1 |
45865174 |
REPAIR OF PWS PIPELINE WITH PUMP HOUSE JALESWARPUR AND BATAGRAM UNDER JALESWARPUR GP |
400000 |
REPAIR OF PWS PIPELINE WITH PUMP HOUSE JALESWARPUR AND BATAGRAM UNDER JALESWARPUR GP1 |
Completion of work |
-
latitude : 21.67791333333333,21.678062
Longitude : 87.40185333333332,87.402197
file name : Image_07042021164519196.png
|
2021-04-07 16:45:19.296977 |
2 |
60861989 |
Contribution towards SBM Phase-II under Jaleswarpur G.P |
153400 |
Contribution towards SBM Phase-II under Jaleswarpur G.P1 |
Completion of work |
-
latitude : 21.6762246
Longitude : 87.3993727
file name : Image_22022022123338771.png
|
2022-02-22 12:33:38.884158 |
3 |
55435789 |
REMUNERATION OF PUMP CARE TAKER OF JALESWARPUR PWS |
12000 |
REMUNERATION OF PUMP CARE TAKER OF JALESWARPUR PWS1 |
Completion of work |
-
latitude : 21.680543333333336
Longitude : 87.40601833333334
file name : Image_08122021121358156.png
|
2021-12-08 12:13:58.288282 |
4 |
55435806 |
EXTENSION OF NEW PIPE LINE AT JALESWARPUR CHC POSTMORTEM HOUSE TO KUTURA GHADEI HOUSE AND JALESWARPU |
100000 |
EXTENSION OF NEW PIPE LINE AT JALESWARPUR CHC POSTMORTEM HOUSE TO KUTURA GHADEI HOUSE AND JALESWARPU1 |
Completion of work |
-
latitude : 21.681259999999998,21.681265
Longitude : 87.40574333333333,87.40574
file name : Image_25022022104014406.png
|
2022-02-25 10:40:14.492358 |
5 |
55435878 |
WATER SUPPLY, SANITARY AND TOILET WORKS AT JALESWARPUR GOVT HIGH SCHOOL UNDER 5T |
250000 |
WATER SUPPLY, SANITARY AND TOILET WORKS AT JALESWARPUR GOVT HIGH SCHOOL UNDER 5T1 |
Completion of work |
-
latitude : 21.67824166666667
Longitude : 87.40496499999999
file name : Image_19052022113244694.png
|
2022-05-19 11:32:44.798342 |
6 |
55440690 |
COMPLETION OF JALESWARPUR GOVT HIGH SCHOOL BUILDING UNDER 5T |
50000 |
COMPLETION OF JALESWARPUR GOVT HIGH SCHOOL BUILDING UNDER 5T1 |
Completion of work |
-
latitude : 21.676783333333333
Longitude : 87.40111166666665
file name : Image_02032022103504458.png
|
2022-03-02 10:35:04.55341 |
7 |
55440769 |
COMPLETION OF JALESWARPUR GOVT HIGH SCHOOL BUILDING UNDER 5T |
200000 |
COMPLETION OF JALESWARPUR GOVT HIGH SCHOOL BUILDING UNDER 5T1 |
Completion of work |
-
latitude : 21.676920000000003
Longitude : 87.40084666666668
file name : Image_22022022122235770.png
|
2022-02-22 12:22:35.858034 |
8 |
55435834 |
CONTRIBUTION TOWARDS SBM PHASE II AT JALESWARPUR |
92000 |
CONTRIBUTION TOWARDS SBM PHASE II AT JALESWARPUR1 |
Completion of work |
-
latitude : 21.676926666666667
Longitude : 87.40083333333332
file name : Image_22022022122055842.png
|
2022-02-22 12:20:55.94014 |
9 |
55435834 |
CONTRIBUTION TOWARDS SBM PHASE II AT JALESWARPUR |
92000 |
CONTRIBUTION TOWARDS SBM PHASE II AT JALESWARPUR1 |
Completion of work |
-
latitude : 21.677515000000003
Longitude : 87.40075
file name : Image_22022022122539307.png
|
2022-02-22 12:25:39.396684 |
10 |
55435834 |
CONTRIBUTION TOWARDS SBM PHASE II AT JALESWARPUR |
92000 |
CONTRIBUTION TOWARDS SBM PHASE II AT JALESWARPUR1 |
Completion of work |
-
latitude : 21.677310000000002
Longitude : 87.40068666666666
file name : Image_22022022122817642.png
|
2022-02-22 12:28:17.742465 |
11 |
55435743 |
ENERGY CHARGES OF PWS ,STREET LIGHT, GP OFFICE BUILDING |
200000 |
ENERGY CHARGES OF PWS ,STREET LIGHT, GP OFFICE BUILDING1 |
Completion of work |
-
latitude : 21.6780884
Longitude : 87.4052831
file name : Image_07022022182918575.png
|
2022-02-07 18:29:18.714144 |
12 |
55435768 |
ENGAGEMENT OF EXTRA LABOUR |
15000 |
ENGAGEMENT OF EXTRA LABOUR1 |
Completion of work |
-
latitude : 21.6780111
Longitude : 87.4052634
file name : Image_09032022194931411.png
|
2022-03-09 19:49:31.562783 |
13 |
55435781 |
PROCUREMENT OF BLEACHING |
5000 |
PROCUREMENT OF BLEACHING1 |
Completion of work |
-
latitude : 21.6780117
Longitude : 87.4052613
file name : Image_09032022194813336.png
|
2022-03-09 19:48:13.474226 |
14 |
63430047 |
ENERGY CHARGE OF JALESWARPUR GP |
200000 |
ENERGY CHARGE OF JALESWARPUR GP1 |
Completion of work |
-
latitude : 21.635293333333333
Longitude : 87.47127833333334
file name : Image_07092022134700471.png
|
2022-09-07 13:47:00.588264 |
15 |
63430660 |
CLEANING OF DRAIN UNDER JALESWARPUR GP |
100000 |
CLEANING OF DRAIN UNDER JALESWARPUR GP1 |
Completion of work |
-
latitude : 21.678061,21.678061
Longitude : 87.4052482,87.4052482
file name : Image_24122022174651438.png
|
2022-12-24 17:46:51.533232 |
16 |
63432046 |
CONST OF CC ROAD FROM JALESWARPUR BISESWAR ROUT HOUSE TO MAIN ROAD |
50000 |
CONST OF CC ROAD FROM JALESWARPUR BISESWAR ROUT HOUSE TO MAIN ROAD1 |
Completion of work |
-
latitude : 21.685203333333334,21.685201666666664
Longitude : 87.40819333333333,87.40817
file name : Image_09092022112337318.png
|
2022-09-09 11:23:37.412074 |
17 |
63432009 |
CONST OF DRAIN WITH REPAIR OF CC ROAD FROM JALESWARPUR HARENDRA DAS HOUSE PWD ROAD TO SIKHAK BHABAN |
350000 |
CONST OF DRAIN WITH REPAIR OF CC ROAD FROM JALESWARPUR HARENDRA DAS HOUSE PWD ROAD TO SIKHAK BHABAN1 |
Completion of work |
-
latitude : 21.681064999999997,21.681076666666666
Longitude : 87.40858000000001,87.4085
file name : Image_09092022112932167.png
|
2022-09-09 11:29:32.26235 |
18 |
63430452 |
PUMP CARETAKER AT JALESWARPUR |
12000 |
PUMP CARETAKER AT JALESWARPUR1 |
Completion of work |
-
latitude : 21.680528333333335
Longitude : 87.40612000000002
file name : Image_29092022095444456.png
|
2022-09-29 09:54:44.567144 |
19 |
63431974 |
CONST OF DRAIN WITH CC ROAD FROM PRASHANTA DEY HOUSE TO DILLIP GHADAI HOUSE AT GABARDHANPUR |
