1 |
44275787 |
CONST OF BEGUNIAPADA PRY SCHOOL CC ROAD |
250000 |
CONST OF BEGUNIAPADA PRY SCHOOL CC ROAD1 |
Completion of work |
-
latitude : 20.0867112,20.0867021
Longitude : 85.68416172,85.68416436
file name : Image_09072021165706444.png
|
2021-07-09 16:57:06.58944 |
2 |
44275787 |
CONST OF BEGUNIAPADA PRY SCHOOL CC ROAD |
250000 |
CONST OF BEGUNIAPADA PRY SCHOOL CC ROAD1 |
Completion of work |
-
latitude : 20.08670502,20.08670491,20.0867048
Longitude : 85.68416366,85.68416365,85.68416372
file name : Image_09072021165702370.png
|
2021-07-09 16:57:02.529818 |
3 |
44275787 |
CONST OF BEGUNIAPADA PRY SCHOOL CC ROAD |
250000 |
CONST OF BEGUNIAPADA PRY SCHOOL CC ROAD1 |
Completion of work |
-
latitude : 20.08715566,20.08715311,20.08715488,20.08715876
Longitude : 85.68368914,85.68369807,85.68369266,85.68368733
file name : Image_16012021121432499.png
|
2021-01-16 12:14:32.55721 |
4 |
44254022 |
SUPPLY OF DRINKING WATER THROUGH TANKER |
85000 |
SUPPLY OF DRINKING WATER THROUGH TANKER1 |
Completion of work |
-
latitude : 20.06617411
Longitude : 85.69370291
file name : Image_28102021114638619.png
|
2021-10-28 11:46:38.771579 |
5 |
44254199 |
OPENING OF JALACHHATRA |
36000 |
OPENING OF JALACHHATRA1 |
Completion of work |
-
latitude : 20.0660232
Longitude : 85.69369564
file name : Image_26112021230710556.png
|
2021-11-26 23:07:10.704205 |
6 |
44274255 |
DRINKING WATER |
20000 |
DRINKING WATER1 |
Completion of work |
-
latitude : 20.08713447
Longitude : 85.68175602
file name : Image_28102021131644415.png
|
2021-10-28 13:16:44.546425 |
7 |
44275619 |
IMPROVEMENT OF MAA MANGALA COMMUNITY HAL AT GHANIPUR VILLAGE |
100000 |
IMPROVEMENT OF MAA MANGALA COMMUNITY HAL AT GHANIPUR VILLAGE1 |
Completion of work |
-
latitude : 20.06684535
Longitude : 85.69429399
file name : Image_16062021140922531.png
|
2021-06-16 14:09:22.612872 |
8 |
44275584 |
IMPROVEMENT OF JORAKANI HARIJAN SAHI KOTHAGHAR |
100000 |
IMPROVEMENT OF JORAKANI HARIJAN SAHI KOTHAGHAR1 |
Completion of work |
-
latitude : 20.07226513
Longitude : 85.67987937
file name : Image_16062021143831209.png
|
2021-06-16 14:38:31.300748 |
9 |
44275546 |
IMPROVEMENT OF JORAKANI SUNDARA SAHI KOTHAGHAR |
150000 |
IMPROVEMENT OF JORAKANI SUNDARA SAHI KOTHAGHAR1 |
Completion of work |
-
latitude : 20.07124774
Longitude : 85.68017715
file name : Image_16062021143403120.png
|
2021-06-16 14:34:03.220805 |
10 |
44274630 |
REPAIRE MAINTENANCE OF TIGIRIA HIGH SCHOOL |
150000 |
REPAIRE MAINTENANCE OF TIGIRIA HIGH SCHOOL1 |
Completion of work |
-
latitude : 20.05832735
Longitude : 85.68685508
file name : Image_16062021142117142.png
|
2021-06-16 14:21:17.237395 |
11 |
44274597 |
CONSTRUCTION OF GADABEGUNIAPADA SCHOOL BOUNDARY |
300000 |
CONSTRUCTION OF GADABEGUNIAPADA SCHOOL BOUNDARY1 |
Completion of work |
-
latitude : 20.08665415
Longitude : 85.68422572
file name : Image_09072021170908769.png
|
2021-07-09 17:09:08.8843 |
12 |
60011818 |
Opening of Jalachhatra Under GPDP 2022-23 |
30000 |
Opening of Jalachhatra Under GPDP 2022-231 |
Completion of work |
-
latitude : 20.13435418
Longitude : 85.71045847
file name : Image_29122022094304507.png
|
2022-12-29 09:43:04.579249 |
13 |
44274970 |
COST OF DATA ENTRY |
6000 |
COST OF DATA ENTRY1 |
Completion of work |
-
latitude : 20.0771771
Longitude : 85.7368802
file name : Image_23082021124451930.png
|
2021-08-23 12:44:52.060918 |
14 |
44275245 |
MAINTENACE AND PURCHAGE OF OFFICE COMPUTER |
40000 |
MAINTENACE AND PURCHAGE OF OFFICE COMPUTER1 |
Completion of work |
-
latitude : 20.0771781
Longitude : 85.7368785
file name : Image_23082021124842021.png
|
2021-08-23 12:48:42.141616 |
15 |
44275075 |
MAINTENANCE OF MOBILE |
6000 |
MAINTENANCE OF MOBILE1 |
Completion of work |
-
latitude : 20.0771782
Longitude : 85.7368792
file name : Image_23082021125110205.png
|
2021-08-23 12:51:10.357652 |
16 |
47657622 |
REPAIRE MAINTENANCE OF BEGUNIAPADA SCHOOL BOUNDARY WALL |
200000 |
REPAIRE MAINTENANCE OF BEGUNIAPADA SCHOOL BOUNDARY WALL1 |
Roof laid |
-
latitude : 20.08697683
Longitude : 85.6841038
file name : Image_10112021154800525.png
|
2021-11-10 15:48:00.665664 |
17 |
47657622 |
REPAIRE MAINTENANCE OF BEGUNIAPADA SCHOOL BOUNDARY WALL |
200000 |
REPAIRE MAINTENANCE OF BEGUNIAPADA SCHOOL BOUNDARY WALL1 |
Plinth level |
-
latitude : 20.0870116
Longitude : 85.68411891
file name : Image_10112021154601070.png
|
2021-11-10 15:46:01.20411 |
18 |
47657622 |
REPAIRE MAINTENANCE OF BEGUNIAPADA SCHOOL BOUNDARY WALL |
200000 |
REPAIRE MAINTENANCE OF BEGUNIAPADA SCHOOL BOUNDARY WALL1 |
