1 |
48360306 |
Opening of Jalachhatra ( Bus stop, Market Place, Main Chowk etc.) |
108205 |
Opening of Jalachhatra ( Bus stop, Market Place, Main Chowk etc.) 1 |
Completion of work |
-
latitude : 20.722992522642016
Longitude : 82.93106496334076
file name : Image_16112021121814246.png
|
2021-11-16 12:18:14.333932 |
2 |
44080015 |
Opening of of Jalachhatra(Busstop, Market Place, Main Chowk etc) |
85120 |
Opening of of Jalachhatra(Busstop, Market Place, Main Chowk etc)1 |
Completion of work |
-
latitude : 20.7324496563524
Longitude : 82.91889997199178
file name : Image_18102021155429685.png
|
2021-10-18 15:54:29.756694 |
3 |
44080015 |
Opening of of Jalachhatra(Busstop, Market Place, Main Chowk etc) |
85120 |
Opening of of Jalachhatra(Busstop, Market Place, Main Chowk etc)1 |
Completion of work |
-
latitude : 20.732466587796807
Longitude : 82.9188865609467
file name : Image_18102021162035688.png
|
2021-10-18 16:20:35.747159 |
4 |
44080015 |
Opening of of Jalachhatra(Busstop, Market Place, Main Chowk etc) |
85120 |
Opening of of Jalachhatra(Busstop, Market Place, Main Chowk etc)1 |
Completion of work |
-
latitude : 20.732466587796807
Longitude : 82.9188865609467
file name : Image_18102021162130174.png
|
2021-10-18 16:21:30.239472 |
5 |
44080015 |
Opening of of Jalachhatra(Busstop, Market Place, Main Chowk etc) |
85120 |
Opening of of Jalachhatra(Busstop, Market Place, Main Chowk etc)1 |
Completion of work |
-
latitude : 20.732523961924016
Longitude : 82.91890474967659
file name : Image_18102021162016841.png
|
2021-10-18 16:20:16.919474 |
6 |
44080455 |
White washing of all Quarters of all Schools |
231772 |
White washing of all Quarters of all Schools1 |
Completion of work |
-
latitude : 20.71941051632166
Longitude : 82.90850180201232
file name : Image_29042021111921190.png
|
2021-04-29 11:19:21.270429 |
7 |
44080245 |
Supply of Drinking Water at Godbhanga Primary School with Bath rooms |
100000 |
Supply of Drinking Water at Godbhanga Primary School with Bath rooms1 |
Completion of work |
-
latitude : 20.732474173419178,20.732426228933036
Longitude : 82.91641272604465,82.91641306132078
file name : Image_29042021115316489.png
|
2021-04-29 11:53:16.556183 |
8 |
44080407 |
Constructio of Boundary Wall at Primary School |
250000 |
Constructio of Boundary Wall at Primary School1 |
Completion of work |
-
latitude : 20.719410977326334
Longitude : 82.90847841650248
file name : Image_29042021112106554.png
|
2021-04-29 11:21:06.657257 |
9 |
44080387 |
Beautification of Darlipali Primary School |
150000 |
Beautification of Darlipali Primary School 1 |
Completion of work |
-
latitude : 20.719392579048872
Longitude : 82.90847389027476
file name : Image_29042021112423719.png
|
2021-04-29 11:24:23.810449 |
10 |
44080704 |
Construction of Boundary Wall of AWC, Badbahali |
200000 |
Construction of Boundary Wall of AWC, Badbahali1 |
Completion of work |
-
latitude : 20.716407322324812
Longitude : 82.89053116925061
file name : Image_27052021121531360.png
|
2021-05-27 12:15:31.439129 |
11 |
44080314 |
Sinking of New Tube Well |
73000 |
Sinking of New Tube Well1 |
Completion of work |
-
latitude : 20.72205542586744
Longitude : 82.94131821021438
file name : Image_27052021115039677.png
|
2021-05-27 11:50:39.764916 |
12 |
44080485 |
Piped Water System at all UP Schools, |
150000 |
Piped Water System at all UP Schools, 1 |
Completion of work |
-
latitude : 20.71933633647859
Longitude : 82.90836752392352
file name : Image_30062021115334294.png
|
2021-06-30 11:53:34.361986 |
13 |
44080293 |
