1 |
44117240 |
CONST. OF DRAIN FROM HARIHATA TO SATRUGHANA NAYAK HOUSE |
100000 |
CONST. OF DRAIN FROM HARIHATA TO SATRUGHANA NAYAK HOUSE1 |
Completion of work |
-
latitude : 21.26987612,21.27028754
Longitude : 86.49855982,86.49864932
file name : Image_28042021132724071.png
|
2021-04-28 13:27:24.181899 |
2 |
44114642 |
CONST. OF DRAIN FROM AJAY BEHERA HOUSE TO NADI |
100000 |
CONST. OF DRAIN FROM AJAY BEHERA HOUSE TO NADI1 |
Completion of work |
-
latitude : 21.26425051,21.26424941
Longitude : 86.50109577,86.50119943
file name : Image_28042021133245796.png
|
2021-04-28 13:32:45.916554 |
3 |
44117943 |
Const. Drain From Madhusudan Rana House to Gopal Sahi |
100000 |
Const. Drain From Madhusudan Rana House to Gopal Sahi1 |
Completion of work |
-
latitude : 21.26984767,21.26984926
Longitude : 86.49858939,86.49858793
file name : Image_28042021132320560.png
|
2021-04-28 13:23:20.65467 |
4 |
44114235 |
HONORARIUM OF SEM & PWS OPERATOR |
48000 |
HONORARIUM OF SEM & PWS OPERATOR1 |
Completion of work |
-
latitude : 21.26869047
Longitude : 86.49911006
file name : Image_05062021095304034.png
|
2021-06-05 09:53:04.128581 |
5 |
44114235 |
HONORARIUM OF SEM & PWS OPERATOR |
48000 |
HONORARIUM OF SEM & PWS OPERATOR1 |
Completion of work |
-
latitude : 21.26868929
Longitude : 86.49901699
file name : Image_07062021073634269.png
|
2021-06-07 07:36:34.383441 |
6 |
44114235 |
HONORARIUM OF SEM & PWS OPERATOR |
48000 |
HONORARIUM OF SEM & PWS OPERATOR1 |
Completion of work |
-
latitude : 21.2687345
Longitude : 86.4990915
file name : Image_07062021073637954.png
|
2021-06-07 07:36:38.040787 |
7 |
44114235 |
HONORARIUM OF SEM & PWS OPERATOR |
48000 |
HONORARIUM OF SEM & PWS OPERATOR1 |
Completion of work |
-
latitude : 21.268736
Longitude : 86.4990921
file name : Image_07062021073641539.png
|
2021-06-07 07:36:41.626206 |
8 |
44117000 |
CONST. OF GUARD WALL AT SINGHA SAHI TO MUNI PADA |
100000 |
CONST. OF GUARD WALL AT SINGHA SAHI TO MUNI PADA1 |
Completion of work |
-
latitude : 21.27253966
Longitude : 86.49697145
file name : Image_07062021074857820.png
|
2021-06-07 07:48:57.943919 |
9 |
44117887 |
Impo. of Road From Incomplite CCroad To Nirmal Barik House |
70000 |
Impo. of Road From Incomplite CCroad To Nirmal Barik House1 |
Completion of work |
-
latitude : 21.26908298,21.26908516
Longitude : 86.499528,86.49952237
file name : Image_07062021080705124.png
|
2021-06-07 08:07:05.212539 |
10 |
44116922 |
const.of drain from madhu sahu house to gohiri |
100000 |
const.of drain from madhu sahu house to gohiri1 |
Completion of work |
-
latitude : 21.27540593,21.27541568
Longitude : 86.49714171,86.49715012
file name : Image_07062021075303377.png
|
2021-06-07 07:53:03.470984 |
11 |
44117819 |
IMP. OF ROAD FROM INCOMPLITE CCROAD TO MADHU SAHU HOUSE |
150000 |
IMP. OF ROAD FROM INCOMPLITE CCROAD TO MADHU SAHU HOUSE 1 |
Completion of work |
-
latitude : 21.27532031,21.27524816
Longitude : 86.49704657,86.49702416
file name : Image_07062021075503364.png
|
2021-06-07 07:55:03.468853 |
12 |
44114714 |
CONST. OF GUARD WALL AT NIMA POKHARI |
100000 |
CONST. OF GUARD WALL AT NIMA POKHARI1 |