Completion of work |
-
latitude : 20.08683158
Longitude : 85.68410902
file name : Image_10112021154328916.png
|
2021-11-10 15:43:29.057348 |
19 |
47673642 |
COMPLETION OF MRKET COMPLEX T GADA BEGUNIAPADA VILLAGE |
276606 |
COMPLETION OF MRKET COMPLEX T GADA BEGUNIAPADA VILLAGE1 |
Plinth level |
-
latitude : 20.08593676
Longitude : 85.68598921
file name : Image_10112021153336262.png
|
2021-11-10 15:33:36.394103 |
20 |
47673642 |
COMPLETION OF MRKET COMPLEX T GADA BEGUNIAPADA VILLAGE |
276606 |
COMPLETION OF MRKET COMPLEX T GADA BEGUNIAPADA VILLAGE1 |
Plinth level |
-
latitude : 20.08591918
Longitude : 85.68597043
file name : Image_08112021145022636.png
|
2021-11-08 14:50:22.776595 |
21 |
47673642 |
COMPLETION OF MRKET COMPLEX T GADA BEGUNIAPADA VILLAGE |
276606 |
COMPLETION OF MRKET COMPLEX T GADA BEGUNIAPADA VILLAGE1 |
Completion of work |
-
latitude : 20.08586522
Longitude : 85.68604915
file name : Image_08112021144519988.png
|
2021-11-08 14:45:20.130405 |
22 |
44276007 |
IMPROVEMENT OF SWADIN SABHA YUBAK SANGHA AT BEGUNIAPADA |
100000 |
IMPROVEMENT OF SWADIN SABHA YUBAK SANGHA AT BEGUNIAPADA1 |
Roof laid |
-
latitude : 20.08581423
Longitude : 85.68582524
file name : Image_10112021154030105.png
|
2021-11-10 15:40:30.247759 |
23 |
44276007 |
IMPROVEMENT OF SWADIN SABHA YUBAK SANGHA AT BEGUNIAPADA |
100000 |
IMPROVEMENT OF SWADIN SABHA YUBAK SANGHA AT BEGUNIAPADA1 |
Plinth level |
-
latitude : 20.08586221
Longitude : 85.68586369
file name : Image_10112021153515830.png
|
2021-11-10 15:35:15.965719 |
24 |
44276007 |
IMPROVEMENT OF SWADIN SABHA YUBAK SANGHA AT BEGUNIAPADA |
100000 |
IMPROVEMENT OF SWADIN SABHA YUBAK SANGHA AT BEGUNIAPADA1 |
Completion of work |
-
latitude : 20.08577659
Longitude : 85.68592035
file name : Image_08112021145706766.png
|
2021-11-08 14:57:06.904994 |
25 |
47655077 |
RAISED TUBEWELL PLAT FORM AT HADIA SASHI GOPAPTANA VILLAGE |
20000 |
RAISED TUBEWELL PLAT FORM AT HADIA SASHI GOPAPTANA VILLAGE1 |
Roof laid |
-
latitude : 20.06802973
Longitude : 85.6909085
file name : Image_09032022112119643.png
|
2022-03-09 11:21:19.757197 |
26 |
47655077 |
RAISED TUBEWELL PLAT FORM AT HADIA SASHI GOPAPTANA VILLAGE |
20000 |
RAISED TUBEWELL PLAT FORM AT HADIA SASHI GOPAPTANA VILLAGE1 |
Plinth level |
-
latitude : 20.06804534
Longitude : 85.69088983
file name : Image_09032022110304718.png
|
2022-03-09 11:03:04.842705 |
27 |
47655077 |
RAISED TUBEWELL PLAT FORM AT HADIA SASHI GOPAPTANA VILLAGE |
20000 |
RAISED TUBEWELL PLAT FORM AT HADIA SASHI GOPAPTANA VILLAGE1 |
Completion of work |
-
latitude : 20.06805332
Longitude : 85.69091183
file name : Image_09032022105715176.png
|
2022-03-09 10:57:15.329358 |
28 |
47655077 |
RAISED TUBEWELL PLAT FORM AT HADIA SASHI GOPAPTANA VILLAGE |
20000 |
RAISED TUBEWELL PLAT FORM AT HADIA SASHI GOPAPTANA VILLAGE1 |
Completion of work |
-
latitude : 20.0694962
Longitude : 85.6908351
file name : Image_24022022150331413.png
|
2022-02-24 15:03:31.525498 |
29 |
44275829 |
COSTRUCTION OF GOPAPATNA VILLAGE CABAR STAN CC ROAD |
100000 |
COSTRUCTION OF GOPAPATNA VILLAGE CABAR STAN CC ROAD1 |
Roof laid |
-
latitude : 20.0685029,20.0685029,20.0685029
Longitude : 85.6912114,85.6912114,85.6912114
file name : Image_09032022112114295.png
|
2022-03-09 11:21:14.417563 |
30 |
44275829 |
COSTRUCTION OF GOPAPATNA VILLAGE CABAR STAN CC ROAD |
100000 |
COSTRUCTION OF GOPAPATNA VILLAGE CABAR STAN CC ROAD1 |
Plinth level |
-
latitude : 20.06804628,20.06804523
Longitude : 85.69088769,85.6908838
file name : Image_09032022110227091.png
|
2022-03-09 11:02:27.209444 |
31 |
44275829 |
COSTRUCTION OF GOPAPATNA VILLAGE CABAR STAN CC ROAD |
100000 |
COSTRUCTION OF GOPAPATNA VILLAGE CABAR STAN CC ROAD1 |
Completion of work |
-
latitude : 20.06805677,20.06805294
Longitude : 85.69091889,85.69091366
file name : Image_09032022105616403.png
|
2022-03-09 10:56:16.573568 |
32 |
44275829 |
COSTRUCTION OF GOPAPATNA VILLAGE CABAR STAN CC ROAD |
100000 |
COSTRUCTION OF GOPAPATNA VILLAGE CABAR STAN CC ROAD1 |
Completion of work |
-
latitude : 20.06805789,20.06805967
Longitude : 85.69091806,85.69091885
file name : Image_24022022145802473.png
|
2022-02-24 14:58:02.604501 |
33 |
47658513 |
COST OF DATA ENTRY |
6000 |
COST OF DATA ENTRY1 |
Completion of work |
-
latitude : 20.06613079,20.06613079
Longitude : 85.69375097,85.69375097
file name : Image_09032022200316327.png
|
2022-03-09 20:03:16.442195 |
34 |
47659194 |
SOCIAL AUDIT GRAM SABHA |
5000 |
SOCIAL AUDIT GRAM SABHA1 |