Construction of Bathrooms 10 Nos at Darlipali Primary School |
250000 |
Construction of Bathrooms 10 Nos at Darlipali Primary School1 |
Completion of work |
-
latitude : 20.719403768889606
Longitude : 82.90846408344805
file name : Image_30062021112459227.png
|
2021-06-30 11:24:59.286432 |
14 |
44080293 |
Construction of Bathrooms 10 Nos at Darlipali Primary School |
250000 |
Construction of Bathrooms 10 Nos at Darlipali Primary School2 |
Completion of work |
-
latitude : 20.71951176971197
Longitude : 82.90832611732185
file name : Image_30062021113946308.png
|
2021-06-30 11:39:46.367871 |
15 |
44080293 |
Construction of Bathrooms 10 Nos at Darlipali Primary School |
250000 |
Construction of Bathrooms 10 Nos at Darlipali Primary School3 |
Completion of work |
-
latitude : 20.71953108999878
Longitude : 82.90819108486176
file name : Image_30062021114258832.png
|
2021-06-30 11:42:58.892445 |
16 |
44080293 |
Construction of Bathrooms 10 Nos at Darlipali Primary School |
250000 |
Construction of Bathrooms 10 Nos at Darlipali Primary School4 |
Completion of work |
-
latitude : 20.719249416142702
Longitude : 82.90822721086442
file name : Image_30062021114516708.png
|
2021-06-30 11:45:16.770073 |
17 |
44080223 |
Honorarium to SEMs & Pump Driver |
24000 |
Honorarium to SEMs & Pump Driver1 |
Completion of work |
-
latitude : 20.61729395762086
Longitude : 82.90331759490073
file name : Image_09072021064204494.png
|
2021-07-09 06:42:04.628658 |
18 |
44080742 |
Electrification and Wiring to All Primary Schools of the GP |
150000 |
Electrification and Wiring to All Primary Schools of the GP1 |
Completion of work |
-
latitude : 20.71937325876206
Longitude : 82.90847330354154
file name : Image_12082021113750206.png
|
2021-08-12 11:37:50.311706 |
19 |
44080361 |
Maintenance of ODF status |
33652 |
Maintenance of ODF status 1 |
Completion of work |
-
latitude : 20.72159081697464
Longitude : 82.90858327411115
file name : Image_06092021154839942.png
|
2021-09-06 15:48:40.022495 |
20 |
44080647 |
Cleaning of Bathing Ghat, Street/AWC/Schools/Drain etc |
50000 |
Cleaning of Bathing Ghat, Street/AWC/Schools/Drain etc1 |
Completion of work |
-
latitude : 20.721549578011036
Longitude : 82.90859207510948
file name : Image_06092021154434751.png
|
2021-09-06 15:44:34.831973 |
21 |
48493102 |
Maintenance of road from Malpara road to Shiba Mandir |
200000 |
Maintenance of road from Malpara road to Shiba Mandir1 |
Completion of work |
-
latitude : 20.736900363117456,20.736900363117456
Longitude : 82.91209009476006,82.91209009476006
file name : Image_08092021173136230.png
|
2021-09-08 17:31:36.348787 |
22 |
48492297 |
Maintenance of road from Nuapada to Kenal road , Darlipali |
100000 |
Maintenance of road from Nuapada to Kenal road , Darlipali1 |
Completion of work |
-
latitude : 20.719815487973392,20.719786318950355
Longitude : 82.9096080455929,82.90963771753013
file name : Image_29112021121812891.png
|
2021-11-29 12:18:12.994548 |
23 |
48492983 |
Maintenance of road from Malpara to Tikrapara |
150000 |
Maintenance of road from Malpara to Tikrapara 1 |
Completion of work |
-
latitude : 20.737334587611258,20.73736522346735
Longitude : 82.90664956904948,82.90651495568454
file name : Image_29112021111254803.png
|
2021-11-29 11:12:54.883904 |
24 |
48492063 |
Maintenance of road from Barbahali to Admunda, Barbahali |
100000 |
Maintenance of road from Barbahali to Admunda, Barbahali1 |
Completion of work |
-
latitude : 20.71001473814249,20.709939594380558
Longitude : 82.8985738568008,82.89858031086624
