1 |
55758884 |
REMUNERATION OF PUMP OPERATOR |
72000 |
REMUNERATION OF PUMP OPERATOR1 |
Completion of work |
-
latitude : 21.62422373
Longitude : 87.44082554
file name : Image_04022022095526023.png
|
2022-02-04 09:55:26.127358 |
2 |
55758884 |
REMUNERATION OF PUMP OPERATOR |
72000 |
REMUNERATION OF PUMP OPERATOR1 |
Completion of work |
-
latitude : 21.6242054
Longitude : 87.4409087
file name : Image_04022022095529725.png
|
2022-02-04 09:55:29.827351 |
3 |
55758806 |
ENERGY CHARGES OF PWS GOCHHIDATEGHARI GP |
350000 |
ENERGY CHARGES OF PWS GOCHHIDATEGHARI GP1 |
Completion of work |
-
latitude : 21.62428216,21.62428216
Longitude : 87.4407546,87.4407546
file name : Image_03022022174456013.png
|
2022-02-03 17:44:56.181763 |
4 |
44223374 |
PROCUREMENT OF BLICHIN G POWDER |
8000 |
PROCUREMENT OF BLICHIN G POWDER1 |
Completion of work |
-
latitude : 21.62421281
Longitude : 87.44080433
file name : Image_25012022095501463.png
|
2022-01-25 09:55:01.586597 |
5 |
44223842 |
CONST OF COMMUNITY SANITARY COMPLEX |
90000 |
CONST OF COMMUNITY SANITARY COMPLEX1 |
Completion of work |
-
latitude : 21.62420115
Longitude : 87.44065538
file name : Image_21112020102054414.png
|
2020-11-21 10:20:54.509738 |
6 |
44223584 |
CONST OF BOUNDARY WALL AT K NAGAR KALUACHANDI AWC A |
100000 |
CONST OF BOUNDARY WALL AT K NAGAR KALUACHANDI AWC A1 |
Completion of work |
-
latitude : 21.61082966
Longitude : 87.45577413
file name : Image_21112020083451165.png
|
2020-11-21 08:34:51.273786 |
7 |
44223584 |
CONST OF BOUNDARY WALL AT K NAGAR KALUACHANDI AWC A |
100000 |
CONST OF BOUNDARY WALL AT K NAGAR KALUACHANDI AWC A1 |
Completion of work |
-
latitude : 21.61081449
Longitude : 87.4557634
file name : Image_21112020101929539.png
|
2020-11-21 10:19:29.632318 |
8 |
44223926 |
CONST OF CONNECTING ROAD FROM KM NAGAR GOPAL MANDAL HOUSE TO ANANTA MANDAL HOUSE |
100000 |
CONST OF CONNECTING ROAD FROM KM NAGAR GOPAL MANDAL HOUSE TO ANANTA MANDAL HOUSE1 |
Completion of work |
-
latitude : 21.60600552,21.60602892
Longitude : 87.44324187,87.44319879
file name : Image_11012021163016684.png
|
2021-01-11 16:30:16.772476 |
9 |
44224040 |
CONST OF BOUNDARY WALL AT G TEGHARI AWC C |
100000 |
CONST OF BOUNDARY WALL AT G TEGHARI AWC C1 |
Completion of work |
-
latitude : 21.62492741
Longitude : 87.44317409
file name : Image_03022021165359487.png
|
2021-02-03 16:53:59.599102 |
10 |
44223748 |
CONST OF CONNECTING ROAD FROM MANGARAJPUR PRAVAT SETHI HOUSE TO SUBASH SETHI HOUSE |
100000 |
CONST OF CONNECTING ROAD FROM MANGARAJPUR PRAVAT SETHI HOUSE TO SUBASH SETHI HOUSE1 |
Completion of work |
-
latitude : 21.62108083,21.62110111
Longitude : 87.44854731,87.44857342
file name : Image_13042021123949657.png
|
2021-04-13 12:39:49.764483 |
11 |
44223683 |
CONST OF CONNECTING ROAD FROM S P[UR BALIGADIA CHHAKA TO JHADESWAR PRADJHAN HOUSE |
100000 |
CONST OF CONNECTING ROAD FROM S P[UR BALIGADIA CHHAKA TO JHADESWAR PRADJHAN HOUSE1 |