Completion of work |
-
latitude : 20.06610669
Longitude : 85.69372242
file name : Image_09032022183402266.png
|
2022-03-09 18:34:02.410614 |
35 |
47660200 |
MAINTENANCE OF GP MOBILE |
5695 |
MAINTENANCE OF GP MOBILE1 |
Completion of work |
-
latitude : 20.06610733
Longitude : 85.69373508
file name : Image_09032022201005666.png
|
2022-03-09 20:10:05.813331 |
36 |
44274998 |
GRAM SABHA AND SOCIAL AUDIT |
10000 |
GRAM SABHA AND SOCIAL AUDIT1 |
Completion of work |
-
latitude : 20.0661232
Longitude : 85.69373158
file name : Image_09032022182856172.png
|
2022-03-09 18:28:56.312926 |
37 |
47652648 |
SALARY OF SEM |
24000 |
SALARY OF SEM1 |
Completion of work |
-
latitude : 20.0673298
Longitude : 85.6934019
file name : Image_26062022074456090.png
|
2022-06-26 07:44:56.19325 |
38 |
47652648 |
SALARY OF SEM |
24000 |
SALARY OF SEM1 |
Completion of work |
-
latitude : 20.0673298
Longitude : 85.6934019
file name : Image_26062022074528952.png
|
2022-06-26 07:45:29.053716 |
39 |
44275864 |
IMPROVEMENT OF GADA BEGUNIAPADA CHANDI TEMPLE COMMUNITY HALL |
207040 |
IMPROVEMENT OF GADA BEGUNIAPADA CHANDI TEMPLE COMMUNITY HALL1 |
Completion of work |
-
latitude : 20.0662489
Longitude : 85.69370246
file name : Image_28062022150825034.png
|
2022-06-28 15:08:25.146918 |
40 |
44253817 |
SALARY OF SEM |
24000 |
SALARY OF SEM1 |
Completion of work |
-
latitude : 20.0666336
Longitude : 85.69364301
file name : Image_12062021221525711.png
|
2021-06-12 22:15:25.817548 |
41 |
47676055 |
REPAIRE AND MAINTENANCE OF CHHATOI SAHI CC ROAD AT BEGUNIAPADA VILLAGE |
100000 |
REPAIRE AND MAINTENANCE OF CHHATOI SAHI CC ROAD AT BEGUNIAPADA VILLAGE1 |
Roof laid |
-
latitude : 20.08643949,20.08644615
Longitude : 85.68218588,85.68218544
file name : Image_22092022150736216.png
|
2022-09-22 15:07:36.275053 |
42 |
47676055 |
REPAIRE AND MAINTENANCE OF CHHATOI SAHI CC ROAD AT BEGUNIAPADA VILLAGE |
100000 |
REPAIRE AND MAINTENANCE OF CHHATOI SAHI CC ROAD AT BEGUNIAPADA VILLAGE1 |
Plinth level |
-
latitude : 20.08654951,20.08652331
Longitude : 85.68224985,85.68224731
file name : Image_22092022145656933.png
|
2022-09-22 14:56:57.013847 |
43 |
47676055 |
REPAIRE AND MAINTENANCE OF CHHATOI SAHI CC ROAD AT BEGUNIAPADA VILLAGE |
100000 |
REPAIRE AND MAINTENANCE OF CHHATOI SAHI CC ROAD AT BEGUNIAPADA VILLAGE1 |
Completion of work |
-
latitude : 20.08638797,20.08639805
Longitude : 85.68220025,85.68221338
file name : Image_22092022145210899.png
|
2022-09-22 14:52:10.983369 |
44 |
47675137 |
CONST OF BEGUNIAPADA UP SCHOOL CC ROAD |
100000 |
CONST OF BEGUNIAPADA UP SCHOOL CC ROAD1 |
Roof laid |
-
latitude : 20.08752009,20.08752009
Longitude : 85.6837884,85.6837884
file name : Image_22092022153222532.png
|
2022-09-22 15:32:22.603852 |
45 |
47675137 |
CONST OF BEGUNIAPADA UP SCHOOL CC ROAD |
100000 |
CONST OF BEGUNIAPADA UP SCHOOL CC ROAD1 |
Roof laid |
-
latitude : 20.08757607,20.08757565
Longitude : 85.68365556,85.68365449
file name : Image_22092022152216877.png
|
2022-09-22 15:22:16.949654 |
46 |
47675137 |
CONST OF BEGUNIAPADA UP SCHOOL CC ROAD |
100000 |
CONST OF BEGUNIAPADA UP SCHOOL CC ROAD1 |
Plinth level |
-
latitude : 20.08760502,20.08756615
Longitude : 85.68372153,85.68369868
file name : Image_22092022151824379.png
|
2022-09-22 15:18:24.44583 |
47 |
47675137 |
CONST OF BEGUNIAPADA UP SCHOOL CC ROAD |
100000 |
CONST OF BEGUNIAPADA UP SCHOOL CC ROAD1 |
Completion of work |
-
latitude : 20.08760224,20.08760316
Longitude : 85.68368462,85.68366398
file name : Image_22092022151444527.png
|
2022-09-22 15:14:44.593773 |
48 |
47656196 |
CONST OF GHANIPUR SCHOOL DRAIN |
150000 |
CONST OF GHANIPUR SCHOOL DRAIN1 |
Roof laid |
-
latitude : 20.06811793
Longitude : 85.69357633
file name : Image_22092022133035479.png
|
2022-09-22 13:30:35.568213 |
49 |
47656196 |
CONST OF GHANIPUR SCHOOL DRAIN |
150000 |
CONST OF GHANIPUR SCHOOL DRAIN1 |
Plinth level |
-
latitude : 20.06810282
Longitude : 85.69365894
file name : Image_22092022132730622.png
|
2022-09-22 13:27:30.700291 |
50 |
47656196 |
CONST OF GHANIPUR SCHOOL DRAIN |
150000 |
CONST OF GHANIPUR SCHOOL DRAIN1 |
Completion of work |
-
latitude : 20.06808082
Longitude : 85.69357075
file name : Image_22092022131240137.png
|
2022-09-22 13:12:40.198519 |
51 |
47654327 |
RAISED TUBEWELL PLATFORM AT BEGUNIAPADA MAHADEV TEMPLE |
20000 |
RAISED TUBEWELL PLATFORM AT BEGUNIAPADA MAHADEV TEMPLE1 |
Roof laid |
-
latitude : 20.08817985
Longitude : 85.68214179
file name : Image_22092022144448510.png
|
2022-09-22 14:44:48.587255 |
