1 |
44549709 |
Repair of Sanitray well at Bhuktakanali SC Sahi |
20000 |
Repair of Sanitray well at Bhuktakanali SC Sahi1 |
Plinth level |
-
latitude : 20.41890115
Longitude : 84.26745303
file name : Image_15012021094520960.png
|
2021-01-15 09:45:21.068198 |
2 |
44549958 |
Construction of Boundary wall at Titrapanga AWC |
102350 |
Construction of Boundary wall at Titrapanga AWC1 |
Plinth level |
-
latitude : 20.43378188
Longitude : 84.26298141
file name : Image_09022021143205230.png
|
2021-02-09 14:32:05.33009 |
3 |
44549975 |
Construction of Boundary wall at Kudapada AWC |
100000 |
Construction of Boundary wall at Kudapada AWC1 |
Plinth level |
-
latitude : 20.43966651
Longitude : 84.26563372
file name : Image_13022021120528748.png
|
2021-02-13 12:05:28.867436 |
4 |
44549845 |
Repair of Sanitary well at Bhuktakanali Gudrisahi |
20000 |
Repair of Sanitary well at Bhuktakanali Gudrisahi1 |
Plinth level |
-
latitude : 20.4172915
Longitude : 84.26271431
file name : Image_13022021120410305.png
|
2021-02-13 12:04:10.38106 |
5 |
44549733 |
Repair of Sanitary well at Bhuktakanali ST Sahi |
20000 |
Repair of Sanitary well at Bhuktakanali ST Sahi1 |
Plinth level |
-
latitude : 20.41732598
Longitude : 84.26561148
file name : Image_13022021112321598.png
|
2021-02-13 11:23:21.557008 |
6 |
44549910 |
Construction of Boundary wall at Nediguda AWC |
100000 |
Construction of Boundary wall at Nediguda AWC1 |
Plinth level |
-
latitude : 20.43745758
Longitude : 84.27202373
file name : Image_13022021120607781.png
|
2021-02-13 12:06:07.890475 |
7 |
44549875 |
Construction of Boundary wall at Gudribadi UPS |
100000 |
Construction of Boundary wall at Gudribadi UPS1 |
Plinth level |
-
latitude : 20.43051214
Longitude : 84.27267368
file name : Image_13022021125858892.png
|
2021-02-13 12:58:59.041497 |
8 |
44549668 |
Repair of Sanitary well and Construction of Changing room at Nediguda Behera Sahi |
50000 |
Repair of Sanitary well and Construction of Changing room at Nediguda Behera Sahi1 |
Completion of work |
-
latitude : 20.43844881
Longitude : 84.27222544
file name : Image_24022021155817202.png
|
2021-02-24 15:58:17.302313 |
9 |
44550096 |
Improvement of Community Center at Nrusingha Mandir, Titrapanga |
300000 |
Improvement of Community Center at Nrusingha Mandir, Titrapanga1 |
Completion of work |
-
latitude : 20.43429348
Longitude : 84.26253676
file name : Image_19072021123209488.png
|
2021-07-19 12:32:09.600466 |
10 |
44550096 |
Improvement of Community Center at Nrusingha Mandir, Titrapanga |
300000 |
Improvement of Community Center at Nrusingha Mandir, Titrapanga1 |
Completion of work |
-
latitude : 20.43426001
Longitude : 84.26252876
file name : Image_19072021121724644.png
|
2021-07-19 12:17:24.74065 |
11 |
44549749 |
Repair of Sanitary well at Gandakathi ST Sahi |
20000 |
Repair of Sanitary well at Gandakathi ST Sahi1 |
Completion of work |
-
latitude : 20.4286763
Longitude : 84.26555095
file name : Image_23072021130007333.png
|
2021-07-23 13:00:07.455878 |
12 |
44549811 |
Repair of Sanitary well at Kaladi Kana Sahi |
20000 |
Repair of Sanitary well at Kaladi Kana Sahi1 |
Completion of work |
-
latitude : 20.44457148
Longitude : 84.25230821
file name : Image_23072021130022378.png
|
2021-07-23 13:00:22.484936 |
13 |
44549767 |
Repaair of Sanitary well at Titrapanga SC uparasahi |