300000 |
CONST OF DRAIN WITH CC ROAD FROM PRASHANTA DEY HOUSE TO DILLIP GHADAI HOUSE AT GABARDHANPUR1 |
Completion of work |
-
latitude : 21.676806666666668,21.676800000000004
Longitude : 87.41009166666666,87.41008500000001
file name : Image_29092022135253522.png
|
2022-09-29 13:52:53.621965 |
20 |
65187282 |
Const of CC Road from incomplete CC Road to Sikhak Bhaban at Jaleswarpur |
200000 |
Const of CC Road from incomplete CC Road to Sikhak Bhaban at Jaleswarpur1 |
Completion of work |
-
latitude : 21.681319999999996,21.681283333333333
Longitude : 87.40872833333333,87.40861000000001
file name : Image_29092022164620234.png
|
2022-09-29 16:46:20.356387 |
21 |
63430536 |
SINKING OF NEW TUBE WELL AT CHHATO MAHESHPUR |
80000 |
SINKING OF NEW TUBE WELL AT CHHATO MAHESHPUR1 |
Completion of work |
-
latitude : 21.677146666666665
Longitude : 87.39988999999998
file name : Image_11102023171546976.png
|
2023-10-11 17:15:47.095541 |
22 |
63430536 |
SINKING OF NEW TUBE WELL AT CHHATO MAHESHPUR |
80000 |
SINKING OF NEW TUBE WELL AT CHHATO MAHESHPUR1 |
Completion of work |
-
latitude : 21.677208333333336
Longitude : 87.39987166666667
file name : Image_11102023171424612.png
|
2023-10-11 17:14:24.712953 |
23 |
55440800 |
CONST OF CC ROAD FROM BATAGRAM PADMOLOCHAN NAYAK HOUSE TO RD ROAD |
50000 |
CONST OF CC ROAD FROM BATAGRAM PADMOLOCHAN NAYAK HOUSE TO RD ROAD1 |
Completion of work |
-
latitude : 21.694691666666667,21.694701666666667
Longitude : 87.40274166666669,87.40276666666665
file name : Image_09092022100447152.png
|
2022-09-09 10:04:47.241302 |
24 |
55440539 |
CONST OF DRAIN FROM BATAGRAM JITENDRA GIRI HOUSE TO SCHOOL BOUNDARY VIA GIRI CHAK |
100000 |
CONST OF DRAIN FROM BATAGRAM JITENDRA GIRI HOUSE TO SCHOOL BOUNDARY VIA GIRI CHAK1 |
Completion of work |
-
latitude : 21.695606666666663,21.69577
Longitude : 87.40109499999998,87.40116000000002
file name : Image_09092022101311225.png
|
2022-09-09 10:13:11.315 |
25 |
57234508 |
CLEANING AND GARBAGE SHIFTING OF DRAIN FROM JALESWARPUR COLLEGE CANTEEN TO CHATANACHAK |
60000 |
CLEANING AND GARBAGE SHIFTING OF DRAIN FROM JALESWARPUR COLLEGE CANTEEN TO CHATANACHAK1 |
Roof laid |
-
latitude : 21.679611666666666
Longitude : 87.40656499999999
file name : Image_21102022110512945.png
|
2022-10-21 11:05:13.06504 |
26 |
57234508 |
CLEANING AND GARBAGE SHIFTING OF DRAIN FROM JALESWARPUR COLLEGE CANTEEN TO CHATANACHAK |
60000 |
CLEANING AND GARBAGE SHIFTING OF DRAIN FROM JALESWARPUR COLLEGE CANTEEN TO CHATANACHAK1 |
Completion of work |
-
latitude : 21.6797885
Longitude : 87.4072747
file name : Image_21012022134411433.png
|
2022-01-21 13:44:11.552561 |
27 |
55440888 |
CONST OF CC ROAD FROM BATAGRAM PWD ROAD TO AKHANDALA MANI MANDIR |
50000 |
CONST OF CC ROAD FROM BATAGRAM PWD ROAD TO AKHANDALA MANI MANDIR1 |
Completion of work |
-
latitude : 21.694733333333335,21.69478333333333,21.694779999999998,21.694776666666666
Longitude : 87.41248666666667,87.41235666666668,87.41234666666666,87.41235166666665
file name : Image_05022022133846273.png
|
2022-02-05 13:38:46.387314 |
28 |
55440786 |
CONST OF CC ROAD FROM MIRKASANPUR JITENDRA HATI HOUSE TO ANANTA JENA HOUSE |
200000 |
CONST OF CC ROAD FROM MIRKASANPUR JITENDRA HATI HOUSE TO ANANTA JENA HOUSE1 |
Completion of work |
-
latitude : 21.679190000000002,21.678581666666666
Longitude : 87.40595833333333,87.40685666666668
file name : Image_14122021125603930.png
|
2021-12-14 12:56:04.047707 |
29 |
55440601 |
CONST OF CC ROAD FROM JALESWARPUR GIRISH DUTTA LAND TO ARDHENDU TRIPATHY HOUSE |
100000 |
CONST OF CC ROAD FROM JALESWARPUR GIRISH DUTTA LAND TO ARDHENDU TRIPATHY HOUSE1 |
Roof laid |
-
latitude : 21.680746666666664,21.680754999999998,21.680754999999998
Longitude : 87.40932166666668,87.40932833333333,87.40933000000001
file name : Image_21102022104627518.png
|
2022-10-21 10:46:27.622599 |
30 |
55440601 |
CONST OF CC ROAD FROM JALESWARPUR GIRISH DUTTA LAND TO ARDHENDU TRIPATHY HOUSE |
100000 |
CONST OF CC ROAD FROM JALESWARPUR GIRISH DUTTA LAND TO ARDHENDU TRIPATHY HOUSE1 |
Roof laid |
-
latitude : 21.680746666666664,21.680754999999998,21.680754999999998
Longitude : 87.40932166666668,87.40932833333333,87.40933000000001
file name : Image_21102022104641172.png
|
2022-10-21 10:46:41.277437 |
31 |
55440601 |
CONST OF CC ROAD FROM JALESWARPUR GIRISH DUTTA LAND TO ARDHENDU TRIPATHY HOUSE |
100000 |
CONST OF CC ROAD FROM JALESWARPUR GIRISH DUTTA LAND TO ARDHENDU TRIPATHY HOUSE1 |
Completion of work |
-
latitude : 21.68063833333333,21.68063833333333,21.68057666666667
Longitude : 87.40938,87.40938,87.40941999999998
file name : Image_14122021131858644.png
|
2021-12-14 13:18:58.748945 |
32 |
55440601 |
CONST OF CC ROAD FROM JALESWARPUR GIRISH DUTTA LAND TO ARDHENDU TRIPATHY HOUSE |
100000 |
CONST OF CC ROAD FROM JALESWARPUR GIRISH DUTTA LAND TO ARDHENDU TRIPATHY HOUSE1 |
Completion of work |
-
latitude : 21.6809305,21.6808353
Longitude : 87.4088008,87.4086953
file name : Image_14122021132249737.png
|
2021-12-14 13:22:49.876505 |
33 |
55440616 |
CONST OF CC ROAD FROM JALESWARPUR SATISH SAMAL LAND TO BIJAY DAS HOUSE |
150000 |
CONST OF CC ROAD FROM JALESWARPUR SATISH SAMAL LAND TO BIJAY DAS HOUSE1 |
Roof laid |
-
latitude : 21.68064,21.68064,21.68063666666667
Longitude : 87.40886166666665,87.40886166666665,87.40885833333331
file name : Image_21102022104624171.png
|
2022-10-21 10:46:24.292667 |
34 |
55440616 |
CONST OF CC ROAD FROM JALESWARPUR SATISH SAMAL LAND TO BIJAY DAS HOUSE |
150000 |