52 |
47654327 |
RAISED TUBEWELL PLATFORM AT BEGUNIAPADA MAHADEV TEMPLE |
20000 |
RAISED TUBEWELL PLATFORM AT BEGUNIAPADA MAHADEV TEMPLE1 |
Plinth level |
-
latitude : 20.08814351
Longitude : 85.68215863
file name : Image_22092022144008356.png
|
2022-09-22 14:40:08.456234 |
53 |
47654327 |
RAISED TUBEWELL PLATFORM AT BEGUNIAPADA MAHADEV TEMPLE |
20000 |
RAISED TUBEWELL PLATFORM AT BEGUNIAPADA MAHADEV TEMPLE1 |
Completion of work |
-
latitude : 20.08816713
Longitude : 85.68211609
file name : Image_22092022142058181.png
|
2022-09-22 14:20:58.413252 |
54 |
47653058 |
SUPPLY OF DRINKING WATER THROUGH TANKER |
72000 |
SUPPLY OF DRINKING WATER THROUGH TANKER1 |
Completion of work |
-
latitude : 20.0773595
Longitude : 85.7368397
file name : Image_29112022165739075.png
|
2022-11-29 16:57:39.152828 |
55 |
47653058 |
SUPPLY OF DRINKING WATER THROUGH TANKER |
72000 |
SUPPLY OF DRINKING WATER THROUGH TANKER1 |
Completion of work |
-
latitude : 20.0773617
Longitude : 85.7367996
file name : Image_10112022120440820.png
|
2022-11-10 12:04:40.873 |
56 |
47653058 |
SUPPLY OF DRINKING WATER THROUGH TANKER |
72000 |
SUPPLY OF DRINKING WATER THROUGH TANKER1 |
Completion of work |
-
latitude : 20.0773611
Longitude : 85.7368003
file name : Image_19102022170848877.png
|
2022-10-19 17:08:48.966645 |
57 |
44254445 |
CONST OF RAISED TUBWELL PLATFORM AND SOCK PIT AT GHANIPUR VILLAGE |
20000 |
CONST OF RAISED TUBWELL PLATFORM AND SOCK PIT AT GHANIPUR VILLAGE1 |
Roof laid |
-
latitude : 20.08633502
Longitude : 85.69310434
file name : Image_22092022160038608.png
|
2022-09-22 16:00:38.68597 |
58 |
44254445 |
CONST OF RAISED TUBWELL PLATFORM AND SOCK PIT AT GHANIPUR VILLAGE |
20000 |
CONST OF RAISED TUBWELL PLATFORM AND SOCK PIT AT GHANIPUR VILLAGE1 |
Plinth level |
-
latitude : 20.08637039
Longitude : 85.69310805
file name : Image_22092022155034171.png
|
2022-09-22 15:50:34.276576 |
59 |
44254445 |
CONST OF RAISED TUBWELL PLATFORM AND SOCK PIT AT GHANIPUR VILLAGE |
20000 |
CONST OF RAISED TUBWELL PLATFORM AND SOCK PIT AT GHANIPUR VILLAGE1 |
Completion of work |
-
latitude : 20.0866094
Longitude : 85.6929342
file name : Image_22092022154343800.png
|
2022-09-22 15:43:43.891324 |
60 |
44254445 |
CONST OF RAISED TUBWELL PLATFORM AND SOCK PIT AT GHANIPUR VILLAGE |
20000 |
CONST OF RAISED TUBWELL PLATFORM AND SOCK PIT AT GHANIPUR VILLAGE1 |
Completion of work |
-
latitude : 20.06606957
Longitude : 85.69531441
file name : Image_18102021090004618.png
|
2021-10-18 09:00:04.768217 |
61 |
44254445 |
CONST OF RAISED TUBWELL PLATFORM AND SOCK PIT AT GHANIPUR VILLAGE |
20000 |
CONST OF RAISED TUBWELL PLATFORM AND SOCK PIT AT GHANIPUR VILLAGE1 |
Completion of work |
-
latitude : 20.06608229
Longitude : 85.69529587
file name : Image_18102021120831718.png
|
2021-10-18 12:08:31.860955 |
62 |
60022055 |
Raised well plat form at Ghanipur Danda Sahi Under GPDP 2022-23 |
25000 |
Raised well plat form at Ghanipur Danda Sahi Under GPDP 2022-231 |
Roof laid |
-
latitude : 20.0670595
Longitude : 85.6975728
file name : Image_22092022125301455.png
|
2022-09-22 12:53:01.566725 |
63 |
60022055 |
Raised well plat form at Ghanipur Danda Sahi Under GPDP 2022-23 |
25000 |
Raised well plat form at Ghanipur Danda Sahi Under GPDP 2022-231 |
Plinth level |
-
latitude : 20.06678514
Longitude : 85.69746903
file name : Image_22092022124729676.png
|
2022-09-22 12:47:29.812175 |
64 |
60022055 |
Raised well plat form at Ghanipur Danda Sahi Under GPDP 2022-23 |
25000 |
Raised well plat form at Ghanipur Danda Sahi Under GPDP 2022-231 |
Completion of work |
-
latitude : 20.06678557
Longitude : 85.6975016
file name : Image_22092022124220966.png
|
2022-09-22 12:42:21.289667 |
65 |
60022055 |
Raised well plat form at Ghanipur Danda Sahi Under GPDP 2022-23 |
25000 |
Raised well plat form at Ghanipur Danda Sahi Under GPDP 2022-231 |
Completion of work |
-
latitude : 20.06685085
Longitude : 85.69754881
file name : Image_22092022124013290.png
|
2022-09-22 12:40:13.462054 |
66 |
44275336 |
COMPLETION OF RAGHUNATH MANDIRA COMMUNITY HALL |
200000 |
COMPLETION OF RAGHUNATH MANDIRA COMMUNITY HALL1 |
Roof laid |
-
latitude : 20.06566272
Longitude : 85.69311324
file name : Image_26092022133006176.png
|
2022-09-26 13:30:06.251022 |
67 |
44275336 |
COMPLETION OF RAGHUNATH MANDIRA COMMUNITY HALL |
200000 |
COMPLETION OF RAGHUNATH MANDIRA COMMUNITY HALL1 |
Plinth level |
-
latitude : 20.06571538
Longitude : 85.69317524
file name : Image_26092022132640803.png
|
2022-09-26 13:26:40.893303 |
68 |