20000 |
Repaair of Sanitary well at Titrapanga SC uparasahi1 |
Completion of work |
-
latitude : 20.43348861
Longitude : 84.26296967
file name : Image_23072021130018474.png
|
2021-07-23 13:00:18.589263 |
14 |
44549788 |
Repaair of Sanitary well at nediguda talasahi |
20000 |
Repaair of Sanitary well at nediguda talasahi1 |
Completion of work |
-
latitude : 20.43697571
Longitude : 84.27050903
file name : Image_23072021130013269.png
|
2021-07-23 13:00:13.384547 |
15 |
44550020 |
Water Supply at CCH, Barihaguda |
150000 |
Water Supply at CCH, Barihaguda1 |
Completion of work |
-
latitude : 20.43566179
Longitude : 84.27750999
file name : Image_17082021165408923.png
|
2021-08-17 16:54:09.037729 |
16 |
48650612 |
Repair of Sanitary well at Gundribadi Upper Sahi |
20000 |
Repair of Sanitary well at Gundribadi Upper Sahi1 |
Completion of work |
-
latitude : 20.43047614
Longitude : 84.27061802
file name : Image_17112021113502854.png
|
2021-11-17 11:35:02.960648 |
17 |
48650730 |
Repair of Sanitary well Gundribadi Majhisahi |
20000 |
Repair of Sanitary well Gundribadi Majhisahi1 |
Completion of work |
-
latitude : 20.43046611
Longitude : 84.26984518
file name : Image_17112021113445748.png
|
2021-11-17 11:34:45.854769 |
18 |
44549891 |
Construction of Boundary wall at Rajkhamar AWC |
100000 |
Construction of Boundary wall at Rajkhamar AWC1 |
Completion of work |
-
latitude : 20.43600676
Longitude : 84.28377878
file name : Image_26112021124613681.png
|
2021-11-26 12:46:13.833931 |
19 |
48649593 |
Payment of energy charges of exiting piped water supply system of Titrapanga GP (GP Office , Kladai |
128825 |
Payment of energy charges of exiting piped water supply system of Titrapanga GP (GP Office , Kladai 1 |
Completion of work |
-
latitude : 20.3562456
Longitude : 84.1219303
file name : Image_06042022133030267.png
|
2022-04-06 13:30:30.396385 |
20 |
48650033 |
Improvement of road at Titrapanga GP Campus |
200000 |
Improvement of road at Titrapanga GP Campus1 |
Completion of work |
-
latitude : 20.480711,20.480711
Longitude : 84.232075,84.232075
file name : Image_08042022103918426.png
|
2022-04-08 10:39:18.559461 |
21 |
48650033 |
Improvement of road at Titrapanga GP Campus |
200000 |
Improvement of road at Titrapanga GP Campus1 |
Completion of work |
-
latitude : 20.433536666666665,20.433536666666665
Longitude : 84.26381333333332,84.26381333333332
file name : Image_09042022112501721.png
|
2022-04-09 11:25:01.842568 |
22 |
48650876 |
Construction of meeting Pindi at titrapnaga UP School |
173844 |
Construction of meeting Pindi at titrapnaga UP School1 |
Completion of work |
-
latitude : 20.487028333333335
Longitude : 84.22762333333334
file name : Image_17022023114558764.png
|
2023-02-17 11:45:58.898966 |
23 |
48650114 |
Improvement and colouring at Maa Baraladevi High School Hostel Building and temple |
202350 |
Improvement and colouring at Maa Baraladevi High School Hostel Building and temple1 |
Completion of work |
-
latitude : 20.44163
Longitude : 84.25296333333333
file name : Image_12042022095805173.png
|
2022-04-12 09:58:05.309399 |
24 |
44549541 |
Honorarium of self employeed mechanics for repair of tube wells |
120000 |
Honorarium of self employeed mechanics for repair of tube wells1 |
Completion of work |
-
latitude : 20.4369242
Longitude : 84.4041766
file name : Image_29042022155551141.png
