1 |
44136221 |
Re-Construction of Damage CC road from Sub-Station to Bharati Rana house ,Dhobachakurai |
169074 |
Re-Construction of Damage CC road from Sub-Station to Bharati Rana house ,Dhobachakurai 1 |
Completion of work |
-
latitude : 21.65164333333333,21.65156833333333
Longitude : 87.09481666666667,87.09482000000001
file name : Image_13022022140011661.png
|
2022-02-13 14:00:11.798926 |
2 |
44136221 |
Re-Construction of Damage CC road from Sub-Station to Bharati Rana house ,Dhobachakurai |
169074 |
Re-Construction of Damage CC road from Sub-Station to Bharati Rana house ,Dhobachakurai 1 |
Completion of work |
-
latitude : 21.703545000000002,21.703545000000002
Longitude : 87.056885,87.056885
file name : Image_07022022122948738.png
|
2022-02-07 12:29:48.843858 |
3 |
54489312 |
Completion of Dhobachakurai Community Centre Dhobachakurai |
100000 |
Completion of Dhobachakurai Community Centre Dhobachakurai 1 |
Completion of work |
-
latitude : 21.703505000000003
Longitude : 87.05694999999999
file name : Image_07022022123247629.png
|
2022-02-07 12:32:47.723305 |
4 |
44135926 |
Const. of Raised Tube Well Platform at Bhagichakurai Badhi Sahi Near Gopal Majhi house |
25000 |
Const. of Raised Tube Well Platform at Bhagichakurai Badhi Sahi Near Gopal Majhi house 1 |
Completion of work |
-
latitude : 21.7038954
Longitude : 87.0559595
file name : Image_08022021161110450.png
|
2021-02-08 16:11:10.531243 |
5 |
44135913 |
Const. of Raised Tube Well Platform at Naa Ghat Sahi Basuchakurai |
25000 |
Const. of Raised Tube Well Platform at Naa Ghat Sahi Basuchakurai 1 |
Completion of work |
-
latitude : 21.7038975
Longitude : 87.0559643
file name : Image_08022021161105287.png
|
2021-02-08 16:11:05.358071 |
6 |
44136090 |
Plaster of School Boundary Wall at Bhagichakurai |
100000 |
Plaster of School Boundary Wall at Bhagichakurai 1 |
Completion of work |
-
latitude : 21.7043951
Longitude : 87.0552672
file name : Image_11102021190544003.png
|
2021-10-11 19:05:44.121098 |
7 |
44136197 |
Development of work the Panchayat Boundary |
200000 |
Development of work the Panchayat Boundary 1 |
Completion of work |
-
latitude : 21.7039921,21.7039887
Longitude : 87.0559248,87.0559276
file name : Image_18032021144201051.png
|
2021-03-18 14:42:00.720931 |
8 |
44136050 |
Const. of CC road from Trilochan Das house to Prafulla Das house ,Bhagichakurai |
120000 |
Const. of CC road from Trilochan Das house to Prafulla Das house ,Bhagichakurai 1 |
Completion of work |
-
latitude : 21.648535,21.648535
Longitude : 87.09924333333332,87.09923833333332
file name : Image_11102021164407015.png
|
2021-10-11 16:44:07.120871 |
9 |
44135965 |
Const. of CC road from Avta Nayak house to Khadi Sahi Tube Well Chhak |
200000 |
Const. of CC road from Avta Nayak house to Khadi Sahi Tube Well Chhak1 |
Completion of work |
-
latitude : 21.704193333333333,21.70400666666667
Longitude : 87.05625666666668,87.05605166666668
file name : Image_13052021072844577.png
|
2021-05-13 07:28:44.683077 |
10 |
44136136 |
Development work of Basuchakurai AWC , Basuchakurai |
100000 |
Development work of Basuchakurai AWC , Basuchakurai 1 |
Completion of work |
-
latitude : 21.64224,21.64224166666667
Longitude : 87.09772,87.09771500000001
file name : Image_08062021123100406.png
|
2021-06-08 12:31:00.55052 |
11 |
49657117 |
Const of CC road from Ramakanta Das house to Harinarayan Das house |
165772 |
Const of CC road from Ramakanta Das house to Harinarayan Das house 1 |
Completion of work |
-
latitude : 21.640385,21.640409999999996
Longitude : 87.09449833333335,87.09452666666667
file name : Image_01072021130755304.png
|
2021-07-01 13:07:55.404056 |