Completion of work |
-
latitude : 21.25588469
Longitude : 86.50555314
file name : Image_03082021154117835.png
|
2021-08-03 15:41:17.93554 |
13 |
44117990 |
Impo. of Road From Incomplite CCroad To Khatua Sahi |
150000 |
Impo. of Road From Incomplite CCroad To Khatua Sahi1 |
Completion of work |
-
latitude : 21.26961976,21.26961976
Longitude : 86.48693129,86.48692844
file name : Image_03082021152642862.png
|
2021-08-03 15:26:42.961427 |
14 |
44115632 |
IMPROVEMENT OF ROAD FROM CHHATRABUREI INCOMPLITE CC ROAD TO KANHU MAHARANA HOUSE |
100000 |
IMPROVEMENT OF ROAD FROM CHHATRABUREI INCOMPLITE CC ROAD TO KANHU MAHARANA HOUSE1 |
Completion of work |
-
latitude : 21.26824177,21.268243,21.26825113,21.26825066,21.26824831,21.26824613
Longitude : 86.51221408,86.51221404,86.512177,86.51217953,86.51218303,86.51218759
file name : Image_26082021105619699.png
|
2021-08-26 10:56:19.831653 |
15 |
44115632 |
IMPROVEMENT OF ROAD FROM CHHATRABUREI INCOMPLITE CC ROAD TO KANHU MAHARANA HOUSE |
100000 |
IMPROVEMENT OF ROAD FROM CHHATRABUREI INCOMPLITE CC ROAD TO KANHU MAHARANA HOUSE1 |
Completion of work |
-
latitude : 21.26825563,21.26824158
Longitude : 86.51217069,86.51222898
file name : Image_26082021105627472.png
|
2021-08-26 10:56:27.601109 |
16 |
56545338 |
CONST OF APPROACH ROAD FROM INCOMPLETE CC ROAD TO SUNDHIRA AWC II |
100000 |
CONST OF APPROACH ROAD FROM INCOMPLETE CC ROAD TO SUNDHIRA AWC II1 |
Completion of work |
-
latitude : 21.28026306,21.27282838,21.27279938,21.27283684
Longitude : 86.46305331,86.49649529,86.4966471,86.49655571
file name : Image_14022022102417626.png
|
2022-02-14 10:24:17.743772 |
17 |
47597810 |
IMPROVEMENT OF ROAD FROM MAIN ROAD TO SINGH SAHI |
93000 |
IMPROVEMENT OF ROAD FROM MAIN ROAD TO SINGH SAHI1 |
Completion of work |
-
latitude : 21.27271826,21.27268652
Longitude : 86.4977893,86.49785486
file name : Image_12022022111002346.png
|
2022-02-12 11:10:02.456145 |
18 |
47596052 |
GPDP/PRIYASOFT |
12772 |
GPDP/PRIYASOFT1 |
Completion of work |
-
latitude : 21.2687217
Longitude : 86.499079
file name : Image_12022022114535312.png
|
2022-02-12 11:45:35.430879 |
19 |
47596052 |
GPDP/PRIYASOFT |
12772 |
GPDP/PRIYASOFT1 |
Completion of work |
-
latitude : 21.2687217
Longitude : 86.499079
file name : Image_12022022114702141.png
|
2022-02-12 11:47:02.260744 |
20 |
47594266 |
IMPROVEMENT OF ROAD FROM PMGSY ROAD TO THAKURANI |
150000 |
IMPROVEMENT OF ROAD FROM PMGSY ROAD TO THAKURANI1 |
Completion of work |
-
latitude : 21.25583311,21.25583029,21.25582896
Longitude : 86.5056419,86.50557571,86.50556692
file name : Image_12022022110140986.png
|
2022-02-12 11:01:41.093131 |
21 |
44114996 |
CONST. OF DRAIN FROM PURBAPADA CLUB TO TO BHAGABAN LENKA HOUSE |
100000 |
CONST. OF DRAIN FROM PURBAPADA CLUB TO TO BHAGABAN LENKA HOUSE1 |
Completion of work |
-
latitude : 21.26896863,21.26906902
Longitude : 86.50058712,86.50048292
file name : Image_12022022112941853.png
|
2022-02-12 11:29:41.993312 |
22 |
47595121 |
IMPROVEMENT ROAD FROM RD ROAD TO SAMBUNATH KHATUA HOUSE |
100000 |
IMPROVEMENT ROAD FROM RD ROAD TO SAMBUNATH KHATUA HOUSE1 |
Completion of work |
