1 |
66062002 |
COMPLETION OF CC ROAD FROM LAMBODAR SAHOO HOUSE TO PRATAP SINDHU HOUSE. |
60000 |
COMPLETION OF CC ROAD FROM LAMBODAR SAHOO HOUSE TO PRATAP SINDHU HOUSE.1 |
Completion of work |
-
latitude : 21.1871127,21.1871127
Longitude : 86.41229761,86.41229761
file name : Image_30052023093847541.png
|
2023-05-30 09:38:47.691804 |
2 |
66062002 |
COMPLETION OF CC ROAD FROM LAMBODAR SAHOO HOUSE TO PRATAP SINDHU HOUSE. |
60000 |
COMPLETION OF CC ROAD FROM LAMBODAR SAHOO HOUSE TO PRATAP SINDHU HOUSE.1 |
Completion of work |
-
latitude : 21.18713274,21.18713274
Longitude : 86.41229326,86.41229326
file name : Image_30052023093858122.png
|
2023-05-30 09:38:58.214868 |
3 |
62685459 |
CONSTRUCTION OF DRAIN FROM SANATAN SETHI HOUSE TO SALANDI RIVER AT CHARIGAON |
150000 |
CONSTRUCTION OF DRAIN FROM SANATAN SETHI HOUSE TO SALANDI RIVER AT CHARIGAON1 |
Completion of work |
-
latitude : 21.18272551
Longitude : 86.40718111
file name : Image_30052023095858704.png
|
2023-05-30 09:58:58.802199 |
4 |
62685459 |
CONSTRUCTION OF DRAIN FROM SANATAN SETHI HOUSE TO SALANDI RIVER AT CHARIGAON |
150000 |
CONSTRUCTION OF DRAIN FROM SANATAN SETHI HOUSE TO SALANDI RIVER AT CHARIGAON1 |
Completion of work |
-
latitude : 21.1825253
Longitude : 86.40713762
file name : Image_30052023100006000.png
|
2023-05-30 10:00:06.104343 |
5 |
62688722 |
COMPLETION OF SIDHAPATANA HARIHAT AT CHAKRAPADHI |
150000 |
COMPLETION OF SIDHAPATANA HARIHAT AT CHAKRAPADHI1 |
Completion of work |
-
latitude : 21.18878032
Longitude : 86.42078361
file name : Image_31052023172543928.png
|
2023-05-31 17:25:44.026705 |
6 |
62688722 |
COMPLETION OF SIDHAPATANA HARIHAT AT CHAKRAPADHI |
150000 |
COMPLETION OF SIDHAPATANA HARIHAT AT CHAKRAPADHI1 |
Completion of work |
-
latitude : 21.18878156
Longitude : 86.42076865
file name : Image_31052023172609524.png
|
2023-05-31 17:26:09.637371 |
7 |
62688722 |
COMPLETION OF SIDHAPATANA HARIHAT AT CHAKRAPADHI |
150000 |
COMPLETION OF SIDHAPATANA HARIHAT AT CHAKRAPADHI1 |
Completion of work |
-
latitude : 21.18878032
Longitude : 86.42078361
file name : Image_31052023172651447.png
|
2023-05-31 17:26:51.554286 |
8 |
62688722 |
COMPLETION OF SIDHAPATANA HARIHAT AT CHAKRAPADHI |
150000 |
COMPLETION OF SIDHAPATANA HARIHAT AT CHAKRAPADHI1 |
Completion of work |
-
latitude : 21.18878156
Longitude : 86.42076865
file name : Image_31052023172503978.png
|
2023-05-31 17:25:04.085305 |
9 |
62689059 |
CONSTRUCTION OF CC ROAD AT CHAKARAPADHI NODAL SCHOOL CAMPUS ,CHAKARAPADHI |
50000 |
CONSTRUCTION OF CC ROAD AT CHAKARAPADHI NODAL SCHOOL CAMPUS ,CHAKARAPADHI1 |
Completion of work |
-
latitude : 21.1884486,21.18844861
Longitude : 86.41989954,86.41989948
file name : Image_31052023172813007.png
|
2023-05-31 17:28:13.106449 |
10 |
62689059 |
CONSTRUCTION OF CC ROAD AT CHAKARAPADHI NODAL SCHOOL CAMPUS ,CHAKARAPADHI |
50000 |
CONSTRUCTION OF CC ROAD AT CHAKARAPADHI NODAL SCHOOL CAMPUS ,CHAKARAPADHI1 |
Completion of work |
-
latitude : 21.1884486,21.18844861
Longitude : 86.41989954,86.41989948
file name : Image_31052023172902960.png
|
2023-05-31 17:29:03.06637 |
11 |
62689059 |
CONSTRUCTION OF CC ROAD AT CHAKARAPADHI NODAL SCHOOL CAMPUS ,CHAKARAPADHI |
50000 |
CONSTRUCTION OF CC ROAD AT CHAKARAPADHI NODAL SCHOOL CAMPUS ,CHAKARAPADHI1 |
Completion of work |
-
latitude : 21.18844554,21.18844551
Longitude : 86.41989712,86.41989711
file name : Image_31052023172934624.png
|
2023-05-31 17:29:34.736713 |
12 |
62688647 |
CONSTRUCTION OF CC FROM ROAD LAMBODAR SAHOO HOUSE TO PRATAP SINDHU SAHOO HOUSE |
100000 |
CONSTRUCTION OF CC FROM ROAD LAMBODAR SAHOO HOUSE TO PRATAP SINDHU SAHOO HOUSE1 |
Completion of work |
-
latitude : 21.18714378,21.18714109
Longitude : 86.41239135,86.41239147
file name : Image_30052023093837692.png
|
2023-05-30 09:38:37.791716 |
13 |
62688647 |
CONSTRUCTION OF CC FROM ROAD LAMBODAR SAHOO HOUSE TO PRATAP SINDHU SAHOO HOUSE |
100000 |
CONSTRUCTION OF CC FROM ROAD LAMBODAR SAHOO HOUSE TO PRATAP SINDHU SAHOO HOUSE1 |
Completion of work |
-
latitude : 21.18711404,21.18711405
Longitude : 86.4123051,86.41230508
file name : Image_30052023093842073.png
|
2023-05-30 09:38:42.170615 |
14 |
44121317 |
SEM Honorarium |
48000 |
SEM Honorarium1 |
Completion of work |
-
latitude : 21.1236177,21.1236177
Longitude : 86.3161538,86.3161538
file name : Image_29042021175334595.png
|
2021-04-29 17:53:34.711898 |
15 |
48120783 |
Completion of Rajabati Community Center, CHARIGAN SFC |
200000 |
Completion of Rajabati Community Center, CHARIGAN SFC 1 |
Completion of work |
-
latitude : 21.18551969
Longitude : 86.41301405
file name : Image_30052023094920106.png
|
2023-05-30 09:49:20.218111 |
16 |
48120783 |
Completion of Rajabati Community Center, CHARIGAN SFC |
200000 |
Completion of Rajabati Community Center, CHARIGAN SFC 1 |
Completion of work |
-
latitude : 21.18560113
Longitude : 86.41309147
file name : Image_30052023094825918.png
|
2023-05-30 09:48:26.019976 |
17 |
64095076 |
IMP OF CHARIGAN SETHI SAHI NADIGHAT |
100000 |
IMP OF CHARIGAN SETHI SAHI NADIGHAT 1 |
Completion of work |
-
latitude : 21.18271262
Longitude : 86.40714747
file name : Image_30052023095602161.png
|
2023-05-30 09:56:02.258133 |
18 |
64095076 |
IMP OF CHARIGAN SETHI SAHI NADIGHAT |
100000 |
IMP OF CHARIGAN SETHI SAHI NADIGHAT 1 |
Completion of work |
-
latitude : 21.18290567
Longitude : 86.40717032
file name : Image_30052023095700710.png
|
2023-05-30 09:57:00.80536 |
19 |
64094966 |
CON OF CC ROAD FROM EKADASI MOHANTY HOUSE TO RABI PRAMANIK U |
100000 |
CON OF CC ROAD FROM EKADASI MOHANTY HOUSE TO RABI PRAMANIK U1 |
Completion of work |
-
latitude : 21.18745818,21.18745844
Longitude : 86.41195772,86.41195798
file name : Image_28062022125235663.png
|
2022-06-28 12:52:35.788161 |
20 |
64094966 |
CON OF CC ROAD FROM EKADASI MOHANTY HOUSE TO RABI PRAMANIK U |
100000 |
CON OF CC ROAD FROM EKADASI MOHANTY HOUSE TO RABI PRAMANIK U1 |
Completion of work |
-
latitude : 21.18743891,21.18743887
Longitude : 86.4119606,86.41196061
file name : Image_28062022125340081.png
|
2022-06-28 12:53:40.201342 |
21 |
64094937 |
DEVELOPMENT OF CHAKARAPADHI HARIHAT MANDAP U |
100000 |
DEVELOPMENT OF CHAKARAPADHI HARIHAT MANDAP U1 |
Completion of work |
-
latitude : 21.1854273
Longitude : 86.41934953
file name : Image_28062022123315896.png