12 |
49657117 |
Const of CC road from Ramakanta Das house to Harinarayan Das house |
165772 |
Const of CC road from Ramakanta Das house to Harinarayan Das house 1 |
Completion of work |
-
latitude : 21.64041166666667,21.640351666666668
Longitude : 87.09475833333333,87.09454499999998
file name : Image_01072021125133341.png
|
2021-07-01 12:51:33.650811 |
13 |
44136072 |
Completion of School Building at Dhobachakurai Pry School |
150000 |
Completion of School Building at Dhobachakurai Pry School 1 |
Completion of work |
-
latitude : 21.70434
Longitude : 87.0552226
file name : Image_02072021051958014.png
|
2021-07-02 05:19:58.140935 |
14 |
44136072 |
Completion of School Building at Dhobachakurai Pry School |
150000 |
Completion of School Building at Dhobachakurai Pry School 1 |
Completion of work |
-
latitude : 21.7043426
Longitude : 87.0552223
file name : Image_02072021052004452.png
|
2021-07-02 05:20:04.543151 |
15 |
44136072 |
Completion of School Building at Dhobachakurai Pry School |
150000 |
Completion of School Building at Dhobachakurai Pry School 1 |
Completion of work |
-
latitude : 21.7039882
Longitude : 87.0559646
file name : Image_02072021052229540.png
|
2021-07-02 05:22:29.613907 |
16 |
49650645 |
Remuneration of Sweeper |
24000 |
Remuneration of Sweeper 1 |
Completion of work |
-
latitude : 21.704343
Longitude : 87.0552192
file name : Image_30072021115305262.png
|
2021-07-30 11:53:05.41978 |
17 |
44136005 |
Const. of CC road from Club Chhak to Chema Behera house |
200000 |
Const. of CC road from Club Chhak to Chema Behera house 1 |
Completion of work |
-
latitude : 21.642483333333335,21.642470000000003
Longitude : 87.097655,87.09764166666668
file name : Image_25112021134736712.png
|
2021-11-25 13:47:36.840295 |
18 |
49651874 |
Const of CC road from Club Chhak to Gouranga Behera house Dhobachakurai |
200000 |
Const of CC road from Club Chhak to Gouranga Behera house Dhobachakurai 1 |
Completion of work |
-
latitude : 21.7043949,21.704396
Longitude : 87.0552187,87.0552209
file name : Image_18112022124420943.png
|
2022-11-18 12:44:21.070044 |
19 |
44135947 |
Const. of Drain from Club Chhak CC to Abhira Chhak , Basuchakurai |
150000 |
Const. of Drain from Club Chhak CC to Abhira Chhak , Basuchakurai 1 |
Completion of work |
-
latitude : 21.64228666666667,21.642296666666667
Longitude : 87.09789,87.09791666666666
file name : Image_21092021120132138.png
|
2021-09-21 12:01:32.226369 |
20 |
66909156 |
Creation of Small-bore pipe conveyance system |
200000 |
Creation of Small-bore pipe conveyance system1 |
Completion of work |
-
latitude : 21.59517312
Longitude : 87.06729695
file name : Image_23032023223800483.png
|
2023-03-23 22:38:00.568467 |
21 |
49644987 |
Extension of Water supply Pipe Line from Mahabir to Pravakar Jena house |
133886 |
Extension of Water supply Pipe Line from Mahabir to Pravakar Jena house 1 |
Completion of work |
-
latitude : 21.64511,21.64515666666667
Longitude : 87.09739833333333,87.09749166666667
file name : Image_06102021103050646.png
|
2021-10-06 10:30:50.750965 |
22 |
49651166 |
Const of Nadi Ghata at Naa Ghata Sahi |
200886 |
Const of Nadi Ghata at Naa Ghata Sahi 1 |
Completion of work |
-
latitude : 21.704220000000003
Longitude : 87.05505333333333
file name : Image_18012022172414765.png
|
2022-01-18 17:24:14.87773 |
23 |
49644877 |
Const of Tube Well Platform at Basuchakurai Hatapada |
10000 |
Const of Tube Well Platform at Basuchakurai Hatapada 1 |
Completion of work |
-
latitude : 21.7044063
Longitude : 87.0552653
file name : Image_27062022152902659.png
|
2022-06-27 15:29:02.763705 |
24 |
49644877 |
Const of Tube Well Platform at Basuchakurai Hatapada |