CONST OF CC ROAD FROM JALESWARPUR SATISH SAMAL LAND TO BIJAY DAS HOUSE1 |
Roof laid |
-
latitude : 21.68064,21.68064,21.68063666666667
Longitude : 87.40886166666665,87.40886166666665,87.40885833333331
file name : Image_21102022104637702.png
|
2022-10-21 10:46:37.834649 |
35 |
55440616 |
CONST OF CC ROAD FROM JALESWARPUR SATISH SAMAL LAND TO BIJAY DAS HOUSE |
150000 |
CONST OF CC ROAD FROM JALESWARPUR SATISH SAMAL LAND TO BIJAY DAS HOUSE1 |
Completion of work |
-
latitude : 21.6809432,21.6808475
Longitude : 87.4089239,87.4088185
file name : Image_22122021162921272.png
|
2021-12-22 16:29:21.407235 |
36 |
55440837 |
CONST OF CC ROAD FROM JALESWARPUR RAJANI GHADAI DOKAN TO BHAGIRATHA GHADAI LAND SITE |
150000 |
CONST OF CC ROAD FROM JALESWARPUR RAJANI GHADAI DOKAN TO BHAGIRATHA GHADAI LAND SITE1 |
Completion of work |
-
latitude : 21.684075,21.68403166666667
Longitude : 87.40887666666667,87.40890833333333
file name : Image_14122021133038169.png
|
2021-12-14 13:30:38.30062 |
37 |
55440871 |
DEVELOPMENT OF MISSION SHAKTI BUILDING AT JALESWARPUR |
50000 |
DEVELOPMENT OF MISSION SHAKTI BUILDING AT JALESWARPUR1 |
Roof laid |
-
latitude : 21.679313333333333
Longitude : 87.40568499999999
file name : Image_21102022110830080.png
|
2022-10-21 11:08:30.180917 |
38 |
55440871 |
DEVELOPMENT OF MISSION SHAKTI BUILDING AT JALESWARPUR |
50000 |
DEVELOPMENT OF MISSION SHAKTI BUILDING AT JALESWARPUR1 |
Completion of work |
-
latitude : 21.67936166666667
Longitude : 87.40557333333332
file name : Image_21022022165625805.png
|
2022-02-21 16:56:25.92596 |
39 |
55440629 |
CONST OF JALESWARPUR GOVT HIGH SCHOOL GATE |
80000 |
CONST OF JALESWARPUR GOVT HIGH SCHOOL GATE1 |
Completion of work |
-
latitude : 21.676398333333335
Longitude : 87.40126000000001
file name : Image_29112021152414069.png
|
2021-11-29 15:24:14.203763 |
40 |
55440530 |
CONST OF CC ROAD FROM JALESWARPUR GOBINDA BEHERA HOUSE TO BHAGABT PRADHAN HOUSE |
100000 |
CONST OF CC ROAD FROM JALESWARPUR GOBINDA BEHERA HOUSE TO BHAGABT PRADHAN HOUSE1 |
Completion of work |
-
latitude : 21.676065,21.685545
Longitude : 87.40587500000001,87.40368500000001
file name : Image_02122021153331055.png
|
2021-12-02 15:33:31.145864 |
41 |
55435867 |
CONST OF COMMUNITY SANITARY COMPLEX AT GOBARDHANPUR NEAR SHIVA MANDIR |
200000 |
CONST OF COMMUNITY SANITARY COMPLEX AT GOBARDHANPUR NEAR SHIVA MANDIR1 |
Roof laid |
-
latitude : 21.674871666666665
Longitude : 87.40309166666665
file name : Image_21102022085129082.png
|
2022-10-21 08:51:29.183716 |
42 |
55435867 |
CONST OF COMMUNITY SANITARY COMPLEX AT GOBARDHANPUR NEAR SHIVA MANDIR |
200000 |
CONST OF COMMUNITY SANITARY COMPLEX AT GOBARDHANPUR NEAR SHIVA MANDIR1 |
Completion of work |
-
latitude : 21.674874999999997
Longitude : 87.40285999999999
file name : Image_22022022113602149.png
|
2022-02-22 11:36:02.26499 |
43 |
56298266 |
REPAIR OF CC ROAD FROM BATAGRAM GOPAL MANDAL LAND TO PITABASH MANDAL HOUSE |
50000 |
REPAIR OF CC ROAD FROM BATAGRAM GOPAL MANDAL LAND TO PITABASH MANDAL HOUSE1 |
Completion of work |
-
latitude : 21.694543333333332,21.694531666666663,21.694518333333335
Longitude : 87.40246666666665,87.40246,87.40244833333333
file name : Image_09092022100659302.png
|
2022-09-09 10:06:59.384715 |
44 |
56298171 |
COMPLETION OF COMMUNITY SANITARY COMPLEX AT GABARDHANPUR NEAR SHIBA MANDIR |
90000 |
COMPLETION OF COMMUNITY SANITARY COMPLEX AT GABARDHANPUR NEAR SHIBA MANDIR1 |
Roof laid |
-
latitude : 21.674801666666667
Longitude : 87.40308000000002
file name : Image_21102022084842284.png
|
2022-10-21 08:48:42.388114 |
45 |
56298171 |
COMPLETION OF COMMUNITY SANITARY COMPLEX AT GABARDHANPUR NEAR SHIBA MANDIR |
90000 |
COMPLETION OF COMMUNITY SANITARY COMPLEX AT GABARDHANPUR NEAR SHIBA MANDIR1 |
Completion of work |
-
latitude : 21.675458333333335
Longitude : 87.40357166666666
file name : Image_02032022103111017.png
|
2022-03-02 10:31:11.117432 |
46 |
56298213 |
CONST OF CC ROAD FROM BATAGRAM SIDHESWAR GIRI LAND TO GANESH MURMU HOUSE |
50000 |
CONST OF CC ROAD FROM BATAGRAM SIDHESWAR GIRI LAND TO GANESH MURMU HOUSE1 |
Completion of work |
-
latitude : 21.696781666666666,21.696776666666665
Longitude : 87.40765000000002,87.40767666666667
file name : Image_05022022133333445.png
|
2022-02-05 13:33:33.58556 |
47 |
56298188 |
CONST OF CC ROAD FROM BATAGRAM BALAKRUSHNA DAS HOUSE TO GOPAL DAS HOUSE |
50000 |
CONST OF CC ROAD FROM BATAGRAM BALAKRUSHNA DAS HOUSE TO GOPAL DAS HOUSE1 |
Completion of work |
-
latitude : 21.69729,21.697301666666664
Longitude : 87.40419166666668,87.40416333333333
file name : Image_05022022132659174.png
|
2022-02-05 13:26:59.299155 |
48 |
55615202 |
CONST OF CC ROAD FROM BATAGRAM BISHNUPADA DAS HOUSE TO CC ROAD |
100000 |
CONST OF CC ROAD FROM BATAGRAM BISHNUPADA DAS HOUSE TO CC ROAD1 |
Completion of work |
-
latitude : 21.697315000000003,21.697276666666667,21.69729
Longitude : 87.40400666666667,87.40418333333334,87.40418666666667
file name : Image_05022022132456127.png
|
2022-02-05 13:24:56.248851 |
49 |
55615160 |
DEVELOPMENT OF JALESWARPUR PUMP HOUSE |
100312 |
DEVELOPMENT OF JALESWARPUR PUMP HOUSE1 |
Roof laid |
-
latitude : 21.680443333333333
Longitude : 87.40609333333332
file name : Image_21102022104614645.png
|
2022-10-21 10:46:14.76824 |
50 |
55615160 |
DEVELOPMENT OF JALESWARPUR PUMP HOUSE |
100312 |
DEVELOPMENT OF JALESWARPUR PUMP HOUSE1 |
Completion of work |
-
latitude : 21.680421666666668
Longitude : 87.40604666666668
file name : Image_21022022172224512.png
|
2022-02-21 17:22:24.602345 |
