524 |
CONTN. OF TUBE WELL PLATFORM AT LASTALA UP SCHOOL FRONT - CFC |
15000 |
CONTN. OF TUBE WELL PLATFORM AT LASTALA UP SCHOOL FRONT - CFC1 |
Completion of work |
-
latitude : 20.967506049200892
Longitude : 83.90731327235699
file name : Image_25052021115016953.png
|
2021-05-25 11:50:17.029576 |
14 |
44116590 |
CONSTN. OF TUBE WELL PLATFORM AT LASTLA GOUNTIAPADA - CFC |
15000 |
CONSTN. OF TUBE WELL PLATFORM AT LASTLA GOUNTIAPADA - CFC1 |
Completion of work |
-
latitude : 20.967049151659012
Longitude : 83.90354351140559
file name : Image_25052021115900195.png
|
2021-05-25 11:59:00.278713 |
15 |
44116852 |
CONSTN. OF TUBE WELL PLATFORM AT PODHATIKRA MEHER PADA - CFC |
15000 |
CONSTN. OF TUBE WELL PLATFORM AT PODHATIKRA MEHER PADA - CFC1 |
Completion of work |
-
latitude : 20.944435028359294
Longitude : 83.8968492206186
file name : Image_26052021130248196.png
|
2021-05-26 13:02:48.257734 |
16 |
44116543 |
CONSTN. OF TUBEWELL PLATFORM AT LASTALA BARIKPADA - CFC |
15000 |
CONSTN. OF TUBEWELL PLATFORM AT LASTALA BARIKPADA - CFC1 |
Completion of work |
-
latitude : 20.966476751491427
Longitude : 83.90187048353255
file name : Image_25052021115414206.png
|
2021-05-25 11:54:14.2999 |
17 |
44116366 |
CONSTN. OF TUBE WELL PLATFORM AT JHARI LASTALA - CFC |
15000 |
CONSTN. OF TUBE WELL PLATFORM AT JHARI LASTALA - CFC1 |
Completion of work |
-
latitude : 20.97289909143001
Longitude : 83.90537168830633
file name : Image_26052021132857305.png
|
2021-05-26 13:28:57.386592 |
18 |
44116490 |
CONSTN. OF TUBE WELL PLATFORM AT BHAJANPADA LASTALA GOANMUNDA - CFC |
15000 |
CONSTN. OF TUBE WELL PLATFORM AT BHAJANPADA LASTALA GOANMUNDA - CFC1 |
Completion of work |
-
latitude : 20.957667790353298
Longitude : 83.9075974188745
file name : Image_26052021131057987.png
|
2021-05-26 13:10:58.062646 |
19 |
44116461 |
CONSTN. OF TUBE WELL PLATFORM AT BHAJANPADA LASTALA GOAN MAJHI- CFC |
15000 |
CONSTN. OF TUBE WELL PLATFORM AT BHAJANPADA LASTALA GOAN MAJHI- CFC1 |
Completion of work |
-
latitude : 20.957678058184683
Longitude : 83.9062485191971
file name : Image_26052021131554244.png
|
2021-05-26 13:15:54.31978 |
20 |
44116394 |
CONSTN. OF PLATFORM AT LASTALA JAGADALAKATA NEAR - CFC |
15000 |
CONSTN. OF PLATFORM AT LASTALA JAGADALAKATA NEAR - CFC1 |
Completion of work |
-
latitude : 20.967663754709065
Longitude : 83.9076616242528
file name : Image_25052021114157727.png
|
2021-05-25 11:41:57.802646 |
21 |
48044694 |
RURAL LIBRARY AT TURIPADA LASTALA -CFC |
165772 |
RURAL LIBRARY AT TURIPADA LASTALA -CFC1 |
Completion of work |
-
latitude : 20.962946210056543
Longitude : 83.9091225899756
file name : Image_25052021114022286.png
|
2021-05-25 11:40:22.379143 |
22 |
44115589 |
CONSTN. OF G.P BUILDING BOUNDARY WALL AT LASTALA - CFC |
300000 |
CONSTN. OF G.P BUILDING BOUNDARY WALL AT LASTALA - CFC1 |
Completion of work |
-
latitude : 20.963255000000004
Longitude : 83.90961333333334
file name : Image_24082021115609402.png
|
2021-08-24 11:56:09.5551 |
23 |
44117211 |
RURAL ELECTRIFICATION AT LASTALA TURIPADA -SFC |
10000 |
RURAL ELECTRIFICATION AT LASTALA TURIPADA -SFC1 |
Completion of work |
-
latitude : 20.957648333333335
Longitude : 83.90670333333334
file name : Image_08092021140925965.png
|
2021-09-08 14:09:26.108651 |
24 |
44117161 |
RURAL ELECTRIFICATION AT LIMBAPALI -SFC |
10000 |
RURAL ELECTRIFICATION AT LIMBAPALI -SFC1 |
Completion of work |
-
latitude : 20.956015
Longitude : 83.89861666666665
file name : Image_08092021143745684.png
|
2021-09-08 14:37:45.804378 |
25 |
44117174 |
RURAL ELECTRIFICATION AT ANTAPALI-SFC |
10000 |
RURAL ELECTRIFICATION AT ANTAPALI-SFC1 |
Completion of work |
-
latitude : 20.963113333333332
Longitude : 83.91253166666665
file name : Image_08092021143721237.png
|
2021-09-08 14:37:21.356727 |
26 |
44117198 |
RURAL ELECTRIFICATION AT LASTALA HARIJANPADA -SFC |
10000 |
RURAL ELECTRIFICATION AT LASTALA HARIJANPADA -SFC1 |
Completion of work |
-
latitude : 20.954386666666664
Longitude : 83.89443833333334
file name : Image_08092021144724505.png
|
2021-09-08 14:47:24.615359 |
27 |
44117230 |
RURAL ELECTRIFICATION AT UDEPADAR -SFC |
20000 |
RURAL ELECTRIFICATION AT UDEPADAR -SFC1 |
Completion of work |
-
latitude : 20.95451333333333
Longitude : 83.89513833333334
file name : Image_08092021143800615.png
|
2021-09-08 14:38:00.749733 |
28 |
44116337 |
CONSTN. OF TUBE WELL PLATFROM AT LIMBAPALI KULTAPADA - CFC |
15000 |
CONSTN. OF TUBE WELL PLATFROM AT LIMBAPALI KULTAPADA - CFC1 |
Completion of work |
-
latitude : 20.956573333333335
Longitude : 83.89766
file name : Image_22092021170753770.png
|
2021-09-22 17:07:53.847139 |
29 |
44117086 |
RENOV. OF NUABANDHA AT LASTALA HARIJANPADA - SFC |
200000 |
RENOV. OF NUABANDHA AT LASTALA HARIJANPADA - SFC1 |
Completion of work |
-