|
2022-06-28 12:33:16.002982 |
22 |
64094937 |
DEVELOPMENT OF CHAKARAPADHI HARIHAT MANDAP U |
100000 |
DEVELOPMENT OF CHAKARAPADHI HARIHAT MANDAP U1 |
Completion of work |
-
latitude : 21.18569357
Longitude : 86.41883101
file name : Image_28062022123413416.png
|
2022-06-28 12:34:13.544122 |
23 |
64094860 |
CON OF CC ROAD FROM SRIDHAR SAHOO HOUSE TO NADI GHAT U |
100000 |
CON OF CC ROAD FROM SRIDHAR SAHOO HOUSE TO NADI GHAT U1 |
Completion of work |
-
latitude : 21.18578175,21.18578175
Longitude : 86.41207635,86.41207635
file name : Image_28062022130939989.png
|
2022-06-28 13:09:40.074306 |
24 |
64094860 |
CON OF CC ROAD FROM SRIDHAR SAHOO HOUSE TO NADI GHAT U |
100000 |
CON OF CC ROAD FROM SRIDHAR SAHOO HOUSE TO NADI GHAT U1 |
Completion of work |
-
latitude : 21.18572344,21.18572344
Longitude : 86.41238705,86.41238705
file name : Image_28062022130944593.png
|
2022-06-28 13:09:44.680165 |
25 |
64094975 |
CON OF CC ROAD FROM MAHESWAR PANDA HOUSE TO KACHERI POKHARI U |
100000 |
CON OF CC ROAD FROM MAHESWAR PANDA HOUSE TO KACHERI POKHARI U1 |
Completion of work |
-
latitude : 21.1815996,21.18159968
Longitude : 86.40541928,86.40541925
file name : Image_28062022132038508.png
|
2022-06-28 13:20:38.60169 |
26 |
64094975 |
CON OF CC ROAD FROM MAHESWAR PANDA HOUSE TO KACHERI POKHARI U |
100000 |
CON OF CC ROAD FROM MAHESWAR PANDA HOUSE TO KACHERI POKHARI U1 |
Completion of work |
-
latitude : 21.18163049,21.18163049
Longitude : 86.40538682,86.40538682
file name : Image_28062022131952935.png
|
2022-06-28 13:19:53.028892 |
27 |
64095118 |
COMP OF CC ROAD FROM ASHOK JENA HOUSE TO RD ROAD SFC |
100000 |
COMP OF CC ROAD FROM ASHOK JENA HOUSE TO RD ROAD SFC1 |
Completion of work |
-
latitude : 21.17881156,21.17881156
Longitude : 86.40692988,86.40692988
file name : Image_28062022132942524.png
|
2022-06-28 13:29:42.628547 |
28 |
64095118 |
COMP OF CC ROAD FROM ASHOK JENA HOUSE TO RD ROAD SFC |
100000 |
COMP OF CC ROAD FROM ASHOK JENA HOUSE TO RD ROAD SFC1 |
Completion of work |
-
latitude : 21.17880657,21.17880656
Longitude : 86.40693763,86.40693762
file name : Image_28062022133027967.png
|
2022-06-28 13:30:28.058432 |
29 |
64094951 |
CON OF CC ROAD FROM CHAKARAPADHI HARIHAT TO GOLAK KUNDU HOUSE U |
100000 |
CON OF CC ROAD FROM CHAKARAPADHI HARIHAT TO GOLAK KUNDU HOUSE U1 |
Completion of work |
-
latitude : 21.18569768,21.1856977
Longitude : 86.41880287,86.41880287
file name : Image_28062022123728847.png
|
2022-06-28 12:37:28.958862 |
30 |
64094951 |
CON OF CC ROAD FROM CHAKARAPADHI HARIHAT TO GOLAK KUNDU HOUSE U |
100000 |
CON OF CC ROAD FROM CHAKARAPADHI HARIHAT TO GOLAK KUNDU HOUSE U1 |
Completion of work |
-
latitude : 21.18569916,21.18569917
Longitude : 86.41879275,86.41879266
file name : Image_28062022123838180.png
|
2022-06-28 12:38:38.286664 |
31 |
48120174 |
Exp towards GPDP ,social audit,Mobile recharge, Furniture, office contigency etc U |
100000 |
Exp towards GPDP ,social audit,Mobile recharge, Furniture, office contigency etc U1 |
Completion of work |
-
latitude : 21.0877103
Longitude : 86.3341798
file name : Image_20012022151455134.png
|
2022-01-20 15:14:55.264008 |
32 |
50379620 |
Water Supply of AWC at Itua |
30000 |
Water Supply of AWC at Itua1 |
Completion of work |
-
latitude : 21.18498698,21.18498698
Longitude : 86.42824864,86.42824864
file name : Image_18072021183009278.png
|
2021-07-18 18:30:09.392237 |
33 |
50379620 |
Water Supply of AWC at Itua |
30000 |
Water Supply of AWC at Itua1 |
Completion of work |
-
latitude : 21.18491837,21.18491837
Longitude : 86.42824855,86.42824855
file name : Image_18072021183024511.png
|
2021-07-18 18:30:24.605968 |
34 |
50379425 |
Water Supply of AWC at Charigan Jena Sahi |
30000 |
Water Supply of AWC at Charigan Jena Sahi1 |
Completion of work |
-
latitude : 21.18703815,21.18704776
Longitude : 86.40980895,86.40981291
file name : Image_29062021134119213.png
|
2021-06-29 13:41:19.324072 |
35 |
50379425 |
Water Supply of AWC at Charigan Jena Sahi |
30000 |
Water Supply of AWC at Charigan Jena Sahi1 |
Completion of work |
-
latitude : 21.18711255,21.18711524
Longitude : 86.40983976,86.40983186
file name : Image_29062021134218398.png
|
2021-06-29 13:42:18.499247 |
36 |
50379425 |
Water Supply of AWC at Charigan Jena Sahi |
30000 |
Water Supply of AWC at Charigan Jena Sahi1 |
Completion of work |
-
latitude : 21.18703422,21.18703422
Longitude : 86.40982551,86.40982551
file name : Image_29062021134311289.png
|
2021-06-29 13:43:11.445071 |
37 |
50379955 |
Water Supply of AWC at Telanati |
30000 |
Water Supply of AWC at Telanati1 |
Completion of work |
-
latitude : 21.19415095,21.19415093
Longitude : 86.42906182,86.42906183
file name : Image_29062021141326452.png
|
2021-06-29 14:13:26.56747 |
38 |
50379955 |
Water Supply of AWC at Telanati |
30000 |
Water Supply of AWC at Telanati1 |
Completion of work |
-
latitude : 21.19413255,21.19413536
Longitude : 86.42909031,86.42909213
file name : Image_29062021141411335.png
|
2021-06-29 14:14:11.438699 |
39 |
50379169 |
Water Supply of AWC at Chakarapadhi |
30000 |
Water Supply of AWC at Chakarapadhi1 |
Completion of work |
-
latitude : 21.18523124,21.18523124
Longitude : 86.41630518,86.41630518
file name : Image_29062021135002810.png
|
2021-06-29 13:50:02.925432 |
40 |
50379169 |
Water Supply of AWC at Chakarapadhi |
30000 |
Water Supply of AWC at Chakarapadhi1 |
Completion of work |
-
latitude : 21.1852532,21.1852532
Longitude : 86.41624727,86.41624727
file name : Image_29062021141256774.png
|
2021-06-29 14:12:56.879006 |
41 |
44121242 |
Const. of Anuku chandra CC center,TELNATI |
150000 |
Const. of Anuku chandra CC center,TELNATI1 |
Completion of work |
-
latitude : 21.19338627
Longitude : 86.42578542
file name : Image_01072023170732656.png
|
2023-07-01 17:07:32.749764 |
42 |
44121242 |
Const. of Anuku chandra CC center,TELNATI |
150000 |
Const. of Anuku chandra CC center,TELNATI1 |
Completion of work |
-
latitude : 21.19328113
Longitude : 86.42590264
file name : Image_01072023171139992.png
|
2023-07-01 17:11:40.084487 |
43 |
44121242 |
Const. of Anuku chandra CC center,TELNATI |
150000 |
Const. of Anuku chandra CC center,TELNATI1 |
Completion of work |
-
latitude : 21.19346368
Longitude : 86.42593305
file name : Image_31052023171638297.png
|