-
latitude : 21.26926314,21.26929429
Longitude : 86.50014008,86.50006443
file name : Image_12022022113225826.png
|
2022-02-12 11:32:25.94834 |
23 |
47596800 |
IMPROVEMENT OF ROAD FROM BHASKAR JENA HOUSE TO THAKURANI |
150000 |
IMPROVEMENT OF ROAD FROM BHASKAR JENA HOUSE TO THAKURANI1 |
Completion of work |
-
latitude : 21.26649517,21.26646123
Longitude : 86.50329172,86.50329807
file name : Image_09032022085744700.png
|
2022-03-09 08:57:44.798959 |
24 |
56562916 |
Improvement of road from Sundhira Mahakud Sahi incomplete cc road to Budhiram Barik House |
131008 |
Improvement of road from Sundhira Mahakud Sahi incomplete cc road to Budhiram Barik House 1 |
Completion of work |
-
latitude : 21.26832021,21.26830206
Longitude : 86.49802385,86.49800515
file name : Image_09032022085023128.png
|
2022-03-09 08:50:23.228084 |
25 |
65732768 |
GPDP/PRIYASOFT |
12000 |
GPDP/PRIYASOFT1 |
Completion of work |
-
latitude : 21.26874176
Longitude : 86.49916714
file name : Image_18032023140835070.png
|
2023-03-18 14:08:35.155801 |
26 |
47594719 |
IMPROVEMENT ROAD FROM INCOMPLETE CC ROAD TO RD ROAD |
150000 |
IMPROVEMENT ROAD FROM INCOMPLETE CC ROAD TO RD ROAD1 |
Completion of work |
-
latitude : 21.26310611,21.26310559
Longitude : 86.48078452,86.48078401
file name : Image_26052022152231819.png
|
2022-05-26 15:22:31.923037 |
27 |
47595744 |
IMPROVEMENT OF ROAD FROM RD ROAD TO KRUSHNA ROUT HOUSE |
100000 |
IMPROVEMENT OF ROAD FROM RD ROAD TO KRUSHNA ROUT HOUSE1 |
Completion of work |
-
latitude : 21.27312289,21.26249839
Longitude : 86.41824289,86.50308614
file name : Image_26052022150144398.png
|
2022-05-26 15:01:44.519657 |
28 |
47965679 |
GP CONTINGENCY |
42000 |
GP CONTINGENCY1 |
Completion of work |
-
latitude : 21.2687218
Longitude : 86.4990786
file name : Image_10062022082544679.png
|
2022-06-10 08:25:44.775561 |
29 |
44114348 |
ENERGY CHARGES FOR PWS PROJECTS |
50000 |
ENERGY CHARGES FOR PWS PROJECTS1 |
Completion of work |
-
latitude : 21.26818822
Longitude : 86.49929891
file name : Image_27062022094439934.png
|
2022-06-27 09:44:40.048611 |
30 |
44114348 |
ENERGY CHARGES FOR PWS PROJECTS |
50000 |
ENERGY CHARGES FOR PWS PROJECTS1 |
Completion of work |
-
latitude : 21.26824934
Longitude : 86.4993231
file name : Image_27062022094443607.png
|
2022-06-27 09:44:43.724107 |
31 |
44114348 |
ENERGY CHARGES FOR PWS PROJECTS |
50000 |
ENERGY CHARGES FOR PWS PROJECTS1 |
Completion of work |
-
latitude : 21.2682514
Longitude : 86.49931885
file name : Image_27062022094447630.png
|
2022-06-27 09:44:47.742772 |
32 |
44114348 |
ENERGY CHARGES FOR PWS PROJECTS |
50000 |
ENERGY CHARGES FOR PWS PROJECTS1 |
Completion of work |
-
latitude : 21.26826961
Longitude : 86.49934019
file name : Image_27062022094451333.png
|
2022-06-27 09:44:51.45016 |
33 |
47595567 |
IMPROVEMENT OF ROAD FROM SATRUGHAN NAYAK HOUSE TO NIHARI SAHI |
100000 |
IMPROVEMENT OF ROAD FROM SATRUGHAN NAYAK HOUSE TO NIHARI SAHI1 |
Completion of work |
-
latitude : 21.27052416,21.2704567
Longitude : 86.49803302,86.4985491
file name : Image_27062022094428614.png
|
2022-06-27 09:44:28.721324 |
34 |
47593626 |