Completion of work |
-
latitude : 21.62760828,21.62761387
Longitude : 87.44310665,87.44310512
file name : Image_13042021125428351.png
|
2021-04-13 12:54:28.466131 |
12 |
44223656 |
CONST OF CONNECTING ROAD FROM G TEGHARI NARAYAN RANA HOUSE TO SUBALK RANA HOUSE |
70000 |
CONST OF CONNECTING ROAD FROM G TEGHARI NARAYAN RANA HOUSE TO SUBALK RANA HOUSE1 |
Completion of work |
-
latitude : 21.62729597,21.62729604
Longitude : 87.4540424,87.45404237
file name : Image_13042021124711770.png
|
2021-04-13 12:47:11.884256 |
13 |
44223726 |
CONST OF BOUNDARY WALL AT G TEGHARI G.P OFFICE |
400000 |
CONST OF BOUNDARY WALL AT G TEGHARI G.P OFFICE1 |
Completion of work |
-
latitude : 21.62436932
Longitude : 87.44096171
file name : Image_13042021123945371.png
|
2021-04-13 12:39:45.480853 |
14 |
44223468 |
REPAIR OF G TEGHARI PWS PIPELINE |
106688 |
REPAIR OF G TEGHARI PWS PIPELINE1 |
Completion of work |
-
latitude : 21.62427313
Longitude : 87.4408228
file name : Image_31052021092249904.png
|
2021-05-31 09:22:50.032848 |
15 |
44223336 |
ENGAGEMENT OF EXTRA LABOUR AND SEM SALARY |
12000 |
ENGAGEMENT OF EXTRA LABOUR AND SEM SALARY1 |
Completion of work |
-
latitude : 21.62515895
Longitude : 87.4432854
file name : Image_25012022095012370.png
|
2022-01-25 09:50:12.510232 |
16 |
44223511 |
REMUNARATION OF PUMP OPERATOR 2 NOS |
48000 |
REMUNARATION OF PUMP OPERATOR 2 NOS1 |
Completion of work |
-
latitude : 21.6226139
Longitude : 87.4374696
file name : Image_07092021132425378.png
|
2021-09-07 13:24:25.481507 |
17 |
55759189 |
CONST OF CONNECTING ROAD FROM S PUR DIBAKAR PRADHAN HOUSE TO CHANDAN PRADHAN HOUSE |
200000 |
CONST OF CONNECTING ROAD FROM S PUR DIBAKAR PRADHAN HOUSE TO CHANDAN PRADHAN HOUSE1 |
Completion of work |
-
latitude : 21.62793398,21.62791317
Longitude : 87.44295035,87.44294857
file name : Image_07012022110831500.png
|
2022-01-07 11:08:31.603931 |
18 |
55759403 |
CONST OF CONNECTING ROAD FROM K NAGAR RANJAN MALLICK HOUSE TO HARENDRA BEHERA HOUSE |
100000 |
CONST OF CONNECTING ROAD FROM K NAGAR RANJAN MALLICK HOUSE TO HARENDRA BEHERA HOUSE1 |
Completion of work |
-
latitude : 21.61070765,21.61069252,21.61069204
Longitude : 87.44340654,87.44340933,87.44340947
file name : Image_07012022113923381.png
|
2022-01-07 11:39:23.507784 |
19 |
55759428 |
CONST OF CONNECTING ROAD FROM G TEGHARI PWD ROAD TO RADHASHYAM DEY HOUSE |
80000 |
CONST OF CONNECTING ROAD FROM G TEGHARI PWD ROAD TO RADHASHYAM DEY HOUSE1 |
Completion of work |
-
latitude : 21.6254362,21.62544013
Longitude : 87.44647866,87.44647713
file name : Image_07012022121249309.png
|
2022-01-07 12:12:49.408792 |
20 |
55758964 |
CONST OF ROAD FROM KRUSHNANAGAR AMULYA MALLICK HOUSE TO BANSIDHAR BEHERA HOUSE |
100000 |
CONST OF ROAD FROM KRUSHNANAGAR AMULYA MALLICK HOUSE TO BANSIDHAR BEHERA HOUSE1 |
Completion of work |
-
latitude : 21.61073034,21.61070011,21.61069716
Longitude : 87.44342802,87.44341306,87.44340481