|
2022-04-29 15:55:51.322647 |
25 |
44549541 |
Honorarium of self employeed mechanics for repair of tube wells |
120000 |
Honorarium of self employeed mechanics for repair of tube wells1 |
Completion of work |
-
latitude : 20.4369336
Longitude : 84.4041947
file name : Image_29042022155554460.png
|
2022-04-29 15:55:54.596497 |
26 |
63093075 |
Beautification of Titrapanga UPS Campus |
200000 |
Beautification of Titrapanga UPS Campus1 |
Completion of work |
-
latitude : 20.434011666666667
Longitude : 84.26356166666667
file name : Image_19052022110029016.png
|
2022-05-19 11:00:29.133698 |
27 |
48650399 |
Repair of Sanitary well at Gandakathi SC Sahi |
20000 |
Repair of Sanitary well at Gandakathi SC Sahi1 |
Completion of work |
-
latitude : 20.4369993
Longitude : 84.4042591
file name : Image_26072022124950546.png
|
2022-07-26 12:49:50.658357 |
28 |
44549588 |
Payment of energy charges of existing piped water supply system of titrapanga GP |
150000 |
Payment of energy charges of existing piped water supply system of titrapanga GP1 |
Completion of work |
-
latitude : 20.4369998,20.4369998
Longitude : 84.4042587,84.4042587
file name : Image_28092022153145276.png
|
2022-09-28 15:31:45.376383 |
29 |
48650315 |
Repair of Sanitary well at Nediguda SC Sahi |
20000 |
Repair of Sanitary well at Nediguda SC Sahi1 |
Completion of work |
-
latitude : 20.456701666666667
Longitude : 84.24136666666666
file name : Image_29092022072332123.png
|
2022-09-29 07:23:32.203883 |
30 |
48649655 |
SB Phase Phase -ii ODF Plus |
132350 |
SB Phase Phase -ii ODF Plus1 |
Completion of work |
-
latitude : 20.442906666666666
Longitude : 84.24265166666667
file name : Image_29092022074723625.png
|
2022-09-29 07:47:23.724218 |
31 |
48649710 |
Gundribadi Solar Pump water supply |
450000 |
Gundribadi Solar Pump water supply1 |
Completion of work |
-
latitude : 20.43140227
Longitude : 84.26904567
file name : Image_17112021113546509.png
|
2021-11-17 11:35:46.636839 |
32 |
44549518 |
Titrapanga Janisahi Solar Pump water Supply |
450000 |
Titrapanga Janisahi Solar Pump water Supply1 |
Plinth level |
-
latitude : 20.43573725
Longitude : 84.25866668
file name : Image_29122020142352937.png
|
2020-12-29 14:23:53.023757 |
33 |
44549518 |
Titrapanga Janisahi Solar Pump water Supply |
450000 |
Titrapanga Janisahi Solar Pump water Supply1 |
Plinth level |
-
latitude : 20.4362154
Longitude : 84.2586632
file name : Image_30122020125550795.png
|
2020-12-30 12:55:50.911687 |
34 |
44549634 |
Jalachatra |
60000 |
Jalachatra1 |
Completion of work |
-
latitude : 20.43604919
Longitude : 84.28190262
file name : Image_23102021170330628.png
|
2021-10-23 17:03:30.704656 |
35 |
66520447 |
Creation of community soak pits for group of Households |
60000 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 20.442588333333333
Longitude : 84.24170333333335
file name : Image_12012023122758524.png
|
2023-01-12 12:27:58.631762 |
36 |
66520405 |
Operation & maintenance of Grey water management system |
87300 |
Operation & maintenance of Grey water management system1 |
Completion of work |
-
latitude : 20.433546666666665
Longitude : 84.26167333333333
file name : Image_12012023123612984.png
|
2023-01-12 12:36:13.097528 |
37 |
66520056 |
Providing piped water supply to public institutions |
55000 |