latitude : 20.971943333333336
Longitude : 83.90558833333334
file name : Image_10022022154152836.png
|
2022-02-10 15:41:52.901807 |
30 |
44117086 |
RENOV. OF NUABANDHA AT LASTALA HARIJANPADA - SFC |
200000 |
RENOV. OF NUABANDHA AT LASTALA HARIJANPADA - SFC1 |
Completion of work |
-
latitude : 20.9719874
Longitude : 83.90573893
file name : Image_12042021101009050.png
|
2021-04-12 10:10:09.164298 |
31 |
47531207 |
CONSTN. OF KHOLA MANDAP AT HANUMAN CHHAK LASTALA- CFC |
100000 |
CONSTN. OF KHOLA MANDAP AT HANUMAN CHHAK LASTALA- CFC1 |
Completion of work |
-
latitude : 20.966891666666665
Longitude : 83.90726500000001
file name : Image_28092021154750519.png
|
2021-09-28 15:47:50.630844 |
32 |
47531499 |
CONSTN. OF KHOLA MANDAP AT LASTALA KANDEN BUDHI, LASTLA- CFC |
65772 |
CONSTN. OF KHOLA MANDAP AT LASTALA KANDEN BUDHI, LASTLA- CFC1 |
Completion of work |
-
latitude : 20.967701666666667
Longitude : 83.91168
file name : Image_28092021154950625.png
|
2021-09-28 15:49:50.731518 |
33 |
44117253 |
RURAL ELECTRIFICATION AT LASTALA BARPADAR -SFC |
7074 |
RURAL ELECTRIFICATION AT LASTALA BARPADAR -SFC1 |
Completion of work |
-
latitude : 20.974031666666665
Longitude : 83.91165833333335
file name : Image_07102021164134748.png
|
2021-10-07 16:41:34.842367 |
34 |
47531335 |
IMPRV. & MAINTENANCE OF ROAD FROM PWD ROAD TO PODHATIKIRA - CFC |
100000 |
IMPRV. & MAINTENANCE OF ROAD FROM PWD ROAD TO PODHATIKIRA - CFC1 |
Completion of work |
-
latitude : 20.946104999999996,20.946143333333332
Longitude : 83.89497833333334,83.89503
file name : Image_30092021113542614.png
|
2021-09-30 11:35:42.723233 |
35 |
55492240 |
Constn. Of Drain with CC Road from Podhatikira to Podhatikira RD Road - CFC |
50000 |
Constn. Of Drain with CC Road from Podhatikira to Podhatikira RD Road - CFC1 |
Completion of work |
-
latitude : 20.944838333333337,20.944838333333337
Longitude : 83.89936166666666,83.89936166666666
file name : Image_03032022163102638.png
|
2022-03-03 16:31:02.733644 |
36 |
55492290 |
Constn. Of Drain at Turipada Lastala - CFC |
50000 |
Constn. Of Drain at Turipada Lastala - CFC1 |
Completion of work |
-
latitude : 20.963180000000005,20.963180000000005
Longitude : 83.90951666666666,83.90951666666666
file name : Image_03032022165138923.png
|
2022-03-03 16:51:39.094494 |
37 |
55492191 |
Constn. Of Drain with CC Road at Muhurigali at Lastala CFC |
100000 |
Constn. Of Drain with CC Road at Muhurigali at Lastala CFC1 |
Completion of work |
-
latitude : 20.972095,20.97209833333333
Longitude : 83.90745333333334,83.90745833333334
file name : Image_03032022170432632.png
|
2022-03-03 17:04:32.729554 |
38 |
55497986 |
Constn. Of Khola Mandap at Hanuman Chhowk Lastala - SFC |
50000 |
Constn. Of Khola Mandap at Hanuman Chhowk Lastala - SFC1 |
Completion of work |
-
latitude : 20.966900000000003
Longitude : 83.90742999999999
file name : Image_28012022160927163.png
|
2022-01-28 16:09:27.399162 |
39 |
55492445 |
Renov. Of Banhuru Munda at Udepadar - CFC |
200000 |
Renov. Of Banhuru Munda at Udepadar - CFC1 |
Completion of work |
-
latitude : 20.948775
Longitude : 83.89530500000001
file name : Image_13052022103557511.png
|
2022-05-13 10:35:57.650848 |
40 |
47532328 |
RENOV. OF TELENMUNDA AT LASTALA - CFC |
282886 |
RENOV. OF TELENMUNDA AT LASTALA - CFC1 |
Completion of work |
-
latitude : 20.966320000000003
Longitude : 83.89600999999999
file name : Image_13052022101638019.png
|
2022-05-13 10:16:38.143771 |
41 |
55497766 |
Cleaning of all village of Lastala - SFC |
56000 |
Cleaning of all village of Lastala - SFC1 |
Completion of work |
-
latitude : 20.963634
Longitude : 83.8828539
file name : Image_06052022121802698.png
|
2022-05-06 12:18:02.866183 |
42 |
55497711 |
27nos. Of leach pit at all village of Lastala G.P @3000 - SFC |
81000 |
27nos. Of leach pit at all village of Lastala G.P @3000 - SFC1 |
Completion of work |
-
latitude : 20.966383083723485
Longitude : 83.90352549031377
file name : Image_08052023134243323.png
|
2023-05-08 13:42:43.404019 |
43 |
55497711 |
27nos. Of leach pit at all village of Lastala G.P @3000 - SFC |
81000 |
27nos. Of leach pit at all village of Lastala G.P @3000 - SFC1 |
Completion of work |
-
latitude : 20.96717433538288
Longitude : 83.90354921109974
file name : Image_08052023133821799.png
|
2023-05-08 13:38:21.87682 |
44 |
60577198 |
Constn. of drain with CC road at Gauntiakhuli, Lastala = CFC |
100000 |
Constn. of drain with CC road at Gauntiakhuli, Lastala = CFC1 |
Completion of work |
-
latitude : 20.966471596620977,20.96695921383798
Longitude : 83.90371508896351,83.90330228023231
file name : Image_08052023133046478.png
|
2023-05-08 13:30:46.567925 |
45 |
60576448 |
Jalachhatra at Lastala GP |
56744 |
Jalachhatra at Lastala GP1 |
Completion of work |
-
latitude : 20.9636