file name : Image_07012022113744510.png
|
2022-01-07 11:37:44.657102 |
21 |
55758979 |
REPAIR AND MAINTENANCE OF DTLK HIGH SCHOOL SHYAMANANDIPUR (5T) |
500000 |
REPAIR AND MAINTENANCE OF DTLK HIGH SCHOOL SHYAMANANDIPUR (5T)1 |
Completion of work |
-
latitude : 21.62654262
Longitude : 87.44758926
file name : Image_08032022101054050.png
|
2022-03-08 10:10:54.172849 |
22 |
55759443 |
CONST OF CONNECTING ROAD FROM S PUR GOURAHARI SAHU HOUSE TO SRIPATI SAHU HOUSE |
94032 |
CONST OF CONNECTING ROAD FROM S PUR GOURAHARI SAHU HOUSE TO SRIPATI SAHU HOUSE1 |
Completion of work |
-
latitude : 21.61326923,21.61326015
Longitude : 87.44035,87.4403643
file name : Image_08062022084050266.png
|
2022-06-08 08:40:50.40255 |
23 |
55759473 |
CONST OF CONNECTING ROAD FROM G TEGHARI PMGSY ROAD TO SUDHIR PARIDA HOUSE |
70000 |
CONST OF CONNECTING ROAD FROM G TEGHARI PMGSY ROAD TO SUDHIR PARIDA HOUSE1 |
Completion of work |
-
latitude : 21.6132728,21.61327188
Longitude : 87.44033745,87.44034219
file name : Image_08062022084131933.png
|
2022-06-08 08:41:32.050124 |
24 |
63867231 |
EXCAVATION OF KRUSHNANAGAR PADMO POND |
164032 |
EXCAVATION OF KRUSHNANAGAR PADMO POND1 |
Completion of work |
-
latitude : 21.61314355
Longitude : 87.44027304
file name : Image_09062022162723997.png
|
2022-06-09 16:27:24.12172 |
25 |
55758897 |
CONTRIBUTION TOWARDS SBM PHASE TWO |
450578 |
CONTRIBUTION TOWARDS SBM PHASE TWO1 |
Completion of work |
-
latitude : 21.62664883
Longitude : 87.44795747
file name : Image_17062022085419755.png
|
2022-06-17 08:54:19.863303 |
26 |
55758783 |
PROCUREMENT OF BLEACHING POWDER |
5000 |
PROCUREMENT OF BLEACHING POWDER1 |
Completion of work |
-
latitude : 21.62422711
Longitude : 87.44085817
file name : Image_29062022113506310.png
|
2022-06-29 11:35:06.424454 |
27 |
55758833 |
CONTINGENCY |
150000 |
CONTINGENCY1 |
Completion of work |
-
latitude : 21.6242292
Longitude : 87.4410914
file name : Image_29062022113616686.png
|
2022-06-29 11:36:16.812316 |
28 |
55758731 |
SPARE PARTS AND REPAIRING OF TUBE WELL AND PIPE LINE |
50000 |
SPARE PARTS AND REPAIRING OF TUBE WELL AND PIPE LINE1 |
Completion of work |
-
latitude : 21.62257714
Longitude : 87.43746555
file name : Image_29062022113256671.png
|
2022-06-29 11:32:56.776269 |
29 |
63540930 |
Energy charges of PWS Gochhidateghari GP |
240000 |
Energy charges of PWS Gochhidateghari GP1 |
Completion of work |
-
latitude : 21.62417786,21.62417786
Longitude : 87.44073509,87.44073509
file name : Image_20082022121550387.png
|
2022-08-20 12:15:50.485609 |
30 |
63540915 |
Repair and maintenance of Gochhidateghari ,Krushnanagar, Mangarajpur and Shyamanadopur PWS Pipeline |
132542 |
Repair and maintenance of Gochhidateghari ,Krushnanagar, Mangarajpur and Shyamanadopur PWS Pipeline1 |
Completion of work |
-
latitude : 21.62945281,21.62945281
Longitude : 87.45659802,87.45659802
file name : Image_08092022165251989.png
|