2023-05-31 17:16:38.39696 |
44 |
44121242 |
Const. of Anuku chandra CC center,TELNATI |
150000 |
Const. of Anuku chandra CC center,TELNATI1 |
Completion of work |
-
latitude : 21.19354305
Longitude : 86.42601675
file name : Image_31052023171822398.png
|
2023-05-31 17:18:22.49592 |
45 |
44121242 |
Const. of Anuku chandra CC center,TELNATI |
150000 |
Const. of Anuku chandra CC center,TELNATI1 |
Completion of work |
-
latitude : 21.1939628
Longitude : 86.4253226
file name : Image_31052023171859930.png
|
2023-05-31 17:19:00.039551 |
46 |
44121242 |
Const. of Anuku chandra CC center,TELNATI |
150000 |
Const. of Anuku chandra CC center,TELNATI1 |
Completion of work |
-
latitude : 21.1939623
Longitude : 86.4253205
file name : Image_31052023172112453.png
|
2023-05-31 17:21:12.556786 |
47 |
44121242 |
Const. of Anuku chandra CC center,TELNATI |
150000 |
Const. of Anuku chandra CC center,TELNATI1 |
Completion of work |
-
latitude : 21.19354305
Longitude : 86.42601675
file name : Image_31052023172259180.png
|
2023-05-31 17:22:59.276405 |
48 |
44121242 |
Const. of Anuku chandra CC center,TELNATI |
150000 |
Const. of Anuku chandra CC center,TELNATI1 |
Completion of work |
-
latitude : 21.1939628
Longitude : 86.4253226
file name : Image_31052023172420574.png
|
2023-05-31 17:24:20.672871 |
49 |
44121503 |
Const. of Itua School Boundary,Itua SFC |
114080 |
Const. of Itua School Boundary,Itua SFC1 |
Completion of work |
-
latitude : 21.18486985,21.18486985
Longitude : 86.42811203,86.42811203
file name : Image_30072021130318508.png
|
2021-07-30 13:03:18.573054 |
50 |
44121503 |
Const. of Itua School Boundary,Itua SFC |
114080 |
Const. of Itua School Boundary,Itua SFC1 |
Completion of work |
-
latitude : 21.18486985,21.18486985
Longitude : 86.42811203,86.42811203
file name : Image_30072021130336613.png
|
2021-07-30 13:03:36.694572 |
51 |
44121503 |
Const. of Itua School Boundary,Itua SFC |
114080 |
Const. of Itua School Boundary,Itua SFC1 |
Completion of work |
-
latitude : 21.1856095,21.1856095
Longitude : 86.4283682,86.4283682
file name : Image_30072021130449790.png
|
2021-07-30 13:04:49.851514 |
52 |
48120287 |
Const. of CC road from Ranjan Sahoo House to Mangilia Sahoo House U |
100000 |
Const. of CC road from Ranjan Sahoo House to Mangilia Sahoo House U1 |
Completion of work |
-
latitude : 21.18688797
Longitude : 86.4124581
file name : Image_28062022130932461.png
|
2022-06-28 13:09:32.553397 |
53 |
48120287 |
Const. of CC road from Ranjan Sahoo House to Mangilia Sahoo House U |
100000 |
Const. of CC road from Ranjan Sahoo House to Mangilia Sahoo House U1 |
Completion of work |
-
latitude : 21.18689251
Longitude : 86.41246116
file name : Image_28062022130935617.png
|
2022-06-28 13:09:35.701846 |
54 |
48122350 |
Const. of Drain from Bhaba das House to nadighat, Charigan T |
115000 |
Const. of Drain from Bhaba das House to nadighat, Charigan T1 |
Completion of work |
-
latitude : 21.18216662
Longitude : 86.4072435
file name : Image_30102022101858268.png
|
2022-10-30 10:18:58.3621 |
55 |
48122350 |
Const. of Drain from Bhaba das House to nadighat, Charigan T |
115000 |
Const. of Drain from Bhaba das House to nadighat, Charigan T1 |
Completion of work |
-
latitude : 21.18218393
Longitude : 86.40725419
file name : Image_30102022101944139.png
|
2022-10-30 10:19:44.218115 |
56 |
48122350 |
Const. of Drain from Bhaba das House to nadighat, Charigan T |
115000 |
Const. of Drain from Bhaba das House to nadighat, Charigan T1 |
Completion of work |
-
latitude : 21.18212521
Longitude : 86.40721676
file name : Image_28062022131624064.png
|
2022-06-28 13:16:24.159011 |
57 |
48122350 |
Const. of Drain from Bhaba das House to nadighat, Charigan T |
115000 |
Const. of Drain from Bhaba das House to nadighat, Charigan T1 |
Completion of work |
-
latitude : 21.18214328
Longitude : 86.4072206
file name : Image_28062022131707050.png
|
2022-06-28 13:17:07.143412 |
58 |
48120908 |
Const. of CC road from Kartika Nath house to Durga Mandap, CHARIGAN SFC |
128032 |
Const. of CC road from Kartika Nath house to Durga Mandap, CHARIGAN SFC 1 |
Completion of work |
-
latitude : 21.18265532
Longitude : 86.40086018
file name : Image_28062022133743858.png
|
2022-06-28 13:37:43.963677 |
59 |
48120908 |
Const. of CC road from Kartika Nath house to Durga Mandap, CHARIGAN SFC |
128032 |
Const. of CC road from Kartika Nath house to Durga Mandap, CHARIGAN SFC 1 |
Completion of work |
-
latitude : 21.18267266
Longitude : 86.40085376
file name : Image_28062022133928422.png
|
2022-06-28 13:39:28.523061 |
60 |
48120455 |
Imp. Of Playground Sundarapal Play field at Chakrapadhi U |
73312 |
Imp. Of Playground Sundarapal Play field at Chakrapadhi U1 |
Completion of work |
-
latitude : 21.23230103
Longitude : 86.38651571
file name : Image_28062022122635132.png
|
2022-06-28 12:26:35.244619 |
61 |
48120455 |
Imp. Of Playground Sundarapal Play field at Chakrapadhi U |
73312 |
Imp. Of Playground Sundarapal Play field at Chakrapadhi U1 |
Completion of work |
-
latitude : 21.23230103
Longitude : 86.38651571
file name : Image_28062022122522819.png
|
2022-06-28 12:25:22.939496 |
62 |
44121511 |
Const. of Majhisahi CC center,Itua SFC |
100000 |
Const. of Majhisahi CC center,Itua SFC1 |
Completion of work |
-
latitude : 21.18561055,21.18561057
Longitude : 86.42583288,86.42583285
file name : Image_30102022100137241.png
|
2022-10-30 10:01:37.322306 |
63 |
44121511 |
Const. of Majhisahi CC center,Itua SFC |
100000 |
Const. of Majhisahi CC center,Itua SFC1 |
Completion of work |
-
latitude : 21.1856096,21.1856096
Longitude : 86.42583786,86.42583786
file name : Image_30102022100639469.png
|
2022-10-30 10:06:39.556625 |
64 |
44121511 |
Const. of Majhisahi CC center,Itua SFC |
100000 |
Const. of Majhisahi CC center,Itua SFC1 |
Completion of work |
-
latitude : 21.18559365,21.18559365
Longitude : 86.42582526,86.42582526
file name : Image_30102022100654257.png
|
2022-10-30 10:06:54.333085 |
65 |
44121511 |
Const. of Majhisahi CC center,Itua SFC |
100000 |
Const. of Majhisahi CC center,Itua SFC1 |
Completion of work |
-
latitude : 21.18557664,21.18557665
Longitude : 86.42584844,86.42584846
file name : Image_30102022100719261.png
|
2022-10-30 10:07:19.343605 |
66 |
44121511 |
Const. of Majhisahi CC center,Itua SFC |