44275336 |
COMPLETION OF RAGHUNATH MANDIRA COMMUNITY HALL |
200000 |
COMPLETION OF RAGHUNATH MANDIRA COMMUNITY HALL1 |
Completion of work |
-
latitude : 20.06565763
Longitude : 85.69313025
file name : Image_26092022131444592.png
|
2022-09-26 13:14:44.66355 |
69 |
44275336 |
COMPLETION OF RAGHUNATH MANDIRA COMMUNITY HALL |
200000 |
COMPLETION OF RAGHUNATH MANDIRA COMMUNITY HALL1 |
Completion of work |
-
latitude : 20.06574197
Longitude : 85.69304002
file name : Image_13062021173539662.png
|
2021-06-13 17:35:39.77106 |
70 |
44275746 |
SOILD WASTE MANAGEMENT AT GHANIPUR GP |
57040 |
SOILD WASTE MANAGEMENT AT GHANIPUR GP1 |
Roof laid |
-
latitude : 20.06811009
Longitude : 85.69140932
file name : Image_15112022143616384.png
|
2022-11-15 14:36:16.476728 |
71 |
44275746 |
SOILD WASTE MANAGEMENT AT GHANIPUR GP |
57040 |
SOILD WASTE MANAGEMENT AT GHANIPUR GP1 |
Plinth level |
-
latitude : 20.06835669
Longitude : 85.69122786
file name : Image_15112022143148002.png
|
2022-11-15 14:31:48.094176 |
72 |
44275746 |
SOILD WASTE MANAGEMENT AT GHANIPUR GP |
57040 |
SOILD WASTE MANAGEMENT AT GHANIPUR GP1 |
Completion of work |
-
latitude : 20.0680501
Longitude : 85.69145221
file name : Image_15112022142657892.png
|
2022-11-15 14:26:57.977024 |
73 |
44274462 |
CONST OF JORAKANI NUAPATNA DRAIN |
200000 |
CONST OF JORAKANI NUAPATNA DRAIN1 |
Roof laid |
-
latitude : 20.07113343,20.07114602
Longitude : 85.6786386,85.67861415
file name : Image_10112022144257274.png
|
2022-11-10 14:42:57.352425 |
74 |
44274462 |
CONST OF JORAKANI NUAPATNA DRAIN |
200000 |
CONST OF JORAKANI NUAPATNA DRAIN1 |
Plinth level |
-
latitude : 20.07112918,20.07113277
Longitude : 85.67861447,85.67861484
file name : Image_10112022143453887.png
|
2022-11-10 14:34:53.950243 |
75 |
44274462 |
CONST OF JORAKANI NUAPATNA DRAIN |
200000 |
CONST OF JORAKANI NUAPATNA DRAIN1 |
Completion of work |
-
latitude : 20.07110471,20.07110363
Longitude : 85.67867236,85.67868046
file name : Image_10112022142503747.png
|
2022-11-10 14:25:03.815361 |
76 |
47674769 |
REPIRE MAINTENANCE OF HARIJAN SAHI KOTHAGAR JORAKANI |
100000 |
REPIRE MAINTENANCE OF HARIJAN SAHI KOTHAGAR JORAKANI1 |
Roof laid |
-
latitude : 20.07236085
Longitude : 85.67991648
file name : Image_02122022172041905.png
|
2022-12-02 17:20:41.982833 |
77 |
47674769 |
REPIRE MAINTENANCE OF HARIJAN SAHI KOTHAGAR JORAKANI |
100000 |
REPIRE MAINTENANCE OF HARIJAN SAHI KOTHAGAR JORAKANI1 |
Plinth level |
-
latitude : 20.07235876
Longitude : 85.6799197
file name : Image_02122022171758892.png
|
2022-12-02 17:17:58.96201 |
78 |
47674769 |
REPIRE MAINTENANCE OF HARIJAN SAHI KOTHAGAR JORAKANI |
100000 |
REPIRE MAINTENANCE OF HARIJAN SAHI KOTHAGAR JORAKANI1 |
Completion of work |
-
latitude : 20.07232489
Longitude : 85.67986967
file name : Image_02122022171422805.png
|
2022-12-02 17:14:22.894213 |
79 |
44275471 |
IMPROVEMENT OF BITIPUR KOTHAGHAR |
100000 |
IMPROVEMENT OF BITIPUR KOTHAGHAR1 |
Roof laid |
-
latitude : 20.06833484
Longitude : 85.67680499
file name : Image_02122022170431559.png
|
2022-12-02 17:04:31.638987 |
80 |
44275471 |
IMPROVEMENT OF BITIPUR KOTHAGHAR |
100000 |
IMPROVEMENT OF BITIPUR KOTHAGHAR1 |
Plinth level |
-
latitude : 20.06827825
Longitude : 85.67675394
file name : Image_02122022170134367.png
|
2022-12-02 17:01:34.438537 |
81 |
44275471 |
IMPROVEMENT OF BITIPUR KOTHAGHAR |
100000 |
IMPROVEMENT OF BITIPUR KOTHAGHAR1 |
Completion of work |
-
latitude : 20.06828404
Longitude : 85.67679632
file name : Image_02122022164858331.png
|
2022-12-02 16:48:58.421275 |
82 |
47660508 |
REPAIRE MAINTENACE OF BEGUNIAPADA SCHOOL ROOM |
100000 |
REPAIRE MAINTENACE OF BEGUNIAPADA SCHOOL ROOM1 |
Roof laid |
-
latitude : 20.08756302
Longitude : 85.6837479
file name : Image_19012023112456347.png
|
2023-01-19 11:24:56.42268 |
83 |
47660508 |
REPAIRE MAINTENACE OF BEGUNIAPADA SCHOOL ROOM |
100000 |
REPAIRE MAINTENACE OF BEGUNIAPADA SCHOOL ROOM1 |
Plinth level |
-
latitude : 20.08749986
Longitude : 85.68379053
file name : Image_22092022152930205.png
|
2022-09-22 15:29:30.278782 |
84 |
47660508 |
REPAIRE MAINTENACE OF BEGUNIAPADA SCHOOL ROOM |
100000 |
REPAIRE MAINTENACE OF BEGUNIAPADA SCHOOL ROOM1 |
Completion of work |
-
latitude : 20.08750215
Longitude : 85.68380954
file name : Image_22092022152537032.png
|
2022-09-22 15:25:37.109399 |
85 |
44275387 |
CONSTRUCTION OF MARKET COMPLEX AT GHANIPUR GP |
573391 |
CONSTRUCTION OF MARKET COMPLEX AT GHANIPUR GP1 |
Roof laid |
-
latitude : 20.068459
Longitude : 85.6911361