Providing piped water supply to public institutions1 |
Completion of work |
-
latitude : 20.432783333333337
Longitude : 84.25796833333334
file name : Image_17022023115121377.png
|
2023-02-17 11:51:21.473951 |
38 |
66520056 |
Providing piped water supply to public institutions |
55000 |
Providing piped water supply to public institutions1 |
Completion of work |
-
latitude : 20.432785000000003
Longitude : 84.25796166666666
file name : Image_17022023114752962.png
|
2023-02-17 11:47:53.054485 |
39 |
66520082 |
Water Supply to villages |
150594 |
Water Supply to villages1 |
Completion of work |
-
latitude : 20.432766666666666
Longitude : 84.25797833333333
file name : Image_13022023122218130.png
|
2023-02-13 12:22:18.227188 |
40 |
66520082 |
Water Supply to villages |
150594 |
Water Supply to villages1 |
Completion of work |
-
latitude : 20.432766666666666
Longitude : 84.25794833333333
file name : Image_27012023105358213.png
|
2023-01-27 10:53:58.323294 |
41 |
66518733 |
IMPROVEMENT OF HIGH SCHOOL AT KALADI UNDER 5T |
470000 |
IMPROVEMENT OF HIGH SCHOOL AT KALADI UNDER 5T1 |
Completion of work |
-
latitude : 20.455571666666668
Longitude : 84.24088166666667
file name : Image_25042023092545997.png
|
2023-04-25 09:25:46.092604 |
42 |
66520037 |
Operation & maintenance of drinking water supply system |
96000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 20.43384166666667
Longitude : 84.26360500000001
file name : Image_24042023132827439.png
|
2023-04-24 13:28:27.590935 |
43 |
61881585 |
CONSTRUCTION OF DRAIN, STEPS AT MARKET COMPEX & COLOURING OF GP OFFICE |
393844 |
CONSTRUCTION OF DRAIN, STEPS AT MARKET COMPEX & COLOURING OF GP OFFICE1 |
Completion of work |
-
latitude : 20.437023
Longitude : 84.4042335
file name : Image_09022024130653787.png
|
2024-02-09 13:06:53.885719 |
44 |
82738113 |
Water Supply to villages |
96000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 20.480439
Longitude : 84.2290118
file name : Image_24042024115245222.png
|
2024-04-24 11:52:45.321192 |
45 |
82738113 |
Water Supply to villages |
96000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 20.480439
Longitude : 84.2290118
file name : Image_24042024114517507.png
|
2024-04-24 11:45:17.605371 |
46 |
82738113 |
Water Supply to villages |
96000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 20.4804922
Longitude : 84.229055
file name : Image_24042024111830074.png
|
2024-04-24 11:18:30.168998 |
47 |
82739548 |
Creation of other water recharging structure |
42000 |
Creation of other water recharging structure1 |
Roof laid |
-
latitude : 20.4804837
Longitude : 84.2289911
file name : Image_10052024113837770.png
|
2024-05-10 11:38:37.901531 |
48 |
82739548 |
Creation of other water recharging structure |
42000 |
Creation of other water recharging structure1 |
Plinth level |
-
latitude : 20.4804837
Longitude : 84.2289911
file name : Image_10052024113633225.png
|
2024-05-10 11:36:33.370318 |
49 |
82739548 |
Creation of other water recharging structure |
42000 |
Creation of other water recharging structure1 |
Completion of work |
-
latitude : 20.480473
Longitude : 84.2289924
file name : Image_10052024113253887.png
|
2024-05-10 11:32:54.038686 |
50 |
82736026 |
Water Supply to villages |
120000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 20.481448333333333
Longitude : 84.23198499999998
file name : Image_22032024204921856.png