file name : Image_29112021123455401.png
|
2021-11-29 12:34:55.508209 |
25 |
48494873 |
Maintenance of Road from Darlipali to Godbhanga |
100000 |
Maintenance of Road from Darlipali to Godbhanga1 |
Completion of work |
-
latitude : 20.72762608062476,20.72752671316266
Longitude : 82.90993544273078,82.90987484157085
file name : Image_29112021115458521.png
|
2021-11-29 11:54:58.639835 |
26 |
48482808 |
Const. of Drain Darlipali Sanimandir to Sahupara ,Darlipali |
250000 |
Const. of Drain Darlipali Sanimandir to Sahupara ,Darlipali1 |
Completion of work |
-
latitude : 20.72040201164782,20.7217362
Longitude : 82.9075981490314,82.9083
file name : Image_03022022180128411.png
|
2022-02-03 18:01:28.492445 |
27 |
48482958 |
Cleaning of Bathing Ghat, Street ,AWC, Schools/Drain etc. |
100000 |
Cleaning of Bathing Ghat, Street ,AWC, Schools/Drain etc.1 |
Completion of work |
-
latitude : 20.726495403796434
Longitude : 82.90925458073616
file name : Image_03022022174754680.png
|
2022-02-03 17:47:54.767379 |
28 |
48360456 |
Provide of Drinking water to water scarcity villages during peak summer by Mobile Tanker |
300000 |
Provide of Drinking water to water scarcity villages during peak summer by Mobile Tanker 1 |
Completion of work |
-
latitude : 20.72174035012722
Longitude : 82.90871964767575
file name : Image_05022022075837328.png
|
2022-02-05 07:58:37.449584 |
29 |
63927140 |
Improvement of Play ground at Darlipali |
100000 |
Improvement of Play ground at Darlipali1 |
Completion of work |
-
latitude : 20.723125291988254,20.72313128504902
Longitude : 82.89952327497303,82.89959871210158
file name : Image_18062022092145435.png
|
2022-06-18 09:21:45.531912 |
30 |
63927166 |
Repair and Maintenance of Road from Admunda to Kandhenjhula |
143074 |
Repair and Maintenance of Road from Admunda to Kandhenjhula1 |
Completion of work |
-
latitude : 20.710605327039957,20.7106575043872
Longitude : 82.90229533798993,82.90218570269644
file name : Image_27062022160831603.png
|
2022-06-27 16:08:31.691242 |
31 |
48492549 |
Repair and maintenance of road of Bariha Para road , Barbahali |
100000 |
Repair and maintenance of road of Bariha Para road , Barbahali 1 |
Completion of work |
-
latitude : 20.71574385277927,20.715873772278428,20.715851015411317
Longitude : 82.89017586037517,82.89024224504828,82.8902502078563
file name : Image_02072022150236844.png
|
2022-07-02 15:02:36.932187 |
32 |
48493346 |
Maintenance of road from Admunda Basti |
150000 |
Maintenance of road from Admunda Basti 1 |
Completion of work |
-
latitude : 20.70990434847772,20.709913610480726
Longitude : 82.9017785936594,82.90165152400732
file name : Image_02072022151237001.png
|
2022-07-02 15:12:37.089237 |
33 |
62022173 |
Jalachhatras at all Villages |
108205 |
Jalachhatras at all Villages1 |
Completion of work |
-
latitude : 20.736721116118133
Longitude : 82.91243291459978
file name : Image_28082022101709102.png
|
2022-08-28 10:17:09.171291 |
34 |
62022148 |
Drinking Water through Tanker |
100000 |
Drinking Water through Tanker1 |
Completion of work |
-
latitude : 20.732994438149035
Longitude : 82.91707137599587
file name : Image_10082022132425063.png
|
2022-08-10 13:24:25.129655 |
35 |
48492194 |
Const . of Bathing step Banjimunda , Darlipali |
100000 |
Const . of Bathing step Banjimunda , Darlipali1 |
Completion of work |
-
latitude : 20.725996010005474
Longitude : 82.90954518131912
file name : Image_30082022102718461.png
|
2022-08-30 10:27:18.5314 |
36 |
48483137 |
Const. of Bathing Step Uppar Munda Bandh , Godbhanga |
132886 |
