1 |
44399100 |
CONST OF RURAL BATHING COMPLEX WITH WATER SUPPLY AT JAMJODI AND JABAGUDA |
300000 |
CONST OF RURAL BATHING COMPLEX WITH WATER SUPPLY AT JAMJODI AND JABAGUDA1 |
Completion of work |
-
latitude : 19.800383406691253
Longitude : 83.48641508258879
file name : Image_28122020133619719.png
|
2020-12-28 13:36:19.842797 |
2 |
44399100 |
CONST OF RURAL BATHING COMPLEX WITH WATER SUPPLY AT JAMJODI AND JABAGUDA |
300000 |
CONST OF RURAL BATHING COMPLEX WITH WATER SUPPLY AT JAMJODI AND JABAGUDA1 |
Completion of work |
-
latitude : 19.803642206825316
Longitude : 83.52227387018502
file name : Image_04052021112317810.png
|
2021-05-04 11:23:17.91151 |
3 |
44399211 |
INSTALLATION OF SOLAR DUAL PUMP AT BADAPANGADI |
285000 |
INSTALLATION OF SOLAR DUAL PUMP AT BADAPANGADI1 |
Completion of work |
-
latitude : 19.76303569972515
Longitude : 83.5033155977726
file name : Image_12052021093254930.png
|
2021-05-12 09:32:55.026717 |
4 |
44399034 |
CONST OF TUBE WELL PLATFORM 4 NOS |
40000 |
CONST OF TUBE WELL PLATFORM 4 NOS 1 |
Completion of work |
-
latitude : 19.7889556,19.7889556,19.7889556
Longitude : 83.5024595,83.5024595,83.5024595
file name : Image_24062021122027194.png
|
2021-06-24 12:20:27.273427 |
5 |
44398379 |
COSNT OF DINING HALL AT BIRIPADA PRY SCHOOL |
210000 |
COSNT OF DINING HALL AT BIRIPADA PRY SCHOOL1 |
Completion of work |
-
latitude : 19.792033354751766
Longitude : 83.49065699614584
file name : Image_09012022122856536.png
|
2022-01-09 12:28:56.614441 |
6 |
44398182 |
INSTALLATION OF SOLAR STREET LIGHT AT GIRINGILI |
120000 |
INSTALLATION OF SOLAR STREET LIGHT AT GIRINGILI1 |
Completion of work |
-
latitude : 19.79195410385728
Longitude : 83.49277518689632
file name : Image_08072021194700682.png
|
2021-07-08 19:47:00.786221 |
7 |
44398593 |
REPAIR OF AWC GHAMATGUDA |
100000 |
REPAIR OF AWC GHAMATGUDA1 |
Completion of work |
-
latitude : 19.791371813043952
Longitude : 83.5073768813163
file name : Image_08072021194720553.png
|
2021-07-08 19:47:20.648334 |
8 |
44398593 |
REPAIR OF AWC GHAMATGUDA |
100000 |
REPAIR OF AWC GHAMATGUDA1 |
Completion of work |
-
latitude : 19.791371813043952
Longitude : 83.5073768813163
file name : Image_08072021194736790.png
|
2021-07-08 19:47:36.884188 |
9 |
44398804 |
CONST OF ROAD FROM TURUKUPA TO PANJABALI |
40350 |
CONST OF ROAD FROM TURUKUPA TO PANJABALI1 |
Completion of work |
-
latitude : 19.799921857193112,19.799921857193112
Longitude : 83.47728442400694,83.47728442400694
file name : Image_15012022145901559.png
|
2022-01-15 14:59:01.702715 |
10 |
44398839 |
IMP OF ROAD FROM ROTEDI TO BADAPANGADI |
20000 |
IMP OF ROAD FROM ROTEDI TO BADAPANGADI1 |
Completion of work |
-
latitude : 19.848533920012414,19.848499302752316,19.848499302752316
Longitude : 83.46427872776985,83.46423882991076,83.46423882991076
file name : Image_20012022080029773.png
|
2022-01-20 08:00:29.854073 |
11 |
44399308 |
JALACHATRA IN SUMMER |
100000 |
JALACHATRA IN SUMMER1 |
Completion of work |
-
latitude : 19.78908590041101
Longitude : 83.50250196643174
file name : Image_08092021132137613.png
|
2021-09-08 13:21:37.689595 |
12 |
47801643 |
INSTALLATION OF SOLAR STRRET LIGHT AT KANIBORI |
103844 |