10000 |
Const of Tube Well Platform at Basuchakurai Hatapada 1 |
Completion of work |
-
latitude : 21.704422
Longitude : 87.0552734
file name : Image_27062022152906196.png
|
2022-06-27 15:29:06.28918 |
25 |
49551043 |
Const of Tube Well Platform at Paikadiha Near Bridge |
10000 |
Const of Tube Well Platform at Paikadiha Near Bridge 1 |
Completion of work |
-
latitude : 21.7044143
Longitude : 87.0552701
file name : Image_27062022152858468.png
|
2022-06-27 15:28:58.562406 |
26 |
63775395 |
Remuneration of SEM |
24000 |
Remuneration of SEM1 |
Completion of work |
-
latitude : 21.7043959
Longitude : 87.0552646
file name : Image_08082022155253257.png
|
2022-08-08 15:52:53.372568 |
27 |
63775419 |
ODF Plus SBM Phase-II |
200000 |
ODF Plus SBM Phase-II1 |
Completion of work |
-
latitude : 21.7043944
Longitude : 87.0552225
file name : Image_12082022164104459.png
|
2022-08-12 16:41:04.566086 |
28 |
64301928 |
Recharge Pit at Karttik Jena house, Dhobachakurai |
60000 |
Recharge Pit at Karttik Jena house, Dhobachakurai 1 |
Completion of work |
-
latitude : 21.7043959
Longitude : 87.0552627
file name : Image_26082022154427128.png
|
2022-08-26 15:44:27.237916 |
29 |
63775332 |
Energy Charges of Streetlight |
73000 |
Energy Charges of Streetlight1 |
Completion of work |
-
latitude : 21.70429
Longitude : 87.05513833333335
file name : Image_28092022162537270.png
|
2022-09-28 16:25:37.462955 |
30 |
49550778 |
Lifting and Re boring of Tube Well at Dehuri Sahi Basuchakurai |
120000 |
Lifting and Re boring of Tube Well at Dehuri Sahi Basuchakurai 1 |
Completion of work |
-
latitude : 21.64481333333333
Longitude : 87.09720666666665
file name : Image_06102021095049384.png
|
2021-10-06 09:50:49.522653 |
31 |
49550778 |
Lifting and Re boring of Tube Well at Dehuri Sahi Basuchakurai |
120000 |
Lifting and Re boring of Tube Well at Dehuri Sahi Basuchakurai 1 |
Completion of work |
-
latitude : 21.644804999999998
Longitude : 87.09722166666667
file name : Image_06102021095354210.png
|
2021-10-06 09:53:54.319902 |
32 |
49550818 |
Lifting and Re boring of Tube Well at Badhia Sahi Kua Pada Bhagichakurai |
120000 |
Lifting and Re boring of Tube Well at Badhia Sahi Kua Pada Bhagichakurai 1 |
Completion of work |
-
latitude : 21.648046666666666
Longitude : 87.09185000000001
file name : Image_06102021095359146.png
|
2021-10-06 09:53:59.253548 |
33 |
49550948 |
Remuneration of SEM |
24000 |
Remuneration of SEM 1 |
Completion of work |
-
latitude : 21.704365
Longitude : 87.0552268
file name : Image_30072021114909069.png
|
2021-07-30 11:49:09.214303 |
34 |
54489058 |
Convergence of SBMG with MGNREGS and FC Funds Grants towards ODF Plus Achievement |
84077 |
Convergence of SBMG with MGNREGS and FC Funds Grants towards ODF Plus Achievement 1 |
Completion of work |
-
latitude : 21.704044999999997
Longitude : 87.05494666666667
file name : Image_18012022173247976.png
|
2022-01-18 17:32:48.077762 |
35 |
65706231 |
Operation & maintenance of drinking water supply system |
9000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.59514009
Longitude : 87.06748135
file name : Image_25112022200438465.png
|
2022-11-25 20:04:38.558405 |
36 |
65706240 |
Operation & maintenance of drinking water supply system |
8000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.59512593
Longitude : 87.06748776
file name : Image_25112022200453707.png
|
2022-11-25 20:04:53.783206 |
37 |
63776201 |
cc Road from Club Chhak to Dhobachakrurai School |
100000 |
cc Road from Club Chhak to Dhobachakrurai School1 |
Completion of work |
-
latitude : 21.59515242,21.59515223
Longitude : 87.06748146,87.0674816