Longitude : 83.8829769
file name : Image_20082022153511383.png
|
2022-08-20 15:35:11.447674 |
46 |
60578065 |
Maintenance of Road from Lastala Tikirapada to Barpadar - CFC |
78992 |
Maintenance of Road from Lastala Tikirapada to Barpadar - CFC1 |
Completion of work |
-
latitude : 20.974062331952155,20.97402444574982
Longitude : 83.90876191668212,83.90866518951952
file name : Image_23082022172036584.png
|
2022-08-23 17:20:36.652603 |
47 |
60576867 |
Constn. of drain with CC road at Natugali, Lastala = CFC |
50000 |
Constn. of drain with CC road at Natugali, Lastala = CFC1 |
Completion of work |
-
latitude : 20.972167728468776,20.972245219163597
Longitude : 83.9075662381947,83.90751963481307
file name : Image_30092022091746014.png
|
2022-09-30 09:17:46.097663 |
48 |
60576605 |
Constn. of drain with CC road Daspada to Panthei, Udepadar - CFC |
100000 |
Constn. of drain with CC road Daspada to Panthei, Udepadar - CFC1 |
Completion of work |
-
latitude : 20.9551118966192,20.955099784769118
Longitude : 83.89632568694651,83.89636466279626
file name : Image_30092022095356020.png
|
2022-09-30 09:53:56.128555 |
49 |
60576959 |
Constn. of drain with CC road at Beheragali, Lastala = CFC |
50000 |
Constn. of drain with CC road at Beheragali, Lastala = CFC1 |
Completion of work |
-
latitude : 20.97252764739096,20.97245736513287
Longitude : 83.90802104026079,83.90802942216396
file name : Image_30092022092213279.png
|
2022-09-30 09:22:13.368508 |
50 |
60577073 |
Constn. of drain with CC road at Bhajanpada, Lastala = CFC |
56744 |
Constn. of drain with CC road at Bhajanpada, Lastala = CFC1 |
Completion of work |
-
latitude : 20.957566620782018,20.957637070678174
Longitude : 83.90683935955167,83.90688654966652
file name : Image_30092022090123426.png
|
2022-09-30 09:01:23.517665 |
51 |
60582465 |
Constn. of CC Road with drain at Turipada Lastala - SFC |
100000 |
Constn. of CC Road with drain at Turipada Lastala - SFC1 |
Completion of work |
-
latitude : 20.963042015209794,20.963104334659874
Longitude : 83.90745299868286,83.90744210220873
file name : Image_30092022090852617.png
|
2022-09-30 09:08:52.690745 |
52 |
47504139 |
CONSTN. OF G.P BUILDING BOUNDARY WALL AT LASTALA - CFC |
500000 |
CONSTN. OF G.P BUILDING BOUNDARY WALL AT LASTALA - CFC1 |
Completion of work |
-
latitude : 20.96338504459709
Longitude : 83.90936298295856
file name : Image_30092022094105847.png
|
2022-09-30 09:41:05.942943 |
53 |
60577568 |
Constn. and maintenance of Rural Park at Udepadar podhatikira - CFC |
200000 |
Constn. and maintenance of Rural Park at Udepadar podhatikira - CFC1 |
Completion of work |
-
latitude : 20.947281983681023,20.94728009775281
Longitude : 83.90383939258754,83.90380955301225
file name : Image_30112022134628921.png
|
2022-11-30 13:46:28.991576 |
54 |
65877197 |
Providing piped water supply to public institutions |
200000 |
Providing piped water supply to public institutions1 |
Completion of work |
-
latitude : 20.946947881020606,20.94695714302361
Longitude : 83.90368927270174,83.90364141203463
file name : Image_22012023132020121.png
|
2023-01-22 13:20:20.176306 |
55 |
65877197 |
Providing piped water supply to public institutions |
200000 |
Providing piped water supply to public institutions1 |
Completion of work |
-
latitude : 20.94656541477889,20.946557074785233
Longitude : 83.90134619548917,83.90133446082473
file name : Image_22012023131152302.png
|
2023-01-22 13:11:52.350834 |
56 |
65877094 |
Installation of Solar Light at New GP Office Lastala -CFC |
100000 |
Installation of Solar Light at New GP Office Lastala -CFC1 |
Completion of work |
-
latitude : 20.96332381479442
Longitude : 83.90929827466607
file name : Image_22012023124736295.png
|
2023-01-22 12:47:36.35602 |
57 |
65877094 |
Installation of Solar Light at New GP Office Lastala -CFC |
100000 |
Installation of Solar Light at New GP Office Lastala -CFC1 |
Completion of work |
-
latitude : 20.9633308975026
Longitude : 83.90934152528644
file name : Image_22012023124621753.png
|
2023-01-22 12:46:21.81103 |
58 |
65877094 |
Installation of Solar Light at New GP Office Lastala -CFC |
100000 |
Installation of Solar Light at New GP Office Lastala -CFC1 |
Completion of work |
-
latitude : 20.963356168940663
Longitude : 83.90943716280162
file name : Image_22012023124509681.png
|
2023-01-22 12:45:09.739502 |
59 |
65877070 |
Installation of Solar Light at Rural Park Udepadar - CFC |
100000 |
Installation of Solar Light at Rural Park Udepadar - CFC1 |
Completion of work |
-
latitude : 20.947250006720424
Longitude : 83.9038001652807
file name : Image_22012023130408259.png
|
2023-01-22 13:04:08.310209 |
60 |
65877070 |
Installation of Solar Light at Rural Park Udepadar - CFC |
100000 |
Installation of Solar Light at Rural Park Udepadar - CFC1 |