INSTALLATION OF SOLAR STRRET LIGHT AT KANIBORI1 |
Completion of work |
-
latitude : 19.804981299676
Longitude : 83.50493079051375
file name : Image_10122021132723474.png
|
2021-12-10 13:27:23.57308 |
13 |
47799539 |
INSTALLATION OF SOLAR STREET LIGHT AT CHICHANGBORI |
200000 |
INSTALLATION OF SOLAR STREET LIGHT AT CHICHANGBORI1 |
Completion of work |
-
latitude : 19.775449172593653
Longitude : 83.51100725121796
file name : Image_10122021132735065.png
|
2021-12-10 13:27:35.160319 |
14 |
47799539 |
INSTALLATION OF SOLAR STREET LIGHT AT CHICHANGBORI |
200000 |
INSTALLATION OF SOLAR STREET LIGHT AT CHICHANGBORI1 |
Completion of work |
-
latitude : 19.775449172593653
Longitude : 83.51100725121796
file name : Image_10122021132752978.png
|
2021-12-10 13:27:53.04391 |
15 |
47792622 |
SOLAR STREET LIGHT AT SANA PANGADI |
104350 |
SOLAR STREET LIGHT AT SANA PANGADI 1 |
Completion of work |
-
latitude : 19.763707760721445
Longitude : 83.49644134752452
file name : Image_10122021132739918.png
|
2021-12-10 13:27:39.987414 |
16 |
47792622 |
SOLAR STREET LIGHT AT SANA PANGADI |
104350 |
SOLAR STREET LIGHT AT SANA PANGADI 1 |
Completion of work |
-
latitude : 19.763707760721445
Longitude : 83.49644134752452
file name : Image_10122021132757727.png
|
2021-12-10 13:27:57.805482 |
17 |
47792257 |
SOLAR STREET LIGHT AT BADAPANGADI |
100000 |
SOLAR STREET LIGHT AT BADAPANGADI1 |
Completion of work |
-
latitude : 19.77604361716658
Longitude : 83.51054415106773
file name : Image_10122021132729575.png
|
2021-12-10 13:27:29.654323 |
18 |
47792257 |
SOLAR STREET LIGHT AT BADAPANGADI |
100000 |
SOLAR STREET LIGHT AT BADAPANGADI1 |
Completion of work |
-
latitude : 19.77604361716658
Longitude : 83.51054415106773
file name : Image_10122021132745638.png
|
2021-12-10 13:27:45.704226 |
19 |
47796109 |
ENERGY CHARGES OF PWS |
100000 |
ENERGY CHARGES OF PWS1 |
Completion of work |
-
latitude : 19.789049020037055
Longitude : 83.50152329541743
file name : Image_09012022122852941.png
|
2022-01-09 12:28:53.018329 |
20 |
47789683 |
REPAIR PRY.SCHOOL AT ROTEDI |
150000 |
REPAIR PRY.SCHOOL AT ROTEDI 1 |
Completion of work |
-
latitude : 19.62375202216208
Longitude : 83.49496152251959
file name : Image_10062022175627366.png
|
2022-06-10 17:56:27.449883 |
21 |
47789683 |
REPAIR PRY.SCHOOL AT ROTEDI |
150000 |
REPAIR PRY.SCHOOL AT ROTEDI 1 |
Completion of work |
-
latitude : 19.62375202216208
Longitude : 83.49496152251959
file name : Image_10062022175603071.png
|
2022-06-10 17:56:03.154355 |
22 |
44398634 |
REPAIR OF PRIMARY SCHOOL CHICHANGBORI |
100000 |
REPAIR OF PRIMARY SCHOOL CHICHANGBORI1 |
Completion of work |
-
latitude : 19.77667280472815
Longitude : 83.50920195691288
file name : Image_04022022174548820.png
|
2022-02-04 17:45:48.915254 |
23 |
47800674 |
CONST. OF DRAIN AT PANJABALI |
100000 |
CONST. OF DRAIN AT PANJABALI1 |
Completion of work |
-
latitude : 19.789364808239043
Longitude : 83.50229979492724
file name : Image_12032022130152438.png
|
2022-03-12 13:01:52.521671 |
24 |
57001119 |
REPAIR & MAINTENANCE OF PRIMATY SCHOOL KERANDI & AWC GIRINGILI |
60000 |
REPAIR & MAINTENANCE OF PRIMATY SCHOOL KERANDI & AWC GIRINGILI1 |
Completion of work |
-
latitude : 19.623400820419192