file name : Image_25112022195230978.png
|
2022-11-25 19:52:31.082127 |
38 |
65706202 |
CONST OF CC ROAD AT BASUCHAKRAI GP COURTYARD |
150000 |
CONST OF CC ROAD AT BASUCHAKRAI GP COURTYARD1 |
Completion of work |
-
latitude : 21.64474808,21.64477708
Longitude : 87.09942162,87.09939052
file name : Image_17122022123852151.png
|
2022-12-17 12:38:52.261157 |
39 |
63775320 |
Energy Charges of PWS |
174090 |
Energy Charges of PWS1 |
Completion of work |
-
latitude : 21.704086666666665,21.704207
Longitude : 87.05510833333334,87.0550267
file name : Image_23092022180922906.png
|
2022-09-23 18:09:23.002726 |
40 |
63775320 |
Energy Charges of PWS |
174090 |
Energy Charges of PWS1 |
Completion of work |
-
latitude : 21.7043991,21.7043972
Longitude : 87.0552629,87.0552618
file name : Image_05072022154728405.png
|
2022-07-05 15:47:28.515306 |
41 |
63776208 |
cc Road from Gopal Majhi house to Main Road Bhagichakurai |
132737 |
cc Road from Gopal Majhi house to Main Road Bhagichakurai1 |
Completion of work |
-
latitude : 21.59505815,21.59505734,21.59505736
Longitude : 87.0673045,87.06730527,87.06730516
file name : Image_10012023085258618.png
|
2023-01-10 08:52:58.734766 |
42 |
63775518 |
Colouring of Bhagichakrurai UP School Building |
90000 |
Colouring of Bhagichakrurai UP School Building1 |
Completion of work |
-
latitude : 21.5953594
Longitude : 87.0681433
file name : Image_21022023181524467.png
|
2023-02-21 18:15:24.557933 |
43 |
63775548 |
Repairing and Colouring of Basuchakrai AWC |
100000 |
Repairing and Colouring of Basuchakrai AWC1 |
Completion of work |
-
latitude : 21.5953586
Longitude : 87.0681044
file name : Image_03032023181243518.png
|
2023-03-03 18:12:43.60356 |
44 |
63775552 |
Colouring of Dhobachakurai AWC |
100000 |
Colouring of Dhobachakurai AWC1 |
Completion of work |
-
latitude : 21.595359
Longitude : 87.0681045
file name : Image_03032023181248276.png
|
2023-03-03 18:12:48.366283 |
45 |
63776144 |
Repair and maintenance of Health Sub-Centre,Basuchakrai Building |
50000 |
Repair and maintenance of Health Sub-Centre,Basuchakrai Building1 |
Completion of work |
-
latitude : 21.7043913
Longitude : 87.0552204
file name : Image_28032023142140782.png
|
2023-03-28 14:21:40.871544 |
46 |
65706247 |
Operation & maintenance of drinking water supply system |
8000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.7043934
Longitude : 87.0552251
file name : Image_28032023142732851.png
|
2023-03-28 14:27:32.945618 |
47 |
66905243 |
CONST OF CC ROAD FROM DHOBACHAKURAI MAIN ROAD TO SANYASI DAS HOUSE |
120000 |
CONST OF CC ROAD FROM DHOBACHAKURAI MAIN ROAD TO SANYASI DAS HOUSE1 |
Completion of work |
-
latitude : 21.59509033,21.59509758
Longitude : 87.06745688,87.06744933
file name : Image_24042023204745887.png
|
2023-04-24 20:47:45.989017 |
48 |
66916893 |
CONST OF CC ROAD FROM DHOBACHAKURAI MAIN ROAD TO SUDHAKAR BARIK HOUSE |
176000 |
CONST OF CC ROAD FROM DHOBACHAKURAI MAIN ROAD TO SUDHAKAR BARIK HOUSE1 |
Completion of work |
-
latitude : 21.59509109,21.59509095
Longitude : 87.06743912,87.06743852
file name : Image_24042023205132224.png
|
2023-04-24 20:51:32.319912 |
49 |
66907015 |
OFFICE CONTIGENCY |
53900 |
OFFICE CONTIGENCY1 |
Completion of work |
-
latitude : 21.7043973
Longitude : 87.0552221
file name : Image_04052023132512611.png
|
2023-05-04 13:25:12.71533 |
50 |
63775539 |
Repairing Desk, Bench of Mangala Nodal UP School and New Utencils for School Dhobackarurai |
150000 |
Repairing Desk, Bench of Mangala Nodal UP School and New Utencils for School Dhobackarurai1 |
Completion of work |
-
latitude : 21.704395
Longitude : 87.0552235
file name : Image_04052023140130104.png
|