Const. of Bathing Step Uppar Munda Bandh , Godbhanga 1 |
Completion of work |
-
latitude : 20.732338135130703
Longitude : 82.91788240894675
file name : Image_30082022101837006.png
|
2022-08-30 10:18:37.088792 |
37 |
62022831 |
Construction of Bathing Step with Dress Changing Room at Godbhanga Tank |
150000 |
Construction of Bathing Step with Dress Changing Room at Godbhanga Tank1 |
Completion of work |
-
latitude : 20.732564823701978
Longitude : 82.9175550956279
file name : Image_02112022145602920.png
|
2022-11-02 14:56:02.997188 |
38 |
62022831 |
Construction of Bathing Step with Dress Changing Room at Godbhanga Tank |
150000 |
Construction of Bathing Step with Dress Changing Room at Godbhanga Tank1 |
Completion of work |
-
latitude : 20.73253171518445
Longitude : 82.91758501902223
file name : Image_28102022162547036.png
|
2022-10-28 16:25:47.104588 |
39 |
62022831 |
Construction of Bathing Step with Dress Changing Room at Godbhanga Tank |
150000 |
Construction of Bathing Step with Dress Changing Room at Godbhanga Tank1 |
Completion of work |
-
latitude : 20.732508203946054
Longitude : 82.91778920218349
file name : Image_02112022150312272.png
|
2022-11-02 15:03:12.328206 |
40 |
48492674 |
Const. of Bathing Step Kurmibandh, Admunda |
100000 |
Const. of Bathing Step Kurmibandh, Admunda 1 |
Completion of work |
-
latitude : 20.71081147994846
Longitude : 82.9051027726382
file name : Image_28102022164831874.png
|
2022-10-28 16:48:31.973457 |
41 |
62022659 |
Cleaning of Schools, AWCs, Streets, Bathing Ghat area |
60000 |
Cleaning of Schools, AWCs, Streets, Bathing Ghat area1 |
Completion of work |
-
latitude : 20.733352261595428
Longitude : 82.9168970324099
file name : Image_14022023124225110.png
|
2023-02-14 12:42:25.20114 |
42 |
62022659 |
Cleaning of Schools, AWCs, Streets, Bathing Ghat area |
60000 |
Cleaning of Schools, AWCs, Streets, Bathing Ghat area1 |
Completion of work |
-
latitude : 20.733352261595428
Longitude : 82.9168970324099
file name : Image_14022023205352359.png
|
2023-02-14 20:53:52.473706 |
43 |
62022659 |
Cleaning of Schools, AWCs, Streets, Bathing Ghat area |
60000 |
Cleaning of Schools, AWCs, Streets, Bathing Ghat area1 |
Completion of work |
-
latitude : 20.8208015
Longitude : 83.1456012
file name : Image_14022023205356353.png
|
2023-02-14 20:53:56.430393 |
44 |
62022659 |
Cleaning of Schools, AWCs, Streets, Bathing Ghat area |
60000 |
Cleaning of Schools, AWCs, Streets, Bathing Ghat area1 |
Completion of work |
-
latitude : 20.820811
Longitude : 83.1456181
file name : Image_14022023205413553.png
|
2023-02-14 20:54:13.628 |
45 |
62022719 |
Repair and Maintenance of CC road at Malpada |
50000 |
Repair and Maintenance of CC road at Malpada1 |
Completion of work |
-
latitude : 20.73644384276122,20.736440951004624
Longitude : 82.91014708578587,82.91013191454113
file name : Image_06022023174610615.png
|
2023-02-06 17:46:10.694982 |
46 |
62022798 |
Construction of Bathing Step with Dress Changing Room at Malpad tank |
150000 |
Construction of Bathing Step with Dress Changing Room at Malpad tank1 |
Completion of work |
-
latitude : 20.739682568237185
Longitude : 82.91403846815228
file name : Image_06022023174606503.png
|
2023-02-06 17:46:06.589864 |
47 |
62022761 |
Construction of Boundary wall at AWC, Godbhanga |
108992 |
Construction of Boundary wall at AWC, Godbhanga1 |
Completion of work |
-
latitude : 20.7363964850083
Longitude : 82.91744068264961
file name : Image_21032023080657608.png
|
2023-03-21 08:06:57.715627 |
48 |
48491968 |