Longitude : 83.49503561854362
file name : Image_10062022175622537.png
|
2022-06-10 17:56:22.616293 |
25 |
57001119 |
REPAIR & MAINTENANCE OF PRIMATY SCHOOL KERANDI & AWC GIRINGILI |
60000 |
REPAIR & MAINTENANCE OF PRIMATY SCHOOL KERANDI & AWC GIRINGILI1 |
Completion of work |
-
latitude : 19.623400820419192
Longitude : 83.49503561854362
file name : Image_10062022175557182.png
|
2022-06-10 17:55:57.265257 |
26 |
57000481 |
CONSTRUCTION OF COMMUNITY CENTRE AR BADAPANGADI |
200000 |
CONSTRUCTION OF COMMUNITY CENTRE AR BADAPANGADI1 |
Completion of work |
-
latitude : 19.623801433481276
Longitude : 83.49490058608353
file name : Image_10062022175548048.png
|
2022-06-10 17:55:48.130298 |
27 |
47790803 |
CONST.OF SOCIAL & CULTURAL BUILDING AT KATABADI |
150000 |
CONST.OF SOCIAL & CULTURAL BUILDING AT KATABADI1 |
Completion of work |
-
latitude : 19.623993085697293
Longitude : 83.49497769959271
file name : Image_10062022175608613.png
|
2022-06-10 17:56:08.696636 |
28 |
47795597 |
JALA CHHATRA AT SUMMER |
100000 |
JALA CHHATRA AT SUMMER1 |
Completion of work |
-
latitude : 19.789181957021356
Longitude : 83.50240549072623
file name : Image_30072022084719788.png
|
2022-07-30 08:47:19.880404 |
29 |
47795017 |
INSTALLATION OF SOLAR DUEL PUMP AT KERANDI |
300000 |
INSTALLATION OF SOLAR DUEL PUMP AT KERANDI1 |
Completion of work |
-
latitude : 19.798346855677664
Longitude : 83.50892661139369
file name : Image_21082022111516750.png
|
2022-08-21 11:15:16.820277 |
30 |
65716506 |
INSTALLATION OF STREET LIGHT AT KATHABADI |
99000 |
INSTALLATION OF STREET LIGHT AT KATHABADI1 |
Completion of work |
-
latitude : 19.623132389970124
Longitude : 83.49473261274397
file name : Image_11022023122858395.png
|
2023-02-11 12:28:58.455608 |
31 |
65716524 |
INSTALLATION OF STRRET LIGHT AT JAMJODI |
99000 |
INSTALLATION OF STRRET LIGHT AT JAMJODI1 |
Completion of work |
-
latitude : 19.623166085220873
Longitude : 83.49471962079406
file name : Image_11022023122902264.png
|
2023-02-11 12:29:02.324228 |
32 |
47788048 |
COMPLITION OF INCOMPLITE SCHOOL BULIDING AT GHAMATGUDA |
150000 |
COMPLITION OF INCOMPLITE SCHOOL BULIDING AT GHAMATGUDA1 |
Completion of work |
-
latitude : 19.78832679335028
Longitude : 83.50633853115141
file name : Image_13032023202421389.png
|
2023-03-13 20:24:21.453818 |
33 |
65716305 |
PURCHASE OF FURNITURE AND LED TV FOR VC AT GHAMATGUDA GP |
100000 |
PURCHASE OF FURNITURE AND LED TV FOR VC AT GHAMATGUDA GP1 |
Completion of work |
-
latitude : 19.82846642844379
Longitude : 83.45946055836976
file name : Image_10022023094406527.png
|
2023-02-10 09:44:06.616745 |
34 |
65716305 |
PURCHASE OF FURNITURE AND LED TV FOR VC AT GHAMATGUDA GP |
100000 |
PURCHASE OF FURNITURE AND LED TV FOR VC AT GHAMATGUDA GP1 |
Completion of work |
-
latitude : 19.6231818
Longitude : 83.4948785
file name : Image_05062023123058903.png
|
2023-06-05 12:30:59.004637 |
35 |
65716543 |
CONST OF BOUNDARY AT KANIBORI |
150000 |
CONST OF BOUNDARY AT KANIBORI1 |
Completion of work |
-
latitude : 19.83356560114771
Longitude : 83.45448346808553
file name : Image_16062023094221812.png
|
2023-06-16 09:42:21.983492 |
36 |
47794443 |
INSTALLATION OF SOLAR DUEL PUMP AT PANJABALI |
300000 |