Completion of work |
-
latitude : 20.946868755854666
Longitude : 83.90370167791843
file name : Image_22012023130221369.png
|
2023-01-22 13:02:21.419886 |
61 |
65877070 |
Installation of Solar Light at Rural Park Udepadar - CFC |
100000 |
Installation of Solar Light at Rural Park Udepadar - CFC1 |
Completion of work |
-
latitude : 20.947125158272684
Longitude : 83.9036381430924
file name : Image_22012023125745626.png
|
2023-01-22 12:57:45.693628 |
62 |
65877070 |
Installation of Solar Light at Rural Park Udepadar - CFC |
100000 |
Installation of Solar Light at Rural Park Udepadar - CFC1 |
Completion of work |
-
latitude : 20.94716698396951
Longitude : 83.90371601097286
file name : Image_22012023125930863.png
|
2023-01-22 12:59:30.938925 |
63 |
60576740 |
Constn. of drain with culvert near Maheswari Mandir, Lastala - CFC |
100000 |
Constn. of drain with culvert near Maheswari Mandir, Lastala - CFC1 |
Completion of work |
-
latitude : 20.966373779810965,20.96650051418692
Longitude : 83.9036085549742,83.90359589830041
file name : Image_22012023122439562.png
|
2023-01-22 12:24:39.653897 |
64 |
65877330 |
Creation of community compost pits for a group of Households |
57600 |
Creation of community compost pits for a group of Households1 |
Completion of work |
-
latitude : 20.97237652167678
Longitude : 83.90797527506948
file name : Image_06022023153414347.png
|
2023-02-06 15:34:14.418182 |
65 |
65877330 |
Creation of community compost pits for a group of Households |
57600 |
Creation of community compost pits for a group of Households1 |
Completion of work |
-
latitude : 20.962956184521317
Longitude : 83.90783932060003
file name : Image_06022023152416461.png
|
2023-02-06 15:24:16.532249 |
66 |
65877330 |
Creation of community compost pits for a group of Households |
57600 |
Creation of community compost pits for a group of Households1 |
Completion of work |
-
latitude : 20.962123526260257
Longitude : 83.91133138909936
file name : Image_06022023151940885.png
|
2023-02-06 15:19:40.93984 |
67 |
65877330 |
Creation of community compost pits for a group of Households |
57600 |
Creation of community compost pits for a group of Households1 |
Completion of work |
-
latitude : 20.96344158053398
Longitude : 83.91227812506258
file name : Image_06022023151647946.png
|
2023-02-06 15:16:48.016269 |
68 |
65877330 |
Creation of community compost pits for a group of Households |
57600 |
Creation of community compost pits for a group of Households1 |
Completion of work |
-
latitude : 20.957534057088196
Longitude : 83.90768098644912
file name : Image_06022023150850912.png
|
2023-02-06 15:08:50.966277 |
69 |
65877330 |
Creation of community compost pits for a group of Households |
57600 |
Creation of community compost pits for a group of Households1 |
Completion of work |
-
latitude : 20.970865599811077
Longitude : 83.9056290127337
file name : Image_06022023153037180.png
|
2023-02-06 15:30:37.248438 |
70 |
65877305 |
Creation of Shed for segregation and processing of wet and dry waste |
21000 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 20.966916382312775
Longitude : 83.90745744109154
file name : Image_06022023154607937.png
|
2023-02-06 15:46:08.007516 |
71 |
65877620 |
Constn. Of Tubewell Platform at Tikrapada Lastala -SFC |
15000 |
Constn. Of Tubewell Platform at Tikrapada Lastala -SFC1 |
Completion of work |
-
latitude : 20.972769004292786
Longitude : 83.90811072662473
file name : Image_06022023153815750.png
|
2023-02-06 15:38:15.823071 |
72 |
65877178 |
Creation of new Rainwater harvesting (RWH) structure |
194850 |
Creation of new Rainwater harvesting (RWH) structure1 |
Completion of work |
-
latitude : 20.963587635196745
Longitude : 83.90801542438567
file name : Image_22022023174535694.png
|
2023-02-22 17:45:35.755898 |
73 |
65877523 |
Constn. Of Children Playing Yard at Udepadar AWC-II & Podhatikira AWC -CFC |
30000 |
Constn. Of Children Playing Yard at Udepadar AWC-II & Podhatikira AWC -CFC1 |
Completion of work |
-
latitude : 20.954954191111028
Longitude : 83.89634169638157
file name : Image_22022023173213328.png
|
2023-02-22 17:32:13.390414 |
74 |
60581952 |
Mass cleaning of all village of Lastala GP - SFC |
56000 |
Mass cleaning of all village of Lastala GP - SFC1 |
Completion of work |
-
latitude : 20.944920382462442
Longitude : 83.89899850822985
file name : Image_28032023104257313.png
|
2023-03-28 10:42:57.373492 |
75 |
65877263 |
Construction of Community Sanitary Complex |
90000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 20.96326899714768
Longitude : 83.90933490358293
file name : Image_28032023101657560.png
|
2023-03-28 10:16:57.623611 |
76 |
65877113 |
Dev. Of Rural Park at Udepadar -CFC |
80000 |
Dev. Of Rural Park at Udepadar -CFC1 |
Completion of work |