CONST.OF GUARD WALL FROM MAHENDRA NAYAK HOUSE TO MUNI PADA |
100000 |
CONST.OF GUARD WALL FROM MAHENDRA NAYAK HOUSE TO MUNI PADA1 |
Completion of work |
-
latitude : 21.27238173,21.27243944
Longitude : 86.49605609,86.49604677
file name : Image_27062022094436051.png
|
2022-06-27 09:44:36.162882 |
35 |
47593366 |
CONST.GUARD WALL AT-CHEMEI MOHANTY POKHARI TO MUNI PADA |
100000 |
CONST.GUARD WALL AT-CHEMEI MOHANTY POKHARI TO MUNI PADA1 |
Completion of work |
-
latitude : 21.27372858
Longitude : 86.49688204
file name : Image_28062022095344765.png
|
2022-06-28 09:53:44.87514 |
36 |
47597015 |
IMPROVEMENT OF ROAD FROM RD ROAD TO DAS SAHI |
100000 |
IMPROVEMENT OF ROAD FROM RD ROAD TO DAS SAHI1 |
Completion of work |
-
latitude : 21.2539456,21.25395146
Longitude : 86.4879439,86.48794585
file name : Image_30072022103259494.png
|
2022-07-30 10:32:59.594074 |
37 |
47597216 |
IMOROVEMENT OF ROAD FROM GHADEI SAHI TO BEHERA SAHI |
100000 |
IMOROVEMENT OF ROAD FROM GHADEI SAHI TO BEHERA SAHI1 |
Completion of work |
-
latitude : 21.2522293,21.25223736
Longitude : 86.49375973,86.49372677
file name : Image_30072022103255892.png
|
2022-07-30 10:32:55.997489 |
38 |
65732397 |
Water Supply to villages |
10000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 21.26646889
Longitude : 86.49956176
file name : Image_21122022120159085.png
|
2022-12-21 12:01:59.176219 |
39 |
47598125 |
IMPROVEMENT OF PLAYGROUND AT-BASULI PADA |
100074 |
IMPROVEMENT OF PLAYGROUND AT-BASULI PADA1 |
Completion of work |
-
latitude : 21.26761849,21.26759857
Longitude : 86.49553487,86.49553638
file name : Image_11032023095939786.png
|
2023-03-11 09:59:39.873885 |
40 |
65732360 |
Operation & maintenance of drinking water supply system |
48000 |
Operation & maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.26892134
Longitude : 86.49904641
file name : Image_11032023100552357.png
|
2023-03-11 10:05:52.449137 |
41 |
65732709 |
IMP.OF ROAD FROM PATRA SAHI TO MAJHI SAHI |
118992 |
IMP.OF ROAD FROM PATRA SAHI TO MAJHI SAHI1 |
Completion of work |
-
latitude : 21.24839595,21.24839333
Longitude : 86.49885719,86.49884826
file name : Image_27032023132820974.png
|
2023-03-27 13:28:21.098414 |
42 |
65732709 |
IMP.OF ROAD FROM PATRA SAHI TO MAJHI SAHI |
118992 |
IMP.OF ROAD FROM PATRA SAHI TO MAJHI SAHI1 |
Completion of work |
-
latitude : 21.24837625,21.24839378
Longitude : 86.49876626,86.49877061
file name : Image_27032023132835647.png
|
2023-03-27 13:28:35.766478 |
43 |
65732434 |
Creation of a new source of drinking water |
123744 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 21.27254184,21.272533
Longitude : 86.49868093,86.49872948
file name : Image_27032023093153308.png
|
2023-03-27 09:31:53.398901 |
44 |
65732898 |
IMP OF ROAD FROM INCOMPLETE CC ROAD TO KHATUA SAHI |
100000 |
IMP OF ROAD FROM INCOMPLETE CC ROAD TO KHATUA SAHI1 |
Completion of work |
-
latitude : 21.26944717,21.26944896
Longitude : 86.48734532,86.48731256
file name : Image_31032023125650168.png
|
2023-03-31 12:56:50.27047 |
45 |
65732845 |
IMP OF ROAD FROM DHIRIA MAHARANA HOUSE TO SRIKANTA KHATUA HOUSE |
90000 |
