1 |
47551145 |
CONST. OF DRAIN FROM KARLAJRI KHA;LIAKATA TO SHIV TEMPLE(TIED CFC) |
300000 |
CONST. OF DRAIN FROM KARLAJRI KHA;LIAKATA TO SHIV TEMPLE(TIED CFC)1 |
Completion of work |
-
latitude : 21.0141037,21.01429082
Longitude : 83.46753698,83.46714093
file name : Image_03032022100154129.png
|
2022-03-03 10:01:54.208715 |
2 |
47568925 |
RAIN WATER DRINNING FOR CONST. OF CC ROAD AT KARLAJURI(UNTIED CFC) |
465772 |
RAIN WATER DRINNING FOR CONST. OF CC ROAD AT KARLAJURI(UNTIED CFC)1 |
Completion of work |
-
latitude : 21.01426632,21.01426632
Longitude : 83.46736635,83.46736635
file name : Image_03032022100352722.png
|
2022-03-03 10:03:52.802061 |
3 |
64389821 |
REPAIR AND MAINTANANCE OF 4 NOS BATHING STEPS AT BARKATA DUMERPALI. |
170000 |
REPAIR AND MAINTANANCE OF 4 NOS BATHING STEPS AT BARKATA DUMERPALI.1 |
Completion of work |
-
latitude : 21.02383459
Longitude : 83.46762711
file name : Image_08092022115712504.png
|
2022-09-08 11:57:12.602484 |
4 |
64389821 |
REPAIR AND MAINTANANCE OF 4 NOS BATHING STEPS AT BARKATA DUMERPALI. |
170000 |
REPAIR AND MAINTANANCE OF 4 NOS BATHING STEPS AT BARKATA DUMERPALI.1 |
Completion of work |
-
latitude : 21.02382652
Longitude : 83.46760972
file name : Image_08092022115702637.png
|
2022-09-08 11:57:02.738944 |
5 |
64389821 |
REPAIR AND MAINTANANCE OF 4 NOS BATHING STEPS AT BARKATA DUMERPALI. |
170000 |
REPAIR AND MAINTANANCE OF 4 NOS BATHING STEPS AT BARKATA DUMERPALI.1 |
Completion of work |
-
latitude : 21.02384283
Longitude : 83.4675664
file name : Image_08092022115655102.png
|
2022-09-08 11:56:55.210195 |
6 |
64389821 |
REPAIR AND MAINTANANCE OF 4 NOS BATHING STEPS AT BARKATA DUMERPALI. |
170000 |
REPAIR AND MAINTANANCE OF 4 NOS BATHING STEPS AT BARKATA DUMERPALI.1 |
Completion of work |
-
latitude : 21.0238288
Longitude : 83.46757702
file name : Image_08092022115649547.png
|
2022-09-08 11:56:49.655094 |
7 |
64389821 |
REPAIR AND MAINTANANCE OF 4 NOS BATHING STEPS AT BARKATA DUMERPALI. |
170000 |
REPAIR AND MAINTANANCE OF 4 NOS BATHING STEPS AT BARKATA DUMERPALI.1 |
Completion of work |
-
latitude : 21.02382839
Longitude : 83.46763794
file name : Image_08092022115721104.png
|
2022-09-08 11:57:21.237822 |
8 |
47568556 |
CONST. OF MAIN GATE AT TILEIMAL PRI. SCHOOL(UNTIED CFC) |
100000 |
CONST. OF MAIN GATE AT TILEIMAL PRI. SCHOOL(UNTIED CFC)1 |
Completion of work |
-
latitude : 21.02906809
Longitude : 83.47421942
file name : Image_08092022112440205.png
|
2022-09-08 11:24:40.296709 |
9 |
68176489 |
Construction of toilets in public institutions |
100000 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 21.011833333333335
Longitude : 83.47644666666665
file name : Image_08062023112526797.png
|
2023-06-08 11:25:26.89827 |
10 |
65713142 |
Water Supply to villages |
200000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 20.873423
Longitude : 84.0405908
file name : Image_06122022174037025.png
|
2022-12-06 17:40:37.12817 |
11 |
50431459 |
RAIN WATER DRAINING FOR CONS OF DRAIN WITH CC ROAD FOR GAJMAL TO MAHULMUNDA ROAD |
100000 |