2023-05-04 14:01:30.199149 |
51 |
63775528 |
Repairing and Colouring of Basuchakrai UP School |
68990 |
Repairing and Colouring of Basuchakrai UP School1 |
Completion of work |
-
latitude : 21.7043953
Longitude : 87.0552199
file name : Image_01062023171146876.png
|
2023-06-01 17:11:46.970416 |
52 |
49645440 |
Expenditure for Cleaning of Streets and Drains in GP Area |
50000 |
Expenditure for Cleaning of Streets and Drains in GP Area 1 |
Completion of work |
-
latitude : 21.7043948
Longitude : 87.0552174
file name : Image_01062023170014833.png
|
2023-06-01 17:00:14.936707 |
53 |
66916914 |
Repair of drainage channel |
150000 |
Repair of drainage channel1 |
Completion of work |
-
latitude : 21.53567708
Longitude : 86.9046908
file name : Image_07062023142909237.png
|
2023-06-07 14:29:09.34362 |
54 |
49550850 |
Compressor Washing of Tube Wells |
25000 |
Compressor Washing of Tube Wells1 |
Completion of work |
-
latitude : 21.7043954
Longitude : 87.0552645
file name : Image_24052022170425776.png
|
2022-05-24 17:04:25.858845 |
55 |
63775368 |
Pipe LINE Connection from Bulu Sing House to Chasi Bridge |
72782 |
Pipe LINE Connection from Bulu Sing House to Chasi Bridge1 |
Completion of work |
-
latitude : 21.59501149,21.59501128
Longitude : 87.06739997,87.06739562
file name : Image_27062023094746264.png
|
2023-06-27 09:47:46.36098 |
56 |
63775368 |
Pipe LINE Connection from Bulu Sing House to Chasi Bridge |
72782 |
Pipe LINE Connection from Bulu Sing House to Chasi Bridge1 |
Completion of work |
-
latitude : 21.59514815,21.59514782
Longitude : 87.06731959,87.06732018
file name : Image_27062023114212015.png
|
2023-06-27 11:42:12.121713 |
57 |
63775380 |
Pipe line Connection from Main Road to Khetra Jena House |
40000 |
Pipe line Connection from Main Road to Khetra Jena House1 |
Completion of work |
-
latitude : 21.59518402,21.59515198
Longitude : 87.06741595,87.06738032
file name : Image_28062023133425218.png
|
2023-06-28 13:34:25.315791 |
58 |
83598316 |
Installation of Street Lights |
245000 |
Installation of Street Lights1 |
Plinth level |
-
latitude : 21.7043491
Longitude : 87.055265
file name : Image_25092023182404216.png
|
2023-09-25 18:24:04.361614 |
59 |
83598316 |
Installation of Street Lights |
245000 |
Installation of Street Lights1 |
Completion of work |
-
latitude : 21.7043492
Longitude : 87.0552644
file name : Image_25092023182136201.png
|
2023-09-25 18:21:36.35243 |
60 |
49550872 |
Compressor Washing of Tube Wells |
25000 |
Compressor Washing of Tube Wells1 |
Completion of work |
-
latitude : 21.6447303
Longitude : 87.099375
file name : Image_03112023131455886.png
|
2023-11-03 13:14:55.986058 |
61 |
83596147 |
Operation and Maintenance of drinking water supply system |
250000 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 21.7043959,21.7043957
Longitude : 87.0552649,87.0552644
file name : Image_16112023174435250.png
|
2023-11-16 17:44:35.373449 |
62 |
83596147 |
Operation and Maintenance of drinking water supply system |
250000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 21.7043962,21.7043974
Longitude : 87.0552146,87.055214
file name : Image_27092023184448761.png
|
2023-09-27 18:44:48.8661 |
63 |
83596147 |
Operation and Maintenance of drinking water supply system |
250000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.70459316,21.70449621
Longitude : 87.05485749,87.05500967
file name : Image_27092023183305060.png
|
2023-09-27 18:33:05.186722 |
64 |
83598996 |
Installation of Tubewell |
10000 |
Installation of Tubewell1 |
Roof laid |
-
latitude : 21.59507155
Longitude : 87.06732613
file name : Image_01052024111702229.png
|
2024-05-01 11:17:02.324537 |