100000 |
Const. of Majhisahi CC center,Itua SFC1 |
Completion of work |
-
latitude : 21.18559365,21.18559365
Longitude : 86.42582526,86.42582526
file name : Image_30102022100734950.png
|
2022-10-30 10:07:35.03224 |
67 |
44121511 |
Const. of Majhisahi CC center,Itua SFC |
100000 |
Const. of Majhisahi CC center,Itua SFC1 |
Completion of work |
-
latitude : 21.18557664,21.18557665
Longitude : 86.42584844,86.42584846
file name : Image_30102022100801811.png
|
2022-10-30 10:08:01.880494 |
68 |
44121493 |
Development of Deulapada play ground,Deulapadi SFC |
100000 |
Development of Deulapada play ground,Deulapadi SFC1 |
Completion of work |
-
latitude : 21.18927298,21.18927527
Longitude : 86.4108331,86.41083301
file name : Image_28062022124606287.png
|
2022-06-28 12:46:06.396581 |
69 |
44121493 |
Development of Deulapada play ground,Deulapadi SFC |
100000 |
Development of Deulapada play ground,Deulapadi SFC1 |
Completion of work |
-
latitude : 21.18931047,21.18931127
Longitude : 86.41075142,86.41075434
file name : Image_28062022124651484.png
|
2022-06-28 12:46:51.590646 |
70 |
44121281 |
Completion of Kalipadia CC center,Charigan |
150000 |
Completion of Kalipadia CC center,Charigan1 |
Completion of work |
-
latitude : 21.18376176
Longitude : 86.41095168
file name : Image_30102022102857787.png
|
2022-10-30 10:28:57.906892 |
71 |
44121281 |
Completion of Kalipadia CC center,Charigan |
150000 |
Completion of Kalipadia CC center,Charigan1 |
Completion of work |
-
latitude : 21.18380259
Longitude : 86.41097
file name : Image_28062022130948572.png
|
2022-06-28 13:09:48.670808 |
72 |
44121281 |
Completion of Kalipadia CC center,Charigan |
150000 |
Completion of Kalipadia CC center,Charigan1 |
Completion of work |
-
latitude : 21.1838141
Longitude : 86.41096585
file name : Image_28062022131029242.png
|
2022-06-28 13:10:29.333679 |
73 |
54873911 |
CON OF CC CENTRE NEAR UPARA JENA SAHI SFC |
200000 |
CON OF CC CENTRE NEAR UPARA JENA SAHI SFC1 |
Completion of work |
-
latitude : 21.17947304
Longitude : 86.4060379
file name : Image_28062022132630655.png
|
2022-06-28 13:26:30.73186 |
74 |
54873911 |
CON OF CC CENTRE NEAR UPARA JENA SAHI SFC |
200000 |
CON OF CC CENTRE NEAR UPARA JENA SAHI SFC1 |
Completion of work |
-
latitude : 21.17947965
Longitude : 86.40604571
file name : Image_28062022132716230.png
|
2022-06-28 13:27:16.32764 |
75 |
62685407 |
CONSTRUCTION OF DRAIN FROM KARTTIK KATUAL HOUSE TO BAHALI BLLA AT TELANATI |
180000 |
CONSTRUCTION OF DRAIN FROM KARTTIK KATUAL HOUSE TO BAHALI BLLA AT TELANATI1 |
Completion of work |
-
latitude : 21.19146527,21.19146533
Longitude : 86.42427738,86.42427737
file name : Image_30102022095014521.png
|
2022-10-30 09:50:14.611045 |
76 |
62685407 |
CONSTRUCTION OF DRAIN FROM KARTTIK KATUAL HOUSE TO BAHALI BLLA AT TELANATI |
180000 |
CONSTRUCTION OF DRAIN FROM KARTTIK KATUAL HOUSE TO BAHALI BLLA AT TELANATI1 |
Completion of work |
-
latitude : 21.19147389,21.19147395
Longitude : 86.42428498,86.42428495
file name : Image_30102022094912867.png
|
2022-10-30 09:49:12.962423 |
77 |
62688669 |
CONSTRUCTION OF CC FROM ROAD MAHENDRA KATUAL HOUSE TO MURALI KATUAL HOUSE CHARIGAON |
100000 |
CONSTRUCTION OF CC FROM ROAD MAHENDRA KATUAL HOUSE TO MURALI KATUAL HOUSE CHARIGAON1 |
Completion of work |
-
latitude : 21.18779901,21.187799
Longitude : 86.41108968,86.41108964
file name : Image_30102022104042433.png
|
2022-10-30 10:40:42.524723 |
78 |
64095053 |
IMP OF TOILET OF BOYS AND GIRLS AT BALIPOKHARI HIGH SCHOOL T |
100000 |
IMP OF TOILET OF BOYS AND GIRLS AT BALIPOKHARI HIGH SCHOOL T1 |
Completion of work |
-
latitude : 21.19557621
Longitude : 86.42515904
file name : Image_05112022170833954.png
|
2022-11-05 17:08:34.030526 |
79 |
64095053 |
IMP OF TOILET OF BOYS AND GIRLS AT BALIPOKHARI HIGH SCHOOL T |
100000 |
IMP OF TOILET OF BOYS AND GIRLS AT BALIPOKHARI HIGH SCHOOL T1 |
Completion of work |
-
latitude : 21.19559275
Longitude : 86.42514253
file name : Image_30102022110723939.png
|
2022-10-30 11:07:24.011962 |
80 |
64095036 |
CON OF NEW GATE AT BALIPOKHARI HIGH SCHOOL |
400000 |
CON OF NEW GATE AT BALIPOKHARI HIGH SCHOOL1 |
Completion of work |
-
latitude : 21.19548008,21.19548007
Longitude : 86.42519598,86.42519598
file name : Image_30102022110326371.png
|
2022-10-30 11:03:26.443062 |
81 |
64094989 |
IMP OF BOUNDARY WALL AT BALIPOKHARI HIGH SCHOOL U |
100000 |
IMP OF BOUNDARY WALL AT BALIPOKHARI HIGH SCHOOL U1 |
Completion of work |
-
latitude : 21.19536347
Longitude : 86.42518232
file name : Image_30102022105836253.png
|
2022-10-30 10:58:36.353438 |
82 |
64094989 |
IMP OF BOUNDARY WALL AT BALIPOKHARI HIGH SCHOOL U |
100000 |
IMP OF BOUNDARY WALL AT BALIPOKHARI HIGH SCHOOL U1 |
Completion of work |
-
latitude : 21.19548176
Longitude : 86.42521129
file name : Image_30102022105932439.png
|
2022-10-30 10:59:32.541286 |
83 |
48120751 |
Completion of Kalipadia Community center,Charigan SFC |
100000 |
Completion of Kalipadia Community center,Charigan SFC1 |
Completion of work |
-
latitude : 21.18374796
Longitude : 86.41093963
file name : Image_30102022102638510.png
|
2022-10-30 10:26:38.659829 |
84 |
48120751 |
Completion of Kalipadia Community center,Charigan SFC |
100000 |
Completion of Kalipadia Community center,Charigan SFC1 |
Completion of work |
-
latitude : 21.18380221
Longitude : 86.4109499
file name : Image_30102022102955930.png
|
2022-10-30 10:29:56.085684 |
85 |
44121249 |
Const. of Majhi sahi CC center,Telnati |
100000 |
Const. of Majhi sahi CC center,Telnati1 |
Completion of work |
-
latitude : 21.19921457
Longitude : 86.43145225
file name : Image_05112022171041859.png
|
2022-11-05 17:10:41.940515 |
86 |
44121249 |
Const. of Majhi sahi CC center,Telnati |
100000 |
Const. of Majhi sahi CC center,Telnati1 |
Completion of work |
-
latitude : 21.19920187
Longitude : 86.43144122
file name : Image_05112022171126684.png
|
2022-11-05 17:11:26.763396 |
87 |
44121323 |
Const. of CC drain Uparsahi harihat To Sethi sahi,Charigan |
170000 |
Const. of CC drain Uparsahi harihat To Sethi sahi,Charigan1 |
Completion of work |
-
latitude : 21.1813967,21.18139666
Longitude : 86.40697543,86.40697539
file name : Image_08042021122653974.png
|
2021-04-08 12:26:54.074241 |
88 |
44121323 |
Const. of CC drain Uparsahi harihat To Sethi sahi,Charigan |