51 |
55615176 |
WATER SUPPLY CONNECTION TO GOBARDHANPURUP SCHOOL |
39000 |
WATER SUPPLY CONNECTION TO GOBARDHANPURUP SCHOOL1 |
Roof laid |
-
latitude : 21.676198333333332,21.67619666666667
Longitude : 87.40590333333333,87.40589166666665
file name : Image_21102022084700589.png
|
2022-10-21 08:47:00.690713 |
52 |
55615176 |
WATER SUPPLY CONNECTION TO GOBARDHANPURUP SCHOOL |
39000 |
WATER SUPPLY CONNECTION TO GOBARDHANPURUP SCHOOL1 |
Completion of work |
-
latitude : 21.676058333333337,21.676126666666665
Longitude : 87.40586499999999,87.40588166666666
file name : Image_30112021103916609.png
|
2021-11-30 10:39:16.717973 |
53 |
55615183 |
CONST OF BOUNDARY WALL AT JALESWARPUR PWS |
200000 |
CONST OF BOUNDARY WALL AT JALESWARPUR PWS1 |
Roof laid |
-
latitude : 21.680501666666668,21.680463333333332,21.68047166666667
Longitude : 87.406075,87.40601666666667,87.40601666666667
file name : Image_21102022104617856.png
|
2022-10-21 10:46:17.977535 |
54 |
55615183 |
CONST OF BOUNDARY WALL AT JALESWARPUR PWS |
200000 |
CONST OF BOUNDARY WALL AT JALESWARPUR PWS1 |
Roof laid |
-
latitude : 21.680501666666668,21.680463333333332,21.68047166666667
Longitude : 87.406075,87.40601666666667,87.40601666666667
file name : Image_21102022104630659.png
|
2022-10-21 10:46:30.769567 |
55 |
55615183 |
CONST OF BOUNDARY WALL AT JALESWARPUR PWS |
200000 |
CONST OF BOUNDARY WALL AT JALESWARPUR PWS1 |
Completion of work |
-
latitude : 21.68042666666667,21.68039666666667
Longitude : 87.40591166666667,87.40589999999999
file name : Image_21022022172041939.png
|
2022-02-21 17:20:42.045359 |
56 |
55615198 |
CONST OF CC ROAD FROM GOBARDHANPUR RD ROAD TO RABI DAS HOUSE |
50000 |
CONST OF CC ROAD FROM GOBARDHANPUR RD ROAD TO RABI DAS HOUSE1 |
Roof laid |
-
latitude : 21.675265,21.675248333333336
Longitude : 87.40348166666666,87.40349999999998
file name : Image_21102022090356011.png
|
2022-10-21 09:03:56.098545 |
57 |
55615198 |
CONST OF CC ROAD FROM GOBARDHANPUR RD ROAD TO RABI DAS HOUSE |
50000 |
CONST OF CC ROAD FROM GOBARDHANPUR RD ROAD TO RABI DAS HOUSE1 |
Completion of work |
-
latitude : 21.675288333333334,21.675288333333334,21.675288333333334,21.67528666666666,21.675255
Longitude : 87.40349166666668,87.40349166666668,87.40349166666668,87.40349333333333,87.40347166666668
file name : Image_29112021152409527.png
|
2021-11-29 15:24:09.634649 |
58 |
45864777 |
ENGAGEMENT OF EXTRA LABOUR |
20000 |
ENGAGEMENT OF EXTRA LABOUR1 |
Completion of work |
-
latitude : 21.67878333333333
Longitude : 87.40613
file name : Image_20072021105658008.png
|
2021-07-20 10:56:58.111098 |
59 |
45864894 |
PUMP CARETAKER JALESWARPUR PWS POINT |
24000 |
PUMP CARETAKER JALESWARPUR PWS POINT1 |
Roof laid |
-
latitude : 21.680490000000002
Longitude : 87.40607999999999
file name : Image_21102022104620947.png
|
2022-10-21 10:46:21.053388 |
60 |
45864894 |
PUMP CARETAKER JALESWARPUR PWS POINT |
24000 |
PUMP CARETAKER JALESWARPUR PWS POINT1 |
Roof laid |
-
latitude : 21.680490000000002
Longitude : 87.40607999999999
file name : Image_21102022104633801.png
|
2022-10-21 10:46:33.904342 |
61 |
45864894 |
PUMP CARETAKER JALESWARPUR PWS POINT |
24000 |
PUMP CARETAKER JALESWARPUR PWS POINT1 |
Completion of work |
-
latitude : 21.680476666666664
Longitude : 87.40609500000001
file name : Image_13072021181146517.png
|
2021-07-13 18:11:46.606195 |
62 |
45865003 |
JALACHHATRA UNDER JALESWARPUR GP |
10000 |
JALACHHATRA UNDER JALESWARPUR GP1 |
Completion of work |
-
latitude : 21.681163333333334
Longitude : 87.40896833333333
file name : Image_20072021114401612.png
|
2021-07-20 11:44:01.71146 |
63 |
45867730 |
CONST. OF CC ROAD FROM CHHOTAMAHESWAR RABINDRA DAS HOUSE TO ARUN KHILLAR HOUSE |
100000 |
CONST. OF CC ROAD FROM CHHOTAMAHESWAR RABINDRA DAS HOUSE TO ARUN KHILLAR HOUSE1 |
Roof laid |
-
latitude : 21.67317166666667,21.67317666666667,21.673184999999997
Longitude : 87.40230166666667,87.40229666666667,87.402295
file name : Image_21102022093351881.png
|
2022-10-21 09:33:51.982528 |
64 |
45867730 |
CONST. OF CC ROAD FROM CHHOTAMAHESWAR RABINDRA DAS HOUSE TO ARUN KHILLAR HOUSE |
100000 |
CONST. OF CC ROAD FROM CHHOTAMAHESWAR RABINDRA DAS HOUSE TO ARUN KHILLAR HOUSE1 |
Roof laid |
-
latitude : 21.673173333333338,21.673183333333334
Longitude : 87.40227666666667,87.402295
file name : Image_21102022093359217.png
|
2022-10-21 09:33:59.320668 |
65 |
45867730 |
CONST. OF CC ROAD FROM CHHOTAMAHESWAR RABINDRA DAS HOUSE TO ARUN KHILLAR HOUSE |
100000 |
CONST. OF CC ROAD FROM CHHOTAMAHESWAR RABINDRA DAS HOUSE TO ARUN KHILLAR HOUSE1 |
Roof laid |
-
latitude : 21.673173333333338,21.673183333333334
Longitude : 87.40227666666667,87.402295
file name : Image_21102022093412599.png
|
2022-10-21 09:34:12.694994 |
66 |
45867730 |
CONST. OF CC ROAD FROM CHHOTAMAHESWAR RABINDRA DAS HOUSE TO ARUN KHILLAR HOUSE |
100000 |
CONST. OF CC ROAD FROM CHHOTAMAHESWAR RABINDRA DAS HOUSE TO ARUN KHILLAR HOUSE1 |
Completion of work |
-
latitude : 21.67316333333333,21.673123333333333
Longitude : 87.40218833333331,87.40218833333331
file name : Image_27052021124249847.png
|
2021-05-27 12:42:49.951756 |
67 |
45867605 |
COMPLETION OF NEW MARKET COMPLEX NEAR JALESWARPUR GP OFFICE |
100000 |
COMPLETION OF NEW MARKET COMPLEX NEAR JALESWARPUR GP OFFICE1 |
Roof laid |
-
latitude : 21.67930833333333
Longitude : 87.40580833333334
file name : Image_21102022104846474.png
|
2022-10-21 10:48:46.600922 |
68 |
45867605 |
COMPLETION OF NEW MARKET COMPLEX NEAR JALESWARPUR GP OFFICE |
100000 |