65 |
83598996 |
Installation of Tubewell |
10000 |
Installation of Tubewell1 |
Plinth level |
-
latitude : 21.59509978
Longitude : 87.06732834
file name : Image_01052024110748773.png
|
2024-05-01 11:07:48.86908 |
66 |
83598996 |
Installation of Tubewell |
10000 |
Installation of Tubewell1 |
Completion of work |
-
latitude : 21.59506595
Longitude : 87.06733057
file name : Image_01052024110305758.png
|
2024-05-01 11:03:05.849299 |
67 |
83598781 |
Construction and Maintenance of Community Centre |
95000 |
Construction and Maintenance of Community Centre1 |
Plinth level |
-
latitude : 21.59523531
Longitude : 87.06722599
file name : Image_06022024181044303.png
|
2024-02-06 18:10:44.435874 |
68 |
83598781 |
Construction and Maintenance of Community Centre |
95000 |
Construction and Maintenance of Community Centre1 |
Completion of work |
-
latitude : 21.59523965
Longitude : 87.06722159
file name : Image_06022024180853318.png
|
2024-02-06 18:08:53.493555 |
69 |
83599918 |
Tap water connections to households |
47845 |
Tap water connections to households1 |
Roof laid |
-
latitude : 21.70456645
Longitude : 87.05502761
file name : Image_05092024161705642.png
|
2024-09-05 16:17:05.738595 |
70 |
83599918 |
Tap water connections to households |
47845 |
Tap water connections to households1 |
Plinth level |
-
latitude : 21.70455663
Longitude : 87.05504085
file name : Image_05092024161126765.png
|
2024-09-05 16:11:26.864824 |
71 |
83599918 |
Tap water connections to households |
47845 |
Tap water connections to households1 |
Completion of work |
-
latitude : 21.70465743
Longitude : 87.05501599
file name : Image_05092024160028209.png
|
2024-09-05 16:00:28.296422 |
72 |
83608941 |
Repairing/Construction of Building |
160000 |
Repairing/Construction of Building1 |
Plinth level |
-
latitude : 21.7044081
Longitude : 87.0552299
file name : Image_12022024174616246.png
|
2024-02-12 17:46:16.321844 |
73 |
83608941 |
Repairing/Construction of Building |
160000 |
Repairing/Construction of Building1 |
Completion of work |
-
latitude : 21.7044115
Longitude : 87.0552291
file name : Image_12022024174249964.png
|
2024-02-12 17:42:50.042311 |
74 |
83608941 |
Repairing/Construction of Building |
160000 |
Repairing/Construction of Building1 |
Completion of work |
-
latitude : 21.7044093
Longitude : 87.0552293
file name : Image_12022024173937148.png
|
2024-02-12 17:39:37.229251 |
75 |
83610832 |
Purchase of Tricycles/other battery -operated vehicles for door to door collection of waste |
8970 |
Purchase of Tricycles/other battery -operated vehicles for door to door collection of waste1 |
|
-
latitude : 21.45184006
Longitude : 87.04049404
file name : Image_25122023143353026.png
|
2023-12-25 14:33:53.146072 |
76 |
83599521 |
Repairing and maintenance of roads |
100000 |
Repairing and maintenance of roads1 |
Roof laid |
-
latitude : 21.5951547,21.59514815
Longitude : 87.0674546,87.06746889
file name : Image_01032024185511384.png
|
2024-03-01 18:55:11.473645 |
77 |
83599521 |
Repairing and maintenance of roads |
100000 |
Repairing and maintenance of roads1 |
Plinth level |
-
latitude : 21.59513079,21.59513106
Longitude : 87.06745691,87.0674565
file name : Image_01032024185307912.png
|
2024-03-01 18:53:08.001975 |
78 |
83599521 |
Repairing and maintenance of roads |
100000 |
Repairing and maintenance of roads1 |
Completion of work |
-
latitude : 21.59515374,21.59515374
Longitude : 87.06743798,87.06743788
file name : Image_01032024184823204.png
|
2024-03-01 18:48:23.293144 |
79 |
83596568 |
Converting abandoned borewells into water recharging structure |
126000 |
Converting abandoned borewells into water recharging structure1 |