170000 |
Const. of CC drain Uparsahi harihat To Sethi sahi,Charigan1 |
Completion of work |
-
latitude : 21.18123759,21.18123752
Longitude : 86.40683837,86.40683836
file name : Image_08042021122839420.png
|
2021-04-08 12:28:39.52151 |
89 |
44121456 |
Const. of Tarini Nadighat,Charigan |
115312 |
Const. of Tarini Nadighat,Charigan1 |
Completion of work |
-
latitude : 21.1889134,21.1889134
Longitude : 86.41390754,86.41390754
file name : Image_11062021113159014.png
|
2021-06-11 11:31:59.115075 |
90 |
44121327 |
Const. of drain from Haria Rana house to Mani behera house,Telnati |
200000 |
Const. of drain from Haria Rana house to Mani behera house,Telnati1 |
Completion of work |
-
latitude : 21.24181526
Longitude : 86.38029263
file name : Image_11062021110252115.png
|
2021-06-11 11:02:52.197187 |
91 |
52235235 |
CON OF CC ROAD FROM KHETRABASI ROUT HOUSE TO HAREKRUSHNA PANDA HOUSE. |
100000 |
CON OF CC ROAD FROM KHETRABASI ROUT HOUSE TO HAREKRUSHNA PANDA HOUSE.1 |
Completion of work |
-
latitude : 21.1814834,21.1814834
Longitude : 86.4059187,86.4059187
file name : Image_16062021105817434.png
|
2021-06-16 10:58:17.543749 |
92 |
52235282 |
CON OF BOTHSIDE GUARD WALL FROM BAIRI SAHI HOUSE TO ITUA MAIN ROAD. |
200000 |
CON OF BOTHSIDE GUARD WALL FROM BAIRI SAHI HOUSE TO ITUA MAIN ROAD.1 |
Completion of work |
-
latitude : 21.19089235,21.19089205
Longitude : 86.42594909,86.42594963
file name : Image_30072021130309384.png
|
2021-07-30 13:03:09.457471 |
93 |
52235282 |
CON OF BOTHSIDE GUARD WALL FROM BAIRI SAHI HOUSE TO ITUA MAIN ROAD. |
200000 |
CON OF BOTHSIDE GUARD WALL FROM BAIRI SAHI HOUSE TO ITUA MAIN ROAD.1 |
Completion of work |
-
latitude : 21.19076442,21.19076738
Longitude : 86.42595556,86.42595424
file name : Image_30072021124920118.png
|
2021-07-30 12:49:20.230934 |
94 |
54873964 |
REPAIRING OF CC ROAD FROM BANIA SAHI CHHAKA TO HARIHATA |
250000 |
REPAIRING OF CC ROAD FROM BANIA SAHI CHHAKA TO HARIHATA 1 |
Completion of work |
-
latitude : 21.18051362,21.18051823
Longitude : 86.40622055,86.40622869
file name : Image_25102021124850053.png
|
2021-10-25 12:48:50.163613 |
95 |
54873964 |
REPAIRING OF CC ROAD FROM BANIA SAHI CHHAKA TO HARIHATA |
250000 |
REPAIRING OF CC ROAD FROM BANIA SAHI CHHAKA TO HARIHATA 1 |
Completion of work |
-
latitude : 21.18053268,21.18053268
Longitude : 86.40621502,86.40621502
file name : Image_25102021124758756.png
|
2021-10-25 12:47:58.865649 |
96 |
54874002 |
CON OF GUARD WALL FROM SAMBUNATH SAHOO HOUSE TO BANIA SAHI CHHAKA. |
90000 |
CON OF GUARD WALL FROM SAMBUNATH SAHOO HOUSE TO BANIA SAHI CHHAKA.1 |
Completion of work |
-
latitude : 21.1805241,21.1805264
Longitude : 86.40632445,86.40632685
file name : Image_19012022171953854.png
|
2022-01-19 17:19:53.949968 |
97 |
54874002 |
CON OF GUARD WALL FROM SAMBUNATH SAHOO HOUSE TO BANIA SAHI CHHAKA. |
90000 |
CON OF GUARD WALL FROM SAMBUNATH SAHOO HOUSE TO BANIA SAHI CHHAKA.1 |
Completion of work |
-
latitude : 21.18051522,21.18051524
Longitude : 86.4063183,86.4063183
file name : Image_19012022172047002.png
|
2022-01-19 17:20:47.092109 |
98 |
44121275 |
Const. of Jagannath CC center,Charigan |
100000 |
Const. of Jagannath CC center,Charigan1 |
Completion of work |
-
latitude : 21.18514552
Longitude : 86.40972096
file name : Image_21092021143911104.png
|
2021-09-21 14:39:11.210619 |
99 |
44121275 |
Const. of Jagannath CC center,Charigan |
100000 |
Const. of Jagannath CC center,Charigan1 |
Completion of work |
-
latitude : 21.18513249
Longitude : 86.40974546
file name : Image_21092021144008830.png
|
2021-09-21 14:40:08.944803 |
100 |
44121302 |
Completion of Budhi Jagulei CC center,Chakarapadhi |
250000 |
Completion of Budhi Jagulei CC center,Chakarapadhi1 |
Completion of work |
-
latitude : 21.19637889,21.19637889
Longitude : 86.41545194,86.41545194
file name : Image_08042021115635749.png
|
2021-04-08 11:56:35.872114 |
101 |
44121302 |
Completion of Budhi Jagulei CC center,Chakarapadhi |
250000 |
Completion of Budhi Jagulei CC center,Chakarapadhi1 |
Completion of work |
-
latitude : 21.19640348,21.19640344
Longitude : 86.41544877,86.41544881
file name : Image_08042021115758877.png
|
2021-04-08 11:57:59.031736 |
102 |
44121284 |
Development of Kalipadia play ground,Charigan |
100000 |
Development of Kalipadia play ground,Charigan1 |
Completion of work |
-
latitude : 21.18210584
Longitude : 86.4100658
file name : Image_11062021113245616.png
|
2021-06-11 11:32:45.72975 |
103 |
52235257 |
CON OF CC ROAD FROM NARENDRA KAR HOUSE TO PARIKHITA MOHARANA HOUSE. |
100000 |
CON OF CC ROAD FROM NARENDRA KAR HOUSE TO PARIKHITA MOHARANA HOUSE.1 |
Completion of work |
-
latitude : 21.19001943,21.19001943
Longitude : 86.42059493,86.42059493
file name : Image_16062021103520384.png
|
2021-06-16 10:35:20.511983 |
104 |
52235257 |
CON OF CC ROAD FROM NARENDRA KAR HOUSE TO PARIKHITA MOHARANA HOUSE. |
100000 |
CON OF CC ROAD FROM NARENDRA KAR HOUSE TO PARIKHITA MOHARANA HOUSE.1 |
Completion of work |
-
latitude : 21.19002512,21.19002583
Longitude : 86.42064024,86.42064054
file name : Image_16062021103643401.png
|
2021-06-16 10:36:43.495564 |
105 |
48120341 |
Const. od CC road from Raghunatha Behera house to Nabakishore sahoo House U |
250000 |
Const. od CC road from Raghunatha Behera house to Nabakishore sahoo House U1 |
Completion of work |
-
latitude : 21.18463155
Longitude : 86.41120122
file name : Image_04092021162753934.png
|
2021-09-04 16:27:54.026871 |
106 |
48120341 |
Const. od CC road from Raghunatha Behera house to Nabakishore sahoo House U |
250000 |
Const. od CC road from Raghunatha Behera house to Nabakishore sahoo House U1 |
Completion of work |
-
latitude : 21.1846669
Longitude : 86.41123123
file name : Image_04092021162844169.png
|
2021-09-04 16:28:44.257048 |
107 |
62685050 |
SEGREGATION SED OF CHARIGAON VILLAGE |
50000 |
SEGREGATION SED OF CHARIGAON VILLAGE1 |
Completion of work |
-
latitude : 21.18648107
Longitude : 86.40981229
file name : Image_02122022143350775.png
|
2022-12-02 14:33:50.882826 |
108 |
62685050 |
SEGREGATION SED OF CHARIGAON VILLAGE |
50000 |
SEGREGATION SED OF CHARIGAON VILLAGE1 |
Completion of work |
-
latitude : 21.1864567
Longitude : 86.40974777
file name : Image_02122022143428224.png
|
2022-12-02 14:34:28.351675 |