INSTALLATION OF SOLAR DUEL PUMP AT PANJABALI1 |
Completion of work |
-
latitude : 19.8282541
Longitude : 83.4593315
file name : Image_19072023124945434.png
|
2023-07-19 12:49:45.557573 |
37 |
60533121 |
CFC/TIED/INSTALLATION OF SOLAR DUAK PUMP AT CHICHANGBORI |
300000 |
CFC/TIED/INSTALLATION OF SOLAR DUAK PUMP AT CHICHANGBORI1 |
Completion of work |
-
latitude : 19.834415609948337
Longitude : 83.45646855421364
file name : Image_01082023092351985.png
|
2023-08-01 09:23:52.079936 |
38 |
60533086 |
CFC/TIED/JALACHATRA IN SUMMER |
100000 |
CFC/TIED/JALACHATRA IN SUMMER1 |
Completion of work |
-
latitude : 19.6231802
Longitude : 83.4948367
file name : Image_03082023105439810.png
|
2023-08-03 10:54:39.889259 |
39 |
60533219 |
CFC/UNTIED/CONST. OF DRAIN AT JABAGUDA |
200000 |
CFC/UNTIED/CONST. OF DRAIN AT JABAGUDA1 |
Completion of work |
-
latitude : 19.6231393,19.6231393
Longitude : 83.4947816,83.4947816
file name : Image_03092024123513387.png
|
2024-09-03 12:35:13.478883 |
40 |
82601406 |
Water Supply to villages |
36000 |
Water Supply to villages1 |
|
-
latitude : 19.8282532
Longitude : 83.4593266
file name : Image_01122023111701530.png
|
2023-12-01 11:17:01.664295 |
41 |
75926045 |
Drainage Construction |
80000 |
Drainage Construction1 |
Roof laid |
-
latitude : 19.79651059024036
Longitude : 83.51342383772135
file name : Image_04012024122524757.png
|
2024-01-04 12:25:24.848649 |
42 |
75926045 |
Drainage Construction |
80000 |
Drainage Construction1 |
Plinth level |
-
latitude : 19.796470147557557
Longitude : 83.5134036373347
file name : Image_04012024121906136.png
|
2024-01-04 12:19:06.220502 |
43 |
75926045 |
Drainage Construction |
80000 |
Drainage Construction1 |
Completion of work |
-
latitude : 19.796439888887107
Longitude : 83.51340338587761
file name : Image_04012024120539640.png
|
2024-01-04 12:05:39.744239 |
44 |
75923718 |
Drainage Construction |
50000 |
Drainage Construction1 |
Roof laid |
-
latitude : 19.6228439
Longitude : 83.5014853
file name : Image_11012024131459415.png
|
2024-01-11 13:14:59.49705 |
45 |
75923718 |
Drainage Construction |
50000 |
Drainage Construction1 |
Plinth level |
-
latitude : 19.6229381
Longitude : 83.5014649
file name : Image_11012024130741383.png
|
2024-01-11 13:07:41.592578 |
46 |
75923718 |
Drainage Construction |
50000 |
Drainage Construction1 |
Completion of work |
-
latitude : 19.6228407
Longitude : 83.5014842
file name : Image_11012024130008571.png
|
2024-01-11 13:00:08.653019 |
47 |
75923173 |
Drainage Construction |
100000 |
Drainage Construction1 |
Roof laid |
-
latitude : 19.6229205
Longitude : 83.5014624
file name : Image_11012024134058994.png
|
2024-01-11 13:40:59.128354 |
48 |
75923173 |
Drainage Construction |
100000 |
Drainage Construction1 |
Plinth level |
-
latitude : 19.6227946
Longitude : 83.5014643
file name : Image_11012024133513655.png
|
2024-01-11 13:35:13.729519 |
49 |
75923173 |
Drainage Construction |
100000 |
Drainage Construction1 |
Completion of work |
-
latitude : 19.6229076
Longitude : 83.5014793
file name : Image_11012024132721885.png
|
2024-01-11 13:27:21.960622 |
50 |
81433355 |
Operation and Maintenance of drinking water supply system |
36060 |