Roof laid |
-
latitude : 21.59514868
Longitude : 87.0671642
file name : Image_21052024102233593.png
|
2024-05-21 10:22:33.678444 |
80 |
83596568 |
Converting abandoned borewells into water recharging structure |
126000 |
Converting abandoned borewells into water recharging structure1 |
Plinth level |
-
latitude : 21.59515728
Longitude : 87.06725331
file name : Image_21052024101757818.png
|
2024-05-21 10:17:57.903752 |
81 |
83596568 |
Converting abandoned borewells into water recharging structure |
126000 |
Converting abandoned borewells into water recharging structure1 |
Completion of work |
-
latitude : 21.59518988
Longitude : 87.06756441
file name : Image_20052024182730301.png
|
2024-05-20 18:27:30.39985 |
82 |
63775340 |
Pipe LINE Connection from Basuchakrai Club Chhak to Digambar Das House |
72872 |
Pipe LINE Connection from Basuchakrai Club Chhak to Digambar Das House1 |
Completion of work |
-
latitude : 21.59512612,21.59512301
Longitude : 87.06736707,87.06737424
file name : Image_27062023114947958.png
|
2023-06-27 11:49:48.067311 |
83 |
83608673 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.6997796,21.6998103
Longitude : 87.2710272,87.2710035
file name : Image_27032024115102495.png
|
2024-03-27 11:51:02.58281 |
84 |
83608673 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.699787,21.6997789
Longitude : 87.2710184,87.271022
file name : Image_27032024114015255.png
|
2024-03-27 11:40:15.348332 |
85 |
83608673 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.6998062,21.6998086
Longitude : 87.2710077,87.2710042
file name : Image_27032024112846032.png
|
2024-03-27 11:28:46.148908 |
86 |
83608673 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.6998166,21.6997789
Longitude : 87.270984,87.271022
file name : Image_27032024112841799.png
|
2024-03-27 11:28:41.883435 |
87 |
102070878 |
Creation of a new source of drinking water |
30000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 21.6446893
Longitude : 87.0993453
file name : Image_30032024150011285.png
|
2024-03-30 15:00:11.382008 |
88 |
102069695 |
Construction of new Piped Water Supply schemes |
70000 |
Construction of new Piped Water Supply schemes1 |
Completion of work |
-
latitude : 21.6446889
Longitude : 87.0993432
file name : Image_30032024150528497.png
|
2024-03-30 15:05:28.614995 |
89 |
102069695 |
Construction of new Piped Water Supply schemes |
70000 |
Construction of new Piped Water Supply schemes1 |
Completion of work |
-
latitude : 21.6446893
Longitude : 87.0993391
file name : Image_30032024150524997.png
|
2024-03-30 15:05:25.104634 |
90 |
105554737 |
Operation and Maintenance of drinking/piped water supply system |
300000 |
Operation and Maintenance of drinking/piped water supply system1 |
Completion of work |
-
latitude : 21.59525658,21.5952576
Longitude : 87.06726735,87.06726734
file name : Image_26092024161258974.png
|
2024-09-26 16:12:59.096362 |
91 |
105554737 |
Operation and Maintenance of drinking/piped water supply system |
300000 |
Operation and Maintenance of drinking/piped water supply system1 |
Completion of work |
-
latitude : 21.59521054,21.59521766
Longitude : 87.06725028,87.06724909
file name : Image_26092024160620820.png
|
2024-09-26 16:06:20.941229 |
92 |
105561846 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.96929698,21.96939651
Longitude : 86.69037665,86.69026469
file name : Image_08102024162428829.png
|
2024-10-08 16:24:28.915969 |
93 |
105561846 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.9694658,21.96947084
Longitude : 86.69031596,86.69030854
file name : Image_08102024161906619.png
|
2024-10-08 16:19:06.706015 |
94 |