RAIN WATER DRAINING FOR CONS OF DRAIN WITH CC ROAD FOR GAJMAL TO MAHULMUNDA ROAD1 |
Completion of work |
-
latitude : 21.0200302
Longitude : 83.48057392
file name : Image_26082021171615801.png
|
2021-08-26 17:16:15.875792 |
12 |
50431459 |
RAIN WATER DRAINING FOR CONS OF DRAIN WITH CC ROAD FOR GAJMAL TO MAHULMUNDA ROAD |
100000 |
RAIN WATER DRAINING FOR CONS OF DRAIN WITH CC ROAD FOR GAJMAL TO MAHULMUNDA ROAD1 |
Completion of work |
-
latitude : 21.02008297
Longitude : 83.48053223
file name : Image_26082021171620744.png
|
2021-08-26 17:16:20.813729 |
13 |
50431459 |
RAIN WATER DRAINING FOR CONS OF DRAIN WITH CC ROAD FOR GAJMAL TO MAHULMUNDA ROAD |
100000 |
RAIN WATER DRAINING FOR CONS OF DRAIN WITH CC ROAD FOR GAJMAL TO MAHULMUNDA ROAD1 |
Completion of work |
-
latitude : 21.02008309
Longitude : 83.48053225
file name : Image_26082021171625614.png
|
2021-08-26 17:16:25.682275 |
14 |
50431459 |
RAIN WATER DRAINING FOR CONS OF DRAIN WITH CC ROAD FOR GAJMAL TO MAHULMUNDA ROAD |
100000 |
RAIN WATER DRAINING FOR CONS OF DRAIN WITH CC ROAD FOR GAJMAL TO MAHULMUNDA ROAD1 |
Completion of work |
-
latitude : 21.02009265
Longitude : 83.48053279
file name : Image_26082021171632302.png
|
2021-08-26 17:16:32.373118 |
15 |
50431459 |
RAIN WATER DRAINING FOR CONS OF DRAIN WITH CC ROAD FOR GAJMAL TO MAHULMUNDA ROAD |
100000 |
RAIN WATER DRAINING FOR CONS OF DRAIN WITH CC ROAD FOR GAJMAL TO MAHULMUNDA ROAD1 |
Completion of work |
-
latitude : 21.02007337
Longitude : 83.48053684
file name : Image_26082021171636275.png
|
2021-08-26 17:16:36.351212 |
16 |
50431276 |
NAL SE JALANDIMP AT GAJMAL TILEMAL KARLAJURI DUMERPALI MAHULPALI AWC AND PRY SCHOOLS |
250000 |
NAL SE JALANDIMP AT GAJMAL TILEMAL KARLAJURI DUMERPALI MAHULPALI AWC AND PRY SCHOOLS1 |
Completion of work |
-
latitude : 21.022928333333333
Longitude : 83.46741500000002
file name : Image_03062021115133137.png
|
2021-06-03 11:51:33.319427 |
17 |
50431276 |
NAL SE JALANDIMP AT GAJMAL TILEMAL KARLAJURI DUMERPALI MAHULPALI AWC AND PRY SCHOOLS |
250000 |
NAL SE JALANDIMP AT GAJMAL TILEMAL KARLAJURI DUMERPALI MAHULPALI AWC AND PRY SCHOOLS1 |
Completion of work |
-
latitude : 21.022940000000002
Longitude : 83.46742166666667
file name : Image_03062021115241515.png
|
2021-06-03 11:52:41.670017 |
18 |
44125903 |
REPAIR & MAINTANANCE OF DRAIN INFRONT OF TELIEIMAL PRY.SCHOOL(TIEDCFC) |
120000 |
REPAIR & MAINTANANCE OF DRAIN INFRONT OF TELIEIMAL PRY.SCHOOL(TIEDCFC)1 |
Completion of work |
-
latitude : 21.02909954,21.02912049
Longitude : 83.47426729,83.47406085
file name : Image_06112021114834158.png
|
2021-11-06 11:48:34.243595 |
19 |
44125642 |
RENO OF TELIMAL KATA AT TELIMAL(CFC TIED) |
400000 |
RENO OF TELIMAL KATA AT TELIMAL(CFC TIED)1 |
Completion of work |
-
latitude : 21.029271666666666
Longitude : 83.47404666666668
file name : Image_05052021115109664.png
|
2021-05-05 11:51:09.822758 |
20 |
44125684 |
COMPL OF GATE AND RAIN WATER DRAINAGE FOR CONST OF CC ROAD INSIDE TILEIMAL PRY SCHOOL.(CFC UNTIED) |
250000 |