file name : Image_25092023112634397.png
|
2023-09-25 11:26:34.482494 |
86 |
44275387 |
CONSTRUCTION OF MARKET COMPLEX AT GHANIPUR GP |
573391 |
CONSTRUCTION OF MARKET COMPLEX AT GHANIPUR GP1 |
Roof laid |
-
latitude : 20.0674076
Longitude : 85.70483799
file name : Image_27032023123939951.png
|
2023-03-27 12:39:40.059914 |
87 |
44275387 |
CONSTRUCTION OF MARKET COMPLEX AT GHANIPUR GP |
573391 |
CONSTRUCTION OF MARKET COMPLEX AT GHANIPUR GP1 |
Plinth level |
-
latitude : 20.06754424
Longitude : 85.70507947
file name : Image_27032023121314986.png
|
2023-03-27 12:13:15.065231 |
88 |
44275387 |
CONSTRUCTION OF MARKET COMPLEX AT GHANIPUR GP |
573391 |
CONSTRUCTION OF MARKET COMPLEX AT GHANIPUR GP1 |
Completion of work |
-
latitude : 20.0683191
Longitude : 85.69130215
file name : Image_24032023152317350.png
|
2023-03-24 15:23:17.41551 |
89 |
60016674 |
Social Audit / Gramasabha Under GPDP 2022-23 |
10000 |
Social Audit / Gramasabha Under GPDP 2022-231 |
Completion of work |
-
latitude : 20.0773607
Longitude : 85.7368004
file name : Image_28032023163643496.png
|
2023-03-28 16:36:43.612567 |
90 |
60016674 |
Social Audit / Gramasabha Under GPDP 2022-23 |
10000 |
Social Audit / Gramasabha Under GPDP 2022-231 |
Completion of work |
-
latitude : 20.0773611
Longitude : 85.7368003
file name : Image_28032023163849630.png
|
2023-03-28 16:38:49.711594 |
91 |
60003635 |
Salary of SEM Under GPDP 2022-23 |
24000 |
Salary of SEM Under GPDP 2022-231 |
Completion of work |
-
latitude : 20.0773433
Longitude : 85.7367917
file name : Image_29032023170848368.png
|
2023-03-29 17:08:48.486005 |
92 |
44254147 |
ENERGY CHARGES OF PWS |
30000 |
ENERGY CHARGES OF PWS1 |
Completion of work |
-
latitude : 20.0772358
Longitude : 85.7367705
file name : Image_24042023121802993.png
|
2023-04-24 12:18:03.102697 |
93 |
44254147 |
ENERGY CHARGES OF PWS |
30000 |
ENERGY CHARGES OF PWS1 |
Completion of work |
-
latitude : 20.0772089
Longitude : 85.7367684
file name : Image_24042023121811702.png
|
2023-04-24 12:18:11.79983 |
94 |
47653323 |
ENERGY CHARGES PWS |
50000 |
ENERGY CHARGES PWS1 |
Completion of work |
-
latitude : 20.2508191
Longitude : 85.8543529
file name : Image_30032023112240573.png
|
2023-03-30 11:22:40.686086 |
95 |
60017521 |
Implementation of Solid and liquid Waste Mangaement of ghanipur gp Under GPDP 2022-23 |
685100 |
Implementation of Solid and liquid Waste Mangaement of ghanipur gp Under GPDP 2022-231 |
Completion of work |
-
latitude : 20.0773156
Longitude : 85.7367995
file name : Image_24042023122145485.png
|
2023-04-24 12:21:45.79649 |
96 |
60017521 |
Implementation of Solid and liquid Waste Mangaement of ghanipur gp Under GPDP 2022-23 |
685100 |
Implementation of Solid and liquid Waste Mangaement of ghanipur gp Under GPDP 2022-231 |
Completion of work |
-
latitude : 20.08709703
Longitude : 85.68365211
file name : Image_19012023112944047.png
|
2023-01-19 11:29:44.133682 |
97 |
47674423 |
REPIRE MAINTENANCE OF JORAKANI SUNDAR SAHI COMMUNITY HALL |
107040 |
REPIRE MAINTENANCE OF JORAKANI SUNDAR SAHI COMMUNITY HALL1 |
Plinth level |
-
latitude : 20.071271
Longitude : 85.68030436
file name : Image_30052023142625213.png
|
2023-05-30 14:26:25.26966 |
98 |
47674423 |
REPIRE MAINTENANCE OF JORAKANI SUNDAR SAHI COMMUNITY HALL |
107040 |
REPIRE MAINTENANCE OF JORAKANI SUNDAR SAHI COMMUNITY HALL1 |
Plinth level |
-
latitude : 20.07125134
Longitude : 85.6802551
file name : Image_30052023142130425.png
|
2023-05-30 14:21:30.480458 |
99 |
47674423 |
REPIRE MAINTENANCE OF JORAKANI SUNDAR SAHI COMMUNITY HALL |
107040 |
REPIRE MAINTENANCE OF JORAKANI SUNDAR SAHI COMMUNITY HALL1 |
Completion of work |
-
latitude : 20.07131582
Longitude : 85.68021822
file name : Image_30052023141526407.png
|
2023-05-30 14:15:26.469337 |
100 |
44274897 |
CONST OF AWC KITCHEN SHED AT BEGUNIAPADA VILLAGE |
133391 |
CONST OF AWC KITCHEN SHED AT BEGUNIAPADA VILLAGE1 |
Roof laid |
-
latitude : 20.0875486
Longitude : 85.6834358
file name : Image_30052023150835388.png
|
2023-05-30 15:08:35.473911 |
101 |
44274897 |
CONST OF AWC KITCHEN SHED AT BEGUNIAPADA VILLAGE |
133391 |
CONST OF AWC KITCHEN SHED AT BEGUNIAPADA VILLAGE1 |
Roof laid |
-
latitude : 20.08750808
Longitude : 85.68341286
file name : Image_30052023151128256.png
|
2023-05-30 15:11:28.32331 |
102 |
44274897 |
CONST OF AWC KITCHEN SHED AT BEGUNIAPADA VILLAGE |
133391 |
CONST OF AWC KITCHEN SHED AT BEGUNIAPADA VILLAGE1 |
Plinth level |
-
latitude : 20.08754421
Longitude : 85.6834237
file name : Image_30052023150315169.png