-
latitude : 20.94693669117987,20.9469024091959
Longitude : 83.90364116057754,83.90364862047136
file name : Image_28032023104042051.png
|
2023-03-28 10:40:42.111396 |
77 |
65877113 |
Dev. Of Rural Park at Udepadar -CFC |
80000 |
Dev. Of Rural Park at Udepadar -CFC1 |
Completion of work |
-
latitude : 20.94700844027102,20.94700844027102,20.947006260976195
Longitude : 83.90367678366601,83.90367678366601,83.9037000015378
file name : Image_28032023102653043.png
|
2023-03-28 10:26:53.113624 |
78 |
55497907 |
Constn. Of Boundary wall at Udepadar U.P School - SFC |
100000 |
Constn. Of Boundary wall at Udepadar U.P School - SFC1 |
Completion of work |
-
latitude : 20.955205103382468
Longitude : 83.89544114470482
file name : Image_15052023102948897.png
|
2023-05-15 10:29:48.971982 |
79 |
75640373 |
Installation of Street Lights |
177230 |
Installation of Street Lights1 |
Roof laid |
-
latitude : 20.945091750472784
Longitude : 83.89854320324957
file name : Image_19012024151037954.png
|
2024-01-19 15:10:38.017809 |
80 |
75640373 |
Installation of Street Lights |
177230 |
Installation of Street Lights1 |
Plinth level |
-
latitude : 20.945068197324872
Longitude : 83.89861872419715
file name : Image_19012024145847754.png
|
2024-01-19 14:58:47.819227 |
81 |
75640373 |
Installation of Street Lights |
177230 |
Installation of Street Lights1 |
Completion of work |
-
latitude : 20.945029598660767
Longitude : 83.89846634119749
file name : Image_16012024135922473.png
|
2024-01-16 13:59:22.522813 |
82 |
75639008 |
Installation of Street Lights |
40000 |
Installation of Street Lights1 |
Roof laid |
-
latitude : 20.963291209191084
Longitude : 83.91263988800347
file name : Image_19012024153245345.png
|
2024-01-19 15:32:45.403728 |
83 |
75639008 |
Installation of Street Lights |
40000 |
Installation of Street Lights1 |
Plinth level |
-
latitude : 20.963217616081238
Longitude : 83.91260275617242
file name : Image_19012024152618747.png
|
2024-01-19 15:26:18.81169 |
84 |
75639008 |
Installation of Street Lights |
40000 |
Installation of Street Lights1 |
Plinth level |
-
latitude : 20.963221597485244
Longitude : 83.9126211963594
file name : Image_19012024152548592.png
|
2024-01-19 15:25:48.65631 |
85 |
75639008 |
Installation of Street Lights |
40000 |
Installation of Street Lights1 |
Completion of work |
-
latitude : 20.963136395439506
Longitude : 83.91233277507126
file name : Image_16012024142534945.png
|
2024-01-16 14:25:35.001112 |
86 |
75639688 |
Installation of Street Lights |
20000 |
Installation of Street Lights1 |
Roof laid |
-
latitude : 20.973410177975893
Longitude : 83.91172751784325
file name : Image_19012024160242845.png
|
2024-01-19 16:02:42.922231 |
87 |
75639688 |
Installation of Street Lights |
20000 |
Installation of Street Lights1 |
Plinth level |
-
latitude : 20.973448902368546
Longitude : 83.91163925640285
file name : Image_19012024154749089.png
|
2024-01-19 15:47:49.138592 |
88 |
75639688 |
Installation of Street Lights |
20000 |
Installation of Street Lights1 |
Completion of work |
-
latitude : 20.973462145775557
Longitude : 83.91164629720151
file name : Image_16012024141238408.png
|
2024-01-16 14:12:38.4681 |
89 |
75626026 |
Maintenance of Panchayat Bhawan |
343688 |
Maintenance of Panchayat Bhawan1 |
Roof laid |
-
latitude : 20.963328843936324
Longitude : 83.90959692187607
file name : Image_10022024153742344.png
|
2024-02-10 15:37:42.402693 |
90 |
75626026 |
Maintenance of Panchayat Bhawan |
343688 |
Maintenance of Panchayat Bhawan1 |
Roof laid |
-
latitude : 20.963291125372052
Longitude : 83.90967428684235
file name : Image_10022024153737500.png
|
2024-02-10 15:37:37.556356 |
91 |
75626026 |
Maintenance of Panchayat Bhawan |
343688 |
Maintenance of Panchayat Bhawan1 |
Plinth level |
-
latitude : 20.963323479518294
Longitude : 83.9095314592123
file name : Image_10022024152338424.png
|
2024-02-10 15:23:38.479446 |
92 |
75626026 |
Maintenance of Panchayat Bhawan |
343688 |
Maintenance of Panchayat Bhawan1 |
Completion of work |
-
latitude : 20.96328073181212
Longitude : 83.90958443284035
file name : Image_10022024134148998.png
|
2024-02-10 13:41:49.048732 |
93 |
75641600 |
Construction and Maintenance of Children Park |
150000 |
Construction and Maintenance of Children Park1 |
Roof laid |
-
latitude : 20.946976421400905,20.947106801904738
Longitude : 83.90355608426034,83.90352113172412
file name : Image_12122023133356443.png
|
2023-12-12 13:33:56.503342 |
94 |
75641600 |
Construction and Maintenance of Children Park |
150000 |
Construction and Maintenance of Children Park1 |
Plinth level |
-
latitude : 20.94696674030274,20.947036938741803
Longitude : 83.90362062491477,83.90363068319857
file name : Image_12122023132320914.png
|
2023-12-12 13:23:20.96496 |
95 |