109 |
62685161 |
SEGREGATION SED OF TELANATI VILLAGE |
50000 |
SEGREGATION SED OF TELANATI VILLAGE1 |
Completion of work |
-
latitude : 21.19370199
Longitude : 86.42498406
file name : Image_02122022135428229.png
|
2022-12-02 13:54:28.344919 |
110 |
62685161 |
SEGREGATION SED OF TELANATI VILLAGE |
50000 |
SEGREGATION SED OF TELANATI VILLAGE1 |
Completion of work |
-
latitude : 21.19369028
Longitude : 86.42487389
file name : Image_02122022135509736.png
|
2022-12-02 13:55:09.848907 |
111 |
62685186 |
SEGREGATION SED OF ITUA VILLAGE |
50000 |
SEGREGATION SED OF ITUA VILLAGE1 |
Completion of work |
-
latitude : 21.18518664
Longitude : 86.42661958
file name : Image_02122022134233551.png
|
2022-12-02 13:42:33.658161 |
112 |
62685186 |
SEGREGATION SED OF ITUA VILLAGE |
50000 |
SEGREGATION SED OF ITUA VILLAGE1 |
Completion of work |
-
latitude : 21.18512203
Longitude : 86.42657601
file name : Image_02122022134617852.png
|
2022-12-02 13:46:17.970465 |
113 |
66062234 |
Creation of community soak pits for group of Households |
82000 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 21.18635939
Longitude : 86.4098118
file name : Image_02122022143549646.png
|
2022-12-02 14:35:49.75995 |
114 |
66062234 |
Creation of community soak pits for group of Households |
82000 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 21.18634901
Longitude : 86.4098511
file name : Image_02122022143629163.png
|
2022-12-02 14:36:29.278841 |
115 |
62689001 |
CONSTRUCTION OF CC ROAD FROM SANATAN NANDI HOUSE TO KIRTTAN CHARAN SAHOO HOUSE,CHAKARAPADHI |
220000 |
CONSTRUCTION OF CC ROAD FROM SANATAN NANDI HOUSE TO KIRTTAN CHARAN SAHOO HOUSE,CHAKARAPADHI1 |
Completion of work |
-
latitude : 21.18530013,21.18530013
Longitude : 86.41639843,86.41639843
file name : Image_10012023165641848.png
|
2023-01-10 16:56:41.978197 |
116 |
62689001 |
CONSTRUCTION OF CC ROAD FROM SANATAN NANDI HOUSE TO KIRTTAN CHARAN SAHOO HOUSE,CHAKARAPADHI |
220000 |
CONSTRUCTION OF CC ROAD FROM SANATAN NANDI HOUSE TO KIRTTAN CHARAN SAHOO HOUSE,CHAKARAPADHI1 |
Completion of work |
-
latitude : 21.18531193,21.18531193
Longitude : 86.41642774,86.41642775
file name : Image_10012023165721088.png
|
2023-01-10 16:57:21.189476 |
117 |
66062365 |
Providing piped water supply to public institutions |
26000 |
Providing piped water supply to public institutions1 |
Completion of work |
-
latitude : 21.18853485
Longitude : 86.41975492
file name : Image_14032023105639026.png
|
2023-03-14 10:56:39.119005 |
118 |
66062365 |
Providing piped water supply to public institutions |
26000 |
Providing piped water supply to public institutions1 |
Completion of work |
-
latitude : 21.18840368
Longitude : 86.41962042
file name : Image_14032023105532464.png
|
2023-03-14 10:55:32.559656 |
119 |
66062349 |
Operation & maintenance of drinking water supply system |
14000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.18840478
Longitude : 86.41965034
file name : Image_14032023110736566.png
|
2023-03-14 11:07:36.659129 |
120 |
62688741 |
CONSTRUCTION OF BOUNDARY WALL AT ITUA PRIMARY SCHOOL |
200000 |
CONSTRUCTION OF BOUNDARY WALL AT ITUA PRIMARY SCHOOL1 |
Completion of work |
-
latitude : 21.18449908
Longitude : 86.42820484
file name : Image_20022023120642422.png
|
2023-02-20 12:06:42.544918 |
121 |
62688741 |
CONSTRUCTION OF BOUNDARY WALL AT ITUA PRIMARY SCHOOL |
200000 |
CONSTRUCTION OF BOUNDARY WALL AT ITUA PRIMARY SCHOOL1 |
Completion of work |
-
latitude : 21.1844853
Longitude : 86.42818532
file name : Image_20022023120737457.png
|
2023-02-20 12:07:37.563502 |
122 |
48120866 |
Completion of CC road from Main Road to Bhuyan sahi, CHARIGAN SFC |
100000 |
Completion of CC road from Main Road to Bhuyan sahi, CHARIGAN SFC1 |
Completion of work |
-
latitude : 21.18092708
Longitude : 86.40674342
file name : Image_30052023205032282.png
|
2023-05-30 20:50:32.390937 |
123 |
48120866 |
Completion of CC road from Main Road to Bhuyan sahi, CHARIGAN SFC |
100000 |
Completion of CC road from Main Road to Bhuyan sahi, CHARIGAN SFC1 |
Completion of work |
-
latitude : 21.181019
Longitude : 86.40678148
file name : Image_31052023174007236.png
|
2023-05-31 17:40:07.348879 |
124 |
48120866 |
Completion of CC road from Main Road to Bhuyan sahi, CHARIGAN SFC |
100000 |
Completion of CC road from Main Road to Bhuyan sahi, CHARIGAN SFC1 |
Completion of work |
-
latitude : 21.1810219
Longitude : 86.40676271
file name : Image_31052023174129097.png
|
2023-05-31 17:41:29.198299 |
125 |
48121320 |
Repairing of Charigaon UGME school T |
200000 |
Repairing of Charigaon UGME school T1 |
Completion of work |
-
latitude : 21.18720305
Longitude : 86.4098165
file name : Image_14112024162444769.png
|
2024-11-14 16:24:44.907771 |
126 |
48121320 |
Repairing of Charigaon UGME school T |
200000 |
Repairing of Charigaon UGME school T1 |
Completion of work |
-
latitude : 21.18703853
Longitude : 86.40976562
file name : Image_14112024162346452.png
|
2024-11-14 16:23:46.618988 |
127 |
48121886 |
Const. Of tubewell Platform near Ratha Panda House. Charigan T |
15000 |
Const. Of tubewell Platform near Ratha Panda House. Charigan T1 |
Completion of work |
-
latitude : 21.18184392
Longitude : 86.40624237
file name : Image_22032024151627646.png
|
2024-03-22 15:16:27.740032 |
128 |
48121886 |
Const. Of tubewell Platform near Ratha Panda House. Charigan T |
15000 |
Const. Of tubewell Platform near Ratha Panda House. Charigan T1 |
Completion of work |
-
latitude : 21.1818098
Longitude : 86.40621102
file name : Image_31052023175510697.png
|
2023-05-31 17:55:10.79153 |
129 |
66062818 |
CON OF CC ROAD FROM LAXMIPRIYA PATI HOUSE TO BISHNU NANDI HOUSE. |
150000 |
CON OF CC ROAD FROM LAXMIPRIYA PATI HOUSE TO BISHNU NANDI HOUSE.1 |
Completion of work |
-
latitude : 21.18724037,21.18724026
Longitude : 86.41673022,86.41673028
file name : Image_14032023111722092.png
|
2023-03-14 11:17:22.193093 |
130 |
66062818 |
CON OF CC ROAD FROM LAXMIPRIYA PATI HOUSE TO BISHNU NANDI HOUSE. |
150000 |
CON OF CC ROAD FROM LAXMIPRIYA PATI HOUSE TO BISHNU NANDI HOUSE.1 |
Completion of work |
-
latitude : 21.18722517,21.18722517
Longitude : 86.41673967,86.41673967
file name : Image_14032023111817871.png
|
2023-03-14 11:18:17.973341 |
131 |
66062321 |
Construction of Community Sanitary Complex |