Const. of Boundary wall of AWC, building , Godbhanga |
200000 |
Const. of Boundary wall of AWC, building , Godbhanga1 |
Completion of work |
-
latitude : 20.736408387310803
Longitude : 82.9174554347992
file name : Image_21032023080652673.png
|
2023-03-21 08:06:52.768231 |
49 |
62022405 |
Constructin of Drain at Godbhaba |
50000 |
Constructin of Drain at Godbhaba1 |
Completion of work |
-
latitude : 20.73411551769823,20.73411551769823
Longitude : 82.91735124774277,82.91735124774277
file name : Image_29042023064508868.png
|
2023-04-29 06:45:08.94308 |
50 |
68282005 |
Creation of Shed for segregation and processing of wet and dry waste |
58500 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 20.592031
Longitude : 82.9615944
file name : Image_24072023112158346.png
|
2023-07-24 11:21:58.436375 |
51 |
68396946 |
Creation of community compost pits for a group of Households |
30000 |
Creation of community compost pits for a group of Households1 |
Completion of work |
-
latitude : 20.5921131
Longitude : 82.9613479
file name : Image_24072023112958490.png
|
2023-07-24 11:29:58.557776 |
52 |
62022478 |
Construction of Drain at Admunda |
57744 |
Construction of Drain at Admunda1 |
Completion of work |
-
latitude : 20.71024540811777
Longitude : 82.9020632430911
file name : Image_16082023161444961.png
|
2023-08-16 16:14:45.035915 |
53 |
87031040 |
CONST OF BATHINFG STEP WITH CHANGING ROOM AT DARLIPALI |
100000 |
CONST OF BATHINFG STEP WITH CHANGING ROOM AT DARLIPALI1 |
Completion of work |
-
latitude : 20.715106870047748
Longitude : 82.91380293667316
file name : Image_16082023155629037.png
|
2023-08-16 15:56:29.176585 |
54 |
82470445 |
Augmentation of existing sources of Drinking Water |
85750 |
Augmentation of existing sources of Drinking Water1 |
Roof laid |
-
latitude : 20.5921186
Longitude : 82.9614346
file name : Image_02122023125427899.png
|
2023-12-02 12:54:27.991335 |
55 |
82470445 |
Augmentation of existing sources of Drinking Water |
85750 |
Augmentation of existing sources of Drinking Water1 |
Plinth level |
-
latitude : 20.5921186
Longitude : 82.9614346
file name : Image_02122023124720903.png
|
2023-12-02 12:47:20.998212 |
56 |
82470445 |
Augmentation of existing sources of Drinking Water |
85750 |
Augmentation of existing sources of Drinking Water1 |
Completion of work |
-
latitude : 20.59214981
Longitude : 82.96132482
file name : Image_02122023120423807.png
|
2023-12-02 12:04:23.894205 |
57 |
82465332 |
Water Supply to villages |
105316 |
Water Supply to villages1 |
|
-
latitude : 20.59210726
Longitude : 82.96139687
file name : Image_02122023120207441.png
|
2023-12-02 12:02:07.529909 |
58 |
48492434 |
Const. of Drain Majhi para to Sahu pada , Darlipali |
100000 |
Const. of Drain Majhi para to Sahu pada , Darlipali1 |
Completion of work |
-
latitude : 20.72240177
Longitude : 82.90858972
file name : Image_11122023162653050.png
|
2023-12-11 16:26:53.144385 |
59 |
62022434 |
Construction of Draina at Darlipali |
50000 |
Construction of Draina at Darlipali1 |
Completion of work |
-
latitude : 20.72075246,20.72075113
Longitude : 82.90846575,82.90846837
file name : Image_11122023161927633.png
|
2023-12-11 16:19:27.729517 |
60 |
68396670 |
Creation of drainage channel for management of grey water |
150000 |
Creation of drainage channel for management of grey water1 |
Completion of work |
-
latitude : 20.72077047
Longitude : 82.90849215
file name : Image_11122023162210747.png
|
2023-12-11 16:22:10.845977 |
61 |
62022887 |
Repair and Maintenance of CC Road at Barbahali |
80000 |