COMPLETION OF NEW MARKET COMPLEX NEAR JALESWARPUR GP OFFICE1 |
Roof laid |
-
latitude : 21.678972
Longitude : 87.4057238
file name : Image_17042021153900057.png
|
2021-04-17 15:39:00.219849 |
69 |
45867394 |
CONST. OF CC ROAD FROM SANJIB DAS HOUSE TO PRAFULLA MANDAL LAND AT -JALESWARPUR |
100000 |
CONST. OF CC ROAD FROM SANJIB DAS HOUSE TO PRAFULLA MANDAL LAND AT -JALESWARPUR1 |
Roof laid |
-
latitude : 21.678836666666665,21.678846666666665
Longitude : 87.40685166666665,87.40687166666666
file name : Image_21102022094138155.png
|
2022-10-21 09:41:38.262499 |
70 |
45867394 |
CONST. OF CC ROAD FROM SANJIB DAS HOUSE TO PRAFULLA MANDAL LAND AT -JALESWARPUR |
100000 |
CONST. OF CC ROAD FROM SANJIB DAS HOUSE TO PRAFULLA MANDAL LAND AT -JALESWARPUR1 |
Completion of work |
-
latitude : 21.682795000000002,21.68268666666667,21.68268666666667,21.68268666666667
Longitude : 87.40560500000001,87.40555666666666,87.40555666666666,87.40555666666666
file name : Image_07042021141835162.png
|
2021-04-07 14:18:35.242817 |
71 |
45866819 |
CONST. OF DRAIN FROM TAHASIL BOUNDARY TO POSTMOTOM HOUSE AT-JALESWARPUR |
100000 |
CONST. OF DRAIN FROM TAHASIL BOUNDARY TO POSTMOTOM HOUSE AT-JALESWARPUR1 |
Roof laid |
-
latitude : 21.680554999999995,21.680566666666664
Longitude : 87.40616166666665,87.40615833333335
file name : Image_21102022094804535.png
|
2022-10-21 09:48:04.668882 |
72 |
45866819 |
CONST. OF DRAIN FROM TAHASIL BOUNDARY TO POSTMOTOM HOUSE AT-JALESWARPUR |
100000 |
CONST. OF DRAIN FROM TAHASIL BOUNDARY TO POSTMOTOM HOUSE AT-JALESWARPUR1 |
Completion of work |
-
latitude : 21.6796191,21.6796191
Longitude : 87.4057211,87.4057211
file name : Image_17042021135400225.png
|
2021-04-17 13:54:00.345222 |
73 |
45867027 |
CONST. OF CC ROAD FROM GOBARDHANPUR UMAKANTA SETHI LAND TO SUBAL PATRA HOUSE |
100000 |
CONST. OF CC ROAD FROM GOBARDHANPUR UMAKANTA SETHI LAND TO SUBAL PATRA HOUSE1 |
Roof laid |
-
latitude : 21.67644833333333,21.676444999999998,21.676351666666665
Longitude : 87.40987666666666,87.40988166666666,87.40983166666668
file name : Image_21102022083240354.png
|
2022-10-21 08:32:40.484658 |
74 |
45867027 |
CONST. OF CC ROAD FROM GOBARDHANPUR UMAKANTA SETHI LAND TO SUBAL PATRA HOUSE |
100000 |
CONST. OF CC ROAD FROM GOBARDHANPUR UMAKANTA SETHI LAND TO SUBAL PATRA HOUSE1 |
Completion of work |
-
latitude : 21.676656666666666,21.676656666666666
Longitude : 87.40997999999999,87.40997999999999
file name : Image_11052021115813256.png
|
2021-05-11 11:58:13.38577 |
75 |
45867027 |
CONST. OF CC ROAD FROM GOBARDHANPUR UMAKANTA SETHI LAND TO SUBAL PATRA HOUSE |
100000 |
CONST. OF CC ROAD FROM GOBARDHANPUR UMAKANTA SETHI LAND TO SUBAL PATRA HOUSE1 |
Completion of work |
-
latitude : 21.67668666666667,21.67665833333333
Longitude : 87.40997333333334,87.41003
file name : Image_11052021115513411.png
|
2021-05-11 11:55:13.537241 |
76 |
45867027 |
CONST. OF CC ROAD FROM GOBARDHANPUR UMAKANTA SETHI LAND TO SUBAL PATRA HOUSE |
100000 |
CONST. OF CC ROAD FROM GOBARDHANPUR UMAKANTA SETHI LAND TO SUBAL PATRA HOUSE1 |
Completion of work |
-
latitude : 21.676656666666666,21.676656666666666
Longitude : 87.40997999999999,87.40997999999999
file name : Image_11052021115517393.png
|
2021-05-11 11:55:17.560802 |
77 |
45867027 |
CONST. OF CC ROAD FROM GOBARDHANPUR UMAKANTA SETHI LAND TO SUBAL PATRA HOUSE |
100000 |
CONST. OF CC ROAD FROM GOBARDHANPUR UMAKANTA SETHI LAND TO SUBAL PATRA HOUSE1 |
Completion of work |
-
latitude : 21.67659833333333,21.67664333333333
Longitude : 87.41006999999999,87.40983499999999
file name : Image_11052021115509747.png
|
2021-05-11 11:55:09.87848 |
78 |
45864741 |
ENERGY CHARGES OF PWS POINT,STREET LIGHT AND GP OFFICE |
200000 |
ENERGY CHARGES OF PWS POINT,STREET LIGHT AND GP OFFICE1 |
Roof laid |
-
latitude : 21.67935166666667,21.67935166666667,21.67935166666667,21.67935166666667
Longitude : 87.405655,87.405655,87.405655,87.405655
file name : Image_21102022111502700.png
|
2022-10-21 11:15:02.877306 |
79 |
45865066 |
CONST. OF RAISED TUBEWELL PLATFORMS UNDER JALESWARPUR GP |
40000 |
CONST. OF RAISED TUBEWELL PLATFORMS UNDER JALESWARPUR GP1 |
Roof laid |
-
latitude : 21.674031666666664
Longitude : 87.39544499999998
file name : Image_21102022093405772.png
|
2022-10-21 09:34:05.880745 |
80 |
45865066 |
CONST. OF RAISED TUBEWELL PLATFORMS UNDER JALESWARPUR GP |
40000 |
CONST. OF RAISED TUBEWELL PLATFORMS UNDER JALESWARPUR GP1 |
Roof laid |
-
latitude : 21.674031666666664
Longitude : 87.39544499999998
file name : Image_21102022093422416.png
|
2022-10-21 09:34:22.514095 |
81 |
45865066 |
CONST. OF RAISED TUBEWELL PLATFORMS UNDER JALESWARPUR GP |
40000 |
CONST. OF RAISED TUBEWELL PLATFORMS UNDER JALESWARPUR GP1 |
Completion of work |
-
latitude : 21.677281666666666
Longitude : 87.40072
file name : Image_22032021150039941.png
|
2021-03-22 15:00:40.132219 |
82 |
45865098 |
CONST. OF PWS TAPE POINT PLATFORM UNDER JALESWARPUR GP |
60000 |
CONST. OF PWS TAPE POINT PLATFORM UNDER JALESWARPUR GP1 |
Roof laid |
-
latitude : 21.678850000000004,21.678861666666663,21.678853333333336
Longitude : 87.40683666666668,87.40682666666667,87.40682833333334
file name : Image_21102022094420030.png
|
2022-10-21 09:44:20.131786 |
83 |
45866780 |
CONST. OF CC ROAD FROM KATI PANDA HOUSE TO MOHADEV MANDIR AT-JALESWARPUR |
150000 |
CONST. OF CC ROAD FROM KATI PANDA HOUSE TO MOHADEV MANDIR AT-JALESWARPUR1 |
Completion of work |
-
latitude : 21.686005,21.686065
Longitude : 87.40604666666668,87.40613499999999
file name : Image_07042021140354795.png