200000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 21.18806814
Longitude : 86.4199121
file name : Image_07062023113436867.png
|
2023-06-07 11:34:36.983863 |
132 |
66062321 |
Construction of Community Sanitary Complex |
200000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 21.18804335
Longitude : 86.41987452
file name : Image_07062023114227746.png
|
2023-06-07 11:42:27.839929 |
133 |
62688976 |
CONSTRUCTION OF CC ROAD FROM KAMBU DAS HOUSE TO NABA KISHORE SAHOO HOUSE,CHAKARAPADHI |
200000 |
CONSTRUCTION OF CC ROAD FROM KAMBU DAS HOUSE TO NABA KISHORE SAHOO HOUSE,CHAKARAPADHI1 |
Completion of work |
-
latitude : 21.18514357,21.18514358
Longitude : 86.41161268,86.41161289
file name : Image_07062023112625347.png
|
2023-06-07 11:26:25.44099 |
134 |
62688976 |
CONSTRUCTION OF CC ROAD FROM KAMBU DAS HOUSE TO NABA KISHORE SAHOO HOUSE,CHAKARAPADHI |
200000 |
CONSTRUCTION OF CC ROAD FROM KAMBU DAS HOUSE TO NABA KISHORE SAHOO HOUSE,CHAKARAPADHI1 |
Completion of work |
-
latitude : 21.17435821,21.18517221
Longitude : 86.41893789,86.41165071
file name : Image_07062023112536532.png
|
2023-06-07 11:25:36.632087 |
135 |
62689044 |
CONSTRUCTION OF KAR SAHI NADIGHAT,CHAKARAPADHI |
150000 |
CONSTRUCTION OF KAR SAHI NADIGHAT,CHAKARAPADHI1 |
Completion of work |
-
latitude : 21.18541741
Longitude : 86.42064807
file name : Image_05102023141101177.png
|
2023-10-05 14:11:01.282754 |
136 |
62689044 |
CONSTRUCTION OF KAR SAHI NADIGHAT,CHAKARAPADHI |
150000 |
CONSTRUCTION OF KAR SAHI NADIGHAT,CHAKARAPADHI1 |
Completion of work |
-
latitude : 21.1854113
Longitude : 86.42065594
file name : Image_05102023140954264.png
|
2023-10-05 14:09:54.357617 |
137 |
62689044 |
CONSTRUCTION OF KAR SAHI NADIGHAT,CHAKARAPADHI |
150000 |
CONSTRUCTION OF KAR SAHI NADIGHAT,CHAKARAPADHI1 |
Completion of work |
-
latitude : 21.18542477
Longitude : 86.42067983
file name : Image_05102023140850869.png
|
2023-10-05 14:08:50.974513 |
138 |
62685623 |
CONSTRUCTION OF DRAIN FROM MULI ROUT HOUSE TO GOHIRI NALA AT CHAKARAPADHI |
68544 |
CONSTRUCTION OF DRAIN FROM MULI ROUT HOUSE TO GOHIRI NALA AT CHAKARAPADHI1 |
Completion of work |
-
latitude : 21.18744456
Longitude : 86.41909976
file name : Image_24092023174713697.png
|
2023-09-24 17:47:13.778907 |
139 |
62685623 |
CONSTRUCTION OF DRAIN FROM MULI ROUT HOUSE TO GOHIRI NALA AT CHAKARAPADHI |
68544 |
CONSTRUCTION OF DRAIN FROM MULI ROUT HOUSE TO GOHIRI NALA AT CHAKARAPADHI1 |
Completion of work |
-
latitude : 21.18744327
Longitude : 86.41910335
file name : Image_24092023174633555.png
|
2023-09-24 17:46:33.647315 |
140 |
64095004 |
IMP OF OF PARK ,GARDEN AT BALIPOKHARI HIGH SCHOOL U |
100000 |
IMP OF OF PARK ,GARDEN AT BALIPOKHARI HIGH SCHOOL U1 |
Completion of work |
-
latitude : 21.1956567,21.1956567
Longitude : 86.4253466,86.4253466
file name : Image_24092023174003983.png
|
2023-09-24 17:40:04.064091 |
141 |
64095004 |
IMP OF OF PARK ,GARDEN AT BALIPOKHARI HIGH SCHOOL U |
100000 |
IMP OF OF PARK ,GARDEN AT BALIPOKHARI HIGH SCHOOL U1 |
Completion of work |
-
latitude : 21.1956817,21.1956817
Longitude : 86.4254064,86.4254064
file name : Image_24092023173905609.png
|
2023-09-24 17:39:05.698931 |
142 |
75680018 |
Operation and Maintenance of piped water supply system |
220000 |
Operation and Maintenance of piped water supply system1 |
Completion of work |
-
latitude : 21.24172801
Longitude : 86.3804713
file name : Image_20102023110939050.png
|
2023-10-20 11:09:39.152789 |
143 |
75680018 |
Operation and Maintenance of piped water supply system |
220000 |
Operation and Maintenance of piped water supply system1 |
Completion of work |
-
latitude : 21.2417254
Longitude : 86.38047537
file name : Image_20102023110922243.png
|
2023-10-20 11:09:22.340751 |
144 |
75680018 |
Operation and Maintenance of piped water supply system |
220000 |
Operation and Maintenance of piped water supply system1 |
Completion of work |
-
latitude : 21.24173799
Longitude : 86.38049904
file name : Image_19102023081133825.png
|
2023-10-19 08:11:33.915629 |
145 |
75696544 |
Operation and Maintenance of piped water supply system |
96000 |
Operation and Maintenance of piped water supply system1 |
Completion of work |
-
latitude : 21.24172597
Longitude : 86.38047658
file name : Image_20102023110918200.png
|
2023-10-20 11:09:18.305395 |
146 |
75696544 |
Operation and Maintenance of piped water supply system |
96000 |
Operation and Maintenance of piped water supply system1 |
Completion of work |
-
latitude : 21.2417377
Longitude : 86.38050034
file name : Image_19102023081043421.png
|
2023-10-19 08:10:43.5089 |
147 |
62685554 |
CONSTRUCTION OF CC DRAIN FROM TELANATI PRIMARY SCHOOL TO NEAR BHARAT NAYAK HOUSE CULVERT AT TELANAT |
180000 |
CONSTRUCTION OF CC DRAIN FROM TELANATI PRIMARY SCHOOL TO NEAR BHARAT NAYAK HOUSE CULVERT AT TELANAT1 |
Completion of work |
-
latitude : 21.1796676
Longitude : 86.40614634
file name : Image_27122023150849515.png
|
2023-12-27 15:08:49.620049 |
148 |
62685554 |
CONSTRUCTION OF CC DRAIN FROM TELANATI PRIMARY SCHOOL TO NEAR BHARAT NAYAK HOUSE CULVERT AT TELANAT |
180000 |
CONSTRUCTION OF CC DRAIN FROM TELANATI PRIMARY SCHOOL TO NEAR BHARAT NAYAK HOUSE CULVERT AT TELANAT1 |
Completion of work |
-
latitude : 21.17965697
Longitude : 86.40609693
file name : Image_27122023150812081.png
|
2023-12-27 15:08:12.185968 |
149 |
75717996 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.18959987,21.18959992
Longitude : 86.42139312,86.42139304
file name : Image_08052024122621001.png
|
2024-05-08 12:26:21.088821 |
150 |
75717996 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.1895971,21.18959715
Longitude : 86.42135941,86.42135868
file name : Image_08052024122707747.png
|
2024-05-08 12:27:07.838115 |
151 |
75717745 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.18808329,21.18808386
Longitude : 86.41655874,86.41655876
file name : Image_08052024121957066.png
|
2024-05-08 12:19:57.150456 |
152 |
75717745 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.18805422,21.18805422
Longitude : 86.41643604,86.41643604
file name : Image_08052024121854842.png
|
2024-05-08 12:18:54.933976 |
153 |
62685259 |
CONSTRUCTION OF COMMUNITY TOILET AT CHAKRAPADHI VILLAGE |
90000 |
CONSTRUCTION OF COMMUNITY TOILET AT CHAKRAPADHI VILLAGE1 |