IMP OF ROAD FROM DHIRIA MAHARANA HOUSE TO SRIKANTA KHATUA HOUSE1 |
Completion of work |
-
latitude : 21.26862639,21.26868779
Longitude : 86.4999519,86.50000198
file name : Image_27032023094555200.png
|
2023-03-27 09:45:55.289105 |
46 |
65732932 |
IMP OF ROAD FROM MUNIPADA INCOMPLETE CC ROAD TO CHEMEI MOHANTY POKHARI |
30000 |
IMP OF ROAD FROM MUNIPADA INCOMPLETE CC ROAD TO CHEMEI MOHANTY POKHARI1 |
Completion of work |
-
latitude : 21.27339163,21.27350308,21.27350034
Longitude : 86.4966015,86.49672752,86.49672465
file name : Image_31032023130458708.png
|
2023-03-31 13:04:58.816173 |
47 |
65732862 |
IMP OF ROAD FROM INCOMPLETE CC ROAD TO SANTUNU DAS HOUSE |
70000 |
IMP OF ROAD FROM INCOMPLETE CC ROAD TO SANTUNU DAS HOUSE1 |
Completion of work |
-
latitude : 21.25156969,21.25159708
Longitude : 86.49464703,86.49469841
file name : Image_22062023121602024.png
|
2023-06-22 12:16:02.12084 |
48 |
65732727 |
IMP.OF ROAD FROM NIMA POKHARI INCOMPLETE CC ROAD TO CLUB |
100000 |
IMP.OF ROAD FROM NIMA POKHARI INCOMPLETE CC ROAD TO CLUB1 |
Completion of work |
-
latitude : 21.25562327,21.25562498,21.25556543
Longitude : 86.50611556,86.50611466,86.50595107
file name : Image_15072023102510335.png
|
2023-07-15 10:25:10.44383 |
49 |
65732748 |
CONSTR.OF DRAIN FROM TRANSFORMER TO BARIK SAHI |
100000 |
CONSTR.OF DRAIN FROM TRANSFORMER TO BARIK SAHI1 |
Completion of work |
-
latitude : 21.27423331,21.25250104
Longitude : 86.48509361,86.49085578
file name : Image_15072023100258909.png
|
2023-07-15 10:02:59.036763 |
50 |
47592537 |
CONST.OF GUARD WALL WITH CULVERT AT-RD ROAD TO GOPAL SAHI |
132800 |
CONST.OF GUARD WALL WITH CULVERT AT-RD ROAD TO GOPAL SAHI1 |
Completion of work |
-
latitude : 21.26782058,21.26787491
Longitude : 86.49914605,86.49906128
file name : Image_15072023102708748.png
|
2023-07-15 10:27:08.881677 |
51 |
65732910 |
COMPLETITION OF TRILOCHANPUR CRC |
53074 |
COMPLETITION OF TRILOCHANPUR CRC1 |
Completion of work |
-
latitude : 21.25236276
Longitude : 86.49478845
file name : Image_05122023142859697.png
|
2023-12-05 14:28:59.78039 |
52 |
65732558 |
Creation of community soak pits for group of Households |
26400 |
Creation of community soak pits for group of Households1 |
Completion of work |
-
latitude : 21.26253002
Longitude : 86.50304067
file name : Image_05122023142316807.png
|
2023-12-05 14:23:16.88983 |
53 |
83380404 |
Construction of roads |
50422 |
Construction of roads1 |
Roof laid |
-
latitude : 21.26428718,21.26411953,21.26412419
Longitude : 86.48007572,86.48004415,86.4800541
file name : Image_16032024113620239.png
|
2024-03-16 11:36:20.318563 |
54 |
83380404 |
Construction of roads |
50422 |
Construction of roads1 |
Plinth level |
-
latitude : 21.2642422,21.26415747,21.26415683
Longitude : 86.48005585,86.48006837,86.48006774
file name : Image_16032024113033907.png
|
2024-03-16 11:30:33.972583 |
55 |
83380404 |
Construction of roads |
50422 |
Construction of roads1 |
Completion of work |
-
latitude : 21.26405185,21.26410595,21.26411143
Longitude : 86.48007046,86.48010835,86.48011638
file name : Image_16032024110240830.png
|
2024-03-16 11:02:40.913511 |