COMPL OF GATE AND RAIN WATER DRAINAGE FOR CONST OF CC ROAD INSIDE TILEIMAL PRY SCHOOL.(CFC UNTIED)1 |
Completion of work |
-
latitude : 21.029268333333334,21.029263333333333,21.02926
Longitude : 83.47427833333334,83.47428,83.474255
file name : Image_27042021125220608.png
|
2021-04-27 12:52:20.725112 |
21 |
44126265 |
RAIN WATER DRAINNING FOR CONST. OF CC ROAD & COMPOUND WAKK AT DUMERPALI PRY. SCHOOL(CFC UNTIED) |
200000 |
RAIN WATER DRAINNING FOR CONST. OF CC ROAD & COMPOUND WAKK AT DUMERPALI PRY. SCHOOL(CFC UNTIED)1 |
Completion of work |
-
latitude : 21.022993333333336,21.023141666666668
Longitude : 83.46737999999999,83.46837500000001
file name : Image_27042021095854962.png
|
2021-04-27 09:58:55.092147 |
22 |
44126265 |
RAIN WATER DRAINNING FOR CONST. OF CC ROAD & COMPOUND WAKK AT DUMERPALI PRY. SCHOOL(CFC UNTIED) |
200000 |
RAIN WATER DRAINNING FOR CONST. OF CC ROAD & COMPOUND WAKK AT DUMERPALI PRY. SCHOOL(CFC UNTIED)1 |
Completion of work |
-
latitude : 21.023031666666665,21.022948333333336
Longitude : 83.46744166666667,83.46735833333332
file name : Image_17032021124151296.png
|
2021-03-17 12:41:51.422387 |
23 |
44126342 |
RAIN WATER DRAINNING FOR CONST. OF GUARD WALL & CC ROAD FROM MAHULPALI HARIJAPADA TO RD ROAD(CFCUNT) |
450000 |
RAIN WATER DRAINNING FOR CONST. OF GUARD WALL & CC ROAD FROM MAHULPALI HARIJAPADA TO RD ROAD(CFCUNT)1 |
Completion of work |
-
latitude : 21.014566666666664,21.014600000000005
Longitude : 83.49845333333333,83.49844999999999
file name : Image_10022021140128711.png
|
2021-02-10 14:01:28.832966 |
24 |
44126342 |
RAIN WATER DRAINNING FOR CONST. OF GUARD WALL & CC ROAD FROM MAHULPALI HARIJAPADA TO RD ROAD(CFCUNT) |
450000 |
RAIN WATER DRAINNING FOR CONST. OF GUARD WALL & CC ROAD FROM MAHULPALI HARIJAPADA TO RD ROAD(CFCUNT)1 |
Completion of work |
-
latitude : 21.014583333333334,21.014595
Longitude : 83.49847166666665,83.49845666666667
file name : Image_10022021140258278.png
|
2021-02-10 14:02:58.374718 |
25 |
53033359 |
JALACHHATRA |
187264 |
JALACHHATRA1 |
Completion of work |
-
latitude : 21.03566279
Longitude : 83.47874286
file name : Image_12082021111327677.png
|
2021-08-12 11:13:27.748923 |
26 |
65713106 |
CONST OF CC ROAD FROM KARLAJURI TALIPADA TO CHARBATIA CHOAK. |
200000 |
CONST OF CC ROAD FROM KARLAJURI TALIPADA TO CHARBATIA CHOAK.1 |
Completion of work |
-
latitude : 21.0475451,21.0475448
Longitude : 83.5516332,83.5516329
file name : Image_09022023132053075.png
|
2023-02-09 13:20:53.158482 |
27 |
65713082 |
CONST OF CC ROAD FROM KARLAJURI DUANPADA TO RIVER ONG |
300000 |
CONST OF CC ROAD FROM KARLAJURI DUANPADA TO RIVER ONG1 |
Completion of work |
-
latitude : 21.047544,21.0475446
Longitude : 83.5516305,83.5516323
file name : Image_09022023132043369.png
|
2023-02-09 13:20:43.524648 |
28 |
68176248 |
BATHING STEP AT KARLAJURI KHALIAKATA |
267850 |
BATHING STEP AT KARLAJURI KHALIAKATA1 |
Completion of work |
-
latitude : 20.84367333333333
Longitude : 84.09341666666666
file name : Image_11052023090157376.png
|
2023-05-11 09:01:57.432333 |
29 |
68176109 |
Rejuvenation and Desilting of tank/waterbody |