Completion of work |
-
latitude : 21.18802183
Longitude : 86.41977989
file name : Image_13052024130209189.png
|
2024-05-13 13:02:09.281369 |
154 |
62685259 |
CONSTRUCTION OF COMMUNITY TOILET AT CHAKRAPADHI VILLAGE |
90000 |
CONSTRUCTION OF COMMUNITY TOILET AT CHAKRAPADHI VILLAGE1 |
Completion of work |
-
latitude : 21.18780258
Longitude : 86.4198731
file name : Image_13052024130112093.png
|
2024-05-13 13:01:12.186477 |
155 |
66062051 |
Construction of Community Sanitary Complex |
110000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 21.18800927
Longitude : 86.41990209
file name : Image_13052024130730187.png
|
2024-05-13 13:07:30.277816 |
156 |
66062051 |
Construction of Community Sanitary Complex |
110000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 21.18800947
Longitude : 86.4199052
file name : Image_13052024130633755.png
|
2024-05-13 13:06:33.85036 |
157 |
75718369 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.18774469,21.18774459
Longitude : 86.42144755,86.42144744
file name : Image_22032024150450656.png
|
2024-03-22 15:04:50.748442 |
158 |
75718369 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.18772858,21.18772843
Longitude : 86.42137841,86.42137886
file name : Image_22032024150102128.png
|
2024-03-22 15:01:02.213545 |
159 |
75718369 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.18774228,21.18774227
Longitude : 86.42139821,86.42139819
file name : Image_22032024145613247.png
|
2024-03-22 14:56:13.329778 |
160 |
75718369 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.18776166,21.18776173
Longitude : 86.42142098,86.42142096
file name : Image_22032024145456217.png
|
2024-03-22 14:54:56.300859 |
161 |
75718369 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.18765153,21.18764895
Longitude : 86.42138288,86.4213833
file name : Image_15032024175633262.png
|
2024-03-15 17:56:33.34985 |
162 |
75718369 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.18769308,21.18769308
Longitude : 86.42140141,86.42140139
file name : Image_15032024175440966.png
|
2024-03-15 17:54:41.061775 |
163 |
75718369 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.1876386,21.18764042
Longitude : 86.42140214,86.42139767
file name : Image_15032024174638176.png
|
2024-03-15 17:46:38.267692 |
164 |
75718369 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.18765339,21.187652
Longitude : 86.42136102,86.4213633
file name : Image_15032024174536318.png
|
2024-03-15 17:45:36.4101 |
165 |
105815676 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.18581254,21.18581282
Longitude : 86.4122415,86.41224078
file name : Image_27092024140602126.png
|
2024-09-27 14:06:02.237153 |
166 |
105815676 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.18571899,21.1857191
Longitude : 86.4122675,86.4122672
file name : Image_27092024140515523.png
|
2024-09-27 14:05:15.646737 |
167 |
98301864 |
Operation and Maintenance of drinking/piped water supply system |
156000 |
Operation and Maintenance of drinking/piped water supply system1 |
Completion of work |
-
latitude : 21.24180956
Longitude : 86.3805362
file name : Image_27092024094912196.png
|
2024-09-27 09:49:12.282662 |
168 |
98301990 |
Operation and Maintenance of drinking/piped water supply system |
200000 |
Operation and Maintenance of drinking/piped water supply system1 |
Completion of work |
-
latitude : 21.24192038
Longitude : 86.3805184
file name : Image_27092024122320162.png
|
2024-09-27 12:23:20.310115 |
169 |
75719362 |
Construction and Maintenance of Community Centre |
100000 |
Construction and Maintenance of Community Centre1 |
Completion of work |
-
latitude : 21.18549541
Longitude : 86.41297897
file name : Image_19072024131736907.png
|
2024-07-19 13:17:37.009952 |
170 |
75719362 |
Construction and Maintenance of Community Centre |
100000 |
Construction and Maintenance of Community Centre1 |
Completion of work |
-
latitude : 21.18548808
Longitude : 86.4129453
file name : Image_19072024131825055.png
|
2024-07-19 13:18:25.149922 |
171 |
105818997 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets |
200000 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets1 |
Completion of work |
-
latitude : 21.18524257
Longitude : 86.41651832
file name : Image_28102024121158001.png
|
2024-10-28 12:11:58.103376 |
172 |
105818997 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets |
200000 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets1 |
Completion of work |
-
latitude : 21.18525574
Longitude : 86.41653335
file name : Image_28102024121048659.png
|
2024-10-28 12:10:48.752176 |
173 |
75721064 |
Maintenance of school buildings |
100000 |
Maintenance of school buildings1 |
Completion of work |
-
latitude : 21.18718969
Longitude : 86.40982658
file name : Image_14112024162906655.png
|
2024-11-14 16:29:06.748 |
174 |
75721064 |
Maintenance of school buildings |
100000 |
Maintenance of school buildings1 |
Completion of work |
-
latitude : 21.18720789
Longitude : 86.40975761
file name : Image_14112024162732228.png
|
2024-11-14 16:27:32.415037 |
175 |
75721064 |
Maintenance of school buildings |
100000 |
Maintenance of school buildings1 |
Completion of work |
-
latitude : 21.18722809
Longitude : 86.40982105
file name : Image_14112024162633049.png
|
2024-11-14 16:26:33.204076 |
176 |
105816001 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.18957013,21.18957013
Longitude : 86.42057114,86.42057111
file name : Image_03122024143912461.png
|
2024-12-03 14:39:12.560251 |
177 |
105816001 |
Construction of roads |
150000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.1895173,21.18951703
Longitude : 86.42058194,86.42058264
file name : Image_03122024144020971.png
|
2024-12-03 14:40:21.059671 |
178 |
105815824 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets |
100000 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets1 |
Completion of work |
-
latitude : 21.1796566
Longitude : 86.40610717
file name : Image_03122024161624431.png
|
2024-12-03 16:16:24.520327 |
179 |
105815824 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets |
100000 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets1 |
Completion of work |
-
latitude : 21.17944425
Longitude : 86.40599215
file name : Image_03122024161542071.png
|
2024-12-03 16:15:42.167494 |