56 |
83370069 |
Repair of drainage channel |
50000 |
Repair of drainage channel1 |
Roof laid |
-
latitude : 21.25247613
Longitude : 86.49085937
file name : Image_10052024110248098.png
|
2024-05-10 11:02:48.169312 |
57 |
83370069 |
Repair of drainage channel |
50000 |
Repair of drainage channel1 |
Plinth level |
-
latitude : 21.25251605
Longitude : 86.49086224
file name : Image_10052024105731928.png
|
2024-05-10 10:57:32.002695 |
58 |
83370069 |
Repair of drainage channel |
50000 |
Repair of drainage channel1 |
Completion of work |
-
latitude : 21.25252801
Longitude : 86.49087955
file name : Image_10052024104206339.png
|
2024-05-10 10:42:06.40775 |
59 |
83358365 |
Construction of roads |
40000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.26862345,21.26861335
Longitude : 86.4999048,86.49991043
file name : Image_10052024123101907.png
|
2024-05-10 12:31:01.981123 |
60 |
83358365 |
Construction of roads |
40000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.2686306,21.26863058
Longitude : 86.49988892,86.49991125
file name : Image_10052024122532940.png
|
2024-05-10 12:25:33.017502 |
61 |
83358365 |
Construction of roads |
40000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.2678912,21.2678912
Longitude : 86.5004442,86.5004442
file name : Image_10052024121711657.png
|
2024-05-10 12:17:11.724909 |
62 |
83599156 |
Construction of roads |
121980 |
Construction of roads1 |
Roof laid |
-
latitude : 21.26841576,21.26835053
Longitude : 86.51154554,86.51162041
file name : Image_10052024132024546.png
|
2024-05-10 13:20:24.620397 |
63 |
83599156 |
Construction of roads |
121980 |
Construction of roads1 |
Plinth level |
-
latitude : 21.26840703,21.26838705
Longitude : 86.51155153,86.51155517
file name : Image_10052024130810034.png
|
2024-05-10 13:08:10.102274 |
64 |
83599156 |
Construction of roads |
121980 |
Construction of roads1 |
Completion of work |
-
latitude : 21.26842668,21.26840435
Longitude : 86.5115076,86.51153149
file name : Image_10052024124013031.png
|
2024-05-10 12:40:13.101502 |
65 |
83371217 |
Repair of drainage channel |
40000 |
Repair of drainage channel1 |
Roof laid |
-
latitude : 21.27218238
Longitude : 86.49912572
file name : Image_10052024121025990.png
|
2024-05-10 12:10:26.064907 |
66 |
83371217 |
Repair of drainage channel |
40000 |
Repair of drainage channel1 |
Plinth level |
-
latitude : 21.27215591
Longitude : 86.49911616
file name : Image_10052024120611054.png
|
2024-05-10 12:06:11.121982 |
67 |
83371217 |
Repair of drainage channel |
40000 |
Repair of drainage channel1 |
Completion of work |
-
latitude : 21.27220014
Longitude : 86.49911495
file name : Image_10052024115648431.png
|
2024-05-10 11:56:48.562256 |
68 |
83357708 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.269149,21.26914913
Longitude : 86.48763238,86.48763184
file name : Image_10052024113516968.png
|
2024-05-10 11:35:17.043635 |
69 |
83357708 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.26916431,21.26916428
Longitude : 86.48761352,86.48761341
file name : Image_10052024113027620.png
|
2024-05-10 11:30:27.701066 |
70 |