200000 |
Rejuvenation and Desilting of tank/waterbody1 |
Completion of work |
-
latitude : 20.843675
Longitude : 84.09337
file name : Image_11052023090009686.png
|
2023-05-11 09:00:09.739838 |
30 |
59833258 |
CONST. OF TUBEWELL LICH PIT/SOAK PIT IN GP AREA |
116744 |
CONST. OF TUBEWELL LICH PIT/SOAK PIT IN GP AREA1 |
Completion of work |
-
latitude : 21.047106666666664
Longitude : 83.54612666666665
file name : Image_29042023111156524.png
|
2023-04-29 11:11:56.585441 |
31 |
59834304 |
CONST. OF COMMUNITY COMPOST PIT AT ALL VILLAGERS OF KARLAJURI GP |
40000 |
CONST. OF COMMUNITY COMPOST PIT AT ALL VILLAGERS OF KARLAJURI GP1 |
Completion of work |
-
latitude : 21.0463012
Longitude : 83.545723
file name : Image_19102023171536253.png
|
2023-10-19 17:15:36.308912 |
32 |
82231046 |
Purchase of Tricycles/other battery -operated vehicles for door to door collection of waste |
75000 |
Purchase of Tricycles/other battery -operated vehicles for door to door collection of waste1 |
|
-
latitude : 21.0463396
Longitude : 83.5456882
file name : Image_20072024160816899.png
|
2024-07-20 16:08:16.996877 |
33 |
82237951 |
Rejuvenation and desilting of tank/ water body |
165688 |
Rejuvenation and desilting of tank/ water body1 |
Roof laid |
-
latitude : 21.0463328
Longitude : 83.545686
file name : Image_31072024170241136.png
|
2024-07-31 17:02:41.223383 |
34 |
82237951 |
Rejuvenation and desilting of tank/ water body |
165688 |
Rejuvenation and desilting of tank/ water body1 |
Plinth level |
-
latitude : 21.0464596
Longitude : 83.5468262
file name : Image_25072024224519432.png
|
2024-07-25 22:45:19.508899 |
35 |
82237951 |
Rejuvenation and desilting of tank/ water body |
165688 |
Rejuvenation and desilting of tank/ water body1 |
Completion of work |
-
latitude : 21.04630408
Longitude : 83.54653
file name : Image_25072024223422418.png
|
2024-07-25 22:34:22.498535 |
36 |
82237951 |
Rejuvenation and desilting of tank/ water body |
165688 |
Rejuvenation and desilting of tank/ water body1 |
Completion of work |
-
latitude : 21.0464047
Longitude : 83.5465372
file name : Image_25072024222145249.png
|
2024-07-25 22:21:45.328963 |
37 |
82237063 |
Rejuvenation and desilting of tank/ water body |
200000 |
Rejuvenation and desilting of tank/ water body1 |
Roof laid |
-
latitude : 21.0463281
Longitude : 83.5456879
file name : Image_31072024170344561.png
|
2024-07-31 17:03:44.685117 |
38 |
82237063 |
Rejuvenation and desilting of tank/ water body |
200000 |
Rejuvenation and desilting of tank/ water body1 |
Roof laid |
-
latitude : 21.0463301
Longitude : 83.5456884
file name : Image_31072024170119693.png
|
2024-07-31 17:01:19.798742 |
39 |
82237063 |
Rejuvenation and desilting of tank/ water body |
200000 |
Rejuvenation and desilting of tank/ water body1 |
Plinth level |
-
latitude : 21.04629351
Longitude : 83.54652422
file name : Image_25072024224247881.png
|
2024-07-25 22:42:47.973839 |
40 |
82237063 |
Rejuvenation and desilting of tank/ water body |
200000 |
Rejuvenation and desilting of tank/ water body1 |