|
2023-05-30 15:03:15.238943 |
103 |
44274897 |
CONST OF AWC KITCHEN SHED AT BEGUNIAPADA VILLAGE |
133391 |
CONST OF AWC KITCHEN SHED AT BEGUNIAPADA VILLAGE1 |
Plinth level |
-
latitude : 20.08749055
Longitude : 85.68340417
file name : Image_30052023145951496.png
|
2023-05-30 14:59:51.568408 |
104 |
44274897 |
CONST OF AWC KITCHEN SHED AT BEGUNIAPADA VILLAGE |
133391 |
CONST OF AWC KITCHEN SHED AT BEGUNIAPADA VILLAGE1 |
Completion of work |
-
latitude : 20.08750867
Longitude : 85.68346609
file name : Image_30052023145632436.png
|
2023-05-30 14:56:32.521957 |
105 |
60023834 |
Improvement of P.H.C Ghoradia,Ghanipur GP Under GPDP 2022-23 |
200000 |
Improvement of P.H.C Ghoradia,Ghanipur GP Under GPDP 2022-231 |
Roof laid |
-
latitude : 20.06456599
Longitude : 85.69449183
file name : Image_09082023141408128.png
|
2023-08-09 14:14:08.263307 |
106 |
60023834 |
Improvement of P.H.C Ghoradia,Ghanipur GP Under GPDP 2022-23 |
200000 |
Improvement of P.H.C Ghoradia,Ghanipur GP Under GPDP 2022-231 |
Plinth level |
-
latitude : 20.06441328
Longitude : 85.69435231
file name : Image_09082023140700375.png
|
2023-08-09 14:07:00.466316 |
107 |
60023834 |
Improvement of P.H.C Ghoradia,Ghanipur GP Under GPDP 2022-23 |
200000 |
Improvement of P.H.C Ghoradia,Ghanipur GP Under GPDP 2022-231 |
Completion of work |
-
latitude : 20.06445958
Longitude : 85.69426482
file name : Image_09082023134952545.png
|
2023-08-09 13:49:52.64924 |
108 |
82626356 |
Operation and Maintenance of drinking water supply system |
24000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 20.06667626
Longitude : 85.69367018
file name : Image_27022024085325718.png
|
2024-02-27 08:53:25.796665 |
109 |
78137480 |
Electricity connection /Installation of Solar Energy |
226723 |
Electricity connection /Installation of Solar Energy1 |
Roof laid |
-
latitude : 20.06810526
Longitude : 85.69108212
file name : Image_23112023140134355.png
|
2023-11-23 14:01:34.452991 |
110 |
78137480 |
Electricity connection /Installation of Solar Energy |
226723 |
Electricity connection /Installation of Solar Energy1 |
Plinth level |
-
latitude : 20.06818785
Longitude : 85.69114256
file name : Image_22112023113813469.png
|
2023-11-22 11:38:13.555657 |
111 |
78137480 |
Electricity connection /Installation of Solar Energy |
226723 |
Electricity connection /Installation of Solar Energy1 |
Completion of work |
-
latitude : 20.06823889
Longitude : 85.69115025
file name : Image_25092023135223397.png
|
2023-09-25 13:52:23.476918 |
112 |
78137480 |
Electricity connection /Installation of Solar Energy |
226723 |
Electricity connection /Installation of Solar Energy1 |
Completion of work |
-
latitude : 20.06658237
Longitude : 85.69358479
file name : Image_25092023104338477.png
|
2023-09-25 10:43:38.586595 |
113 |
74590855 |
Piped drinking water to public institutions |
72000 |
Piped drinking water to public institutions1 |
|
-
latitude : 20.0682731
Longitude : 85.6911759
file name : Image_22112023113509259.png
|
2023-11-22 11:35:09.352655 |
114 |
75524232 |
Water Supply to villages |
30000 |
Water Supply to villages1 |
|
-
latitude : 20.07735094
Longitude : 85.73673456
file name : Image_22112023154357567.png
|
2023-11-22 15:43:57.653737 |
115 |
75489213 |
Operation and Maintenance of drinking water supply system |
20000 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 20.06886124
Longitude : 85.68504017
file name : Image_04042024170538991.png
|
2024-04-04 17:05:39.070662 |
116 |
75489213 |
Operation and Maintenance of drinking water supply system |
20000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 20.06894935
Longitude : 85.68515284
file name : Image_04042024170032663.png
|
2024-04-04 17:00:32.760313 |
117 |
75489213 |
Operation and Maintenance of drinking water supply system |
20000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 20.06890346
Longitude : 85.68512446
file name : Image_04042024164552228.png
|
2024-04-04 16:45:52.315168 |
118 |
75490932 |
Operation and Maintenance of drinking water supply system |
30000 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 20.06611537
Longitude : 85.69365022
file name : Image_09042024101618473.png
|
2024-04-09 10:16:18.558782 |
119 |
75490932 |
Operation and Maintenance of drinking water supply system |
30000 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 20.06914156
Longitude : 85.69113811
file name : Image_04042024163906058.png
|
2024-04-04 16:39:06.168793 |
120 |
75490932 |