|
2021-04-07 14:03:54.889001 |
84 |
45867081 |
CONST. OF JALESWARPUR GP OFFICE GATE |
300000 |
CONST. OF JALESWARPUR GP OFFICE GATE1 |
Roof laid |
-
latitude : 21.679236666666664
Longitude : 87.40579666666666
file name : Image_21102022105702962.png
|
2022-10-21 10:57:03.089327 |
85 |
45867081 |
CONST. OF JALESWARPUR GP OFFICE GATE |
300000 |
CONST. OF JALESWARPUR GP OFFICE GATE1 |
Completion of work |
-
latitude : 21.67921666666667
Longitude : 87.405855
file name : Image_01102021143826713.png
|
2021-10-01 14:38:26.877429 |
86 |
45867433 |
CONST. OF CC ROAD FROM RAMANI GIRI LAND TO MRUTYUNJAY PATRA HOUSE AT-JALESWARPUR |
100000 |
CONST. OF CC ROAD FROM RAMANI GIRI LAND TO MRUTYUNJAY PATRA HOUSE AT-JALESWARPUR1 |
Completion of work |
-
latitude : 21.686428333333332,21.686428333333332
Longitude : 87.40781333333334,87.40781333333334
file name : Image_22032021151336495.png
|
2021-03-22 15:13:36.63654 |
87 |
45867496 |
CONST. OF CC ROAD FROM HARIPADA MOHANTY HOUSE TO CHETEI THAKURANI AT-BATAGRAM |
150000 |
CONST. OF CC ROAD FROM HARIPADA MOHANTY HOUSE TO CHETEI THAKURANI AT-BATAGRAM1 |
Completion of work |
-
latitude : 21.69668166666667,21.696689999999997
Longitude : 87.40083666666666,87.40080666666667
file name : Image_07042021122025385.png
|
2021-04-07 12:20:25.442822 |
88 |
45867547 |
CONST. OF CC ROAD FROM UMAKANTA GHADAI HOUSE TO SUBSTATION AT-C.S JALESWARPUR |
100000 |
CONST. OF CC ROAD FROM UMAKANTA GHADAI HOUSE TO SUBSTATION AT-C.S JALESWARPUR1 |
Completion of work |
-
latitude : 21.685549999999996,21.685549999999996
Longitude : 87.41115333333333,87.41115333333333
file name : Image_20032021141805072.png
|
2021-03-20 14:18:05.21646 |
89 |
45867673 |
CONST. OF CC ROAD FROM GOPAL NAYAK HOUSE TO SAMAJ BADI AT-BATAGRAM |
100000 |
CONST. OF CC ROAD FROM GOPAL NAYAK HOUSE TO SAMAJ BADI AT-BATAGRAM1 |
Completion of work |
-
latitude : 21.694768333333332,21.694743333333335
Longitude : 87.40516833333335,87.40516000000001
file name : Image_07042021121112896.png
|
2021-04-07 12:11:12.999932 |
90 |
63430516 |
CONST OF RAISED TUBE WELL PLATFORM 2 NOS UNDER JALESWARPUR GP |
20000 |
CONST OF RAISED TUBE WELL PLATFORM 2 NOS UNDER JALESWARPUR GP1 |
Completion of work |
-
latitude : 21.6780612
Longitude : 87.405246
file name : Image_02122022134545365.png
|
2022-12-02 13:45:45.475239 |
91 |
65187106 |
Operation & maintenance of Grey water management system |
70000 |
Operation & maintenance of Grey water management system1 |
Completion of work |
-
latitude : 21.67526666666667,21.675506666666667
Longitude : 87.40309,87.40349499999999
file name : Image_17122022123417497.png
|
2022-12-17 12:34:17.599922 |
92 |
56301325 |
TRANSFER FOR LED STREET LIGHT 2ND PHASE UNDER JALESWARPUR GP |
86483 |
TRANSFER FOR LED STREET LIGHT 2ND PHASE UNDER JALESWARPUR GP1 |
Completion of work |
-
latitude : 21.6780602
Longitude : 87.4052465
file name : Image_12122022151410487.png
|
2022-12-12 15:14:10.641823 |
93 |
65187270 |
Operation & maintenance of community sanitary complex |
20000 |
Operation & maintenance of community sanitary complex1 |
Completion of work |
-
latitude : 21.6780596
Longitude : 87.4052479
file name : Image_19122022181144086.png
|
2022-12-19 18:11:44.178035 |
94 |
63430580 |
SINKING OF NEW TUBE WELL AT BATOGRAM |
80000 |
SINKING OF NEW TUBE WELL AT BATOGRAM1 |
Completion of work |
-
latitude : 21.6780833
Longitude : 87.4052467
file name : Image_24022023170235028.png
|
2023-02-24 17:02:35.121724 |
95 |
63430580 |
SINKING OF NEW TUBE WELL AT BATOGRAM |
80000 |
SINKING OF NEW TUBE WELL AT BATOGRAM1 |
Completion of work |
-
latitude : 21.6780833
Longitude : 87.4052467
file name : Image_24022023170128079.png
|
2023-02-24 17:01:28.181785 |
96 |
63430580 |
SINKING OF NEW TUBE WELL AT BATOGRAM |
80000 |
SINKING OF NEW TUBE WELL AT BATOGRAM1 |
Completion of work |
-
latitude : 21.6780871
Longitude : 87.4052441
file name : Image_24022023170124873.png
|
2023-02-24 17:01:24.957686 |
97 |
63430580 |
SINKING OF NEW TUBE WELL AT BATOGRAM |
80000 |
SINKING OF NEW TUBE WELL AT BATOGRAM1 |
Completion of work |
-
latitude : 21.6780853
Longitude : 87.4052471
file name : Image_24022023170354648.png
|
2023-02-24 17:03:54.737522 |
98 |
63431984 |
CONST OF CC ROAD FROM CHAKABADI JALESWARPUR ANANDA DAS HOUSE TO LAXMAN DAS LAND SITE |
160000 |
CONST OF CC ROAD FROM CHAKABADI JALESWARPUR ANANDA DAS HOUSE TO LAXMAN DAS LAND SITE1 |
Completion of work |
-
latitude : 21.6780671,21.6780693,21.6780693
Longitude : 87.4052271,87.4052296,87.4052296
file name : Image_14032023170719641.png
|
2023-03-14 17:07:19.734573 |
99 |
63431984 |
CONST OF CC ROAD FROM CHAKABADI JALESWARPUR ANANDA DAS HOUSE TO LAXMAN DAS LAND SITE |
160000 |
CONST OF CC ROAD FROM CHAKABADI JALESWARPUR ANANDA DAS HOUSE TO LAXMAN DAS LAND SITE1 |
Completion of work |
-
latitude : 21.6780775,21.6780739
Longitude : 87.4052217,87.405231
file name : Image_14032023170716541.png
|
2023-03-14 17:07:16.635906 |
100 |
63431984 |
CONST OF CC ROAD FROM CHAKABADI JALESWARPUR ANANDA DAS HOUSE TO LAXMAN DAS LAND SITE |
160000 |
CONST OF CC ROAD FROM CHAKABADI JALESWARPUR ANANDA DAS HOUSE TO LAXMAN DAS LAND SITE1 |
Completion of work |
-
latitude : 21.6780612,21.6780695
Longitude : 87.4052287,87.4052288
file name : Image_14032023160808663.png
|
2023-03-14 16:08:08.750486 |
101 |
67683970 |
Operation & maintenance of drinking water supply system |
80000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.6780934,21.6780909
Longitude : 87.4052532,87.4052533