83357708 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.26913236,21.26914671,21.26914631
Longitude : 86.48757096,86.48758862,86.48758687
file name : Image_10052024112512558.png
|
2024-05-10 11:25:12.633475 |
71 |
83357708 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.26916806,21.26916744
Longitude : 86.48760176,86.48760139
file name : Image_10052024111502071.png
|
2024-05-10 11:15:02.142427 |
72 |
83564038 |
Operation and Maintenance of drinking water supply system |
150000 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 21.26865533
Longitude : 86.49914537
file name : Image_16032024122843452.png
|
2024-03-16 12:28:43.541011 |
73 |
83564038 |
Operation and Maintenance of drinking water supply system |
150000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 21.26862617
Longitude : 86.49911564
file name : Image_16032024122303958.png
|
2024-03-16 12:23:04.048947 |
74 |
83564038 |
Operation and Maintenance of drinking water supply system |
150000 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 21.26865636
Longitude : 86.49910369
file name : Image_16032024120447591.png
|
2024-03-16 12:04:47.676085 |
75 |
83564038 |
Operation and Maintenance of drinking water supply system |
150000 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 21.26863386
Longitude : 86.49912486
file name : Image_15032024163039224.png
|
2024-03-15 16:30:39.301426 |
76 |
83567894 |
Creation of a new source of drinking water |
48000 |
Creation of a new source of drinking water1 |
Roof laid |
-
latitude : 21.26864655
Longitude : 86.49914917
file name : Image_16032024122926747.png
|
2024-03-16 12:29:26.826732 |
77 |
83567894 |
Creation of a new source of drinking water |
48000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 21.26863426
Longitude : 86.4991188
file name : Image_16032024122356310.png
|
2024-03-16 12:23:56.400739 |
78 |
83567894 |
Creation of a new source of drinking water |
48000 |
Creation of a new source of drinking water1 |
Plinth level |
-
latitude : 21.26864084
Longitude : 86.49913546
file name : Image_16032024120602987.png
|
2024-03-16 12:06:03.077474 |
79 |
83567894 |
Creation of a new source of drinking water |
48000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 21.26864677
Longitude : 86.49912731
file name : Image_15032024163221886.png
|
2024-03-15 16:32:21.96675 |
80 |
83567894 |
Creation of a new source of drinking water |
48000 |
Creation of a new source of drinking water1 |
Completion of work |
-
latitude : 21.26864922
Longitude : 86.49911766
file name : Image_15032024163215673.png
|
2024-03-15 16:32:15.750142 |
81 |
98649345 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.26393151,21.26389326
Longitude : 86.48010025,86.48007047
file name : Image_21032024124902627.png
|
2024-03-21 12:49:02.724269 |
82 |
98649345 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.26398394,21.26389296
Longitude : 86.48006492,86.48012424
file name : Image_21032024124116813.png
|
2024-03-21 12:41:16.888692 |
83 |
98649345 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.26388114,21.26387087,21.26386966