Operation and Maintenance of drinking water supply system1 |
Roof laid |
-
latitude : 19.8282532
Longitude : 83.4593289
file name : Image_28112023131342676.png
|
2023-11-28 13:13:42.835007 |
51 |
81433355 |
Operation and Maintenance of drinking water supply system |
36060 |
Operation and Maintenance of drinking water supply system1 |
Plinth level |
-
latitude : 19.8282534
Longitude : 83.45933
file name : Image_28112023130830588.png
|
2023-11-28 13:08:30.720616 |
52 |
81433355 |
Operation and Maintenance of drinking water supply system |
36060 |
Operation and Maintenance of drinking water supply system1 |
Completion of work |
-
latitude : 19.8286213260144
Longitude : 83.45922762528062
file name : Image_28112023125858492.png
|
2023-11-28 12:58:58.62413 |
53 |
75925734 |
Construction of Boundary Wall |
100000 |
Construction of Boundary Wall1 |
Roof laid |
-
latitude : 19.623175
Longitude : 83.4947904
file name : Image_19022024130326114.png
|
2024-02-19 13:03:26.197867 |
54 |
75925734 |
Construction of Boundary Wall |
100000 |
Construction of Boundary Wall1 |
Plinth level |
-
latitude : 19.6231704
Longitude : 83.494799
file name : Image_19022024125731794.png
|
2024-02-19 12:57:31.878244 |
55 |
75925734 |
Construction of Boundary Wall |
100000 |
Construction of Boundary Wall1 |
Completion of work |
-
latitude : 19.623172
Longitude : 83.494799
file name : Image_19022024124959852.png
|
2024-02-19 12:49:59.950844 |
56 |
82602611 |
Water Supply to villages |
100000 |
Water Supply to villages1 |
|
-
latitude : 19.8282532
Longitude : 83.4593266
file name : Image_20122023173057894.png
|
2023-12-20 17:30:58.026817 |
57 |
60533210 |
CFC/UNTIED/INFRASTRUCTURE OF GP OFFICE |
250000 |
CFC/UNTIED/INFRASTRUCTURE OF GP OFFICE1 |
Completion of work |
-
latitude : 19.6231652
Longitude : 83.4948012
file name : Image_27022024163717217.png
|
2024-02-27 16:37:17.314412 |
58 |
60533250 |
SFC/CONST. OF COMMUNITY CENTER AT KUSUMGUDA |
150000 |
SFC/CONST. OF COMMUNITY CENTER AT KUSUMGUDA1 |
Completion of work |
-
latitude : 19.6229449
Longitude : 83.4949759
file name : Image_15032024185143877.png
|
2024-03-15 18:51:43.958097 |
59 |
75924347 |
Construction of Building |
303844 |
Construction of Building1 |
Roof laid |
-
latitude : 19.6231381
Longitude : 83.4948118
file name : Image_19032024111711822.png
|
2024-03-19 11:17:11.90433 |
60 |
75924347 |
Construction of Building |
303844 |
Construction of Building1 |
Plinth level |
-
latitude : 19.6231365
Longitude : 83.4948064
file name : Image_19032024111152502.png
|
2024-03-19 11:11:52.576676 |
61 |
75924347 |
Construction of Building |
303844 |
Construction of Building1 |
Completion of work |
-
latitude : 19.6231395
Longitude : 83.4948111
file name : Image_19032024110719412.png
|
2024-03-19 11:07:19.492771 |
62 |
75924347 |
Construction of Building |
303844 |
Construction of Building1 |
Completion of work |
-
latitude : 19.6231467
Longitude : 83.4947956
file name : Image_16032024175603650.png
|
2024-03-16 17:56:03.739874 |
63 |
75867689 |
Repair of pipe drinking water |
60000 |
Repair of pipe drinking water1 |
Roof laid |
-
latitude : 19.6231371
Longitude : 83.4948047
file name : Image_19032024114136171.png
|