Repair and Maintenance of CC Road at Barbahali1 |
Completion of work |
-
latitude : 20.72012573,20.72012573
Longitude : 82.94029164,82.94029164
file name : Image_12122023150738469.png
|
2023-12-12 15:07:38.559262 |
62 |
68396879 |
Cleaning of SchoolAWC, Bathing Ghat are |
60000 |
Cleaning of SchoolAWC, Bathing Ghat are1 |
Completion of work |
-
latitude : 20.73634605
Longitude : 82.90922102
file name : Image_29052024090150707.png
|
2024-05-29 09:01:50.791961 |
63 |
62022209 |
Piped Water Connection to GP Office |
78539 |
Piped Water Connection to GP Office1 |
Completion of work |
-
latitude : 20.71998969
Longitude : 82.90896888
file name : Image_25042024124028702.png
|
2024-04-25 12:40:28.829745 |
64 |
82609212 |
Any other operation and maintenance needs related to solid waste management |
71180 |
Any other operation and maintenance needs related to solid waste management1 |
Roof laid |
-
latitude : 20.73688388
Longitude : 82.90727551
file name : Image_17072024123532066.png
|
2024-07-17 12:35:32.1528 |
65 |
82609212 |
Any other operation and maintenance needs related to solid waste management |
71180 |
Any other operation and maintenance needs related to solid waste management1 |
Plinth level |
-
latitude : 20.73684405
Longitude : 82.90729646
file name : Image_17072024123416539.png
|
2024-07-17 12:34:16.690551 |
66 |
82609212 |
Any other operation and maintenance needs related to solid waste management |
71180 |
Any other operation and maintenance needs related to solid waste management1 |
Plinth level |
-
latitude : 20.73685182
Longitude : 82.90729376
file name : Image_17072024123131174.png
|
2024-07-17 12:31:31.259241 |
67 |
82609212 |
Any other operation and maintenance needs related to solid waste management |
71180 |
Any other operation and maintenance needs related to solid waste management1 |
Completion of work |
-
latitude : 20.73689867
Longitude : 82.90726971
file name : Image_17072024120110088.png
|
2024-07-17 12:01:10.182594 |
68 |
82480077 |
Weighing machine for use in Solid Waste Management |
20564 |
Weighing machine for use in Solid Waste Management1 |
Roof laid |
-
latitude : 20.73686862
Longitude : 82.90723821
file name : Image_17072024130717448.png
|
2024-07-17 13:07:17.537443 |
69 |
82480077 |
Weighing machine for use in Solid Waste Management |
20564 |
Weighing machine for use in Solid Waste Management1 |
Plinth level |
-
latitude : 20.73687241
Longitude : 82.90726441
file name : Image_17072024123302728.png
|
2024-07-17 12:33:02.828796 |
70 |
82480077 |
Weighing machine for use in Solid Waste Management |
20564 |
Weighing machine for use in Solid Waste Management1 |
Completion of work |
-
latitude : 20.73688778
Longitude : 82.90718343
file name : Image_17072024120908261.png
|
2024-07-17 12:09:08.35107 |
71 |
74428937 |
Operation and Maintenance of piped water supply system |
100000 |
Operation and Maintenance of piped water supply system1 |
Roof laid |
-
latitude : 20.73448687
Longitude : 82.91493391
file name : Image_13092024150905366.png
|
2024-09-13 15:09:05.459736 |
72 |
74428937 |
Operation and Maintenance of piped water supply system |
100000 |
Operation and Maintenance of piped water supply system1 |
Roof laid |
-
latitude : 20.73443674
Longitude : 82.91487487
file name : Image_12092024162329203.png
|
2024-09-12 16:23:29.286197 |
73 |
74428937 |
Operation and Maintenance of piped water supply system |
100000 |
Operation and Maintenance of piped water supply system1 |
Plinth level |
-
latitude : 20.73439775
Longitude : 82.91488248