2022-09-08 16:52:52.107818 |
31 |
63540948 |
Remuneration of Pump operator |
96000 |
Remuneration of Pump operator1 |
Completion of work |
-
latitude : 21.62422723
Longitude : 87.44080236
file name : Image_20082022121634468.png
|
2022-08-20 12:16:34.569964 |
32 |
63540970 |
Development of DTLK Nodal H S for 5T |
400000 |
Development of DTLK Nodal H S for 5T1 |
Completion of work |
-
latitude : 21.6257766
Longitude : 87.4479355
file name : Image_20082022164310800.png
|
2022-08-20 16:43:10.918879 |
33 |
63540989 |
Contingency |
178542 |
Contingency1 |
Completion of work |
-
latitude : 21.62260756
Longitude : 87.43738841
file name : Image_31052023113854650.png
|
2023-05-31 11:38:54.743035 |
34 |
63540989 |
Contingency |
178542 |
Contingency1 |
Completion of work |
-
latitude : 21.62415023
Longitude : 87.44101817
file name : Image_08092022165407949.png
|
2022-09-08 16:54:08.05573 |
35 |
63540989 |
Contingency |
178542 |
Contingency1 |
Completion of work |
-
latitude : 21.62418973
Longitude : 87.44080838
file name : Image_20082022164301786.png
|
2022-08-20 16:43:01.9018 |
36 |
44224022 |
CONST OF CONNECTING ROAD FROM G TEGHARI AMULYA PATRA HOUSE TO NIASA PATRA HOUSE |
70000 |
CONST OF CONNECTING ROAD FROM G TEGHARI AMULYA PATRA HOUSE TO NIASA PATRA HOUSE1 |
Completion of work |
-
latitude : 21.62502396,21.62502395
Longitude : 87.45131781,87.45131774
file name : Image_13052021170205289.png
|
2021-05-13 17:02:05.375711 |
37 |
55759388 |
CONST OF CONNECTING ROAD FROM M PUR BABU SETHI HOUSE TO SUBAL NAYAK HOUSE |
100000 |
CONST OF CONNECTING ROAD FROM M PUR BABU SETHI HOUSE TO SUBAL NAYAK HOUSE1 |
Completion of work |
-
latitude : 21.62147716,21.62146385
Longitude : 87.44927829,87.44927578
file name : Image_07012022120951266.png
|
2022-01-07 12:09:51.359043 |
38 |
55759388 |
CONST OF CONNECTING ROAD FROM M PUR BABU SETHI HOUSE TO SUBAL NAYAK HOUSE |
100000 |
CONST OF CONNECTING ROAD FROM M PUR BABU SETHI HOUSE TO SUBAL NAYAK HOUSE1 |
Completion of work |
-
latitude : 21.62147716,21.62146385
Longitude : 87.44927829,87.44927578
file name : Image_07012022121227998.png
|
2022-01-07 12:12:28.091151 |
39 |
44224004 |
CONST OF GUARD WALL G TEGHJARI NIASA PATRA HOUSE TO DINABANDHU PATRA HOUSE |
100000 |
CONST OF GUARD WALL G TEGHJARI NIASA PATRA HOUSE TO DINABANDHU PATRA HOUSE1 |
Completion of work |
-
latitude : 21.62504491,21.62503531
Longitude : 87.45217173,87.45216252
file name : Image_13052021170008956.png
|
2021-05-13 17:00:09.077612 |
40 |
44223949 |
CONST OF CONNECTING ROAD FROM M PUR GANESHJ PRADHAN HOUSE TO HIMANSU PRADHAN HOUSE |
70000 |
CONST OF CONNECTING ROAD FROM M PUR GANESHJ PRADHAN HOUSE TO HIMANSU PRADHAN HOUSE1 |
Completion of work |
-
latitude : 21.6209165,21.6209165
Longitude : 87.45162072,87.45162072
file name : Image_13052021170633740.png
|
2021-05-13 17:06:33.822866 |
41 |
63541188 |
Const of connecting road from Mangarajpur Subal Nayak house to Madhusudan Parida house |