2024-03-19 11:41:36.255973 |
64 |
75867689 |
Repair of pipe drinking water |
60000 |
Repair of pipe drinking water1 |
Plinth level |
-
latitude : 19.6231396
Longitude : 83.494811
file name : Image_19032024113802967.png
|
2024-03-19 11:38:03.050209 |
65 |
75867689 |
Repair of pipe drinking water |
60000 |
Repair of pipe drinking water1 |
Completion of work |
-
latitude : 19.6231364
Longitude : 83.4948114
file name : Image_19032024113230188.png
|
2024-03-19 11:32:30.290761 |
66 |
75918289 |
Drainage Construction |
200000 |
Drainage Construction1 |
Roof laid |
-
latitude : 19.833756666666666
Longitude : 83.454725
file name : Image_07062024075541833.png
|
2024-06-07 07:55:39.069015 |
67 |
75918289 |
Drainage Construction |
200000 |
Drainage Construction1 |
Plinth level |
-
latitude : 19.833801666666666
Longitude : 83.45467666666667
file name : Image_07062024074851830.png
|
2024-06-07 07:48:51.90182 |
68 |
75918289 |
Drainage Construction |
200000 |
Drainage Construction1 |
Completion of work |
-
latitude : 19.833743333333334
Longitude : 83.45469833333333
file name : Image_07062024073544332.png
|
2024-06-07 07:35:44.407212 |
69 |
60533292 |
SFC/CONST. OF BOUNDARY WALL AT AWC LABAGUDA |
100000 |
SFC/CONST. OF BOUNDARY WALL AT AWC LABAGUDA1 |
Completion of work |
-
latitude : 19.833495000000003
Longitude : 83.45468333333335
file name : Image_07062024081223043.png
|
2024-06-07 08:12:23.128744 |
70 |
60533107 |
CFC/TIED/MAINTENANCE OF PWS |
100000 |
CFC/TIED/MAINTENANCE OF PWS1 |
Completion of work |
-
latitude : 19.833548333333333
Longitude : 83.45461833333333
file name : Image_19092024170359129.png
|
2024-09-19 17:03:59.211395 |
71 |
60533275 |
SFC/CONST. OF STEPS AT ROTODI SANONADI GHAT |
150000 |
SFC/CONST. OF STEPS AT ROTODI SANONADI GHAT1 |
Completion of work |
-
latitude : 19.6231429
Longitude : 83.4947841
file name : Image_28092024152111416.png
|
2024-09-28 15:21:11.499444 |
72 |
75870361 |
Creation of Shed for segregation and processing of wet and dry waste |
90000 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Roof laid |
-
latitude : 19.623143
Longitude : 83.494784
file name : Image_28092024152941752.png
|
2024-09-28 15:29:41.817439 |
73 |
75870361 |
Creation of Shed for segregation and processing of wet and dry waste |
90000 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Plinth level |
-
latitude : 19.6231556
Longitude : 83.4947774
file name : Image_28092024152645098.png
|
2024-09-28 15:26:45.186383 |
74 |
75870361 |
Creation of Shed for segregation and processing of wet and dry waste |
90000 |
Creation of Shed for segregation and processing of wet and dry waste1 |
Completion of work |
-
latitude : 19.6231431
Longitude : 83.4947836
file name : Image_28092024152315198.png
|
2024-09-28 15:23:15.276619 |
75 |
82527957 |
Drainage Construction |
100000 |
Drainage Construction1 |
Roof laid |
-
latitude : 19.6231505
Longitude : 83.494779
file name : Image_16072024113516422.png
|
2024-07-16 11:35:16.50331 |
76 |
82527957 |
Drainage Construction |
100000 |
Drainage Construction1 |
Plinth level |
-
latitude : 19.6233793
Longitude : 83.4949879
file name : Image_16072024113043655.png
|
2024-07-16 11:30:43.773351 |
77 |