Operation and Maintenance of drinking water supply system |
30000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 20.06908943
Longitude : 85.69106659
file name : Image_04042024162723156.png
|
2024-04-04 16:27:23.241081 |
121 |
75490932 |
Operation and Maintenance of drinking water supply system |
30000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 20.06909893
Longitude : 85.69109983
file name : Image_04042024153322491.png
|
2024-04-04 15:33:22.577599 |
122 |
75487031 |
Operation and Maintenance of drinking water supply system |
20000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 20.0667607
Longitude : 85.6971823
file name : Image_09042024103245814.png
|
2024-04-09 10:32:45.901917 |
123 |
75490126 |
Operation and Maintenance of drinking water supply system |
20000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 20.06589915
Longitude : 85.6915758
file name : Image_08042024134813297.png
|
2024-04-08 13:48:13.392956 |
124 |
75490126 |
Operation and Maintenance of drinking water supply system |
20000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 20.06589692
Longitude : 85.69160823
file name : Image_05042024134116964.png
|
2024-04-05 13:41:17.052053 |
125 |
75490126 |
Operation and Maintenance of drinking water supply system |
20000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 20.06595284
Longitude : 85.69162278
file name : Image_05042024133803219.png
|
2024-04-05 13:38:03.307719 |
126 |
74593222 |
Operation and Maintenance of drinking water supply system |
20000 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 20.0872051
Longitude : 85.68322402
file name : Image_05042024130405432.png
|
2024-04-05 13:04:05.527266 |
127 |
74593222 |
Operation and Maintenance of drinking water supply system |
20000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 20.08711939
Longitude : 85.68329085
file name : Image_05042024125230412.png
|
2024-04-05 12:52:30.492918 |
128 |
74593222 |
Operation and Maintenance of drinking water supply system |
20000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 20.08715471
Longitude : 85.68330994
file name : Image_05042024123759691.png
|
2024-04-05 12:37:59.792192 |
129 |
75488667 |
Operation and Maintenance of drinking water supply system |
20000 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 20.06587026
Longitude : 85.69433516
file name : Image_05042024141042495.png
|
2024-04-05 14:10:42.58 |
130 |
75488667 |
Operation and Maintenance of drinking water supply system |
20000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 20.06579344
Longitude : 85.69435779
file name : Image_05042024140449754.png
|
2024-04-05 14:04:49.845668 |
131 |
75488667 |
Operation and Maintenance of drinking water supply system |
20000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 20.06584238
Longitude : 85.69430134
file name : Image_05042024134842405.png
|
2024-04-05 13:48:42.496951 |
132 |
75486263 |
Operation and Maintenance of drinking water supply system |
20000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 20.0667601
Longitude : 85.6971823
file name : Image_09042024103446556.png
|
2024-04-09 10:34:46.663877 |
133 |
75486263 |
Operation and Maintenance of drinking water supply system |
20000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 20.06708566
Longitude : 85.69460818
file name : Image_09042024102721385.png
|
2024-04-09 10:27:21.460344 |
134 |
60141844 |
Repair and Maintainance of Awc Beguniapada Kitchen Under GPDP 2022-23 |
82710 |
Repair and Maintainance of Awc Beguniapada Kitchen Under GPDP 2022-231 |
Completion of work |
-
latitude : 20.0875514
Longitude : 85.68339131
file name : Image_09042024104941305.png
|
2024-04-09 10:49:41.402635 |
135 |
47673082 |
CONST OF GHANIPUR GP MARKET COMPLE AT GHORADIA HAT |
321052 |
CONST OF GHANIPUR GP MARKET COMPLE AT GHORADIA HAT1 |
Roof laid |
-
latitude : 20.06824851
Longitude : 85.69125708
file name : Image_05042024133044659.png
|
2024-04-05 13:30:44.747935 |
136 |
47673082 |
CONST OF GHANIPUR GP MARKET COMPLE AT GHORADIA HAT |
321052 |
CONST OF GHANIPUR GP MARKET COMPLE AT GHORADIA HAT1 |
Plinth level |
-
latitude : 20.06826515
Longitude : 85.69124185
file name : Image_05042024132424127.png
|
2024-04-05 13:24:24.233999 |
137 |
47673082 |
CONST OF GHANIPUR GP MARKET COMPLE AT GHORADIA HAT |
321052 |
CONST OF GHANIPUR GP MARKET COMPLE AT GHORADIA HAT1 |
Completion of work |
-
latitude : 20.0684706
Longitude : 85.6911466
file name : Image_05042024095222245.png
|
2024-04-05 09:52:22.340907 |