90000 |
Const of connecting road from Mangarajpur Subal Nayak house to Madhusudan Parida house1 |
Completion of work |
-
latitude : 21.62420004,21.62420004
Longitude : 87.4410505,87.4410505
file name : Image_23012023173152054.png
|
2023-01-23 17:31:52.160722 |
42 |
55758989 |
CONST OF G TEGHARI GP OFFICE GARDEN |
90000 |
CONST OF G TEGHARI GP OFFICE GARDEN1 |
Completion of work |
-
latitude : 21.62418972
Longitude : 87.44106084
file name : Image_23012023173147503.png
|
2023-01-23 17:31:47.608855 |
43 |
63541075 |
Repairing of Anganwadi centre A Gochhidateghari |
100000 |
Repairing of Anganwadi centre A Gochhidateghari1 |
Completion of work |
-
latitude : 21.6242035
Longitude : 87.4410087
file name : Image_31052023123704638.png
|
2023-05-31 12:37:04.748092 |
44 |
63541075 |
Repairing of Anganwadi centre A Gochhidateghari |
100000 |
Repairing of Anganwadi centre A Gochhidateghari1 |
Completion of work |
-
latitude : 21.62426511
Longitude : 87.44100179
file name : Image_31052023123707458.png
|
2023-05-31 12:37:07.559291 |
45 |
63541075 |
Repairing of Anganwadi centre A Gochhidateghari |
100000 |
Repairing of Anganwadi centre A Gochhidateghari1 |
Completion of work |
-
latitude : 21.62426511
Longitude : 87.44100179
file name : Image_31052023123710580.png
|
2023-05-31 12:37:10.688086 |
46 |
63541131 |
Const of connecting road from Shyamanadipur Giridhari House to Pitambar Pradhan House |
90000 |
Const of connecting road from Shyamanadipur Giridhari House to Pitambar Pradhan House1 |
Completion of work |
-
latitude : 21.64067874,21.64068413,21.64068199
Longitude : 87.45347438,87.4534512,87.45347361
file name : Image_28042023181252322.png
|
2023-04-28 18:12:52.433771 |
47 |
63541131 |
Const of connecting road from Shyamanadipur Giridhari House to Pitambar Pradhan House |
90000 |
Const of connecting road from Shyamanadipur Giridhari House to Pitambar Pradhan House1 |
Completion of work |
-
latitude : 21.62422465,21.62422695
Longitude : 87.44097915,87.4409795
file name : Image_28042023113040056.png
|
2023-04-28 11:30:40.214155 |
48 |
63541174 |
Const of connecting road from G Teghari Nandadulal Pradhan house to Ananta Pradhan house |
90000 |
Const of connecting road from G Teghari Nandadulal Pradhan house to Ananta Pradhan house1 |
Completion of work |
-
latitude : 21.62421495,21.62421414
Longitude : 87.44097643,87.4409767
file name : Image_28042023112947548.png
|
2023-04-28 11:29:47.70263 |
49 |
63541231 |
Const of Guardwall Behind ranibasan UP School Building |
90000 |
Const of Guardwall Behind ranibasan UP School Building1 |
Completion of work |
-
latitude : 21.62424325,21.62424206
Longitude : 87.44100572,87.44100373
file name : Image_28042023112734014.png
|
2023-04-28 11:27:34.183601 |
50 |
63541142 |
Const of connecting road from Shyamanadipur Benudhar Nayak house to Harekrushna Sahu house |
90000 |
Const of connecting road from Shyamanadipur Benudhar Nayak house to Harekrushna Sahu house1 |