Plinth level |
-
latitude : 21.04629182
Longitude : 83.5465354
file name : Image_25072024224159068.png
|
2024-07-25 22:41:59.158451 |
41 |
82237063 |
Rejuvenation and desilting of tank/ water body |
200000 |
Rejuvenation and desilting of tank/ water body1 |
Completion of work |
-
latitude : 21.04629803
Longitude : 83.54650178
file name : Image_25072024223326203.png
|
2024-07-25 22:33:26.287995 |
42 |
82237063 |
Rejuvenation and desilting of tank/ water body |
200000 |
Rejuvenation and desilting of tank/ water body1 |
Completion of work |
-
latitude : 21.046337
Longitude : 83.54647862
file name : Image_25072024222013473.png
|
2024-07-25 22:20:13.557259 |
43 |
82731859 |
Water Supply to villages |
250000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 21.0463289
Longitude : 83.5456876
file name : Image_01082024155425392.png
|
2024-08-01 15:54:25.478131 |
44 |
82731859 |
Water Supply to villages |
250000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 21.04628567
Longitude : 83.54655545
file name : Image_25072024224340096.png
|
2024-07-25 22:43:40.173277 |
45 |
82731859 |
Water Supply to villages |
250000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 21.04627396
Longitude : 83.54653439
file name : Image_25072024223538536.png
|
2024-07-25 22:35:38.643028 |
46 |
82731859 |
Water Supply to villages |
250000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 21.04632136
Longitude : 83.54650161
file name : Image_25072024222922835.png
|
2024-07-25 22:29:22.922381 |
47 |
82731859 |
Water Supply to villages |
250000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 21.04632136
Longitude : 83.54650161
file name : Image_25072024222917847.png
|
2024-07-25 22:29:17.929466 |
48 |
82731859 |
Water Supply to villages |
250000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 21.04633285
Longitude : 83.54651248
file name : Image_25072024222913307.png
|
2024-07-25 22:29:13.382222 |
49 |
82236294 |
Construction of Building |
250000 |
Construction of Building1 |
Roof laid |
-
latitude : 21.0464294
Longitude : 83.54562783
file name : Image_23102024164519059.png
|
2024-10-23 16:45:19.122281 |
50 |
82236294 |
Construction of Building |
250000 |
Construction of Building1 |
Plinth level |
-
latitude : 21.0463471
Longitude : 83.5456729
file name : Image_23102024164130421.png
|
2024-10-23 16:41:30.486182 |
51 |
82236294 |
Construction of Building |
250000 |
Construction of Building1 |
Completion of work |
-
latitude : 21.04869894
Longitude : 83.70044724
file name : Image_19102024170806434.png
|
2024-10-19 17:08:06.486644 |
52 |
108623555 |
Installation of Street Light |
100992 |
Installation of Street Light1 |
Plinth level |
-
latitude : 21.0468557
Longitude : 83.5474922
file name : Image_07112024170142609.png
|
2024-11-07 17:01:42.66581 |
53 |
108623555 |
Installation of Street Light |
100992 |
Installation of Street Light1 |
Completion of work |
-
latitude : 21.045871
Longitude : 83.5482473
file name : Image_07112024163527233.png
|
2024-11-07 16:35:27.296254 |