file name : Image_12092024142212225.png
|
2024-09-12 14:22:12.320581 |
74 |
74428937 |
Operation and Maintenance of piped water supply system |
100000 |
Operation and Maintenance of piped water supply system1 |
Plinth level |
-
latitude : 20.73438304
Longitude : 82.91492743
file name : Image_12092024142603986.png
|
2024-09-12 14:26:04.065431 |
75 |
74428937 |
Operation and Maintenance of piped water supply system |
100000 |
Operation and Maintenance of piped water supply system1 |
Plinth level |
-
latitude : 20.73436433
Longitude : 82.91490765
file name : Image_12092024141544568.png
|
2024-09-12 14:15:44.652178 |
76 |
74428937 |
Operation and Maintenance of piped water supply system |
100000 |
Operation and Maintenance of piped water supply system1 |
Completion of work |
-
latitude : 20.73435627
Longitude : 82.91492154
file name : Image_12092024140638256.png
|
2024-09-12 14:06:38.344826 |
77 |
74428937 |
Operation and Maintenance of piped water supply system |
100000 |
Operation and Maintenance of piped water supply system1 |
Completion of work |
-
latitude : 20.73434309
Longitude : 82.9149153
file name : Image_12092024140424013.png
|
2024-09-12 14:04:24.097408 |
78 |
74428937 |
Operation and Maintenance of piped water supply system |
100000 |
Operation and Maintenance of piped water supply system1 |
Completion of work |
-
latitude : 20.73446668
Longitude : 82.91489865
file name : Image_05092024115453077.png
|
2024-09-05 11:54:53.207586 |
79 |
74428937 |
Operation and Maintenance of piped water supply system |
100000 |
Operation and Maintenance of piped water supply system1 |
Completion of work |
-
latitude : 20.73435653
Longitude : 82.91489281
file name : Image_12092024135507919.png
|
2024-09-12 13:55:07.998351 |
80 |
62022265 |
Piped Water Connection to UP School, Barbahali |
50000 |
Piped Water Connection to UP School, Barbahali1 |
Completion of work |
-
latitude : 20.73642029
Longitude : 82.90888037
file name : Image_30092024152046854.png
|
2024-09-30 15:20:46.947695 |
81 |
107049343 |
R/M OF SCHOOL DARLIPALI |
100000 |
R/M OF SCHOOL DARLIPALI1 |
Completion of work |
-
latitude : 20.73678167
Longitude : 82.91207503
file name : Image_17072024113523045.png
|
2024-07-17 11:35:23.148455 |
82 |
107049316 |
Greywater management system |
245000 |
Greywater management system1 |
Completion of work |
-
latitude : 20.73645039
Longitude : 82.90926361
file name : Image_17072024114034514.png
|
2024-07-17 11:40:34.624867 |
83 |
82527758 |
Repairing and maintenance of roads |
105593 |
Repairing and maintenance of roads1 |
Roof laid |
-
latitude : 20.73644211,20.73642244,20.73642102
Longitude : 82.90874252,82.90872383,82.90872082
file name : Image_17072024122338208.png
|
2024-07-17 12:23:38.302005 |
84 |
82527758 |
Repairing and maintenance of roads |
105593 |
Repairing and maintenance of roads1 |
Plinth level |
-
latitude : 20.73644977,20.73645149
Longitude : 82.90870755,82.90871035
file name : Image_17072024121403490.png
|
2024-07-17 12:14:03.581936 |
85 |
82527758 |
Repairing and maintenance of roads |
105593 |
Repairing and maintenance of roads1 |
Completion of work |
-
latitude : 20.73679746,20.73679607,20.73679537,20.73679515
Longitude : 82.90927501,82.90927436,82.90927829,82.90927916
file name : Image_17072024114357280.png
|
2024-07-17 11:43:57.377282 |
86 |
103504511 |
Augmentation of existing sources of Drinking Water |
180000 |
Augmentation of existing sources of Drinking Water1 |
Roof laid |
-
latitude : 20.73720797
Longitude : 82.90914225
file name : Image_06112024155704359.png