75641600 |
Construction and Maintenance of Children Park |
150000 |
Construction and Maintenance of Children Park1 |
Completion of work |
-
latitude : 20.94700387213379,20.946950102224946
Longitude : 83.90357838012278,83.9035649690777
file name : Image_12122023130209065.png
|
2023-12-12 13:02:09.112275 |
96 |
76483896 |
Construction and Maintenance of Children Park |
158390 |
Construction and Maintenance of Children Park1 |
Roof laid |
-
latitude : 20.947017786093056,20.947053702548146
Longitude : 83.90386881306767,83.90389555133879
file name : Image_12122023132852709.png
|
2023-12-12 13:28:52.759639 |
97 |
76483896 |
Construction and Maintenance of Children Park |
158390 |
Construction and Maintenance of Children Park1 |
Plinth level |
-
latitude : 20.947049846872687,20.947038950398564
Longitude : 83.9039108902216,83.90389362350106
file name : Image_12122023131630531.png
|
2023-12-12 13:16:30.586733 |
98 |
76483896 |
Construction and Maintenance of Children Park |
158390 |
Construction and Maintenance of Children Park1 |
Completion of work |
-
latitude : 20.947016193531454,20.947068077512085
Longitude : 83.90383151359856,83.90392220579088
file name : Image_12122023130859843.png
|
2023-12-12 13:08:59.898588 |
99 |
75644096 |
Purchase of Tricycles/other battery -operated vehicles for door to door collection of waste |
12100 |
Purchase of Tricycles/other battery -operated vehicles for door to door collection of waste1 |
Roof laid |
-
latitude : 20.99455939605832
Longitude : 83.79194685257971
file name : Image_27032024104249754.png
|
2024-03-27 10:42:49.815666 |
100 |
75644096 |
Purchase of Tricycles/other battery -operated vehicles for door to door collection of waste |
12100 |
Purchase of Tricycles/other battery -operated vehicles for door to door collection of waste1 |
Plinth level |
-
latitude : 20.994566353037953
Longitude : 83.79198046401143
file name : Image_27032024103209390.png
|
2024-03-27 10:32:09.453608 |
101 |
75644096 |
Purchase of Tricycles/other battery -operated vehicles for door to door collection of waste |
12100 |
Purchase of Tricycles/other battery -operated vehicles for door to door collection of waste1 |
Completion of work |
-
latitude : 20.963303321041167
Longitude : 83.90934814698994
file name : Image_20032024123316040.png
|
2024-03-20 12:33:16.094243 |
102 |
75632696 |
Internet in GP Bhawan |
12000 |
Internet in GP Bhawan1 |
Completion of work |
-
latitude : 20.963293598033488
Longitude : 83.9093660004437
file name : Image_20032024144432905.png
|
2024-03-20 14:44:32.963155 |
103 |
75632696 |
Internet in GP Bhawan |
12000 |
Internet in GP Bhawan1 |
Completion of work |
-
latitude : 20.96338625997305
Longitude : 83.909195009619
file name : Image_20032024144428702.png
|
2024-03-20 14:44:28.764859 |
104 |
65877244 |
Purchase of Tricycles/other battery-operated vehicles for door to door collection of waste |
62900 |
Purchase of Tricycles/other battery-operated vehicles for door to door collection of waste1 |
|
-
latitude : 20.963446316309273
Longitude : 83.9093068242073
file name : Image_20032024122751920.png
|
2024-03-20 12:27:51.97113 |
105 |
103846752 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets |
200000 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets1 |
Roof laid |
-
latitude : 20.96330129
Longitude : 83.90924043
file name : Image_21092024163835301.png
|
2024-09-21 16:38:35.392145 |
106 |
103846752 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets |
200000 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets1 |
Plinth level |
-
latitude : 20.96328845
Longitude : 83.90926267
file name : Image_21092024163524088.png
|
2024-09-21 16:35:24.178067 |
107 |
103846752 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets |
200000 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets1 |
Completion of work |
-
latitude : 20.96330898
Longitude : 83.909302
file name : Image_21092024162938704.png
|
2024-09-21 16:29:38.796748 |
108 |
75594004 |
Piped drinking water to public institutions |
100000 |
Piped drinking water to public institutions1 |
Roof laid |
-
latitude : 20.954940780065954
Longitude : 83.89628922566772
file name : Image_31072024131802527.png
|
2024-07-31 13:18:02.587094 |
109 |
75594004 |
Piped drinking water to public institutions |
100000 |
Piped drinking water to public institutions1 |
Plinth level |
-
latitude : 20.95493445172906
Longitude : 83.89628578908741
file name : Image_31072024131009483.png
|
2024-07-31 13:10:09.546871 |
110 |
75594004 |
Piped drinking water to public institutions |
100000 |
Piped drinking water to public institutions1 |
Completion of work |
-
latitude : 20.954991951584816
Longitude : 83.89631093479693
file name : Image_31072024130424308.png
|
2024-07-31 13:04:24.364675 |
111 |