file name : Image_29032023161200100.png
|
2023-03-29 16:12:00.212958 |
102 |
63432040 |
CONST OF CC ROAD FROM JALESWARPURNANDA DAS HOUSE TO AKSHAYA JENA HOUSE |
100000 |
CONST OF CC ROAD FROM JALESWARPURNANDA DAS HOUSE TO AKSHAYA JENA HOUSE1 |
Completion of work |
-
latitude : 21.6780388,21.6780408
Longitude : 87.4052593,87.4052609
file name : Image_05062023162502444.png
|
2023-06-05 16:25:02.5479 |
103 |
63432040 |
CONST OF CC ROAD FROM JALESWARPURNANDA DAS HOUSE TO AKSHAYA JENA HOUSE |
100000 |
CONST OF CC ROAD FROM JALESWARPURNANDA DAS HOUSE TO AKSHAYA JENA HOUSE1 |
Completion of work |
-
latitude : 21.6780456,21.6780437
Longitude : 87.4052626,87.4052599
file name : Image_05062023162658684.png
|
2023-06-05 16:26:58.775228 |
104 |
63432040 |
CONST OF CC ROAD FROM JALESWARPURNANDA DAS HOUSE TO AKSHAYA JENA HOUSE |
100000 |
CONST OF CC ROAD FROM JALESWARPURNANDA DAS HOUSE TO AKSHAYA JENA HOUSE1 |
Completion of work |
-
latitude : 21.6780462,21.6780462
Longitude : 87.4052626,87.4052626
file name : Image_05062023162322659.png
|
2023-06-05 16:23:22.75657 |
105 |
63432019 |
CONST OF CC ROAD FROM MIRKASIMPUR RABINDRA MOHANTY LAND SITE TO NARAYAN GHADAI HOUSE |
100000 |
CONST OF CC ROAD FROM MIRKASIMPUR RABINDRA MOHANTY LAND SITE TO NARAYAN GHADAI HOUSE1 |
Completion of work |
-
latitude : 21.67593,21.675898333333333
Longitude : 87.40499333333334,87.40495833333334
file name : Image_28092023125349963.png
|
2023-09-28 12:53:50.050755 |
106 |
63432019 |
CONST OF CC ROAD FROM MIRKASIMPUR RABINDRA MOHANTY LAND SITE TO NARAYAN GHADAI HOUSE |
100000 |
CONST OF CC ROAD FROM MIRKASIMPUR RABINDRA MOHANTY LAND SITE TO NARAYAN GHADAI HOUSE1 |
Completion of work |
-
latitude : 21.67604833333333,21.67605
Longitude : 87.404865,87.40488333333333
file name : Image_28092023125240794.png
|
2023-09-28 12:52:40.869888 |
107 |
63432019 |
CONST OF CC ROAD FROM MIRKASIMPUR RABINDRA MOHANTY LAND SITE TO NARAYAN GHADAI HOUSE |
100000 |
CONST OF CC ROAD FROM MIRKASIMPUR RABINDRA MOHANTY LAND SITE TO NARAYAN GHADAI HOUSE1 |
Completion of work |
-
latitude : 21.675934999999996,21.675948333333334
Longitude : 87.404995,87.40498833333335
file name : Image_28092023125119016.png
|
2023-09-28 12:51:19.106571 |
108 |
60862025 |
Repair of PWS Pipe line ,pump house and tube well under Jaleswarpur GP |
30178 |
Repair of PWS Pipe line ,pump house and tube well under Jaleswarpur GP1 |
Completion of work |
-
latitude : 21.6780153,21.6780487
Longitude : 87.4051975,87.4052287
file name : Image_02122023130857454.png
|
2023-12-02 13:08:57.534064 |
109 |
60862025 |
Repair of PWS Pipe line ,pump house and tube well under Jaleswarpur GP |
30178 |
Repair of PWS Pipe line ,pump house and tube well under Jaleswarpur GP1 |
Completion of work |
-
latitude : 21.6780308,21.678049,21.678049
Longitude : 87.4052002,87.4052203,87.4052203
file name : Image_02122023130652934.png
|
2023-12-02 13:06:53.01811 |
110 |
60862025 |
Repair of PWS Pipe line ,pump house and tube well under Jaleswarpur GP |
30178 |
Repair of PWS Pipe line ,pump house and tube well under Jaleswarpur GP1 |
Completion of work |
-
latitude : 21.6780541,21.6780478
Longitude : 87.4052348,87.4052216
file name : Image_02122023130458387.png
|
2023-12-02 13:04:58.464475 |
111 |
105101902 |
Operation and Maintenance of drinking/piped water supply system |
558107 |
Operation and Maintenance of drinking/piped water supply system1 |
Plinth level |
-
latitude : 21.6659239
Longitude : 87.4491005
file name : Image_05092024221401908.png
|
2024-09-05 22:14:35.718342 |
112 |
105101902 |
Operation and Maintenance of drinking/piped water supply system |
558107 |
Operation and Maintenance of drinking/piped water supply system1 |
Completion of work |
-
latitude : 21.6659229
Longitude : 87.4491004
file name : Image_05092024220838836.png
|
2024-09-05 22:09:12.580042 |
113 |
82678698 |
Construction of roads |
200000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.6779925,21.677989
Longitude : 87.4051952,87.4051835
file name : Image_04012024221008237.png
|
2024-01-04 22:10:08.345781 |
114 |
82678698 |
Construction of roads |
200000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.688571666666668,21.68858
Longitude : 87.40881833333333,87.40881666666668
file name : Image_23122023132450102.png
|
2023-12-23 13:24:50.077522 |
115 |
82678698 |
Construction of roads |
200000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.688558333333336,21.688554999999997
Longitude : 87.40877,87.40877666666665
file name : Image_22122023155620438.png
|
2023-12-22 15:56:20.509069 |
116 |
82712459 |
Construction of roads |
93395 |
Construction of roads1 |
Roof laid |
-
latitude : 21.6780861,21.6780861
Longitude : 87.4052665,87.4052665
file name : Image_29032024172358254.png
|
2024-03-29 17:23:58.339031 |
117 |
82712459 |
Construction of roads |
93395 |
Construction of roads1 |
Plinth level |
-
latitude : 21.6780885,21.6780833,21.6780833,21.6780833,21.6780833
Longitude : 87.4052627,87.4052623,87.4052623,87.4052623,87.4052623
file name : Image_29032024171839412.png
|
2024-03-29 17:18:39.524688 |
118 |
82712459 |
Construction of roads |
93395 |
Construction of roads1 |
Completion of work |
-
latitude : 21.6779049,21.6779148,21.6779148
Longitude : 87.4052451,87.4052391,87.4052391
file name : Image_11032024125104071.png
|
2024-03-11 12:51:04.160378 |
119 |
63431962 |
CONST OF CC ROAD FROM BASANTA KAMILA HOUSE TO JAGANNATH DAS HOUSE AT CHHATA MAHESHPUR |
250000 |