Completion of work |
-
latitude : 21.62415761,21.62424706
Longitude : 87.44104789,87.44083792
file name : Image_31052023120815584.png
|
2023-05-31 12:08:15.683059 |
51 |
67685302 |
Repair and maintenance of road from G Teghari Jhadeswar Pradhan house to Jatindra Pradhan house |
90000 |
Repair and maintenance of road from G Teghari Jhadeswar Pradhan house to Jatindra Pradhan house1 |
Completion of work |
-
latitude : 21.62513719,21.62505823,21.6250639
Longitude : 87.44467238,87.4446798,87.44467808
file name : Image_21072023131125458.png
|
2023-07-21 13:11:25.667263 |
52 |
82647753 |
Operation and Maintenance of piped water supply system |
527279 |
Operation and Maintenance of piped water supply system1 |
Roof laid |
-
latitude : 21.62411
Longitude : 87.4410351
file name : Image_18102023113351232.png
|
2023-10-18 11:33:51.34539 |
53 |
82647753 |
Operation and Maintenance of piped water supply system |
527279 |
Operation and Maintenance of piped water supply system1 |
Plinth level |
-
latitude : 21.6241134
Longitude : 87.4410339
file name : Image_18102023113051292.png
|
2023-10-18 11:30:51.418749 |
54 |
82647753 |
Operation and Maintenance of piped water supply system |
527279 |
Operation and Maintenance of piped water supply system1 |
Completion of work |
-
latitude : 21.62431846
Longitude : 87.44101608
file name : Image_18102023112730790.png
|
2023-10-18 11:27:30.886588 |
55 |
77217242 |
Creation of Shed for segregation and processing of wet and dry waste |
58500 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 21.62431477
Longitude : 87.44097213
file name : Image_14122023173122895.png
|
2023-12-14 17:31:23.000695 |
56 |
77217242 |
Creation of Shed for segregation and processing of wet and dry waste |
58500 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 21.62417794
Longitude : 87.44094559
file name : Image_13122023131130621.png
|
2023-12-13 13:11:30.72732 |
57 |
77217242 |
Creation of Shed for segregation and processing of wet and dry waste |
58500 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 21.62399036
Longitude : 87.44019793
file name : Image_13122023130459821.png
|
2023-12-13 13:04:59.929734 |
58 |
77217242 |
Creation of Shed for segregation and processing of wet and dry waste |
58500 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 21.62399036
Longitude : 87.44019793
file name : Image_13122023125930405.png
|
2023-12-13 12:59:30.505889 |
59 |
77217242 |
Creation of Shed for segregation and processing of wet and dry waste |
58500 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 21.62420167
Longitude : 87.44100325
file name : Image_13122023130004478.png
|
2023-12-13 13:00:04.572438 |
60 |
78765520 |
Procurement of Computer |
70000 |
Procurement of Computer1 |
|
-
latitude : 21.6408243
Longitude : 87.45343021
file name : Image_24032024073954076.png
|
2024-03-24 07:39:54.165018 |