105561846 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.64214364,21.96952101
Longitude : 87.09808048,86.69026396
file name : Image_08102024161143681.png
|
2024-10-08 16:11:43.774477 |
95 |
83634241 |
Construction of toilets in public institutions |
45932 |
Construction of toilets in public institutions1 |
Roof laid |
-
latitude : 21.7043836
Longitude : 87.0552357
file name : Image_06082024184306245.png
|
2024-08-06 18:43:06.33032 |
96 |
83634241 |
Construction of toilets in public institutions |
45932 |
Construction of toilets in public institutions1 |
Plinth level |
-
latitude : 21.7043835
Longitude : 87.0552355
file name : Image_06082024184012523.png
|
2024-08-06 18:40:12.60334 |
97 |
83634241 |
Construction of toilets in public institutions |
45932 |
Construction of toilets in public institutions1 |
Completion of work |
-
latitude : 21.7043836
Longitude : 87.0552357
file name : Image_06082024183659994.png
|
2024-08-06 18:37:00.080435 |
98 |
105564518 |
Maintenance of Street Lights |
200000 |
Maintenance of Street Lights1 |
Plinth level |
-
latitude : 21.59515004
Longitude : 87.06720225
file name : Image_07082024115201722.png
|
2024-08-07 11:52:01.843438 |
99 |
105564518 |
Maintenance of Street Lights |
200000 |
Maintenance of Street Lights1 |
Plinth level |
-
latitude : 21.59515204
Longitude : 87.06718966
file name : Image_07082024114858052.png
|
2024-08-07 11:48:58.267661 |
100 |
105564518 |
Maintenance of Street Lights |
200000 |
Maintenance of Street Lights1 |
Completion of work |
-
latitude : 21.59515674
Longitude : 87.06720888
file name : Image_07082024113539776.png
|
2024-08-07 11:35:39.916774 |
101 |
105554857 |
Repair of pipe drinking water |
41500 |
Repair of pipe drinking water1 |
Completion of work |
-
latitude : 21.59511064
Longitude : 87.06735246
file name : Image_09082024121850695.png
|
2024-08-09 12:18:50.798645 |
102 |
44136593 |
Imp. of Road from Mahabir to Pravakar Jena house , Dhobachakurai |
15000 |
Imp. of Road from Mahabir to Pravakar Jena house , Dhobachakurai 1 |
Completion of work |
-
latitude : 21.64911833333333,21.64911833333333
Longitude : 87.09863500000002,87.09863500000002
file name : Image_11102021164441501.png
|
2021-10-11 16:44:41.610435 |
103 |
44136570 |
Imp. of Road from Sub-Station to Bridge , Dhobachakurai |
20000 |
Imp. of Road from Sub-Station to Bridge , Dhobachakurai 1 |
Completion of work |
-
latitude : 21.651246666666665,21.651215
Longitude : 87.09466833333333,87.094685
file name : Image_11102021161409915.png
|
2021-10-11 16:14:10.02041 |
104 |
105563817 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets |
150000 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets1 |
Roof laid |
-
latitude : 21.7044071
Longitude : 87.0552355
file name : Image_13112024155329042.png
|
2024-11-13 15:53:29.183531 |
105 |
105563817 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets |
150000 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets1 |
Plinth level |
-
latitude : 21.7044072
Longitude : 87.0552358
file name : Image_13112024154942348.png
|
2024-11-13 15:49:42.426767 |
106 |
105563817 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets |
150000 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets1 |
Completion of work |
-
latitude : 21.7044067
Longitude : 87.0552327
file name : Image_13112024154043866.png
|
2024-11-13 15:40:43.950533 |
107 |
105563817 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets |
150000 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets1 |
Completion of work |
-
latitude : 21.7043972
Longitude : 87.0552194
file name : Image_13112024153856554.png
|
2024-11-13 15:38:56.640945 |