|
2024-03-22 20:49:21.958329 |
51 |
82736026 |
Water Supply to villages |
120000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 20.4696122
Longitude : 84.2337627
file name : Image_22032024204726315.png
|
2024-03-22 20:47:26.438343 |
52 |
82736026 |
Water Supply to villages |
120000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 20.481456666666666
Longitude : 84.23204333333334
file name : Image_22032024204506534.png
|
2024-03-22 20:45:06.64226 |
53 |
82736026 |
Water Supply to villages |
120000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 20.479125
Longitude : 84.23058999999999
file name : Image_22032024204322192.png
|
2024-03-22 20:43:22.314252 |
54 |
100516293 |
Piped/tap water supply to HH |
271567 |
Piped/tap water supply to HH1 |
Roof laid |
-
latitude : 20.4813891
Longitude : 84.2320482
file name : Image_04102024083249661.png
|
2024-10-04 08:32:49.754932 |
55 |
100516293 |
Piped/tap water supply to HH |
271567 |
Piped/tap water supply to HH1 |
Plinth level |
-
latitude : 20.4696087
Longitude : 84.2337375
file name : Image_04102024083008346.png
|
2024-10-04 08:30:08.430877 |
56 |
100516293 |
Piped/tap water supply to HH |
271567 |
Piped/tap water supply to HH1 |
Completion of work |
-
latitude : 20.4813866
Longitude : 84.2320399
file name : Image_04102024082843612.png
|
2024-10-04 08:28:43.695871 |
57 |
82733135 |
Setting up of Faecal Sludge Management Plant |
64654 |
Setting up of Faecal Sludge Management Plant1 |
Completion of work |
-
latitude : 20.436978
Longitude : 84.4042373
file name : Image_24102024144308973.png
|
2024-10-24 14:43:09.109676 |
58 |
100516792 |
Creation of a new source of drinking water |
42000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 20.4369772
Longitude : 84.4042375
file name : Image_23102024150342738.png
|
2024-10-23 15:03:42.861452 |
59 |
66518794 |
REPAIR OF SANITARY WELL AT KALADI PIPALSAHI AND GANDAKATHI SC SAHI 02 NOS. |
48992 |
REPAIR OF SANITARY WELL AT KALADI PIPALSAHI AND GANDAKATHI SC SAHI 02 NOS.1 |
Completion of work |
-
latitude : 20.429489999999998
Longitude : 84.26564833333332
file name : Image_07122024132841151.png
|
2024-12-07 13:28:41.251782 |
60 |
99863320 |
Converting abandoned borewells into water recharging structure/Borewell Recharge Pit/Dug Well Recharge/ Injection wells/Recharge wells |
35000 |
Converting abandoned borewells into water recharging structure/Borewell Recharge Pit/Dug Well Recharge/ Injection wells/Recharge wells1 |
Completion of work |
-
latitude : 20.434478333333335
Longitude : 84.26239833333332
file name : Image_08122024092216820.png
|
2024-12-08 09:22:16.898854 |
61 |
99863320 |
Converting abandoned borewells into water recharging structure/Borewell Recharge Pit/Dug Well Recharge/ Injection wells/Recharge wells |
35000 |
Converting abandoned borewells into water recharging structure/Borewell Recharge Pit/Dug Well Recharge/ Injection wells/Recharge wells1 |
Completion of work |
-
latitude : 20.434486666666665
Longitude : 84.26241
file name : Image_08122024092211200.png
|
2024-12-08 09:22:11.276929 |
62 |
48650649 |
Repair of Sanitary well at Rajkhmar |
20000 |
Repair of Sanitary well at Rajkhmar1 |
Completion of work |
-
latitude : 20.436868333333333
Longitude : 84.28179166666665
file name : Image_07122024123941759.png
|
2024-12-07 12:39:41.85178 |