65877428 |
Purchase of Furniture for New GP Building Lastala -CFC |
70000 |
Purchase of Furniture for New GP Building Lastala -CFC1 |
Completion of work |
-
latitude : 20.96332552
Longitude : 83.90944219
file name : Image_22102024104652941.png
|
2024-10-22 10:46:52.275295 |
112 |
65877428 |
Purchase of Furniture for New GP Building Lastala -CFC |
70000 |
Purchase of Furniture for New GP Building Lastala -CFC1 |
Completion of work |
-
latitude : 20.96334451
Longitude : 83.90939166
file name : Image_22102024104229734.png
|
2024-10-22 10:42:29.825649 |
113 |
65877428 |
Purchase of Furniture for New GP Building Lastala -CFC |
70000 |
Purchase of Furniture for New GP Building Lastala -CFC1 |
Completion of work |
-
latitude : 20.96332409
Longitude : 83.90942008
file name : Image_22102024104515097.png
|
2024-10-22 10:45:15.179843 |
114 |
65877568 |
Purchase of Furniture of New GP Office Lastala -SFC |
48000 |
Purchase of Furniture of New GP Office Lastala -SFC1 |
Completion of work |
-
latitude : 20.9633254
Longitude : 83.90944222
file name : Image_22102024104709234.png
|
2024-10-22 10:47:09.317173 |
115 |
65877568 |
Purchase of Furniture of New GP Office Lastala -SFC |
48000 |
Purchase of Furniture of New GP Office Lastala -SFC1 |
Completion of work |
-
latitude : 20.9633299
Longitude : 83.90939912
file name : Image_22102024104233493.png
|
2024-10-22 10:42:33.57109 |
116 |
65877568 |
Purchase of Furniture of New GP Office Lastala -SFC |
48000 |
Purchase of Furniture of New GP Office Lastala -SFC1 |
Completion of work |
-
latitude : 20.9633239
Longitude : 83.90942098
file name : Image_22102024104521004.png
|
2024-10-22 10:45:21.084886 |
117 |
103849199 |
Construction of Gram Panchayat Bhawan |
150000 |
Construction of Gram Panchayat Bhawan1 |
Roof laid |
-
latitude : 20.9632981
Longitude : 83.90939275
file name : Image_22102024110920138.png
|
2024-10-22 11:09:20.231211 |
118 |
103849199 |
Construction of Gram Panchayat Bhawan |
150000 |
Construction of Gram Panchayat Bhawan1 |
Plinth level |
-
latitude : 20.96327785
Longitude : 83.90937022
file name : Image_22102024110916482.png
|
2024-10-22 11:09:16.564603 |
119 |
103849199 |
Construction of Gram Panchayat Bhawan |
150000 |
Construction of Gram Panchayat Bhawan1 |
Plinth level |
-
latitude : 20.96329458
Longitude : 83.90936964
file name : Image_22102024110215435.png
|
2024-10-22 11:02:15.529476 |
120 |
103849199 |
Construction of Gram Panchayat Bhawan |
150000 |
Construction of Gram Panchayat Bhawan1 |
Completion of work |
-
latitude : 20.96328418
Longitude : 83.90934912
file name : Image_22102024105242702.png
|
2024-10-22 10:52:42.785132 |
121 |
103849199 |
Construction of Gram Panchayat Bhawan |
150000 |
Construction of Gram Panchayat Bhawan1 |
Completion of work |
-
latitude : 20.96333431
Longitude : 83.909405
file name : Image_22102024104857153.png
|
2024-10-22 10:48:57.230312 |
122 |
103849199 |
Construction of Gram Panchayat Bhawan |
150000 |
Construction of Gram Panchayat Bhawan1 |
Completion of work |
-
latitude : 20.96330647
Longitude : 83.90943755
file name : Image_22102024104752350.png
|
2024-10-22 10:47:52.444032 |
123 |
103849199 |
Construction of Gram Panchayat Bhawan |
150000 |
Construction of Gram Panchayat Bhawan1 |
Completion of work |
-
latitude : 20.96329157
Longitude : 83.90935633
file name : Image_22102024104225506.png
|
2024-10-22 10:42:25.596563 |
124 |
82201557 |
Services of Collection & transportation of waste from household to treatment site |
20860 |
Services of Collection & transportation of waste from household to treatment site1 |
|
-
latitude : 20.95457629300654
Longitude : 83.89539990574121
file name : Image_12082024185151675.png
|
2024-08-12 18:51:51.723845 |
125 |
82197796 |
Services of Collection & transportation of waste from household to treatment site |
4640 |
Services of Collection & transportation of waste from household to treatment site1 |
|
-
latitude : 20.9631599066779
Longitude : 83.9124623592943
file name : Image_12082024174901281.png
|
2024-08-12 17:49:01.3361 |
126 |
82202651 |
Services of Collection & transportation of waste from household to treatment site |
26440 |
Services of Collection & transportation of waste from household to treatment site1 |
|
-
latitude : 20.972124645486474
Longitude : 83.90741460956633
file name : Image_12082024184357860.png
|
2024-08-12 18:43:57.927317 |
127 |
82198373 |
Services of Collection & transportation of waste from household to treatment site |
700 |
Services of Collection & transportation of waste from household to treatment site1 |
|
-
latitude : 20.974270328879356
Longitude : 83.91159751452506
file name : Image_12082024181700706.png
|
2024-08-12 18:17:00.76369 |
128 |
75611404 |
Creation of community compost pits for a group of Households |