|
2024-11-06 15:57:04.444217 |
87 |
103504511 |
Augmentation of existing sources of Drinking Water |
180000 |
Augmentation of existing sources of Drinking Water1 |
Roof laid |
-
latitude : 20.73651398
Longitude : 82.90870482
file name : Image_17102024112858556.png
|
2024-10-17 11:28:58.776243 |
88 |
103504511 |
Augmentation of existing sources of Drinking Water |
180000 |
Augmentation of existing sources of Drinking Water1 |
Plinth level |
-
latitude : 20.73653283
Longitude : 82.90870392
file name : Image_17102024112650449.png
|
2024-10-17 11:26:50.543591 |
89 |
103504511 |
Augmentation of existing sources of Drinking Water |
180000 |
Augmentation of existing sources of Drinking Water1 |
Completion of work |
-
latitude : 20.73651996
Longitude : 82.90871567
file name : Image_17102024112337500.png
|
2024-10-17 11:23:37.606054 |
90 |
103505348 |
Water Supply to villages |
129000 |
Water Supply to villages1 |
Roof laid |
-
latitude : 20.73724517
Longitude : 82.90902343
file name : Image_06112024162253416.png
|
2024-11-06 16:22:53.506577 |
91 |
103505348 |
Water Supply to villages |
129000 |
Water Supply to villages1 |
Plinth level |
-
latitude : 20.73715192
Longitude : 82.90899517
file name : Image_06112024161623374.png
|
2024-11-06 16:16:23.457578 |
92 |
103505348 |
Water Supply to villages |
129000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 20.736594
Longitude : 82.9093088
file name : Image_06112024160145154.png
|
2024-11-06 16:01:45.24866 |
93 |
103507555 |
Any other operation and maintenance needs related to solid waste management |
80000 |
Any other operation and maintenance needs related to solid waste management1 |
Roof laid |
-
latitude : 20.73721776
Longitude : 82.90900874
file name : Image_06112024162400838.png
|
2024-11-06 16:24:00.926886 |
94 |
103507555 |
Any other operation and maintenance needs related to solid waste management |
80000 |
Any other operation and maintenance needs related to solid waste management1 |
Plinth level |
-
latitude : 20.73718139
Longitude : 82.90902037
file name : Image_06112024161803194.png
|
2024-11-06 16:18:03.283335 |
95 |
103507555 |
Any other operation and maintenance needs related to solid waste management |
80000 |
Any other operation and maintenance needs related to solid waste management1 |
Completion of work |
-
latitude : 20.73718295
Longitude : 82.90914615
file name : Image_06112024160151698.png
|
2024-11-06 16:01:51.79139 |
96 |
62022328 |
Installation of RO Water Hot and Cold in the GP Office, Darlipali |
70000 |
Installation of RO Water Hot and Cold in the GP Office, Darlipali1 |
Completion of work |
-
latitude : 20.73693485
Longitude : 82.90913379
file name : Image_10122024162522814.png
|
2024-12-10 16:25:22.914068 |
97 |
103510587 |
Repair of School Doors/ Windows/ Gates/ Fixtures |
200000 |
Repair of School Doors/ Windows/ Gates/ Fixtures1 |
Roof laid |
-
latitude : 20.5921476
Longitude : 82.9613153
file name : Image_20122024150525651.png
|
2024-12-20 15:05:25.740936 |
98 |
103510587 |
Repair of School Doors/ Windows/ Gates/ Fixtures |
200000 |
Repair of School Doors/ Windows/ Gates/ Fixtures1 |
Plinth level |
-
latitude : 20.5921405
Longitude : 82.9613334
file name : Image_20122024150324309.png
|
2024-12-20 15:03:24.390514 |
99 |
103510587 |
Repair of School Doors/ Windows/ Gates/ Fixtures |
200000 |
Repair of School Doors/ Windows/ Gates/ Fixtures1 |
Completion of work |
-
latitude : 20.5921398
Longitude : 82.9613347
file name : Image_20122024145945477.png
|
2024-12-20 14:59:45.559648 |