CONST OF CC ROAD FROM BASANTA KAMILA HOUSE TO JAGANNATH DAS HOUSE AT CHHATA MAHESHPUR1 |
Completion of work |
-
latitude : 21.6779063,21.6779133
Longitude : 87.4052525,87.4052473
file name : Image_11032024130510824.png
|
2024-03-11 13:05:10.907746 |
120 |
63431962 |
CONST OF CC ROAD FROM BASANTA KAMILA HOUSE TO JAGANNATH DAS HOUSE AT CHHATA MAHESHPUR |
250000 |
CONST OF CC ROAD FROM BASANTA KAMILA HOUSE TO JAGANNATH DAS HOUSE AT CHHATA MAHESHPUR1 |
Completion of work |
-
latitude : 21.6779116,21.6779116
Longitude : 87.4052443,87.4052443
file name : Image_11032024125643450.png
|
2024-03-11 12:56:43.534166 |
121 |
63431962 |
CONST OF CC ROAD FROM BASANTA KAMILA HOUSE TO JAGANNATH DAS HOUSE AT CHHATA MAHESHPUR |
250000 |
CONST OF CC ROAD FROM BASANTA KAMILA HOUSE TO JAGANNATH DAS HOUSE AT CHHATA MAHESHPUR1 |
Completion of work |
-
latitude : 21.6779109,21.6779109
Longitude : 87.4052468,87.4052468
file name : Image_11032024125511188.png
|
2024-03-11 12:55:11.274632 |
122 |
77422030 |
Any other operation and maintenance needs related to solid waste management |
105760 |
Any other operation and maintenance needs related to solid waste management1 |
Roof laid |
-
latitude : 21.6659101
Longitude : 87.4491151
file name : Image_03102024194619069.png
|
2024-10-03 19:46:19.01477 |
123 |
77422030 |
Any other operation and maintenance needs related to solid waste management |
105760 |
Any other operation and maintenance needs related to solid waste management1 |
Plinth level |
-
latitude : 21.6659108
Longitude : 87.4491179
file name : Image_03102024194309039.png
|
2024-10-03 19:43:09.097633 |
124 |
77422030 |
Any other operation and maintenance needs related to solid waste management |
105760 |
Any other operation and maintenance needs related to solid waste management1 |
Completion of work |
-
latitude : 21.6659101
Longitude : 87.4491151
file name : Image_03102024194053898.png
|
2024-10-03 19:40:53.962543 |
125 |
77429291 |
Purchase of equipment (including safety equipment) for waste management |
32000 |
Purchase of equipment (including safety equipment) for waste management1 |
Roof laid |
-
latitude : 21.6659101
Longitude : 87.4491151
file name : Image_03102024201931246.png
|
2024-10-03 20:19:30.900499 |
126 |
77429291 |
Purchase of equipment (including safety equipment) for waste management |
32000 |
Purchase of equipment (including safety equipment) for waste management1 |
Plinth level |
-
latitude : 21.6659103
Longitude : 87.4491162
file name : Image_03102024200621588.png
|
2024-10-03 20:06:21.659493 |
127 |
77429291 |
Purchase of equipment (including safety equipment) for waste management |
32000 |
Purchase of equipment (including safety equipment) for waste management1 |
Completion of work |
-
latitude : 21.665911
Longitude : 87.4491184
file name : Image_03102024195503616.png
|
2024-10-03 19:55:03.681166 |
128 |
82666999 |
Operation and Maintenance of drinking water supply system |
526752 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 21.6779971,21.6779985
Longitude : 87.4052644,87.4052641
file name : Image_02032024223009417.png
|
2024-03-02 22:30:09.570339 |
129 |
82666999 |
Operation and Maintenance of drinking water supply system |
526752 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 21.6779953,21.6779975
Longitude : 87.4052675,87.4052685
file name : Image_02032024222611036.png
|
2024-03-02 22:26:11.174837 |
130 |
82666999 |
Operation and Maintenance of drinking water supply system |
526752 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.6780201,21.6780124
Longitude : 87.4052431,87.4052445
file name : Image_28092023153543019.png
|
2023-09-28 15:35:43.120315 |
131 |
82666999 |
Operation and Maintenance of drinking water supply system |
526752 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.6780229,21.6780181
Longitude : 87.405243,87.4052451
file name : Image_28092023152326554.png
|
2023-09-28 15:23:26.637825 |
132 |
82666999 |
Operation and Maintenance of drinking water supply system |
526752 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.6780156,21.6780121
Longitude : 87.4052463,87.4052437
file name : Image_28092023140712571.png
|
2023-09-28 14:07:12.669505 |
133 |
82672346 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.6658984,21.6658991
Longitude : 87.4490921,87.449099
file name : Image_20122024202903938.png
|
2024-12-20 20:29:04.036453 |
134 |
82672346 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.6658991,21.6658986
Longitude : 87.449099,87.4490949
file name : Image_20122024202344985.png
|
2024-12-20 20:23:45.064222 |
135 |
82672346 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.6659006,21.6658999
Longitude : 87.4491004,87.4491006
file name : Image_20122024201855690.png
|
2024-12-20 20:18:55.771779 |
136 |
67683935 |
Operation & maintenance of drinking water supply system |
195000 |
Operation & maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 21.6659006
Longitude : 87.4491004
file name : Image_20122024205554895.png
|
2024-12-20 20:55:54.978182 |
137 |
67683935 |
Operation & maintenance of drinking water supply system |
195000 |
Operation & maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 21.6659004
Longitude : 87.4491005
file name : Image_20122024205356383.png
|
2024-12-20 20:53:56.462979 |
138 |
67683935 |
Operation & maintenance of drinking water supply system |
195000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.6659002
Longitude : 87.4491001
file name : Image_20122024205027349.png
|
2024-12-20 20:50:27.458226 |