82527957 |
Drainage Construction |
100000 |
Drainage Construction1 |
Completion of work |
-
latitude : 19.62316333333333
Longitude : 83.49484833333332
file name : Image_16072024112318785.png
|
2024-07-16 11:23:18.871766 |
78 |
75593783 |
Pipe water supply to village health centre |
80000 |
Pipe water supply to village health centre1 |
Roof laid |
-
latitude : 19.6231468
Longitude : 83.4947773
file name : Image_16072024111653971.png
|
2024-07-16 11:16:54.060679 |
79 |
75593783 |
Pipe water supply to village health centre |
80000 |
Pipe water supply to village health centre1 |
Plinth level |
-
latitude : 19.6231466
Longitude : 83.494779
file name : Image_16072024111009166.png
|
2024-07-16 11:10:09.263703 |
80 |
75593783 |
Pipe water supply to village health centre |
80000 |
Pipe water supply to village health centre1 |
Completion of work |
-
latitude : 19.623151
Longitude : 83.4947779
file name : Image_16072024110551083.png
|
2024-07-16 11:05:51.175998 |
81 |
75593783 |
Pipe water supply to village health centre |
80000 |
Pipe water supply to village health centre1 |
Completion of work |
-
latitude : 19.623147
Longitude : 83.4947769
file name : Image_16072024110311959.png
|
2024-07-16 11:03:12.04678 |
82 |
75741654 |
Repair of drainage channel |
100000 |
Repair of drainage channel1 |
Roof laid |
-
latitude : 19.623143
Longitude : 83.4947753
file name : Image_31072024155446870.png
|
2024-07-31 15:54:46.996208 |
83 |
75741654 |
Repair of drainage channel |
100000 |
Repair of drainage channel1 |
Plinth level |
-
latitude : 19.6231426
Longitude : 83.4947759
file name : Image_31072024155128606.png
|
2024-07-31 15:51:28.694991 |
84 |
75741654 |
Repair of drainage channel |
100000 |
Repair of drainage channel1 |
Completion of work |
-
latitude : 19.6231427
Longitude : 83.4947752
file name : Image_31072024154217051.png
|
2024-07-31 15:42:17.138801 |
85 |
60533232 |
SFC/CONST. OF BOUNDARY WALL AT AWC GIRINGILI |
150000 |
SFC/CONST. OF BOUNDARY WALL AT AWC GIRINGILI1 |
Completion of work |
-
latitude : 19.6231478
Longitude : 83.4947727
file name : Image_16082024171516340.png
|
2024-08-16 17:15:16.428621 |
86 |
75921965 |
Construction of community washing & bathing complex |
70000 |
Construction of community washing & bathing complex1 |
Roof laid |
-
latitude : 19.62314
Longitude : 83.4947815
file name : Image_16082024172857197.png
|
2024-08-16 17:28:57.29612 |
87 |
75921965 |
Construction of community washing & bathing complex |
70000 |
Construction of community washing & bathing complex1 |
Plinth level |
-
latitude : 19.6231393
Longitude : 83.4947816
file name : Image_16082024172302407.png
|
2024-08-16 17:23:02.536572 |
88 |
75921965 |
Construction of community washing & bathing complex |
70000 |
Construction of community washing & bathing complex1 |
Completion of work |
-
latitude : 19.6231399
Longitude : 83.4947816
file name : Image_16082024171218262.png
|
2024-08-16 17:12:18.34313 |
89 |
60533133 |
CFC/TIED/DRAIN CLEANING AT GP AREA |
56744 |
CFC/TIED/DRAIN CLEANING AT GP AREA1 |
Completion of work |
-
latitude : 19.62314,19.6231402
Longitude : 83.4947841,83.4947836
file name : Image_05112024170943200.png
|
2024-11-05 17:09:43.27857 |