9600 |
Creation of community compost pits for a group of Households1 |
Plinth level |
-
latitude : 20.96348843537271
Longitude : 83.91222280450165
file name : Image_13082024101210892.png
|
2024-08-13 10:12:10.951847 |
129 |
75611404 |
Creation of community compost pits for a group of Households |
9600 |
Creation of community compost pits for a group of Households1 |
Completion of work |
-
latitude : 20.963463205844164
Longitude : 83.91217527911067
file name : Image_12082024174309208.png
|
2024-08-12 17:43:09.271849 |
130 |
75621564 |
Creation of community compost pits for a group of Households |
9600 |
Creation of community compost pits for a group of Households1 |
Plinth level |
-
latitude : 20.95257494598627
Longitude : 83.8957077730447
file name : Image_13082024104118688.png
|
2024-08-13 10:41:18.750419 |
131 |
75621564 |
Creation of community compost pits for a group of Households |
9600 |
Creation of community compost pits for a group of Households1 |
Completion of work |
-
latitude : 20.95250990241766
Longitude : 83.89575471170247
file name : Image_12082024184559819.png
|
2024-08-12 18:45:59.876768 |
132 |
75621867 |
Creation of community compost pits for a group of Households |
9600 |
Creation of community compost pits for a group of Households1 |
Plinth level |
-
latitude : 20.974127082154155
Longitude : 83.91162316314876
file name : Image_13082024095726246.png
|
2024-08-13 09:57:26.309454 |
133 |
75621867 |
Creation of community compost pits for a group of Households |
9600 |
Creation of community compost pits for a group of Households1 |
Completion of work |
-
latitude : 20.974157927557826
Longitude : 83.91162366606295
file name : Image_12082024181118647.png
|
2024-08-12 18:11:18.706902 |
134 |
75643206 |
Construction and Maintenance of Classroom Flooring |
60000 |
Construction and Maintenance of Classroom Flooring1 |
Plinth level |
-
latitude : 20.95490704290569
Longitude : 83.89528641477227
file name : Image_13082024103035268.png
|
2024-08-13 10:30:35.353507 |
135 |
75643206 |
Construction and Maintenance of Classroom Flooring |
60000 |
Construction and Maintenance of Classroom Flooring1 |
Plinth level |
-
latitude : 20.95500272233039
Longitude : 83.89643339440227
file name : Image_13082024102454145.png
|
2024-08-13 10:24:54.196971 |
136 |
75643206 |
Construction and Maintenance of Classroom Flooring |
60000 |
Construction and Maintenance of Classroom Flooring1 |
Completion of work |
-
latitude : 20.95499735791236
Longitude : 83.89640422537923
file name : Image_12082024192400008.png
|
2024-08-12 19:24:00.083465 |
137 |
75643206 |
Construction and Maintenance of Classroom Flooring |
60000 |
Construction and Maintenance of Classroom Flooring1 |
Completion of work |
-
latitude : 20.954883615486324
Longitude : 83.89534969814122
file name : Image_12082024191621729.png
|
2024-08-12 19:16:21.811388 |
138 |
75643206 |
Construction and Maintenance of Classroom Flooring |
60000 |
Construction and Maintenance of Classroom Flooring2 |
Roof laid |
-
latitude : 20.95505543
Longitude : 83.89639176
file name : Image_29112024121338456.png
|
2024-11-29 12:13:38.553357 |
139 |
75643206 |
Construction and Maintenance of Classroom Flooring |
60000 |
Construction and Maintenance of Classroom Flooring2 |
Plinth level |
-
latitude : 20.95496065
Longitude : 83.89634262
file name : Image_22102024132224574.png
|
2024-10-22 13:22:24.862499 |
140 |
75643206 |
Construction and Maintenance of Classroom Flooring |
60000 |
Construction and Maintenance of Classroom Flooring2 |
Completion of work |
-
latitude : 20.95498422
Longitude : 83.89635412
file name : Image_22102024131630310.png
|
2024-10-22 13:16:30.425857 |
141 |
103895046 |
Drinking water facilities/ Installation of RO/ Water Filter |
89567 |
Drinking water facilities/ Installation of RO/ Water Filter1 |
Plinth level |
-
latitude : 20.9635973
Longitude : 83.8828674
file name : Image_29112024130835038.png
|
2024-11-29 13:08:35.135348 |
142 |
103895046 |
Drinking water facilities/ Installation of RO/ Water Filter |
89567 |
Drinking water facilities/ Installation of RO/ Water Filter1 |
Completion of work |
-
latitude : 20.96373156
Longitude : 83.88285375
file name : Image_29112024130313153.png
|
2024-11-29 13:03:13.301167 |
143 |
104411052 |
Chlorinization of drinking water source |
200000 |
Chlorinization of drinking water source1 |
Plinth level |
-
latitude : 20.9635999
Longitude : 83.8828542
file name : Image_29112024124833791.png
|
2024-11-29 12:48:33.952531 |
144 |
104411052 |
Chlorinization of drinking water source |
200000 |
Chlorinization of drinking water source1 |
Completion of work |
-
latitude : 20.9635974
Longitude : 83.8828615
file name : Image_29112024121749436.png
|
2024-11-29 12:17:49.557429 |