Longitude : 86.48007162,86.48009475,86.48009825
file name : Image_21032024122314480.png
|
2024-03-21 12:23:14.811062 |
84 |
101995693 |
Purchase of equipment (including safety equipment) for waste management |
10000 |
Purchase of equipment (including safety equipment) for waste management1 |
Plinth level |
-
latitude : 21.26867876
Longitude : 86.49919124
file name : Image_24092024131418951.png
|
2024-09-24 13:14:19.017811 |
85 |
101995693 |
Purchase of equipment (including safety equipment) for waste management |
10000 |
Purchase of equipment (including safety equipment) for waste management1 |
Completion of work |
-
latitude : 21.26867479
Longitude : 86.49917398
file name : Image_24092024125745834.png
|
2024-09-24 12:57:45.906504 |
86 |
83372741 |
Drainage Construction |
100000 |
Drainage Construction1 |
Roof laid |
-
latitude : 21.25813189
Longitude : 86.50215594
file name : Image_01082024112528213.png
|
2024-08-01 11:25:28.289276 |
87 |
83372741 |
Drainage Construction |
100000 |
Drainage Construction1 |
Plinth level |
-
latitude : 21.25818408
Longitude : 86.50211754
file name : Image_01082024111955004.png
|
2024-08-01 11:19:55.07163 |
88 |
83372741 |
Drainage Construction |
100000 |
Drainage Construction1 |
Completion of work |
-
latitude : 21.25810629
Longitude : 86.50217518
file name : Image_01082024110255185.png
|
2024-08-01 11:02:55.256782 |
89 |
83358856 |
Construction of roads |
100000 |
Construction of roads1 |
Roof laid |
-
latitude : 21.27030439,21.27029479
Longitude : 86.49657789,86.49657235
file name : Image_01082024141727507.png
|
2024-08-01 14:17:27.571456 |
90 |
83358856 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.27031267,21.27031688
Longitude : 86.4967125,86.49660884
file name : Image_01082024140403948.png
|
2024-08-01 14:04:04.060544 |
91 |
83358856 |
Construction of roads |
100000 |
Construction of roads1 |
Plinth level |
-
latitude : 21.27029771,21.27029309,21.27029053
Longitude : 86.49661069,86.49659949,86.49659733
file name : Image_01082024140806813.png
|
2024-08-01 14:08:06.890996 |
92 |
83358856 |
Construction of roads |
100000 |
Construction of roads1 |
Completion of work |
-
latitude : 21.27028033,21.27028031
Longitude : 86.49654847,86.49654872
file name : Image_01082024135548492.png
|
2024-08-01 13:55:48.554803 |
93 |
102037468 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets |
170000 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets1 |
Roof laid |
-
latitude : 21.26109499
Longitude : 86.50278426
file name : Image_01082024115149464.png
|
2024-08-01 11:51:49.580428 |
94 |
102037468 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets |
170000 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets1 |
Plinth level |
-
latitude : 21.26112735
Longitude : 86.5028228
file name : Image_01082024114525403.png
|
2024-08-01 11:45:25.479335 |
95 |
102037468 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets |
170000 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets1 |
Completion of work |
-
latitude : 21.26110415
Longitude : 86.50279144
file name : Image_01082024113642031.png
|
2024-08-01 11:36:42.123816 |